fdot contract bdk84 977-04 alberto a. sagüés, principal ... · mario a. paredes, pe, project...
TRANSCRIPT
![Page 1: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/1.jpg)
FDOT CONTRACT BDK84 977-04
Alberto A. Sagüés, Principal Investigator Department of Civil and Environmental Engineering
University of South Florida
Mario A. Paredes, PE, Project Manager State Corrosion Engineer
State Materials Office Florida Department of Transportation
1
![Page 2: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/2.jpg)
2
FDOT Standard Specification for Road and Bridge Construction, Item 462-6.2
2009
![Page 3: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/3.jpg)
3
• To control corrosion, FDOT Standard Specifications for Road and Bridge Construction (2009) limits period between PT strand placement and grouting to 7 days.
• If specification too conservative for some service
environments: - Needless/costly construction requirements. Period may be
extended. • If specification too liberal for other environments:
- Corrosion risk. Shorter period or alternative/supplemental control methods may be needed.
Background/Problem:
![Page 4: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/4.jpg)
4
• Establish fact-based guidelines for duration period
• Determine/recommend practical alternative corrosion protection steps
• Selection based on - Environmental service conditions per FDOT
classifications - Type of tendon and structure considered.
Needs/Objectives:
![Page 5: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/5.jpg)
5
Tendon Set-Up
![Page 6: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/6.jpg)
6
Inland Installation Set-Up
![Page 7: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/7.jpg)
7
Seashore Installation Set-Up
![Page 8: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/8.jpg)
8
Table 3.1 – Field Exposure Conditions
![Page 9: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/9.jpg)
9
Visual Corrosion Rating
![Page 10: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/10.jpg)
10
Little Or No Corrosion: Acceptable
Photo 1: Strand Surface Before Cleaning Photo 1A: Strand Surface After Cleaning
“Pictures reproduced from Sason (1992) by kind permission from The Precast Prestressed Concrete Institute (PCI).”
![Page 11: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/11.jpg)
11
Some Amount of Surface Corrosion: Acceptable
Photo 2: Strand Surface Before Cleaning Photo 2A: Strand Surface After Cleaning
“Pictures reproduced from Sason (1992) by kind permission from The Precast Prestressed Concrete Institute (PCI).”
![Page 12: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/12.jpg)
12
More Corrosion: But Still Acceptable
Photo 3: Strand Surface Before Cleaning Photo 3A: Strand Surface After Cleaning
“Pictures reproduced from Sason (1992) by kind permission from The Precast Prestressed Concrete Institute (PCI).”
![Page 13: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/13.jpg)
13
More Corrosion: Borderline
Photo 4: Strand Surface Before Cleaning Photo 4A: Strand Surface After Cleaning
“Pictures reproduced from Sason (1992) by kind permission from The Precast Prestressed Concrete Institute (PCI).”
![Page 14: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/14.jpg)
14
Excessive Corrosion, Visible Pitting: Cause for Rejection
Photo 5: Strand Surface Before Cleaning Photo 5A: Strand Surface After Cleaning
“Pictures reproduced from Sason (1992) by kind permission from The Precast Prestressed Concrete Institute (PCI).”
![Page 15: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/15.jpg)
15
Further excessive Corrosion, Visible Pitting: Cause for Rejection
Photo 6: Strand Surface Before Cleaning Photo 6A: Strand Surface After Cleaning
“Pictures reproduced from Sason (1992) by kind permission from The Precast Prestressed Concrete Institute (PCI).”
![Page 16: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/16.jpg)
16
Figure A3.4 – Inland – 8 Week Exposure
In
itial
A
s-Extracted
WCI WCN DON DCN WCI WCN DON DCN
WCI WCN DON DCN WCI WCN DON DCN
![Page 17: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/17.jpg)
17
Figure A3.8 – Seashore – 8 Week Exposure
In
itial
A
s-Extracted
WCI WCN DON DCN WCI WCN DON DCN
WCI WCN DON DCN WCI WCN DON DCN
![Page 18: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/18.jpg)
18
Figure A3.9 – Most Severe Pitting Observed (Seashore Facility) – Set 1
![Page 19: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/19.jpg)
19
Conclusions
1. Dry ducts do not show significant corrosion.
2. Only ducts with free water standing show some
corrosion.
3. Corrosion was in the form of shallow pits.
4. Pitting did not cause significant tensile property changes.
5. Possible considerations could be made to extending time to grouting.
![Page 20: FDOT CONTRACT BDK84 977-04 Alberto A. Sagüés, Principal ... · Mario A. Paredes, PE, Project Manager . ... Bridge Construction, Item 462-6.2 . 2009 . 3 • To control corrosion,](https://reader034.vdocument.in/reader034/viewer/2022042922/5f6dc29b5c25171f27390f80/html5/thumbnails/20.jpg)
20