federal energy regulatory commission item no. c- 2 continuing progress of lng terminals in the gulf...
TRANSCRIPT
Federal Energy Regulatory Commission
Item No. C- 2Item No. C- 2
Continuing Progress of Continuing Progress of LNG Terminals in the LNG Terminals in the
Gulf Coast RegionGulf Coast Region
June 30, 2005
Federal Energy Regulatory Commission
Item No. C- 7 Golden Pass LNG
Golden Pass LNG Terminal LPDocket No. CP04-386-000
Golden Pass Pipeline LPDocket Nos. CP04-400-000, CP04-401-000 & CP04-402-000
Golden Pass Project
Item No. C- 2 - TerminalItem No. C- 2 - Terminal
Golden Pass LNGGolden Pass LNG
Section 3 AuthorizationSection 3 Authorization• Marine TerminalMarine Terminal• Five Storage TanksFive Storage Tanks• 2 Bcf/day of Vaporization 2 Bcf/day of Vaporization
and send-out capacityand send-out capacity
Item No. C- 2 - PipelineItem No. C- 2 - Pipeline
Golden Pass PipelineGolden Pass Pipeline
Section 7 AuthorizationSection 7 Authorization• 120 miles 36”, 2 miles 24”120 miles 36”, 2 miles 24”• Up to 11 interconnects with intra and Up to 11 interconnects with intra and
interstate pipelinesinterstate pipelines• 2.5 Bcf/day Mainline Capacity2.5 Bcf/day Mainline Capacity
Federal Energy Regulatory Commission
Corpus Christi, TX
Vista Del Sol
Ingleside LNG
Lake Charles, LA
Port Pelican
Pearl Crossing
Beacon Port
Freeport, TX
Golden Pass, TX
Port Lavaca, TX
Port Arthur
Sabine Pass, LA
Gulf Gateway
Gulf Coast LNG Terminals
Freeport McMoran
Cameron
Gulf Landing
Compass Pass
Legend:
Existing Terminal
Approved Terminal
Proposed Terminal: Pre-Filing
Proposed Terminal: Filed
Working on DEIS
Working on FEIS
Planned Terminal
Galveston, TX
Pascagoula, MS
Creole Trail
TeamTeam
Webster Gray – OEPWebster Gray – OEP
Jennifer Kerrigan – OEP Jennifer Kerrigan – OEP
Walt McDaniel – OMTRWalt McDaniel – OMTR
Al Francese – OGCAl Francese – OGC