Film and Publication Board
Presentation to the Portfolio
Committee on Communications
09 September 2014
1
Presentation Outline
• Vision, Mission & Values
• Historical Perspective
• Legal Framework
• Regulatory Tools
• Governance Structures
• FPB Management
• Strategic Outcomes
• Strategic Priority Programmes 2014-2019
• FPB Successes
• Current Challenges
• Employment Equity
• Staff Misconduct Matters
• Performance Information Report Quarter 3
• Revenue and Expenditure Report: 3rd Quarter 2013-14
2
FPB Vision, Mission and Values
Vision Mission Values
“A Leading and
Credible Content
Classification
Authority in
South Africa”
“Ensure efficient
and effective
consumer
protection
through
regulation of
media content,,
while
empowering the
public especially
children, through
information
sharing”
• Accountability
• Fairness
• Integrity
• Transparency
•Professionalism
3
Historical Perspective
• Previous Censor Board within the Department of Internal Affairs
• Governed by the Publications Act of 1974 to Censor undesirable content
• 1994 shift from Censorship to Content Classification
• Task Group established to draft legislation to replace Publications Act
• Film and Publications Act no 65 of 1996
• FP Act allowed for content classification and age ratings, only child pornography and bestiality prohibited from distribution
4
Legislative Framework
Statute Area of Governance
Constitution of the Republic of South
Africa 1996
Bill of Rights, Rights of Children and
child protection
Film and Publications Act no. 65 of
1996 as amended
Creation, possession and distribution
of films, games and certain
publications
Makes Child Pornography punishable
by law (Section 24 (c) )
Public Administration and Justice Act
(PAJA)
Public Administration
Classification Guidelines Classification process and age ratings
5
Evolution of FP Act
• Enacted in 1996 to establish the FPB and regulate the creation, possession and distribution of films, games and certain publications.
• Amended in 2009 to among others: – Insert and delete certain definitions
– Establish and provide for the powers and duties of a Council
– Provide for the appointment of functions of compliance officers
– Provide for the compositions, functions and management of the Board
– Repeal certain schedules to the Act
• Currently a legislative amendment process is underway to allow for better regulation of online content distribution
6
FPB Regulatory Tools
Constitution 1996
Registration of distributors
Classification Guidelines
Compliance monitoring
Consumer education and outreach
7
AP
PE
AL
S
REGULATIONS
FILMS AND PUBLICATIONS ACT 1996
Governance Structures
Executive Authority
Council
CEO
OPTICOM HR &
REMCO
A&RC Committee
of Chairs
Fincom
Appeals Tribunal
8
FPB Management
CEO
Chief Operations Officer
Shared Services Executive
Chief Financial Officer
Chief Information
Officer
9
FPB Strategic Outcomes: 13/14 – 17/18
Strategic Outcome Description
(SO1) Effective and visible monitoring of industry throughout
the entire value chain for the protection of children and
adults through information
(SO2) Consumers, general members of the public and industry
informed about the mandate of the FPB
(SO3) Effective and efficient management of FPB Operations
(SO4) Revised, effective and innovative regulation of the
content distributed online, mobile and related platforms
for the protection of children and adults through
information
SO5) Expand FPB footprint through effective partnerships and
stakeholders in pursuance of our Mandate
10
STRATEGIC PRIORITY PROGRAMMES
2014/2019
1. Research, Compliance Monitoring & Evaluation (SO1)
2. High Visibility-High Impact Communications, Stakeholder Engagement & Consumer Education (SO2)
3. Resourcing and Financing Plans and Institutional Reform (SO3)
4. ICT , Connectivity and Digitisation Strategy (SO3)
5. Technology driven content classification (SO4)
6. Legislative review (SO4)
7. Regional, Continental and International Partnerships (SO5)
11
FPB Successes
• National, Regional, International visibility • Online Regulation – Agreements with distributors in place
(Altech, Apple, Google) • Our classification processes and governance are more
rigorous and effective due to online submission of games • Financial systems are sound, we had 5 years of unqualified
audit reports. • Reduced the % of appeals to classified material due to
improved operational efficiencies and training of Classifiers • We have developed a training manual for the classifiers
which will be accredited through UNISA as a formal training programme
• Inadequate empirical research and industry-specific expertise
• Proliferation of content on various platforms (local and international), accessible to South African citizens, especially online
• Increase of illegal content and user generated content (especially Child Pornography)
• Cyber-safety as it relates to children
• Inadequate regulatory tools for online content distribution (pending legislative amendments, Online Strategy implementation, ICT tools)
• Limited enforcement of FP Act provisions (inadequate enforcement provisions)
• Reduced funding sources to meet an expanding mandate (Decreased revenue generation due to shift from physical to online distribution)
13
Current Challenges
Employment Equity
Occupational
Categories
Male Female
TOTAL African Coloured Indian Whit
e
African Coloure
d
India
n
White
Support Staff
24
2
1
1
37
0
1
1
67
Senior
Management
4
0
0
1
3
0
0
0
8
Executive
Management
3
0
0
0
2
0
0
0
5
TOTAL 31 2 1 2 42 0 1 1 80
Persons with
disabilities
2 0 0 0 0 0 0 0 2
14
Staff Misconduct Matters
1. Misrepresentation of Qualifications – Gross Dishonesty: – Detected through a credential verification process – Investigated and referred to a Disciplinary Hearing – Employee found Guilty and Dismissed
2. Failure to relocate as per Contractual Obligation + Absenteeism + Misconduct at an Official FPB Function:
– Investigated and referred to a Disciplinary Hearing – Dismissal Finding, employee lodged an appeal and the finding was upheld – Employee referred the matter to CCMA for arbitration – settled “ out-of-arbitration” on
provision that employee receives full pension benefit.
3. Classifier’s Failure to Comply with Requirements for Content Classification at an External Viewing Venue:
– Disciplinary hearing was held , finding was that the FPB was unable to provide evidence to support the allegations
– Ruling – Classifier found Not Guilty of charges
Staff Misconduct Matters...continued
1. Theft of Material submitted to the FPB for Classifications + Accessing Viewing Facilities and Utilising Equipment and Materials without Authorisation:(2 Operations Staff)
– Two employees suspended while allegations were investigated – They were charged and disciplinary hearing was held on the 05 – 22 August 2014 – Employees were found guilty on all charges and dismissed with effect from the 25 August
2014
2. Collusion with a service provider + Conflict of interest + Contravention of FPB Fraud Prevention Plan: (Senior Manager & Operations Staff)
– Allegations reported to FPB from a whistle-blower – Allegations currently being investigated through forensic auditors – Outcome still to be determined
3. Non-compliance with SCM procedures and regulations as accountable FPB Official + Irregular expenditure (Executive)
– Investigation report tabled with FPB Council Task Team – Responsible Executive was suspended with effect from 8 August 2014 – Charges are being formulated .
Performance Information
Report
2013/2014 Quarter 3
17
SO 1 :Effective and visible regulation of films game and certain publications throughout the entire value chain to protect children and inform the public
Outstanding deliverables (Milestones)
Challenges and Corrective measures
Overall Comment – Achievement on some of the quarterly performance targets with much emphasis improved rates on compliance and inspections
Draft Regulations implemented On going refinements to the Regulations
75% non- compliance letters issued Lack of capacity
100% non-compliant distributors referred to SAPS
Lack of capacity
18
SO: 3 Effective and efficient management of FPB procedures
Outstanding deliverables
Challenges/ Corrective measures
Overall Comment : Partial Achievement of targets regarding the governance due to approval processes
Implement new tariffs • Awaiting approval of new Regulations.
Regulation fees: 2% of total revenue generated
• Awaiting approval of new Regulations.
Automation project (Turn Around strategy implementation)
• Investigation of the cancelled Vodacom APN. • Delay with quotes for IS VPN service
19
SO4: Ensure effective and innovative regulation of the content distributed on online, mobile and related platforms to protect children and inform the
general public
Outstanding deliverables
Challenges/ Corrective measures
Overall Comment : Partial Achievement of targets regarding the governance due to approval processes
Implement training manual • Lack of Internal Capacity to develop a manual
20
SO 1: Effective and visible monitoring of films games and certain publications throughout the entire value chain (content creators, producers and distributors of
fpgs) to protect children and inform the general public
Annual Target Q3 Milestone Q3 Performance Status Reason for variance /Percentage if Partially Achieved
Implement Automated processes
System processes
• System enhancement including FPB verification module tested internally • System report compiled
None
Conduct OSS industry Audits
Implementation
•Classification Governance Framework Implementation In Progress (Phased-approach) •3 Meetings held with distributors and Classifiers in Gauteng
None
21
SO 1: Effective and visible monitoring of films games and certain publications throughout the entire value chain (content creators, producers and distributors of
fpgs) to protect children and inform the general public
Annual Target Q3 Milestone
Q3 Performance Status Reason for variance /Percentage if Partially Achieved
Classify 100% of classifiable material submitted
Classify 100% of classifiable material submitted
100% of received material classified
None
Classification Governance review undertaken
Implementation
•Classification Governance Framework Implementation In Progress (Phased-approach) •Standard Operating Procedures (SOP) developed and approved
Finalisation of Penalties and Exemption Committee due to delayed approval of Regulations amendments
22
SO 1: Effective and visible monitoring of films games and certain publications throughout the entire value chain (content creators, producers and distributors of fpgs) to protect children and inform the general public
Annual Target Q3 Milestone Q3 Performance Status Reason for variance /Percentage if Partially Achieved
Accreditation of approved Classifiers Training Program
Training on new Manual
•Training conducted on blasphemy and prejudice
•Procurement process conducted and final editing in progress.
•Accreditation process in progress
None
Develop Labelling system
Develop labelling system
•Project plan developed and approved .
Project put on hold due to financial constraints.
23
SO 1: Effective and visible monitoring of films games and certain publications
throughout the entire value chain (content creators, producers and distributors of fpgs) to protect children and inform the general public
Annual Target Q3 Milestone Q3 Performance Status Reason for variance /Percentage if Partially Achieved
Identification of Unregistered Distributors = 2000
Identification of unregistered Distributors= 400
• 806 Inspections to unregistered distributors done • 64% of Q2 target
None
Identification of New Distributors 20% of Unregistered Distributors= 400
New Registrations:80
•77 New Registrations •81 Closures Reported
None
24
SO 1: Effective and visible monitoring of films games and certain publications throughout the entire value chain (content creators, producers and distributors of fpgs) to protect children and inform the general public
Annual Target Q3 Milestone Q3 Performance Status
Reason for variance /Percentage if Partially Achieved
6000 inspections of existing distributors ( 6000 targeted)
800 targeted inspections
• 1405 targeted inspections
None
Online Inspections: 1500 ISP: 1000 Social Networks: 150
Online Inspections: 300 ISP: 200 Social Networks: 30
Online Inspections: 579 ISP: 88 Social Networks: 65
Capacity reinforced to improve targets
25
SO 2: Consumers, general members of the public and industry informed about the mandate of the FPB
Annual Target Q3 Milestone Quarter 3 Actual Performance
Reason for variance /Percentage if Partially Achieved
Implement 13/14 Communication Plan
Media Support to Public Dialogues and Outreach Programmes
Media Interviews Conducted on Outreach Programmes
None
Implement 16 Days of activism media campaign linked to the FPB mandate
Adverts placed in Media and Special Feature
None
Marketing Campaign on Classification Guidelines implemented
Marketing campaign on the classification symbols ended in Q2.
Insufficient for TV ads
26
SO 2: Consumers, general members of the public and industry informed about the mandate of the FPB
Annual Target Q3 Milestone Quarter 3 Actual Performance Reason for Variation/ Highlights
Implementation of the approved outreach programme
Multi-Unit Outreach Program Held
Multi Unit Outreach programme held with Compliance division in Newcastle
None
Three Public Dialogues Held
Two Public Dialogues held in Bloemfontein and East London
Third Dialogue shifted to Q4
16 Days of Activism Campaign Outreach held
•Participated in the DWCD’s Young Women Dialogue in support of 16 Days of Activism Against Women and Children Abuse. • Exhibited at the launch of the 16 days Campaign Against Women and Children Abuse. •Exhibited for Johannesburg City Parks World Record Campaign event in support of the campaign.
Multi Unit approach adopted with strategic partners
27
SO 3: Effective and efficient management of FPB Operations
Annual Target Q3 Milestone Quarter 3 Actual Performance Reason for variance /Percentage if Partially Achieved
Finalise migration to new structure and review it's effectiveness
Review and Analysis of Turnaround structure completed.
• Individual Coaching Program implemented. •Deferred team-based coaching program to Q4 •Phase Two Change Management Project – aligned to BPM and Quality Management terms of reference developed.
• Implementation of Change Management Program deferred to 2014/2014 FY
Office infrastructure Office Infrastructure acquired
Contract amendment approved and signed by Department of Public Works. Space Plans developed.
Delay with approval from DPW and Bid Committee
28
SO 3: Effective and efficient management of FPB Operations
Annual Target Q3 Milestone Quarter 3 Actual Performance
Reason for variance/Highlights
Implement organisational skills plan
Implement approved FPB skills development plan
•Training Costs for the period = R46 850.00 Educational Assistant support - Program / Project Management & Administrative Management. •Appointment of Compliance Interns for the 2014 Internship Program.
9 Interns appointed and 1 resigned during the year
29
SO 3: Effective and efficient management of FPB Operations
Annual Target Q3 Milestone Quarter 3 Actual Performance
Reason for variance /Percentage if Partially Achieved
Implementation of internal communication plan
Review internal communications plan reviewed
Internal Communications Plan reviewed by staff
None
Implement 13/14 Targets ( IT Strategy Implementation)
IT Strategy Implementation
•IT Strategy approved • Service level management accepted by IT Steering Committee
None
30
SO 3: Effective and efficient management of FPB Operations
Annual Target Q3 Milestone Quarter 3 Actual Performance
Reason for variance /Percentage if Partially Achieved
Integrate FPB Systems
FPB Systems integrated
•Enterprise Content Management has been integrated. • System Integration user requirements developed. • ToR integration of systems has been developed
None
Automation project ( Turn Around strategy implementation)
Implement automation
Draft Online Draft Strategy in place
• Online Monitoring Strategy due for approval
31
SO 3: Effective and efficient management of FPB Operations
Annual Target Q3 Milestone Quarter 3 Actual Performance
Reason for variance /Percentage if Partially Achieved
Service Management Implementation and Review
Risk Strategy and framework approved
Draft Service Level Management accepted by IT Steering Committee
•Finalisation of the Draft SLM and presenting to approval committees
Trends Analysis on Quarterly reporting
Trends analysis developed
Quarterly Trends report completed
None
Draft Risk Management Strategy in place Draft Strategic and Operational Risk Registers in place
Risk Management Strategy developed
Draft Risk Framework developed
None
32
SO 3: Effective and efficient management of FPB Operations
Annual Target Q3 Milestone Quarter 3 Actual Performance
Reason for variance
Update policies and procedures
Policies updated Update policies None
New Strategy approved in 13/14
Review draft incorporating Executive Authority/ NT inputs
Strategy approved by Executive Authority on December 2013
None
90% compliance with SCM policy
SCM Compliance trends report; review SCM policy
100% SCM Compliance achieved; SCM policy reviewed.
None
Asset management
Assets reconciliation reports
All assets were reconciled to the GL on monthly basis.
None
Implement the Governance Framework
Framework and Charters implemented
Terms of Reference approved
None
33
SO4: Ensure effective and innovative regulation of the content distributed on online, mobile and related platforms to protect children and inform the general public
Annual Target Q3 Milestone Quarter 3Actual Performance
Reason for variance /Percentage if Partially Achieved
Develop Online and Mobile Content Regulation Strategy
Online and Mobile Content Regulation Strategy developed
Draft Strategy in place and awaiting Council approval
Strategy costing still to be developed
Join international body for regulation of digital content.
IARC joined and framework implemented
IARC joined Implementation dependent on finalization of framework by IARC
Upgrade Online and telephonic monitoring and reporting tools
Quarterly Reports to INHOPE as per MOU
Referred to SAPS and In Hope RMS: 52 and Online: 2
34
SO4: Ensure effective and innovative regulation of the content distributed on online, mobile and related platforms to protect children and inform the general public
Annual Target Q3 Milestone Quarter 3Actual Performance
Reason for variance /
Roll out 10 industry workshops, 18 parent workshops focusing on online child protection
3 industry workshops, 5 parent’s workshops focusing on child protection
4 Industry workshops and 2 Parent Workshops held
N/A
Info Hub develop and maintain
Pilot information hub
Information Hub drafted and piloted with other units
N/A
35
SO 5:Expand our footprint as the FPB through partnership and stakeholder relationships in pursuance of our mandate
Annual Target
Q3 Milestone Quarter 3 Actual Performance
Reason for variance/ Highlights
Implement a Stakeholder Relationship Strategy
Implement stakeholder relations strategy and plan
Quarterly engagement with stakeholders conducted
• Growth in stakeholder development
Convene quarterly stakeholder initiatives
Annual report launch held in October 2013
N/A
Strategic partners initiated
Impact assessment report compiled
Outcomes assessed
36
SO 5:Expand our footprint as the FPB through partnership and stakeholder relationships in pursuance of our mandate
Annual Target Q3 Milestone Quarter 3Actual Performance
Reason for variance /Percentage if Partially Achieved
Host 4 Africa/ SADC engagements on cyber safety and FPB mandate related issues
Cyber safety workshop in 1 SADC/ African country
Preliminary meeting held in Botswana to prepare for the 2014 Outreach Program
Present papers in 3 International Seminars
Develop and present 1 Seminar paper
FPB attended and presented the paper at the International Safety Campaign in Cape Town
37
SO 5:Expand our footprint as the FPB through partnership and stakeholder relationships in pursuance of our mandate
Annual Target Q3 Milestone Quarter 3Actual Performance
Reason for variance /Highlights
Participate in 2 In Hope AGM’s and related platforms
INHOPE AGM FPB attended In Hope AGM in Netherlands
Participate in 4 Local and International Gaming Festivals
Durban International Film Festival
Not applicable for this quarter.
Target achieved in quarter 2
38
REVENUE AND EXPENDITURE REPORT: 3RD QUARTER
2013-14
39
Table of Contents
oRevenue
oExpenditure
oBudget Report
oReport on Irregular Expenditure
oAdditional Funding Requirements
FPB Revenue Framework
FPB Revenue Structure
Grants Allocation
- DHA allocation
Audited Results
2011-12 R65.4mil
2012-13 R69.8mil
2013-14 R82.6mil
MTEF Estimates
2014-15 R78.9mil
2015-16 R82.9mil
2016-17 R87.3mil
2017-18 R91.6mil
Registration Fees
- Classification Fees
- Registration Fees
Audited Results
2011-12 R7.1mil
2012-13 R5.7mil
2013-14 R4.4mil
MTEF Estimates
2014-15 R5.0mil
2015-16 R5.5mil
2016-17 R6.1mil
2017-18 R6.5mil
Other Income
- Interest Income
-Copies of Certificates
Audited Results
2011-12 R0.394mil
2012-13 R0.168mil
2013-14 R0.032mil
MTEF Estimates
2014-15 No estimates
2015-16 No estimates
2016-17 No estimates
2017-18 No estimates
Revenue Report for Q3 ended 31 December 2013
o Grant subsidy R 55,631,000 was received to date from the Department of Home Affairs. The Grant subsidy is being transferred in quarterly instalments of R 20,669,000 at the beginning of each quarter. o Classification fees of R 6,375,750 were collected during the first three quarters of the current financial year. To date only 30% of projected fees were collected; this is due to a decline in the material submitted for classification. o Registration fees of R 339,919 were collected during the first three quarters of the current financial year. To date only 24% of projected fees were collected. o Annual renewal fees of R 195,149 were generated. To date only 26% of projected fees were collected. This is due to an increase in number of distributors closing shop. o Interest Income amounting to R 15,848 was received to date from short-term investment made during the current financial year. o Other income collected from during the quarter related to recoveries from staff and income received for Tender purchases, at end of second quarter total amount of R 6,200 was collected. o 70 % of the overall budgeted income was actually received as at the end of the third quarter.
Expenditure Report for Q3 ended 31 October 2013
o SO1 – Effective and visible monitoring of industry compliance throughout the value chain for the protection of children and adults through consumer education. 50% of the budget has been spent. o SO2 - Consumers, general members of the public and industry informed about the mandate of the FPB. 78% of the budget has been spent. o SO3 – Effective and efficient management of the FPB operations. 61% of the budget has been spent. o SO4 – Effective and innovative regulation of content distributed on-line, mobile and related platforms for the protection of children and adults through consumer advice and information. 56% of the budget has been spent. o SO5 – Expand FPB footprint through partnerships and stakeholder relations in pursuance of the FPB mandate. 65% of the budget has been spent. o 54% of the Capital expenditure budget has been spent. o 61% of the administration expenditure has been spent. Overall, 59% of the expenditure budget was spent as at the end of the third quarter, these amounts include commitments.
Q3 Expenditure Comparison Report 2012 and 2013
OPERATING AND CAPITAL EXPENDITURE 2013-14 2012-13 (YTD)
Q3 ACTUALS Q3 ACTUALS % COMMENTS
STRATEGIC OUTCOME 1: EFFECTIVE AND
VISIBLE REGULATION OF FILMS, GAMES AND CERTAIN PUBLICATION THROUGH THE ENTIRE
VALUE CHAIN (CONTENT CREATORS, PRODUCERS AND DISTRIBUTORS OF FPG'S) TO
PROTECT CHILDREN AND INFORM THE GENERAL PUBLIC
R 13 988 984 16 400
961 117%
17% increase in prior year was due to classifiers
training and strategic partnerships projects which were reallocated to Strategic Objective 5.
STRATEGIC OUTCOME 2: CONSUMERS,
GENERAL MEMBERS OF THE PUBLIC AND INDUSTRY INFORMED ABOUT THE MANDATE
OF THE FPB
R 9 490 348 12 032
917 127%
27% increase in prior year was due to
implementation of integrated media plan. STRATEGIC OUTCOME 3: EFFECTIVE AND
EFFICIENT MANAGEMENT OF FPB OPERATIONS R 15 470 713
15 608
956 101%
1% increase in prior year was due to full
implementation of the turnaround strategy. STRATEGIC OUTCOME 4: EFFECTIVE AND
INNOVATIVE REGULATION OF THE CONTENT DISTRIBUTED ON-LINE, MOBILE AND RELATED
PLATFORMS FOR THE PROTECTION OF CHILDREN AND ADULTS THROUGH CONSUMER
ADVICE INFORMATION
R 4 911 643
0 0%
This is a new Strategic Objective introduced in
2013-14 financial year. The aim of the strategic objective is to focus on online content
management and compliance monitoring.
STRATEGIC OUTCOME 5: PARTNERSHIPS AND
COLLABORATIONS R 3 941 138
0 0%
This is a new Strategic Objective introduced in
2013-14 financial year. The aim of the strategic objective is to expand our footprint through
partnerships and stakeholder relationships.
CAPEX R 3 096 811 619
699 20%
Increase in current year is due to new ICT
Infrastructure procured in the current financial year (i.e. backup server and software).
ADMINISTRATIVE EXPENSES R 4 650 343 10 426
743 224%
Increase in prior year was due to new office space
and most of the budget items ( i.e. Travel and Accommodation) in administration expenditure
were reallocated to Strategic Objective 3 in the current year, hence a decrease in actual
expenditure to date in the current financial year.
TOTAL OPERATING AND CAPITAL EXPENDITURE R 55 549 980
55 089 277 101%
Budget Report
Budget Report for period ended 31 December 2013
R 28 146 584
R 12 152 844
R 25 172 772
R 8 700 000
R 6 053 158 R 5 750 000
R 7 651 642
R 13 988 984
R 9 490 348
R 15 470 713
R 4 911 643 R 3 941 138
R 3 096 811 R 4 650 343
SO 1 SO 2 SO 3 SO 4 SO 5 CAPEX ADMINISTRATIVEEXPENSES
Budget and Actual Expenditure
BUDGET ACTUAL
Report on Irregular Expenditure
Report on Irregular Expenditure
• During the third quarter it was noted that one of our service providers did not deliver services contracted upon, as a result of which, the total amount of R 1 080 000 paid to the service provider was identified as irregular expenditure.
• After internal investigation, it was determined that there was a breach of procurement processes and disciplinary processes are underway.
• Recovery processes were also instituted against the service provider. FPB has since received a written offer of settlement from the service provider.
ADDITIONAL FUNDING REQUIREMENTS
ADDITIONAL FUNDING REQUIREMENTS
a) Organisational Capacity and Capability – R 3 800 000, this once off allocation will be used to resolve current salary disparity; the new packages will be incorporated into the baseline throughout the MTEF.
b) Implementation of Communication Strategy – R 10 300 000, this additional allocation will be used to implement the revised communication strategy during the 2015-2016 financial year. The strategy will be focussing on the implementation of Media Engagement Strategy, Stakeholder Relations, Public Relations and Marketing and Community Forums and Outreaches.
c) ICT Modernisation and Infrastructure Improvement – R 32 400 000, due to the current ICT challenges highlighted above, it is recommended that the FPB improve current ICT infrastructure and optimise its ICT services to meet its business requirement. The additional allocation will be distributed as follows over the MTEF period:
• 2015 – 2016 = R13.8m • 2016 – 2017 = R9.6m • 2017 – 2018 = R4.1m • 2018 – 2019 = R5.3m