fdc - klimaoprema · 2020. 10. 5. · promastop-i or hilti cfs-ct). mineral wool and damper casing...

30
1 Gradna 78A, 10430 Samobor, Croatia +385 (0)1 33 62 513 [email protected] www.klimaoprema.hr FDC Installation manual Fire protection Issue Date: 18.8.2020

Upload: others

Post on 03-Sep-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

1

Gradna 78A, 10430 Samobor, Croatia

+385 (0)1 33 62 513

[email protected]

www.klimaoprema.hr

FDC

Installation manual

Fire protection

Issue Date: 18.8.2020

Page 2: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

2

1. Product presentation..........................................................................................................................3

2. Dimensional range.............................................................................................................................4

3. Dimensions.......................................................................................................................................5

4. Storage and handling.........................................................................................................................8

5. Installation and implementation..........................................................................................................8

6. Control mechanism..........................................................................................................................23

7. Electrical connections......................................................................................................................25

8. Other mechanisms...........................................................................................................................26

9. Evolution of service kits....................................................................................................................28

10. Maintenance..................................................................................................................................28

table of contents

Page 3: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

3

1. product presentation

Fire dampers FDC25/FDC40 are installed in ventilation ducts between fire compartments in order to stop the spread of fire and smoke trough the duct. They have a modular (manual or magnet) or motorized mechanism, entirely outside the wall. Casing is made out of galvanized steel sheet, damper blade is made of special insulating material, and damper blade shaft and push rod are made of stainless steel. Bearings are made of brass, seals of polyurethane and elastomer. The fire damper can be equipped with a simple mechanism with thermal fuse, or with solenoid actuator mechanism or with electric actuator mechanism..

• Tested according to EN 1366-2 up to 500 Pa• Airtightness according to standard EN 1751 class C• Approved for installation in a concrete wall, a concrete slab, plasterboard wall and gypsum

blocks wall• Operating mechanism completely outside the wall• Easy to install• Maintenance free

1. Galvanized steel casing2. Fire resistant damper blade3. Control mechanism4. Intumescent joint5. Connection flanges6. Product marking on the casing7. Thermal fuse

1. Gypsum layers2. Intumescent joint3. Cold smoke seal4. Boundary layer

1

3

45

2

6

7

1

23

4

Page 4: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

4

Diameter (mm) Gross section (dm²) Netto area (dm²)

FDC25

100 0,74 0,50

125 1,17 0,87

160 1,93 1,55200 3,05 2,56250 4,79 4,18300 6,18 5,74315 7,64 6,87

FDC40

355 9,73 8,33400 12,37 10,79450 15,69 13,91500 19,39 17,41630 30,86 28,36710 39,24 36,42800 49,86 46,68

2. dimensional range

In decimeters:

Free area for dimensions Ø100-315 (blade 25mm) (dm²) = [(π x (Ø-3)2/4)-25 x (Ø-5)]/10 000

Free area for dimensions Ø350-800 (blade 40mm) (dm²) = [(π x (Ø-3)2/4)-40 x (Ø-5)]/10 000

In meters:

Free area for dimensions Ø100-315 (blade 25mm) (m²) = [(π x (Ø-3)2/4)-25 x (Ø-5)]/1 000 000

Free area for dimensions Ø350-800 (blade 40mm) (m²) = [(π x (Ø-3)2/4)-40 x (Ø-5)]/1 000 000

Diameter (mm) Gross section (dm²) Netto area (dm²)

FDCApplique

100 3,30 0,50

125 3,80 0,87

160 5,11 1,55200 6,16 2,56250 8,55 4,18315 12,25 6,87

Page 5: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

5

3. dimensions

380 ∅D/2+12 ∅D/2+22220

Y

D

AC

D∅D

E

380 ∅D/2+12 ∅D/2+22∅

D

Y

101

E

A

E

Y

D

AC

∅D

380 ∅D/2+12

C

∅D/2+22

Fdc25-r

Fdc40-r

Fdc25/40 m

Product A C D E

BelimoBFL (M) 25 200 90 120

BFN (M) 25 225 100 120

Klimaoprema

-R (FDC 25) 55 150 105 150

-R (FDC 40) 55 200 105 200

-EMP (FDC 25/40) 55 200 105 200

Page 6: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

6

∅D

380100 45

∅D+

A

(∅D/2)+80 (∅D/2)+94

(∅D/2)+80 (∅D/2)+124

380100 45

∅D

∅D+

A

45

∅D+

A

380

145

∅D+16045

∅D+

A

380

145

∅D+160

(∅D/2)+80 (∅D/2)+124

380100 45

∅D

∅D+

A

∅D

380100 45

∅D+

A

(∅D/2)+80 (∅D/2)+94Fdc appliQue

Damper diameter ØD[mm] Applique frame diameter [mm]

100 Øn+105mm

125-180 Øn+95mm

200-315 Øn+80mm

Y = (Øn/2) - 110 (mm)X* = (Øn/2) - 270 (mm)*(dimension X is same as Y (blade

lenght outside of housing) but on

opposite side

Page 7: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

7

FDC25 / FDC40-MF1 kit for “on the wall” installation• MF1 kit is an installation subframe for quick and easy installation on the rigid and flexible walls• made out of calcium silicate boards • quick wall mounting with screws

• factory assembled to the fire damper

62 82

D

n

380 Dn+118

D

n+11

8

36

36 FDC25-R-MF1

FDC40-M-MF1

62 82

D

n

380 Dn+118

D

n+11

8

36

36

FDC40-R/EMS/EMP-MF1

62 82

D

n

380 Dn+118

D

n+11

8

36

36

FDC25-MF1-R FDC25-MF1-EMS FDC25-MF1-MØn[mm] 100 125 160 200 250 315 100 125 160 200 250 315 100 125 160 200 250 315

Weight [kg] 7,10 7,58 8,63 9,38 10,96 13,17 7,40 7,88 8,93 9,68 11,26 13,47 7,40 7,88 8,93 9,68 11,26 13,47

Page 8: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

8

4. storage and handling

As a safety element, the fire damper must be stored, handled and installed carefully. Pay attention to:• unload in a dry area• avoid any shocks• do not use the damper as a workbench or scaffolding• do not fit the small dampers in the large one

The damper must be stored in a dry place, and kept out of water and frost. It should not be stacked beyond the original packaging. It must be properly stowed so as to prevent any damage or deformation resulting from an impact or high humidity. It must not be exposed to direct sunlight to prevent premature aging of the thermal fuse. Once the damper is installed, the mechanism should be kept away from any projections (cement, paint, flocking, water, dust) that may harm its operation. The damper must be protected against the risk of heavy condensation. The intumescent joints are essential for the fire resistance of the damper, all mechanical actions on the refractory parts are to be excluded. All precautions shall be taken to ensure that premature aging of the damper does not occur before it is actually installed. The actions of wedging and caulking during the sealing of the dampers must not cause deformations that will alter the good functioning of the damper and in particular the closing of the blade.

5. installation and implementation

5.1 installation

• Mounting is possible with the blade axis in horizontal or in vertical position• The installation must comply with the tests that were performed during certification, as

explained in 8.2.• Avoid any obstruction of the moving blade by the connected ducts• The class of air-tightness is maintained in case the installation of the damper is made in

accordance with the technical manual• Operating temperature: 50° C max• For indoor use onlyThe FDC25 / FDC40 fire damper is always tested in standardized support frames (both in a concrete wall and in a flexible wall) in accordance with EN 1366-2: 1999 table 3/4/5. The results obtained are valid for all similar support frames which have a thickness and / or density and / or fire resistance similar or greater than the one of the test.

Minimum opening hole for fire damper instalation:

Damper size – ØD [mm] Opening size – A (minimum)

ØD < 160 ØD + 85180 < ØD < 315 ØD + 75315 < ØD < 450 ØD + 65

ØD > 450 ØD + 55

Page 9: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

9

5.2 installation and sealing

5.2.1 Concrete wall and reinforced concrete wall installationThe wall is composed of concrete blocks (minimum density of 550 kg/m³) and with a minimum thickness of 100 mm.

5.2.2 Aerated concrete ceiling installation and reinforced concrete ceiling installationThe ceiling is made of aerated concrete with a minimum density of 550 kg/m³ and a minimum thickness of 100 mm

Place the damper in an openingaccording to table (on pg. 6)

Fix the damper to the wall using screws (screw hole is 6mm in diameter)

Fill the space between the damper and the wall with mortar

Place the damper in an opening according to table

(on pg. 6)

Fix the damper to the slab using screws (screw hole is 6mm in

diameter)

Fill the space between the damper and the slab with mortar

Page 10: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

10

5.2.3 Gypsum blocks wall 70mmThe wall is composed of gypsum blocks (minimum density of 995kg/m³), and with minimum thickness of 70mm.

Place the damper in an openingaccording to table (on pg. 6)

Fix damper and GKF gypsum boards (12,5mm thick) to wall with screws

(screw hole is 6mm in diameter)

Fill the space between the damper and the wall with mortar

Cover the mortar with GKF gypsum boards (12,5 mm thick)

* The Kit is universal for all dimensions and must be cut to fit the specific dimensions

of the damper

Diameter of the damper (mm)

Mounting kit

100 60061429125 60061430160 60061431200 60061432250 60061433315 60061435355 60061436400 60061437450 60061438500 60061439560 60061440630 60061441710 60061442800 60061443

Page 11: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

11

5.2.5 Flexible wall mounting (mineral wool sealing)The wall is composed of 2x2 GKF plates, 12.5 mm thick, installed on a 48 mm wide steel construction. The interior of the wall is filled with mineral wool of 100 kg/m³ density.

625 625 > 440

Realization of the steel construction

Place the damper in an openingaccording to table (on pg. 6)

Fix the damper to the wall using screws (screw hole is 6mm in diameter)

Fill the space between the damper and the wall with mineral wool (100 kg/m³

of density)

Cover the mineral wool with GKF gypsum boards (12,5 mm thick)

* The Kit is universal for all dimensions and must be cut to fit the specific dimensions

of the damper

Diameter of the damper (mm)

Mounting kit

100 60061429125 60061430160 60061431200 60061432250 60061433315 60061435355 60061436400 60061437450 60061438500 60061439560 60061440630 60061441710 60061442800 60061443

Page 12: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

12

5.2.6 Flexible wall mounting (mortar sealing)The wall is composed of 2x2 GKF plates (example PROMATECT 100, 12,5 mm thick), installed on a steel construction of 48 mm width.

625 625 > 440

Realization of the steel construction

Place the damper in an opening according to table

(on pg. 6)

Fix the damper to the wall using screws (screw hole is 6mm in

diameter)

Fill the space between the damper and the wall with mortar

Cover the mortar with GKF gypsum boards (12,5 mm thick)

* The Kit is universal for all dimensions and must be cut to fit the specific dimensions

of the damper

Diameter of the damper (mm)

Mounting kit

100 60061429125 60061430160 60061431200 60061432250 60061433315 60061435355 60061436400 60061437450 60061438500 60061439560 60061440630 60061441710 60061442800 60061443

Page 13: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

13

5.2.7 Installation in flexible wall (Weichschott)Installation material: Fire damper FDC, Mineral wool >140kg/m³, Fire protection coating, (HILTI and PROMAT system).

Recommended wall opening forfire damper installation is Ø +

400mm, but openings from Ø +80…600 mm can also be used

Insert fire damper into wallDamper blade must be closed

during installation!

Space between casing and wallclose with two layers of mineral

wool (density 140 kg/m³ or more, 50 mm thick, coated on one side)

Connections of mineral wool seal with intumescent fire resistant sealant (e.g. Promastop-I or Hilti CFS-CT). Mineral

wool and damper casing must be coated with 2 mm thick fire protection

coating

Page 14: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

14

5.2.8 Installation remote from flexible/rigid wallThe wall is composed of 2x2 GFK plates, 12.5 mm thick, installed on a 48 mm wide steel construction. The interior of the wall is filled with mineral wool of 100 kg/m³ density.

700

Øn+80

Øn+

80

Arrangement of steel profilesPlace the damper in an opening

according to table (on pg. 6) (wall cover with gypsium plates)

Place ventilation duct trough wall (thickness of threaded rod for

suspension should be M12 or more)

Install fire damper and secure it with self-tapping screws 4,3x10 to duct

(every 300mm)

Fill space between duct and wall with mineral wool (Isover U protect, min. 80mm

thickness). Additionally paint wool with Isover BSF in thickness of 1mm

Repeat the same procedure on the other side. Place the wool on ventilation

duct in lenght of 80mm

Close installation with L profiles 30x30x-3mm. Additionally fix profiles to duct with self-tapping screws, and screw them to wall with 4,5x50 screws with 200mm

distance between them

Place steel protection on place where insulation on damper ends (80x80mm,

1mm thick metal sheet cover)

On connection wool-wall applyglue Isover BSK in thickness of 2mm

Page 15: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

15

5.2.9 Installation in ceiling (Weichschott)The ceiling is composed of aerated concrete blocks (minimum density of 550 kg/m³) and with a minimum thickness of 100 mm.

Recommended ceiling openingfor fire damper installation is

Ø+ 400mm, but openings fromØ + 80…600 mm can also be used

Insert fire damper into ceilingDamper blade must be closed

during installation!

Space between casing and wallclose with two layers of mineral

wool (density 140 kg/m³ or more, 50 mm thick, coated on one side)

Connections of mineral wool should be sealed with intumescent fire resistant sealant (e.g.

Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick

fire protection coating

5.2.10 Suspension for Weichschott installationSuspension systems are required for the dry mortarless installation of the fire damper with mineral wool in solid walls, flexible walls and ceiling slabs. Fire dampers can be suspended from solid ceiling slabs using adequately sized threaded rods. Load the suspension system only with the weight of the fire damper. Ducts must be suspended separately.

1

32

1

4 5

Dn + 70Dn + 70

Wall installation Ceiling installation Threaded rod (M10), galvanized steel

Washer, galvanized steel

Nut, galvanized steel

Bracket, 45x30x1,5 mm, galvanized steel

L shaped profile (50x50x1) secured with self tapping screw to damper housing

1

2

3

4

5

Page 16: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

16

5.2.11 Installation in gypsum blocks wall 70mmThe wall is composed of gypsum blocks (minimum density of 995kg/m³), and with minimum thickness of 70mm.

30

30

30

45º

30

150

150

Prepare opening in the wall according to dimension table (on page 6) Insert fire damper into wall

Fire damper can be installed with minimal distance of 30 mm between wall, ceiling

or other dampers.

Cover the mortar with GKF gypsum boards (12,5 mm thick)

Space between casing and wallclose with mortar

Page 17: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

17

5.2.12 Installation in gypsum blocks wall 100mmThe wall is composed of gypsum blocks (minimum density of 995kg/m³), and with minimum thickness of 100mm.

30

30

30

45º

30

150

150

Prepare opening in the wall according to dimension table

(on page 6)Insert fire damper into wall

Fire damper can be installed with minimal distance of 30 mm between wall, ceiling

or other dampers.

Cover the mortar with GKF gypsum boards (12,5 mm thick)

Space between casing and wallclose with mortar

Page 18: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

18

5.2.13 Installation in rigid wall 100mmThe wall is composed of concrete blocks (minimum density of 550 kg/m³) and with a minimum thickness of 100 mm.

30

30

30

45º

30

Prepare opening in the wall according to dimension table

(on page 6)Insert fire damper into wall

Fire damper can be installed with minimal distance of 30 mm between wall, ceiling

or other dampers.

Space between casing and wallclose with mortar

Page 19: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

19

5.2.14 Flexible wall mountingThe wall is composed of 2x2 GKF plates, 12.5 mm thick, installed on a 48 mm wide steel construction. The interior of the wall is filled with mineral wool of 100 kg/m³ density.

30

30

30

45º

30

Arrangement of steel profiles according to drawing. Prepare opening

in the wall according to dimension table (on page 6)

Insert fire damper into wall

Mineral wool and damper casing must be coated with 2 mm thick fire protection

coating

Space between casing and wallclose with two layers of mineral

wool (density 140 kg/m³, 50 mm thick)

Fire damper can be installed with minimal distance of 30 mm between wall, ceiling

or other dampers.

Page 20: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

20

5.2.15 Installation in rigid floor 100mmThe floor is composed aerated concrete blocks (minimum density of 550 kg/m³) and with a minimum thickness of 100 mm.

30

30

30

45º

30

Prepare opening in the wall according to dimension table

(on page 6)Insert fire damper into floor

Fire damper can be installed with minimal distance of 30 mm between wall, ceiling

or other dampers.

Space between casing and wallclose with mortar

Page 21: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

21

5.2.16 Flexible wall installation with applique kitThe wall is composed of 2x2 GKF plates, 12.5 mm thick, installed on a 48 mm wide steel construction. The interior of the wall is filled with mineral wool of 100 kg/m³ density.

5.2.17 Concrete wall and reinforced concrete wall installation with applique kitThe wall is made of aerated concrete with a minimum density of 550 kg/m³ and a minimum thickness of 100 mm.

Arrangement of steel profiles. Installation hole is Ød + A + 10 mm (see page 5)

Insert fire damper into walland fasten with screws

(8 pcs, 4.8x60 mm)

625 625

n

+A

n +A

Installation hole is Ød + A + 10 mm (max)

Insert fire damper into walland fasten with screws

(8 pcs, 4.8x60 mm)

Wall opening dimensions

Damper diameter Ød[mm] Applique frame diameter D [mm] Wall opening [mm]

100 Ød+105 Ød+115mm

125-180 Ød+95mm Ød+105mm

200-315 Ød+80mm Ød+90mm

Page 22: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

22

5.2.18 Flexible wall installation with MF1 kitThe wall is composed of 2x2 GKF plates, 12.5 mm thick, installed on a 48 mm wide steel construction. The interior of the wall is filled with mineral wool of 100 kg/m³ density.

5.2.19 Concrete wall and reinforced concrete wall installation with MF1 kitThe wall is made of aerated concrete with a minimum density of 550 kg/m³ and a minimum thickness of 100 mm.

Crate an opening in the wall ød +15mm

Place the damper in the opening

Insert fire damper into walland fasten with screws(4 pcs, 4.8x120 mm)

Crate an opening in the wall ød +15mm

Place the damper in the opening

Insert fire damper into walland fasten with screws(4 pcs, 4.8x120 mm)

Page 23: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

23

6. control mechanism

MANUAL FUSE ONLY MECHANISMSelf-operating mechanism equipped with a thermal fuse.The Manual fuse only control mechanism closes the damper blade automatically if the temperature in the duct exceeds72 °C. The damper is reset manually by means of a screwdriver.Standard equipment:• Thermal fuse 72 °C• Manual triggering is possible• Manual reset, use the screwdriver (turn counterclockwise)

To open the damper, insert the screwdriver into the shaft (parallel to the ventilation duct axis) and turn

counterclockwise

To close the damper, press the thermal fusehead with a screwdriver

OPTIONSFor this self-operating version, the double contact – S - is available as an option (factory option or after-sales kit):The double contact S (OPEN / CLOSED) consists of:• electric limit switch indicating CLOSED position• electric limit switch indicating OPEN position

MANUAL FUSE ONLY MECHANISM UPGRADABLE TO SOLENOID MECHANISMFD25/FD40 in self-operating versionActivation :• Manual activation: Push the release button.• Self-operating activation: With a fuse at 72 ºCResetting :• Manual reset: Turn the screwdriver counter clockwise

Page 24: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

24

To open the damper, insert the screwdriver into the shaft (parallel to the ventilation duct axis) and turn

counterclockwise

To close the damper, press the thermal fuse head with a screwdriver

OPTIONS• For this self-operating version, the double contact – S and the 4-contacts – S2 - are available as

an option (factory option or after-sales kit):The 4-contact – S2 - consists of:• electric limit switch indicating CLOSED position• electric limit switch indicating OPEN position• additional electric limit switch indicating CLOSED position• additional electric limit switch indicating OPEN

FD25/FD40 solenoid mechanism version: EVO T

Activation:• Manual activation: Push the release button.• Self-operating activation: With a fuse at 72 ºC• Remote activation: By emission or break of current (solenoid with 24/48 V automatic voltage)

Resetting:• Manual reset: Turn the lever counterclockwise

Reminder:• For this version with remote activation, the double contact S (OPEN / CLOSED) are mounted as

standard equipment• The 4-contact – S2 - are available as an option (factory option or after-sales kit).

Page 25: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

25

7.electrical connections

FD25 MANUAL FUSE ONLY MECHANISM

• Electrical wiring of the S option Electronic control board

FC = Limit switch - end C = common NF = normally closedDC = Limit switch - start NO = normally open

Electrical specifications FD fuse only FD fuse only upgradable

Nominal voltage N/ASolenoid: 24/48 VDC

(automatic change on the electronic card)

Power N/ADual voltage SOLENOID:

• Break of current: Pnom = 1.6W

Switching capacity1mA…500mA, 5VDC…48VDC

1mA…500mA, 5VDC…48VDC

Blade closure timeBlade opening time

Spring: 1 secondManual

Spring: 1 second

Degree of protection IP 42 IP 42

Page 26: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

26

8. other mechanism

BELIMO

OperationDamper is delivered in closed position. When electric actuator is connected to the power supply damper will open. When the damper reaches the end position (damper open), the electromotor will stop. Closing fire damper takes place automatically when a power failure occurs. Thermal tripping device that comes with fire damper causes power circuit break at a temperature of 72 °C (inside or outside duct). If checking is needed for proper functioning of fire damper, pushing the switch on the thermal tripping device will close damper. When switch on tripping device is released, the damper will open.Damper can be opened without connecting to a voltage with enclosed handle turning in the direction of the arrow on electric actuator (clockwise). Damper can be locked in the desired position by fast turning back handle a quarter of a turn (counterclockwise) for Belimo BF, and by puling brake on Belimo BFL and BFN. To unlock the electromotor, turn handle clockwise for a quarter of a turn for Belimo BF, or release brake for Belimo BFL and BFN. After release, damper will be closed by return spring. When damper is opened manually, electric actuator will not move the damper into closed position after power failure.

Wiring diagram

1 negative (direct-current) or neutral (alternating current)2 positive (direct-current) or faze (alternating current)

S1 common micro switch closed damperS2 normally closed micro switch closed damperS3 normally open micro switch closed damperS4 common micro switch open damperS5 normally closed micro switch open damperS6 normally open micro switch open damperTf1 temperature sensor on the outer side of the duct (ambienttemperature) max. 72°CTf2 temperature sensor on the inner side of the duct (temperature in the duct) max. 72°CTf3 temperature sensor on the inner side of the duct (temperature in the duct) max. 72°C

Page 27: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

27

Type of Belimo actuator BFL24-T BFN24-T BFL230-T BFN230-T BF24-T BF230-T

Nominal voltage /

power con-sumption

voltageAC/

DC 24V, 50/60Hz

AC 24V, 50/60Hz

AC 230V, 50/60Hz

AC 230V, 50/60Hz

AC/DC 24V, 50/60Hz

AC 230V, 50/60Hz

opening 2,5 W 4 W 3,5 W 5 W 7 W 8.5 W

holding 0,8 W 1,4 W 1,1 W 2,1 W 2 W 3 W

for wire sizing 4 VA 6 VA 6,5 VA 10 VA 10 VA 11 VA

End switch

1 mA...3 A (0,5 A), DC

5 V...AC 250V

1 mA...3 A (0.5 A), DC

5 V...AC 250 V

1 mA...3 A (0.5 A), DC

5 V...AC 250 V

1 mA...3 A (0.5 A), DC

5 V...AC 250 V

1 mA...6 A (3 A), DC 5 V...AC 250 V

1 mA...3 A (0.5 A), DC

5 V...AC 250 V

Running timemotor <60 s <60 s <60 s <60 s <120 s <120 s

spring-return ~20 s ~20 s ~20 s ~20 s ~16 s ~16 s

Ambient temperature range min. -30°C, max. 50°C

SCHISCHEK ExMax

OperationDamper is delivered in closed position. When electricactuator is connected to the power supply damperwill open. When the damper reaches the end position(damper open), in which is it blocked, the electromotorwill stop. Closing fire damper takes place automatically when a power failure occurs. Thermal tripping device that comes with fire damper causes power circuit break at a temperature of 72 °C (inside or outsideduct). If checking is needed for proper unctioning of fire damper, pushing the switch on the thermal tripping device will close damper. When switch on tripping device is released, the damper will open. Damper can be opened without connecting to a voltage with enclosed Allen key, by turning in the direction of the arrow on electric actuator(clockwise). After release of Allen key, damper will go to closed position.Type Examination Certificate Number: EXA 14 ATEX0064XEquippment complies with the essential health and safety requirements relating to the design and construction of equippment intended to usein potentially explosive atmospheres given in annex II of the directive 94/9/EC..

Wiring diagram

Page 28: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

28

Designation Code

Fuse

onl

y m

echa

nism

Fuse kit FD-THERM-72

Double contact S kit FD-S-KIT

Upg

rade

able

to s

olen

oid

Solenoid current break kit FD-EMP-KIT

9. evolution / service kits

10. maintenance

• Observe the requirements specified in the NF S 61-933.• Provide at least one annual check of the damper• After each intervention, provide a systematic cleaning of dust and especially the solenoid and its

movable plate• Check the if the electrical terminals are tightened

Page 29: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

29

1.

Uni

que

iden

tific

atio

n co

de o

f th

e pr

oduc

t-ty

pe:

Cir

cula

r fir

e da

mpe

r 2

. Id

entific

atio

n of

the

con

stru

ctio

n pr

oduc

t:FD

C25

/40

3.

Inte

nded

use

(s)

of t

he c

onst

ruct

ion

prod

uct:

Cir

cula

r fir

e da

mpe

r to

be

used

in c

onju

nction

with

fire

sepa

rating

ele

men

ts t

o m

aint

ain

fire

com

part

men

ts in

HVA

C in

stal

lation

s. 4

. N

ame

and

cont

act

addr

ess

of t

he m

anuf

actu

rer:

Klim

aopr

ema

d.d.

, G

radn

a 78

A, 1

0430

Sam

obor

5.

Not

app

licab

le 6

. Sy

stem

of as

sess

men

t an

d ve

rific

atio

n of

con

stan

cy o

fSy

stem

1 p

erfo

rman

ce o

f th

e co

nstr

uction

pro

udct

7.

In c

ase

of t

he d

ecla

ration

of pe

rfor

man

ce c

once

rnin

g a

The

notifie

d bo

dy 1

812

carr

ied

out

the

initia

l ins

pect

ion

of t

he m

anuf

actu

ring

pla

nt a

nd o

f th

e fa

ctor

y c

onst

ruct

ion

prod

uct

cove

red

by a

har

mon

ised

sta

ndar

d:pr

oduc

tion

con

trol

as

wel

l as

the

cont

inou

s su

rvei

llanc

e, a

sses

smen

t an

d ev

alua

tion

of fa

ctor

y pr

oduc

tion

cont

rol u

nder

sys

tem

1 a

nd is

sued

the

Cer

tific

ate

of c

onst

ancy

of pe

rfor

man

ce 1

812

- CPR

- 1

161

8.

Not

app

licab

le 9

. D

ecla

red

perf

orm

ance

acc

ordi

ng t

o EN

156

50:

(Fir

e re

sist

ance

acc

ordi

ng t

o EN

136

6‐2

and

clas

sific

atio

ns a

ccor

ding

to

EN 1

3501

‐3)

Ess

enti

al c

har

acte

rist

ics

Per

form

ance

Ran

ge

Su

pp

orti

ng

con

stru

ctio

n S

up

por

tin

g c

onst

ruct

ion

det

ails

Typ

e of

in

stal

lati

on C

lass

ific

atio

n

ф10

0- ф

630m

m

(FD

C40

) F

lexi

ble

wal

l

Type

of in

stal

lation

: re

mot

e fr

om w

all,

0-

180⁰

Nom

inal

act

ivat

ion

cond

itio

ns/s

ensi

tivi

ty a

ccor

ding

to

ISO

102

94-4

:Pa

ssed

- se

nsin

g el

emen

t lo

ad b

eari

ng c

apac

ity

- se

nsin

g el

emen

t re

spon

se t

empe

ratu

re R

espo

nse

dela

y (c

losi

ng t

ime)

acc

ordi

ng t

o EN

136

6-2:

Pass

ed

Ope

ration

al r

elia

bilit

y (o

peni

ng,

clos

ing)

acc

ordi

ng t

o EN

136

6-2:

Pass

ed

Dur

abili

ty o

f re

spon

se d

elay

acc

ordi

ng t

o IS

O 1

0294

-4:

Pass

ed

- se

nsin

g el

emen

t re

spon

se t

o te

mpe

ratu

re a

nd lo

ad b

eari

ng c

apac

ity

Dur

abili

ty o

f op

erat

iona

l rel

iabi

lity

(ope

ning

and

clo

sing

cyc

le)

acco

rdin

g to

EN

156

50:

Pass

ed

- Be

limo,

Sch

isch

ek,

Siem

ens

- 10

000

cyc

les

- Fu

se o

nly,

Fus

e +

ele

ctro

mag

net

(Klim

aopr

ema)

- 30

0 cy

cles

Pro

tect

ion

agai

nst

corr

osio

n ac

cord

ing

to E

N 6

0068

-2-5

2:N

PD

Dam

per

blad

e an

d ca

sing

leak

age

acco

rdin

g to

EN

175

1:Cla

ss ≥

C 1

0. T

he p

erfo

rman

ce o

f th

e pr

oduc

t id

entifie

d in

poi

nts

1 an

d 2

is in

con

form

ity

with

the

decl

ared

per

form

ance

in p

oint

7.

Thi

s de

clar

atio

n of

per

form

anse

is is

sued

und

er t

he s

ole

resp

onsi

bilty

of t

he m

anuf

actu

rer

iden

tifie

d in

poi

nt 4

. S

igne

d fo

r on

beh

alf of

the

man

ufac

ture

r by

:Se

rgio

Gal

ošić

, G

ener

al m

anag

er

Sam

obor

, 0

1.

July

20

20

.

Pla

ster

boar

d ty

pe 9

8/48

100m

m E

I 60

(ve

i←o)

S (3

00 P

a) I

sove

r (r

emot

e fr

om w

all)

EI

90 (

ve i↔

o)S

(500

Pa)

Type

of in

stal

latio

n: b

uilt

in,

APP

LIQ

UE,

MF1

, 0

-360

°. M

inim

al d

ista

nces

aut

oris

ed:

EI

90 (

ve i↔

o)S

(500

Pa)

Fle

xibl

e w

all

WEI

CH

SCH

OTT

Rig

id w

all

Aera

ted

conc

rete

(≥

550k

g/m

3) ≥

100m

m a

nd

rein

forc

ed c

oncr

ete

(≥22

00kg

/m3)

≥10

0mm

MF1

(in

stal

lation

fra

me)

EI

60 (

ve i↔

o)S

(500

Pa)

Fle

xibl

e w

all

Gyp

sum

blo

cks

(≥99

5kg/

m3)

≥70

mm

Min

eral

woo

l + c

over

boa

rds

WEI

CH

SCH

OTT

DE

CLA

RA

TIO

N O

F P

ER

FOR

MA

NC

E N

o: D

oP 7

11/2

020_

7_EN

Gyp

sum

pla

ster

/Mor

tar

WEI

CH

SCH

OTT

Min

eral

woo

l + c

over

boa

rds

ф10

0 -

ф80

0mm

Aera

ted

conc

rete

(≥

550k

g/m

3) ≥

100m

m a

nd

rein

forc

ed c

oncr

ete

(≥22

00kg

/m3)

≥10

0mm

EI

90 (

ve i↔

o)S

(500

Pa)

Plas

terb

oard

typ

e 98

/48

≥10

0mm

EI

120

(ve

i↔o)

S (5

00 P

a)

Flo

or/c

eilin

gAe

rate

d co

ncre

te (

≥55

0kg/

m3)

≥10

0mm

and

re

info

rced

con

cret

e (≥

2200

kg/m

3) ≥

100m

m

EI

90 (

ve i↔

o)S

(300

Pa)

Gyp

sum

pla

ster

/Mor

tar

Harmonised standard EN 15650:2010

Gyp

sum

pla

ster

/Mor

tar

+ c

over

boa

rds

ф10

0 -

ф31

5mm

EI

120

(ve

i↔o)

S (5

00Pa

) E

I 90

(ve

i↔o)

S (3

00Pa

)

EI

120

(ve

i↔o)

S (5

00Pa

)

EI

120

(ho

i↔o)

S (5

00Pa

)

EI

90 (

ho i↔

o)S

(300

Pa)

Gyp

sum

pla

ster

/Mor

tar

+ c

over

boa

rds

Aera

ted

conc

rete

(≥

550k

g/m

3) ≥

100m

m a

nd

rein

forc

ed c

oncr

ete

(≥22

00kg

/m3)

≥10

0mm

APP

LIQ

UE

(ins

talla

tion

fra

me)

Plas

terb

oard

typ

e 98

/48

≥10

0mm

Rig

id w

all

Fle

xibl

e w

all

Gyp

sum

blo

cks

(≥99

5kg/

m3)

≥70

mm

Gyp

sum

blo

cks

(≥99

5kg/

m3)

≥70

mm

Plas

terb

oard

typ

e 98

/48

≥10

0mm

Rig

id w

all

Page 30: FDC - Klimaoprema · 2020. 10. 5. · Promastop-I or Hilti CFS-CT). Mineral wool and damper casing must be coated with 2 mm thick fire protection coating. 14 5.2.8 Installation remote

30

Design, production and service of Ventilation, Air-Conditioning and Cleanroom equipment.

Gradna 78A, 10430 Samobor, Croatia

+385 (0)1 33 62 513

[email protected]

www.klimaoprema.hr