fichtner

22
Company Profile FICHTNER Consulting Engineers (India) Private Limited. Chennai, India

Upload: kamala-sundaran

Post on 14-Oct-2014

138 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: fichtner

Company Profile

FICHTNER Consulting Engineers (India) Private Limited.Chennai, India

Page 2: fichtner
Page 3: fichtner

The Fichtner Group

• Established in 1922

• Germany's largest independent engineering and consulting company

• Over 1400 employees worldwide

• Working for public- and private-sector infrastructure service providers with the focus on utilities

• Annual revenue of 190 million euros in 2009 (consolidated)

Page 4: fichtner
Page 5: fichtner
Page 6: fichtner
Page 7: fichtner
Page 8: fichtner

ABOUT FICHTNER INDIA

• Started in 1987 as a joint venture.

• Equity structure had undergone major changes during the last 23 years.

• Presently Fichtner GmbH & Co KG holds 84% of the equity as Indian Promoters disinvested last financial year.

• Balance equity held by Dr. Sharan, Founder Director and senior professionals of the company.

• Head office in the city of Chennai and Branch offices at Mumbai & Bangalore.

• Has established itself as a premier engineering consultancy company in India.

• Annual Turnover 2009-10 : Rs.800 Millions

• Growing at the rate of 30 to 35% in the last three years.

Page 9: fichtner

����������� �� ������������

���� ������������� !��� "

Page 10: fichtner

FICHTNER India has vast Experience and Expertise in Power and Water Sector

SECTOR OF ACTIVITIES

•Steam Power Plants•Industrial power plants, cogeneration plants•Gas turbine power plants•Combined cycle power plants•Engine cogeneration plants, diesel power plants•Renewable energies

•Electrical networks and components•Switch yards, Sub-stations & switchgears•Network control and load dispatch centers•I&C, protection and telecommunications

•Energy master plans•Energy supply concepts•Energy saving studies

Studies

Generation

Transmission

POWER

•Thermal Technology•Membrane Technology

Sea Water Desalination

•Urban Water Supply Schemes•Combined Water Supply Schemes•Water Distribution Networks•Water Treatment & Conveyance•Underground Sewerage Systems•Low Cost Sanitation•Integrated Land Development•Storm Water Drainage Projects

WATER & INFRASTRUCTURE

Page 11: fichtner

POWER

• Techno-Economic Feasibility Report• Detailed Project Report• Project Development • Project Management

- Technical specifications- Procurement assistance- Basic & detailed engineering- Inspection & expediting

• Site Management- Supervision of construction &

erection- Testing & commissioning assistance- Quality control implementation - Measurement & certification

• Due Diligence

RANGE OF SERVICES

Page 12: fichtner

• Conceptual Studies• Master Plans• Feasibility Studies• Survey & Investigation• Project Reporting & Monitoring• Detailed Project Reports• Financial Viability Analysis• Technical Audit• Inspection & Quality Control• Unaccounted for Water (UFW)• Leak Detection Studies• Rehabilitation and Augmentation Studies

WATER & INFRASTRUCTURE

Page 13: fichtner

DISCIPLINECHENNAI

OFFICEMUMBAI

OFFICEB'LORE OFFICE

SITE SERVICES

TOTAL

Management 5 2 2 1 10

Business Development 5 2 - - 7

Mechanical 75 23 32 13 143

Civil & Structural 92 14 19 19 144

Electrical 37 28 15 6 86

Control & Instrumentation 23 9 4 - 36

Water & Infrastructure 39 - - 39

System Admin. 8 2 1 - 11

Admin / HRD / Finance 39 16 8 1 64

Total 323 96 81 40 540

Page 14: fichtner

INFRASTRUCTURE

Office Floor Area

55000 Sq. ft.

Communication Facilities

Broad Band Internet ConnectionE- Mail FacilitiesISDNTelephone, FaxVideo Conferencing

Computer Aided Design & Engineering

MS Windows based network with more than 300 engineering and design work stations.

All required software including special purpose software likeAUTOCAD CAESER IISTADD PRO DigSILENTKPRO PDSETAP CADWORKSPIPENET INTOOLSGT PRO

Page 15: fichtner

INTERNATIONAL EXPERIENCE

DETAILED ENGINEERING FOR EPC CONTRACTORS1100 MW COAL FIRED PP - Mitsui Babcock750 MW CCPP - MHI, Japan660 MW CCPP - Siemens, Germany600 MW GTPP - MHI, Japan500 MW GTPP - Enka Teknik, Istanbul480 MW GTPP - BEMCO,KSA420 MW GTPP - BEMCO, KSA355 MW CCPP - Hanjung, Korea388 - 400 MW CCPP - Lotte, Korea300 MW CCPP - Lakdhanavi Ltd,, Sri Lanka120 MW HFO FIRED PP - Ansaldo, Italy100 MW GTPP - Techmaster, Lebanon

OWNERS ENGINEERING TO UTILITIES2000 MW LNG BASED CCPP - Petronas+TNB120 MW GAS FIRED POWER PLANT - Eurochem – Nigeria15 MW DGPP - Rolls Royce Power Ventures,

UKOWNERS ENGINEERING IN RENEWABLES

Solar Thermal Power Plants in India, Iran and SpainSITE SERVICES

Fichtner, KSARolls Royce Power Ventures, Nigeria

Page 16: fichtner

COAL BASED POWER PLANTS

Total plants engineered by Fichtner 302group in the last 20 years

Fichtner Germany 158

Fichtner India 144

Page 17: fichtner

COAL / LIGNITE BASED POWER PLANTS

����� 500 MW 200 MW AND BELOW TOTALCRITICAL & ABOVE ABOVE & 200 MW

LESS THAN 500 MW

Fichtner group 39 56 43 164 302

Fichtner Germany 12 29 25 92 158

Fichtner India 27 27 18 72 144

Page 18: fichtner

CompletedDPR2x800 MWVideocon Power Ltd.8

CompletedDPR2x800 MWILFS TN Power Co Ltd7

CompletedDPR2x800 MWKPCL6

CompletedDPR2x800 MWKPCL5

CompletedDPR2x800 MWKPCL4

CompletedFeasibility Report2x800 MWTNEB- Udangudi3

CompletedPre-Feasibility Report2x800 MWNLC, Neyveli2

CompletedPre-Feasibility Report3x800 MWGagan Power Ltd.1

800 MW

COMPLETED ASSIGNMENTS

Period of Execution/StatusDescription of ServiceSizeClientSI No

#������$��������� %&�'��&% ��

Page 19: fichtner

CompletedBTG Spec PreparationChattisgarh2x660 MWJindal Power Ltd.16

CompletedDPRKahalgaon Dist, Bihar2x660 MWBihar Power

Infrastructure Co Ltd.15

CompletedDPRPiprainti Dist., Bihar2x660 MWBihar Power Infrastructure Co Ltd.14

CompletedDPRLakhisarai Dist. Bihar2x660 MWBihar Power

Infrastructure Co Ltd.13

CompletedDPRNavasari, Gujarat2x660 MWILFS TN Power Co Ltd12

CompletedDPRNagapattnam Dist.2x660 MWEmpee Power & Infra Ltd.11

CompletedDPRNagapattnam Dist.2x660 MWNSL NagapattnamPower And Infra Pvt. LTd.

10

CompletedPre-Feasibility ReportChindwara Dist., MP2x660 MWSKS Ispat & Power

Ltd.9

660 MW

COMPLETED ASSIGNMENTS

Period of Execution/Status

Description of ServiceLocation SizeClientSI No

#������$��������� %&�'��&% ��

Page 20: fichtner

2010 - 2014DPR + OES in Limited Packages

Raigarh, Chattisgarh2x660 MWGodawari Energy Ltd.27

2010 - 2014DPR + OES in Multiple PackagesBanka, Bihar4x660 MW

JAS Infrastructure Capital Pvt. Ltd.(Abhijeet)

26

2010 - 2014OES in 2 Package Basis(BTG + BOP)Krishnapatnam, AP2x660 MWThermal Powertech

corporation India Ltd.25

2009 - 2014DPR +BTG Spec Preparation + OES in Multiple Packages

Angul/Orissa4x660 MWBhushan Energy24

2009 - 2010DPR + Selection of BTG contractorChattisgarh & Bihar2x660 MWAdhunik Power &

Natural Resources Ltd.23

2008 - 2013OES in Limited Package Basis

Tiroda , Maharashtra

3x660 MW Phase - IAdani22

2010 - 2014OES in Limited Package Basis

Tiroda , Maharashtra

2x660 MW Phase - IIAdani21

2010 - 2014DPR + OES in Limited Package BasisDahej, Gujarat4x660 MWAdani20

2010DPROrissa2x660 MWPTC Energy (Sahara Group)19

2010Due DiligenceKrishnapatnam, AP2x660 MWSembcorp Industries Ltd.18

660 MW

2009 - 2012DES of BOP in Multiple PackagesKrishnapatnam, AP2x800 MWTATA Projects Ltd.17

800 MW

PROJECTS UNDER EXECUTION

Period of Execution/Status

Description of ServiceLocation SizeClientSI No

#������$��������� %&�'��&% ��

Page 21: fichtner

COMBINED CYCLE POWER PLANTS

Total plants engineered by Fichtner 170group in the last 20 years

Fichtner Germany 128

Fichtner India 42

Page 22: fichtner

COMBINED CYCLE POWER PLANTS

Type of Gas Turbine No. of projectsof Major Projects

- LM 6000 PC 1- Fr 5 3- Fr 6B 3- Fr 6FA 4- Fr 9E 4- Fr 9FA 8- ABB type 8C 1- Fr 7 EA 2- MW 701 F 2- MW 701 1- Siemens V-94.2 2- Siemens V-94.3A 1- Siemens SGT 5 – 4000F 1- Siemens SGT 5 – 4000E 1 - Others 8