fema 4129 dr ny

58
New York State Office of Emergency Management http://www.dhses.ny.gov/ FEMA 4129 DR NY Severe Storms and Flooding Incident Period: June 28 July 4, 2013 Declaration Date: July 12, 2013 Andrew M. Cuomo Jerome M. Hauer Governor Commissioner PUBLIC ASSISTANCE PROGRAM (Infrastructure Support Program) HANDBOOK of POLICIES AND GUIDELINES for APPLICANTS

Upload: others

Post on 20-Jan-2022

10 views

Category:

Documents


0 download

TRANSCRIPT

New York State Office of Emergency Management http://www.dhses.ny.gov/

PUBLIC ASSISTANCE PROGRAM

(Infrastructure Support Program)

HANDBOOK

of

POLICIES AND GUIDELINES

for

APPLICANTS

FEMA 4129 DR NY Severe Storms and Flooding

Incident Period: June 28 – July 4, 2013

Declaration Date: July 12, 2013

Andrew M. Cuomo Jerome M. Hauer

Governor Commissioner

PUBLIC ASSISTANCE PROGRAM

(Infrastructure Support Program)

HANDBOOK

of

POLICIES AND GUIDELINES

for

APPLICANTS

New York State Office of Emergency Management FEMA 4129 DR NY

Page 2 of 20

APPLICANT’S HANDBOOK POLICIES AND GUIDELINES

TABLE OF CONTENTS

Page PROGRAM OVERVIEW 3

Disaster Fact Sheet 4

Application Requirements 5

I. Preparation of Documents 6-9

A. Damage Eligibility 6

B. Kick-Off Meeting - Project Identification 6

1. Kick-Off Meeting 6-7

2. Categories of Work 7

3. Special Considerations 8-9

II. Project Management and Funding Instructions 9-20

A. Reimbursement and Payment Procedures 9-12

1. Small Project Grants 9

2. Small Project Validation 9-10

3. Large Project Grants 10-11

4. Large Project Progress Payment Procedure 11

5. Alternate Projects 11

6. Improved Projects 12

7. Direct Administrative Costs 12

B. Documentation Requirements, Instructions, Eligibility 12-18

1. Documentation Forms 12

2. Insurance 12-13

3. Funds Received from Other Sources 13

4. Labor Requirements 13-15

5. Equipment Requirements 16

6. Material Requirements 16-17

7. Contract Work Documentation & Eligibility 17-18

C. Completion of Work 18-19

1. Time Extensions 18

2. Quarterly Report Requirement 19

D. Final Inspections 19

E. Appeals 20

F. Audit Requirements 20

APPENDIX

I. Private Non-Profit Eligibility Guidelines (PNP)

II. FEMA Equipment Rates

III. Kick-Off Meeting Checklist

IV. Project Worksheet and Cost Summary Sheets w/ Instructions

V. Debris Removal Fact Sheet

New York State Office of Emergency Management FEMA 4129 DR NY

Page 3 of 20

NY STATE OFFICE OF EMERGENCY MANAGEMENT

FEDERAL EMERGENCY MANAGEMENT AGENCY

PUBLIC ASSISTANCE PROGRAM

PROGRAM OVERVIEW

Infrastructure Support Program

The Federal Emergency Management Agency (FEMA) Public Assistance Program provides supplemental

reimbursement for the repair or restoration of the infrastructures and facilities to pre-disaster condition after the

declaration of a major disaster by the President. The New York State Office of Emergency Management

(NYSOEM) is responsible for the program management and administration within the State of New York.

The Public Assistance Program is voluntary. If all eligibility requirements are met and you wish to seek federal

reimbursement, you must adhere to the program guidelines. If you choose not to participate, you will not be

eligible for any public assistance grants under the Public Assistance Program; however, your decision not to

participate in this Program does not preclude your eligibility from other federal programs.

Eligible applicants include State agencies, municipalities, Native American Tribal Organizations, and certain

private non-profit organizations that provide essential services of a governmental nature to the general public.

Reimbursement is generally provided on a 75% Federal share, 25% non-Federal share.

In order for disaster expenditures to be considered as part of an eligible public assistance project, it must meet the

following criteria:

1. The damage must be a direct result of an incident for which there is a Presidential declared disaster.

2. The damage must be within the federally designated disaster area.

3. The damage must have occurred within the designated disaster incident period.

4. Eligible damage at a designated work-site must total at least $1,000.

5. The damaged infrastructure must be owned by and/or be the legal responsibility of an eligible

applicant at the time of the incident.

6. The damage and work performed must not be eligible for reimbursement under the authority of

another federal program.

7. Insurance proceeds are deducted from eligible cost.

The deadline for completion of emergency work (debris removal and emergency protective measures) is six (6)

months from the date of the Presidential Disaster Declaration. The deadline for permanent work is eighteen (18)

months from the Presidential Disaster Declaration. The State may extend the emergency work deadline for an

additional six (6) months and permanent work deadline can be extended for an additional thirty (30) months with

justification.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 4 of 20

DISASTER FACT SHEET

Office of Emergency Management

State of New York DISASTER NUMBER: FEMA 4129 DR NY TYPE OF DISASTER: Severe Storms and Flooding DATE OF DECLARATION: July 12, 2013 INCIDENT PERIOD: June 28 – July 4, 2013

TYPE OF ASSISTANCE AVAILABLE:

Public Assistance: Assistance to State and local governments and certain private nonprofit

organizations for the repair or replacement of disaster-damaged public facilities in:

Allegany, Chenango, Cortland, Delaware, Franklin, Herkimer, Madison,

Montgomery, Niagara, Oneida, Otsego and Warren County

Hazard Mitigation Grant Program: Assistance to State and local governments for actions

taken to prevent or reduce long term risk to life and property from natural hazards. All

Counties in the State of New York are eligible to apply for assistance under the

Hazard Mitigation Grant Program.

STATE OFFICE OF EMERGENCY MANAGEMENT ADDRESS:

New York State Office of Emergency Management

1220 Washington Avenue

Building 22, Suite 101

Albany, New York 12226-2251

Recovery Facsimile: (518) 322-4984

Recovery Section: (518) 292-2293

Website: http://www.dhses.ny.gov/

Alternate Governor’s Authorized Representative: Jerome M. Hauer

Chief of Public Assistance: Christopher Holmes

Disaster Assistance Officer (DAO): Brenda Gausby

DAO Phone Number: 518-292-2840

Deadlines:

Applicant Submit RPA: August 12, 2013

Applicant Identification of Damage: 60 days from Kickoff Meeting

Emergency Work Completion: January 12, 2014 (6 months from declaration date)

Permanent Work Completion: January 12, 2015 (18 months from declaration date)

New York State Office of Emergency Management FEMA 4129 DR NY

Page 5 of 20

APPLICATION REQUIREMENTS & INSTRUCTIONS

The applicant is responsible for documenting, providing and maintaining

ALL information pertaining to damage and claims.

DISASTER ASSISTANCE APPLICATION REQUIREMENTS

POTENTIAL APPLICANTS SHOULD SUBMIT

THE FOLLOWING ITEMS BEFORE LEAVING THE BRIEFING:

1. A completed Request for Public Assistance (RPA) form

Can be obtained from FEMA Web Site:

http://www.fema.gov/library/viewRecord.do?id=2690

-or-

NYSOEM Web Site:

http://www.dhses.ny.gov/oem/recovery/

2. A completed Applicant Certification

3. A completed Drug Free Workplace Certification

4. Federal Tax ID Form

5. DUNS Number Form (Dun and Bradstreet)

6. OSC Substitute Form W-9

OTHER REQUIREMENTS NEEDED AS SOON AS POSSIBLE,

IN ORDER TO BE CONSIDERED FOR APPLICANT ELIGIBILITY

Submit completed RPA Package as soon as possible to John Grubsick at NYS Office of Emergency

Management [email protected] or fax 518-322-4984

Any authorized official of the governmental unit or organization can sign and submit the above

documents.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 6 of 20

I. PREPARATION OF DOCUMENTS FOR KICK-OFF MEETINGS, REIMBURSEMENTS, APPEALS,

AUDITS, ACCOUNTING INSTRUCTIONS

A. DAMAGE ELIGIBILITY

In order for an expenditure to be eligible under the Public Assistance Program, all disaster related damages must

meet the following criteria:

1. The damage must be a direct result of an incident for which there is a Presidential declared disaster.

2. The damage must be within the federally designated disaster area.

3. The damage must have occurred within the designated disaster incident period.

4. Eligible damage at a designated work-site must total at least $1,000.

5. The damaged infrastructure must be owned by and/or be the legal responsibility of an eligible

applicant at the time of the incident.

6. The damage and work performed must not be eligible for reimbursement under the authority of

another federal program.

7. Insurance proceeds are deducted from eligible cost.

The applicant is responsible for

documenting, providing, and maintaining all information

pertaining to damage and claims.

B. INITIAL KICK-OFF MEETING - PROJECT IDENTIFICATION

The Public Assistance Program gives the applicant the opportunity for re-imbursement for the costs associated

with the repair of the damages sustained by the incident, based on the applicant’s identification of the damages.

The development of the projects and their identification on a project worksheet is the basis for all reimbursement

of recovery activities subsequent to a Presidential disaster declaration.

1. Kick-Off Meeting

The kick-off meeting is the initial meeting between FEMA, the State and the applicant to determine potential

eligible projects within the applicant’s jurisdiction. The FEMA Public Assistance Coordinator (PAC) and the

NYSOEM Disaster Assistance Representative (DAR) will meet with the applicant to provide detailed information,

guidelines and assistance regarding the Public Assistance Program.

The PAC/DAR team will assist the applicant in preparing Project Worksheets (PW’s) for small projects. All

projects identified as “large projects” will be assigned a PAC/DAR team to work closely with the applicant in the

preparation of the project scope of work and associated costs. The applicant has 60 days from the date of the kick-

off meeting to identify all projects.

The kick-off meeting should include discussion regarding hazard mitigation which is any sustained action taken to

reduce or eliminate long-term risk to people and property from natural hazards and their effects.

Projects which have been identified as technically complex in nature, such as the replacement of a school building

or bridge, should be discussed with the PAC/DAR team at the kick-off meeting. It may be desirable to request

funding for an architectural and/or engineering design study (or other specialized study) to be conducted. If such a

study is funded, it must include one or all of the following:

Provide documentation of specific codes and design standards adopted by the community prior to the

incident which are included in the final recommendation.

Provide at least three viable alternatives, with estimated costs.

All alternatives should address their impacts on environmental, historical, floodplain, endangered

species, and coastal zones and barriers.

The impact on the areas upstream and downstream of the damages must be considered.

All permits (federal, state, local) must be obtained.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 7 of 20

The final design study must be forwarded to NYSOEM for review and submission to FEMA for final scope of

work approval. Funding for the project will be held by FEMA until their final determination on the scope of work.

2. Categories of Work

To facilitate the processing of Public Assistance Program grants, FEMA has divided disaster related work into

seven Categories of Work. These categories are listed below.

Emergency Work

Category A: Debris Removal

Clearance of trees and woody debris; building wreckage; sand, mud, silt, and gravel; vehicles; and other disaster-

related material deposited on public and, in very limited cases, private property

Category B: Emergency Protective Measures

Measures taken before, during, and after a disaster to save lives, protect public health and safety, and protect

improved public and private property.

Permanent Work

Category C: Roads and Bridges

Repair of roads, bridges, and associated features, such as shoulders, ditches, culverts, lighting and signs

Category D: Water Control Facilities

Repair of irrigation systems, drainage channels, and pumping facilities. Repair of levees, dams, and flood control

channels fall under Category D, but the eligibility of these facilities is restricted.

Category E: Buildings and Equipment

Repair or replacement of buildings, including their contents and systems; heavy equipment; and vehicles.

Category F: Utilities

Repair of water treatment and delivery systems; power generation facilities and distribution lines; and sewage

collection and treatment facilities.

Category G: Parks, Recreational Facilities, and Other Items

Repair and restoration of parks, playgrounds, pools, cemeteries, and beaches. This category also is used for any

work or facility that cannot be characterized adequately by Categories A-F

3. Special Considerations

The term “special considerations” is used to describe issues other than program eligibility that could affect the

scope of work and funding for a project. These issues include insurance, hazard mitigation measures, and

compliance with other federal laws and regulations, such as those pertaining to environmental protection and

historic preservation.

The applicant has a critical role in identifying---and quickly resolving---special consideration issues based on their

knowledge of the community; by considering the issues below before meeting with State-Federal staff, the

applicant can speed the reimbursement process. As part of the PW writing, the PAC and DAR will discuss the

following nine (9) special consideration questions for each project. Projects that have special considerations will

be individually reviewed and the applicant will receive guidance and instructions based on the results of the special

considerations review.

Insurance

Does the damaged facility or item of work have insurance and/or is it an insurable risk?

(e.g., buildings, vehicles, etc.)

New York State Office of Emergency Management FEMA 4129 DR NY

Page 8 of 20

Floodplain

Is the damaged facility located within a floodplain or coastal high hazard area, or does it have an impact on a

floodplain or wetland?

Coastal Barriers

Is the damaged facility or item of work located within or adjacent to a Coastal Barrier Resources System Unit or

an Otherwise Protected Area?

Environmental Impact

Will the proposed facility repairs/reconstruction change the pre-disaster condition? (e.g., footprint, location,

capacity, use or function

Hazard Mitigation

Does the applicant have a hazard mitigation proposal or would the applicant like technical assistance for a hazard

mitigation proposal?

Historic Preservation

Is the damaged facility on the National register of Historic Places or the state historic listing? Is it older than 50

years? Are there more, similar buildings near the site?

Historic properties may not be obvious to the casual observer, and may include districts, buildings, structures,

objects, landscapes, archeological sites, and traditional cultural properties that are included in, or eligible for

inclusion in, the National Registers of Historic Places. These are not just old buildings or well-known historic

sites, but places important in local, State or national history. Facilities as diverse as bridges and water treatment

plants may be considered historic.

Pristine or Natural Areas

Are there any pristine or undisturbed areas on, or near, the project site? Are there large tracts of forestland?

Hazardous Materials

Are there any hazardous materials at or adjacent to the damaged facility and/or item of work?

Controversy

Are there any other known environmental or controversial issues associated with the damaged facility and/or item

of work?

It is always the responsibility of the applicant to obtain the necessary work permits prior to beginning any repair or

reconstruction work. In New York State, agencies which could have a role in issuing the various permits include

(but are not limited to) the following:

1. New York State Department of Environmental Conservation

2. Adirondack Park Agency

3. Catskill Park Agency

4. County Soil and Water Conservation Agencies

5. County Drainage Agencies

6. Utility Companies

7. US Army Corps of Engineers

8. US Environmental Protection Agency

9. New York State Office of Parks, Recreation, and Historic Preservation

10. Local building departments which could include considerations of Americans with Disabilities Act

provisions

11. Endangered Species under the jurisdiction of the US Fish and Wildlife Service

12. Beaches – Coastal Zone Management under the New York State Department of State

13. County Health Departments

New York State Office of Emergency Management FEMA 4129 DR NY

Page 9 of 20

II. PROJECT MANAGEMENT AND FUNDING INSTRUCTIONS

A. REIMBURSEMENT AND PAYMENT PROCEDURES

Two different payment methods have been established for Public Assistance Program grants. The difference

between the methods is dependent on whether a project is small or large. That determination is based on a cost

threshold that changes annually. As of October 1st, 2012 the current threshold amount is $67,500. If the estimated

cost of a project is equal to or exceeds this threshold, the project is processed as a large project.

1. Small Project (under $67,500)

Small Projects are funded using an initial estimate of costs. An estimate is prepared either by FEMA or by the

Applicant. The funding level for small projects is fixed, regardless of the final cost incurred by the Applicant.

FEMA does not perform a final inspection of completed small projects; however, the State must certify that the

Applicant completed the work in compliance with all applicable laws, regulations, and policies.

NYSOEM will process for payment the authorized Federal and State shares.

Small projects are not usually eligible for cost overruns. HOWEVER, if a major omission or error in the scope

of work is identified, the applicant can request this be corrected.

2. Small Project Validation

The intent of validation is to reduce the overall administrative costs associated with the Public Assistance Program

and to get reimbursement funds into the applicants’ hands quickly. Validation applies to all small projects

(including emergency work, permanent work and small projects with special considerations) submitted to the

PAC/DAR team.

During validation, a Specialist from FEMA or the State reviews a portion of the Applicant’s small projects to

confirm that the Applicant has developed accurate scopes of work and cost estimates and that the Applicant has

sufficient documentation to support the project eligibility and cost. Normally, the review is limited to 20 percent of

the Applicant’s small projects; however, if problems are found, the sample size may be expanded.

It is imperative the applicant document all work submitted for reimbursement. In support of the PW, the

applicant’s method of estimating the costs to accomplish the eligible project and related costs must be documented.

Additionally, any work accomplished by the applicant prior to preparation of the PW should be reflected as the

actual costs incurred. The documentation, which is the basis for these actual costs, must be available during the

review. Steps should be taken that all claimed expenses are for work completed as a result of the incident.

In addition to the required paper documentation, photographs of damages and work sites before the repair work

begins, during repair or reconstruction, and as soon as the work is complete are an effective way to support the cost

documentation for the repair efforts. Photographs accomplish three things:

1. Verify the extent of damages,

2. Verify that the work had been accomplished,

3. Provide documentation of the repaired condition in the event that a subsequent disaster was to destroy

the facility or road once repaired, but prior to a final inspection.

For particularly vulnerable sites or facilities, an applicant may wish to take photographs annually to establish the

pre-disaster condition. This makes it easier to prove damages occurred as a result of an event.

3. Large Projects ($67,500 and over)

Reimbursements for Large Projects are based on the actual documented costs incurred in the completion of the

approved scope of work using New York State Municipal Law for procurement practices. The steps for processing

a large project are described below:

New York State Office of Emergency Management FEMA 4129 DR NY

Page 10 of 20

A Project Worksheet is prepared by the PAC/DAR team. FEMA approves funding using the estimate

and obligates the Federal share of the funds to the State.

When the project is complete, the State determines the final cost of accomplishing the eligible work,

often performing inspections or audits to do so. The State then submits a report on the completed

project to FEMA, certifying that the Applicant’s costs were incurred in the completion of eligible

work.

After reviewing the State’s report, FEMA will consider adjusting the amount of the grant to reflect the

actual cost of the eligible work.

While proceeding with the project, the Applicant must ensure that grant funds are used only for eligible work.

Payment cannot be processed until work has been completed, documented and paid for.

The cost estimating methodology that is used in the development of large projects is called the Cost Estimating

Format (CEF). This allows for a better estimate of the total cost of large projects. The CEF is a forward-pricing

model that allows FEMA to account for all possible costs associated with a construction project. FEMA uses

experienced cost estimators and construction engineers to apply the CEF.

Cost Overruns:

Sometimes the actual costs incurred by the applicant during performance of the work exceed the approved

estimated amount. This situation is known as a Cost Overrun. When this occurs the applicant must determine the

reason for the cost overrun. Overruns are usually caused by one of the following:

Variations in unit pricing: The unit prices used in the cost estimate may have been lower than those

the applicant was actually charged.

Change in the scope of work: While performing the work, the applicant may find that additional

eligible work or changes in the prescribed work are necessary. If this occurs the applicant must notify

the State immediately. Scope of work changes must be approved prior to initiating work.

Delay in starting or completion times: Problems beyond the applicant’s control may contribute to

delays in starting or completing work.

The applicant should evaluate cost overruns on large projects. The applicant should notify NYSOEM if the cost

overrun exceeds the approved amount by 50%. If the additional costs are justified, the applicant can request

additional funding. The applicant should contact the State to ensure that proper guidelines for documenting any

additional costs are followed. When necessary the State will forward requests for additional funding to FEMA.

Such requests must contain documentation to support that the additional costs were incurred during the

performance of eligible work.

Small projects are handled differently. Cost overruns are not handled on a project-by-project basis; rather, the

Applicant may request supplemental funding for a net cost overrun on all small projects by submitting an appeal

through the State to FEMA. An appeal should be submitted only when the total costs for all small projects exceed

the total cost approved for all small projects. The appeal must be submitted within 60 days of the completion of

that Applicant’s last small project. The appeal must include documentation of actual costs correlated to each line

item in the scopes of work. This includes projects with under runs as well as those with overruns. An explanation

of all cost and quantity differences with the approved scopes of work should be included.

4. Large Project Progress Payment Procedure

Applicants may request progress payments based upon documented expended costs. The applicant will need to

provide supporting documentation such as, permits, contracts, proof of payments, and indicate what percent

complete the project is. NYSOEM will then audit the submitted documentation and after the review may grant a

progress payment up to 50 % of the approved amount on the project worksheet.

5. Alternate Project

If a decision is made that the public welfare would not be best served to repair, restore or reconstruct a damaged

facility to its pre-disaster condition, an alternate project can be requested.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 11 of 20

NYSOEM and FEMA must approve this option prior to construction. To obtain this approval, the applicant must

submit to NYSOEM the following: description of the proposed alternate project, a schedule of the proposed

project, and projected cost of the proposed project. In the development of the alternate project, it is necessary to

supply assurance of compliance with special requirements including, but not limited to, floodplain management,

environmental assessment, hazard mitigation, protection of wetlands, and general hazard or flood insurance.

NYSOEM will provide technical assistance to the applicant in the development of the alternate project documents

and forward the recommendation to FEMA.

The Federal funding for alternate projects for State and local government applicants is limited to 90% of the

federal share of the costs that would be associated with repairing the damaged facility to its pre-disaster condition.

(Funding for PNPs is limited to 75% of the federal share of those costs.) Possible alternate projects include:

Repair or expansion of other public facilities.

Construction of new public facilities.

Purchase of capital equipment.

Funding of hazard mitigation measures.

Funding may not be used for operating costs or to meet the non-federal cost share requirement on other public

assistance projects or projects that utilize other federal grants.

This option must be requested within 12 months of applicant’s Kickoff Meeting, must be approved prior to

construction, and can only be used on permanent, restorative work.

6. Improved Project

The improved project funding option can be used for projects when damaged facilities are restored to the pre-

disaster condition or function, but improvements are made at the time of restoration or repair. The applicant must

request State approval for an improved project prior to beginning construction. NYSOEM will advise the

applicant of the determination and will forward approvals to FEMA.

Federal funding for these projects is limited to the federal share of the estimated costs that would be associated

with repairing or restoring the facility to its pre-disaster condition. Funds to construct the improved project can be

combined with a grant from another federal agency; however, federal grants cannot be used to meet the non-federal

cost share associated with the grant.

This option must be approved prior to construction and can only be used on permanent, restorative work.

7. Direct Administrative Cost

Direct Administrative Costs are costs incurred by the applicant that can be identified separately and assigned to a

specific project. Such costs can include staff’s time to conduct an initial inspection, prepare and submit a Project

Worksheet (PW), and make interim and final inspections of the project. These costs will be identified on each

specific PW.

B. DOCUMENTATION REQUIREMENTS, INSTRUCTIONS AND ELIGIBILITY

DOCUMENT & MAINTAIN COPIES

Disaster reimbursement is based on verification of completed work and actual eligible cost. Therefore, proper

documentation of costs and other records is an absolute requirement. It is not enough to complete the disaster

work; the work must also be fully and accurately documented. Incomplete documentation could result in a

municipality or organization not receiving reimbursement for which it might otherwise have been entitled.

The applicant is responsible for documenting, providing and managing all information pertaining to damages

and claims.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 12 of 20

1. Documentation Forms

Realizing that a single employee may work on more than one site in one day, and that different types of equipment

and materials may be used at each site, report forms for labor, equipment, materials, and contracts, are attached

(See Appendix). These forms are to assist the applicant in keeping track of the actual work performed at each

work-site. Use the attached forms to summarize all labor, materials, equipment and contract information from the

original documentation.

For example, materials/supplies are ordered for repairs to a building. If the order exceeds that required for the

disaster repairs, you must subtract from the original purchase order or invoice the pertinent information (vendor,

item, etc.) plus the exact amount needed for the disaster repair and enter this information onto the Materials Record

form. The original purchase order/invoice is kept in the appropriate file as back up to verify the purchase.

If an applicant has the capability to generate automated summary reports, they are free to do so. Please keep in

mind that whichever method is used, the same information must be provided when requested.

2. Insurance

Public Assistance Reimbursement is only available for uninsured losses. The applicant is responsible for providing

the insurance policy prior to FEMA providing any funding. FEMA requires the applicant to obtain and maintain

insurance on any insurable facility that receives funding from the Public Assistance Program. In the case of

insurable facilities in a floodplain, the applicant must have flood insurance equivalent to that issued by the National

Flood Insurance Program. If the facility is not insured FEMA will reduce project amount by the maximum

amount of insurance proceeds the Applicant would have received if the facility had been fully covered by an NFIP

standard flood insurance policy.

The applicant must provide the following to the DAR/PAC team:

Policies (general hazard and flood) currently in place,

Deductible information,

Proof of loss statement received from the insurance carrier identifying the equipment/building which

have sustained damages.

The only reimbursable expense for insured damages is the deductible plus any eligible items over and above the

insurance policy limits. For example, the insurance policy is for $1000 with a $100 deductible. Damage received

amounts to $1500. Assuming the applicant would receive the $900 insurance claim, the project would be written

for $600 - the $100 deductible and the $500 not covered by insurance.

Claims with the insurance company MUST be filed before seeking FEMA assistance. FEMA is the funding

source of last resort, not first.

Self-Insurance: FEMA does not recognize self-insurance for government entities below the state level.

3. Funds Received From Other Sources

The applicant is required to inform the PAC/DAR team of other sources of funding and the amounts utilized

toward the repair or restoration of those damages being claimed. The amount received from other sources will be

deducted from the project amount. Examples might include funding made available from another state or federal

program or a capital project included in the jurisdiction’s annual budget for that year.

If duplicate funding has occurred, for example School Aid, the applicant will be responsible for paying back the

duplicate amount.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 13 of 20

4. Labor Requirements

a. Force Account Labor Eligibility:

Force account work is defined as using your regularly employed personnel and applicant owned equipment to

repair/restore disaster damages.

Federal regulation establishes the cost of straight-time salaries and benefits of force account labor (an applicant’s

own permanent employees) to be ineligible when performing emergency work (Categories A and B).

Only force account labor overtime costs are eligible when performing emergency work; all force account labor

costs for permanent work (Categories C-G) are eligible.

NOTE: Records for straight-time employees on emergency work are still required to verify equipment usage.

Only direct additional expenses are eligible for emergency work. The basis for this federal policy is that costs

associated with the applicant’s regular employees performing emergency work would be incurred regardless of

whether or not a disaster occurred.

NOTE: Superintendents, supervisors and foremen are generally not eligible for reimbursement. However, if the

manager was a “working” supervisor (i.e., actually operating a piece of equipment, not delegating who does the

work), the time is reimbursable. But you must document and show this! The payroll and equipment logs must

also support each request.

b. Labor Documentation:

Each employee to be claimed must be identified by name and title. The summary of labor costs should include:

Dates worked,

Hours per day,

Rate of pay (regular and/or overtime),

Applicant fringe benefits rate, based on the total payroll for the applicant.

This information may be obtained from the individual daily time cards and supervisor’s field notes. It is important

to consolidate this information on the Labor Record form at least once a week, if not daily. This will enable the

official responsible for disaster record keeping to show exactly who did what, when, where, and for how long on

each job site.

c. Temporary Personnel/Extra Hires:

When a regular employee is sent to the field to perform disaster work, frequently a backup person fills in for them

in their normal position. There are a few circumstances that affect the eligibility of the backup person:

If a backup person (full-time or part-time) is an extra hire, the cost of this extra person represents an

extra cost to the applicant. Regular salary and overtime pay of this employee is eligible.

If the additional person is a regular employee from another department of the applicant who is working

his/her normal shift, the following costs are eligible:

a. Overtime, and

b. Pay differential for work outside normal responsibilities if the pay differential is the written

policy of the applicant prior to the disaster.

If the additional person is a regular employee who is called in on his/her day off (and thereby works

time in addition to the regular workweek), regular and overtime are eligible because there is an extra

cost incurred by the applicant.

If the additional person is called in from vacation, only overtime is eligible. There will be no extra

cost because the vacation usually can be rescheduled.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 14 of 20

Seasonally employed personnel are budgeted costs and are considered permanently employed for the

purpose of eligibility.

Regular and overtime will be determined according to the applicant’s written policies and labor union

contracts in effect prior to the disaster.

When an employee has been moved to perform disaster emergency work, an additional person who is

hired to backfill for that employee to do non-emergency work is not eligible for reimbursement.

The costs of salaries and benefits for individuals sent home or told not to report due to emergency

conditions are not eligible for reimbursement.

Costs of contractors hired to accomplish emergency work are eligible for reimbursement.

d. Overtime Pay:

Overtime pay must be in accordance with policies in use before the disaster. Overtime for disaster work is not

eligible if you did not have a pre-existing overtime pay policy.

e. Donated Resources/Volunteer Work:

Donated resources used on eligible work that is essential to meeting immediate threats to life and property

resulting from a major disaster may be credited toward the non-Federal share of the grant. Donated resources may

include volunteer labor, donated equipment and donated materials.

Eligibility: Donated resources are eligible to offset the cost of the non-Federal share of eligible emergency work

(Category A and B) costs if they meet the following criteria:

1. Donated resources must be documented by a local public official or a person designated by a local

public official. Documentation must include a record of hours worked, the work location and a

description of the work for each volunteer as well as equivalent information for equipment and

materials.

2. Donated resources must apply to emergency work that is eligible under the Public Assistance

Program. Examples include the following:

a. Removing eligible debris.

b. Filling and placing sandbags.

c. Donating equipment to raise or reinforce a levee.

d. Donating materials, such as rock or sand.

e. Search and rescue when part of an organized search and rescue operation

f. Professional safety inspections.

g. Mass food and shelter for victims, when not the mission of the organization.

3. Donated resources must be documented on the PW.

Value of Resources: The following instruction on the valuing of donated resources is based on 44CFR §13.24:

1. Volunteer Labor: The hourly rate placed on volunteer labor should be the same hourly pay rate (plus

reasonable fringe benefits) ordinarily paid for similar work within the applicant’s organization. If the

applicant does not have employees performing similar work, the rate used should be consistent with

those performing the work in the same labor market. To determine the value of volunteer labor, the

labor rate should be multiplied by the total number of volunteer labor hours.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 15 of 20

2. Donated Equipment: The value of the donated equipment is calculated by multiplying the applicable

applicant rate for the piece of equipment (or FEMA’s equipment rate) by the total number of hours that

equipment piece was used.

3. Donated Materials: Only materials donated by third party entities are eligible for credit. To determine

the value of donated materials, use the current commercial rate for such material based on previous

purchases or information available from vendors. Materials donated from other federal agencies are

not considered “donated” for this purpose.

f. Mutual Aid/Inter-Municipal Assistance Agreements:

If costs are incurred under a written/formal mutual aid or other agreement, the applicant must pay the salaries of

the jurisdiction’s employees who are providing assistance. FEMA has determined that these agreements serve the

same purpose as extra hires and that they are eligible costs. HOWEVER, if the mutual aid is provided at no

additional expense to the applicant, then these costs are not eligible. Reimbursement cannot be provided unless a

cost has been incurred.

5. Equipment Requirements

a. Force Account Equipment Eligibility:

Force account equipment is the term used to identify the applicant’s own equipment used in the repair of disaster

damages. Eligibility guidelines for applicant-owned equipment allow operating time only: down time cannot be

included. Equipment not in actual use is considered standby and is not eligible for reimbursement.

Also NOT ELIGIBLE are: new equipment purchases

repairs*

gasoline and diesel fuel*

*Repairs, maintenance and fuel costs are included in the FEMA Schedule of Equipment Rates as part of the

established rate. Extraordinary repair costs may be eligible.

b. FEMA Schedule of Equipment Rates:

The FEMA Equipment Rate List can be used for applicant-owned equipment (see Appendix II). FEMA Schedule

of Equipment Rates can also be found on the FEMA website: www.fema.gov/schedule-equipment-rates

FEMA will provide rates for any equipment not listed; the applicant will need to provide the make, model number

and any other pertinent information that may help in establishing a rate.

c. Equipment Documentation:

Documentation for applicant-owned and rented equipment must show the following:

Equipment description and operators name,

Dates and total hours used,

Cost per hour with total cost for each item and,

Total cost of all equipment used.

Total equipment hours should be compared to appropriate personnel hours to ensure both are accurate. If a piece

of equipment is used by being attached to another piece of equipment (for example, trailer hitched to a truck), this

should be noted.

Equipment logs and records must identify each piece of equipment used for disaster-related work at each site.

Ensure operator/dispatcher logs and other actual field records are accurately kept, copied and consolidated onto the

Force Account Equipment or the Rented Equipment record forms.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 16 of 20

d. Rental Equipment:

For rented equipment, the documentation must also show the date and amount paid, and the check number for

evidence of payment. This agreement must specify who is responsible for all repairs to the equipment. A separate

vendor invoice file should be established with copies of all rental agreements and invoices from equipment

vendors. Also, a copy of the rental agreement must be maintained in the work site file (see Appendix).

6. Materials Requirements (rip-rap, plywood, sandbags, etc.)

The applicant must document all materials and supplies purchased or taken from stock and used on each job.

Provide and attach invoices, receipts, purchase orders, paid vouchers, etc., showing the actual purchase and price

of all materials used for disaster work. Use the Materials Record form to consolidate the information to one place

(see Appendix).

a. Purchased Materials:

If special materials were purchased to perform disaster work, show the documentation citing that purchase.

Specifically, documentation must show the vendor, quantity, description, unit price, total price, date used, and the

date of purchase and check number.

b. Inventory Materials:

If materials were taken from stock, provide an invoice or voucher showing the last purchase of those items or

stock, even if it was prior to the disaster. Some type of evidence of purchase is required for reimbursement for all

materials used.

7. Contract Work Documentation & Eligibility

Contracts must be of reasonable cost, generally must be competitively bid, and must comply with Federal, State,

and local procurement standards. Contract requirements for local governments are outlined in the NYS General

Municipal Law.

a. Competitive, Fixed Price Contracts:

The preferred and most generally accepted means to assure contract work is undertaken at a reasonable cost is to

follow competitive, fixed-price procurement procedures. Firm fix-price contracts provide for an established price

to maximize incentive for the contractor to control costs and perform effectively.

Fixed-price contracts are achieved by competitive bidding that includes:

1. Developing specific contract work specifications,

2. Proper advertising,

3. Selecting of the lowest qualified bid.

The above three items must be maintained for validation and audit purposes.

Two or more proposals from responsible suppliers are needed to solicit the selection of the lowest qualified bid. IF

the lowest bidder is not awarded the contract, a written statement or justification is required as part of the

documentation explaining the reason for not taking the low bid. Place this statement in the appropriate project file.

Single source quotes or proposals do not meet funding criteria.

For new contracts as well as contracts already in place, the applicant must document and maintain:

The contract.

The vendor invoice showing the charges and rates, applicable to disaster work.

A copy of the bid advertisement.

Justification for selection of other than a lowest bidder (if applicable).

New York State Office of Emergency Management FEMA 4129 DR NY

Page 17 of 20

b. Time and Materials Contract:

Time and materials contracts should be avoided, but may be allowed for work that is necessary immediately after

the disaster has occurred when a clear scope of work cannot be developed. Generally, FEMA will accept time and

materials contracts with a work duration of 70 hours immediately after a disaster. Applicants must carefully

document contractor expenses, and a cost ceiling or “not to exceed” provision must be included in the contract. If a

time and materials contract has been used, the Applicant should contact the State to ensure proper guidelines are

followed.

c. Types of Contracts NOT ELIGIBLE are:

1. Cost plus or percentage of cost methods.

2. Contracts containing a provision which makes payment for eligible work

contingent upon reimbursement.

3. Contracts with any contractor included on any FEMA debarment and suspension listing

http://www.labor.ny.gov/workerprotection/ publicwork/PDFs/debarred.pdf

d. Emergency Contracting Period:

An emergency contracting period usually occurs immediately following a disaster or incident AND is limited to

a matter of days.

Waiving competitive procurement procedures for emergency situations or circumstances may only be accepted

under limited conditions. That is, contracts necessitated by a public emergency arising as a direct result of the

declared such as an accident or other unforeseen occurrence or condition affecting public buildings, public

property or the life, health, safety or property of the inhabitants of a municipality may be awarded without

competitive bid.

This emergency phase will vary depending on the disaster and the immediate threat to public health and safety.

Justification must accompany all contracts not competitively bid. Contract requirements for local governments are

outlined in the NYS General Municipal Law.

C. COMPLETION OF WORK

The deadline for completion of emergency work (debris removal and emergency protective measures) is six (6)

months from the date of the Presidential Disaster Declaration. The deadline for permanent work is eighteen (18)

months from the Presidential Disaster Declaration. The State may extend the emergency work deadline for an

additional six (6) months and permanent work deadline can be extended for an additional thirty (30) months with

justification.

1. Work/Time Extensions

Applicants must request an extension of deadlines PRIOR to assigned dates. Requests for extensions must be

submitted prior to the deadline to allow time for the request to be reviewed. The requests are submitted in

writing to NYSOEM Public Assistance Section using the attached “Request for Time Extension Form”.

All requests for a time extension must include detailed justification for the request. The request must specify each

project for which an extension is requested and detail the efforts being made to complete the work prior to the

established deadlines.

If an applicant does not complete the work within the established deadline, and the applicant does not request

and receive a time extension, reimbursement could be denied for any work completed after the established

deadlines.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 18 of 20

Applicants should not presume that their time extension requests will be approved; however, the disaster work

must continue. Notification will be sent to the applicant advising them of the final determination regarding the

request. An unfavorable response may be appealed with additional justification.

2. Quarterly Progress Reports

The Applicants are required to report to NYSOEM on the status of all large projects that are not complete using the

quarterly report progress form. This allows the NYSOEM to obtain the information needed to comply with FEMA

requirements and provides the opportunity to identify possible problems being incurred by the applicants in their

efforts to complete their projects.

REMEMBER all work must be completed within the existing time limitations. IF work cannot be completed

within the existing time limitation, a time extension MUST be requested. If at any time problems are encountered

or concerns exist, notify the NYSOEM Public Assistance Section. Problems or concerns identified on the

Quarterly Progress Report will be addressed.

Approved Project Notification Folder (Blue Book)

Upon receipt of the Approved Project Notification Folder, please review the package for the following

information:

FEMA Project Summary (P.2 report) which indicates the status of all projects. If there are any

suspended or ineligible projects noted, please provide the requested information as soon as possible.

Deadlines for the projects, if projects require a time extension a request should be submitted.

Changes in the scope of work or discrepancies from the project as identified immediately following the

disaster. If any discrepancies are discovered, notify NYSOEM as soon as possible to avoid payment

problems at the time of final inspection.

Large Projects which were not 100% complete at the time the PW was prepared, must have a report

submitted quarterly detailing the status of the projects.

If a project is no longer under consideration, notify NYSOEM of the need to withdraw the project

from consideration.

As projects are completed, the Project Listing (P.4 form) should be completed and returned to

NYSOEM Public Assistance Section.

Disapproved Project Notification (EMMIE Notification Letter)

Upon receipt of EMMIE Notification Letter, please review all documentation. Documentation may include a copy

of denial notification and project worksheet. Receipt of this notification begins your sixty (60) day timeframe to

appeal the project denial.

D. FINAL INSPECTIONS

Because federal payments are based on final inspections and audits, proper documentation of costs is an absolute

requirement. The final inspection process will begin once NYSOEM Public Assistance Section is notified by the

applicant that all work has been completed and costs associated with the project have been incurred. A final

inspection will be conducted on all large projects for which the work was not 100% complete at the time the PW

was prepared.

Within thirty (30) days of completion of all work associated with a project (large or small projects), the applicant

should notify NYSOEM using the FEMA Project Listing (P.4) included in the Project Application Supplement of

the project completion. This notification consists of completing the P.4 indicating the project cost and completion

date. The applicant’s authorized agent must sign the P.4 certification statement indicating the work was completed

in accordance with Public Law 93-288, as required.

All correspondence should be addressed to the Public Assistance Section at NYSOEM. REMEMBER the

burden of proof and the need to provide detailed justification is the applicant’s responsibility.

New York State Office of Emergency Management FEMA 4129 DR NY

Page 19 of 20

E. APPEALS

An applicant may request that NYSOEM submit an appeal to FEMA for reconsideration of any determination (for

example, funding amounts, eligibility determinations, etc.) that FEMA made related to federal assistance

pertaining to the applicant. Some of the determinations which can be appealed include:

An entity is not an eligible applicant.

A facility or a specific project is not eligible.

The approved eligible cost is less than what the applicant believes is necessary to complete the

approved scope of work.

Denial of a requested time extension.

Denial of specific costs claimed for a project.

The applicant’s written appeal request must be made within sixty (60) days of the date of receipt of FEMA’s

written notification including the receipt of the Project Worksheet (PW) and must include additional, detailed

documentation and/or justification of the appeal. The information should be sent to NYSOEM as soon as possible.

It is the applicant’s responsibility to prepare the appropriate appeal documentation and justification to be presented

to FEMA for their review and consideration.

An applicant has two opportunities to appeal a FEMA decision. Both appeals are submitted to NYSOEM. Each

appeal will be processed through NYSOEM for review and comment before being referred to FEMA. Each appeal

is based on documentation or information not previously known or provided to NYSOEM or FEMA.

F. AUDIT REQUIREMENTS

1. A review of all large projects (and small projects with significant cost overruns) will be conducted by

the State once those projects are completed.

2. In accordance with the Single Audit Act of 1984 (P.L.98-502), as amended in 1996 (P.L. 104-156), a

sub-recipient (applicant) which expends $500,000 or more of Federal funds from all sources during its

fiscal year, must have an independent audit conducted in accordance with the circular. OMB Circular

A-133 further requires that the final report for such audit be completed within nine (9) months of the

end of the sub-recipients fiscal year.

Additionally, per the New York State Budget Policy and Reporting Manual Item I-300, State agencies

that provide funds to sub-recipients pursuant to OMB Circular A-133 must obtain copies of the sub-

recipient’s A-133 audit reports and determine whether any audit findings affecting its programs are

significant and warrant follow-up.

Therefore, all Sub-recipients (Applicants) must provide one copy of such audit report or notification

that they are exempt from the requirements to DHSES within nine (9) months of the end of their fiscal

year. Please submit the A-133 report or exemption notification to:

New York State Division of Homeland Security and Emergency Services

Fiscal Monitoring Unit

State Campus, Building 7A

1220 Washington Avenue

Albany, NY 12242

New York State Office of Emergency Management FEMA 4129 DR NY

Page 20 of 20

Electronic copies or a link to the report is acceptable and can be directed to: [email protected]. An

e-mail response submitted to [email protected] indicating that your entity is exempt which

includes the applicable fiscal period associated with the exemption is acceptable as well.

Failure to provide a copy of the A-133 Single Audit report or notification your entity is exempt from

the requirement within nine (9) months of your fiscal year end will result in a stop payment status

being placed on all DHSES awards until compliance is met. Continued non-compliance can also

negatively impact future funding opportunities and/or result in disallowance of expenditures.

I. Private Non Profit Eligibility Guidelines

Private Non-Profit Eligibility (PNP) Guidelines

Facilities not owned by public entities also may be eligible for disaster assistance if certain criteria are met. The program is intended for organizations that have sustained extensive disaster losses. Obtaining disaster funding involves significant administrative effort and time which includes detailed inspections, preparation of records and documentation. Further information can be obtained by the county emergency management office. ALL eligible private nonprofit organizations, whether a school district, volunteer fire department or an alcohol and drug rehabilitation center MUST also follow the procedures regarding Documentation Requirements, Instructions, and Eligibility as noted in the Applicant’s Handbook. PNP facilities are grouped into one of two different categories: (1) PNPs that are not required to be open to the general public, and (2) PNP’s that must be open to the general public. 1. PNP facilities that are not required to be open to the general public are those that meet the definition of an educational, utility, emergency, medical or custodial care facility as explained in the Code of Federal Regulations at 206.221(e)(1),(2),(4),(5),(6).

2. PNP facilities that must be open to the general public include PNP irrigation Facilities as well as PNP facilities that provide “other essential government services” such as those listed below.

The following facilities are generally eligible for assistance: educational, utilities, irrigation, emergency, medical, and custodial care facilities and facilities that provide essential government services. Those that provide “other essential government services”, must be open to the general public include, irrigation facilities, museums, zoos, community centers, libraries, homeless shelters, senior citizens centers, shelter workshops, and health and safety services of a governmental nature. To be considered as a PNP applicant: the following information is required and must be submitted BEFORE a determination of eligibility can be made. Tax Exemption Certificate granted under sections 501(c) (d) or (e) of the Internal Revenue

Code of 1954, as amended, or State certification that the organization is a nonprofit organization under State Law.

Evidence from NYS that your organization is a non-revenue producing business. Organizational charter or by-laws. Other publications, brochures, pamphlets or literature that describe the organization and its

services, purposes and functions. Description of membership policies or fee structures. Federal Tax Identification Number. D-U-N-S Number (Dun and Bradstreet).

Before an expenditure can be considered as part of the public assistance application, it must meet the following criteria: 1. The damage must be a direct result of a Presidential declared disaster 2. The damage must be within the federally designated disaster area 3. The damage must have occurred within the designated incident period 4. Eligible damage at a designated worksite must total $1,000 or higher 5. The damages infrastructure must be owed by and/or be the legal responsibility of an eligible applicant 6. The damage and work to be performed must not be eligible for reimbursement under the authority of another federal program 7. Assistance is supplemental to any insurance proceeds received Educational Institutions: Educational institutions are defined in terms of primary, secondary, and higher education schools. The school must satisfy the State requirements for compulsory attendance. Any elementary school as defined by section 801 of the Elementary and Secondary Education Act of 1965; or any secondary school as defined by section 801(h) of the Elementary and Secondary Education Act of 1965; or any institution of higher education as defined by section 1201 of the Higher Education Act of 1965. PNP Medical: Any hospital, outpatient facility, rehabilitation facility, or facility for long term care. Hospitals: Include general, tuberculosis and other types of hospitals and related facilities, such as laboratories, outpatient departments, nursing home facilities, extended care facilities, facilities related to programs for home health services, self-care units, and central service facilities operated in connection with hospitals. This category also includes education or training facilities for health profession personnel operated as an integral part of a hospital. A hospital that primarily furnishes home-based care is not considered a hospital under this definition. Custodial Care Facility: Buildings, structures or systems which are used to provide institutional care for persons who require close supervision and some physical constraints on their daily activities for their protection, but do not require daily medical care. Utility: Building, structures, equipment or systems of energy, communication, water supply, sewage collection and treatment of other similar public service facilities. Emergency Facility: Buildings, structures, equipment or systems used to provide emergency services, such as fire protection, ambulance or rescue, to the general public. Other essential Governmental Service Facility: Museums, zoos, community centers, libraries, homeless shelters, senior citizen centers, rehabilitation facilities, shelter workshops and facilities which provide health and safety service of a governmental nature. Examples of Ineligible Services or Facilities are:

Recreational facilities Job counseling or job training Facilities for advocacy groups not directly providing health services Conference facilities Political education Advocacy or lobbying Religious service or religious instruction or study Facilities for social events Roads owned and operated by a property owners association

Requirement for Application to the Small Business Administration (SBA) PNP facilities potentially eligible for permanent work assistance that provide “non-critical services” must first apply for a disaster loan from the SBA before applying to FEMA for disaster assistance. “Non-critical” PNPs, however, may apply directly to FEMA for emergency work costs. “Non-critical services” include educational facilities as well as those facilities defined in § 206.221(e)(7). (Facilities providing “critical services” as defined in §206.226(c)(1), including power, water, sewer and wastewater, communications, medical treatment, fire protection, emergency rescue, nursing homes, and educational institutions may apply directly to FEMA for disaster assistance.)

The SBA loan application process for these “non-critical” PNP facilities will result in one of three outcomes:

1. If the PNP is declined for an SBA loan, the PNP may then apply to FEMA for public

assistance.

2. If the SBA loan fully covers eligible damages from the disaster event, then no assistance from FEMA is available.

3. If the maximum SBA loan for which the facility is eligible does not fully cover eligible

damages, the PNP may then apply to FEMA for the excess eligible damages.

Eligible PNPs are also required to apply to SBA for any 406 Hazard Mitigation costs.

II. FEMA Cost Codes/ Equipment Rates

FEMA's SCHEDULE OF EQUIPMENT RATES

Cost

CodeEquipment Specification Capacity/Size HP Notes Unit Rate

8490 Aerial Lift, Self-Propelled Max. Platform Height 37 ft to 15 Articulated, Telescoping, Scissor. hour $8.25

8491 Aerial Lift, Self-Propelled Max. Platform Height 60 ft to 30 Articulated, Telescoping, Scissor. hour $12.25

8492 Aerial Lift, Self-Propelled Max. Platform Height 70 ft to 50 Articulated, Telescoping, Scissor. hour $21.00

8493 Aerial Lift, Self-Propelled Max. Platform Height 125 ft to 85 Articulated and Telescoping. hour $55.00

8494 Aerial Lift, Self-Propelled Max. Platform Height 150 ft to 130 Articulated and Telescoping. hour $67.00

8486 Aerial Lift, Truck Mntd Max. Platform Height 40 ft

Articulated and Telescoping. Add to

Truck rate for total rate. hour $6.75

8487 Aerial Lift, Truck Mntd Max. Platform Height 61 ft

Articulated and Telescoping. Add to

Truck rate for total rate. hour $12.25

8488 Aerial Lift, Truck Mntd Max. Platform Height 80 ft

Articulated and Telescoping. Add to

Truck rate for total rate. hour $23.50

8489 Aerial Lift, Truck Mntd Max. Platform Height 100 ft

Articulated and Telescoping. Add to

Truck rate for total rate. hour $34.00

8010 Air Compressor Air Delivery 41 cfm to 10 Hoses included. hour $1.50

8011 Air Compressor Air Delivery 103 cfm to 30 Hoses included. hour $7.00

8012 Air Compressor Air Delivery 130 cfm to 50 Hoses included. hour $9.25

8013 Air Compressor Air Delivery 175 cfm to 90 Hoses included. hour $20.00

8014 Air Compressor Air Delivery 400 cfm to 145 Hoses included. hour $27.50

8015 Air Compressor Air Delivery 575 cfm to 230 Hoses included. hour $45.50

8016 Air Compressor Air Delivery 1100 cfm to 355 Hoses included. hour $51.00

8017 Air Compressor Air Delivery 1600 cfm to 500 Hoses included. hour $80.00

8040 Ambulance to 150 hour $25.50

8041 Ambulance to 210 hour $32.50

8060 Auger, Portable Hole Diameter 16 in to 6 hour $1.30

8061 Auger, Portable Hole Diameter 18 in to 13 hour $3.50

8062 Auger, Tractor Mntd Max. Auger Diameter 36 in to 13

Includes digger, boom and mounting

hardware. Add to Tractor rate for total

rate. hour $1.30

8063 Auger, Truck Mntd Max. Auger Size 24 in to 100

Includes digger, boom and mounting

hardware. Add to Truck rate for total

rate. hour $29.00

8070 Automobile to 130 Transporting people. mile $0.50

8071 Automobile to 130 Transporting cargo. hour $13.00

8072 Automobile, Police to 250 Patrolling. mile $0.60

8073 Automobile, Police to 250 Stationary with engine running. hour $16.25

8110 Barge, Deck Size 50'x35'x7.25' hour $34.00

8111 Barge, Deck Size 50'x35'x9' hour $49.00

8112 Barge, Deck Size 120'x45'x10' hour $60.00

8113 Barge, Deck Size 160'x45'x11' hour $75.00

8050 Board, Arrow to 8 Trailer Mounted. hour $3.15

8051 Board, Message to 5 Trailer Mounted. hour $8.50

8133 Boat, Push Size 45'x21'x6' to 435 Flat hull. hour $150.00

8134 Boat, Push Size 54'x21'x6' to 525 Flat hull. hour $200.00

8135 Boat, Push Size 58'x24'x7.5' to 705 Flat hull. hour $250.00

8136 Boat, Push Size 64'x25'x8' to 870 Flat hull. hour $300.00

Information regarding the use of the Schedule is contained in 44 CFR § 206.228 Allowable Costs. Rates for equipment

not listed will be furnished by FEMA upon request. Any appeals shall be in accordance with 44 CFR § 206.206 Appeals.

THESE RATES ARE APPLICABLE TO MAJOR DISASTERS AND EMERGENCIES DECLARED BY THE PRESIDENT

ON OR AFTER SEPTEMBER 15, 2010.

WASHINGTON, D.C. 20472

The rates on this Schedule of Equipment Rates are for applicant-owned equipment in good mechanical condition,

complete with all required attachments. Each rate covers all costs eligible under the Robert T. Stafford Disaster Relief

and Emergency Assistance Act, 42 U.S.C. § 5121, et seq., for ownership and operation of equipment, including

depreciation, overhead, all maintenance, field repairs, fuel, lubricants, tires, OSHA equipment and other costs incidental

to operation. Standby equipment costs are not eligible.

DEPARTMENT OF HOMELAND SECURITY

FEDERAL EMERGENCY MANAGEMENT AGENCY

RECOVERY DIRECTORATEPUBLIC ASSISTANCE DIVISION

Equipment must be in actual operation performing eligible work in order for reimbursement to be eligible. LABOR COSTS

OF OPERATOR ARE NOT INCLUDED in the rates and should be approved separately from equipment costs.

Federal Emergency Management Agency Septmber 15, 2010 Page 1 of 6

FEMA's SCHEDULE OF EQUIPMENT RATES

Cost

CodeEquipment Specification Capacity/Size HP Notes Unit Rate

8130 Boat, Row Heavy duty. hour $0.85

8131 Boat, Runabout Size 13'x5' to 50 Outboard. hour $14.00

8132 Boat, Tender Size 14'x7' to 100 Inboard with 360 degree drive. hour $26.00

8120 Boat, Tow Size 55'x20'x5' to 870 Steel. hour $250.00

8121 Boat, Tow Size 60'x21'x5' to 1050 Steel. hour $300.00

8122 Boat, Tow Size 70'x30'x7.5' to 1350 Steel. hour $450.00

8123 Boat, Tow Size 120'x34'x8' to 2000 Steel. hour $830.00

8140 Boat, Tug Length 16 ft to 100 hour $33.50

8141 Boat, Tug Length 18 ft to 175 hour $53.00

8142 Boat, Tug Length 26 ft to 250 hour $65.00

8143 Boat, Tug Length 40 ft to 380 hour $150.00

8144 Boat, Tug Length 51 ft to 700 hour $225.00

8419

Breaker, Pavement,

Hand-Held Weight 25-90 lb hour $0.65

8420 Breaker, Pavement to 70 hour $31.25

8150 Broom, Pavement Broom Length 72 in to 35 hour $12.30

8151 Broom, Pavement Broom Length 96 in to 100 hour $19.75

8153 Broom, Pavement, Mntd Broom Length 72 in to 18 Add to Prime Mover rate for total rate. hour $6.00

8154 Broom, Pavement, Pull Broom Length 84 in to 20 Add to Prime Mover rate for total rate. hour $10.25

8270 Bucket, Clamshell Capacity 1.0 cy

Includes teeth. Does not include

Clamshell & Dragline. hour $3.60

8271 Bucket, Clamshell Capacity 2.5 cy

Includes teeth. Does not include

Clamshell & Dragline. hour $6.75

8272 Bucket, Clamshell Capacity 5.0 cy

Includes teeth. Does not include

Clamshell & Dragline. hour $11.25

8273 Bucket, Clamshell Capacity 7.5 cy

Includes teeth. Does not include

Clamshell & Dragline. hour $14.50

8275 Bucket, Dragline Capacity 2.0 cy Does not include Clamshell & Dragline. hour $2.90

8276 Bucket, Dragline Capacity 5.0 cy Does not include Clamshell & Dragline. hour $6.50

8277 Bucket, Dragline Capacity 10 cy Does not include Clamshell & Dragline. hour $10.50

8278 Bucket, Dragline Capacity 14 cy Does not include Clamshell & Dragline. hour $13.50

8180 Bus to 150 hour $20.00

8181 Bus to 210 hour $23.00

8182 Bus to 300 hour $27.00

8190 Chain Saw Bar Length 16 in hour $1.75

8191 Chain Saw Bar Length 25 in hour $3.20

8192 Chain Saw, Pole Bar Size 18 in hour $1.60

8200 Chipper, Brush Chipping Capacity 6 in to 35 Trailer Mounted. hour $7.50

8201 Chipper, Brush Chipping Capacity 9 in to 65 Trailer Mounted. hour $16.00

8202 Chipper, Brush Chipping Capacity 12 in to 100 Trailer Mounted. hour $21.75

8203 Chipper, Brush Chipping Capacity 15 in to 125 Trailer Mounted. hour $30.75

8204 Chipper, Brush Chipping Capacity 18 in to 200 Trailer Mounted. hour $45.50

8210

Clamshell & Dragline,

Crawler 149,999 lb to 235 Bucket not included in rate. hour $86.00

8211

Clamshell & Dragline,

Crawler 250,000 lb to 520 Bucket not included in rate. hour $121.00

8212

Clamshell & Dragline,

Truck to 240 Bucket not included in rate. hour $130.00

8712

Cleaner, Sewer/Catch

Basin Hopper Capacity 5 cy

Truck Mounted. Add to Truck rate for

total rate. hour $16.00

8713

Cleaner, Sewer/Catch

Basin Hopper Capacity 14 cy

Truck Mounted. Add to Truck rate for

total rate. hour $21.50

8220 Compactor to 10 hour $11.00

8221

Compactor, Towed,

Vibratory Drum to 45 hour $17.50

8222

Compactor, Vibratory,

Drum to 75 hour $25.00

8223

Compactor, Pneumatic,

Wheel to 100 hour $29.00

8225 Compactor, Sanitation to 300 hour $96.00

8226 Compactor, Sanitation to 400 hour $163.00

8227 Compactor, Sanitation to 535 hour $225.00

8228

Compactor, Towed,

Pneumatic, Wheel 10000 lb Add to Prime Mover rate for total rate. hour $7.50

Federal Emergency Management Agency Septmber 15, 2010 Page 2 of 6

FEMA's SCHEDULE OF EQUIPMENT RATES

Cost

CodeEquipment Specification Capacity/Size HP Notes Unit Rate

8229

Compactor, Towed,

Drum Static 20000 lb Add to Prime Mover rate for total rate. hour $12.25

8500 Crane Max. Lift Capacity 8 MT to 80 hour $27.00

8501 Crane Max. Lift Capacity 15 MT to 150 hour $55.00

8502 Crane Max. Lift Capacity 50 MT to 200 hour $95.00

8503 Crane Max. Lift Capacity 70 MT to 300 hour $155.00

8504 Crane Max. Lift Capacity 110 MT to 350 hour $220.00

8496 Crane, Truck Mntd Max. Lift Capacity 24000 lb Add to Truck rate for total rate. hour $10.00

8497 Crane, Truck Mntd Max. Lift Capacity 36000 lb Add to Truck rate for total rate. hour $16.00

8498 Crane, Truck Mntd Max. Lift Capacity 60000 lb Add to Truck rate for total rate. hour $30.00

8195 Cutter, Brush Cutter Size 8 ft to 150 hour $90.00

8196 Cutter, Brush Cutter Size 8 ft to 190 hour $100.00

8197 Cutter, Brush Cutter Size 10 ft to 245 hour $120.00

8670 Derrick, Hydraulic Digger Max. Boom Length 60 ft

Includes hydraulic pole alignment

attachment. Add to Truck rate. hour $21.00

8671 Derrick, Hydraulic Digger Max. Boom Length 90 ft

Includes hydraulic pole alignment

attachment. Add to Truck rate. hour $39.00

8580 Distributor, Asphalt Tank Capacity 500 gal

Trailer Mounted. Includes burners,

insulated tank, and circulating spray

bar. hour $12.00

8581 Distributor, Asphalt Tank Capacity 1000 gal

Truck Mounted. Includes burners,

insulated tank, and circulating spray

bar. Add to Truck rate. hour $13.00

8582 Distributor, Asphalt Tank Capacity 4000 gal

Truck Mounted. Includes burners,

insulated tank, and circulating spray

bar. Add to Truck rate. hour $25.00

8250 Dozer, Crawler to 75 hour $31.00

8251 Dozer, Crawler to 105 hour $40.00

8252 Dozer, Crawler to 160 hour $65.00

8253 Dozer, Crawler to 250 hour $80.00

8254 Dozer, Crawler to 360 hour $135.00

8255 Dozer, Crawler to 565 hour $250.00

8256 Dozer, Crawler to 850 hour $340.00

8260 Dozer, Wheel to 300 hour $55.00

8261 Dozer, Wheel to 400 hour $110.00

8262 Dozer, Wheel to 500 hour $150.00

8263 Dozer, Wheel to 625 hour $200.00

8280 Excavator, Hydraulic Bucket Capacity 0.5 cy to 45

Crawler, Truck & Wheel. Includes

bucket. hour $18.00

8281 Excavator, Hydraulic Bucket Capacity 1.0 cy to 90

Crawler, Truck & Wheel. Includes

bucket. hour $39.00

8282 Excavator, Hydraulic Bucket Capacity 1.5 cy to 160

Crawler, Truck & Wheel. Includes

bucket. hour $65.00

8283 Excavator, Hydraulic Bucket Capacity 2.5 cy to 265

Crawler, Truck & Wheel. Includes

bucket. hour $120.00

8284 Excavator, Hydraulic Bucket Capacity 4.5 cy to 420

Crawler, Truck & Wheel. Includes

bucket. hour $200.00

8285 Excavator, Hydraulic Bucket Capacity 7.5 cy to 650

Crawler, Truck & Wheel. Includes

bucket. hour $240.00

8286 Excavator, Hydraulic Bucket Capacity 12 cy to 1000

Crawler, Truck & Wheel. Includes

bucket. hour $400.00

8240 Feeder, Grizzly to 35 hour $17.00

8241 Feeder, Grizzly to 55 hour $30.00

8242 Feeder, Grizzly to 75 hour $44.00

8300 Fork Lift Capacity 6000 lb to 60 hour 11,75

8301 Fork Lift Capacity 12000 lb to 90 hour $17.00

8302 Fork Lift Capacity 18000 lb to 140 hour $23.00

8303 Fork Lift Capacity 50000 lb to 215 hour $50.00

8310 Generator Prime Output 5.5 kW to 10 hour $3.25

8311 Generator Prime Output 16 kW to 25 hour $8.00

8312 Generator Prime Output 43 kW to 65 hour $17.00

8313 Generator Prime Output 100 kW to 125 hour $34.00

8314 Generator Prime Output 150 kW to 240 hour $50.00

8315 Generator Prime Output 210 kW to 300 hour $60.00

8316 Generator Prime Output 280 kW to 400 hour $85.00

Federal Emergency Management Agency Septmber 15, 2010 Page 3 of 6

FEMA's SCHEDULE OF EQUIPMENT RATES

Cost

CodeEquipment Specification Capacity/Size HP Notes Unit Rate

8317 Generator Prime Output 350 kW to 500 hour $95.00

8318 Generator Prime Output 530 kW to 750 hour $150.00

8319 Generator Prime Output 710 kW to 1000 hour $200.00

8320 Generator Prime Output 1100 kW to 1500 hour $375.00

8321 Generator Prime Output 2500 kW to 3000 hour $500.00

8755 Golf Cart Capacity 2 person hour $3.20

8330 Graders Moldboard Size 10 ft to 110 Includes Rigid and Articulate hour $34.50

8331 Graders Moldboard Size 12 ft to 150 Includes Rigid and Articulate hour $58.00

8332 Graders Moldboard Size 14 ft to 225 Includes Rigid and Articulate hour $70.00

8350 Hose, Discharge Diameter 3 in Per 25 foot length. Includes couplings. hour $0.13

8351 Hose, Discharge Diameter 4 in Per 25 foot length. Includes couplings. hour $0.19

8352 Hose, Discharge Diameter 6 in Per 25 foot length. Includes couplings. hour $0.50

8353 Hose, Discharge Diameter 8 in Per 25 foot length. Includes couplings. hour $0.75

8354 Hose, Discharge Diameter 12 in Per 25 foot length. Includes couplings. hour $1.35

8355 Hose, Discharge Diameter 16 in Per 25 foot length. Includes couplings. hour $2.20

8356 Hose, Suction Diameter 3 in Per 25 foot length. Includes couplings. hour $0.23

8357 Hose, Suction Diameter 4 in Per 25 foot length. Includes couplings. hour $0.43

8358 Hose, Suction Diameter 6 in Per 25 foot length. Includes couplings. hour $0.90

8359 Hose, Suction Diameter 8 in Per 25 foot length. Includes couplings. hour $1.35

8360 Hose, Suction Diameter 12 in Per 25 foot length. Includes couplings. hour $2.45

8361 Hose, Suction Diameter 16 in Per 25 foot length. Includes couplings. hour $3.90

8517 Jackhammer (Dry) Weight Class 25-45 lb hour $1.00

8518 Jackhammer (Wet) Weight Class 30-55 lb hour $1.15

8380 Loader, Crawler Bucket Capacity 0.5 cy to 32 Includes bucket. hour $11.50

8381 Loader, Crawler Bucket Capacity 1 cy to 60 Includes bucket. hour $19.00

8382 Loader, Crawler Bucket Capacity 2 cy to 118 Includes bucket. hour $42.00

8383 Loader, Crawler Bucket Capacity 3 cy to 178 Includes bucket. hour $76.00

8384 Loader, Crawler Bucket Capacity 4 cy to 238 Includes bucket. hour $115.00

8540 Loader, Skid-Steer Operating Capacity 1000 lb to 35 hour $11.00

8541 Loader, Skid-Steer Operating Capacity 2000 lb to 65 hour $18.00

8542 Loader, Skid-Steer Operating Capacity 3000 lb to 85 hour $22.00

8401 Loader, Tractor, Wheel to 81 hour $25.00

8390 Loader, Wheel Bucket Capacity 0.5 cy to 38 hour $15.50

8391 Loader, Wheel Bucket Capacity 1 cy to 60 hour $21.50

8392 Loader, Wheel Bucket Capacity 2 cy to 105 hour $28.75

8393 Loader, Wheel Bucket Capacity 3 cy to 152 hour $40.00

8394 Loader, Wheel Bucket Capacity 4 cy to 200 hour $52.00

8395 Loader, Wheel Bucket Capacity 5 cy to 250 hour $66.00

8396 Loader, Wheel Bucket Capacity 6 cy to 305 hour $82.00

8397 Loader, Wheel Bucket Capacity 7 cy to 360 hour $95.00

8398 Loader, Wheel Bucket Capacity 8 cy to 530 hour $140.00

8570 Loader-Backhoe, Wheel Loader Bucket Capacity 0.5 cy to 40 Loader and Backhoe Buckets included. hour $14.75

8571 Loader-Backhoe, Wheel Loader Bucket Capacity 1 cy to 70 Loader and Backhoe Buckets included. hour $23.50

8572 Loader-Backhoe, Wheel Loader Bucket Capacity 1.5 cy to 95 Loader and Backhoe Buckets included. hour $33.00

8573 Loader-Backhoe, Wheel Loader Bucket Capacity 1.75 cy to 115 Loader and Backhoe Buckets included. hour $38.00

8410 Mixer, Concrete Portable Batching Capacity 10 cft hour $3.25

8411 Mixer, Concrete Portable Batching Capacity 12 cft hour $4.25

8412

Mixer, Concrete, Trailer

Mntd Batching Capacity 11 cft to 10 hour $8.75

8413

Mixer, Concrete, Trailer

Mntd Batching Capacity 16 cft to 25 hour $15.25

8075 Motorcycle, Police mile $0.35

8633 Mulcher, Trailer Mntd Working Capacity 7 tph to 35 hour $10.25

8634 Mulcher, Trailer Mntd Working Capacity 10 tph to 55 hour $15.75

8635 Mulcher, Trailer Mntd Working Capacity 20 tph to 120 hour $24.75

8430 Paver, Asphalt, Towed Does not include Prime Mover. hour $7.00

8431 Paver, Asphalt to 50 Includes wheel and crawler equipment. hour $65.00

8432 Paver, Asphalt to 125 Includes wheel and crawler equipment. hour $115.00

8433 Paver, Asphalt to 175 Includes wheel and crawler equipment. hour $125.00

8434 Paver, Asphalt to 250 Includes wheel and crawler equipment. hour $140.00

8436 Pick-up, Asphalt to 110 hour $55.00

8437 Pick-up, Asphalt to 150 hour $83.00

8438 Pick-up, Asphalt to 200 hour $110.00

8439 Pick-up, Asphalt to 275 hour $140.00

8660 Plow, Cable Plow Depth 24 in to 30 hour $10.25

Federal Emergency Management Agency Septmber 15, 2010 Page 4 of 6

FEMA's SCHEDULE OF EQUIPMENT RATES

Cost

CodeEquipment Specification Capacity/Size HP Notes Unit Rate

8661 Plow, Cable Plow Depth 36 in to 65 hour $27.75

8662 Plow, Cable Plow Depth 48 in to 110 hour $31.75

8450 Plow, Snow, Grader Mntd Width to 10 ft Add to Grader for total rate. hour $16.00

8451 Plow, Snow, Grader Mntd Width to 14 ft Add to Grader for total rate. hour $24.00

8452 Plow, Snow, Truck Mntd Width to 15 ft Add to Truck rate for total rate. hour $10.75

8453 Plow, Snow, Truck Mntd Width to 15 ft

With leveling wing. Add to Truck rate for

total rate. hour $18.50

8470 Pump to 4 Does not include Hoses. hour $2.15

8471 Pump to 6 Does not include Hoses. hour $3.20

8472 Pump to 10 Does not include Hoses. hour $4.10

8473 Pump to 15 Does not include Hoses. hour $7.75

8474 Pump to 25 Does not include Hoses. hour $9.25

8475 Pump to 40 Does not include Hoses. hour $16.00

8476 Pump to 60 Does not include Hoses. hour $18.75

8477 Pump to 95 Does not include Hoses. hour $26.50

8478 Pump to 140 Does not include Hoses. hour $31.00

8479 Pump to 200 Does not include Hoses. hour $36.00

8480 Pump to 275 Does not include Hoses. hour $80.00

8481 Pump to 350 Does not include Hoses. hour $95.00

8482 Pump to 425 Does not include Hoses. hour $120.00

8483 Pump to 500 Does not include Hoses. hour $135.00

8484 Pump to 575 Does not include Hoses. hour $155.00

8485 Pump to 650 Does not include Hoses. hour $180.00

8510 Saw, Concrete Blade Diameter 14 in to 14 hour $6.00

8511 Saw, Concrete Blade Diameter 26 in to 35 hour $13.50

8512 Saw, Concrete Blade Diameter 48 in to 65 hour $23.00

8513 Saw, Rock to 100 hour $30.00

8514 Saw, Rock to 200 hour $60.00

8521 Scraper Scraper Capacity 16 cy to 250 hour $90.00

8522 Scraper Scraper Capacity 23 cy to 365 hour $130.00

8523 Scraper Scraper Capacity 34 cy to 475 hour $200.00

8524 Scraper Scraper Capacity 44 cy to 600 hour $240.00

8560 Snow Blower Capacity 2,000 tph to 400 hour $140.00

8561 Snow Blower Capacity 2,500 tph to 500 hour $160.00

8562 Snow Blower Capacity 3,500 tph to 600 hour $180.00

8550 Snow Blower, Truck Mntd Capacity 600 tph to 75 Does not include Truck. hour $37.50

8551 Snow Blower, Truck Mntd Capacity 1400 tph to 200 Does not include Truck. hour $70.00

8552 Snow Blower, Truck Mntd Capacity 2000 tph to 340 Does not include Truck. hour $110.00

8553 Snow Blower, Truck Mntd Capacity 2500 tph to 400 Does not include Truck. hour $120.00

8558

Snow Thrower, Walk

Behind Cutting Width 25 in to 5 hour $3.25

8559

Snow Thrower, Walk

Behind Cutting Width 60 in to 15 hour $7.00

8630 Sprayer, Seed Working Capacity 750 gal to 30

Trailer & Truck mounted. Does not

include Prime Mover. hour $9.75

8631 Sprayer, Seed Working Capacity 1250 gal to 50

Trailer & Truck mounted. Does not

include Prime Mover. hour $15.00

8632 Sprayer, Seed Working Capacity 3500 gal to 115

Trailer & Truck mounted. Does not

include Prime Mover. hour $25.75

8458 Spreader, Chemical Capacity 5 cy to 4 Trailer & Truck mounted. Does not hour $4.00

8423 Spreader, Chip Spread Hopper Width 12.5 ft to 152 hour $50.00

8424 Spreader, Chip Spread Hopper Width 16.5 ft to 215 hour $80.00

8425 Spreader, Chip, Mntd Hopper Size 8 ft to 8 Trailer & Truck mounted. hour $3.30

8455 Spreader, Sand Mounting Tailgate, Chassis hour $3.30

8456 Spreader, Sand Mounting Dump Body hour $5.50

8457 Spreader, Sand Mounting Truck (10 yd) hour $7.50

8440 Striper Paint Capacity 40 gal to 22 hour $8.75

8441 Striper Paint Capacity 90 gal to 60 hour $19.00

8442 Striper Paint Capacity 120 gal to 122 hour $37.00

8445 Striper, Truck Mntd Paint Capacity 120 gal to 460 hour $70.00

8446 Striper, Walk-behind Paint Capacity 12 gal hour $3.35

8157 Sweeper, Pavement to 110 hour $59.00

8158 Sweeper, Pavement to 230 hour $74.00

8590 Trailer, Dump Capacity 20 cy Does not include Prime Mover. hour $8.00

Federal Emergency Management Agency Septmber 15, 2010 Page 5 of 6

FEMA's SCHEDULE OF EQUIPMENT RATES

Cost

CodeEquipment Specification Capacity/Size HP Notes Unit Rate

8591 Trailer, Dump Capacity 30 cy Does not include Prime Mover. hour $14.00

8600 Trailer, Equipment Capacity 30 ton hour $10.25

8601 Trailer, Equipment Capacity 40 ton hour $12.50

8602 Trailer, Equipment Capacity 60 ton hour $15.00

8603 Trailer, Equipment Capacity 120 ton hour $25.00

8640 Trailer, Office Trailer Size 8' x 24' hour $1.70

8641 Trailer, Office Trailer Size 8' x 32' hour $1.75

8642 Trailer, Office Trailer Size 10' x 32' hour $2.60

8610 Trailer, Water Tank Capacity 4000 gal

Includes a centrifugal pump with sump

and a rear spraybar. hour $11.00

8611 Trailer, Water Tank Capacity 6000 gal

Includes a centrifugal pump with sump

and a rear spraybar. hour $14.00

8612 Trailer, Water Tank Capacity 10000 gal

Includes a centrifugal pump with sump

and a rear spraybar. hour $16.50

8613 Trailer, Water Tank Capacity 14000 gal

Includes a centrifugal pump with sump

and a rear spraybar. hour $20.50

8650 Trencher to 40

Walk-behind, Crawler & Wheel

Mounted. Chain and Wheel. hour $11.75

8651 Trencher to 85

Walk-behind, Crawler & Wheel

Mounted. Chain and Wheel. hour $25.00

8290 Trowel, Concrete Diameter 48 in to 12 hour $4.50

8680 Truck, Concrete Mixer Mixer Capacity 13 cy to 300 hour $75.00

8720 Truck, Dump Struck Capacity 8 cy to 220 hour $35.00

8721 Truck, Dump Struck Capacity 10 cy to 320 hour $45.00

8722 Truck, Dump Struck Capacity 12 cy to 400 hour $60.00

8723 Truck, Dump Struck Capacity 18 cy to 400 hour $65.00

8724 Truck, Dump, Off Struck Capacity 28 cy to 450 hour $105.00

8690 Truck, Fire Pump Capacity 1000 gpm hour $70.00

8691 Truck, Fire Pump Capacity 1250 gpm hour $80.00

8692 Truck, Fire Pump Capacity 1500 gpm hour $85.00

8693 Truck, Fire Pump Capacity 2000 gpm hour $90.00

8694 Truck, Fire Ladder Ladder length 75 ft hour $125.00

8695 Truck, Fire Ladder Ladder length 150 ft hour $150.00

8700 Truck, Flatbed Maximum Gvw 15000 lb to 200 hour $20.00

8701 Truck, Flatbed Maximum Gvw 25000 lb to 275 hour $22.00

8702 Truck, Flatbed Maximum Gvw 30000 lb to 300 hour $25.00

8703 Truck, Flatbed Maximum Gvw 45000 lb to 380 hour $43.00

8730 Truck, Garbage Capacity 25 cy to 255 hour $47.00

8731 Truck, Garbage Capacity 32 cy to 325 hour $55.00

8800 Truck, Pickup Transporting people. mile $0.50

8801 Truck, Pickup ½ ton hour $14.00

8802 Truck, Pickup 1 ton hour $20.00

8803 Truck, Pickup 1¼ ton hour $22.00

8804 Truck, Pickup 1½ ton hour $25.00

8805 Truck, Pickup 1¾ ton hour $30.00

8790 Truck, Tractor 4 x 2 30000 lb to 220 hour $32.00

8791 Truck, Tractor 4 x 2 45000 lb to 310 hour $45.00

8792 Truck, Tractor 6 x 4 50000 lb to 400 hour $55.00

8780 Truck, Water Tank Capacity 2500 gal to 175 Include pump and rear spray system. hour $31.00

8781 Truck, Water Tank Capacity 4000 gal to 250 Include pump and rear spray system. hour $42.00

8620 Tub Grinder to 440 hour $85.00

8621 Tub Grinder to 630 hour $120.00

8622 Tub Grinder to 760 hour $150.00

8623 Tub Grinder to 1000 hour $270.00

8753 Vehicle, Recreational to 10 hour $3.00

8750 Vehicle, Small to 30 hour $7.00

8761 Vibrator, Concrete to 4 hour $1.15

8770 Welder, Portable to 16 Includes ground cable and lead cable. hour $5.00

8771 Welder, Portable to 34 Includes ground cable and lead cable. hour $11.50

8772 Welder, Portable to 50 Includes ground cable and lead cable. hour $16.00

8773 Welder, Portable to 80 Includes ground cable and lead cable. hour $22.00

Federal Emergency Management Agency Septmber 15, 2010 Page 6 of 6

III. Checklist for Kick-Off

Meeting

KICKOFF MEETING CHECKLIST FEMA – 4129 – DR-NY

(Complete all entries for federal assistance with Public Assistance disaster relief documentation)

GENERAL INFORMATION: PA ID #: ______--_______________--______

Applicant: ______________________________________________ County:

Applicants' Representative:____________________________________________Title____________________________________

Applicant’s Telephone: (________) __________- _____________________________, ext. ______________

Applicant’s Fax: (________) __________- _____________________________

Applicant’s Cell: (________) __________- _____________________________

INCIDENT PERIOD:______________________________

List Sites/Damage/Cost (est.)/Category of Damage (if possible): Site (& approx. location) Damage Description Cost (est.) A B C Other:____

INSURANCE: If the damaged property insured? If so, copies of the insurance policy(ies) will need to be provided.

LABOR COSTS:

Benefits Calculation: For Appropriate Agency Department Amount of annual payroll: $___________________ Avg. hours/year for an employee for holidays: $___________________

Avg. hours/year for an employee for vacations: $___________________ Avg. hours/year for an employee for sick leave: $___________________

Amount paid annually for Unemployment costs: $___________________ Amount paid annually for Workmen’s Comp.: $___________________ Amount paid annually for Retirement: $___________________ Amount paid annually for health benefits: $___________________ Amount paid annually for life insurance: $___________________ Full Time Employees: Name, job title, date, and number of hours worked, (straight and overtime) hourly wage, and brief description of the

work performed. Temporary Employees: Name, job title, date, and number of hours worked, (straight and overtime) hourly wage, and brief description of the

work performed. Volunteer Labor: Name, date, number of hours worked, brief description of the work performed, and equivalent job position wage.

EQUIPMENT COSTS: Year, make, model, horsepower, and capacity of equipment as appropriate. Dates and hours equipment was used.

RENTED EQUIPMENT COSTS: Supply photocopy of rental contracts for equipment.

CONTRACTED SERVICES: If outside contractors were used for the work, please provide name, scope of work, contract duration, cost, type of contract, and a copy of the contract.

MATERIAL COSTS: Detail materials used. Supply photocopies of invoices and tare slips. Supply photocopies of invoices for misc. other items, i.e.: flares, batteries.

DONATED SERVICES: Were labor, equipment, or material resources donated during the incident period?________________________________________________________________ Who/What were the individuals/organizations donating labor, equipment, or material resources?_____________________________________________________________ Do you have written documentation of the names, jobs, locations, dates, and hours worked for labor resources?________________________________________________________ Do you have written documentation of the jobs, locations, dates, and hours worked for equipment resources?___________________________________________________ Do you have written documentation of the material resources donated?__________ _______________________________________________________________________

OTHER INFORMATION:

MEETING RECORD:

DAY DATE TIME LOCATION NOTES Applicant Briefing _______________________________________________________________________________ Kickoff Meeting _______________________________________________________________________________ Meeting: _______________________________________________________________________________

Meeting: _______________________________________________________________________________

Meeting: _______________________________________________________________________________

Meeting: _______________________________________________________________________________

IV. Project Worksheet and

Cost Summary Sheets (with Instructions)

Project Worksheet

Special Considerations

Rented Equipment

Own Equipment

Contract Cost

Materials/Equipment

Labor

Donated Labor

Benefits Calculation

Time Extension Request

Quarterly Report

FEMA Form 90-91 (BACK), SEP 98

FEDERAL EMERGENCY MANAGEMENT AGENCY

PROJECT WORKSHEET INSTRUCTIONS

The Project Worksheet must be completed for each identified damaged project.

Projects with estimated or actual cost of damage greater than $67,500 are large projects.

Projects with estimated or actual cost of damage less than $67,500 are small projects.

After completing Project Worksheets, submit the worksheets to your Public Assistance Coordinator.

Identifying Information

Declaration No: Indicate the disaster declaration number as established by FEMA (i.e. “FEMA -XXXX-DR-NY”, etc.).

Project No: Indicate the project designation number you established to track the project in your system (i.e. 1, 2, 3, etc.). FIPS No: Indicate your FIPS number within this space. This is optional. Date: Indicate the date the worksheet was prepared in MM/DD/YY format. Category: Indicate the category of the project according to FEMA specified work categories. This is optional. Applicant: Name of the governmental or other legal entity to which the funds will be awarded. County: Name of the county where the damage is located. If located in multiple counties, indicate “Multi-County.” Damage facility: Identify the facility and describe its basic function. Work Complete as of: Indicate the date that the work was examined in the format of MM/DD/YY and the percentage of work completed to that date. Location: This item can range anywhere from an “address,” “intersection of…” “1 mile south of …on….” to “county wide.” If damages are in different locations or different counties please list each location. Include latitude and longitude of the project if known. Damage Description and Dimensions: Describe the disaster-related damage to the facility, including the cause of the damage and the area or components affected. Scope of Work: List work that has been completed, and work to be completed, which, is necessary to repair disaster-related damage. Include items recorded on the preliminary damage assessment. Does the Scope of Work change the pre-disaster conditions of the site: If the work described under the Scope of Work changes the facilities conditions (i.e. increases / decreases the size or function of the facility or does not replace damaged components in kind with like materials), check () yes. If the Scope of Work returns the site to its pre-disaster configuration, capacity and dimensions check () no. Special Considerations: If the project includes insurable work, and/or is affected by environmental (NEPA) or historic concerns, check () either the Yes or No box so that appropriate action can be initiated to avoid delays in funding. Refer to Applicant Guidelines for further information. Hazard Mitigation: If the pre-disaster conditions at the site can be changed to prevent the disaster-related damage, check () Yes. If no opportunities for hazard mitigation exist check () no. Appropriate action will be initiated and avoid delays in funding. Refer to Applicant Handbook for further information. Is there insurance coverage on this facility: Federal law requires that FEMA be notified of any entitlement for proceeds to repair disaster-related damages, from insurance or any other source. Check () yes if any funding or proceeds can be received for the work within the Scope of Work from any source besides FEMA.

Project Cost Item: Indicate the item number on the column (i.e. 1, 2, 3, etc.). Use additional forms as necessary to include all items.

Code: If using the FEMA cost codes, place the appropriate number here. Narrative: Indicate the work, material or service that best describes the work (i.e. “force account labor overtime”, “42 in. Dia. RCP”, “sheet rock replacement”, etc.). Quantity/Unit: List the amount of units and the unit of measure (“48/cy”, “32/lf”, “6/ea”, etc.).

Unit Price: Indicate the price per unit.

Cost: This item can be developed from cost to date, contracts, bids, applicant’s experience in that particular repair work, books which lend themselves to work estimates, such as RS Means, or by using cost codes supplied by FEMA. Total Cost: Record total cost of the project. Prepared By: Record the name and title of the person completing the Project Worksheet.

Record Requirements

Please review the Applicant Handbook for detailed instructions and examples. For all completed work, the applicant must keep the following records:

Force account labor documentation sheets identifying the employee, hours worked, date and location; Force account equipment documentation sheets identifying specific equipment, operator, usage by hour/mile and cost used; Material documentation sheets identifying the type of material, quantity used and cost; Copies of all contracts for work and any lease/rental equipment costs.

For all estimated work, keep calculations, quantity estimates, pricing information, etc. as part of the records to document the “cost/ estimate” for which funding is being requested.

APPLICANT PROJECT NO. CATEGORY DATE

LONGITUDE

= %

N

N

N

N

ITEM CODE UNIT QUANTITY UNIT PRICE

1 9007 LS 1.00$

2 9008 LS 1.00$

3 9009 LS 1.00$

4 9003 LS 1.00$

5 9004 LS 1.00$

6 9999 LS 1.00$

7 9999 LS 1.00$

TOTAL:

SUBMITTED BY:

Deduct reimbursable - contract costs

Rented Equipment

Materials

Contract

Labor

Equipment

Is there insurance coverage on this facility?

PROJECT COST

DESCRIPTION COST

SPECIAL CONSIDERATIONS:

Does the scope of work change the pre-disaster conditions at the site?

Special Considerations issues included?

Hazard Mitigation proposal included?

DAMAGE DESCRIPTION:

For the FEMA-_____-___-NY

SCOPE OF WORK:

LATITUDE

WORK COMPLETE AS OF

LOCATION

GENERAL SITE INFORMATION

FEDERAL EMERGENCY MANAGEMENT AGENCY

PROJECT WORKSHEET FIPS NO. COUNTY

DAMAGED FACILITY

2. FIPS NUMBER

4. PROJECT NUMBER 5. LOCATION

1. Does the damaged facility or item of work have insurance and/or is it an insurable risk? (e.g., buildings, equipment, vehicles, etc.)

Yes No Unsure

2. Is the damaged facility located within a floodplain or coastal high hazard area, or does it have an impact on a floodplain or wetland?

Yes No Unsure

3, Is the damaged facility or item of work located within or adjacent to a Coastal Barrier Resource System Unit or an Otherwise Protected Area?

Yes No Unsure

4. Will the proposed facility repairs/reconstruction change the pre-disaster condition? (e.g., footprint, material, location, capacity, use or function)

Yes No Unsure

5. Does the applicant have a hazard mitigation proposal or would the applicant like technical assistance for a hazard mitigation proposal?

Yes No Unsure

6. Is the damaged facility on the National Register of Historic Places or the state historic listing? Is it older than 50 years? Are there more, similar buildings near the site?

Yes No Unsure

7. Are there any pristine or undisturbed areas on, or near, the project site? Are there large tracts of forestland?

Yes No Unsure

8. Are there any hazardous materials at or adjacent to the damaged facility and/or item of work?

Yes No Unsure

9. Are there any other environmentally or controversial issues associated with the damaged facility and/or item of work?

Yes No Unsure

COMMENTS:

COMMENTS:

COMMENTS:

COMMENTS:

COMMENTS:

COMMENTS:

COMMENTS:

COMMENTS:

SPECIAL CONSIDERATIONS QUESTIONS1, APPLICANT'S NAME 3. DATE

Form must be filled out—for each project.

COMMENTS:

RENTED EQUIPMENT RECORD FORM INSTRUCTIONS

Fill in the entire heading.

COLUMN

a List the equipment rented to complete disaster work. Indicate make, model, size,

capacity, and horsepower as appropriate.

b Enter date equipment was used in the top block and hours of equipment usage

underneath.

c Enter the hourly charge rate of equipment usage with an operator or without. This rate

should be clearly outlined on the contract.

d Multiply hours used by the appropriate rate for total cost.

Add the column and enter the Total Cost.

e Enter name of vendor the equipment was rented from.

f Enter number from your invoice used to reserve the equipment.

g Enter the date the bill was paid.

h Enter the check number used to pay the bill.

Sign the Rented Equipment Record form. Use additional sheets when necessary. Each record

needs to be certified.

The information to complete this form is available from the purchasing unit, supervisor’s

record, and other documents.

FO

R

Certifie

d B

y:

Title

:D

ate

:

-$

Tota

l Cost

I certify

that th

e a

bove in

form

atio

n w

as tra

nscrib

ed fro

m d

aily

logs, v

endor in

voic

es, o

r oth

er d

ocum

ents

whic

h a

re a

vaila

ble

for a

udit.

Date

paid

Check

Num

ber

Tota

l Cost

RE

NT

ED

EQ

UIP

ME

NT

RE

CO

RD

PR

OJE

CT

NO

.

Vendor

Date

&

hours

used

Rate

p/h

our

w/o

pera

tor

wo/o

pera

tor

Invoic

e

Num

ber

Type o

f Equip

ment

make, m

odel, s

ize, c

apacity

, HP

(applic

ant)

LO

CA

TIO

N O

F W

OR

K:

FE

MA

CA

TE

GO

RY

SC

OP

E O

F W

OR

K:

FORCE ACCOUNT EQUIPMENT RECORD FORM INSTRUCTIONS

(using your own equipment)

Fill in the entire heading.

COLUMN

a List the equipment used. Indicate make, model, size, capacity, and horsepower.

b Enter the reference number used locally to identify the item on inventory.

c Enter the equipment usage dates on top row.

Enter the hours the equipment was used each day.

d Add the hours across for each type of equipment.

Total the hours in the column and enter the amount at the bottom.

e Enter locally established equipment rate.

f Multiply the total hours (column d) by the equipment rate (column e) to determine cost.

Add the costs in the column and enter the amount at the bottom.

Sign the Force Account Equipment Record form. Use additional sheets when necessary. Each

record needs to be certified.

The information to complete this form is available from the supervisor’s work logs, and other

documents.

FO

R

(applic

ant)

LO

CA

TIO

N O

F W

OR

K:

FE

MA

SC

OP

E O

F W

OR

K:

TY

PE

OF

EQ

UIP

ME

NT

FE

MA

D

AT

E A

ND

HO

UR

S W

OR

KE

DT

OT

AL

HO

UR

LY

TO

TA

L

CA

PA

CIT

Y &

HP

AS

AP

PR

OP

RIA

TE

CO

DE

HO

UR

SR

AT

EC

OS

T

-

-

-

-

-

-

-

-

-

-

TO

TA

L

HO

UR

S-

TO

TA

L

CO

ST

-$

I CE

RT

IFY

TH

AT

TH

E D

AT

A P

RO

VID

ED

HE

RE

WA

S T

RA

NS

CR

IBE

D F

RO

M D

OC

UM

EN

TS

AN

D R

EC

OR

DS

AV

AIL

AB

LE

FO

R A

UD

IT.

CE

RT

IFIE

D B

YT

ITLE

DA

TE

FO

RC

E A

CC

OU

NT

EQ

UIP

ME

NT

CA

TE

GO

RY

PR

OJE

CT

NO

.

CONTRACT COSTS RECORD FORM INSTRUCTIONS

(contracts in place or newly negotiated)

Fill in the entire heading.

COLUMN

a Enter name of vendor or organization the contract is with.

b Enter brief description of activity.

c Enter the contract number.

d Enter the dates of the contract.

e Enter the cost of the contract.

f Enter the check number used to pay the vendor.

Sign the Contract Costs form. Use additional sheets when necessary. Each

record needs to be certified.

FO

R

(applic

ant)

LO

CA

TIO

N O

F W

OR

K:

CA

TE

GO

RY

SC

OP

E O

F W

OR

K:

PR

OJE

CT

NO

.

VE

ND

OR

DE

SC

RIP

TIO

N O

F A

CT

IVIT

YC

ON

TR

AC

TP

ER

IOD

OF

CO

NT

RA

CT

NU

MB

ER

CO

NT

RA

CT

CO

ST

TO

TA

L

I CE

RT

IFY

TH

AT

TH

E D

AT

A P

RO

VID

ED

HE

RE

WA

S T

RA

NS

CR

IBE

D F

RO

M D

OC

UM

EN

TS

AN

D R

EC

OR

DS

AV

AIL

AB

LE

FO

R A

UD

IT.

CE

RT

IFIE

D B

YT

ITLE

NU

MB

ER

DA

TE

FO

RC

E A

CC

OU

NT

CO

NT

RA

CT

S

FE

MACH

EC

K

MATERIALS/(EQUIPMENT PURCHASE) RECORD FORM INSTRUCTIONS

(materials from inventory or purchased)

Fill in the entire heading.

COLUMN

a Enter vendor’s name where materials were purchased (even if taken from stock).

b Enter brief description of item.

c Enter quantity or amount used for work.

d Enter the price of each item (i.e. 1,000 flares @ $2.00 ea. $2.00 is the unit price).

e Multiply quantity (column c) by unit price (column d) and enter total cost of them.

f Enter date materials were purchased (even if taken from stock).

g Enter the number from the check or purchase order/invoice when material was

purchased.

h Enter the date(s) the material was used.

i Check either box: If materials were purchased, mark the invoice box. If materials were

taken from inventory, mark the stock box.

Sign the Materials Record form. Use additional sheets when necessary. Each record needs to

be certified.

FO

R

(applic

ant)

LO

CA

TIO

N O

F W

OR

K:

FE

MA

SC

OP

E O

F W

OR

K:

VE

ND

OR

DE

SC

RIP

TIO

NQ

UA

NT

ITY

UN

IT

TO

TA

LD

AT

EC

HE

CK

DA

TE

S

OU

RC

E O

F D

AT

A

PR

ICE

CO

ST

BO

UG

HT

NU

MB

ER

US

ED

INV

OIC

ES

TO

CK

$ -

$ -

$ -

$ -

$ -

$ -

TO

TA

L C

OS

T

-$

CE

RT

IFIE

D B

YT

ITLE

DA

TE

I certify

that th

e a

bove in

form

atio

n w

as tra

nscrib

ed fro

m d

aily

logs,v

endor in

voic

es, s

tock c

ard

s, o

r oth

er d

ocum

ents

whic

h a

re a

vaila

ble

for a

udit.

FO

RC

E A

CC

OU

NT

MA

TE

RIA

LS

CA

TE

GO

RY

PR

OJE

CT

NO

.

FORCE ACCOUNT LABOR RECORD FORM INSTRUCTIONS

(using your own workers)

Fill in the entire heading.

COLUMN

a Enter each worker’s name and title.

b Enter the dates worked on top row.

Separate the regular or straight pay from overtime pay and enter the hours in

appropriate row.

c Add the hours (regular and overtime) across for the time period specified and enter

amounts in the appropriate row.

Ensure you total the hours in the column (regular and overtime) and enter the amount at

the bottom.

d Enter the appropriate hourly rate of pay used for regular and/or overtime.

e Multiply the total hours (column c) by the rate (column d) for total pay. This is the total

pay the worker received for the time period listed on this record. Ensure you total the

column and enter the total for regular pay (RP) and total for overtime pay (OT).

f Enter the number on the paycheck the employee received.

g --Regular pay (RP) = total regular pay multiplied by the fringe benefit rate. (Enter the

fringe amount in the blank). 1 equals this total.

--Overtime pay (OT) = the total overtime pay multiplied by rate. (Enter the fringe

amount in the blank). 3 equals this total.

Sign the Force Account Labor Record form. Use additional sheets when necessary. Each

record needs to be certified.

The information to complete this form is available from the employee’s time cards,

supervisor’s work logs, and from the payroll office.

Refer to the Applicant’s Handbook for work eligibility when using your own workers.

FO

R(A

PP

LIC

AN

T)

FE

MA

EM

PL

OY

EE

NA

ME

AN

D

DA

TE

AN

D H

OU

RS

WO

RK

ED

EA

CH

DA

YT

OT

AL

HO

UR

LY

TO

TA

L

JO

B D

ES

CR

IPT

ION

D

AT

E H

OU

RS

RA

TE

PA

Y

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

GU

LA

R-

$

O/T

-$

-

$

RE

G P

AY

-$

X F

RIN

GE

RA

TE

OF

=

-$

TO

TA

L H

OU

RS

TO

TA

L R

EG

-$

O/T

PA

Y-

$

X F

RIN

GE

RA

TE

OF

=

-$

TO

TA

L O

/T-

$

TO

TA

L A

LL

-$

RE

G F

RIN

GE

-$

O/T

FR

ING

E-

$ -

$

TIT

LE

DA

TE

I CE

RT

IFY

TH

AT

TH

E D

AT

A P

RO

VID

ED

HE

RE

WA

S T

RA

NS

CR

IBE

D F

RO

M D

OC

UM

EN

TS

AN

D R

EC

OR

DS

AV

AIL

AB

LE

FO

R A

UD

IT.

LO

CA

TIO

N O

F W

OR

K:

SC

OP

E O

F W

OR

K:

CA

TE

GO

RY

FO

RC

E A

CC

OU

NT

LA

BO

R R

EC

OR

D

CE

RT

IFIE

D B

Y

TO

TA

L O

T (O

NLY

) WIT

H F

RIN

GE

-$

TO

TA

L L

AB

OR

WIT

H F

RIN

GE

S

PR

OJE

CT

NO

.

DONATED LABOR RECORD FORM INSTRUCTIONS

(using volunteers)

Fill in the entire heading.

COLUMN

a. Enter the name of each individual.

b. Enter the dates worked across the top row and hours worked each day in the

appropriate column.

c. Add the hours across for the time period specified and enter amounts.

d. Enter the approved hourly rate of pay.

e. Multiply the total hours (column c) by the rate (column d) for total pay. This is

the total pay equivalent of the donated labor services.

An authorized official of the entity or organization is required sign the certification at the

bottom of each form.

D

ON

AT

ED

LA

BO

R R

EC

OR

D

for_

___________

___________________(en

tity o

r org

anizatio

n)

Locatio

n o

f Work

: _____________

____________________

____________________

P

age_

_____o

f______

Descrip

tion o

f Work

: _____________

________________________________________

Perio

d: _

__________to

___________20____

Pro

ject Num

ber: _

______________________________

[a] Nam

e of In

div

idual

[b] d

ate/hours w

ork

ed each

day

[c]

Total

Ho

urs

[d]

Rate

per H

our

[e] Total P

ay

Equiv

alent

date

Hours

Hours

Hours

Hours

Hours

Hours

Hours

Hours

T

otal H

ours

T

otal $

I certify th

at the ab

ove in

form

ation is a tru

e and

accurate acc

ountin

g o

f do

nated

labo

r services relatin

g to

this p

roject an

d th

at back

up

do

cum

entatio

n is av

ailable fo

r revie

w.

Certified

By:_

____

____

___________________________T

itle:_____________________________

_________

Date:_

_______________

_______

TOTAL PAYROLL IN DOLLARS

DOLLARS & HOURS

Holidays / 2080 =

Vacation Leave / 2080 =

Sick Leave / 2080 =

* Social Security *

* Medicare *

* Umemployment / total payroll = *

* Worker's Comp / total payroll = *

** Retirement / total payroll = **

Health Benefits / total payroll =

Life Insurance Benefits / total payroll =

Total (in % of annual salary)

I CERTIFY THAT THE INFORMATION ABOVE WAS TRANSCRIBED FROM PAYROLL

RECORDS OR OTHER DOCUMENTS WHICH ARE AVAILABLE FOR AUDIT.

CERTIFIED:

TITLE:

DATE:

* Only categories for overtime fringe benefits.

** Only when supported by employee contract

7.65% 7.65%

1.45%

6.20%

0.00%

0.00%

REGULAR TIME % OVERTIME %

0.00%

FEDERAL EMERGENCY MANAGEMENT AGENCY

APPLICANT'S BENEFITS CALCULATION WORKSHEET

APPLICANT:

DISASTER NUMBER:

(FIGURES IN YELLOW AUTOMATICLY "GO" TO THE FORCE ACCOUNT LABOR SHEETS)

P.A. ID:

PROJECT NUMBER:

6.20%

1.45%

TIME EXTENSION REQUEST FORM

INSTRUCTIONS

COLUMN

a Enter the FEMA disaster number.

Enter your Project Application.

b Enter name of applicant.

c Enter the Project Worksheet (PW) number.

d Enter the category of work (A through G).

e Enter the current date work is to be completed.

f Enter the date the work will begin or the date work began.

g Enter the percentage of work completed.

h Enter the new requested deadline by which work will be completed.

i SOEM use only – leave blank.

j Enter brief description of the reason new deadline is requested. Use

additional sheets if necessary.

Ensure the request is signed and dated before forwarding to SOEM. You will be notified

by mail of approval/disapproval.

TO

:G

overnor's Authorized R

epresentativeA

TT

N: Public A

ssistance Officer

State Office of E

mergency M

anagement

a

bc

de

fg

hI

j

Alternate G

overnor's Authorized R

epresentative

Date of S

ubmittal:

Date of A

pproval:

JUS

TIF

ICA

TIO

N

We ___________________________________ (applicant) are requesting an extension for the com

pletion of work, based on the follow

ing inform

ation:

STATE OFFICE OF EMERGENCY MANAGEMENT T

IME

EX

TE

NSIO

N R

EQ

UE

ST

FEM

A _____________-D

R-N

Y

P.A. # _________ - ________________

State Office C

ampus, B

ldg # 22 A

lbany, NY

12226-2251 Fax: (518) 322-4984

Local Representative (nam

e, title)

SO

EM

US

E

ON

LY

PW #

CATEGORYCURRENT DEADLINE

PROJECT START DATE

% COMPLETED

REQUESTED DEADLINE

APPROVED DEADLINE

NE

W Y

OR

K S

TA

TE

O

FF

ICE

of E

ME

RG

EN

CY

MA

NA

GE

ME

NT

D

ISA

ST

ER

RE

CO

VE

RY

QU

AR

TE

RL

Y P

RO

GR

ES

S R

EP

OR

T

A) F

EM

A _

____

__ D

R –

NY

P.A

. I.D. #

____

___

___

___

____

___

FR

OM

:__

___

___

___

___

__

____

___

Check B

ox if th

ere

is a

Poin

t of C

onta

ct c

hang

e

Nam

e/T

itle:_

___

__

___

___

____

___

___

__

___

___

___

___

Addre

ss:_

___

___

___

___

_____

___

___

__

___

___

___

___

City

, Sta

te Z

ip:_

____

___

__

____

___

___

__

___

___

___

__

E-M

ail:_

__

___

___

___

__

__

____

___

___

__

___

___

___

___

Pho

ne:_

__

___

___

___

___

_____

___

___

__

___

___

___

___

B) P

RO

JE

CT

AC

TIO

N N

OT

IFIC

AT

ION

S

(ple

ase c

he

ck a

ll tha

t ap

ply

)

T

ime

Exte

nsio

n n

eeded?

Change in

Desig

n?

W

ork

done b

y C

ontra

ct?

B

ids in

Pro

gre

ss/A

ccepte

d?

W

ork

done b

y F

orc

e A

ccount?

C

hange in

Scope o

f work

?

W

ork

under c

onstru

ctio

n p

er a

ppro

ved S

cope o

f Work

?

C)

D)

E)

F)

G)

H)

I) J

)

Pro

jec

t W

ork

sh

ee

t (P

W #

)

Pro

jec

t S

tatu

s

% o

f Wo

rk

Co

mp

lete

E

stim

ate

d

Fin

al C

os

t A

mo

un

t S

pe

nt to

D

ate

Es

tima

ted

D

ate

of

Co

mp

letio

n

Ap

pro

ve

d

Tim

e

Ex

ten

sio

n

Co

mm

en

ts

(An

y fu

rthe

r info

rma

tion

ex

pla

inin

g th

e s

tatu

s o

f pro

jec

t)

P

re-d

esig

n

Desig

n

Under

Constru

ctio

n

P

re-d

esig

n

Desig

n

Under

Constru

ctio

n

P

re-d

esig

n

Desig

n

Under

Constru

ctio

n

P

re-d

esig

n

Desig

n

Under

Constru

ctio

n

P

re-d

esig

n

Desig

n

Under

Constru

ctio

n

P

re-d

esig

n

Desig

n

Under

Constru

ctio

n

P

re-d

esig

n

Desig

n

Under

Constru

ctio

n

Local R

epre

se

nta

tive (P

lease P

rint N

am

e)

E-m

ail a

ddre

ss

Pho

ne

F

ax #

D

ate

SE

ND

TO

: Pu

blic

Assis

tan

ce O

fficer

NY

S O

ffice o

f Em

erg

en

cy M

an

ag

em

en

t

Bu

ildin

g #

22, S

uite

101

1220 W

ash

ing

ton

Aven

ue

Alb

an

y, N

ew

Yo

rk 1

2226

-2251

Ph

on

e #

(518) 2

92

-2293 F

ax #

(518) 3

22

-4984

V. Debris Fact Sheet

1

PUBLIC ASSISTANCE PROGRAM DEBRIS REMOVAL FACT SHEET FOR LOCAL GOVERNMENTS

Under a Presidential disaster declaration for New York, the Federal Emergency Management Agency (FEMA) may provide assistance to State and local governments for costs associated with debris removal operations. (Debris removal operations include collection, pick-up, hauling, and disposal at a temporary site, segregation, reduction, and final disposal). This document provides information on the eligibility of debris removal operations for Public Assistance funding. Questions: Questions regarding debris operations or the Public Assistance Program in general should be referred to the State Public Assistance Officer.

General Work Eligibility: Determination of eligibility is a FEMA responsibility. Removal and disposal of debris that is a result of the disaster, and is on public property, is eligible for Federal assistance. Public property includes roads, streets, and publicly-owned facilities. Removal of debris from parks and recreation areas is eligible when it affects public health and safety, or limits the use of those facilities.

Debris Removal from Private Property: Disaster-related debris may be removed from private property if it is pre-approved by the Federal Disaster Recovery Manager, is a public health and safety hazard, and if the work is performed by an eligible applicant, such as a municipal or county government. The cost of debris removal by private individuals is not eligible under the Public Assistance Program; however, within a specific time period, a private property owner may move disaster-related debris to the curbside for pick-up by an eligible applicant. That time period will be established by FEMA in coordination with the State. (The cost of picking up reconstruction debris is not eligible for FEMA reimbursement).

Eligible Costs: If an applicant uses force-account personnel and equipment, the cost of the equipment and overtime costs for personnel are eligible for Federal funding. If an applicant chooses to award a contract(s) for debris operations, the costs of the contracts also are eligible for Federal funding. Applicants should exercise judicious care in contracting for debris operations, since by law, FEMA is authorized only to assist with reasonable costs. Reasonable costs are those that are fair and equitable for the type of work performed. If desired, FEMA staff will provide technical assistance on this subject prior to contract award. FEMA may reimburse the straight-or regular-time salaries and benefits of permanently employed staff that performs eligible debris-related work over a period not to exceed 30 consecutive calendar days.

Direct Federal Assistance: If disaster-related debris removal and disposal operations are beyond the capability of State and local governments to perform or contract for the work, the State may request direct Federal assistance. In such instances, FEMA will give to the U.S. Army Corps of Engineers a mission assignment to prepare, execute, and monitor contracts for debris operations.

MAP-21 Emergency Relief: Allows FEMA reimbursement for disaster related debris removal on FHWA roads. (See attached)

Use of Contractors: If an applicant decides to award contracts for debris removal, FEMA advises the following: Do not allow contractors to make eligibility determinations; they have no authority to do so. Utilize pre-negotiated contracts if available. Consider using qualified local contractors because of their familiarity with the area. Utilize formal competitive procedures when time permits. If time does not permit use of normal

competitive procedures, competitive bids still may be obtained using a reduced time frame for submittal of bids. Request copies of references, licenses, and financial records from unknown contractors.

Document procedures used to obtain contractors. Do not accept contractor-provided contracts without close review. FEMA can provide technical

assistance on contracts and contract procedures. FEMA does not recommend, pre-approve, or certify any debris contractor.

FEMA does not certify or credential personnel other than official employees and

For additional detailed information see FEMA’s web-site http://www.fema.gov 2

Technical Assistance Contract personnel assigned to the disaster by FEMA.

Only FEMA has the authority to make eligibility determinations. (See Appendix F: 325 book - Debris Contract Information.)

Types of Debris Contracts: There are three general types of contracts that may be used for debris operations: Time and Materials Contracts may be used for short periods of time immediately after the disaster to mobilize contractors for emergency removal efforts. They must have a dollar ceiling or a not-to-exceed limit for hours (or both), and should be terminated immediately when this limit is reached. For FEMA reimbursement, such contracts should be limited to 70 hours of actual work. The contract should state that (a) the price for equipment applies only when equipment is operating, (b) the hourly rate includes operator, fuel, maintenance, and repair, (c) the community reserves the right to terminate the contract at its convenience, and (d) the community does not guarantee a minimum number of hours.

Unit Price Contracts are based on weights (tons) or volume (cubic yards) of debris hauled, and should be used when the scope-of-work is not well defined. They require close monitoring of pick-up, hauling, and dumping to ensure that quantities are accurate. Unit price contracts may be complicated by the need to segregate debris for disposal. Lump Sum Contracts establishes the total contract price using a one-item bid from the contractor. They should be used only when the scope of work is clearly defined, with areas of work and quantities of material clearly identified. Lump-sum contracts can be defined in one of two ways: area method, where the scope of work is based on a one-time clearance of a specified area; and pass method, where the scope of work is based on a certain number of passes through a specified area, such as a given distance along a right-of-way.

Ineligible Contracts: FEMA will not provide funding for cost-plus-percentage of cost contracts, contracts contingent upon receipt of State or Federal disaster assistance funding, or contracts awarded to debarred contractors.

Contract Monitoring: The applicant should monitor the contractor’s activities to ensure satisfactory performance. Monitoring includes: verification that all debris picked up is a direct result of the disaster; measuring and inspecting trucks to ensure they are fully loaded; on-site inspection of pick-up areas, debris traffic routes, temporary storage sites, and disposal areas; verification that the contractor is working in its assigned contract areas; verification that all debris reduction and disposal sites have access control and security. FEMA can provide assistance with monitoring if necessary. If an applicant has insufficient staff to properly monitor debris contract operations, the cost of hiring of additional staff for monitoring (or contracting for monitoring) is eligible for Federal funding. Documentation: To ensure that processing of Federal funding is done as quickly as possible, applicants should keep the following information: debris estimates, procurement information (bid requests, bid tabulations, etc.), contracts, invoices, and monitoring information (load tickets, scale records). If an applicant does debris removal, the payroll and equipment hours must be kept.

Technical Assistance FEMA and the State may provide technical assistance with planning, carrying out, and monitoring of debris removal operations. Applicants in need of technical assistance should contact the State Public Assistance Officer at the number given in the first paragraph.

For further information please consult detailed publications at http://www.fema.gov

DEBRIS CONTRACT INFORMATION FOR APPLICANTS Many of the problems that affect Federal reimbursement for debris removal, reduction and disposal occur as a result of improper contracting procedures, incomplete or inappropriate contracts, and/or inadequate monitoring of contract operations. FEMA and/or the State can provide technical assistance on the preparation and review of debris contracts and contracting. The following information is provided to assist you in developing and monitoring debris related contracts. 1. FEMA does not certify, credential, or recommend debris contractors. 2. No debris contractor has the authority to make eligibility determinations. 3. You need to make sure that you are familiar with FEMA eligibility, and not allow the contractor to make

eligibility determinations. Eligibility information is available in numerous FEMA documents including the Public Assistance Guide (FEMA 322), Public Assistance Applicant Handbook (FEMA 323), and the Public Assistance Debris Management Guide (FEMA 325) It also is available on the FEMA Website, www.fema.gov. If you have eligibility questions, call the State or FEMA.

4. Make sure the debris contract is one that contains a clear and definitive scope of work, monitoring requirements, and specific language that is required for each debris related task.

5. Do not sign a contract provided by a contractor until it has been thoroughly reviewed by your legal representative.

6. Use competitive bidding unless impossible to do otherwise. Many applicants have received competitive bids in very short time frames.

7. You are responsible for payment of services contracted, regardless of whether or not such services are eligible for reimbursement by FEMA. Remember that FEMA is not a party to a debris-related contract entered into by you and a contractor.

8. Be aware of the limitations of time and material contracts. It is FEMA policy to reimburse for only the first 70 hours of a time and materials contract. Some contracts contain time and material clauses for certain types of work, and costs of such work may not be fully reimbursable.

9. All types of contracts must contain a requirement that records be kept that shows the amount of debris pickup-up, hauled, and/or reduced to determine reasonable costs.

10. Every contract should contain a “Termination for Convenience” clause. An example of such a clause is as follows:

“This contract may be terminated at any time for the convenience of (the contracting entity). If this clause is executed, (the contracting entity) agrees to pay the contractor for all work completed through the termination date, as well as any demobilization costs that were a part of the original contract.”

11. The contract should contain a cap on the cost. When that cap is reached, a review of work accomplished and work completed should be conducted to determine work remaining. If necessary, the contract can then be modified to reflect more accurate information.

12. Be sure the contract has a reasonable period of performance for the work to be done. Monitor the work effort to ensure compliance with the schedule for completion.

13. Many services offered for a fee by contractors (training in preparing Project Worksheets, documentation requirements, eligibility information, etc.) may be available free from FEMA or the State. Be sure you are aware of those services.

14. Make sure costs are reasonable. FEMA pays only reasonable costs. 15. In some instances, it may be necessary to use temporary debris storage and/or reduction sites. Such sites are

expensive to develop, manage and restore. Don’t sign a contract for the development and management of such sites unless you know it is necessary. Call the State for assistance.

16. You, not the contractor, are responsible for monitoring and certifying debris operations. Be sure you have sufficient staff deployed for that task. If you do not have enough staff, hiring additional staff is eligible for funding according to the disaster cost share (usually 75% Federal, 25% non-Federal); however, those costs must be reasonable. It is not necessary to use registered professional engineers for monitoring. Many applicants find that construction inspectors are very appropriate.