figure 4.0-1 exxonmobil proprietary syu opsrb · 2019. 10. 14. · exxonmobil proprietary syu opsrb...

17
Figure 4.0-1 SYU OPSRB

Upload: others

Post on 15-Feb-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • ExxonMobil ProprietaryFigure 4.0-1 SYU OPSRB

  • ExxonMobil ProprietarySYU OPSRB

    SYU Existing Offshore Facilities Overview

    Figure 4.0-2

  • ExxonMobil ProprietarySYU OPSRB

    SYU LFC Onshore Facilities Overview

    PACIFIC OCEAN

    U.S. 101AND

    RAILROAD

    CABLE SPLICE EXCAVATION

    Tunnel Access in El Capitan State Beach (Bike Path)

    Tunnel Access in LFC

    FIBER OPTIC CABLE(Existing Conduit to POPCO)

    (OSS)

    TUNNEL

    Figure 4.0-3

  • LFC Side of Tunnel

    SYU OPSRB4

    TRANSITION SPLICE AREA

    LFC SIDE TUNNEL ACCESS AREA

    TUNNEL

    Figure 4.0-4

  • Cross-Section of Tunnel

    SYU OPSRB

    Oil Emulsion

    Water Gas

    SUBMARINECABLE C1,B,A

    Figure 4.0-5

  • Diagram of Elevation of Tunnel and Conduit Area

    SYU OPSRB

    Nearshore Area LFC Area

    Figure 4.0-6

  • SYU Nearshore Power Cable Conduit Location

    SYU OPSRB

    CONDUIT TERMINUS AREA

    Figure 4.0-7

  • ExxonMobil Proprietary

    SYU Existing Power Distribution System

    State Jurisdiction

    Outer Continental Shelf (Federal Jurisdiction)

    Harmony

    Heritage ~19 MW

    Harmony ~17 MW

    Hondo ~8 MW

    Total ~44 MW

    LFC / POPCO

    E

    D1

    B

    A

    C

    C1

    D

    SYU Offshore Power Distribution System- Original cables are shown in black (early 1990s)- OPSR-A cables are shown in blue (2003)- Dotted line represents cables taken out of service

    Approximate Power Consumption

    Hondo

    Up to 50 MW generation at LFC

    Location of fault repairs on C1 cable

    SYU OPSRB

    Harmony

    Heritage

    Figure 4.0-8

  • ExxonMobil Proprietary

    OPSRB Proposed ScopeDescription• Replace 2 existing submarine power cables: Replace

    A (or B) with A2 (or B2) and replace C1 with F2 and G2 [Phase-2]− 29 miles of 3 phase cables; 35 kV ; 32 MW − Total cable weight approx. 2900 tons

    Excavating / trenching for splicing Remove cable in tunnel & conduits

    Retrieve cables and install replacement cables and P/L crossings within State Lands ROW

    Remove cable fromHA & HE J- Tubes

    • Retrieve and recycle 12-18 miles of Cables A (or B) and C1 (LFC to State/Federal Boundary, on and adjacent to HA and HE, and along route) [Phase-2]

    • Install modifications on HA and HE for cable installation and electrical equipment [Phase-1]

    Install risers and cable in centenary

    Pre-Project Surveys including near shore marine biological and route archeological

    Install replacement cables and cable crossings in OCS

    Install new GISbuilding

    SYU OPSRBFigure 4.0-9

  • ExxonMobil Proprietary

    SYU Cable Cross-Sections

    35 kV Pirelli Cable Installed in 2003

    • Kerite (1993)- Original submarine power cable installations• Pirelli (2003)- Cable C1 and D1 (Similar design except water blocking and fiber optics)• OPSRB (2015)- Similar to Pirelli with double armor wire, 46 kV insulation, and larger conductors

    Fiber Optic Cable

    Power Conductors

    SYU OPSRB

    Water Blocking

    Armor Servings

    Single Armor

    35 kV Kerite Cable Installed in 1993

    Figure 4.0-10

  • ExxonMobil Proprietary

    Red Cables A2 (or B2), F2 & G2 will be installed replacement cables. Blue Cables B (or A), D, D1, & E are existing cables that will remain in operation. Black Dashed Cables A (or B), C1 & C will be abandoned in place. Cables A (or B) & C1 will be retrieved in Tunnel, Conduits, State Waters and adjacent to Platforms.

    OPSRB Cable Overview Diagram

    Figure 4.0-11

  • Typical DP Cable Installation Vessel

    SYU OPSRB

    Typical Typical DP Cable Installation Vessel - Preliminary Deck Layout

    Figure 4.0-12

  • Cable Retrieval from Conduit and Tunnel

    SYU OPSRB

    IDENTIFY, CUT AND RETRIEVE CABLE(CONDUIT & TUNNEL)

    Figure 4.0-13

  • Cable Installation Start Pull-In at Platform

    SYU OPSRB

    Winch (Locate asAppropriate)

    PLATFORMHERITAGE DP Cable Installation Vessel ( Typical)

    Existing J-Tube

    Cable C1

    Figure 4.0-14

  • Cable Installation Platform to Platform or Platform to Shore

    SYU OPSRB

    DP Cable Installation Vessel ( Typical)

    ROV Monitoring Touch Down as Appropriate

    Figure 4.0-15

  • Cable Installation Final Pull-In (Platform to Platform)

    SYU OPSRB

    DP Cable Installation Vessel ( Typical)

    Winch (Locateas Appropriate)

    Cable D1

    Figure 4.0-16

  • Cable Installation Final Shore Pull-In (Platform to Shore)

    SYU OPSRB

    DP Cable Installation Vessel ( Typical)DIVE SUPPORT VESSEL

    Figure 4.0-17