Fibria’s Team

Executive Officers

Marcelo Castelli, CEO

Guilherme Cavalcanti, CFO

Henri Philippe, Comercial & International Logistics

Aires Galhardo, Forestry Operations

Portocel

Patricia Lascosque, Superintendent Director

Mauricio Talarico, Manager

Technology Center

Fernando Bertolucci, General Manager

Robert Sartório, Manager

Strategy and M&A

Vinicius Nonino, Strategy and M&A General Manager

Industrial Operations

João Florêncio, General Manager – Technical Assistant

Paulo Silveira, Aracruz Unit General Manager

Marcelo de Oliveira, Pulp Production Manager

Forestry Operations

Zoe Donati, General Manager

Rodrigo Zagonel, Harvesting Manager

Sebastião Andrade, Siviculture and Nursery Manager

Fernando Geraldi, Forestry Management and Performance

Corporate Communication

Mara Pinheiro | Tiago Nogueira Noronha

Pedro Torres Pinto

Investor Relations

André Gonçalves | Fernanda Naveiro | Roberto Costa Isabela Cerbasi | Robélia Silva

FINANCE GUILHERME CAVALCANTI - CFO

Main Achievements

• Liquidity Events in 2012: R$ 2.2bn (Equity Offering + BPM + Losango)

• Cash cost reduction and capex control

• Working Capital Improvements

• EBITDA margin improvement and Free Cash Flow Generation

• 2020 Notes Tender Offer of US$ 514mn – annual saving of R$80mn

• Covenants renegotiation to 4.5x in US$ and without waiver fee

• Hedging Strategy

• Rating outlook revised by S&P from “BB Stable” to “BB Positive” (Jul/12)

• 1st Fibria Investor Tour – Aracruz Unit (Oct/12)

• 2nd Fibria Day – NYSE – New York (Nov/12)

FORESTRY AIRES GALHARDO - FORESTRY DIRECTOR

Fibria has operations reaching many cities and countless communities

2

Four operational sites with different locations, but similar challenges

3

Forestry planning is a long-term process in which the environment has a significant impact on the biological asset

4

In the short term, tactical solutions are designed using the best production planning and control tools

5

In the short term, tactical solutions are designed using the best production planning and control tools

6

In the short term, tactical solutions are designed using the best production planning and control tools

7

In the short term, tactical solutions are designed using the best production planning and control tools

8

The CAPEX for a planted forest has not a linear format but peaks in the first year

9

OPEX

10

CAPEX and OPEX are influenced mainly by labor and service costs

11

State-of-the-art technologies are studied under a major project, called Forest of the Future (implementation 2010 - 2015)

12

State-of-the-art technologies are studied under a major project, called Forest of the Future (implementation 2010 - 2015)

13

State-of-the-art technologies are studied under a major project, called Forest of the Future (implementation 2010 - 2015)

14

State-of-the-art technologies are studied under a major project, called Forest of the Future (implementation 2010 - 2015)

15

Curve of capture: expected savings due to projects included in ‘Forest of the Future’

16

Forest development at Fibria

17

Land use model: The mosaic system

18

Selection for: Adaptability and disease tolerance

19

20

21

Added value

22

Forest Genetics Classical Breeding

23

Biotechnology: Genetic Transformation of Elite Clones

24

Forest Management: Plant Nutrition

25

A new added value projected

26

JOÃO FLORÊNCIO DA COSTA - GENERAL MANAGER INDUSTRIAL - TECHNICAL ASSISTANT

30

Flexibility with Multiple Facilities

31

Clean and Low CO2 Emission Energy Matrix

32

Increasing Production by Efficiency Improvement

33

Cost Reduction by Efficiency Improvement

34

Impact of Efficiency on Production and Cost

35

Process and Product Development

36

Product Development: Holistic Approach

37

Cash Cost Structure

38

CAPEX Structure

39

Investment Decision Matrix

40

Efficiency Project - Aracruz Revit “A“

41

Efficiency Project - Jacarei Energy Master Plan

42

Strategy for Gaining Scale

43

PATRICIA DUTRA LASCOSQUE SUPERINTENDENT DIRECTOR

46

Location

47

Location

48

History

49

Historical Annual Average

50

2011 Performance

51

Woodpulp Destination 2011

52

STX

53

STX

54

Loading of Woodpulp

55

Woodpulp barge operation

56

Unloading operation of woodpulp

57

Unloading operation of woodpulp

58

Logs discharge

59

Logs discharge

60

Salt discharge

61

New Industrial and Port Projects

62

Current Scenario

63

Current Scenario

64

Portocel I Expansion (berth 104)

65

Investments

66

Expansion Project: Portocel II

67

Expansion Project: Portocel II

68

Expansion Project: Portocel II

69