Feasibility Analysis. P14415. Thermoforming Quote- CJK. DIY Vacuum Forming. Use kitchen oven to heat plastic Use shop-vac with vacuum box shown Build vacuum box for under $100 Shop-vac costs $69-$299 External Heat source possibility Quote for New and Used Machines. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/1.jpg)
Feasibility AnalysisP14415
![Page 2: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/2.jpg)
Thermoforming Quote- CJK
![Page 3: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/3.jpg)
DIY Vacuum Forming
• Use kitchen oven to heat plastic
• Use shop-vac with vacuum box shown
• Build vacuum box for under $100
• Shop-vac costs $69-$299
• External Heat source possibility
• Quote for New and Used Machines
![Page 4: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/4.jpg)
Purchasing Vacuum Forming Mach.
• Cost: $12,900
• http://www.belovac.com/
![Page 5: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/5.jpg)
ABS vs. PolycarbonatePolycarbonatePros:•Outstanding toughness•Good optical clarity•Strong and stiff•Easy to fabricate•Easy to solvent bond••Cons:•Expensive compared to ABS•Good resistance to UV with stabilizers•Thermoforms well after drying
ABSPros:•Outstanding impact resistance•Good machinability•Easy to thermoform•Easy to bond with adhesives•Strong and stiff•Low cost•Cons:•Poor UV resistance•Becomes brittle with UV stabilizers•
![Page 6: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/6.jpg)
Material Eliminations:
Acrylic: Brittle
Polyethylene (HDPE/LDPE): Poor material strength properties compared to ABS
Polycarbonate: Expensive relative to ABS (2x the cost for most sheets)
Curbellplastics.com
![Page 7: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/7.jpg)
Material Research References:http://www.morganclaypool.com/doi/pdf/10.2200/S00184ED1V01Y200904MRE001
http://plastruct.com/Pages/Properties.html
http://www.toolcraft.co.uk/vacuum-forming-material-specs-abs-hips-hdpe-petg-pp-pvc.htm
http://www.machinist-materials.com/comparison_table_for_plastics.htm
http://www.curbellplastics.com/technical-resources/plastics-properties-table.asp?cols=&compare=1,2,6,8,16,17,21,23,24&direction=desc
![Page 8: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/8.jpg)
Design 1 Models
![Page 9: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/9.jpg)
Design 1 Models
![Page 10: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/10.jpg)
Design 1 Models
![Page 11: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/11.jpg)
Design 1 Models
![Page 12: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/12.jpg)
Ansys Analysis - Design 1 Summary
• Max Stress: ~1.5x Ultimate Strength Values
• Too high of stress values for fairly conservative model of worst case
• Design is insufficient as is to move forward with
• Needs redesign with added strength from additional supports: metal
![Page 13: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/13.jpg)
Ansys Analysis - Modeling Summary
• Worst Case and Normal Usage
• Multiple Discussions with Dr. Boedo and Dr. Debartolo
• Worst Case: Load (270lbs) around hole
• Normal Usage: Load (270lbs) across two locations at normal stance width
• Only base modeled, without material thinning
• Iterative solution modeling
![Page 14: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/14.jpg)
Ansys Analysis - Results Summary
![Page 15: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/15.jpg)
Design 1 - Stresses: Normal Loading
Circles denote peak stress locations.
![Page 16: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/16.jpg)
Design 1 - Deflection: Normal Loading
![Page 17: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/17.jpg)
Design 1 - Meshing: Normal Loading
![Page 18: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/18.jpg)
Design 1 - Stresses: Normal Loading
Circles denote peak stress locations.
![Page 19: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/19.jpg)
Design 1 - Deflection: Normal Loading
![Page 20: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/20.jpg)
Design 1 - Meshing: Normal Loading
![Page 21: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/21.jpg)
Design 1 Feedback
![Page 22: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/22.jpg)
Ansys Analysis - Conclusions
• Stresses too high for a fairly conservative model
• Redesign required with additional supports, such as rebar
• Debartolo believed analysis and conclusions seemed valid
![Page 23: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/23.jpg)
Design 2 - Analysis
Assumptions
• Rigid supports for deflection between ribs
• Cantilevered rib bending
![Page 24: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/24.jpg)
Design 2 - Analysis
Deflection between rigid supports
![Page 25: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/25.jpg)
Design 2 - Analysis
Deflection of Ribs
![Page 26: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/26.jpg)
Design 2 - Analysis
![Page 27: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/27.jpg)
Design 2 - Feedback
Dr. Debartolo• Assumptions inappropriate
• Need to assume ribs pinned, not cantilevered
• Need to assume deflection between ribs is cantilevered
• Distributed load will reduce deflection between ribs
![Page 28: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/28.jpg)
Design 2 - Moving Forward
• Redo calculations with new boundary condition assumptions
• Possibly change material based on new analysis
![Page 29: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/29.jpg)
Shipping Costs- Miami To Haiti (Preliminary Analysis)
-Analysis of per unit cost if container is filled to capacity
-Assumptions:
- One day storage before loading and after unloading (2 days total)
- Weight does not affect cost
- Cost per part is determined by volume
![Page 30: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/30.jpg)
Shipping Costs- Data
![Page 31: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/31.jpg)
Shipping Costs- Calculations
![Page 32: Feasibility Analysis](https://reader035.vdocument.in/reader035/viewer/2022062408/5681398a550346895da11e35/html5/thumbnails/32.jpg)
New Risks
Risk Chart Entry: