feasibility report for heritage farms street and … report presentation.pdflisbon avenue north,...

18
Heritage Farms Street and Utility Improvements SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc. FEASIBILITY REPORT for HERITAGE FARMS STREET AND UTILITY IMPROVEMENTS RESOULTION RECEIVING REPORT AND CALLING FOR PUBLIC IMPROVEMENT HEARING

Upload: others

Post on 13-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

FEASIBILITY REPORTfor

HERITAGE FARMS STREET AND UTILITY IMPROVEMENTS

RESOULTION RECEIVING REPORT ANDCALLING FOR PUBLIC IMPROVEMENT HEARING

Page 2: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

HERITAGE FARMS STREET & UTILITY IMPROVEMENTS PROGRAMMED STREET SEGMENTS

• Lisbon Avenue North, from30th Street to the southend;

• Lisbon Avenue CourtNorth, from Lisbon Avenueto the end of cul-de-sac;and

• 30th Street Circle North,from 30th Street North to30th Street North.

Page 3: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PROPOSED IMPROVEMENTS

1. Extension of public sanitary sewer from 30th Street North into the Heritage Farms subdivision and then along each street in the neighborhood. 30th Street Circle will connect to the Northport Subdivision. Individual sewer service stubs will be installed to the edge of right-of-way at each of the 44 residential properties.

2. Review and replacement of existing watermain valves, hydrants and other appurtenances as deemed necessary. Watermain pipe is relatively new.

3. Reconstruction of all streets in the Heritage Farms subdivision, including new concrete curb and gutter, new granular sand subbase, new class 6 aggregate base and new bituminous. New concrete curb and gutter is proposed to protect the edge of the pavement, provide improved construction tolerance and improve drainage along the street.

4. Storm sewer and drainage improvements are included only as needed to prevent standing water on or along the street and include replacement of failing catch basin structures, limited storm sewer pipe, culvert and flared end sections. Some new storm sewer is proposed in areas where the street grade is flat and the street does not drain well. Includes replacement of at least one outfall pipe that has failed. Storm sewer and drainage improvements will be limited to drainage issues that can be addressed within the City right-of-way.

Page 4: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PROPOSED IMPROVEMENTS

• Street widths are proposed to be maintained in order to preserve the character of theneighborhoods and minimize impacts to private properties. 2-way streets are 26-28 feet wide. One-way streets are 16-18 feet wide with bituminous curb.

• Adding concrete curb and gutter will result in perceived narrowing of the streets. Should provide atraffic calming benefit. No parking signage may need to be considered. It is assumed no parkingalong one-way streets. 2-way streets are 28-feet wide.

• If sanitary sewer is not extended into the neighborhood, the streets may be able to be improvedthrough a lower cost street reclaim project. A geotechnical investigation would need to becompleted as part of the project design to determine the viability of using a reclaim improvement.

Page 5: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PROPOSED SANITARY SEWER IMPROVEMENTS

Connect to existing sewer manhole in 30th Street North

Connect to existing sewer manhole extended to east side of 30th Street North by Northport Addition

Page 6: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PROPOSED STREET & STORM SEWER IMPROVEMENTS

Page 7: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PROPOSED STREET & STORM SEWER IMPROVEMENTS

Page 8: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PROPOSED STREET & STORM SEWER IMPROVEMENTS

Page 9: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

TOTAL ESTIMATED PROJECT COSTS

TOTAL ESTIMATED PROJECT COST: $2,708,000

Street and Storm Sewer Improvements – Full Reconstruction $ 1,774,000 Sanitary Sewer Improvements $ 884,000 Water System Repair/Replacement $ 50,000

*Street and Storm Sewer Improvements – Reclaim option (no utility) $ 999,600

Page 10: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

ASSESSABLE PROPERTIES

SANITARY SEWER ASSESSMENTS-- 44 Assessable properties-- Lisbon Avenue N.-- Lisbon Avenue Court N.-- 30th Street Circle N.

STREET & DRAINAGE ASSESSMENTS-- 46 Assessable properties-- Lisbon Avenue N.-- Lisbon Avenue Court N.-- 30th Street Circle N.-- Buildable lot at

Parcel ID 2402921110022-- Heritage Park (City owned)

Page 11: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PRELIMINARY SANITARY SEWER ASSESSMENTS

• Residential properties: Sanitary Sewer assessed per unit method at 30% total project costs.

• 44 properties assessed for Sanitary Sewer.

Sanitary Sewer ImprovementsTotal Estimated Project

Costs

CITY SHARE OF

PROJECT COST

ESTIMATED PER UNIT

ASSESSED RATE

Lisbon Avenue North,

Lisbon Avenue Court North, and 30th Street

Circle North

$884,000 $0 $20,500

Watermain Repair/Replacement

Improvements

Total Estimated Project

Costs

CITY SHARE OF

PROJECT COST

ESTIMATED PER UNIT

ASSESSED RATE

Lisbon Avenue North,

Lisbon Avenue Court North, and 30th Street

Circle North

$50,000 $50,000 $0

Page 12: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

ADDITIONAL SANITARY SEWER COSTS

• Estimated “Total” Sewer Costs for typical residential property. $27,050 + servicehook-up.

Unit Assessment: $20,500 per REC paid over 20 years.

Sewer Availability Charge: $3,000 per REC paid over 20 years.

Sewer Connection Charge: $1,000 per REC paid over 20 years.

Sewer permit fee: $65 due at connection.

MCES SAC: $2,485 (2019 fee) per REC due at connection.

Cost to run private service line: Various by property. Typical $5,000 to $8,000 paid tocontractor.

City assessment policy includes Hardship deferral provisions for qualifying propertyowners.

Page 13: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PRELIMINARY STREET AND STORM SEWER ASSESSMENTS

• Residential properties: Street & Storm Sewer assessed per unit method at 30% totalproject costs.

• 46 Properties assessed for Street and Storm Sewer.

Street and Storm Sewer ImprovementsTotal Estimated Project

Costs

CITY SHARE OF

PROJECT COST

ESTIMATED PER UNIT

ASSESSED RATE

Lisbon Avenue North,

Lisbon Avenue Court North, and 30th Street

Circle North

$1,686,000 $1,180,000 $11,000

30th Street North (MSA Road) $ 88,000 $ 88,000 $0

*Street and Storm Sewer Improvements – Reclaim option (no utility) $ 999,600Unit Assessment $ 6,500

Page 14: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PRELIMINARY ASSESSMENT ROLL – STREET AND STORM SEWER

Page 15: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PRELIMINARY ASSESSMENT ROLL – SANITARY SEWER

Page 16: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

FINDINGS AND RECOMMENDATIONS

• Street pavements along Lisbon Avenue N., Lisbon Avenue Court N. and 30th Street Circle N. are inpoor condition and beyond their useful service life.

• A petition for sanitary sewer was received by the neighborhood and accepted by the City councilin 2018.

• It is recommended to extend sanitary sewer into the neighborhood and reconstruct the streets.Drainage and storm sewer improvements are recommended as detailed in the report to correctdrainage deficiencies that will otherwise cause premature pavement failures. Placement of newconcrete curb & gutter is recommended to replace existing bituminous curb and gutter to improvethe street construction and extend the useful service life of the streets.

• It is further recommend to make any necessary water system repairs and replacements as part ofthe project.

• It is recommended that an Assessment be levied to each of these properties, payable over 15years for the street and storm sewer assessment and 20 years for the sanitary sewer assessment;each at the Bond Rate +1%. Assessments would be levied in accordance with the preliminaryassessment rolls provided in the Report.

• The project, as proposed, is technically and financially feasible, is necessary, cost-effective, and willresult in benefit to the properties to be assessed.

Page 17: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

PROJECT SCHEDULE

JULY 16, 2019 Council orders preparation of Feasibility Report.

SEPTEMBER 17, 2019 Presentation of Feasibility Report. Council accepts Report and calls Hearing.

OCTOBER 15, 2019 Public Improvement Hearing.Council orders the preparation of Plans and Specifications.

MARCH 3, 2020 Council approves Plans and Specifications and orders Advertisement for Bids.Declare Costs to be Assessed and Call for Hearing on Assessment.

APRIL 2, 2020 Receive Contractor Bids.

APRIL 21, 2020 Final Assessment Hearing. Council Orders Improvement (4/5th Vote);accepts Bids and awards Contract; Adopt Final Assessment Roll.

MAY 19, 2020 Conduct Pre-Construction Meeting and issue Notice to Proceed.• SEPTEMEBER 25, 2020 Substantial Completion.• NOVEMBER 13, 2020 Final Completion.

Page 18: FEASIBILITY REPORT for HERITAGE FARMS STREET AND … Report Presentation.pdfLisbon Avenue North, Lisbon Avenue Court North, and 30th Street Circle North $884,000 $0 $20,500 Watermain

Heritage Farms Street and Utility Improvements

SEPTEMBER 17, 2019 FOCUS ENGINEERING, inc.

18QUESTIONS?

• It is recommended that the City Council approve Resolution 2019-068 Receiving the FeasibilityReport and calling a Public Hearing for the Heritage Farms Street and Utility Improvements tobe held on October 15, 2019.