Field Of Dreams: Build It and They Will Come MPRA Conference February 26, 2015 Springfield, MO

Upload: brian-hauff

Post on 22-Jan-2018

259 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Field Of Dreams - Copy

Field Of Dreams: Build It and They Will Come

MPRA Conference February 26, 2015

Springfield, MO

Page 2: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference2 February 26, 2015

Panel Speakers

Dr. Keith Ernce, MSU Program Director Recreation,

Sport and Park Administration

Brian Hauff and Terry Rowland, MSU Planning,

Design and Construction

Ashleigh Lewellen, MSU Asst. Director Facilities and

Operations Foster Recreation Center

Randall Blackwood, MSU Exec. Dir. for Athletics and

Entertainment

Casey Hunt, MSU Senior Associate Director of

Athletics

Page 3: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference3 February 26, 2015

Program Objective

Identify the funding process for the projects

Identify challenges with the planning and

construction phases of the projects

Learn about state-of-the-art materials and

technology applications

Identify the issues that have occurred since

completion

Page 4: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference4 February 26, 2015

Field

Hockey*

Foster

Recreation

Center

Track and Soccer* Sand Volleyball*

Plaster

Stadium

Betty and Bobby Allison Sports Stadiums*

Page 5: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference5 February 26, 2015

Athletic Facility Funding B.E.A.R (Bear Experience and Recreation) fee

All of the facilities will be available for student

recreation, intramural and intercollegiate use.

SGA initiative—student vote 2,948 for, 726 opposed

and 232 abstained October 2013

$50 per semester, $1.6M annually

$200,000 managed by the Office of Student Engagement to

“enhance the student experience” at athletic events

$1.4M annual retirement on $20M bonds

Students will not pay the fee until the projects are completed

Page 6: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference6 February 26, 2015

Page 7: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference7 February 26, 2015

Betty and Bobby Allison North Stadium Field Hockey and Lacrosse

Cost $4.9 Million

Page 8: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference8 February 26, 2015

Betty and Bobby Allison North Stadium Field Hockey and Lacrosse

BEFORE

Page 9: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference9 February 26, 2015

Betty and Bobby Allison North Stadium Field Hockey and Lacrosse

AFTER

Page 10: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference10 February 26, 2015

Page 11: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference11 February 26, 2015

Betty and Bobby Allison North Stadium

Page 12: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference12 February 26, 2015

Betty and Bobby Allison Sand Volleyball Complex

Cost $1.1 Million

Page 13: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference13 February 26, 2015

Page 14: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference14 February 26, 2015

Betty and Bobby Allison Sand Volleyball

Page 15: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference15 February 26, 2015

Betty and Bobby Allison South StadiumTrack and Soccer

Cost $8.1 Million

Page 16: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference16 February 26, 2015

Betty and Bobby Allison South StadiumTrack and Soccer

BEFORE

Page 17: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference17 February 26, 2015

Betty and Bobby Allison South StadiumTrack and Soccer

AFTER

Page 18: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference18 February 26, 2015

Betty and Bobby Allison South Stadium

Page 19: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference19 February 26, 2015

Betty and Bobby Allison South Stadium

Page 20: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference20 February 26, 2015

Betty and Bobby Allison South Stadium

Page 21: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference21 February 26, 2015

Robert W. Plaster Stadium – East Side Expansion Project

Cost $13.3 Million

Page 22: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference22 February 26, 2015

Robert W. Plaster Stadium – East Side Expansion Project

BEFORE

Page 23: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference23 February 26, 2015

Robert W. Plaster Stadium – East Side Expansion Project

AFTER

Page 24: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference24 February 26, 2015

Robert W. Plaster Stadium – East Side Expansion Project

Page 25: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference25 February 26, 2015

Robert W. Plaster Stadium – East Side Expansion Project

Page 26: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference26 February 26, 2015

Robert W. Plaster Stadium

Page 27: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference27 February 26, 2015

State-of-the-Art Applications

Synthetic Turf fields are more complicated than

you may think…

The foundations of these fields are more

important than the synthetic turf itself !

Invest the money in the infrastructure.

Work with experienced turf designers and

turf builders.

Page 28: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference28 February 26, 2015

Issues Post-ConstructionIf We Had a Do Over

MSU Athletic and Recreation Fields

“I would also say that time was the major factor during design. Because of the schedule, the end user did not have as much time to review the design, materials and how each venue functioned, as we would normally like. The quick design added additional pressure to the quick construction schedule, because changes were made to the design during construction. “Lessons: plan for the appropriate amount of time for design and construction. A year or two may seem like a lot of time, but goes fast in design and construction.” Robert Neu, AIA, LEED AP Associate | Project Architect

SAINT LOUIS, MO

Page 29: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference29 February 26, 2015

Issues Post-ConstructionIf We Had a Do Over

MSU Athletic and Recreation Fields“The greatest challenge we had during construction was the accelerated schedule. Twenty-five million dollars’ worth of construction put in service in eight months does not allow for typical project coordination. “Unforeseen conditions, owner changes, and plan changes which are normally and uneventfully incorporated into a project became emergency issues that had to be resolved at ‘100 mph.’” John Blanton Associate | Construction Manager

SAINT LOUIS, MO

MSU Athletic and Recreation Fields

Page 30: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference30 February 26, 2015

Issues Post-ConstructionIf We Had a Do Over

“At [Football] Venue One the schedule and site logistics were stretched to

their limits. There was the active field immediately to the West, the main path

for University administration, physical plant and several shuttle lines

immediately to the East. There was no room to efficiently laydown and

organize materials and equipment. All of this again was compounded by the

unforeseen conditions in the soils and all the snow and cold. Just in time

deliveries were required daily for all trades; with very limited access to

vehicular traffic. The site constraints and pace of the project stretched the

patience and cooperation of all trades to their maximum.

Bruce B. Colony

DeWitt & Associates, Inc.

MSU Athletic and Recreation Fields

Page 31: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference31 February 26, 2015

Issues Post-ConstructionIf We Had a Do Over

“The biggest challenges we faced on this project were related to schedule,

site logistics and unforeseen conditions. All were compounded by the awful

weather and the design challenges that arose as a result of a very short

design phase.

“Last but not least was the introduction of the signage and scoreboards that

had not been completely designed and were not coordinated with the site and

design requirements. All of which detracted the entire design team away from

the other issues.”

Bruce B. Colony

DeWitt & Associates, Inc.

MSU Athletic and Recreation Fields

Page 32: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference32 February 26, 2015

Issues Post-ConstructionIf We Had a Do Over

“[Field Hockey / Lacrosse] Venue Three had a fair amount of civil work to do

in preparation for the field placement, during the worst time of the year for

that kind of work. Add to that challenge the very wet, very cold weather and

the six month timeline for construction. There were myriad design issues

overlooked which impacted both schedule and cost.

“At [Track / Soccer] Venue Two there was a little more time in the schedule

but we met large amounts of bad soils and the remediation of those

conditions with the weather was a massive delay. Compounding these issues

were the myriad design issues brought on not only by the short design period

(track length, surface material, structural detailing) but also by the change to

cast masonry units from precast concrete; which was a necessity for both

constructability and cost.

Bruce B. Colony

DeWitt & Associates, Inc.

MSU Athletic and Recreation Fields

Page 33: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference33 February 26, 2015

Issues Post-ConstructionIf We Had a Do Over – MSU Athletic and Recreation Fields

Give yourselves more time than we had for design and construction.

Our Schedule for $27+ million project budget:

• Planning (Defining the Scope): March 2013 to June 2013 (4 Months !)• President Smart announces on March 4, 2013.

• MSU Planning Design and Construction (PDC) prepares RFQ for Architect

from March to April 2013.

• MSU PDC receives RFQ responses from Architects May 2013.

• MSU PDC interviews Architects in June 2013.

• MSU hires Hastings and Chivetta in June 2013 for Programming.

• Programming completed in one month!

Page 34: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference34 February 26, 2015

Issues Post-ConstructionIf We Had a Do Over – MSU Athletic and Recreation Fields

• Design: July 2013 to end of October 2013 (4 Months !)• Homecoming October 2013 – Students vote on B.E.A.R. Fee. 80%+ voted in

favor of proposal !

• Design continues until end of October 2013.

• Bidding and Negotiation: November 2013 (1 Month!)

• Construction: December 2013 to September 2014 (10 Months !)• Venue – Football : : :December 2013 to September 2014 10 Months

• Venue – Track Soccer : :December 2013 to August 2014 9 Months

• Venue – Field Hockey / Lacrosse :December 2013 to June 2014 7 Months

• Venue – Sand Volleyball :June 2014 to August 2014 2 Months

• 19 Months from Start to Finish !!!

(Should have been 28 Months from start to finish)

Page 35: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference35 February 26, 2015

Issues Post-ConstructionIf We Had a Do Over – MSU Athletic and Recreation Fields

Follow up to punch list items

-Making sure items are corrected and/or fixed

(windows, fencing)

Field events area for Track and Field

Field Signage

Access to facilities

Equipment needs

Student/Faculty Access to fields– Card Readers

Page 36: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference36 February 26, 2015

9 Lessons learned for a project to be successful…

1. From Steven Covey’s 7 Habits…”Begin with the end in

mind” = Always work backward from the goal.

2. There is no silver bullet for success, just humility and

hard work.

3. Clearly define the goal for everyone and work towards

the same goal so everybody can share in the success.

4. Know the difference between what is necessary and what

is less important. Focus on the essentials for success.

5. All Stakeholders and Key Players need to take ownership

and responsibility for their decisions.

Page 37: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference37 February 26, 2015

9 Lessons learned for a project to be successful…

1. Communication is key – Be as proactive as you can

instead of reactive. Anticipate trouble before it becomes

trouble.

2. Teamwork is essential – please leave the egos at the door.

Owner, Architect, and Contractor need to cooperate with

one another. It is amazing what can be accomplished if

you don’t care who gets the credit !

3. Multiple Substantial Completion Dates on Athletic Fields

were needed, but it made planning, design, and

construction more difficult.

4. Give yourselves more time than we had for planning,

design, and construction. It will save you money in the

long run.

Page 38: Field Of Dreams - Copy

Field of Dreams Presentation – MPRA 2015 Conference38 February 26, 2015

Thank You!Contact Information

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]

[email protected]