file name : sapraa

18
File Name : SAPRAA Date : 21 November 2008 Presentation to : CONFIGURATION MANAGEMENT SOUTH AFRICAN PHARMACEUTICAL REGULATORY AFFAIRS ASSOCIATION Carol Cotty 1

Upload: jael-warner

Post on 31-Dec-2015

39 views

Category:

Documents


3 download

DESCRIPTION

CONFIGURATION MANAGEMENT. Presentation to :. SOUTH AFRICAN PHARMACEUTICAL REGULATORY AFFAIRS ASSOCIATION Carol Cotty. Date : 21 November 2008. File Name : SAPRAA. SCOPE. Configuration Management Problem and Background Time Line Why Re-engineer CM? The Goal The How. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: File Name :  SAPRAA

File Name: SAPRAA Date: 21 November 2008

Presentation to:

CONFIGURATION MANAGEMENT

SOUTH AFRICAN PHARMACEUTICAL REGULATORY AFFAIRS

ASSOCIATION

Carol Cotty

1

Page 2: File Name :  SAPRAA

Configuration Management

Problem and Background

Time Line

Why Re-engineer CM?

The Goal

The How

2

SCOPE

Page 3: File Name :  SAPRAA

- Incorrect items (numbering, naming, etc.)

- Delinquent time scales

- Incorrect/inadequate documentation

- Cumbersome processes

- Accountability, responsibilities, authorities

- Reputation?

3

- Frustrated Workers?

- Frustrated Management?

- Frustrated Organization?

What about

THE PROBLEM

Page 4: File Name :  SAPRAA

• A discipline ensuring that a product is what it was intended to be

• Knowing what something is comprised of and managing changes to it

• Maintaining consistency between the product and it’s documentation

4

Understood to be ...

CONFIGURATION MANAGEMENT

Page 5: File Name :  SAPRAA

=

Configuration Management is not …

5

Caution

• Registration and indexing • Filing and storage• Control• Retrieval and distribution• Archiving

Documentation Management is …

documentation management

Page 6: File Name :  SAPRAA

1960’s early US Defence Force documents

1960s late First USA Military Standards 480 series

1970s mid CM Process re-engineered (CMII)

1992 MIL-STD-973 - Released

1994 MIL-STD-973 - Cancelled

1995 ISO 10007 - Updated 2003

1998 ANSI/EIA 649 - Updated 2004

6

TIME LINE

Page 7: File Name :  SAPRAA

WHY ?

7

Page 8: File Name :  SAPRAA

8

REQUIREMENTS DRIVEN

Page 9: File Name :  SAPRAA

Corrective Action …

WHAT IS OUR EXPERIENCE?

9

• is nothing more than rework

• performing tasks that we should not have to do

• the unnecessary costs to do business

i.e. Intervention

ELIMINATES CORRECTIVE ACTION

Page 10: File Name :  SAPRAA

Studies by the ICM and in SA indicate …

60%

40%

40% - 60% resources spent on intervention

HOW DID WE DO ?

10

ELIMINATES CORRECTIVE ACTION (CONT.)

Page 11: File Name :  SAPRAA

11

THE COAL OF CMII

Page 12: File Name :  SAPRAA

12

THE COAL OF CMII (CONT.)

Page 13: File Name :  SAPRAA

13

COMMON SET OF OPERATING STANDARDS

Page 14: File Name :  SAPRAA

14

COMMON OPERATING STANDARDS (CONT.)

Page 15: File Name :  SAPRAA

15

COMMON OPERATING STANDARDS (CONT.)

Page 16: File Name :  SAPRAA

16

CM – AS REINVENTED

Page 17: File Name :  SAPRAA

• Requirements driven

• Creates one common set of operating standards

• Eliminates corrective action

• Accommodates change

• Promotes cost reductions

• Restores accountability, responsibility, authority and most strategically …

17

CONCLUSION

REPUTATION

Page 18: File Name :  SAPRAA

18

AUTHORIZE AND CONTROL WORK