Page 1: FEED Study of 110,000 tpa Post-Combustion Capture Plant

1

FEED Study of 110,000 tpa Post-Combustion

Capture Plant for the Australia Surat Basin

Integrated CCS Project

澳大利亚苏拉特盆地CCS项目十万吨级燃烧后捕集系统

前端工程设计

Dr. Shiwang Gao

China Huaneng Clean Energy Research institute

Kyoto, Japan

2019-9-17

Page 2: FEED Study of 110,000 tpa Post-Combustion Capture Plant

CONTENT 目录

2

Overview of CERI 清能院简介

Project Background 项目背景

Project Execution Plan 项目实施情况

FEED Engineering Summary 工程设计概要

Future Work 未来工作计划

Page 3: FEED Study of 110,000 tpa Post-Combustion Capture Plant

3

Overview of CERI 清能院简介

中国华能集团直属清洁能源前沿技术研发机构

Institution focused on the frontier technology research and development of clean energy.

主要研发领域 Mainly focuses on research of the following aspects

近零排放燃煤发电、煤气化及煤基清洁转化(Nearly zero emission for coal-fired

power generation; Coal gasification and clean coal-based energy conversion)

大型循环流化床锅炉、低质煤利用(Large–scale circulating fluidized bed boiler;

Low-quality coal utilization;)

可再生能源发电、发电新材料、能源系统设计优化(Renewable energy power

generation; Design and optimization of energy system)

CO2捕集、利用和封存(Capture, utilization and storage of CO2)

Page 4: FEED Study of 110,000 tpa Post-Combustion Capture Plant

4

CERI on Carbon Capture 清能院碳捕集发展里程碑

在华能北京热电厂建成我国第一个燃煤电厂碳捕集示范装置,规模为3000吨/年

2008

实验室规模测试与筛选实验

2009

在华能上海石洞口第二电厂同步建成当时世界上最大的燃煤电厂碳捕集示范装置,规模为12万吨/年

2011

在华能秦岭电厂建成第一套可移动式燃煤电厂碳捕集测试平台,规模为300吨/年

在华能长春热电厂建成一套可移动、带CO2超临界压缩的碳捕集测试平台,规模为1000吨/年

2013

2014

在北京未来科技城建成世界领先的碳捕集技术开发实验室

在密云建成第一套燃气烟气CO2捕集中试平台,规模为1000吨/年

Lab-scale

Study

China’s first CO2 capture

facility in Huaneng Beijing

Cogeneration Power Plant,

3000t/a

The largest CO2 capture

facility in Huaneng Shanghai

Shidongkou NO.2 Power

Plant, 120000t/a

The first removable

CO2 capture facility

in Huaneng Qinling

Power Plant, 300t/a

A removable CO2 capture

and compression facility in

Huaneng Changchun Power

Plant, 1000t/a

Advanced Laboratory

in Beijing

The first CO2

capture facility

for NGCC

Page 5: FEED Study of 110,000 tpa Post-Combustion Capture Plant

Overview of Surat Basin CCS Project 苏拉特项目简介

5

Surat Basin has 3 billion tonnes of CO2 theoretical

storage potential

二氧化碳理论储存量近30亿吨

Three existing coal-fired power stations closer to

the Surat Basin, inlcuding Huaneng’s Millmerran

Power Station

附近有3个燃煤电厂,包括华能M电厂

Deliver an integrated Carbon Capture and Storage

(CCS) Project incorporating carbon capture,

transport and sequestration in the Surat Basin.

项目目标是开发包含二氧化碳捕集、运输和封存全流程的CCS示范项目

Black Coal Industry (ACALET) and Australian

Government Funded Project,led by Glencore

through CTSCo (100% Glencore) as the Proponent.

项目由澳洲煤炭工业协会和澳大利亚政府资助,由Glencore全资子公司CTSCO管理。

Page 6: FEED Study of 110,000 tpa Post-Combustion Capture Plant

Overview of Surat Basin CCS Project 苏拉特项目简介

6

Feasibility/FEED study of the Integrated Project, including the FEED of PCC plant, is completed at the end of 2018.

全流程CCS项目的前端工程设计(含碳捕集装置)已于2018年底完成; The construction of the CCS demo project is planned to be completed by 2021/2022. 项目预计于2021/2022年建成; Injection capacity is 60ktpa for the first 3 years and then increase to 120 ktpa. 开始3年年注入量预计为6万吨/年,然后扩大到12万吨/年

Schedule of Surate CCS Project

项目开展进度和工作计划

Page 7: FEED Study of 110,000 tpa Post-Combustion Capture Plant

Scope of FEED Engineering - 工程设计范围

7

Flue Gas Desulfurization (FGD)

CO2 Capture Process(CCP)

CO2 Post-Treatment(CPT)

Millmerran Power Station

PCC Plant

System Integration

工程设计范围涵盖:(1)PCC装置:FGD(因为电厂没有脱硫), CCP和CPT三个部分(2)PCC和电厂的系统集成

Page 8: FEED Study of 110,000 tpa Post-Combustion Capture Plant

8

Executive Parties & Roles - 项目分工

CERI MPSAECOMCTSCo

Overal Project

Management

项目管理Design Review

设计审查HAZOP

风险分析

Process Design

工艺设计 Facility Design

设施设计 Cost Estimate

设备造价估算 Preliminary

Management

Plan

管理方案 HAZOP

风险分析

Site geological

exploration

地勘 Cost Estimate

(EPC)

EPC估价 Design Review

Against AS

设计审查 HAZOP

风险分析

Technical Support

技术支持HAZOP

风险分析

Page 9: FEED Study of 110,000 tpa Post-Combustion Capture Plant

9

9

kick-off meetingApril 2018, Beijing

项目启动会

Process Design BriefingJune 2018, Brisbane

工艺设计汇报

Onsite Data AcquisationJune 2018, Brisbane

现场数据收集

HAZOP meetingOct, 2018风险分析

2nd Review meetingSep, 2018

设施设计审查

Project Timeline - 项目重要节点

1st Review meetingJuly 2018

工艺设计审查

FEED Study CompletedDec, 2018

设计完成及汇报

Post-FEED Study March, 2019完成设计优化

Page 10: FEED Study of 110,000 tpa Post-Combustion Capture Plant

10

Desgin Basis 设计基础

Item Remark

Feedstock-Flue Gas 烟气参数

- Temperature

- Flow Rate

- CO2 Concentration

- SO2 Concentration

150℃

73,000 Nm3/h

12%

1300 mg/Nm3

Product-Liquid CO2 产品参数

- Temperature / Pressure

- Production Rate

- CO2 Concentration

- Impurities

-20 ℃/ 2.5 MPa

13.75 tph/110,000 tpa

> 99.9%

GB 1886.228-2016 (Appendix A1002)

Design Operating Hours 设计运行小时数 8,000hrs / 20yrs

Solvent Specification 设计溶液 HNC-5

Utilities 公用工程参数

- Steam

- Electricity

- Cooling Water

215 ℃/13.6 MPa

6.6 kV, 415/240V

35℃(inlet) / 45℃(outlet)

Page 11: FEED Study of 110,000 tpa Post-Combustion Capture Plant

11

Process Design 工艺设计

Flue gas desulfurization (FGD)

Limestone-gypsum wet FGD with additional Flue Gas Cooler is

selected to remove SO2 and to cool the flue gas.

采用传统石灰石-石膏法脱硫,外加辅助烟气换热器。

CO2 Capture Process (CCP)

Amine-based chemical absorption technology is selected due to low

technical risk and available industrial experience.

考虑到技术风险较低,决定采用有机胺化学吸收法碳捕集工艺。

CO2 Post Treatment (CPT)

Food grade liquid CO2 with truck transportation is selected based on an

overal consideration of CAPEX、OPEX and CO2 market.

综合考量了造价、运行成本以及二氧化碳市场,决定生产食品级液态二氧化碳,采用罐车运输。

The PCC Plant is divided into 3 Processes:

Page 12: FEED Study of 110,000 tpa Post-Combustion Capture Plant

12

Process Design 工艺设计

Aspen Plus Models are designed to calculate the Mmaterial &

Heat Balance (MHB) for FGD, CCP & CPT Unit

FGD

CCP (CO2 Capture Process)

CO2 Post

Treatment (CPT)

Page 13: FEED Study of 110,000 tpa Post-Combustion Capture Plant

13

PFD/PIDs - 工艺流程图和管道仪表图

A total of 11 PFDs and 35 PIDs are delivered.

Page 14: FEED Study of 110,000 tpa Post-Combustion Capture Plant

14

Site Condition - 项目选址

Page 15: FEED Study of 110,000 tpa Post-Combustion Capture Plant

15

Site Condition - 项目选址

The total occupation is 13,125m2 (175m x 75m), the PCC plant is divided to two

sections by an existing road in the power station. The section near the stack

contains the equipment of FGD and CPT process, and the control room. The other

section contains the CPT equipment as well as the air cooler.

Page 16: FEED Study of 110,000 tpa Post-Combustion Capture Plant

16

PCC Plant Layout - 平面布置图

Page 17: FEED Study of 110,000 tpa Post-Combustion Capture Plant

17

3D PCC Plant - 三维建模

Page 18: FEED Study of 110,000 tpa Post-Combustion Capture Plant

18

3D PCC Plant - 三维建模

Page 19: FEED Study of 110,000 tpa Post-Combustion Capture Plant

19

Equipment Design - 设备设计

Design of Standard Equipent is Provided by Vendors

标准设备的设计由厂家提供

Design of Non-Standard Vessels is Provided by CERI

非标塔器、罐体和容器等由CERI设计

FGD Scrubber脱硫塔

CO2 Absorber/Stripper吸收塔/再生塔

Page 20: FEED Study of 110,000 tpa Post-Combustion Capture Plant

20

Modulisation Design - 模块化设计

The PCC plant is manufactured in China and shipped to Australia

by Modules to reduce the onsite installation work.

碳捕集装置在中国生产,分成若干模块运往澳洲组装。

Page 21: FEED Study of 110,000 tpa Post-Combustion Capture Plant

21

Impact of PCC on MPS - 捕集装置运行对电厂的影响

Flue gas extraction: only 2.5% of the total flue gas is extracted, 90% of

which will be returned to the stack.

Steam exctraction: 25 t/h steam is extracted from the auxiliary steam

system. Impact on the turbine system is negligible. No impact on the

steam-water balance since the condensate will return to the drainage tank.

Electricity: an increase of 3.4 MWh on auxliary comsumption, lead to a

decrease of net generation.

Cooling system: independent air cooling system. No impact on MPS

cooling capacity.

Other consumption: the consumption of DI water, filtered water,

compressed air has negligible impact on MPS operation.

Waste: the ash-making system of MPS has the capacity margin for PCC

waste water and Gypsum-Slurry; the amount of solid waste is negligible.

Page 22: FEED Study of 110,000 tpa Post-Combustion Capture Plant

22

OPEX Study - 运行成本分析

OPEX = 69.45 AUD/tCO2

Page 23: FEED Study of 110,000 tpa Post-Combustion Capture Plant

23

CAPEX Study - 投资造价分析

The CAPEX of the PCC plant is divided to two major parts:

(1) The equipment package price is provided by CERI;

(2) The EPC price is provided by AECOM.

(3) The total CAPEX is not given for the business secret protection purpose.脱碳项目的造价被分为两部分:设备造价由CERI提供;EPC总包造价由AECOM提供。由于是商业机密,总造价这里没有介绍。

Page 24: FEED Study of 110,000 tpa Post-Combustion Capture Plant

24

MPS PCC vs. Shanghai PCC - 澳洲项目和上海捕集装置的比较

Features Shanghai PCC MPS PCC

Capacity Design 10 ktpa; Max. 12 ktpa. Design 11 ktpa

Product grade Food grade Food grade

Flue gas T=50℃SO2 < 30mg/Nm3 (after FGD)

CO2 ~ 12%

Emitting to air directly

T=150℃(much higher)SO2 ~ 1300mg/Nm3 (no FGD)

CO2 ~ 12%

Back to the stack

Overal Process CCP + CPT FGD + CCP + CPT

Cooling Cooling water Air cooler

Solvent HNC-5 HNC-5

Solvent

Reclaimer

Thermal Reclaimer Ion Exchanger

Waste

Treatment

Burn with coal Mixing with coal ash

Page 25: FEED Study of 110,000 tpa Post-Combustion Capture Plant

Future Work - 未来工作计划

25

The FEED Engineering work is completed. And the FEED Procurement is

almost done. The FID package is under preparation and will be delivered soon.

前端工程设计目前已完成,项目决策工作目前正在进行。 The Purchase\Construction\Commissioning of the PCC plant will be completed

in 3 years after the FID.

项目计划在决策后3年内完成采购、建造和投产。

Page 26: FEED Study of 110,000 tpa Post-Combustion Capture Plant

26

MILLMERRAN POWER STATION

Acknowledgment - 致谢!

Many thanks to all funders, partners and those who cares about

this project. 感谢项目资助方,项目合作伙伴以及关心该项目的所有人。