Ferrybridge Community Liaison Group
17th April 2019
![Page 2: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/2.jpg)
Agenda• Safety Moment• Previous Minutes• Project/operations updates
– Ferrybridge ‘D’ CCGT– Multifuel 1 – Multifuel 2– Etex Plasterboard– Ferrybridge ‘C’
• AOB
![Page 3: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/3.jpg)
Safety Moment
![Page 4: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/4.jpg)
Previous Meeting Minutes
![Page 5: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/5.jpg)
• Project was on schedule to submit DCO planning application in Q2 2019, however this is subject to a potential delay.
• Outline agreement reached with Network Rail on the pipeline crossing location of their infrastructure. Physical survey of crossing point to be arranged to confirm no issues outstanding, this is a critical activity.
• AGI location at Gateforth end of gas pipeline under review following meetings with landowners. Gas Connection offer awaited from NGG and location to be finalised as part of acceptance criteria.
• www.sse.com/ferrybridged
Ferrybridge ‘D’ CCGT
![Page 6: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/6.jpg)
Multifuel 1 Operations• FM1 had a record year for 2018/19 with Boiler availability of 94.3%.• In 2018/19 there were no environmental incidents.• In March 2019 LRQA audited our ISO 14001 system – passed, no non‐conformances.• We had one LTI – 3 days, APCr in operator’s eye – full recovery, no long term issues.• Work continuing with links to local education:‐
– New animation created– FM1 conference room being used as an educational resource.
• We will start to take on apprentices within the next year.– First apprentice fair to be attended in June this year.
![Page 7: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/7.jpg)
Multifuel 2
![Page 8: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/8.jpg)
Community Liaison Group MeetingWednesday April17th 2019 Ferrybridge Multifuel 2 Project
![Page 9: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/9.jpg)
Civil and Mechanical Construction
Key Activities completed and upcoming Civil Engineering
Completion of underground services.
Final road and layout completion.
Landscaping.
Mechanical & Electrical InstallationCompletion of ACC.
Insulation and internal cladding.
Electrical and instrumental installation.
Commissioning Cold commissioning has commenced Steam blow out Mid JulyFirst Waste Delivery August
2Name of Presentation
![Page 10: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/10.jpg)
Overview of the FM2 Construction Site
3Name of Presentation
![Page 11: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/11.jpg)
Overview of the FM2 Construction Site
4Name of Presentation
![Page 12: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/12.jpg)
Overview of the FM2 Construction Site
5Name of Presentation
![Page 13: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/13.jpg)
Overview of the FM2 Construction Site
6Name of Presentation
![Page 14: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/14.jpg)
Overview of the FM2 Construction Site
7Name of Presentation
![Page 15: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/15.jpg)
Possible Community Impact
Noise• 0 complaints received in the reporting period • 1 Noise compliant in total
Lighting• 0 complaints received
Traffic
• 0 complaints received
Impending Deliveries in the next reporting period:
• Lorries – no impact
![Page 16: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/16.jpg)
Giving Back to the community
Celebrating Working Safely Together – £30,000 donated to our local community
9Name of Presentation
![Page 17: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/17.jpg)
10Name of Presentation
Thank you very muchfor your attention
![Page 18: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/18.jpg)
IBA Plant
![Page 19: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/19.jpg)
Ferrybridge IBA Processing Plant - Project Update
• Earthworks complete to the west plateau
• IBA placed to the west plateau• Earthworks on hold to the east
plateau due to the NPG cables issue to the NE boundary
• Soft spot removal and stabilisation of formation complete
• Attenuation pond excavated substantially complete
• Foundations to building complete
• Foul drainage installed to the process building
• Kerbing works ongoing• Foundation to gabion wall installed• External under slab ducting
ongoing• Steel Frame to building erected• Roller compacted slabs ongoing, • External Materials pens ongoing• Backfilling to the building complete• Precast perimeter walls complete• Safety netting and edge protection
works complete• Cladding works ongoing
![Page 20: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/20.jpg)
![Page 21: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/21.jpg)
Etex Plasterboard
![Page 22: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/22.jpg)
CLG Meeting April 2019
![Page 23: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/23.jpg)
Natural Gypsum Conversion(New Plant)
![Page 24: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/24.jpg)
Natural Gypsum Conversion
• The new plant is running with natural
gypsum (rock).
• we just have a small issue with reclaim
processing equipment.
• that means full factory acceptance tests
on the specified system is delayed to
Qtr.2 of 2019.
![Page 25: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/25.jpg)
Social Responsibility
![Page 26: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/26.jpg)
Charitable Donations
![Page 27: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/27.jpg)
Environmental Responsibility
![Page 28: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/28.jpg)
Site Key Indicators
1st Qtr. • 6 Million m2 of Board
Produced.• 65,020 hours worked on site.• No Lost Time Accidents• No Medical Aids.• 330 plus days since last Lost
Time Accident.
![Page 29: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/29.jpg)
Pylon Removal
National Grid Work.• Shrubs and brambles were
cleared.• Heavy machinery going to
place stakes to support Pylon’s.
• No date as yet.
![Page 30: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/30.jpg)
Noise
We are actively working on a recently received noise complaint that has come to us via Selby Council.
• Meeting held on 12th April at site.
• Wakefield council PPC issuer & Selby Council
Environment Officer present.
• Informed monitoring being undertaken at
residents properties.
![Page 31: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/31.jpg)
CLG Meeting April 2019
Thank You
![Page 32: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/32.jpg)
Ferrybridge ‘C’ ‐ Demolition • 2019 to date
– Asbestos removal in precipitators commenced– Initial enabling works in FDG2 area completed– Engineering studies to facilitate removal of the high level conveyer system in progress – Commenced transformer removal – Commenced demolition of FDG1– Commenced clearance of infrastructure in and around the cooling towers – Three public drop in sessions held in April with approx. 60 attendees.– Letter drop to residents within blowdown exclusion zones
![Page 33: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/33.jpg)
![Page 34: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/34.jpg)
![Page 35: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/35.jpg)
![Page 36: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/36.jpg)
![Page 37: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/37.jpg)
Ferrybridge ‘C’ ‐ Demolition • Next Quarter
– Continue asbestos removal – Complete removal of transformers– Demolition of ancillary buildings around turbine hall – Commence de‐plant of the turbine hall – Commence work on the RO plant area (subject to confirmation with nation grid)
• Later in 2019– Cooling tower test blast ‐ May– 1st cooling tower blowdown – July– 4 off cooling tower blow down – October
![Page 38: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/38.jpg)
Ferrybridge ‘C’ ‐ Site Redevelopment• Ongoing assessment of wider site for redevelopment opportunities• Brotherton Ings
– SSE is required to provide a remediation plan to the EA by November 2019– For the foreseeable future, Brotherton Ings will be managed in accordance with the EA
permit.– Feasibility of ash reclamation is being assessed
• Fryston Woods– Awaiting business proposal from Friends of Fryston Woods (now a CIC)– Fly tipping remains a significant issue, demanding considerable resource
![Page 39: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/39.jpg)
AOB• Next meeting ‐ Wednesday 17th July 2019 at 10:30am
![Page 40: Ferrybridge Community Liaison Group · Ferrybridge ‘D’ CCGT. Multifuel 1 Operations • FM1 had a record year for 2018/19 with Boiler availability of 94.3%. • In 2018/19 there](https://reader034.vdocument.in/reader034/viewer/2022043002/5f7fa06be380a426c108da4f/html5/thumbnails/40.jpg)
Thank You