fd07 flight plan revision - nasa · top 10 reasons o3 fdo was late today: ... 4 051 fd07 flight...
TRANSCRIPT
STS-135/ULF7 FD 07 Execute Package
MSG Page(s) Title
051 1 - 15 FD07 Flight Plan Revision
052 16 - 17 FD07 Mission Summary
053 18 - 19 FD07 Transfer Message
054 20 - 24 Resupply Stowage Platform (RSP) Strut R&R
Approved by FAO: J. Mintz
Approved by OpsPlan: K. Howel
Last Updated: Jul 14 2011 4:08 AM GMT
JEDI (Joint Execute package Development and Integration), v3.0
Top 10 reasons O3 FDO was late today:
10. Coasting, what’s the hurry. 9. Too many DAMs on the way to work today 8. He’s traumatized by flight asking what the NOTAMs mean 7. Orbit 3 hours are rough, he wishes he was on Orbit 1 6. His home OIGN- clock was set incorrectly 5. He was pulled over on the way in and the officer asked “Do you know how fast you
were going?” FDO responded “In which reference frame?” 4. Pink shirt was still in the dryer 3. Handover is non-critical and can be slipped in one rev increments 2. The next burn isn’t until FD12, what is he even here for? 1. Over-burned leaving a stoplight and ran out of gas
MSG 051 (28-0550) - FD07 FLIGHT PLAN REVISION Page 1 of 15
Page 1 of 15, MSG 051 (28-0550)
MSG INDEX 1
2
MSG NO. TITLE 3
051 FD07 Flight Plan Revision 4
052 FD07 Mission Summary 5
053 FD07 Transfer Message 6
054 Resupply Stowage Platform (RSP) Strut R&R 7
8
1. Due to continually running ~700 watts under the predicted power level, margin is now 8 9
hours. 10
11
For today's cryo config, O2 tanks 2 & 4 and H2 tanks 2 & 5 will be active. H2 tank 5 may 12
deplete today, so there may be a post-depletion cryo reconfig before the pre-sleep 13
config tonight. 14
15
R1 O2,H2 MANF VLV TK2 (two) - OP (tb-OP) 16
A11 CRYO TK4 HTR O2 B – OFF 17
18
2. WHC/WCS OPS: WHC is operational and you can resume usage at 19
your convenience. Use of the WHC versus the WCS will build further margin in the 20
waste tank and assist ISS. Since Waste H2O rates are below predicts, the post-21
undocking Condensate CWC dump will be deleted. 22
23
3. Fergy: We copied Sandy’s comment during the transfer brief yesterday about the broken 24
#10 Torque Tip but we need some clarification - Was this the Torque Tip Driver, 3/8-in Drive 25
or the Torque Tip Screwdriver? 26
27
4. The TriDAR team would like to thank you for your excellent troubleshooting on FD03 and 28
is happy to report that they have received great data. More than 70,000 data and telemetry 29
files have been downlinked from the PGSC and the support team is busy pouring over the 30
data. Early analysis indicates that the system has outperformed the docking results 31
received from STS-128 and STS-131. 32
33
5. Below is information about the Santiago ground station for the ground pass at MET 34
5/18:25:54 35
36
The Santiago station provided on-orbit communication support for early shuttle flights, 37
then left the Space Shuttle family as the TDRS satellite network developed and matured. 38
In recent years the Santiago site was asked to support shuttle flights once again, 39
allowing the flight control team to maximize use of the K-Band communication link via 40
the TDRS satellites. Santiago has provided excellent support and their efforts are 41
appreciated. 42
43
6. Crew Choice Downlink KU Opportunities: 44
45
Please allow 1-2 minutes to lock up on Ku-band. Check with MCC before starting 46
playback. 47
48
Pre-Sleep Evening of FD07 49
TDRS AOS LOS Delta (min) Notes W-171 6/02:05 6/02:39 34 E-TDS 6/04:27 6/04:53 26 50
7. Replace Pages 2-22 through 2-25 and 3-68 Through 3-77. 51
1
FLT PLN/135/FLIGHT
FD07
FERGUSON
HURLEY
MAGNUS
WALHEIM
REPLANNED
^AGOS,18:25
2-22
STS-135
ISS
04 05 06 07 08 09 10 11 12 13 14 15GMT 07/14/11 (195) 12 13 14 15 16 17 18 19 20 21 22 23 006/00
MET Day 005
CDR SLEEP POST SLEEP OFFDUTYMEALEXERCISE
IMU
MPLMXFER MPLM XFER PAO
HDPAOHD OFF DUTYMPLM XFER PFC
OCA
PLT SLEEP POST SLEEP OFF DUTYMEALEXERCISEMCIU
PAOHD
ILL OFF
WCS
CWC#7 INIT
CWC#8 INIT
CWC TERM
CWC TERM
CWC XFER
MPLM XFERN2-T
N2-I
OMS*
MS1 SLEEP POST SLEEP OFF DUTY
TRANSFER
UPDATE
MDDK
MEALEXERCISEPOST SLEEP PAOHD
PAOHDMPLM XFER
MS2 SLEEP POST SLEEP OFF DUTYMEALEXERCISELOG
PAOHDMPLM XFER
DAY/NIGHTORBIT 87 88 89 90 91 92 93 94 95
TDRSWEZ
BIAS -XLV -ZVVORB ATTTDRS AVAIL
*POD HTR RECONFIG
Notes
2-22
FD07
FERGUSON
HURLEY
MAGNUS
WALHEIM
REPLANNED
^AGOS,18:25
STS-135
ISS
04 05 06 07 08 09 10 11 12 13 14 15GMT 07/14/11 (195) 12 13 14 15 16 17 18 19 20 21 22 23 006/00
MET Day 005
CDR SLEEP POST SLEEP OFFDUTYMEALEXERCISE
IMU
MPLMXFER MPLM XFER PAO
HDPAOHD OFF DUTYMPLM XFER PFC
OCA
PLT SLEEP POST SLEEP OFF DUTYMEALEXERCISEMCIU
PAOHD
ILL OFF
WCS
CWC#7 INIT
CWC#8 INIT
CWC TERM
CWC TERM
CWC XFER
MPLM XFERN2-T
N2-I
OMS*
MS1 SLEEP POST SLEEP OFF DUTY
TRANSFER
UPDATE
MDDK
MEALEXERCISEPOST SLEEP PAOHD
PAOHDMPLM XFER
MS2 SLEEP POST SLEEP OFF DUTYMEALEXERCISELOG
PAOHDMPLM XFER
DAY/NIGHTORBIT 87 88 89 90 91 92 93 94 95
TDRSWEZ
ORB ATT BIAS -XLV -ZVVTDRS AVAIL
Notes
*POD HTR RECONFIG
2
FLT PLN/135/FLIGHT
FD07
BORISENKO
GARAN
VOLKOV
FURUKAWA
FOSSUM
SAMOKUTYAEV
REPLANNED
2-23
ISS
04 05 06 07 08 09 10 11 12 13 14 15GMT 07/14/11 (195) 12 13 14 15 16 17 18 19 20 21 22 23 006/00
MET Day 005
ISS CDR SLEEP POST SLEEP DPCPW CMS-TVIS GYRO-PT1
CMS-TVIS
SPD-TRQ
CMS-TVIS
GYRO-R&R
PT3
DAK-VFY
♣ DAKONDNLD ARED MEAL T2
FE-1 SLEEP POST SLEEPГФИ17PREP
DPC
БМП Ф2
INIT
PW АК-1МSAMPLБИ1
ИПД SMP
R HAM
PASS
СОЖ T2 MEAL
СОГС
ИП-1 MON
ГФИ17D/LEND
ГФИ PRP
FE-3 SLEEP
SALIVA
POST SLEEP DPCPW ARED
CWC AUD
N2S-CQ-CLEAN WWOFFLD
WW OFFLD
PT 2
MEAL OFF DUTY
FE-4 SLEEP POST SLEEP DPCPW CMS-TVIS GYRO-PT1
CMS-TVIS
GYRO-R&R
PT3
R HAM
PASS
CMSTVISSPEEDCHAR
⊕ VELO MEAL OFF DUTY
FE-5 SLEEP
SALIVA
POST SLEEP DPC PW MPLM XFER MPLM XFERARED
PAO S/U
♦ ® ♥ Δ MEAL
PAO-D
OFF DUTY
FE-6 SLEEP
SALIVA
POST SLEEP DPC PW
VCA N2
♠ T2 φ CONDSSMPL
• LP TRM
PAO S/U
RTN VCA
MEAL OFF DUTY
DAY/NIGHTDAILY ORBIT 14 15 1 2 3 4 5 6 7TDRS AVAIL
122 112 122ISS TLMORBIT 87 88 89 90 91 92 93 94 95
♣СТТС-УКВ2Д-C/O⊕TVIS DNLK
♦CSPN-ITEM-GTHR3®CSPN-2 SMPL-PREP
♥CSPN-2MEU-ATTACH 1GΔCSPN-MELFI-AAE RTRV
♠EMU-LOOP SCRUB-INIT
φEMU-LOOP SCRUB-RCNFG•HTCH STOW RPLC
NOTES
2-23
FD07
BORISENKO
GARAN
VOLKOV
FURUKAWA
FOSSUM
SAMOKUTYAEV
REPLANNED
ISS
04 05 06 07 08 09 10 11 12 13 14 15GMT 07/14/11 (195) 12 13 14 15 16 17 18 19 20 21 22 23 006/00
MET Day 005
ISS CDR SLEEP POST SLEEP DPCPW CMS-TVIS GYRO-PT1
CMS-TVIS
SPD-TRQ
CMS-TVIS
GYRO-R&R
PT3
DAK-VFY
♣ DAKONDNLD ARED MEAL T2
FE-1 SLEEP POST SLEEPГФИ17PREP
DPC
БМП Ф2
INIT
PW АК-1МSAMPLБИ1
ИПД SMP
R HAM
PASS
СОЖ T2 MEAL
СОГС
ИП-1 MON
ГФИ17D/LEND
ГФИ PRP
FE-3 SLEEP
SALIVA
POST SLEEP DPCPW ARED
CWC AUD
N2S-CQ-CLEAN WWOFFLD
WW OFFLD
PT 2
MEAL OFF DUTY
FE-4 SLEEP POST SLEEP DPCPW CMS-TVIS GYRO-PT1
CMS-TVIS
GYRO-R&R
PT3
R HAM
PASS
CMSTVISSPEEDCHAR
⊕ VELO MEAL OFF DUTY
FE-5 SLEEP
SALIVA
POST SLEEP DPC PW MPLM XFER MPLM XFERARED
PAO S/U
♦ ® ♥ Δ MEAL
PAO-D
OFF DUTY
FE-6 SLEEP
SALIVA
POST SLEEP DPC PW
VCA N2
♠ T2 φ CONDSSMPL
• LP TRM
PAO S/U
RTN VCA
MEAL OFF DUTY
DAY/NIGHTDAILY ORBIT 14 15 1 2 3 4 5 6 7TDRS AVAILISS TLM 122 112 122ORBIT 87 88 89 90 91 92 93 94 95
NOTES
♣СТТС-УКВ2Д-C/O⊕TVIS DNLK
♦CSPN-ITEM-GTHR3®CSPN-2 SMPL-PREP
♥CSPN-2MEU-ATTACH 1GΔCSPN-MELFI-AAE RTRV
♠EMU-LOOP SCRUB-INIT
φEMU-LOOP SCRUB-RCNFG•HTCH STOW RPLC
3
FLT PLN/135/FLIGHT
FD07
FERGUSON
HURLEY
MAGNUS
WALHEIM
ISS EXTERNAL SURVEYS
REPLANNED
2-24
STS-135
ISS
16 17 18 19 20 21 22 23 07/15 01 02 03GMT 07/14/11 (195) 006/00 01 02 03 04 05 06 07 08 09 10 11 12
MET Day 006
CDR SLEEPPRESLEEPOFF DUTY
AEM STATUS
CHECK PMC
A/GPRE SLEEP
PLT SLEEPPRE SLEEPOFF DUTY OFF DUTYPFCOCA
ILL ON
MS1 SLEEPPRE SLEEPOFF DUTY
TRANSFER
BRIEF
TRANSFER
BRIEF PREP
MS2 SLEEPPRE SLEEPOFFDUTY
MDDK
OFF DUTYPFCOCA
DAY/NIGHTORBIT 95 96 97 98 99 100 101 102 103
TDRSWEZ
BIAS -XLV -ZVVORB ATTTDRS AVAIL
Notes
2-24
FD07
FERGUSON
HURLEY
MAGNUS
WALHEIM
ISS EXTERNAL SURVEYS
REPLANNED
STS-135
ISS
16 17 18 19 20 21 22 23 07/15 01 02 03GMT 07/14/11 (195) 006/00 01 02 03 04 05 06 07 08 09 10 11 12
MET Day 006
CDR SLEEPPRESLEEPOFF DUTY
AEM STATUS
CHECK PMC
A/GPRE SLEEP
PLT SLEEPPRE SLEEPOFF DUTY OFF DUTYPFCOCA
ILL ON
MS1 SLEEPPRE SLEEPOFF DUTY
TRANSFER
BRIEF
TRANSFER
BRIEF PREP
MS2 SLEEPPRE SLEEPOFFDUTY
MDDK
OFF DUTYPFCOCA
DAY/NIGHTORBIT 95 96 97 98 99 100 101 102 103
TDRSWEZ
ORB ATT BIAS -XLV -ZVVTDRS AVAIL
Notes
4
FLT PLN/135/FLIGHT
FD0FD07
BORISENKO
GARAN
VOLKOV
FURUKAWA
FOSSUM
SAMOKUTYAEV
REPLANNED
2-25
ISS
16 17 18 19 20 21 22 23 07/15 01 02 03GMT 07/14/11 (195) 006/00 01 02 03 04 05 06 07 08 09 10 11 12
MET Day 006
ISS CDR T2 OFF DUTY PW DPC PRE SLEEP-ISS SLEEP
FE-1 ГФИ PRP VELO PW DPC PS PSБМПФ2END
SLEEP
FE-3 OFF DUTY
HAM PRP
HAM PASS
CEVIS PW DPC PRE SLP PRE SLP
MPC ON
MPC DN
SLEEP
FE-4
OFF DUTY
IMS
VID CHK
TVIS
CAM TRDN
PW DPC PRE SLEEP-ISS
МБИ INIT
SLEEP
FE-5 OFF DUTY ♣ T2 PW ⊕DPCPRESLP
PMC PRE SLEEP-ISS SLEEP
FE-6 OFFDUTY ARED PWDPC PRE SLEEP-ISS SLEEP
DAY/NIGHTDAILY ORBIT 7 8 9 10 11 12 13 14 15TDRS AVAIL
122 112 122ISS TLMORBIT 95 96 97 98 99 100 101 102 103
♣ISS-HAM-SM ASSIST⊕VDS-N2-VID-CAP-INSTL
NOTES
2-25
FD0FD07
BORISENKO
GARAN
VOLKOV
FURUKAWA
FOSSUM
SAMOKUTYAEV
REPLANNED
ISS
16 17 18 19 20 21 22 23 07/15 01 02 03GMT 07/14/11 (195) 006/00 01 02 03 04 05 06 07 08 09 10 11 12
MET Day 006
ISS CDR T2 OFF DUTY PW DPC PRE SLEEP-ISS SLEEP
FE-1 ГФИ PRP VELO PW DPC PS PSБМПФ2END
SLEEP
FE-3 OFF DUTY
HAM PRP
HAM PASS
CEVIS PW DPC PRE SLP PRE SLP
MPC ON
MPC DN
SLEEP
FE-4
OFF DUTY
IMS
VID CHK
TVIS
CAM TRDN
PW DPC PRE SLEEP-ISS
МБИ INIT
SLEEP
FE-5 OFF DUTY ♣ T2 PW ⊕DPCPRESLP
PMC PRE SLEEP-ISS SLEEP
FE-6 OFFDUTY ARED PWDPC PRE SLEEP-ISS SLEEP
DAY/NIGHTDAILY ORBIT 7 8 9 10 11 12 13 14 15TDRS AVAILISS TLM 122 112 122ORBIT 95 96 97 98 99 100 101 102 103
NOTES
♣ISS-HAM-SM ASSIST⊕VDS-N2-VID-CAP-INSTL
5
FLT PLN/135/FLIGHT
07
Ferguson Hurley
FD07 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)
REPLANNED
3-68
STS-135/ULF7 FD
04:00
05:00
06:00
07:00
GMT
Date07/14(195)
12:00
13:00
14:00
15:00
16:00
MET
Day 005W E Z
TDRS
~
~ ~
~
D/N
ORB
87
88
89
90
~
~
BIAS -XLV -ZVV
STS ATT
CDR
SLEEP
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
PLT
SLEEP
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
NOTES
3-68
07
Ferguson Hurley
FD07 EZ ACTIVITIES: √OCAC FILTER √MDDK DUCT SCREEN TEPC STATUS CHECK Verify display is backlit HARD REBOOT STS-3(KFX)
REPLANNEDSTS-135/ULF7 FD
04:00
05:00
06:00
07:00
GMT
Date07/14(195)
12:00
13:00
14:00
15:00
16:00
MET
Day 005W E Z
TDRS
D/N
ORB
87
88
89
90
STS ATT~
~
BIAS -XLV -ZVV
CDR
~
SLEEP
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
PLT
~
SLEEP
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
NOTES
6
FLT PLN/135/FLIGHT
07
Magnus Walheim
REPLANNED
3-69
STS-135/ULF7 FD
04:00
05:00
06:00
07:00
GMT
Date07/14(195)
12:00
13:00
14:00
15:00
16:00
MET
Day 005W E Z
TDRS
~
~ ~
~
D/N
ORB
87
88
89
90
~
~
BIAS -XLV -ZVV
STS ATT
MS1
SLEEP
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
MS2
SLEEP
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
SLEEP LOGBOOK (SDBI 1634)
NOTES
3-69
07
Magnus Walheim
REPLANNEDSTS-135/ULF7 FD
04:00
05:00
06:00
07:00
GMT
Date07/14(195)
12:00
13:00
14:00
15:00
16:00
MET
Day 005W E Z
TDRS
D/N
ORB
87
88
89
90
STS ATT~
~
BIAS -XLV -ZVV
MS1
~
SLEEP
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
MS2
~
SLEEP
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
SLEEP LOGBOOK (SDBI 1634)
NOTES
7
FLT PLN/135/FLIGHT
07
Ferguson Hurley
A WCS CRADLE - AUTO INIBIT Inspect hose block filter, change if req'd WCS CRADLE - AUTO
<AGOS, 18:25
REPLANNED
B N2 REPRESS USING PAYLOAD N2 VALVES (ORB OPS, ECLS)Steps 3-7, working parenthetical () steps. In Step 1, H/W FDA already INH. MCC will TMBU S/W FDA.
A14 RCS/OMS HTR L POD - A OFF - B AUTO
3-70
STS-135/ULF7 FD
08:00
09:00
10:00
11:00
GMT
Date07/14(195)
16:00
17:00
18:00
19:00
20:00
MET
Day 005W E Z
TDRS
~
~
~
~
D/N
ORB
90
91
92
~
~
BIAS -XLV -ZVV
STS ATT
CDR
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
EXERCISEARED if Available
IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (10:46 - 11:29) Ref. MSG 049
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
~
PLT
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
EXERCISEARED if Available
L17 Check MCIU filter screen
ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR OFF - ALLWCS FILTER CHECK A
SHUTTLE/ISS H2O CONTAINER FILL (HC)(ORB OPS, ECLS) Perform CWC FILL #7, Ref. MSG 031
SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #8, Ref. MSG 031
SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION, Ref. MSG 031
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
N2 REPRESS INIT B
NOTES
3-70
07
Ferguson Hurley
A WCS CRADLE - AUTO INIBIT Inspect hose block filter, change if req'd WCS CRADLE - AUTO
<AGOS, 18:25
REPLANNED
B N2 REPRESS USING PAYLOAD N2 VALVES (ORB OPS, ECLS)Steps 3-7, working parenthetical () steps. In Step 1, H/W FDA already INH. MCC will TMBU S/W FDA.
A14 RCS/OMS HTR L POD - A OFF - B AUTO
STS-135/ULF7 FD
08:00
09:00
10:00
11:00
GMT
Date07/14(195)
16:00
17:00
18:00
19:00
20:00
MET
Day 005W E Z
TDRS
D/N
ORB
90
91
92
STS ATT~
~
BIAS -XLV -ZVV
CDR
~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
EXERCISEARED if Available
IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (10:46 - 11:29) Ref. MSG 049
~
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
PLT
~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
EXERCISEARED if Available
L17 Check MCIU filter screen
ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR OFF - ALLWCS FILTER CHECK A
SHUTTLE/ISS H2O CONTAINER FILL (HC)(ORB OPS, ECLS) Perform CWC FILL #7, Ref. MSG 031
SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform CWC FILL #8, Ref. MSG 031
SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION, Ref. MSG 031
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
N2 REPRESS INIT B
NOTES
8
FLT PLN/135/FLIGHT
07
Magnus Walheim
REPLANNED
3-71
STS-135/ULF7 FD
08:00
09:00
10:00
11:00
GMT
Date07/14(195)
16:00
17:00
18:00
19:00
20:00
MET
Day 005W E Z
TDRS
~
~
~
~
D/N
ORB
90
91
92
~
~
BIAS -XLV -ZVV
STS ATT
MS1
DAILY TRANSFER LIST UPDATERef. Transfer Lists & MSG 053
CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)
EXERCISE
~
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (10:46 - 11:29) Ref. MSG 049
TRANSFER OPS Ref. MPLM Transfer Lists, MSG 053 and 054
MS2
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
EXERCISE
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
~
NOTES
3-71
07
Magnus Walheim
REPLANNEDSTS-135/ULF7 FD
08:00
09:00
10:00
11:00
GMT
Date07/14(195)
16:00
17:00
18:00
19:00
20:00
MET
Day 005W E Z
TDRS
D/N
ORB
90
91
92
STS ATT~
~
BIAS -XLV -ZVV
MS1
DAILY TRANSFER LIST UPDATERef. Transfer Lists & MSG 053
CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)
~
EXERCISE
POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (10:46 - 11:29) Ref. MSG 049
TRANSFER OPS Ref. MPLM Transfer Lists, MSG 053 and 054
MS2
~POST-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
EXERCISE
~
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
NOTES
9
FLT PLN/135/FLIGHT
07
Ferguson Hurley
REPLANNED
C N2 REPRESS USING PAYLOAD N2 VALVES (ORB OPS, ECLS) Steps 8-12, working parenthetical () steps. MCC will TMBU S/W FDA.
D PFC to be performed using S-Band via Public Call 4 for audio and Ku-band for Video. Please call down SSC preference before the conference and make sure that all applications except Netmeeting have been closed.
3-72
STS-135/ULF7 FD
12:00
13:00
14:00
15:00
GMT
Date07/14(195)
20:00
21:00
22:00
23:00
00:00
MET
Day 005W E Z
TDRS
~
~
~
~
D/N
ORB
92
93
94
95
~
~
BIAS -XLV -ZVV
STS ATT
CDR
OFF DUTY
MEAL
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (13:14 - 13:42) Ref. MSG 050
OFF DUTY
~
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
~
Private Family Conference D ISS KU AVAIL (14:14 - 14:40)
PLT
OFF DUTY
~
MEAL
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (13:14 - 13:42) Ref. MSG 050
SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION, Ref. MSG 031
CWC TRANSFER Transfer 2 CWCs to ISS
N2 REPRESS TERM (On MCC GO) C
NOTES
3-72
07
Ferguson Hurley
REPLANNED
C N2 REPRESS USING PAYLOAD N2 VALVES (ORB OPS, ECLS) Steps 8-12, working parenthetical () steps. MCC will TMBU S/W FDA.
D PFC to be performed using S-Band via Public Call 4 for audio and Ku-band for Video. Please call down SSC preference before the conference and make sure that all applications except Netmeeting have been closed.
STS-135/ULF7 FD
12:00
13:00
14:00
15:00
GMT
Date07/14(195)
20:00
21:00
22:00
23:00
00:00
MET
Day 005W E Z
TDRS
D/N
ORB
92
93
94
95
STS ATT~
~
BIAS -XLV -ZVV
CDR
OFF DUTY
MEAL
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (13:14 - 13:42) Ref. MSG 050
~
OFF DUTY
~
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
Private Family Conference D ISS KU AVAIL (14:14 - 14:40)
PLT
~
OFF DUTY
MEAL
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (13:14 - 13:42) Ref. MSG 050
SHUTTLE/ISS H2O CONTAINER FILL (HC) (ORB OPS, ECLS) Perform FILL TERMINATION, Ref. MSG 031
CWC TRANSFER Transfer 2 CWCs to ISS
N2 REPRESS TERM (On MCC GO) C
NOTES
10
FLT PLN/135/FLIGHT
07
Magnus Walheim
REPLANNED
3-73
STS-135/ULF7 FD
12:00
13:00
14:00
15:00
GMT
Date07/14(195)
20:00
21:00
22:00
23:00
00:00
MET
Day 005W E Z
TDRS
~
~
~
~
D/N
ORB
92
93
94
95
~
~
BIAS -XLV -ZVV
STS ATT
MS1
OFF DUTY
~
MEAL
EXERCISE
~
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (13:14 - 13:42) Ref. MSG 050
MS2
OFF DUTY
~
MEAL
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (13:14 - 13:42) Ref. MSG 050
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
~
NOTES
3-73
07
Magnus Walheim
REPLANNEDSTS-135/ULF7 FD
12:00
13:00
14:00
15:00
GMT
Date07/14(195)
20:00
21:00
22:00
23:00
00:00
MET
Day 005W E Z
TDRS
D/N
ORB
92
93
94
95
STS ATT~
~
BIAS -XLV -ZVV
MS1
~
OFF DUTY
MEAL
~
EXERCISE
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (13:14 - 13:42) Ref. MSG 050
MS2
~
OFF DUTY
MEAL
PUBLIC AFFAIRS EVENT ISS KU AVAIL: (13:14 - 13:42) Ref. MSG 050
~
TRANSFER OPS Ref. MPLM Transfer Lists and MSG 053
NOTES
11
FLT PLN/135/FLIGHT
07
Ferguson Hurley
REPLANNED
D PFC to be performed using S-Band via Public Call 4 for audio and Ku-band for Video. Please call down SSC preference before the conference and make sure that all applications except Netmeeting have been closed.
3-74
STS-135/ULF7 FD
16:00
17:00
18:00
19:00
GMT
Date07/14(195)
00:00
01:00
02:00
03:00
04:00
MET
Day 006W E Z
TDRS
~
~
~
~
D/N
ORB
95
96
97
~
~
BIAS -XLV -ZVV
STS ATT
CDR
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
OFF DUTY
~
AEM UNIT #1,2,3 CHECK (Cue Card)
CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
PLT
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
OFF DUTY
~
OFF DUTY
Private Family Conference D ISS KU AVAIL (16:23 - 17:08)
ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR ON - A,D
NOTES
3-74
07
Ferguson Hurley
REPLANNED
D PFC to be performed using S-Band via Public Call 4 for audio and Ku-band for Video. Please call down SSC preference before the conference and make sure that all applications except Netmeeting have been closed.
STS-135/ULF7 FD
16:00
17:00
18:00
19:00
GMT
Date07/14(195)
00:00
01:00
02:00
03:00
04:00
MET
Day 006W E Z
TDRS
D/N
ORB
95
96
97
STS ATT~
~
BIAS -XLV -ZVV
CDR
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
OFF DUTY
AEM UNIT #1,2,3 CHECK (Cue Card)
CHECK ISS AIRLOCK ATU CONFIGL9 PAYLOAD STATION A/G (two) - OFF PRIVATE MEDICAL CONFERENCE VIA A/G 2
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
PLT
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
OFF DUTY
OFF DUTY
Private Family Conference D ISS KU AVAIL (16:23 - 17:08)
ILLUMINATOR OPS (Cue Card, TV) ILLUMINATOR ON - A,D
NOTES
12
FLT PLN/135/FLIGHT
07
Magnus Walheim
REPLANNED
D PFC to be performed using S-Band via Public Call 4 for audio and Ku-band for Video. Please call down SSC preference before the conference and make sure that all applications except Netmeeting have been closed.
3-75
STS-135/ULF7 FD
16:00
17:00
18:00
19:00
GMT
Date07/14(195)
00:00
01:00
02:00
03:00
04:00
MET
Day 006W E Z
TDRS
~
~
~
~
D/N
ORB
95
96
97
~
~
BIAS -XLV -ZVV
STS ATT
MS1
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
OFF DUTY
~
TRANSFER BRIEFCall down status to MCC
TRANSFER BRIEF PREP
MS2
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
OFF DUTY
~
CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)
OFF DUTY
Private Family Conference D ISS KU AVAIL (15:49 - 16:21)
NOTES
3-75
07
Magnus Walheim
REPLANNED
D PFC to be performed using S-Band via Public Call 4 for audio and Ku-band for Video. Please call down SSC preference before the conference and make sure that all applications except Netmeeting have been closed.
STS-135/ULF7 FD
16:00
17:00
18:00
19:00
GMT
Date07/14(195)
00:00
01:00
02:00
03:00
04:00
MET
Day 006W E Z
TDRS
D/N
ORB
95
96
97
STS ATT~
~
BIAS -XLV -ZVV
MS1
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
OFF DUTY
TRANSFER BRIEFCall down status to MCC
TRANSFER BRIEF PREP
MS2
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
OFF DUTY
CGBA UNIT #1,2 STATUS CHECK (CC), STL STATUS CHECK (CC)
OFF DUTY
Private Family Conference D ISS KU AVAIL (15:49 - 16:21)
NOTES
13
FLT PLN/135/FLIGHT
07
Ferguson Hurley
CREW WAKE @ 06/13:00
REPLANNED
3-76
STS-135/ULF7 FD
20:00
21:00
22:00
23:00
GMT
Date07/14(195)
04:00
05:00
06:00
07:00
08:00
MET
Day 006W E Z
TDRS
~ ~
~~
D/N
ORB
98
99
100
~
~
BIAS -XLV -ZVV
STS ATT
CDR
SLEEP
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
PLT
SLEEP
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
NOTES
3-76
07
Ferguson Hurley
CREW WAKE @ 06/13:00
REPLANNEDSTS-135/ULF7 FD
20:00
21:00
22:00
23:00
GMT
Date07/14(195)
04:00
05:00
06:00
07:00
08:00
MET
Day 006W E Z
TDRS
D/N
ORB
98
99
100
STS ATT~
~
BIAS -XLV -ZVV
CDR
~
SLEEP
~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
PLT
~
SLEEP
~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
NOTES
14
FLT PLN/135/FLIGHT
07
Magnus Walheim
CREW WAKE @ 06/13:00
REPLANNED
3-77
STS-135/ULF7 FD
20:00
21:00
22:00
23:00
GMT
Date07/14(195)
04:00
05:00
06:00
07:00
08:00
MET
Day 006W E Z
TDRS
~ ~
~~
D/N
ORB
98
99
100
~
~
BIAS -XLV -ZVV
STS ATT
MS1
SLEEP
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
MS2
SLEEP
~
PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
~
NOTES
3-77
07
Magnus Walheim
CREW WAKE @ 06/13:00
REPLANNEDSTS-135/ULF7 FD
20:00
21:00
22:00
23:00
GMT
Date07/14(195)
04:00
05:00
06:00
07:00
08:00
MET
Day 006W E Z
TDRS
D/N
ORB
98
99
100
STS ATT~
~
BIAS -XLV -ZVV
MS1
~
SLEEP
~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
MS2
~
SLEEP
~PRE-SLEEP ACTIVITY (ORB OPS, CREW SYSTEMS)
NOTES
15
MSG 052 - FD07 MISSION SUMMARY
END OF PAGE 1 OF 2, MSG 052
"Good Morning, Atlantis and thank you for calling the Mission Control Automated Call 1
Center. We are experiencing an unusually high call volume on the TDRS to White Sands 2
link, due to multiple vehicles utilizing the satellite. Your patience is appreciated." 3
4
"Please choose from one of the 135 options below..." 5
6
“Press or say “1” for Space or Ground Network Techno-Babble.” 7
“Press or say “2” for an NDC password reset.” 8
“Press or say “3” for MPC/Crew Choice playback.” 9
“Press or say “4” if you are experiencing unexpected RFI.” 10
“Press or say “5” if you would like to perform a TDRS handover.” 11
“Press or say “6” For Windows 7 migration issues.” 12
13
<ONE ORBIT SHIFT LATER> 14
15
“Press or say "135" to request a launch hold.” 16
17
<BEEP - SELECTION MADE> 18
19
"Stand by while we connect your call…" 20
21
<HOLD MUSIC> “Ground Control to Major Tom, Ground Control to Major Tom, take your 22
protein pills and put your helmet on…” 23
24
"We apologize for the delay, please remain on the Air-to-Ground lines, your call is very 25
important to us." 26
27
<HOLD MUSIC> “This is Major Tom to Ground Control, I'm stepping through the door and 28
I'm floating in a most peculiar way…” 29
30
"Thank you for holding, we are only able to process low data rate at this time, would you like 31
to remain on the line?" 32
33
<UNINTELLIGIBLE COMMENT> "#*&$*@!!!" 34
35
“I’m sorry, I didn’t catch that… we’ll have GC work on the echoes." 36
37
"Please try your call again later…and KUDOS to you all from the Ground Control and 38
Operations Support Team! Goodbye." 39
40
"Atlantis/ISS, we are now resuming operational audio communications." 41
42
-GC and the OST 43
44
45
46
47
48
49
50
51
16
MSG 052 - FD07 MISSION SUMMARY
END OF PAGE 2 OF 2, MSG 052
YOUR CURRENT ORBIT IS: 213 X 206 NM 1
2
NOTAMS - 3
4
EDW - EDW 22L/04R IN USE. EDT 22R/04L EMERGENCY DAY USE ONLY 5
EDW - LAKEBED RWYS GREEN 6
EDW RWY 22L MLS AZIMUTH SINGLE STRING 7
NOR - LAKEBED RWYS GREEN 8
NTU - RWY 05L/23R AND 14R/32L CLSD 9
MRN - RWY 20 ALS OUT OF SERVICE 10
FMI - TACAN NIM53 DECOMMISSIONED 11
BEJ - CLOSED UNTIL 15 JULY 12
ESN - RWY 03R/21L CLSD 13
ESN - TACAN BAG78 OUT OF SERVICE 14
GUA - TACAN UNZ105 OUT OF SERVICE 15
FFA - NOT USABLE. IN CARETAKER STATUS 16
YQX - TACAN YQX74 DME ONLY 17
YYR - TACAN UYR40 DME ONLY 18
YYT - TACAN UYT23 DME ONLY 19
YJT - TACAN YJT78 DME ONLY 20
BEN - NOT USABLE. NOT SUPPORTED 21
IKF - NOT USABLE. NO AGREEMENT 22
23
NEXT 2 PLS OPPORTUNITIES: 24
25
EDW22 ORB 94 – 5/22:32 SKC 7 220/14P22 26
EDW22 ORB 110 – 6/23:10 SKC 7 220/10P16 27
28
OMS TANK FAIL CAPABILITY: 29
30
NO 31
32
LEAKING OMS PRPLT BURN: 33
34
ALWAYS BURN RETROGRADE 35
36
OMS QUANTITIES(%): 37
38
L OMS OX = 37.90 R OMS OX = 37.74 39
FU = 37.97 FU = 37.32 40
41
DELTA V AVAILABLE: 42
43
OMS 362 FPS 44
ARCS (TOTAL ABOVE QTY1) 34 FPS 45
46
TOTAL IN THE AFT 396 FPS 47
48
ARCS (TOTAL ABOVE QTY2) 63 FPS 49
FRCS (ABOVE QTY 1) 34 FPS 50
51
AFT QTY 1 84 % 52
AFT QTY 2 46 % 53
54
THERE ARE NO FAILURE/IMPACT/WORK AROUNDS FOR TODAY. 55
17
MSG 053 (28-0551) - FD07 TRANSFER MESSAGE Page 1 of 8
Page 1 of 8, MSG 053 (28-0551)
Good morning, Sandy! 1
2
Thank you, and the rest of the crew, for all the hard work yesterday, which continues to keep 3
you ahead of schedule on transfer. Today you should focus on finishing up packing the 4
backside locations of the RSPs and then enjoy your off-duty time this afternoon. 5
6
Transfer Status: 7
o Middeck: 59% complete 8
o MPLM: 48% complete 9
o TOTAL: 49% complete 10
11
12
The Transfer List Excel file, FD07_Transfer_List_STS135.xls, locations are: 13
Shuttle: C:\OCA-up\transfer (KFX machine) 14
Station: K:\OCA-up\transfer 15
16
17
Transfer Notes 18
19
TVIS Gyro stowage: In order to help you stow the TVIS Gyro in the F1_K1 location, 20
OSO has uplinked MSG 54 (28-0558) Resupply Stowage Platform (RSP) R&R 21
detailing the RSP strut removal plan we talked about last night. In summary, you’ll be 22
removing two struts from the left rear of the F1 RSP, folding out the vertical fence, 23
stowing the gyro in the K1 location, and replacing the fence and struts. We’ve looked at 24
alternate stowage locations for the gyro; however, all other options drive additional 25
hardware location changes. Additionally, please wait to complete this activity until we 26
receive confirmation that the new gyro has successfully spun up later today. 27
28
29
FD07 Choreography 30
31
Middeck Return Item 727: Pack condensate sample 32
Complete any RSP backside items not completed on FD06 33
Stow return items in RSR blocked locations while RSP fences are folded 34
35
36
Please incorporate uplink pages as follows (we’ve listed the updates in the order they 37
printed out for you): 38
39
MIDDECK TRANSFER LIST BOOK 40
41
In the Middeck Transfer List RETURN tab 42
Replace the following pages: 43
Return 1 44
Return 2 45
Return 6 46
Return 10 47
48
Add the following page: 49
Return 11 50
18
MSG 053 (28-0551) - FD07 TRANSFER MESSAGE Page 2 of 8
Page 2 of 8, MSG 053 (28-0551)
MPLM RETURN TRANSFER LIST BOOK 1
2
In the MPLM Return Transfer List RETURN tab 3
Replace the following page: 4
Return 38 5
6
7
FD08 Choreography 8
9
Pack old PGT for return in MPLM after PGT C/O 10
Transfer CubeLab Module-7 LMA Pack 2 (s/n 1001) to middeck. 11
LiOH Swap: 12
o 20 unused STS-135 cans from middeck to ISS 13
o 7 unused STS-132 and STS-133 cans from ISS to middeck 14
o 6 used STS-134 cans from ISS to middeck (if found) 15
Uninstall pivot pin brackets at A2, A4, F2, & F4 RSPs and stow in MPLM for return (if 16
backsides are complete). 17
Transfer Micro-4 samples from ISS (CGBA-5) to middeck (CGBA-2). 18
Continue packing MPLM for return. 19
20
Have a great day! 21
22
- STS-135 Transfer Team 23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
19
28-0558 (MSG 054) RESUPPLY STOWAGE PLATFORM (RSP) STRUT R&R Page 1 of 5 pages
13 JUL 11
OBJECTIVE: Remove and replace RSP struts for access to rear fence stowage volume. LOCATION: MPLM DURATION: 20 minutes CREW: One MATERIALS: None PARTS: None TOOLS: Digital Camera ISS IVA Toolbox: Drawer 1:
3/4” Combination Wrench (if required) REFERENCED PROCEDURE: None
20
28-0558 (MSG 054) RESUPPLY STOWAGE PLATFORM (RSP) STRUT R&R Page 2 of 5 pages
13 JUL 11
1. ACCESSING Stowage removed from MPL1F2 Rack Bay for access to side of
MPL1F1 Rack. 2. REMOVE RSP REAR STRUTS
Figure 1.- Overview of RSP rear parts with rack still rotated up.
2.1 Remove RSP Rear Side Strut from Horizontal Middle Rear Fence
and Horizontal Bottom Rear Fence, tethered PIP pins (two). Temporarily stow. Refer to Figure 1.
NOTE PIP pins secure adjacent fences to one another and are at the corners of adjacent M-01 and M-02 fences.
Horizontal Middle Rear Fence
RSP Rear Tube Strut
RSP Rear Side Strut
Horizontal Bottom Fence
Vertical M-01 Fence PIP Pin (one of two)
21
28-0558 (MSG 054) RESUPPLY STOWAGE PLATFORM (RSP) STRUT R&R Page 3 of 5 pages
13 JUL 11
2.3 Remove tethered PIP pins (two) securing Vertical M-01 Fence to Horizontal Middle Rear Fence and Horizontal Bottom Fence.
Refer to Figure 1.
Figure 2. - Top RSP Rear Tube Strut Bracket.
2.4 Remove retaining rings from PIP pins on RSP Rear Tube Struts
(two, one per PIP pin). Refer to Figure 2. 2.5 Remove RSP Rear Tube Strut, PIP pins (two). Temporarily stow. Refer to Figure 2.
NOTE 1. The Jam Nuts on either end of the RSP Rear Tube Strut are
threaded in opposite directions (Left-Hand and Right-Hand threads).
2. Both Jam Nuts will need to be loosened to allow adjustment
of the RSP Rear Tube Strut.
RSP Rear Tube Strut Bracket PIP Pin
Retaining Ring
22
28-0558 (MSG 054) RESUPPLY STOWAGE PLATFORM (RSP) STRUT R&R Page 4 of 5 pages
13 JUL 11
*********************************************************************************** * * * * * * * *
If PIP Pins cannot be removed from RSP Rear Tube Strut Brackets, 2.5.1 Loosen RSP Rear Tube Strut Jam Nuts (two), as
required (3/4” Combination Wrench). 2.5.2 Turn RSP Rear Tube Strut to lengthen or shorten, as
required. 2.5.3 Remove PIP pins (two).
********************************************************************************** 2.6 Swing Vertical M-01 Fence into MPL1F2 Rack Bay for stowage
volume access.
3. STOWAGE 3.1 Stow hardware in RSP volume per transfer list.
4. INSTALL RSP REAR STRUTS 4.1 Swing Vertical M-01 Fence until aligned with PIP Pin clevices on
Horizontal Middle Rear Fence and Horizontal Bottom Fence. Install PIP Pins (two) into Vertical M-01 Fence clevices. Refer to Figure 1. 4.2 Align RSP Rear Tube Strut into RSP Rear Tube Strut Brackets. Install PIP pins (two). PIP Pins install easily (not forced), with some free wiggle. Refer to Figure 2.
*********************************************************************************** * * * * * * * * * * * *
If PIP Pins cannot be easily installed into RSP Rear Tube Strut Brackets, 4.2.1 Loosen RSP Rear Tube Strut Jam Nuts (two), as
required (3/4” Combination Wrench). 4.2.2 Turn RSP Rear Tube Strut to lengthen or shorten, as
required. 4.2.3 Install PIP pins (two). PIP Pins install easily (not forced), with some free
wiggle. 4.2.4 Hand tighten RSP Rear Tube Strut Jam Nuts (two).
********************************************************************************** 4.3 Install retaining rings on PIP pins on RSP Rear Tube Struts (two,
one per PIP pin). Refer to Figure 2.
23
28-0558 (MSG 054) RESUPPLY STOWAGE PLATFORM (RSP) STRUT R&R Page 5 of 5 pages
13 JUL 11
4.4 Install RSP Rear Side Strut (P/N SEG33112727-301) on Horizontal Middle Rear Fence and Horizontal Bottom Rear Fence, tethered PIP pins (two).
Refer to Figure 1. 5. CLOSEOUT 5.1 Photo document rear RSP configuration (Digital Camera). 5.2 Notify MCC-H of task completion.
24