Page 1 of 3 Business Services Procurement and Contracting 16550 SW Merlo Road Beaverton, OR 97003 Phone: 503-356-4324 February 23, 2018 SOLICITATION ADDENDUM NO. 2 ITB 18-0007 Sunset High School Paging System Replacement THE FOLLOWING CHANGES/ADDITIONS TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED: This Addendum modifies the Invitation to Bid (ITB) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum shall remain in full force and effect. This Addendum is hereby made an integral part of the ITB document. Bidder must be responsive to any requirements of this Addendum as if the requirements were set forth in the ITB. Failure to do so may result in Bid rejection. See the ITB regarding requests for clarification or change and protests of this Addendum, and the deadlines for the foregoing. This addendum is to be acknowledged in the space provided on the Bidder Certification form supplied in the solicitation document. Failure to acknowledge receipt of this addendum may be cause to reject your offer. The closing date REMAINS UNCHANGED: March 8, 2018 at 2:00 PM Pacific Time CHANGES: The specification 27 05 00 Common Work Results for Communications, Part 1 – General, 1.17, shall be amended as follows: D. Substitution Request Form. Any product substitution request shall be accompanied by the included Substitution Request Form. In addition to the form a single page narrative must summarize how the alternate product will function compatibly with the District’s existing Rauland and ShoreTel control equipment and software, as well as the required training and spare parts for District personnel to maintain the system effectively. Substitution requests must be submitted using the attached form and include all requested information. The specification 27 15 00 Communications Horizontal Cabling calls out Pink patch cords and cabling for the paging system in a number of places. Part 2 – Products, 2.01, A, 2, G is corrected to read (changes italicized and struck through): Cable jacket color shall be Green Pink.” The District Category Cabling standard is attached.

Upload: lamcong

Post on 30-Jul-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1 of 3

Business Services Procurement and Contracting

16550 SW Merlo Road Beaverton, OR 97003 Phone: 503-356-4324

February 23, 2018 SOLICITATION ADDENDUM NO. 2

ITB 18-0007 Sunset High School Paging System Replacement

THE FOLLOWING CHANGES/ADDITIONS TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED: This Addendum modifies the Invitation to Bid (ITB) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum shall remain in full force and effect. This Addendum is hereby made an integral part of the ITB document. Bidder must be responsive to any requirements of this Addendum as if the requirements were set forth in the ITB. Failure to do so may result in Bid rejection. See the ITB regarding requests for clarification or change and protests of this Addendum, and the deadlines for the foregoing. This addendum is to be acknowledged in the space provided on the Bidder Certification form supplied in the solicitation document. Failure to acknowledge receipt of this addendum may be cause to reject your offer.

The closing date REMAINS UNCHANGED: March 8, 2018 at 2:00 PM Pacific Time CHANGES: The specification 27 05 00 Common Work Results for Communications, Part 1 – General, 1.17, shall be amended as follows:

D. Substitution Request Form. Any product substitution request shall be accompanied by the included Substitution Request Form. In addition to the form a single page narrative must summarize how the alternate product will function compatibly with the District’s existing Rauland and ShoreTel control equipment and software, as well as the required training and spare parts for District personnel to maintain the system effectively. Substitution requests must be submitted using the attached form and include all requested information.

The specification 27 15 00 Communications Horizontal Cabling calls out Pink patch cords and cabling for the paging system in a number of places. Part 2 – Products, 2.01, A, 2, G is corrected to read (changes italicized and struck through):

Cable jacket color shall be Green Pink.”

The District Category Cabling standard is attached.

Page 2 of 3

CLARIFICATIONS:

Clarifications and Questions from the February 14, 2018 Pre-Bid Conference & Site Walk

Bidders are responsible for all locates. There is some asbestos in the walls , so the contractor will need to have someone who is certified on-site when it is disturbed, i.e. during drilling and cutting, etc. The PA system needs to be operational at all times, so while you are installing the new system, the old system needs to stay live. The school needs to be able to broadcast in case of an emergency. Everything in the new system needs to be labeled. The contractor is responsible for obtaining and paying for all permits. All shop drawings and submittals must be submitted to the District for review prior to the start of the work. Adequate time must be allowed for review by the District’s engineer. Question: Does all of the wiring need to be replaced? Answer: Yes. Troubleshooting the existing wiring is one of our biggest problems. In the replacement

system, everything is in zones so we can easily troubleshoot any problems. Question: Does the old system need to be demolished or can it be abandoned in place? Answer: It needs to be demolished and completely removed. Question: In the locations where the old speakers are removed, are cover plates acceptable or do the walls

need to be patched or ceiling tile replaced? Answer: It depends on the location. In general, the walls will need to be patched or the ceiling tiles will

need to be replaced. The use of cover plates will need to be coordinated with and approved by the District. The District uses Rodda paint products. We can let the contractor know the color used in each specific location.

Question: Does the District have any extra ceiling tiles on hand to match the existing? Answer: No. The contractor will need to provide replacements to match the existing as close as possible.

They will need to be fire rated tiles. Question: Are the clocks part of the work? Answer: No. All clocks have been installed and are no longer part of this project. Disregard any notation

and/or drawings referring to the replacement of the clock system. Question: Does the District want anything salvaged? Answer: All equipment should be removed and staged in an area designated by the District

Representative for review by the District to determine if we want to keep anything. The Contractor will be responsible for the disposal of all unwanted items.

Question: Is there any two-way communication or is the system paging only? Answer: It is paging only.

Page 3 of 3

Question: How many zones are there? Answer: They are indicated on the drawings. Question: Is rack space going to be provided by the District? Answer: Your bid should include rack space provided by the contractor.

Questions submitted via e-mail

Question: I was wondering if there was a budget/engineer’s estimate available for this project? Answer: We do not have an engineer’s estimate, or budget for this work. Question: In hard lid areas, is the preferred method for wire surface mounted similar to current conditions

in the building, or should surface mount raceway be used? Answer: Surface mounted raceways should be used. Do not attach wiring to the existing bundles. From

our understanding, some of those wires have been abandoned in past projects and have not been removed. All of those wires will be removed at some point and we do not want the new wires being mistaken as part of that lot.

Question: The plan appears to show ceiling speakers in many areas where there are currently surface

mount speakers. Is there a preference to using ceiling mount over wall mount? Answer: Flush ceiling mounted speakers are preferred wherever possible. There are areas where wall

mounted speakers will be our only option. Question: Are there any areas of the school where there will be summer activities that cannot be

impacted? Assuming that some classrooms will be in use and that we can work with the school to schedule activities in revolving areas to give us access into each area during normal hours. The concern is that there may be special areas like Labs or Gyms that will be in use during normal hours and that they will not have alternative locations to use.

Answer: As long as we can notify the school far ahead of time and can adhere to a rigid schedule, we are confident that we can coordinate construction activities with ongoing classes. It is paramount to assign a Project Manager that has strong communication and management skills on this project.

-END of Addendum Linda Niman Contract Specialist

SUBSTITUTION

REQUEST

(During the Bidding/Negotiating Stage)

Project:

To:

Re:

Substitution Request Number:

From:

Date:

A/E Project Number:

Contract For:

Specification Title: Section: Page:

Article/Paragraph:

Description:

Proposed Substitution:

Manufacturer:

Address: Phone:

Trade Name: Model No.: Attached data includes product description, specifications, drawings, photographs, and performance and test data adequate for evaluation of the request; applicable portions of the data are clearly identified. Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its proper installation.

The Undersigned certifies:

• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

• Same warranty will be furnished for proposed substitution as for specified product.

• Same maintenance service and source of replacement parts, as applicable, is available.

• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.

• Proposed substitution does not affect dimensions and functional clearances.

• Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the

substitution.

Submitted by:

Signed by:

Firm:

Address:

Telephone:

A/E’s REVIEW AND ACTION

Substitution approved - Make submittals in accordance with Specification Section 01 25 00 Substitution Procedures. Substitution approved as noted - Make submittals in accordance with Specification Section 01 25 00 Substitution Procedures. Substitution rejected - Use specified materials. Substitution Request received too late - Use specified materials.

Signed by: Date:

Supporting Data Attached: Drawings Product Data Samples Tests Reports

© Copyright 2007, Construction Specifications Institute,

99 Canal Center Plaza, Suite 300, Alexandria, VA 22314

Page of Form Version: June 2004

CSI Form 1.5C

nimanli
Sample
nimanli
Typewritten Text
Sunset High School Paging System Replacement ITB 18-0007

BSD Technical Standard Appendix A: Category Cabling (5e, 6, 6a) 4/4/16 Page 1 of 1

Appendix A: Category Cabling (5e, 6, 6a)

Equipment

Recommended patch cable (IDF, MDF)

Recommended In Field cabling Note

Data Grey Blue VoIP Green* Blue Access Points (AP) White Blue HVAC Black Black Bundle by system Other mechanical systems Purple Black Bundle by system General Lighting Blue* Green Specialty Lighting (i.e. Production) Orange Orange Bundle by system AV Systems Orange Orange Bundle by system Paging Pink Pink Bundle by system

Security IP Systems Pink Pink

Composite cable to doors to be Yellow outer jacket. Bundle by system

Fire Alarm Red Red non Cat 6 cable to be red Other Systems Verify Verify Will be grey in most cases