fd 11 execute package - nasap h o t o ps ps sleep (8.5) s l v a iss cdr crew conf c r e w p h o t o...

22
STS-124/1J FD 11 Execute Package MSG Page(s) Title 093 1 - 16 FD11 Flight Plan Revision (pdf) 094 17 - 18 FD11 Mission Summary (pdf) 095 19 - 20 FD11 Transfer Message (pdf) 098 21 RPOP2 PGSC Transfer to ISS (pdf) 096 --- Stowage Locations for FD11 Plan (GMT 162) (pdf - Electronic Only) 097 --- ISS EVA Tool Stowage (pdf - Electronic Only) 099 --- FD11 PAO Event Summary - NBC News / KGO Radio, San Francisco, CA / FOX News Radio (pdf - Electronic Only) Approved by FAO: Jaime Marshik Last Updated: Jun 10 2008 5:47AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

Upload: others

Post on 16-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

STS-124/1J FD 11 Execute Package

MSG Page(s) Title 093 1 - 16 FD11 Flight Plan Revision (pdf) 094 17 - 18 FD11 Mission Summary (pdf) 095 19 - 20 FD11 Transfer Message (pdf) 098 21 RPOP2 PGSC Transfer to ISS (pdf) 096 --- Stowage Locations for FD11 Plan (GMT 162) (pdf - Electronic Only) 097 --- ISS EVA Tool Stowage (pdf - Electronic Only) 099 --- FD11 PAO Event Summary - NBC News / KGO Radio,

San Francisco, CA / FOX News Radio (pdf - Electronic Only)

Approved by FAO: Jaime Marshik Last Updated: Jun 10 2008 5:47AM GMT JEDI (Joint Execute package Development and Integration), v2.04.0003

Page 2: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

MSG 093 - FD11 FLIGHT PLAN REVISION

END OF PAGE 1 OF 16, MSG 093

1 MSG INDEX 2 3 MSG NO. TITLE 4 093 FD11 Flight Plan Revision 5 094 FD11 Mission Summary 6 095 FD11 Transfer Message 7 096 Stowage Locations for FD11 Plan (GMT 162) 8 097 ISS EVA Tool Stowage 9 098 RPOP 2 PGSC Transfer to ISS 10 099 FD11 PAO Event Summary – NBC News / KGO Radio / Fox News Radio 11 12 13 14 1. Post Sleep Cryo Config 15 16

For today's cryo config prior to the H2O dump maneuver, additional O2 tanks will be 17

activated to mitigate the effects of cryo tank destratification. Upon completion of the 18

maneuver, EGIL will provide steps real-time to reconfigure to the nominal cryo config. 19 20

R1 O2, H2 MANF VLV TK2 (two) - OP (tb-OP) 21

O2 TK3 HTR A - AUTO 22

23

A11 CRYO TK4 HTR O2 A – AUTO 24 25 26 2. FD10 MMT Summary 27 28 The FD10 MMT met briefly to discuss mission progress and the MMT is not working any 29 issues. The team thanks you for the great job on EVA 3 and both pairs of EVA gloves 30 have been cleared. Enjoy some well deserved time off tomorrow. 31 32 3. FD11 Photo/TV Cable Reminder 33

34 For hatch closure, all video and audio cables between the shuttle and the QD box should 35 be returned on Shuttle. 36

37 4. WLES Big Picture 38 39

After STS6 is transferred to ISS (per MSG098), WLES operations will be running in 40 single laptop mode on STS7. After undock and flyaround, STS5 (RPOP) will be 41 reconfigured as the WLES backup machine. WLES operations will terminate prior to 42 PILOT OPS on FD14. 43

44 5. Middeck Handheld Microphone Replacement 45 46

To troubleshoot the Middeck Hand Held Microphone (HHM) fault which occurred last 47 night, please swap out the flaky HHM with a spare stowed in MF28K or MF57O. Once 48 the swap is complete, please perform a comm check on A/G #2 and provide the serial 49 number of the new unit. If successful, this will confirm a good Middeck ATU. 50

Page 1

Page 3: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

MSG 093 - FD11 FLIGHT PLAN REVISION

END OF PAGE 2 OF 16, MSG 093

1 6. EVA Stowage Notes 2 3

For today's planned shuttle EVA Stow activity scheduled for 9/17:40 MET (14:42 GMT), 4 please refer to MSG 088 (17-0385). If you get ahead on your timeline, you can help the 5 station folks out with the ISS EVA Tools Stowage post 1J, refer to MSG 097 (17-0391). 6

7 8 7. Middeck Duct Transfer & Stowage 9 10

You will be tearing down the Middeck Duct today during Hatch Closure and transferring 11 the duct to ISS for stowage in the PMA. In JNT OPS: 4.102 SHUTTLE/ISS DUCT 12 REMOVAL AND HATCH CLOSING Step 7 on p. 199, transfer the Middeck duct to 13 PMA 2 per Transfer List Item 805. 14

15 16 8. Dump Equipment Pregather 17 18

In preparation for the CWC dump, gather the WWD filter and Y-Y hose, which were used 19 for the FD8 dump. Also, gather Shuttle Condensate CWC S/N 5051, which was temp 20 stowed FD10. 21

22 23 9. Simo Supply/Waste H2O Dump 24

25 Supply and waste water will be dumped simultaneously. Once the waste dump is 26 complete, Shuttle Condensate CWC S/N 5051 will be dumped through the waste line. 27

28 Prior to opening either dump valve, verify with MCC-H in proper dump attitude. 29

30 Perform a simo supply/waste water dump using SUPPLY/WASTE WATER DUMP (ORB 31 OPS, ECLS) p. 5-2. MCC will TMBU limits in steps B and K. 32

33 The supply water dump will be 50 minutes. 34

35 Dump the waste tank to 5%. Waste dump nozzle open time will be ~20 minutes. 36 After step I-3 (dump termination), proceed directly to CWC OVERBOARD DUMP (see 37 item 10 below). 38

39 10. Condensate CWC Dump 40 41

Perform CWC OVERBOARD DUMP (ORB OPS, ECLS) to dump Shuttle Condensate 42 CWC S/N 5051. Begin with Step A then go to Step D. DO NOT initiate the CWC dump 43 until a waste nozzle bakeout to 250 is accomplished. Step C (Heater Activation) is not 44 required; the heater was left on after the Waste Water Dump. MCC will TMBU limits. 45

46 Waste dump nozzle open time will be ~60 minutes. Stow CWC S/N 5051 for entry in 47 Middeck Floor Port 2 (Bag B). 48

49 50 51

Page 2

Page 4: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

MSG 093 - FD11 FLIGHT PLAN REVISION

END OF PAGE 3 OF 16, MSG 093

11. Question for Aki, Karen 1 2

The restow location for the MRK Portable Fan Assy (Qty 2, P/N SEG11100291-703) was 3 not listed in the FD10 Stowage Note for JLP INGRESS. If you have not done so already, 4 please stow them with the other restow items listed in the stowage note for this task in 5 JEM Bag 16 (B/C JBAG0016N). 6 7

12. Answer for Aki 8 9

DOUG on SSC 15 in the JPM. Turns out that that machine was not on the network 10 when the .ini files were updated. We sent up the new files, when you next start DOUG it 11 should start receiving data (PCS DAS). 12

13 14 13. Outlook Files 15 16

In preparation for Undock, please move all e-mails from your Sent Items, Inbox, and 17 Work Related (uplinked by CAPCOM) to your Personal (PST) folders. This will help 18 expedite Mail Syncs post-Undock when OCA is limited by the STS Ku bandwidth. 19

20 21 14. Imagery Cards 22 23

Since we've been taking advantage of ISS Ku for imagery downlinks, please place any 24 imagery cards you may have left for downlink into STS3/KFX or STS7/WLES. 25

26 27 15. REPLACE PAGES 2-36, 2-38, 2-40 and 3-114 THROUGH 3-123. 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Page 3

Page 5: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:13:52

FLT PLN/124/FLT

FD10

KELLY

HAM

NYBERG

GARAN

FOSSUM

HOSHIDE

VOLKOV

KONONENKO

CHAMITOFF

REISMAN

REPLANNED

2-36

S T S - 1 2 4 D N E X P 1 7 U P S T S

22

2306/10

0102

0304

0506

0708

09GMT 06/09/08 (161)

009/00

0102

0304

0506

0708

0910

1112

MET

Day 009

CDR

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

PMC

A/G

PRE SLEEP

PLT

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

MS1

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

L O G

MS2

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

L O G

MS3

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

MS4

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

FE-2

CREW

CONF

C R E W

P H O T O

PSPS

SLEEP (8.5)

S L V A

ISS CDR

CREW

CONF

C R E W

P H O T O

PSPS

SLEEP (8.5)

FE-1

CREW

CONF

C R E W

P H O T O

PSPS

SLEEP (8.5)

FE-2

CREW

CONF

C R E W

P H O T O

PSPS

D R YSLEEP (8.5)

ORBIT

143

144

145

146

147

148

149

150

DAY/NIGHT

TDRS

W -171

E -46

Z 275

BIAS -XLV -ZVV

ORB ATT

NOTES

2-36

FD10

KELLY

HAM

NYBERG

GARAN

FOSSUM

HOSHIDE

VOLKOV

KONONENKO

CHAMITOFF

REISMAN

REPLANNED

S T S - 1 2 4 D N E X P 1 7 U P S T S

22

2306/10

0102

0304

0506

0708

09GMT 06/09/08 (161)

009/00

0102

0304

0506

0708

0910

1112

MET

Day 009

CDR

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

PMC

A/G

PRE SLEEP

PLT

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

MS1

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

L O G

MS2

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

L O G

MS3

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

MS4

CREW

CONF

C R E W

P H O T O

SLEEP

PRE SLEEP

POST

SLEEP

FE-2

CREW

CONF

C R E W

P H O T O

PSPS

SLEEP (8.5)

S L V A

ISS CDR

CREW

CONF

C R E W

P H O T O

PSPS

SLEEP (8.5)

FE-1

CREW

CONF

C R E W

P H O T O

PSPS

SLEEP (8.5)

FE-2

CREW

CONF

C R E W

P H O T O

PSPS

D R YSLEEP (8.5)

ORBIT

143

144

145

146

147

148

149

150

DAY/NIGHT

TDRS

W -171

E -46

Z 275

ORB ATT

BIAS -XLV -ZVV

NOTES

Page 4

Page 6: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:13:52

FLT PLN/124/FLT

FD11

KELLY

HAM

NYBERG

GARAN

FOSSUM

HOSHIDE

VOLKOV

KONONENKO

CHAMITOFF

REISMAN

DUAL

COM

M TE

STS

REPLANNED

2-38

S T S - 1 2 4 D N E X P 1 7 U P S T S

10

1112

1314

1516

1718

1920

21GMT 06/10/08 (162)

12

1314

1516

1718

1920

2122

23010/00

MET

Day 009

CDR

S A Y O

ODS

LEAK

CHECK

N2 XFER

TERM

OFF DUTY

O2 SYS

TEARDOWN

X F E R

B R I E F

X F E R

T A G U P

HATCH

CLOSE

MEAL

X F E R

U P D T E

EXERCISE

POST SLEEP

B S A ^MDDK XFER

PLT

N A R A

RNDZ

TOOLS

C/O

OFF DUTY

FLTR CLN

- INSPECT

A T H O *

GAP

ACT

MEAL

A T H O *M N V R

M N V R

A T H O *

EXERCISE

POST SLEEP

S P L Y

T E R M

W S T #SIMO

INIT

C N D - T

MDDK

XFER

I M U

FCMS

OPS

MDDK

XFER

E Q U I P

MS1

S A Y O

RNDZ

TOOLS

C/O

EXERCISE

OFF DUTY

MEAL

BDS SETUP

POST SLEEP

HATCH

CLOSE

MS2

N A R AEXERCISE

OFF DUTY

EVA STOW

MEAL

POST SLEEP

PRE

SLEEP

MDDK XFER

PGSC

XFER

HATCH

CLOSE

MS3

S A Y O

P/TV 04 S/U

F M K

D P L Y

EXER

CISE

OFF DUTY

EVA STOW

MEAL

POST SLEEP

MDDK XFER

P T V 0 5

D E A C T

P / T V 8

P/TV08

EXTRNL

SURVEY

MS4

N A R A

ODS

LEAK

CHECK

EXERCISE

OFF DUTY

HATCH

CLOSE

MEAL

POST

SLEEP

BDS SETUP

POST SLEEP

FE-2

PSPW

DPC

HANDOVER

HANDOVER

HANDOVER

HANDOVER

CEVIS

RED

DCB

1J PACK

CGBA5

RMV

MEAL

P A O S U

P A O

E V E N T

S A Y OHATCH

CLOSE

ISS CDR

PSPW

PWPW

DPCВОЗД

MNT

CMS

ANLZ

МБИ-21-CDR-EXE

TVIS

MEAL

IMS

VELO + RED

E X E R

N A R AHATCH

CLOSE

FE-1

PSPS

PWPW

PWDPC

МБИ-21-FE1-EXE

КАБ SEARCH

N2 XFER

TERM

O2 SYS

TEARDOWN

TVIS

MEAL

И П - 1

M N TCEVIS

V T R S

S A Y OHATCH

CLOSE

FE-2

PSPW

PWDPC

HANDOVER

HANDOVER

HANDOVER

HANDOVER

S L V A

B L O O D

S / UJ R N L

CEVIS

B L O O D

D R A W

S U B J

DCB

1J PACK

S T O W

R W S

D C B

X F E RMEAL

P A O S U

P A O

E V E N T

N A R AHATCH

CLOSE

ORBIT

151

152

153

154

155

156

157

158

DAY/NIGHT

TDRS

W -171

E -46

Z 275

BIAS -XLV -ZVV

BIAS -XLV +YVV

BIAS -XLV -ZVV

ORB ATT

^RECHARGE TERM

*CMG TO STS

*CMG TO STS

*STS TO CMG

#WASTE TERM/COND INIT

NOTES

2-38

FD11

KELLY

HAM

NYBERG

GARAN

FOSSUM

HOSHIDE

VOLKOV

KONONENKO

CHAMITOFF

REISMAN

DUAL

COM

M TE

STS

REPLANNED

S T S - 1 2 4 D N E X P 1 7 U P S T S

10

1112

1314

1516

1718

1920

21GMT 06/10/08 (162)

12

1314

1516

1718

1920

2122

23010/00

MET

Day 009

CDR

S A Y O

ODS

LEAK

CHECK

N2 XFER

TERM

OFF DUTY

O2 SYS

TEARDOWN

X F E R

B R I E F

X F E R

T A G U P

HATCH

CLOSE

MEAL

X F E R

U P D T E

EXERCISE

POST SLEEP

B S A ^MDDK XFER

PLT

N A R A

RNDZ

TOOLS

C/O

OFF DUTY

FLTR CLN

- INSPECT

A T H O *

GAP

ACT

MEAL

A T H O *M N V R

M N V R

A T H O *

EXERCISE

POST SLEEP

S P L Y

T E R M

W S T #SIMO

INIT

C N D - T

MDDK

XFER

I M U

FCMS

OPS

MDDK

XFER

E Q U I P

MS1

S A Y O

RNDZ

TOOLS

C/O

EXERCISE

OFF DUTY

MEAL

BDS SETUP

POST SLEEP

HATCH

CLOSE

MS2

N A R AEXERCISE

OFF DUTY

EVA STOW

MEAL

POST SLEEP

PRE

SLEEP

MDDK XFER

PGSC

XFER

HATCH

CLOSE

MS3

S A Y O

P/TV 04 S/U

F M K

D P L Y

EXER

CISE

OFF DUTY

EVA STOW

MEAL

POST SLEEP

MDDK XFER

P T V 0 5

D E A C T

P / T V 8

P/TV08

EXTRNL

SURVEY

MS4

N A R A

ODS

LEAK

CHECK

EXERCISE

OFF DUTY

HATCH

CLOSE

MEAL

POST

SLEEP

BDS SETUP

POST SLEEP

FE-2

PSPW

DPC

HANDOVER

HANDOVER

HANDOVER

HANDOVER

CEVIS

RED

DCB

1J PACK

CGBA5

RMV

MEAL

P A O S U

P A O

E V E N T

S A Y OHATCH

CLOSE

ISS CDR

PSPW

PWPW

DPCВОЗД

MNT

CMS

ANLZ

МБИ-21-CDR-EXE

TVIS

MEAL

IMS

VELO + RED

E X E R

N A R AHATCH

CLOSE

FE-1

PSPS

PWPW

PWDPC

МБИ-21-FE1-EXE

КАБ SEARCH

N2 XFER

TERM

O2 SYS

TEARDOWN

TVIS

MEAL

И П - 1

M N TCEVIS

V T R S

S A Y OHATCH

CLOSE

FE-2

PSPW

PWDPC

HANDOVER

HANDOVER

HANDOVER

HANDOVER

S L V A

B L O O D

S / UJ R N L

CEVIS

B L O O D

D R A W

S U B J

DCB

1J PACK

S T O W

R W S

D C B

X F E RMEAL

P A O S U

P A O

E V E N T

N A R AHATCH

CLOSE

ORBIT

151

152

153

154

155

156

157

158

DAY/NIGHT

TDRS

W -171

E -46

Z 275

ORB ATT

BIAS -XLV -ZVV

BIAS -XLV +YVV

BIAS -XLV -ZVV

NOTES

^RECHARGE TERM

*CMG TO STS

*CMG TO STS

*STS TO CMG

#WASTE TERM/COND INIT

Page 5

Page 7: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:13:52

FLT PLN/124/FLT

FD11

KELLY

HAM

NYBERG

GARAN

FOSSUM

HOSHIDE

VOLKOV

KONONENKO

CHAMITOFF

REISMAN

REPLANNED

2-40

S T S - 1 2 4 E X P 1 7 S T S

22

2306/11

0102

0304

0506

0708

09GMT 06/10/08 (162)

010/00

0102

0304

0506

0708

0910

1112

MET

Day 010

CDR

POST SLEEP

ODS

LEAK

CHECK

PMC

A/G

PRE SLEEP

PRE SLEEP

SLEEP

N 2 - TB L E E D

PLT

POST SLEEP

RNDZ

TOOLS

C/O

PRE SLEEP

SLEEP

A T H O *O M S ^

MS1

POST SLEEP

RNDZ

TOOLS

C/O

PRE SLEEP

SLEEP

L O G

MS2

POST SLEEP

EMU

INST

PRE SLEEP

SLEEP

L O G

PRE

SLEEP

MS3

POST SLEEP

PRE SLEEP

EXER

CISE

SLEEP

EMU

INST

S L V A

MS4

POST SLEEP

ODS

LEAK

CHECK

SLEEP

PRE SLEEP

S L V A

MS5

POST SLEEP

S L V APRE SLEEP

SLEEP

ISS CDR

DPC

PSPS

PSPMC

SLEEP (8.5)

FE-1

DPC

PSPS

PSPS

PMC

♣SLEEP (8.5)

FE-2

DPCPS

PSPS

PMC

SLEEP (8.5)

ORBIT

159

160

161

162

163

164

165

166

DAY/NIGHT

TDRS

W -171

E -46

Z 275

BIAS -XLV -ZVV

ORB ATT

♣МБИ-12-EXP-INIT

⊕МБИ12 DCNCT

*STS TO CMG

^I'CNCT RETURN

NOTES

2-40

FD11

KELLY

HAM

NYBERG

GARAN

FOSSUM

HOSHIDE

VOLKOV

KONONENKO

CHAMITOFF

REISMAN

REPLANNED

S T S - 1 2 4 E X P 1 7 S T S

22

2306/11

0102

0304

0506

0708

09GMT 06/10/08 (162)

010/00

0102

0304

0506

0708

0910

1112

MET

Day 010

CDR

POST SLEEP

ODS

LEAK

CHECK

PMC

A/G

PRE SLEEP

PRE SLEEP

SLEEP

N 2 - TB L E E D

PLT

POST SLEEP

RNDZ

TOOLS

C/O

PRE SLEEP

SLEEP

A T H O *O M S ^

MS1

POST SLEEP

RNDZ

TOOLS

C/O

PRE SLEEP

SLEEP

L O G

MS2

POST SLEEP

EMU

INST

PRE SLEEP

SLEEP

L O G

PRE

SLEEP

MS3

POST SLEEP

PRE SLEEP

EXER

CISE

SLEEP

EMU

INST

S L V A

MS4

POST SLEEP

ODS

LEAK

CHECK

SLEEP

PRE SLEEP

S L V A

MS5

POST SLEEP

S L V APRE SLEEP

SLEEP

ISS CDR

DPC

PSPS

PSPMC

SLEEP (8.5)

FE-1

DPC

PSPS

PSPS

PMC

♣SLEEP (8.5)

FE-2

DPCPS

PSPS

PMC

SLEEP (8.5)

ORBIT

159

160

161

162

163

164

165

166

DAY/NIGHT

TDRS

W -171

E -46

Z 275

ORB ATT

BIAS -XLV -ZVV

NOTES

♣МБИ-12-EXP-INIT

⊕МБИ12 DCNCT

*STS TO CMG

^I'CNCT RETURN

Page 6

Page 8: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:14:21

FLT PLN/124/FLT

KELL

YHA

MNY

BERG

11

FD11 EZ ACTIVITES

√OCAC FILTER & MDDK DUCT SCREEN

HARD REBOOT ALL PGSCs EXCEPT:

STS-7(WLES),STS-6(RPOP2),&

OCA ROUTER.

REPLANNED

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

3-114

STS-

124

FD

06:00

07:00

08:00

09:00

GMT

Date

06/10

(162)

08:00

09:00

10:00

11:00

12:00

MET

Day 009

WE

Z

T D R S

~~ ~~

D / N

O R B 1 4 8 1 4 9 1 5 0

~ ~B I A S - X L V - Z V VS T S A T T

CDR

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

SLEEP

~

MS1

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG

(ORB OPS, SDBI)

Notes

3-114

KELL

YHA

MNY

BERG

11

FD11 EZ ACTIVITES

√OCAC FILTER & MDDK DUCT SCREEN

HARD REBOOT ALL PGSCs EXCEPT:

STS-7(WLES),STS-6(RPOP2),&

OCA ROUTER.

REPLANNED

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

STS-

124

FD

06:00

07:00

08:00

09:00

GMT

Date

06/10

(162)

08:00

09:00

10:00

11:00

12:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 4 8 1 4 9 1 5 0

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

SLEEP

~

MS1

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG

(ORB OPS, SDBI)

Notes

Page 7

Page 9: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:14:21

FLT PLN/124/FLT

GARA

NHO

SHID

EFO

SSUM

11REPLANNED

3-115

STS-

124

FD

06:00

07:00

08:00

09:00

GMT

Date

06/10

(162)

08:00

09:00

10:00

11:00

12:00

MET

Day 009

WE

Z

T D R S

~~ ~~

D / N

O R B 1 4 8 1 4 9 1 5 0

~ ~B I A S - X L V - Z V VS T S A T T

MS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG

(ORB OPS, SDBI)

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

Notes

3-115

GARA

NHO

SHID

EFO

SSUM

11REPLANNED

STS-

124

FD

06:00

07:00

08:00

09:00

GMT

Date

06/10

(162)

08:00

09:00

10:00

11:00

12:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 4 8 1 4 9 1 5 0

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

FLIGHT SLEEP LOG

(ORB OPS, SDBI)

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

Notes

Page 8

Page 10: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:14:21

FLT PLN/124/FLT

KELL

YHA

MNY

BERG

11

EXERCISE

√ MCC for proper DAP config for ATT H/O

When ISS is Free Drift,DAP:LVLH,

when rates < 0.1,DAP:AUTO

REPLANNED

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DUMP EQUIPMENT PREGATHER

Ref. MSG 093, Item 8

SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS) INIT

Ref. MSG 093, Item 9

A SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS)

Terminate Waste Dump

CWC OVERBOARD DUMP

(ORB OPS, ECLS)

Initiate Condensate Dump

Ref. MSG 093, Item 10

3-116

STS-

124

FD

10:00

11:00

12:00

13:00

GMT

Date

06/10

(162)

12:00

13:00

14:00

15:00

16:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

O R B 1 5 1 1 5 2 1 5 3

~ B I A S - X L V - Z V V ~B I A S - X L V + Y V VS T S A T T

CDR

TRANSFER UPDATE

Ref. Transfer List & MSG 095

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA SYS: 1.605 BSA BATTERY RECHARGE -TERM

PLT

MNVR (TRK) BIAS -XLV +YVV (SIMO DUMP)

TG=2 BV=5 P=166 Y=353 OM=195

A12/AUTO/VERN Init TRK

WASTE TERM/CONDENSATE INIT A

FC MONITORING SYS (FCMS) OPS

(ORB OPS, EPS)

MS1

EXERCISE

ASSY OPS: 4.017 JEMRMS BDS SETUP PART 1

Steps 1-3, 4.5, 4.6, 6, 8, 10.5, & 11.

Ref. MSG 096

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

Notes

3-116

KELL

YHA

MNY

BERG

11

EXERCISE

√ MCC for proper DAP config for ATT H/O

When ISS is Free Drift,DAP:LVLH,

when rates < 0.1,DAP:AUTO

REPLANNED

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DUMP EQUIPMENT PREGATHER

Ref. MSG 093, Item 8

SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS) INIT

Ref. MSG 093, Item 9

A SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS)

Terminate Waste Dump

CWC OVERBOARD DUMP

(ORB OPS, ECLS)

Initiate Condensate Dump

Ref. MSG 093, Item 10

STS-

124

FD

10:00

11:00

12:00

13:00

GMT

Date

06/10

(162)

12:00

13:00

14:00

15:00

16:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 5 1 1 5 2 1 5 3

S T S A T T ~ B I A S - X L V - Z V V ~B I A S - X L V + Y V V

CDR

TRANSFER UPDATE

Ref. Transfer List & MSG 095

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

EVA SYS: 1.605 BSA BATTERY RECHARGE -TERM

PLT

MNVR (TRK) BIAS -XLV +YVV (SIMO DUMP)

TG=2 BV=5 P=166 Y=353 OM=195

A12/AUTO/VERN Init TRK

WASTE TERM/CONDENSATE INIT A

FC MONITORING SYS (FCMS) OPS

(ORB OPS, EPS)

MS1

EXERCISE

ASSY OPS: 4.017 JEMRMS BDS SETUP PART 1

Steps 1-3, 4.5, 4.6, 6, 8, 10.5, & 11.

Ref. MSG 096

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

Notes

Page 9

Page 11: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:14:21

FLT PLN/124/FLT

GARA

NHO

SHID

EFO

SSUM

11REPLANNED

3-117

STS-

124

FD

10:00

11:00

12:00

13:00

GMT

Date

06/10

(162)

12:00

13:00

14:00

15:00

16:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

O R B 1 5 1 1 5 2 1 5 3

~ B I A S - X L V - Z V V ~B I A S - X L V + Y V VS T S A T T

MS2

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MIDDECK TRANSFER

Ref. Transfer List: Item 24,701,703,705

~

PGSC TRANSFER

Ref. MSG 098 & Transfer List: Item 804

MS3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MIDDECK TRANSFER

Ref. Transfer List:

Item 403.3,710-713,904

~

P/TV08 EXTERNAL SURVEY

(PHOTO/TV, SCENES)

Perform SETUP

P/TV08 EXTERNAL SURVEY

(PHOTO/TV, SCENES)

Perform OPS, Item 2

MS4

EXERCISE

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ASSY OPS: 4.017 JEMRMS BDS SETUP PART 1

Steps 1-3, 4.5, 4.6, 6, 8, 10.5, & 11.

Ref. MSG 096

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

Notes

3-117

GARA

NHO

SHID

EFO

SSUM

11REPLANNED

STS-

124

FD

10:00

11:00

12:00

13:00

GMT

Date

06/10

(162)

12:00

13:00

14:00

15:00

16:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 5 1 1 5 2 1 5 3

S T S A T T ~ B I A S - X L V - Z V V ~B I A S - X L V + Y V V

MS2

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MIDDECK TRANSFER

Ref. Transfer List: Item 24,701,703,705

~

PGSC TRANSFER

Ref. MSG 098 & Transfer List: Item 804

MS3

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MIDDECK TRANSFER

Ref. Transfer List:

Item 403.3,710-713,904

~

P/TV08 EXTERNAL SURVEY

(PHOTO/TV, SCENES)

Perform SETUP

P/TV08 EXTERNAL SURVEY

(PHOTO/TV, SCENES)

Perform OPS, Item 2

MS4

EXERCISE

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ASSY OPS: 4.017 JEMRMS BDS SETUP PART 1

Steps 1-3, 4.5, 4.6, 6, 8, 10.5, & 11.

Ref. MSG 096

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

Notes

Page 10

Page 12: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:14:21

FLT PLN/124/FLT

KELL

YHA

M

11

NYBE

RG

REPLANNED

IMU STAR OF OPTY ALIGN (ORB OPS, GNC)

CWC OVERBOARD DUMP

(ORB OPS, ECLS)

Terminate Condensate Dump

MIDDECK TRANSFER

Ref. Transfer List: Items 704.8

3-118

STS-

124

FD

14:00

15:00

16:00

17:00

GMT

Date

06/10

(162)

16:00

17:00

18:00

19:00

20:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

O R B 1 5 3 1 5 4 1 5 5 1 5 6

~ ~B I A S - X L V - Z V VS T S A T T

CDR

JOINT OPS: 3.103 NITROGEN TRANSFER TERM

Steps 3.2-5.1

Ref. MSG 096

JOINT OPS: 3.122 PREBREATHE USING

SHUTTLE O2 TEARDOWN, Steps 2-End

Ref. MSG 096

TRANSFER BRIEF

Call down status to MCC

DAILY STS/ISS CREW

TRANSFER TAGUP

MEAL ~

MIDDECK TRANSFER

Ref. Transfer List:

Items 700,702,706,715

PLT

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

Inspect filters and clean

as necessary

(Locker: MA16G)

MEAL ~

MNVR (TRK) BIAS -XLV -ZVV

TG=2 BV=5 P=166 Y=353 OM=190

A12/AUTO/VERN Init TRK

When ISS is GO for attitude control,DAP:FREE

EXERCISE

SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS)

Terminate Supply Dump

MIDDECK TRANSFER

Ref. Transfer List: Items 704

MS1

MEAL ~

ASSY OPS: 4.017 JEMRMS BDS SETUP PART 1

Steps 1-3, 4.5, 4.6, 6, 8, 10.5, & 11.

Ref. MSG 096

~

Notes

3-118

KELL

YHA

M

11

NYBE

RG

REPLANNED

IMU STAR OF OPTY ALIGN (ORB OPS, GNC)

CWC OVERBOARD DUMP

(ORB OPS, ECLS)

Terminate Condensate Dump

MIDDECK TRANSFER

Ref. Transfer List: Items 704.8

STS-

124

FD

14:00

15:00

16:00

17:00

GMT

Date

06/10

(162)

16:00

17:00

18:00

19:00

20:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 5 3 1 5 4 1 5 5 1 5 6

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

JOINT OPS: 3.103 NITROGEN TRANSFER TERM

Steps 3.2-5.1

Ref. MSG 096

JOINT OPS: 3.122 PREBREATHE USING

SHUTTLE O2 TEARDOWN, Steps 2-End

Ref. MSG 096

TRANSFER BRIEF

Call down status to MCC

DAILY STS/ISS CREW

TRANSFER TAGUP

MEAL ~

MIDDECK TRANSFER

Ref. Transfer List:

Items 700,702,706,715

PLT

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

Inspect filters and clean

as necessary

(Locker: MA16G)

MEAL ~

MNVR (TRK) BIAS -XLV -ZVV

TG=2 BV=5 P=166 Y=353 OM=190

A12/AUTO/VERN Init TRK

When ISS is GO for attitude control,DAP:FREE

EXERCISE

SUPPLY/WASTE WATER DUMP

(ORB OPS, ECLS)

Terminate Supply Dump

MIDDECK TRANSFER

Ref. Transfer List: Items 704

MS1

MEAL ~

ASSY OPS: 4.017 JEMRMS BDS SETUP PART 1

Steps 1-3, 4.5, 4.6, 6, 8, 10.5, & 11.

Ref. MSG 096

~

Notes

Page 11

Page 13: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:14:21

FLT PLN/124/FLT

GARA

NHO

SHID

EFO

SSUM

11REPLANNED

3-119

STS-

124

FD

14:00

15:00

16:00

17:00

GMT

Date

06/10

(162)

16:00

17:00

18:00

19:00

20:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

O R B 1 5 3 1 5 4 1 5 5 1 5 6

~ ~B I A S - X L V - Z V VS T S A T T

MS2

EXERCISE

EVA STOW

(EVA, AIRLOCK CONFIG)

Ref. MSG 088

MEAL ~

MIDDECK TRANSFER

Ref. Transfer List: Item 24,701,703,705

~

MS3

P/TV04 INGRESS/EGRESS

(PHOTO/TV, SCENES)

Perform SETUP

EVA STOW

(EVA, AIRLOCK CONFIG)

Ref. MSG 088

MEAL ~

MIDDECK TRANSFER

Ref. Transfer List:

Item 403.3,710-713,904

~

P/TV05 ISS INTERNAL OPS

(PHOTO/TV, SCENES)

Perform DEACT,Step 2

MS4

MEAL ~

ASSY OPS: 4.017 JEMRMS BDS SETUP PART 1

Steps 1-3, 4.5, 4.6, 6, 8, 10.5, & 11.

Ref. MSG 096

~

Notes

3-119

GARA

NHO

SHID

EFO

SSUM

11REPLANNED

STS-

124

FD

14:00

15:00

16:00

17:00

GMT

Date

06/10

(162)

16:00

17:00

18:00

19:00

20:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 5 3 1 5 4 1 5 5 1 5 6

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

EXERCISE

EVA STOW

(EVA, AIRLOCK CONFIG)

Ref. MSG 088

MEAL ~

MIDDECK TRANSFER

Ref. Transfer List: Item 24,701,703,705

~

MS3

P/TV04 INGRESS/EGRESS

(PHOTO/TV, SCENES)

Perform SETUP

EVA STOW

(EVA, AIRLOCK CONFIG)

Ref. MSG 088

MEAL ~

MIDDECK TRANSFER

Ref. Transfer List:

Item 403.3,710-713,904

~

P/TV05 ISS INTERNAL OPS

(PHOTO/TV, SCENES)

Perform DEACT,Step 2

MS4

MEAL ~

ASSY OPS: 4.017 JEMRMS BDS SETUP PART 1

Steps 1-3, 4.5, 4.6, 6, 8, 10.5, & 11.

Ref. MSG 096

~

Notes

Page 12

Page 14: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:14:21

FLT PLN/124/FLT

KELL

YHA

MNY

BERG

11

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

UPDATE

TFL 192

REPLANNED

√ MCC for proper DAP config for ATT H/O

When ISS is Free Drift,DAP:LVLH, when rates<0.1,DAP:AUTO

3-120

STS-

124

FD

18:00

19:00

20:00

21:00

GMT

Date

06/10

(162)

20:00

21:00

22:00

23:00

00:00

MET

Day 009

WE

Z

T D R S

~

~~ ~

D / N

O R B 1 5 6 1 5 7 1 5 8

~ ~B I A S - X L V - Z V VS T S A T T

CDR

SAYONARA

JOINT OPS: 4.104 ODS VEST/PMA

DPRS AND HATCH LEAK CHECK

Depress ODS Vestibule Only

~

OFF DUTY

JOINT OPS: 4.102 STS/ISS DUCT RMVL

& HATCH CLOSING

Ref. MSG 093, Item 7

Ref. Transfer List: Item 805

MEAL~

PLT

SAYONARA

~

OFF DUTY

GAP ACTIVATION (Locker: MF43E)

(ASSY OPS

, PAYLOADS)

Activate GAP 8

MEAL~

MS1

SAYONARA

~

OFF DUTY

MEAL~

JOINT OPS: 4.102 STS/ISS DUCT RMVL

& HATCH CLOSING

Ref. MSG 093, Item 7

Ref. Transfer List: Item 805

Notes

3-120

KELL

YHA

MNY

BERG

11

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

UPDATE

TFL 192

REPLANNED

√ MCC for proper DAP config for ATT H/O

When ISS is Free Drift,DAP:LVLH, when rates<0.1,DAP:AUTO

STS-

124

FD

18:00

19:00

20:00

21:00

GMT

Date

06/10

(162)

20:00

21:00

22:00

23:00

00:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 5 6 1 5 7 1 5 8

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

SAYONARA

JOINT OPS: 4.104 ODS VEST/PMA

DPRS AND HATCH LEAK CHECK

Depress ODS Vestibule Only

~

OFF DUTY

JOINT OPS: 4.102 STS/ISS DUCT RMVL

& HATCH CLOSING

Ref. MSG 093, Item 7

Ref. Transfer List: Item 805

MEAL~

PLT

SAYONARA

~

OFF DUTY

GAP ACTIVATION (Locker: MF43E)

(ASSY OPS

, PAYLOADS)

Activate GAP 8

MEAL~

MS1

SAYONARA

~

OFF DUTY

MEAL~

JOINT OPS: 4.102 STS/ISS DUCT RMVL

& HATCH CLOSING

Ref. MSG 093, Item 7

Ref. Transfer List: Item 805

Notes

Page 13

Page 15: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:14:21

FLT PLN/124/FLT

GARA

NHO

SHID

EFO

SSUM

11REPLANNED

3-121

STS-

124

FD

18:00

19:00

20:00

21:00

GMT

Date

06/10

(162)

20:00

21:00

22:00

23:00

00:00

MET

Day 009

WE

Z

T D R S

~

~~ ~

D / N

O R B 1 5 6 1 5 7 1 5 8

~ ~B I A S - X L V - Z V VS T S A T T

MS2

SAYONARA

OFF DUTY

MEAL~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

JOINT OPS: 4.102 STS/ISS DUCT RMVL

& HATCH CLOSING

Ref. MSG 093, Item 7

Ref. Transfer List: Item 805

MS3

SAYONARA

FORMALDEHYDE MONITOR KIT

(ORB OPS,CREW SYS)

Perform Steps 1-6 EX

ERCISE

~

OFF DUTY

MEAL~

MS4

SAYONARA

JOINT OPS: 4.104 ODS VEST/PMA

DPRS AND HATCH LEAK CHECK

Depress ODS Vestibule Only

~

OFF DUTY

JOINT OPS: 4.102 STS/ISS DUCT RMVL

& HATCH CLOSING

Ref. MSG 093, Item 7

Ref. Transfer List: Item 805

MEAL~

Notes

3-121

GARA

NHO

SHID

EFO

SSUM

11REPLANNED

STS-

124

FD

18:00

19:00

20:00

21:00

GMT

Date

06/10

(162)

20:00

21:00

22:00

23:00

00:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 5 6 1 5 7 1 5 8

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

SAYONARA

OFF DUTY

MEAL~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

JOINT OPS: 4.102 STS/ISS DUCT RMVL

& HATCH CLOSING

Ref. MSG 093, Item 7

Ref. Transfer List: Item 805

MS3

SAYONARA

FORMALDEHYDE MONITOR KIT

(ORB OPS,CREW SYS)

Perform Steps 1-6 EXERCISE

~

OFF DUTY

MEAL~

MS4

SAYONARA

JOINT OPS: 4.104 ODS VEST/PMA

DPRS AND HATCH LEAK CHECK

Depress ODS Vestibule Only

~

OFF DUTY

JOINT OPS: 4.102 STS/ISS DUCT RMVL

& HATCH CLOSING

Ref. MSG 093, Item 7

Ref. Transfer List: Item 805

MEAL~

Notes

Page 14

Page 16: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:14:21

FLT PLN/124/FLT

KELL

YHA

MNY

BERG

11

UPDATE

TFL 184

REPLANNED

WAKE

UP

AT 1

0/11

:00

B (ORB OPS, ECLS) Steps 9-13 for PCS 1

MCC will TMBU SM limits

3-122

STS-

124

FD

22:00

23:00

00:00

01:00

GMT

Date

06/10

(162)

00:00

01:00

02:00

03:00

04:00

MET

Day 010

WE

Z

T D R S

~

~

~

D / N

O R B 1 5 9 1 6 0 1 6 1

~ ~B I A S - X L V - Z V VS T S A T T

CDR

JOINT OPS: 4.104 ODS VEST/PMA

DPRS AND HATCH LEAK CHECK

Depress ODS Vestibule Only

~

PRIVATE MEDICAL CONFERENCE

Perform Via A/G 2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

N2 REPRESS USING P/L N2 VALVES B

MO69 LEH O2 8 vlv - OP

PLT

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

When ISS is GO for attitude control, DAP:FREE

I'CNCT RETURN (OPS 2,3) (OPCL, RCS)

MS1

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

Notes

3-122

KELL

YHA

MNY

BERG

11

UPDATE

TFL 184

REPLANNED

WAKE

UP

AT 1

0/11

:00

B (ORB OPS, ECLS) Steps 9-13 for PCS 1

MCC will TMBU SM limits

STS-

124

FD

22:00

23:00

00:00

01:00

GMT

Date

06/10

(162)

00:00

01:00

02:00

03:00

04:00

MET

Day 010

WE

Z

T D R SD / N

O R B 1 5 9 1 6 0 1 6 1

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

JOINT OPS: 4.104 ODS VEST/PMA

DPRS AND HATCH LEAK CHECK

Depress ODS Vestibule Only

~

PRIVATE MEDICAL CONFERENCE

Perform Via A/G 2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

N2 REPRESS USING P/L N2 VALVES B

MO69 LEH O2 8 vlv - OP

PLT

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

When ISS is GO for attitude control, DAP:FREE

I'CNCT RETURN (OPS 2,3)

(OPCL, RCS)

MS1

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

Notes

Page 15

Page 17: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

06/10/08 00:14:21

FLT PLN/124/FLT

GARA

NHO

SHID

EFO

SSUM

REIS

MAN

11REPLANNED

WAKE

UP

AT 1

0/11

:00

3-123

STS-

124

FD

22:00

23:00

00:00

01:00

GMT

Date

06/10

(162)

00:00

01:00

02:00

03:00

04:00

MET

Day 010

WE

Z

T D R S

~

~

~

D / N

O R B 1 5 9 1 6 0 1 6 1

~ ~B I A S - X L V - Z V VS T S A T T

MS2

EMU INSTALLATION

(EVA, AIRLOCK CONFIG)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

~

SLEEP

~

EMU INSTALLATION

(EVA, AIRLOCK CONFIG)

MS4

JOINT OPS: 4.104 ODS VEST/PMA

DPRS AND HATCH LEAK CHECK

Depress ODS Vestibule Only

~

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

Notes

3-123

GARA

NHO

SHID

EFO

SSUM

REIS

MAN

11REPLANNED

WAKE

UP

AT 1

0/11

:00

STS-

124

FD

22:00

23:00

00:00

01:00

GMT

Date

06/10

(162)

00:00

01:00

02:00

03:00

04:00

MET

Day 010

WE

Z

T D R SD / N

O R B 1 5 9 1 6 0 1 6 1

S T S A T T ~ ~B I A S - X L V - Z V V

MS2

EMU INSTALLATION

(EVA, AIRLOCK CONFIG)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EXERCISE

~

SLEEP

~

EMU INSTALLATION

(EVA, AIRLOCK CONFIG)

MS4

JOINT OPS: 4.104 ODS VEST/PMA

DPRS AND HATCH LEAK CHECK

Depress ODS Vestibule Only

~

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP

~

Notes

Page 16

Page 18: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

MSG 094 - FD11 MISSION SUMMARY

END OF PAGE 1 OF 2, MSG 094

1 Good Morning Discovery!!! 2 3 The entire European ATV team, including the Chief Engineer and the Lead Mission 4 Manager, want to thank you for the photos you took of ATV and its lifted MLI during 5 rendezvous. The photos were excellent and very valuable. 6 7 Enjoy your last full day of combined ops!!!! 8 9 10 11 12 YOUR CURRENT ORBIT IS: 185 X 181 NM 13 14 NOTAMS: 15 16 EDW – LAKEBED RUNWAY 15/33 ELS ONLY. OTHER LAKEBED RWYS RED. 17 NOR – LAKEBED RUNWAYS GREEN. 18 NTU – NGU TACAN CH CHANGED TO 86Y. 19 YJT – TACAN CH 78 DME ONLY. 20 HAW – RWY 31 CLOSED. RWY 13 TODA 8,994’. 21 WAK – CLOSED. NOT USABLE. 22 IKF – NOT USABLE. NO AGREEMENT. 23 BEN – NOT RECOMMENDED/NOT SUPPORTED. 24 ZZA – FIRST 600M (~2,000’) OF RWY 30L NOT AVAILABLE. 10,200’ REMAINING. 25 YHZ – RWY 05/23 CLOSED.. 26 27 28 NEXT 2 PLS OPPORTUNITIES: 29 30 NOR23 ORB 156 – 9/20:21 SKC 210/15P25 31 EDT22R ORB 172 – 10/20:42 SCT250 260/10P16 32 33 34 OMS TANK FAIL CAPABILITY: 35 36 L OMS FAILS: NO 37 R OMS FAILS: NO 38 39 LEAKING OMS PRPLT BURN: 40 41 L OMS LEAK: ALWAYS BURN RETROGRADE 42 R OMS LEAK: ALWAYS BURN RETROGRADE 43 44 OMS QUANTITIES(%) 45 46 L OMS OX = 30.3 R OMS OX = 30.3 47 FU = 29.9 FU = 30.3 48 49 SUBTRACT INTERCONNECT COUNTER TO OBTAIN CURRENT OMS QUANTITIES 50 51

Page 17

Page 19: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

MSG 094 - FD11 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 094

1 DELTA V AVAILABLE: 2 3 OMS 315 FPS 4 ARCS (TOTAL ABOVE QTY1) 37 FPS 5 6 TOTAL IN THE AFT 352 FPS 7 8 ARCS (TOTAL ABOVE QTY2) 71 FPS 9 FRCS (ABOVE QTY 1) 18 FPS 10 11 AFT QTY 1 77 % 12 AFT QTY 2 39 % 13 14 15 16 17 18 19 THERE ARE NO FAILURE/IMPACT/WORK AROUNDS FOR TODAY. 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Page 18

Page 20: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

MSG 095 (17-0392) - FD11 TRANSFER MESSAGE Page 1 of 5

Page 1 of 5, MSG 095 (17-0392)

1 Good morning Aki and Mark! 2 3 Today is your final day of transfer! You are currently 98% complete on Resupply, 81% 4 complete on Return, and 87% complete overall. 5 6 Mark, the Spacehab duct is not going to be removed until the hatch closure procedure. So it 7 will need to be left in PMA2 as you close the hatch. This is the only item that we will not 8 expect transfer confirmation on before hatch closure, but I will give you a reminder during 9 our final transfer conference. 10 11 Mark, return CTB #401 (empty) can be stowed back at NOD1P1 with the other empty CTBs. 12 13 For the ACK (transfer list item 704.8) that would not fit into Bag H we have two options for 14 you. Our recommendation is that you stow the ACK in a food locker of your choice and 15 report the location. Alternately, you can remove the square foam blocks from Bag H until 16 you can fit the ACK. If you choose to remove foam, it will need to be stowed on ISS with 17 other foam for trash, it must be contained inside a CTB or jettison stowage bag, and we’d 18 like to know where it gets stowed. 19 20 For STS, the Transfer List Excel file, FD11_Transfer_List_STS124.xls, is located on the KFX 21 machine in C:\OCA-up\transfer. 22 23 For ISS, the Transfer List Excel file, FD11_Transfer_List_STS124.xls, is located in K:\OCA-24 up\transfer. 25 26 27 28 29 FD11 Choreography (items for transfer today) 30 – Items 715, 700, 702, 706 (Mark): Transfer CTB, Bag A, Bag C, and Bag J during MDDK 31

XFER 32 – Item 805 (Mark): Transfer duct during hatch close 33 – Items 704, 704.8 (Ken): Transfer Bag H and ACK during MDDK XFER 34 – Items 710 thru 713 and 904 (Mike): Transfer EVA Hardware during MDDK XFER prior to 35

EVA STOW 36 – Item 24, 701, 703, & 705 (Ron): Transfer PGSC Desk, Bag B, Bag D, and Bag I during 37

MDDK XFER 38 – Item 804 (Ron): Transfer PGSC during PGSC XFER 39 – Item 403.3 (Greg): Transfer the IWIS tape after the VTR Tape Exchange (this should 40

have been done via stowage note on FD10) 41 – Item 702.2 and 707 (Greg): Transfer blood samples and kit during stow activity 42 – Item 715.1, 718 (Greg): Transfer saliva samples and kit during stow activity 43 – Item 708 (Greg): Transfer double coldbag during coldbag transfer activity 44 – Items 715.3 & 715.4 (Garrett): Transfer PLANT HAB and SGHAB during CGBA removal 45 46 47 48 49 50 51

Page 19

Page 21: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

MSG 095 (17-0392) - FD11 TRANSFER MESSAGE Page 2 of 5

Page 2 of 5, MSG 095 (17-0392)

1 Please update the Transfer List as follows: 2 In RESUPPLY tab: 3

Replace page 13 4 In RETURN tab: 5

Replace pages 11 6 Add page 18 7 On Page 16: Add “petri dish” to the Qty column of item 715.3 8

9 Let us know if you have questions. 10 - The Transfer Team 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

Page 20

Page 22: FD 11 Execute Package - NASAP H O T O PS PS SLEEP (8.5) S L V A ISS CDR CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-1 CREW CONF C R E W P H O T O PS PS SLEEP (8.5) FE-2 CREW CONF

MSG 098 - RPOP2 PGSC TRANSFER TO ISS

END OF PAGE 1 OF 1, MSG 098

CONFIGURE RPOP2 (STS6) FOR TRANSFER TO ISS

1. Prior to RPOP2 prep, retrieve ESD bag from ISS NOD1S4_G for PGSC hard drive

2. Exit all applications and Shut Down PGSC

3. Remove power to PGSC at Outlet (MO63P) and remove the power cables from MO63P and the PGSC

4. Remove all peripherals and connections from the PGSC (including the RF and Quatech cards)

5. Remove “WLES Reboot Sticker” from the PGSC and place it on the RPOP (STS5) PGSC

6. Velcro the WLE Laptop Rcvr Unit to back of RPOP (STS5) laptop lid (this will be connected to RPOP post sep)

7. Remove hard drive per A31p HARD DRIVE CHANGEOUT (ORB OPS, PGSC), pg 12-81, steps 5-8

8. Place hard drive in ESD bag and temp stow

9. Reinstall A31p Hard Drive cover back on A31p (without a hard drive)

10. Stow RPOP2 hard drive in PGSC cutout in the MAR (ML60E). Stow RPOP2 Power cables and green brick

11. On WLES (STS7) PGSC, disable WLES file backup: ‘Enhanced Wideband MicroTAU – WLEFlight 3.0’ Click ‘System Settings’ (left side of display) ‘Backup Mode Selection’ Click ‘Standard’ Click ‘Unit List’ (left side of display)

12. Transfer RPOP2 Shell to ISS NOD1S4_B1 and stow in 0.5 CTB s/n 1068 (reference transfer list item 804)

Page 21