Task back to top Task You are to prepare and submit Assessment 3 as an individual, based on the Virtucon/Globex scenario, and your peer to peer learning from Assessment 2. Using a report format, including table of contents and page numbers, you are required to develop a charter for the Project including: Part One to Part Six below Project description and overview you developed as part of Assessment 2. Note: Your MS Project file (or Project Libre) must also be submitted. Part One: Define Scope and produce a Scope Management Plan Define the scope of the project and detail how the scope will be managed. You should also restate the MOV you determined in Assessment 2. Your scope should align with your MOV. Part Two: Using MS Project, Provide a list of Resources Identify and detail the resources for the project using MS Project where appropriate, including: People (and their roles), plus any extra personnel that is required for the project. Technology - any hardware, network and software needs to support the team and your client. Facilities - where will most of the teamwork be situated?

Upload: others

Post on 22-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: files.transtutors.com  · Web viewback to top. Task. You are to prepare and submit Assessment 3 as an individual, based on the . Virtucon / Globex. scenario, and your peer to peer

Task

back to topTask

You are to prepare and submit Assessment 3 as an individual, based on the Virtucon/Globex scenario, and your peer to peer learning from Assessment 2.

 Using a report format, including table of contents and page numbers, you are required to develop a charter for the Project including:

Part One to Part Six below Project description and overview you developed as part of Assessment 2. Note: Your MS Project file (or Project Libre) must also be submitted.

Part One:

Define Scope and produce a Scope Management Plan

Define the scope of the project and detail how the scope will be managed. You should also restate the MOV you determined in Assessment 2. Your scope should align with your MOV.

Part Two: 

Using MS Project, Provide a list of Resources

Identify and detail the resources for the project using MS Project where appropriate, including:

People (and their roles), plus any extra personnel that is required for the project.

Technology - any hardware, network and software needs to support the team and your client.

Facilities - where will most of the teamwork be situated?

Other - for example, travel, training etc.  

 Using MS Project, develop a schedule using a high-level Work Breakdown Structure (WBS).  It should include:

o Milestones for each phase and deliverable

o This will tell everyone associated with the project that the phase or deliverable was completed satisfactorily.

o Activities / Tasks

Page 2: files.transtutors.com  · Web viewback to top. Task. You are to prepare and submit Assessment 3 as an individual, based on the . Virtucon / Globex. scenario, and your peer to peer

o Define a set of activities / tasks that must be completed to produce each deliverable.

o Resource Assignments

o Assign people and resources to each individual activity.

o Estimates for Each Activity / Task

o Develop a time estimate for each task or activity to be completed.  

Include a high-level snapshot and description in your charter. YOU MUST ALSO SUBMIT AN MS Project or Project Libre file along with your Charter

 

Part Three:

 Project Risk Analysis and Plan

Document any assumptions you have made about the project

Identify at least five potential risks to the project using suitable methodologies.

Analyse the identified risks. Develop a risk register, prioritise each risk, provide a mitigation strategy and assign each risk to an appropriate team member.

Part Four:

 Quality Management Plan.  

Develop 3 – 5 quality standards based upon your analysis of the project’s stakeholder requirements.

Part Five:

List and justify the monitoring and controlling tools and activities you will implement to determine the project’s progress and success.

Part Six: 

Develop a closure checklist that the project team will use to ensure that the project has been closed properly.

Page 3: files.transtutors.com  · Web viewback to top. Task. You are to prepare and submit Assessment 3 as an individual, based on the . Virtucon / Globex. scenario, and your peer to peer

Rationale

back to topThis assessment task will assess the following learning outcome/s:

be able to identify and reflect on the key elements of the PMBOK (Project Management Body of Knowledge) framework, including project stakeholders, communication management, the project management knowledge areas, common tools and techniques, and project success factors.

be able to critically evaluate how a practising ICT project manager applies ICT project management techniques, skills, methods and software tools in the IT profession.

be able to apply and analyse established ICT project management principles, skills and techniques to a case study.

Marking criteria and standards

back to top

Criterion High Distinction Distinction Credit Pass Fail

Produces a Scope Management Plan (SCM).

 (15 Marks)

Scope of the project is clearly defined and scope management well detailed.Scope is well aligned with stated MOV.Consistent application of industry standard language and formatting.

Scope of the project is clearly defined and scope management detailed.Scope is well aligned with stated MOV.Well written with some demonstration of industry standard language and formatting. 

Scope of the project is defined and scope management provided.Scope is aligned with stated MOV.Well written with demonstration of academic standard language and formatting. 

Scope of the project and scope management provided, but lacking some key details.Scope is loosely aligned with stated MOV.Well written but lacks acceptable formatting.

Scope of the project and scope management provided, but lacking significant key details. Scope is not aligned with stated MOV OR Scope / scope plan and MOV are not provided.Writing is not of an acceptable standard.

Utilising MS Project,evidences the processes

Demonstrates high level project management skills,

Demonstrates competent management skills, applying project

 Demonstrates essential management skills, applying

Demonstrates minimal management skills and needs some

The WBS design fails to correctly address one or more

Page 4: files.transtutors.com  · Web viewback to top. Task. You are to prepare and submit Assessment 3 as an individual, based on the . Virtucon / Globex. scenario, and your peer to peer

Criterion High Distinction Distinction Credit Pass Fail

involved with a WBS, including phases, milestones, deliverables, tasks, resources and budget.

 (20 Marks)

integrating and applying project management tools in meaningful and purposeful ways towards completion of WBS design, correctly and comprehensively addressing all project requirements.

management tools in meaningful and purposeful ways towards completion of the WBS design, correctly addresses the all project requirements. 

project management tools in meaningful and purposeful ways towards completion of the WBS design. Essential project requirements addressed. .

improvement in applying project management tools in meaningful and purposeful ways towards completion of WBS. Not all project requirements are clearly addressed. 

essential project requirements. 

Provides a project risk analysis and risk register including mitigation strategies.

 (15 Marks)

All steps in project risk analysis and mitigation strategies are comprehensively discussed. Risk register presented in the context of the project, with evidence of thorough consideration of the project scenario.

All steps in project risk analysis and mitigation strategies are clearly discussed.  Risk register presented in the context of the project, with reference to project scenario.

Evidence that key steps in project risk analysis and mitigation strategies are discussed. Risk register presented in the context of the project, with some linkages back to the project scenario. 

Key steps in project risk analysis and mitigation strategies are accurately presented. Minimal reference to the project scenario in analysis and risk register.

One or more key steps in project risk analysis and mitigation strategies are not presented. Risk register does not reference the project scenario or lacks key information. 

Produces a quality management plan which includes quality

Five or more quality standards correctly identified and appropriately contextualised

Four or more quality standards are correctly identified and are applied to the project

Three (3) or more quality standards are correctly identified and are applied to the project

Three (3) or more quality standards identified and loosely applied to

Multiple project steps are missing or not applied to the selected project. 

Page 5: files.transtutors.com  · Web viewback to top. Task. You are to prepare and submit Assessment 3 as an individual, based on the . Virtucon / Globex. scenario, and your peer to peer

Criterion High Distinction Distinction Credit Pass Fail

standards based on the analysis of stakeholder requirements.

 (15 Marks)

for the project scenario. 

scenario with some contextualisation. 

scenario.  the project scenario. 

Justifies the monitoring and controlling tools and activities that will implemented to determine the project’s progress and success.

(15 marks)

Explains and critically evaluates the selection of monitoring and controlling tools and activities and their suitability for the scenario project.

Explains and analyses the selection of monitoring and controlling tools and activities and their suitability for the scenario project.

Explains and examines the selection of monitoring and controlling tools and activities and their suitability for the scenario project.

Explains and discusses the selection of monitoring and controlling tools and activities and their suitability for the scenario project.

An extremely basic explanation of monitoring and controlling tools and activities. Does not relate this to the scenario project.

A closure checklist is produced.

 (10 marks)

The closure checklist is comprehensively detailed. Captures all key details and is well explained.

The closure checklist is detailed. Captures all key details.

The closure checklist is appropriate to close the project. Captures most key details.

The closure checklist is appropriate to close the project. Some key details missing. 

The closure checklist has not been adequately considered. 

Referencing of sources (APA 6th ed citation)

All written evidence is professionally communicated

All written information is good with appropriate

 All written information is generally well

All written content is loosely connected,

 No apparent logical order of written content, and

Page 6: files.transtutors.com  · Web viewback to top. Task. You are to prepare and submit Assessment 3 as an individual, based on the . Virtucon / Globex. scenario, and your peer to peer

Criterion High Distinction Distinction Credit Pass Fail

to reinforce findings.

 (10 marks)

using correct referencing. referencing 

organised but more clarity of communication is required in terms of referencing.

and there is ineffective use of referencing. 

there is a lack of referencing.

 

Presentation

back to topAssessment tasks should be submitted on EASTS as a Microsoft Word document. Do not submit as a PDF document.

The first page should contain your name, student number, subject code and due date. Please use 12 point font.

Use a report format layout. Proof-read your work so that it is free of spelling, grammar and punctuation mistakes.

Use language that is appropriate to academic and professional tasks. Ensure you use respectful and appropriate terminology. For assistance, see Learning Skills: http://www.csu.edu.au/division/studserv/learning

Your reference list should contain all source documents that you refer to, quote or paraphrase from. It must conform to the APA referencing style: http://student.csu.edu.au/__data/assets/pdf_file/0011/294977/APAReferencingSummary2013.pdf

You must also submit your MS project or Project Libre file.   If you zip files, please ensure all files, including any folders use your surname and

first initial

Requirements

back to topAPA 6th referencing style must be used. Refer to  http://student.csu.edu.au/__data/assets/pdf_file/0011/294977/APAReferencingSummary2013. pdf;  and https://apps.csu.edu.au/reftool/apa-6 for guidance

Page 7: files.transtutors.com  · Web viewback to top. Task. You are to prepare and submit Assessment 3 as an individual, based on the . Virtucon / Globex. scenario, and your peer to peer

First diagram is WBS

And scond is assignment formort .

Page 8: files.transtutors.com  · Web viewback to top. Task. You are to prepare and submit Assessment 3 as an individual, based on the . Virtucon / Globex. scenario, and your peer to peer
Page 9: files.transtutors.com  · Web viewback to top. Task. You are to prepare and submit Assessment 3 as an individual, based on the . Virtucon / Globex. scenario, and your peer to peer