FIELD TREATMENT SITES. Another PIECE of the PUZZLE. Presented by: Doug Buchanan www.DisasterDoug.com. OBJECTIVES. 1- WHAT?. 2- WHY?. 3- WHO?. After this course, you should be able to answer…. What Are They? Identify several resources available to help augment current Treatment Facilities. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FIELD TREATMENT SITES

FIELD TREATMENT SITESAnother PIECE of the PUZZLE

Presented by: Doug Buchananwww.DisasterDoug.com

Page 2: FIELD TREATMENT SITES

OBJECTIVESAfter this course, you should be able to answer…

What Are They?Identify several resources available to help augment current Treatment Facilities

Why Do We Need Them?Describe the purpose and function of a Field Treatment Site.

How Do We Activate an FTS?Outline the Activation and Set-up Process for an FTS.

Where Do We Get the Equipment/Supplies ?Describe the Logistics and Support Process for an FTS.

What Happens at the End of 3 Days?List the options for Demobilization of an FTS.

1- WHAT?1- WHAT?

Who Decides When We Need to Activate an FTS?Describe the Decision Process for Activation of an FTS.

2- WHY?2- WHY?

3- WHO?3- WHO?

4- HOW?4- HOW?

5- WHERE?5- WHERE?

6- WHEN?6- WHEN?

www.DisasterDoug.com

Page 3: FIELD TREATMENT SITES

What is an EMS Field Treatment Site?

• An EMS Field Treatment Site is a temporary facility, designed to provide Triage and Treatment of patients awaiting transportation, for up to 72 hours.

How does this relate to other facility types?

How does this relate to other facility types?

www.DisasterDoug.com

Page 4: FIELD TREATMENT SITES

• The California EMS Authority currently has three 200-bed Mobile Field Hospitals available for deployment.

MOBILE FIELD HOSPITALS

Don’t We Already Have Options?.. like:

ALTERNATE CARE SITES

• Many Operational Areas have already developed plans for establishing Alternate Care Sites as part of the local Medical Surge plan.

www.DisasterDoug.com

Page 5: FIELD TREATMENT SITES

YES. Local and State Government agencies currently have Assets and

Plans to help augment Treatment locations during a Medical Surge.

• However… most of these plans require a minimum of 72 hours to fully activate.

• An EMS FTS is designed to use Paramedics, EMTs, and EMRs to provide care up to 72 hours.

www.DisasterDoug.com

Page 6: FIELD TREATMENT SITES

• Establishing an EMS Field Treatment Site to fill in the gap between the onset of a local Medical Surge event, and the time it takes to activate a Mobile Field Hospital or an Alternate Care Site is one possible scenario (i.e. Medical Surge).

• Another reason why an EMS Field Treatment Site may be activated is that Transportation of patients to definitive care is not possible, due to:

• Unavailable Transportation Routes• Unavailable Transport Resources

Field Treatment SitesFilling in the Gap.

www.DisasterDoug.com

Page 7: FIELD TREATMENT SITES

www.DisasterDoug.com

• Scenario: A bridge on the local highway had partially collapsed during a mud slide earlier today. At 6pm, a 50 passenger bus and several automobiles didn’t notice the problem… until it was too late. This highway is the primary route to local hospitals. Taking alternate routes could take hours. You now have 58 patients, and the weather forecast is calling for freezing temperatures tonight. You anticipate that getting adequate transport resources here could take until morning. You decide to…

TEST YOUR KNOWLEDGELet’s examine what we’ve learned so far…

A. Request a Mobile Field Hospital

B. Request an Alternate Care Site

C. Request a Field Treatment Site

Page 8: FIELD TREATMENT SITES

www.DisasterDoug.com

• If you answered “C. Request a Field Treatment Site,” you’re correct.

• Our problem is not places to send our patients, it is that the transportation routes are significantly affected, and transport resources are significantly delayed.

• Requesting an FTS should allow us to getpatients out of the environment, andprovide facilities to maintain patients overnight.

TEST YOUR KNOWLEDGELet’s examine what we’ve learned so far…

Page 9: FIELD TREATMENT SITES

• An Incident Commander may decide to contact the MHOAC to request an FTS Activation when it appears that patients will have to be cared for greater than 12 hours on scene.

• T he OA EOC may elect to activate an FTS due to a Healthcare Surge event.

• The MHOAC may use the FTS Decision Checklist and tools found in the FTS Planning Guide to:

• Evaluate Resource Options

• Determine number, type, and locations of FTSs

• Sign an FTS Activation Order

• Appoint an FTS Activation Team Leader

• FTS Activation Team Leader oversees the Activation and set-up of the FTS.

Deciding to Activate Requests for FTS Activation come to the MHOAC from a local

Incident Commander or the OA EOC.

www.DisasterDoug.com

Page 10: FIELD TREATMENT SITES

A Medical / Health Technical Advisory Committee may be convened to help assess the available alternatives or Medical Surge strategies, prior to FTS activation.

FTS Decision ChecklistDesigned for use by the MHOAC

www.DisasterDoug.com

Page 11: FIELD TREATMENT SITES

Assessment Factors To assist the MHOAC or the EOC MH Branch in evaluating the need

for an FTS, many factors should be considered. This tool is available in the FTS Planning Guide.

www.DisasterDoug.com

Page 12: FIELD TREATMENT SITES

Pre-Surveyed Facility: If the County has a pre-designated FTS within the area , this location should be considered first. A list of Pre-designated sites can be found in the Appendix of the FTS Planning Guide. Non-Surveyed Facility: If no pre-designated sites in the target area are available, other non-surveyed facilities should be considered, such as halls, community centers, etc. Non-Fixed Site: If there are no targetable facilities within the area, an FTS will need to be identified and established in close proximity to the incident, which may require assets such as tents, portable water / sanitation, and generators, etc.

FTS OptionsConsidering what is available.

www.DisasterDoug.com

Page 13: FIELD TREATMENT SITES

This is the first part of the form, designed to be used by the MHOAC or Med/Health Branch Director at the EOC.

FTS Activation OrderAfter Identifying the Site

www.DisasterDoug.com

Page 14: FIELD TREATMENT SITES

The second portion of the FTS Activation Order is designed to list the Team Leader, appointed by the MHOAC or Med/Health Branch Director of the EOC.

FTS Activation OrderAfter Identifying the Site

www.DisasterDoug.com

Page 15: FIELD TREATMENT SITES

The MHOAC or MH Branch needs to consider when, and how the FTS might be demobilized. Planning must begin as early as possible to ensure a smooth transition. The options for consideration may be:

Decision to Demobilize or TransitionThinking ahead…

•Maintain the FTS until all patients are disbursed, then demobilize the site.

•Utilize the FTS for initial care and treatment, then transition the care of patients to an FTS or ACS at different location.

•Utilize the FTS for initial care and treatment, then transition the FTS into an ACS at the same location.

www.DisasterDoug.com

Page 16: FIELD TREATMENT SITES

The following graphic provides examples of transitioning an on-scene Treatment Area to an FTS and transitioning an FTS into an ACS for longer term care.

Decision to Demobilize or TransitionThinking ahead…

www.DisasterDoug.com

Page 17: FIELD TREATMENT SITES

Decision to Demobilize or TransitionOnce an FTS is Activated…

www.DisasterDoug.com

Page 18: FIELD TREATMENT SITES

Activating an EMS Field Treatment SiteFTS Activation Team Leader Checklist

• Once the decision has been made to activate a Field Treatment Site (FTS), and an FTS Activation Team Leader has been assigned, the team leader is responsible to:

•Assign the Activation Team staff,

•Secure the selected FTS location,

•Acquire the necessary resources to staff and equip the site, and

•Set-up the site.

www.DisasterDoug.com

Page 19: FIELD TREATMENT SITES

This tool from the FTS Planning Guide is meant to assist the FTS Activation Team Leader.

Additional supporting tools are listed in the column to the right.

Activation Team Leader Checklist

www.DisasterDoug.com

Page 20: FIELD TREATMENT SITES

This tool is intended to give the FTS Activation Team leader an overview of the tasks and responsibilities involved in the FTS activation process, and shows how these tasks may be assigned to various Section Chiefs and Unit Leaders.

FTS ACTIVATION TEAMPlanning Tool

TEAM LEADER (Command and Control)

LOGISTICS SECTION CHIEF• Facility Procurement Unit (Select and Secure a Site) • Staffing Unit: (Establish Initial Operational Period

Staffing)• Equipment / Supply Unit: (Order of Equipment and

Supplies)• Communications Unit: (Establish Communication

Systems)

OPERATIONS SECTION CHIEF • Staging Manager: (Receive and inventory incoming

equipment / supplies)• Site Set-up Unit: (Site Set-up)• Security Unit: (Establish Site Security Plan)

www.DisasterDoug.com

Page 21: FIELD TREATMENT SITES

This chart utilizes Smart Art which is feature in PowerPoint 2007. If you wish to make charts like this and don’t have PPT 2007, we have provided the graphical elements to help you build this yourself.

Here is the description of the chart. You may change or delete this text as you wish.

FTS Activation Org ChartExample of how the Activation Team may be organized.

FTS logistics will by

managed by, or in

cooperation with, the

OA EOC

FTS logistics will by

managed by, or in

cooperation with, the

OA EOC

www.DisasterDoug.com

Page 22: FIELD TREATMENT SITES

Job Action Sheets are included in the FTS Planning Guide for each position on the FTS Activation Team.

In addition to the Job Action Sheets, the supporting tools, such as the ICS Forms, can be found in the Attachments section.

Job Action SheetsThe right tool for the right job.

www.DisasterDoug.com

Page 23: FIELD TREATMENT SITES

www.DisasterDoug.com

FTS Equipment / Supplies ToolAnd Recommended Quantities for a 50 patient FTS

Page 24: FIELD TREATMENT SITES

• Example: Available in Local Cache?This is designed to be filled out in advance, based upon known local assets.

www.DisasterDoug.com

FTS Equipment / Supplies ToolHow do we use this form?

PHD 50PHD 150PHD 200OES 100OES 200

Page 25: FIELD TREATMENT SITES

• Example: Select for OrderingThis is designed to be filled out to reflect the actual need during an incident (e.g. if your incident requires care for only 30 patients, the column should reflect that.)

www.DisasterDoug.com

FTS Equipment / Supplies ToolHow do we use this?

PHD 50PHD 150PHD 200OES 100OES 200

309030620

Page 26: FIELD TREATMENT SITES

• Example: Have – Need These columns are designed to indicated what items we already HAVE, versus what we still NEED (e.g. We have 10 cots, 2 Tables, & 2 Chairs; we need everything else).

www.DisasterDoug.com

FTS Equipment / Supplies ToolHow do we use this?

PHD 50PHD 150PHD 200OES 100OES 200

309030620

100022

209030418

Page 27: FIELD TREATMENT SITES

• Example: Requested – Order FilledThe last two columns are meant to help us track what has been requested, and if an order has been filled.

www.DisasterDoug.com

FTS Equipment / Supplies ToolHow do we use this?

PHD 50PHD 150PHD 200OES 100OES 200

309030620

100022

209030418

209030418

Page 28: FIELD TREATMENT SITES

www.DisasterDoug.com

FTS LayoutSample Layout of a Field Treatment Site

Page 29: FIELD TREATMENT SITES

• Scenario: You have been assigned as an FTS Activation Team Leader, and are tasked with activating this facility for 50 patients. Besides patient cots, bedding, and food, what additional items might need to be considered?

A. Portable toilets.

B. Storage area for medical supplies.

C. Nothing.

www.DisasterDoug.com

TEST YOUR KNOWLEDGELet’s examine what we’ve learned so far…

Page 30: FIELD TREATMENT SITES

• If you answered “C. Nothing,” you might need to restart this lesson.

• If you answered “A. Portable toilets,” you have begun thinking like an FTS Activation Team Leader.

• Caring for 50 people will likely require more than one toilet. You might also consider additional handwash stations.

A good rule of thumb is: 20/1

www.DisasterDoug.com

TEST YOUR KNOWLEDGELet’s examine what we’ve learned so far…

Page 31: FIELD TREATMENT SITES

The FTS Organization Chart is largely modeled after the current FIRESCOPE MCI organization chart.

FTS Operations

www.DisasterDoug.com

Page 32: FIELD TREATMENT SITES

Job Action Sheets are included in the FTS Planning Guide for each position in the FTS organization.

In addition to the Job Action Sheets, the supporting tools, such as the ICS Forms and FTS Report Forms can be found in the Attachments section.

FTS OperationsJob Action Sheets, Forms, & other Tools

www.DisasterDoug.com

Page 33: FIELD TREATMENT SITES

Several forms have been developed to assist the personnel with FTS operations, including the:•FTS Report Form

•FTS Staffing Roster

•FTS Time Sheet

•FTS Patient Record

www.DisasterDoug.com

FTS Tools

Page 34: FIELD TREATMENT SITES

• Most Operational Areas in California have had the opportunity to conduct FTS Assessments on local target facilities.

• The FTS Assessment allows us to identify in advance what services or features already exist at a target facility, and what will likely need to be brought in to make a facility functional as an FTS.

In addition to the county –specific FTS Surveys and Site Diagrams, a generic FTS Diagram has been included in the Appendix of the FTS Planning Guide that demonstrates an FTS set-up at or near the site of an incident, using Tents, Cots, etc.

www.DisasterDoug.com

FTS Site Surveys/DiagramsDeveloped through HPP Grant Funding

Page 35: FIELD TREATMENT SITES

Field Treatment SitesAnother piece of the puzzle.

You have completed the FTS Overview.

-Thank you.www.DisasterDoug.com