final 2019 federal transportation ...ftip.scag.ca.gov › documents ›...

236
FINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM PROJECT LISTING VOLUME III OF III - PART B FY 2018/19 - 2023/24 September 2018

Upload: others

Post on 23-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

FINAL2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMPROJECT LISTINGVOLUME III OF III - PART BFY 2018/19 - 2023/24September 2018

Page 2: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Air District Representative Ben Benoit, Wildomar

Business Representative Randall Lewis, Lewis Group of Companies

Tribal Government Regional Planning Board Representative Sabrina LeRoy, San Manuel Band of Mission Indians

Imperial County Transportation Commision Jim Predmore, Holtville

Orange County Transportation Authority Richard D. Murphy, Los Alamitos

Riverside County Transportation Commission Jan Harnik, Palm Desert

San Bernardino County Transportation Authority Alan D. Wapner, Ontario

Ventura County Transportation Commission Mike T. Judge, Simi Valley

Transportation Corridor Agencies Peggy Huang, Yorba Linda

REGIONAL COUNCILOFFICERSPresident Alan D. Wapner, SBCTA First Vice President Bill Jahn, Big Bear Lake Second Vice President Randon Lane, Murrieta Immediate Past President Margaret E. Finlay, Duarte

MEMBERS

Funding: The preparation of this report was financed in part through grants from the United States Department of Transportation – Federal Highway Administration and the Federal Transit Administration in accordance with the provisions under the Metropolitan Planning Program as set forth in Section 104(f) of Title 23 of the U.S. Code. Additional financial assistance was provided by the California State Department of Transportation.

The information and content contained in this publication is provided without warranty of any kind, and the use of or reliance on any information or content contained herein shall be at the user’s sole risk. In no event shall SCAG be responsible or liable for any consequential, incidental or direct damages (including, but not limited to, damages for loss of profits, business interruption, or loss of programs or information) arising from or in connection with the use of or reliance on any information or content of this publication.

VISIONSouthern California’s Catalyst for a Brighter Future

MISSIONTo foster innovative regional solutions that improve the lives of Southern Californians through inclusive collaboration, visionary planning, regional advocacy, information sharing, and promoting best practices.

May 2018

Janice Hahn, Los Angeles County Hilda Solis, Los Angeles County Sean Ashton, Downey Bob Blumenfield, Los Angeles Mike Bonin, Los Angeles Joe Buscaino, Los Angeles Gilbert Cedillo, Los Angeles Margaret Clark, Rosemead Jonathan Curtis, La Cañada Flintridge Peggy Delach, Covina Mitchell Englander, Los Angeles Eric Garcetti, Los AngelesJames Gazeley, Lomita Lena Gonzalez, Long Beach

Marqueece Harris-Dawson, Los Angeles Carol Herrera, Diamond Bar Steven Hofbauer, Palmdale José Huizar, Los Angeles Paul Koretz, Los Angeles Paul Krekorian, Los Angeles Victor Manalo, Artesia Nury Martinez, Los Angeles Marsha McLean, Santa Clarita Dan Medina, Gardena Barbara Messina, Alhambra Judy Mitchell, Rolling Hills Estates Mitch O’Farrell, Los Angeles Sam Pedroza, Claremont

Curren D. Price, Jr., Los Angeles Rex Richardson, Long Beach Monica Rodriquez, Los AngelesLaura Rosenthal, Malibu David Ryu, Los Angeles Meghan Sahli-Wells, Culver CityAli Saleh, Bell Sonny R. Santa Ines, BellflowerAndrew Sarega, La Mirada Emma Sharif, ComptonJess Talamantes, Burbank Herb J. Wesson, Jr., Los Angeles

Los Angeles County

Luis Plancarte, Imperial County Cheryl Viegas-Walker, El CentroImperial County

Shawn Nelson, Orange CountyStacy Berry, CypressArt Brown, Buena ParkBarbara Kogerman, Laguna HillsMichele Martinez, Santa Ana

Fred Minagar, Laguna NiguelKris Murray, AnaheimSteve Nagel, Fountain ValleyMichael Posey, Huntington BeachCharles Puckett, Tustin

Marty Simonoff, BreaTri Ta, WestminsterDonald Wagner, Irvine

Orange County

V. Manuel Pérez, Riverside CountyRusty Bailey, RiversideJeffrey Giba, Moreno Valley

Jim Hyatt, CalimesaClint Lorimore, EastvaleSteve Manos, Lake Elsinore

Greg Pettis, Cathedral CityMichael Wilson, Indio

Riverside County

Curt Hagman, San Bernardino CountyRay Marquez, Chino Hills L. Dennis Michael, Rancho Cucamonga

James Mulvihill, San BernardinoFrank Navarro, Colton

Deborah Robertson, RialtoBarb Stanton, Town of Apple Valley

San Bernardino County

Linda Parks, Ventura CountyGlen Becerra, Simi Valley

John Procter, Santa PaulaCarmen Ramirez, Oxnard

Ventura County

Page 3: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

FINAL

2019

FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM

(FISCAL YEAR 2018/19-2023/24)

PROJECT LISTING

(Volume III of III – Part B)

September 2018

Page 4: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Final 2019 FTIP – PROJECT LIST TABLE OF CONTENTS

September 2018

VOLUME III – PART B

PROJECT LISTING

Table of Contents

Miscellaneous

• Grouped Projects Detailed Backup Listings

Page 5: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Grouped Projects

Detailed Back-Up

Listings

Page 6: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

IMPERIAL

COUNTY

Page 7: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

Note id: 24

1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most currentlistings:

http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html

2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of thefederal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies for funding.

3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details seeChapter 3 of the Local Assistance Procedures Manual.

4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans.

5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed byCaltrans.

6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is theresponsibility of the MPOs and their local agencies.

7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP forbridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STPfunds with Regional STP funds.

8) Corrections to this report should be addressed to the District Local Assistance Engineer:

http://www.dot.ca.gov/hq/LocalPrograms/dlae.htm

Notes:

10/26/2017, 1:42 PM

Caltrans, Division of Local Assistance Page 110/26/2017, 1:42 PM Det2 FL4 SmlTxt brf

#19-00 IMP IMPL507 HBP

Page 8: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

11 Imperial

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Imperial County BRIDGE NO. 58C0007, GENTRY RD, OVER VAIL CANAL, 100' S OF VAIL RD. Replace 2 lane bridge with 2 lane bridge.

Fund Source Summary:

PER/W

Total 36,600

CON

Total

370,000

130,000 166,600

130,000 536,600

36,600

370,000370,000

Phase Summary:

Fed $

Local AC

Local Match

Total

4,198

36,600

LSSRP Bond

Total115,089 475,052

14,911 61,548

130,000 536,600

32,402 327,561

42,439

370,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

1005

5958(054)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

4,198

36,600

LSSRP Bond

Total115,089 147,491

14,911 19,109

130,000 166,600

32,402

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total327,561

42,439

370,000

327,561

42,439

370,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 210/26/2017, 1:42 PM Det2 FL4 SmlTxt brf

#19-00 IMP IMPL507 HBP

Page 9: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

11 Imperial

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Imperial County BRIDGE NO. 58C0014, FORRESTER ROAD OVER WESTSIDE MAIN CANAL, 0.6M N/O KEYSTONE RD. Replace existing two lane bridge with a new two lane bridge. Minor seismic retrofit funds.

Fund Source Summary:

PER/W

Total 200,000

CON

Total

4,621,155

500,000 700,000

2,000,000 2,000,000

500,000 2,000,000 7,321,155

200,000

4,621,1554,621,155

Phase Summary:

Fed $

Local AC

Local Match

Total

22,940

200,000

LSSRP Bond

Total

111,030

442,650 1,770,600 6,481,419

57,350 229,400 728,707

500,000 2,000,000 7,321,155

177,060

111,030

4,091,109

419,017

4,621,155

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4297

5958(094)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

22,940

200,000

LSSRP Bond

Total442,650 619,710

57,350 80,290

500,000 700,000

177,060

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,770,600 1,770,600

229,400 229,400

2,000,000 2,000,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

111,030

4,091,109

419,017

4,621,155

111,030

4,091,109

419,017

4,621,155

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 310/26/2017, 1:42 PM Det2 FL4 SmlTxt brf

#19-00 IMP IMPL507 HBP

Page 10: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

11 Imperial

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Imperial County BRIDGE NO. 58C0094, WINTERHAVEN DRIVE, OVER CALIFORNIA WASTEWAY, 0.1 MI N I-8. LSSRP Seismic Retrofit. No adding lanes tobridge.

Fund Source Summary:

PER/W

Total 400,000

CON

Total

1,332,000 1,332,000

400,000

1,332,000 1,732,000

400,000

Phase Summary:

Fed $

Local AC

Local Match

Total

45,880

400,000

LSSRP Bond

Total

152,780 152,780

1,179,220 1,533,340

152,780 -152,780 45,880

1,179,220 -1,179,2201,332,000 1,732,000

354,120

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

2834

5958(014)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

45,880

400,000

LSSRP Bond

Total354,120

45,880

400,000

354,120

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

152,780 152,780

1,179,220 1,179,220

152,780 -152,780

1,179,220 -1,179,220

1,332,000 1,332,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 410/26/2017, 1:42 PM Det2 FL4 SmlTxt brf

#19-00 IMP IMPL507 HBP

Page 11: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

11 Imperial

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Imperial County BRIDGE NO. 58C0115, VERDE SCHOOL ROAD OVER EAST HIGHLINE CANAL, 0.8 MI E OF S 33. Replace existing 2 lane bridge with 2lane bridge, widened to accommodate shoulders. 9/23/2010: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 578,000

CON

Total

3,236,800

104,000 682,000

250,000 250,000

104,000 250,000 4,168,800

578,000

3,236,8003,236,800

Phase Summary:

Fed $

Local AC

Local Match

Total 578,000

LSSRP Bond

Total104,000 250,000 4,168,800

104,000 250,000 4,168,800

578,000 3,236,800

3,236,800

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3669

5958(078)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 578,000

LSSRP Bond

Total104,000 682,000

104,000 682,000

578,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total250,000 250,000

250,000 250,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,236,800

3,236,800

3,236,800

3,236,800

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 510/26/2017, 1:42 PM Det2 FL4 SmlTxt brf

#19-00 IMP IMPL507 HBP

Page 12: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

11 Imperial

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Imperial County BRIDGE NO. PM00066, Planning of the bridge preventive maintenance program by the County of Imperial. (Project Studies ONLY - fordeveloping a project list - NOT for project development.)

Fund Source Summary:

PER/W

Total 200,000CON

Total

200,000

200,000

200,000

Phase Summary:

Fed $

Local AC

Local Match

Total

22,940

200,000

LSSRP Bond

Total177,060

22,940

200,000

177,060

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3902

5958(086)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

22,940

200,000

LSSRP Bond

Total177,060

22,940

200,000

177,060

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 610/26/2017, 1:42 PM Det2 FL4 SmlTxt brf

#19-00 IMP IMPL507 HBP

Page 13: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

11 Imperial

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Number of Projects:

MPO Summary:

Fed $

Local AC

Local Match

Total for all Phases

95,958

1,414,600

LSSRP Bond

Total

152,780 263,810

661,739 250,000 2,949,820 12,835,670

225,041 76,620 859,075

1,179,220 -1,179,220

2,066,000 250,000 2,000,000 13,958,555

1,318,642

111,030

7,655,470

461,456

8,227,955

Totals:

Imperial Valley Association of Governments

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

5

Caltrans, Division of Local Assistance Page 710/26/2017, 1:42 PM Det2 FL4 SmlTxt brf

#19-00 IMP IMPL507 HBP

Page 14: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Southern California Association of Governments

SHOPP Lump Sum by Category and Fund Type

Dollars x $1000

2016

CONRWPEPRIORTOTAL 20/2119/2018/1917/1816/17

Imperial County

SHOPP - Roadway Preservation

$2617 $2,617 $1,122 $1,495National Hwy System

$2617 $2,617 $1,122 $1,495TOTAL

County TOTAL $2,617 $2,617 $1,122 $1,495

Los Angeles County

SHOPP - Bridge Preservation

$161741 $21,629$92,308 $19,714 $28,090 $18,865 $7,578 $135,298Bridge - State (HBRR)

$161741 $92,308 $21,629 $19,714 $28,090 $18,865 $7,578 $135,298TOTAL

SHOPP - Collision Reduction

$95797 $18,949$30,173 $36,746 $9,929 $19,377 $367 $76,053National Hwy System

$84474 $24,954$22,649 $10,811 $26,060 $15,505 $3,490 $65,479Surface Transportation Program

$180271 $52,822 $43,903 $47,557 $35,989 $34,882 $3,857 $141,532TOTAL

SHOPP - Emergency Response

$2148 $2,148 $538 $20 $1,590National Hwy System

$2148 $2,148 $538 $20 $1,590TOTAL

SHOPP - Mandates

$286424 $60,727$99,205 $74,667 $51,825 $51,654 $6,688 $228,082National Hwy System

$286424 $99,205 $60,727 $74,667 $51,825 $51,654 $6,688 $228,082TOTAL

SHOPP - Mobility

$128334 $21,170$55,005 $52,159 $13,705 $2,811 $111,818National Hwy System

$11529 $7,557 $3,972 $2,707 $30 $8,792State Cash

$139863 $62,562 $21,170 $56,131 $16,412 $2,841 $120,610TOTAL

SHOPP - Roadway Preservation

$614090 $33,971$246,427 $184,993 $148,699 $48,488 $9,911 $555,691National Hwy System

$614090 $246,427 $33,971 $184,993 $148,699 $48,488 $9,911 $555,691TOTAL

County TOTAL $1,384,537 $553,324 $183,548 $383,062 $264,603 $170,839 $30,895 $1,182,803

Orange County

SHOPP - Bridge Preservation

$1683 $1,683 $165 $251 $1,267Bridge - State (HBRR)

$1683 $1,683 $165 $251 $1,267TOTAL

SHOPP - Collision Reduction

$25100 $7,300$6,000 $5,800 $6,000 $4,605 $210 $20,285National Hwy System

$100413 $41,997$16,668 $18,660 $23,088 $22,227 $3,911 $74,275Surface Transportation Program

$125513 $22,668 $49,297 $24,460 $29,088 $26,832 $4,121 $94,560TOTAL

SHOPP - Emergency Response

$2813 $2,813 $1,200 $30 $1,583National Hwy System

$2813 $2,813 $1,200 $30 $1,583TOTAL

SHOPP - Mandates

$42914 $1,950$13,168 $7,165 $20,631 $12,237 $6,908 $23,769National Hwy System

$42914 $13,168 $1,950 $7,165 $20,631 $12,237 $6,908 $23,769TOTAL

SHOPP - Mobility

$66043 $51,660 $14,383 $9,363 $26,180 $30,500National Hwy System

$12075 $5,396 $6,679 $2,989 $41 $9,045State Cash

$78118 $5,396 $58,339 $14,383 $12,352 $26,221 $39,545TOTAL

SHOPP - Roadway Preservation

$50733 $36,957 $11,385 $2,391 $10,956 $2,692 $37,085National Hwy System

$50733 $36,957 $11,385 $2,391 $10,956 $2,692 $37,085TOTAL

County TOTAL $301,774 $75,606 $58,326 $101,349 $66,493 $63,742 $40,223 $197,809

Riverside County

SHOPP - Bridge Preservation

$35747 $11,570 $19,366 $4,811 $7,635 $265 $27,847Bridge - State (HBRR)

$35747 $11,570 $19,366 $4,811 $7,635 $265 $27,847TOTAL

SHOPP - Collision Reduction

$23382 $15,145$4,147 $4,090 $5,401 $350 $17,631National Hwy System

$196636 $151,156$45,480 $26,802 $5,717 $164,117Surface Transportation Program

7/26/2016 11:03:05AM

#19-00 IMP IMPL513 SHOPP Roadway Preservation

WALKER
Rectangle
Page 15: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Southern California Association of Governments

SHOPP Lump Sum by Category and Fund Type

Dollars x $1000

2016

SHOPP - Roadway Preservation

CONRWPEDESCRIPTIONRouteCTIPS ID Dist EAMPO_ID CO

11 42060 10900003903 115 In Imperial County, from north of Alamo River Bridge to north of Gonder Road.

Culvert replacement.

IMP 536 0 607

11 42050 10900003902 78 In Imperial County, from west of Midway Well Road to east of Mitchell Camp Road

at various locations. Culvert replacement.

IMP 586 0 888

1,122 0 1,495County Total

07 30790 10900003629 101 In the city of Los Angeles, near Hollywood, from Route 110 to north of Pilgrimage

Overcrossing. Pavement rehabilitation.

LA 1,008 77 2,710

07 31690 10900003787 1 In Santa Monica, at McClure Tunnel Bridge No. 53-0008. Enhance safety lighting

inside tunnel.

LA 742 65 4,983

07 31350 10900003788 1 In the cities of Los Angeles and Malibu, from south of Tenescal Canyon Road to

Ventura County line; also in Ventura County, from Los Angeles County line to

Tonga Street (PM 0.0/0.9). Rehabilitate culverts.

LA 1,256 252 5,069

07 30970 10900003793 5 In San Fernando, from Route 118 to Route 210. Rehabilitate roadway.LA 5,350 270 47,600

07 30390 10900003798 10 In Baldwin Park and West Covina, from Route 605 to Citrus Avenue. Rehabilitate

roadway.

LA 5,660 170 68,940

07 31730 10900003803 60 In various cities, from Route 5 to San Bernardino County line; also on Route 710,

from Ocean Boulevard to Valley Boulevard (PM 5.6/T27.4). Replace existing signs

with retro-reflective sheeting.

LA 830 20 3,150

07 30780 10900003631 405 In the city of Los Angeles, near Westwood and Sherman Oaks, from Venice

Boulevard to Route 101. Pavement rehabilitation.

LA 1,077 247 2,460

07 31380 10900003817 110 Near Gardena, south of Redondo Beach Boulevard. Replace culvert.LA 485 20 2,905

07 31170 10900003821 134 In the cities of Los Angeles, Burbank, Glendale and Pasadena, from Route 170 to

Route 210. Rehabilitate pavement, upgrade guardrail and ADA curb ramps to

current standards.

LA 3,850 626 37,534

07 30960 10900003826 210 In the city of Los Angeles, from Route 5 to North Wheatland Avenue. Rehabilitate

roadway.

LA 6,500 858 118,084

07 25262 10900003145 5 In and near Santa Clarita, from 0.5 miles south of I-5/SR-14 Separation to 1.7

miles north of Lake Hughes Road Undercrossing. Rehabilitate pavement.

LA 6,410 141 165,138

07 31340 10900003840 710 In the cities of Los Angeles and Monterey Park, from Olympic Boulevard to

Ramona Boulevard. Rehabilitate culverts.

LA 255 97 1,412

07 30080 10900003474 101 In the city of Los Angeles, from Route 5 to Route 110. Rehabilitate pavement.LA 1,814 3,848 14,343

07 3009U 10900003479 110 In and near the cities of Los Angeles and Carson, from Gaffey Street to College

Street. Extend service life of existing pavement and install concrete barrier and

metal beam guardrail.

LA 3,489 170 36,823

07 30770 10900003632 605 In and near Pico Rivera and Industry, from Rose Hills Road to Valley Boulevard.

Pavement rehabilitation.

LA 667 213 1,448

07 30300 10900003484 187 In the cities of Los Angeles and Culver City, on Venice Boulevard from Lincoln

Boulevard (Route 1) to Cadillac Avenue. Rehabilitate pavement.

LA 3,731 40 11,700

07 30750 10900003809 101 In the cities of Los Angeles, Calabasas and Agoura Hills, from Route 170 to

Kanan Road. Rehabilitate pavement, construct and upgrade ADA curb ramps.

LA 2,594 2,513 11,602

07 30130 10900003628 5 In Burbank, from Verdugo Avenue to Magnolia Boulevard. Rehabilitate pavement.LA 1,470 240 16,790

07 30800 10900003627 5 In the cities of Los Angeles, Glendale and Burbank, from Main street to south of

Verdugo Avenue. Pavement rehabilitation.

LA 1,300 44 3,000

48,488 9,911 555,691County Total

12 0J400 10900003655 39 In Anaheim and Buena Park, at Lincoln Avenue (PM 12.4/12.9); at Route 91 (PM

14.3/14.5) and from Route 5 to Rosecrans Avenue (PM 15.1/17.4). Roadway

rehabilitation.

ORA 4,310 342 8,794

12 0N930 10900003905 1 In Newport Beach, from north of Superior Avenue to 60th Street. Rehabilitate

drainage system.

ORA 650 10 1,495

12 0N920 10900003910 22 In Garden Grove, at Haster Street westbound off-ramp. Upgrade drainage system.ORA 644 130 1,617

7/26/2016 11:03:05AM

#19-00 IMP IMPL513 SHOPP Roadway Preservation

WALKER
Rectangle
Page 16: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LOS ANGELES

COUNTY

Page 17: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP

DATE

PRIOR FY19 FY20 FY21 FY22 FY23 FY24 TOTAL

Culver City, City of Elenda Street Sepulveda BoulevardLASR16S001 LASRTS 19-00 Washington-Culver Pedestrian and Cyclist Safety Project.

Washington-Culver Pedestrian & Cyclist safety improvements

along Washington Blvd, Matteson Ave, Girard Ave, Tilden Ave

and Elenda St near La Ballona Elem School inc corner curb

extensions, new controlled intersections & protected cycle

track. Utilizing Toll Credits

ATP 12/31/2019 267 2,505 2,505

Inglewood, City of City City LAS14C004 LASRTS 19-00 The City of Inglewood proposes to prepare a comprehensive

Active Transportation Plan (AT Plan) that incorporates bicycle,

pedestrian, Americans with Disabilities Act (ADA)

considerations and Safe Routes to School (SRTS) analysis and

planning.

ATP 9/1/2019 486 486

Lancaster, City of Avenue H-8 Avenue J-4 LAS14C005 LASRTS 19-00 5th Street East Corridor Improvements. Utilizing Toll Credits. ATP 4/28/2019 85 1,353 1,353

Los Angeles A, City of Various Various LASR16S005 LASRTS 19-00 LAUSD Middle School Bicycle Safety Physical Education

Program. To provide bicycle safety education for middle school

youth by training Physical Education instructors to run a bicycle

safety education program as part of PE classes. Establish bike

clubs and organize rides at each school. Utilizing Toll Credits.

ATP 12/1/2020 1,360 1,360

Los Angeles County Los Nietos Los Nietos LASR16S007 LASRTS 19-00 Los Nietos SRTS- Phase I. Implementation of a Safe Routes to

Schools infrastructure project including curb ramp

improvements, bulbouts, signalized crossings, non-signalized

crossings, new sidewalk, sidewalk improvements, audible push

buttons, and pedestrian countdown signals. Utilizing Toll

Credits.

ATP 6/1/2021 280 1,321 1,601

Los Angeles County Various Streets Et Al LAS14C013 LASRTS 19-00 East Los Angeles Community SRTS Program. ATP 6/30/2021 810 810

Los Angeles County Florence Firestone Et Al LAS14C014 LASRTS 19-00 Florence•-Firestone Community Safe Routes to School project -

State-only funding through ATP Cycle 1

ATP 6/30/2019 110 850 850

Palmdale, City of Sierra Highway 25th Street East LAS14C015 LASRTS 19-00 Ave R Complete Streets and Safe Routes. Project will widen

Avenue R from four lane to 5 lane from Sierra Hwy to 25th St E;

provide sidewalk gap closures, add Class II bike lanes in each

direction, enhanced crosswalks, upgrade of existing signal at R-

4 and 11th signal, ADA compliant curb ramps and bus turnouts

ATP 12/30/2020 3,080 2,252 2,252

3,542 9,896 1,321 11,217

Cudahy, City of Live Oak St Patata St LASR16M002 LASRTS 19-00 Wilcox Avenue Complete Streets and SRTS Project. The project

focuses on 12 crossing locations either near schools, mid-block

or across major arterials in the City. The project will focuses on

the installation of safety enhancements for peds at these

locations and eliminating hazardous conditions.

ATP - MPO 4/30/2019 11 1,333 1,333

Downey, City of Various Various LASR16M005 LASRTS 19-00 South Downey SRTS. Infrastructure: upgrade curb ramps,

signage, replacement of striping, pavement markings, install

vehicle speed feedback signs. New sidewalk construction on

Blodgett Ave. (Alameda to Donovan). Non- infrastructure:

Education/Encouragement outreach: student/parent

workshops, traffic enforcement classes, and surveys.

ATP - MPO 11/28/2019 238 238

El Monte, City of Garvey Avenue Valley Boulevard LASR17M016 LASRTS 19-00 Program delivers comprehensive SRTS services, including

per/bike safety workshops, walking school buses, bike, trains,

an encouragement and education activities for 7,210 students

in 10 elementary and 2 middle school in the Mountain View

School District where 90% of student are eligible for free/

reduced price lunches.

ATP - MPO 3/1/2022 583 583

11 1,571 583 2,154

Cudahy, City of Live Oak St Patata St LASR16M002 LASRTS 19-00 Wilcox Avenue Complete Streets and SRTS Project. The project

focuses on 12 crossing locations either near schools, mid-block

or across major arterials in the City. The project will focuses on

the installation of safety enhancements for peds at these

locations and eliminating hazardous conditions.

CITY 4/30/2019 27 27

Downey, City of Various Various LASR16M005 LASRTS 19-00 South Downey SRTS. Infrastructure: upgrade curb ramps,

signage, replacement of striping, pavement markings, install

vehicle speed feedback signs. New sidewalk construction on

Blodgett Ave. (Alameda to Donovan). Non- infrastructure:

Education/Encouragement outreach: student/parent

workshops, traffic enforcement classes, and surveys.

CITY 11/28/2019 277 277

TOTAL ATP

TOTAL ATP-MPO

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of April 23, 2018

LASRTS- Grouped Projects for Safety Improvement - Safe Route to School Program (ATP Program). Projects are consistent with 40 CFR Part 93.126. Utilizing Toll Credits to match ATP.

#19-00 LA LASRTS Safe Routes to Schools

Page 18: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP

DATE

PRIOR FY19 FY20 FY21 FY22 FY23 FY24 TOTAL

Palmdale, City of Sierra Highway 25th Street East LAS14C015 LASRTS 19-00 Ave R Complete Streets and Safe Routes. Project will widen

Avenue R from four lane to 5 lane from Sierra Hwy to 25th St E;

provide sidewalk gap closures, add Class II bike lanes in each

direction, enhanced crosswalks, upgrade of existing signal at R-

4 and 11th signal, ADA compliant curb ramps and bus turnouts

CITY 12/30/2020 618 719 719

Santa Clarita, City of NA NA LAS14M002 LASRTS 19-00 Sierra Hwy Ped & Bicycle Bridge and Street Improvements will

construct a ped/bike bridge over Sierra Highway lining the

existing bike trail on Golden Valley Road.

CITY 12/21/2019 1,827 20 20

Santa Clarita, City of CITYWIDE CITYWIDE LASR16M012 LASRTS 19-00 Junior High and High School SRTS Plan. Develop a Safe Routes

to School Plan for the City’s junior high and high schools, which

will include School Safety Assessments and School Area

Improvement Plans for the nine subject schools.

CITY 6/30/2019 40 20 20

2,485 1,063 1,063

Los Angeles County Various Streets Et Al LAS14C013 LASRTS 19-00 East Los Angeles Community SRTS Program. COUNTY 6/30/2021 20 20

20 20

PRIOR FY19 FY20 FY21 FY22 FY23 FY24 TOTAL

6,038 12,550 1,904 14,454GRAND TOTAL

TOTAL CITY

TOTAL COUNTY

#19-00 LA LASRTS Safe Routes to Schools

Page 19: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G1 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

Carson, City of Lomita Street Railroad Crossing LA0G412 LA11G1 19-00 Wilmington Avenue Improvements from Lomita Street to

Railroad Crossing consist of reconstruction of the existing

pavement and construction of missing curb & gutter.

AGENCY - Agency 6/30/2020

100 100

Carson, City of Sepulveda Blvd Lomita Blvd LA0G452 LA11G1 19-00 Figueroa Street Improvements from Sepulveda Blvd to

Lomita Blvd consist of reconstruction and rehabilitation

of the existing pavement, curb & gutter, and sidewalk.

[CITY PROJ NO. TBD]

AGENCY - Agency 6/30/2020

500 500

Carson, City of Main St Figueroa St LA0G391 LA11G1 19-00 Sepulveda Blvd Improvements, from main Street to

figueroa St, includes reconstruction of existing pavement

and reconstruction of damaged sidewalk, curb and

gutter.

AGENCY - Agency 6/30/2020

600 600

1,200 1,200

Glendale, City of Colorado Street City Boundry LA0G1034 LA11G1 19-00 Verdugo Road Rehabilitation from Colorado Street to

City's Boundary is roadway improvement (cold milling

and resurfacing the existing pavement with rubberized

asphalt, curb modification and reconstruction, repair

damaged pavement), sewer upsizing and traffic signal

modification project (on Verdugo Rd at Acacia Ave and

Maple St.) Verdugo Rd. is an arterial street, less than a

mile away from Freeways CA-2 and CA-134. Project will

use Toll Credit for CON of STPL.

CITY - City Funds 12/31/2025

713 713

Carson, City of Citywide Citywide LA0G904 LA11G1 19-00 Citywide Annual Overlay FY 2016/17 includes grinding

the existing roadway pavement and overlaying with

rubberized asphalt, repairing damaged sidewalks, curb &

gutter, and constructing new wheelchair ramps or

upgrading existing wheelchair ramps.[CITY PROJ NO.

TBD]

CITY - City Funds 6/30/2020

720 720

Carson, City of Citywide Citywide LA0G903 LA11G1 19-00 Citywide Annual Overlay FY 2015/16 includes grinding

the existing roadway pavement and overlaying with

rubberized asphalt, repairing damaged sidewalk and curb

& gutter, and constructing or upgrading wheelchair

ramps. [CITY PROJ NO. TBD]

CITY - City Funds 6/30/2020

750 750

La Verne, City of San Dimas Canyon road Fulton Road LSSTPL010 LA11G1 19-00 Rehabilitation of pavement surface along Arrow Highway

through the City of La Verne

CITY - City Funds 6/30/2020

1,257 1,257

South Pasadena, City of PASADENA BRENT LA0G046 LA11G1 19-00 MONTEREY ROAD FROM PASADENA AVE to BRENT AVE:

Roadway rehabilitation and reconstruction no lane

additions.

CITY - City Funds 6/30/2021

33 33

Pomona, City of Temple Mills LA0G1256 LA11G1 19-00 Street Rehabilitation in Exist R/W - Districts Citywide. CITY - City Funds 9/18/2021

56 255 311

South Gate, City of Jefferson Ave South City Limit LA0G675 LA11G1 19-00 Street improvements of Imperial Hwy from east City

Limit to LA River and Garfield Avenue from Jefferson Ave

to South City Limit. Improvements include but not limit

to rehabilitation of pavement, reconstruction of

damaged curb and gutter, drive approaches, sidewalk,

ramps, etc.

CITY - City Funds 2/28/2021

100 100

Pomona, City of NCL SCL LA0G1421 LA11G1 19-00 Street Rehabilitation - District 4 and 5 CITY - City Funds 10/21/2020 311 311

LA11G1 - Group projects for pavement resurfacing and/or rehabilitation on local roads throughout County. Projects are consistent with 40 CFR part 93, 126, 127, 128, exempt tables 2 & 3 categories. Pavement resurfacing, rehabilitation, reconstruction, AC overlays, road maintenance to prevent and eliminate hazards, no

lane additions. There are projects in the grouped projecting listing that contain projects with toll credits.

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of April 23, 2018

TOTAL AGENCY

Will Ridder, (213) 922-2887 1 Printed: 4/24/20181:16 PM

#19-00 LA LA11G1 Pavement Rehabilition

Page 20: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G1 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)Palmdale, City of 55th East 790' w/o 25th East LA0G1103 LA11G1 19-00 Pearblossom Highway Reconstruction- 3RD project. From

approximately 55th East to approx. 790’ west of 25th

Street East (+3 miles). Work to consist of : Multi-phase

construction to pulverize roadway; cement treat

roadway, base and re-pave; re-do traffic loops and

striping.

CITY - City Funds 3/1/2021

3,975 2,000 1,500 3,500

Los Angeles County MTA NA N/A LAG1001 LA11G1 19-00 Regionwide local highway system preservation,

pavement resurfacing, rehabilitation, AC overlays and

reconstruction. No lane additions.

CITY - City Funds 12/30/2040

16,500 2,201 2,500 4,701

Palmdale, City of North & South East and West LA0G1299 LA11G1 19-00 City of Palmdale Arterial and Collector Rehabilitation and

Resurfacing Program. This will be a multiphase ongoing

street resurfacing program that will incoporate various

pavement rehabiliation and resurfacing techniques and

materials. All work will be withing the City of Palmdale

Right of Way. The Project will include 160 miles or 34

million square feet of pavement to be resurfaced or

reconstructed. No Right of Way is reqired.

CITY - City Funds 12/31/2020

7,791 7,750 8,050 15,800

28,266 12,451 15,032 713 28,196

San Marino, City of Santa Anita San Gabriel LA0G1334 LA11G1 19-00 Year four implementation project of the 2016 10-year

Pavement Management Program

GEN - General Funds - Locally

Generated

10/1/2020

1,500 1,500

San Dimas, City of Covina Blvd. westerly city limits LA0G1272 LA11G1 19-00 Street Rehab improvements to Badillo St. from Covina

Blvd. to westerly city limit and Covina Hills Rd. from Via

Verde to westerly city limit. Utilizing toll credits.

GEN - General Funds - Locally

Generated

6/30/2019

650 650

San Marino, City of Huntington Drive Roanoke Rd LA0G1333 LA11G1 19-00 Year three implementation project of the 2016 10-year

Pavement Management Program

GEN - General Funds - Locally

Generated

10/1/2019

1,500 1,500

2,150 1,500 3,650

Los Angeles County MTA NA N/A LAG1001 LA11G1 19-00 Regionwide local highway system preservation,

pavement resurfacing, rehabilitation, AC overlays and

reconstruction. No lane additions.

MR15 - Measure R 15% Local

Return

12/30/2040

10,000 3,000 3,000 6,000

10,000 3,000 3,000 6,000

Glendale, City of Colorado Street City Boundry LA0G1034 LA11G1 19-00 Verdugo Road Rehabilitation from Colorado Street to

City's Boundary is roadway improvement (cold milling

and resurfacing the existing pavement with rubberized

asphalt, curb modification and reconstruction, repair

damaged pavement), sewer upsizing and traffic signal

modification project (on Verdugo Rd at Acacia Ave and

Maple St.) Verdugo Rd. is an arterial street, less than a

mile away from Freeways CA-2 and CA-134. Project will

use Toll Credit for CON of STPL.

MR20H - Measure R 20%

Highway

12/31/2025

585 585

585 585

South Gate, City of Jefferson Ave South City Limit LA0G675 LA11G1 19-00 Street improvements of Imperial Hwy from east City

Limit to LA River and Garfield Avenue from Jefferson Ave

to South City Limit. Improvements include but not limit

to rehabilitation of pavement, reconstruction of

damaged curb and gutter, drive approaches, sidewalk,

ramps, etc.

PC20 - Los Angeles County

Proposition "C20"

2/28/2021

430 130 130

Los Angeles County MTA NA N/A LAG1001 LA11G1 19-00 Regionwide local highway system preservation,

pavement resurfacing, rehabilitation, AC overlays and

reconstruction. No lane additions.

PC20 - Los Angeles County

Proposition "C20"

12/30/2040

11,000 3,000 3,000 6,000

11,430 3,130 3,000 6,130

Norwalk, City of Studebaker Road Pioneer Boulevard LA0G1409 LA11G1 19-00 Rehabilitate Foster Road from Studebaker Road to

Pioneer Boulevard

PC25 - Los Angeles County

Proposition "C25"

9/30/2019

295 295

295 295

TOTAL MR15

TOTAL CITY

TOTAL GEN

TOTAL MR20H

TOTAL PC20

TOTAL PC25

Will Ridder, (213) 922-2887 2 Printed: 4/24/20181:16 PM

#19-00 LA LA11G1 Pavement Rehabilition

Page 21: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G1 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)Los Angeles County MTA NA N/A LAG1001 LA11G1 19-00 Regionwide local highway system preservation,

pavement resurfacing, rehabilitation, AC overlays and

reconstruction. No lane additions.

PC40 - Los Angeles County

Proposition "C40"

12/30/2040

7,000 3,000 3,000 6,000

7,000 3,000 3,000 6,000

Los Angeles County MTA NA N/A LAG1001 LA11G1 19-00 Regionwide local highway system preservation,

pavement resurfacing, rehabilitation, AC overlays and

reconstruction. No lane additions.

PROPALR - Los Angeles County

Proposition "A" Local

12/30/2040

10,000 5,000 5,000 10,000

10,000 5,000 5,000 10,000

Los Angeles A, City of Citywide federally classified streetsCitywide federally classified streetsLA0G1447 LA11G1 19-00 STPL Force Account Resurfacing Project XXIII. Citywide

resurfacing and construction of ADA compliant access

ramps and truncated domes as needed by force account

on federally classified streets using STP-L and Toll Credits.

STPL - STP Local 6/30/2026

11,500 11,500

Los Angeles A, City of Citywide federally classified streetsCitywide federally classified streetsLA0G1446 LA11G1 19-00 STPL Force Account Resurfacing Project XXII. Citywide

resurfacing and construction of ADA compliant access

ramps and truncated domes as needed by force account

on federally classified streets using STP-L and Toll Credits.

STPL - STP Local 6/30/2025

11,500 11,500

Los Angeles A, City of Citywide federally classified streetsCitywide federally classified streetsLA0G1445 LA11G1 19-00 STPL Force Account Resurfacing Project XXI. Citywide

resurfacing and construction of ADA compliant access

ramps and truncated domes as needed by force account

on federally classified streets using STP-L and Toll Credits.

STPL - STP Local 6/30/2024

11,500 11,500

Glendale, City of Colorado Street City Boundry LA0G1034 LA11G1 19-00 Verdugo Road Rehabilitation from Colorado Street to

City's Boundary is roadway improvement (cold milling

and resurfacing the existing pavement with rubberized

asphalt, curb modification and reconstruction, repair

damaged pavement), sewer upsizing and traffic signal

modification project (on Verdugo Rd at Acacia Ave and

Maple St.) Verdugo Rd. is an arterial street, less than a

mile away from Freeways CA-2 and CA-134. Project will

use Toll Credit for CON of STPL.

STPL - STP Local 12/31/2025

946 946

Los Angeles A, City of Citywide federally classified streetsCitywide federally classified streetsLA0G1443 LA11G1 19-00 STPL Force Account Resurfacing Project XX. Citywide

resurfacing and construction of ADA compliant access

ramps and truncated domes as needed by force account

on federally classified streets using STP-L and Toll Credits

STPL - STP Local 6/30/2023

11,500 11,500

Los Angeles A, City of federally classified streetsfederally classified streetsLA0G1345 LA11G1 19-00 STPL Force Account Resurfacing Project XVII. Citywide

resurfacing and construction of ADA compliant access

ramps and truncated domes as needed by force account

on federally classified streets using STP-L funding and Toll

credits.

STPL - STP Local 6/30/2022

11,500 11,500

Los Angeles A, City of Citywide federally classified streetsCitywide federally classified streetsLA0G1288 LA11G1 19-00 STP-L Force Account Resurfacing Project XVI. Citywide

resurfacing and construction of ADA compliant access

ramps and truncated domes as needed by force account

on federally classified streets using STP-L funding and Toll

Credits.

STPL - STP Local 6/30/2023

11,500 11,500

San Marino, City of Santa Anita San Gabriel LA0G1334 LA11G1 19-00 Year four implementation project of the 2016 10-year

Pavement Management Program

STPL - STP Local 10/1/2020

89 89

La Verne, City of San Dimas Canyon road Fulton Road LSSTPL010 LA11G1 19-00 Rehabilitation of pavement surface along Arrow Highway

through the City of La Verne

STPL - STP Local 6/30/2020

243 243

Carson, City of Citywide Citywide LA0G903 LA11G1 19-00 Citywide Annual Overlay FY 2015/16 includes grinding

the existing roadway pavement and overlaying with

rubberized asphalt, repairing damaged sidewalk and curb

& gutter, and constructing or upgrading wheelchair

ramps. [CITY PROJ NO. TBD]

STPL - STP Local 6/30/2020

280 280

Carson, City of Citywide Citywide LA0G904 LA11G1 19-00 Citywide Annual Overlay FY 2016/17 includes grinding

the existing roadway pavement and overlaying with

rubberized asphalt, repairing damaged sidewalks, curb &

gutter, and constructing new wheelchair ramps or

upgrading existing wheelchair ramps.[CITY PROJ NO.

TBD]

STPL - STP Local 6/30/2020

280 280

TOTAL PC40

TOTAL PROPALR

Will Ridder, (213) 922-2887 3 Printed: 4/24/20181:16 PM

#19-00 LA LA11G1 Pavement Rehabilition

Page 22: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G1 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)Pasadena, City of Various Various LA0G1316 LA11G1 19-00 This project will provide resurfacing of one street within

the City of Pasadena. The project will be using $154k in

Toll Credits in FFY 19/20.

STPL - STP Local 9/30/2021

1,339 1,339

Glendale, City of SAN FERNANDO RD CENTRAL AVE LA0G1328 LA11G1 19-00 REHABILITATION of COLORADO ST from San Fernando Rd

to Central Ave (principal arterial) and COLUMBUS AVE

from Broadway to Colorado St; cold mill existing

pavement and install rubberized surface course,

reconstruct damaged asphalt pavement, curb and

gutters, sidewalks, driveways, reconstruct ADA curb

ramps, modify one traffic signal, install striping. Project

will use Toll Credit for CON for STPL.

STPL - STP Local 12/31/2024

2,000 2,000

Los Angeles County Saragosa Aeolian LA0G1270 LA11G1 19-00 Norwalk Blvd et al - Roadway improvements including

pavement and median work along Norwalk Blvd and

Slauson Avenue. Utilizing Toll Credits to match STPL.

STPL - STP Local 6/30/2022

5,345 5,345

Los Angeles A, City of Citywide federally classified streetsCitywide federally classified streetsLA0G1347 LA11G1 19-00 STPL Force Account Resurfacing Project XIX. Citywide

resurfacing and construction of ADA compliant access

ramps and truncated domes as needed by force account

on federally classified streets using STP-L and Toll Credits.

STPL - STP Local 6/30/2022

11,500 11,500

Los Angeles County MTA NA N/A LAG1001 LA11G1 19-00 Regionwide local highway system preservation,

pavement resurfacing, rehabilitation, AC overlays and

reconstruction. No lane additions.

STPL - STP Local 12/30/2040

11,000 13,370 13,370

San Marino, City of Huntington Drive Roanoke Rd LA0G1333 LA11G1 19-00 Year three implementation project of the 2016 10-year

Pavement Management Program

STPL - STP Local 10/1/2019

60 60

South Pasadena, City of PASADENA BRENT LA0G046 LA11G1 19-00 MONTEREY ROAD FROM PASADENA AVE to BRENT AVE:

Roadway rehabilitation and reconstruction no lane

additions.

STPL - STP Local 6/30/2021

247 247

Pomona, City of Temple Mills LA0G1256 LA11G1 19-00 Street Rehabilitation in Exist R/W - Districts Citywide. STPL - STP Local 9/18/2021

430 430 860

San Marino, City of Huntington Dr Longden Ave LA0G1172 LA11G1 19-00 the project consists in the overlay of Del Mar Avenue

from Huntington Drive to Longden Avenue.

STPL - STP Local 12/30/2021

660 660

Montebello, City of Paramount Blvd Rose Glen LA0G1249 LA11G1 19-00 Arroyo Drive (Astra Drive to Rose Glen Avenue))

Improvements: concrete improvements and

reconstruction fo AC pavement, existing curb & gutter,

sidewalk, access ramps, traffic signal loop detectors,

traffic striping, markers and pavement marking. Utilizing

Toll Credits to match STPL.

STPL - STP Local 12/1/2021

680 680

Pomona, City of NCL SCL LA0G1421 LA11G1 19-00 Street Rehabilitation - District 4 and 5 STPL - STP Local 10/21/2020 860 860

Los Angeles County New York Altadena Dr LA0G1200 LA11G1 19-00 Allen Avenue et al.-Resurfacing Allen New York Dr. to

Altadena Dr.; Mariposa St. - Lake Av. to Maiden Ln. Using

Toll Credits.

STPL - STP Local 12/1/2022

1,240 1,240

Los Angeles County Del Amo Victoria St LA0G1194 LA11G1 19-00 Wilmington Avenue Roadway Rehabilitation - Del Amo

Blvd to 200' south of Victoria St. Utilizing Toll Credits to

match STPL.

STPL - STP Local 9/1/2021

1,245 1,245

Long Beach, City of Obispo Avenue Spring Street LA0G1264 LA11G1 19-00 On Temple Avenue between Obispo Ave and Spring St,

pavement rehabilitation and restoration, including repair

of curb and gutter, correction of hadicapped access

deficiencies, utility cover adjustment, traffic restriping,

and replacement of damaged signal detector loops.

Project using Toll Credit.

STPL - STP Local 12/30/2019

1,400 1,400

Norwalk, City of Studebaker Road Pioneer Boulevard LA0G1409 LA11G1 19-00 Rehabilitate Foster Road from Studebaker Road to

Pioneer Boulevard

STPL - STP Local 9/30/2019

1,480 1,480

San Dimas, City of Covina Blvd. westerly city limits LA0G1272 LA11G1 19-00 Street Rehab improvements to Badillo St. from Covina

Blvd. to westerly city limit and Covina Hills Rd. from Via

Verde to westerly city limit. Utilizing toll credits.

STPL - STP Local 6/30/2019

1,750 1,750

South Gate, City of Jefferson Ave South City Limit LA0G675 LA11G1 19-00 Street improvements of Imperial Hwy from east City

Limit to LA River and Garfield Avenue from Jefferson Ave

to South City Limit. Improvements include but not limit

to rehabilitation of pavement, reconstruction of

damaged curb and gutter, drive approaches, sidewalk,

ramps, etc.

STPL - STP Local 2/28/2021

1,773 1,773

Will Ridder, (213) 922-2887 4 Printed: 4/24/20181:16 PM

#19-00 LA LA11G1 Pavement Rehabilition

Page 23: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G1 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)Los Angeles County Et Al LA0G977 LA11G1 19-00 Santa Fe Ave from Del Amo Blvd to 700' North of SPBG

495.6 C Roadway resurfacing/reconstruction. Utilizing

Toll Credits to match STPL.

STPL - STP Local 9/1/2021

1,810 1,810

Los Angeles County Et Al LA0G976 LA11G1 19-00 Hazard Avenue Et Al. resurfacing of Hazard Av - Ceasar E

Chavez Av to City Terrace Drive, Blanchard St - Gage Av

to 45 W Dundas Street. Utilizing Toll Credits to match

STPL.

STPL - STP Local 9/1/2019

2,146 2,146

Palmdale, City of 55th East 790' w/o 25th East LA0G1103 LA11G1 19-00 Pearblossom Highway Reconstruction- 3RD project. From

approximately 55th East to approx. 790’ west of 25th

Street East (+3 miles). Work to consist of : Multi-phase

construction to pulverize roadway; cement treat

roadway, base and re-pave; re-do traffic loops and

striping.

STPL - STP Local 3/1/2021

200 2,627 2,627

Los Angeles County Via Joyce Heller Circle LA0G1271 LA11G1 19-00 Heller Circle et al - reconstruction/resurfacing,

reconstruct C&G, sidewalk, curb ramps, and LID

treatments on Plum Canyon Road from Via Joyce Dr to

Heller Circle and Whites Canyon Road from Heller Circle

to 2,630 fr south of Heller Circle. Utilizing Toll Credits to

match STPL.

STPL - STP Local 6/30/2019

3,402 3,402

Los Angeles County 2453 w/o Munz Ranch RoadBouquet Canyon Road LSSTPL052 LA11G1 19-00 Elizabeth Lake Road- Roadway resurfacing and

rehabilitation project. Project is using Toll Credit for

construction phase in the amount of $392

STPL - STP Local 12/31/2020

4,700 4,700

Los Angeles County Et Al LA0G975 LA11G1 19-00 East Los Angeles Comnmunity Roadway Improvements.

Rehabilitation and resurfacing. Utilizing Toll Credits to

match STPL.

STPL - STP Local 12/15/2019

6,566 6,566

Los Angeles A, City of Citywide federally classified streetsCitywide federally classified streetsLA0G1346 LA11G1 19-00 STPL Force Account Resurfacing Project XVIII. Citywide

resurfacing and construction of ADA compliant access

ramps and truncated domes as needed by force account

on federally classified streets using STP-L and Toll credits.

STPL - STP Local 6/30/2021

11,500 11,500

11,200 44,576 34,876 35,446 11,500 11,500 11,500 149,398

PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

77,896 73,602 66,608 36,744 11,500 11,500 11,500 211,454GRAND TOTAL

TOTAL STPL

Will Ridder, (213) 922-2887 5 Printed: 4/24/20181:16 PM

#19-00 LA LA11G1 Pavement Rehabilition

Page 24: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G2 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE

PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)Los Angeles A, City of N/A N/A LSTMP109 LA11G2 19-00 Hollywood Pedestrian/Transit Crossroads - Streetscape

improvements along Hollywood Blvd. (Swap TEA for STPL)

CITY 12/31/2020 29 336 0 0 0 0 0 336

Los Angeles County MTA NA N/A LAG2001 LA11G2 19-00 Countywide pedestrian and bicycle facility improvements and

upgrades recreational purposes.

CITY 12/30/2020 10,000 5,000 5,000 0 0 0 0 10,000

10,029 5,336 5,000 0 0 10,336

Los Angeles County MTA NA N/A LAG2001 LA11G2 19-00 Countywide pedestrian and bicycle facility improvements and

upgrades recreational purposes.

MR15 12/30/2020 10,000 5,000 5,000 0 0 0 0 10,000

10,000 5,000 5,000 0 0 10,000

Los Angeles County MTA NA N/A LAG2001 LA11G2 19-00 Countywide pedestrian and bicycle facility improvements and

upgrades recreational purposes.

Measure R 12/30/2020 4,976 0 0 0 0 0 0 0

4,976 0 0 0 0 0 0 0

Los Angeles A, City of N/A N/A LSTMP109 LA11G2 19-00 Hollywood Pedestrian/Transit Crossroads - Streetscape

improvements along Hollywood Blvd. (Swap TEA for STPL)

PC20 12/31/2020 0 205 0 0 0 0 0 205

Los Angeles County MTA NA N/A LAG2001 LA11G2 19-00 Countywide pedestrian and bicycle facility improvements and

upgrades recreational purposes.

PC20 12/30/2020 20,823 6,000 6,000 0 0 0 0 12,000

20,823 6,205 6,000 0 0 0 12,205

Los Angeles County MTA NA N/A LAG2001 LA11G2 19-00 Countywide pedestrian and bicycle facility improvements and

upgrades recreational purposes.

PC40 12/30/2020 15,500 5,000 5,000 0 0 0 0 10,000

15,500 5,000 5,000 0 0 10,000

Los Angeles County MTA NA N/A LAG2001 LA11G2 19-00 Countywide pedestrian and bicycle facility improvements and

upgrades recreational purposes.

PROPA 12/30/2020 10,000 5,000 5,000 0 0 0 0 10,000

10,000 5,000 5,000 0 0 10,000

Los Angeles A, City of N/A N/A LSTMP109 LA11G2 19-00 Hollywood Pedestrian/Transit Crossroads - Streetscape

improvements along Hollywood Blvd. (Swap TEA for STPL)

STPL 12/31/2020 211 821 0 0 0 0 0 821

Los Angeles County MTA NA N/A LAG2001 LA11G2 19-00 Countywide pedestrian and bicycle facility improvements and

upgrades recreational purposes.

STPL 12/30/2020 10,000 6,000 6,000 0 0 0 0 12,000

10,211 6,821 6,000 0 0 12,821

PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)81,539 33,362 32,000 0 0 65,362

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of January 25, 2018

LA11G2 - Group projects for bicycle and pedestrian facilities. Projects to upgrade, maintain, or enhance pedestrian/cyclist ways. Projects to eliminate or prevent hazards for pedestrians and cyclist throughout County. Projects are consistent with 40CFR part 93.126, 127, 128, exempt tables 2 & 3 categories.

TOTAL CITY

TOTAL MR15

TOTAL PC20

TOTAL PC40

TOTAL PROPA

TOTAL STPL

GRAND TOTAL

TOTAL Measure R

Will Ridder, (213) 922-2887, [email protected] 1 of 1 Printed: 1/25/2018 at 2:34 PM

#19-00 LA LA11G2 Bike and Ped

Page 25: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G2N Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP

DATE

PRIOR FY19 FY20 FY21 FY22 FY23 FY24 TOTAL

Los Angeles County MTA Various Various LSTMP228 LA11G2N 19-00 Regionwide bicycle and pedestrian type projects, non

reportable TCMs. None capacity.

CITY 12/31/2040 2,545 65 65 130

2,545 65 65 130

Los Angeles County MTA Various Various LSTMP228 LA11G2N 19-00 Regionwide bicycle and pedestrian type projects, non

reportable TCMs. None capacity.

MEASURE R 15 12/31/2040 1,000 500 500 1,000

1,000 500 500 1,000

Los Angeles County MTA Various Various LSTMP228 LA11G2N 19-00 Regionwide bicycle and pedestrian type projects, non

reportable TCMs. None capacity.

PROP C 20 12/31/2040 1,000 250 500 750

1,000 250 500 750

Los Angeles County MTA Various Various LSTMP228 LA11G2N 19-00 Regionwide bicycle and pedestrian type projects, non

reportable TCMs. None capacity.

PROP C 40 12/31/2040 1,000 500 500 1,000

1,000 500 500 1,000

Los Angeles County MTA Various Various LSTMP228 LA11G2N 19-00 Regionwide bicycle and pedestrian type projects, non

reportable TCMs. None capacity.

PROP A 12/31/2040 1,000 500 500 1,000

1,000 500 500 1,000

Los Angeles County Slauson Ave La Brea Ave LA0G1285 LA11G2N 19-00 Overhill Drive from Slauson Ave to La Brea Ave -

Implementation of a protected bike facility, pedestrian

walkway, pavement reconstruction and pertinent

improvements. Utilizing Toll Credits.

STPL 6/30/2021 2,500 2,500

Los Angeles County MTA Various Various LSTMP228 LA11G2N 19-00 Regionwide bicycle and pedestrian type projects, non

reportable TCMs. None capacity.

STPL 12/31/2040 2,562 500 500 1,000

2,562 3,000 500 3,500

PRIOR FY19 FY20 FY21 FY22 FY23 FY24 TOTAL

9,107 4,815 2,565 7,380

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of April 23, 2018

LA11G2N - Group projects for bicycle and pedestrian facilities. Projects to upgrade, maintain, or enhance pedestrian/cyclist ways. Projects to eliminate or prevent hazards for pedestrians and cyclist throughout County. Projects are consistent with 40CFR part 93.126, 127, 128, exempt tables 2 & 3 categories. Non reportable

TCM.

GRAND TOTAL

TOTAL CITY

TOTAL MEASURE R 15

TOTAL PROP C 20

TOTAL PROP C 40

TOTAL PROP A

TOTAL STPL

Will Ridder, (213) 922-2887 1 4/23/20184:10 PM

#19-00 LA LA11G2N Bike and Ped (Non-Reportable TCM)

Page 26: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G3 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

Lancaster, City of Avenue H Avenue I LATP16S001 LA11G3 19-00 10th Street West Road Diet and Bikeway Improvements. The

City of Lancaster proposes to develop a complete street on

10th Street West through comprehensive bicycle and

pedestrian improvements and removing vehicular traffic lanes,

adding 1.5 miles of bicycle facilities and dramatically

increasing safety. Utilizing toll credits.

ATP - Active Transportation Program 10/30/2019 70 715 715

70 715 715

Inglewood, City of La Cienega Crenshaw LAF3128 LA11G3 19-00 Century Boulevard Mobility Improvement Project. Construct

raised median with turn pockets & additional turn lanes at

major intersections along Century Blvd to improve mobility &

reduce congestion & delays. Century, La Cienega and

Crenshaw.

CITY - City Funds 2/28/2019 14894

Lancaster, City of Avenue D Avenue M LA0G1414 LA11G3 19-00 Signal Safety Upgrade Improvements. The citywide project will

replace aging signal operating equipment with new video

detection systems, cameras, LEDs, signal indicators, signal

battery backup units including batteries, pedestrian indicators,

push button with protected left turns

CITY - City Funds 12/31/2018 407

Lancaster, City of various various LA0G1422 LA11G3 19-00 Signal Safety Upgrade Improvements. The citywide project will

replace aging signal operating equipment with new video

detection systems, cameras, LEDs, signal indicators, signal

battery backup units including batteries, pedestrian indicators,

push button

CITY - City Funds 5/30/2019 407

Lancaster, City of Avenue H Avenue I LATP16S001 LA11G3 19-00 10th Street West Road Diet and Bikeway Improvements. The

City of Lancaster proposes to develop a complete street on

10th Street West through comprehensive bicycle and

pedestrian improvements and removing vehicular traffic lanes,

adding 1.5 miles of bicycle facilities and dramatically

increasing safety. Utilizing toll credits.

CITY - City Funds 10/30/2019 333

Los Angeles County MTA NA N/A LAG3001 LA11G3 19-00 Regionwide safety and operational improvements. CITY - City Funds 12/30/2020 8000 4000 4000 8000

Pasadena, City of Arroyo S City Limit LA0G235 LA11G3 19-00 This project provides for the seismic retrofit of the San Rafael

Bridge.

CITY - City Funds 12/31/2019 900 5100 5100

Whittier, City of Dorland Street Pleasant Way LA0G357 LA11G3 19-00 Widening and realignment of Norwalk Boulevard at Whittier

Boulevard (SR 72) to create a southbound auxiliary travel lane

and dedicated right turn only lanes.

CITY - City Funds 9/30/2022 6 75 75

24947 9100 4075 13175

Lancaster, City of Avenue H Avenue I LATP16S001 LA11G3 19-00 10th Street West Road Diet and Bikeway Improvements. The

City of Lancaster proposes to develop a complete street on

10th Street West through comprehensive bicycle and

pedestrian improvements and removing vehicular traffic lanes,

adding 1.5 miles of bicycle facilities and dramatically

increasing safety. Utilizing toll credits.

LTF - Local Transportation 10/30/2019 263

263

Los Angeles County MTA NA N/A LAG3001 LA11G3 19-00 Regionwide safety and operational improvements. Measure R 12/30/2020 15000 15000

15000 15000

Los Angeles County MTA NA N/A LAG3001 LA11G3 19-00 Regionwide safety and operational improvements. MR15 - Measure R 15% Local Return 12/30/2020 7000 3500 3500 7000

7000 3500 3500 7000

TOTAL MEASURE R

LA11G3- Group projects for safety and operating improvements on the local highway system throughout the County. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories. Railroad/highway crossing, safer Federal-aid system roads, shoulder improvements, projects that correct, improve, or

eliminate a hazardous location or feature, traffic control devices and operating assistance, signalization projects (individual intersections), pavement marking demonstration projects, truck climbing lanes outside the urbanized area, lighting improvements, emergency truck pullovers, widening narrow pavements(no lane

additions), warning devices, intersection channelization and or improvements(no through lane additions)throughout the County. There are projects in the group project listing that contain projects with toll credits.

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of January 25,2018

TOTAL ATP

TOTAL CITY

TOTAL LTF

TOTAL MEASURE R 15% LOCAL RETURN

Wil Ridder, (213) 922-2887, [email protected] Page 1 of 3 Printed: 1/25/2018 at 10:18 AM

#19-00 LA LA11G3 Safety and Operating Improvements

Page 27: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G3 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

LA11G3- Group projects for safety and operating improvements on the local highway system throughout the County. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories. Railroad/highway crossing, safer Federal-aid system roads, shoulder improvements, projects that correct, improve, or

eliminate a hazardous location or feature, traffic control devices and operating assistance, signalization projects (individual intersections), pavement marking demonstration projects, truck climbing lanes outside the urbanized area, lighting improvements, emergency truck pullovers, widening narrow pavements(no lane

additions), warning devices, intersection channelization and or improvements(no through lane additions)throughout the County. There are projects in the group project listing that contain projects with toll credits.

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of January 25,2018

Los Angeles County MTA NA N/A LAG3001 LA11G3 19-00 Regionwide safety and operational improvements. PC20 - Los Angeles County Proposition "C20" 12/30/2020 8000 4000 4000 8000

8000 4000 4000 8000

Inglewood, City of La Cienega Crenshaw LAF3128 LA11G3 19-00 Century Boulevard Mobility Improvement Project. Construct

raised median with turn pockets & additional turn lanes at

major intersections along Century Blvd to improve mobility &

reduce congestion & delays. Century, La Cienega and

Crenshaw.

PC25 - Los Angeles County Proposition "C25" 2/28/2019 3224

3224

Los Angeles County MTA NA N/A LAG3001 LA11G3 19-00 Regionwide safety and operational improvements. PC40 - Los Angeles County Proposition "C40" 12/30/2020 13000 5000 5000 10000

13000 5000 5000 10000

Los Angeles County MTA NA N/A LAG3001 LA11G3 19-00 Regionwide safety and operational improvements. PROPA - Los Angeles County Proposition "A" 12/30/2020 7000 3500 3500 7000

7000 3500 3500 7000

Baldwin Park, City of Bogart Avenue Downing Avenue LA0G1382 LA11G3 19-00 Installation of two quad railroad crossing gates at Pacific

Avenue to improve public safety, including safety for

motorists, bicyclists and pedestrians. Toll credits will be used

to match STP-L.

STPL - STP Local 10/31/2018 345

Lancaster, City of Avenue D Avenue M LA0G1414 LA11G3 19-00 Signal Safety Upgrade Improvements. The citywide project will

replace aging signal operating equipment with new video

detection systems, cameras, LEDs, signal indicators, signal

battery backup units including batteries, pedestrian indicators,

push button with protected left turns

STPL - STP Local 12/31/2018 673

Lancaster, City of various various LA0G1422 LA11G3 19-00 Signal Safety Upgrade Improvements. The citywide project will

replace aging signal operating equipment with new video

detection systems, cameras, LEDs, signal indicators, signal

battery backup units including batteries, pedestrian indicators,

push button

STPL - STP Local 5/30/2019 673 673

Lancaster, City of Avenue H Avenue I LATP16S001 LA11G3 19-00 10th Street West Road Diet and Bikeway Improvements. The

City of Lancaster proposes to develop a complete street on

10th Street West through comprehensive bicycle and

pedestrian improvements and removing vehicular traffic lanes,

adding 1.5 miles of bicycle facilities and dramatically

increasing safety. Utilizing toll credits.

STPL - STP Local 10/30/2019 715

Los Angeles A, City of NA NA LSTMP110 LA11G3 19-00 Hollywood Media District Area: installation of wayfinding

signage (Swap STPL for TEA). Utilizing Toll Credits to match

STPL.

STPL - STP Local 12/1/2020 20 175 175

Los Angeles A, City of Amigo Ave Calhoun Ave LA0G1308 LA11G3 19-00 (LA11G3) VENTURA BL - AMIGO AVE TO CALHOUN AVE

(VISION ZERO) STM/STP. Replace existing high volt lighting

system w/ low volt. Incl removal of exstg equipment &

installation of conduit, wires, pullboxes, luminaires; upgrade of

exstg low volt lums & conversion of other lgts on side sts on

same high volt ckt. Safety proj. Uses $109K of Toll Credit for

construction phase.

STPL - STP Local 6/30/2020 950 950

Los Angeles A, City of Curson Ave Wilton Pl LA0G1309 LA11G3 19-00 (LA11G3) WILSHIRE BL - CURSON AV TO WILTON PL(VISION

ZERO) STM/STP. Replace existing high voltage lighting system

w/ low voltage. Incl removal of exstg equipment and

installation of conduit, wires, pullboxes, and luminaires;

upgrade of exstg low volt lums & conversion of other lgts on

side sts on same high volt ckt. Will use Toll Credits to match

STPL.

STPL - STP Local 12/20/2020 2550 2550

TOTAL PC20

TOTAL PC25

TOTAL PC40

TOTAL PROPA

Wil Ridder, (213) 922-2887, [email protected] Page 2 of 3 Printed: 1/25/2018 at 10:18 AM

#19-00 LA LA11G3 Safety and Operating Improvements

Page 28: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G3 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

LA11G3- Group projects for safety and operating improvements on the local highway system throughout the County. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories. Railroad/highway crossing, safer Federal-aid system roads, shoulder improvements, projects that correct, improve, or

eliminate a hazardous location or feature, traffic control devices and operating assistance, signalization projects (individual intersections), pavement marking demonstration projects, truck climbing lanes outside the urbanized area, lighting improvements, emergency truck pullovers, widening narrow pavements(no lane

additions), warning devices, intersection channelization and or improvements(no through lane additions)throughout the County. There are projects in the group project listing that contain projects with toll credits.

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of January 25,2018

Los Angeles A, City of 42nd Pl 57th St LA0G1151 LA11G3 19-00 (LA11G3) Main St. Ltg Imp Unit 2 - Replace exstg high volt ltg

sys w/ low volt. Work incl: remove exstg poles; installation of

new ltg poles, conduit, wires, fndtns, pullboxes, luminiares;

upgrade exstg low volt lums or convert lgts on side sts on the

same high volt ckt or at intersection. Safety Project. Use Toll

Credit of $228 for con phase. Toll Credits - Local and State

Hwy of $228 will be used to match FY17 federal funds for the

CON phase

STPL - STP Local 3/1/2022 2900 2900

Los Angeles A, City of 275' N/O Gen. Thaddeus Ksciuszko Way4th St. LA0G1155 LA11G3 19-00 (LA11G3) Lower Grand Ave Tunnel LED Lighting Retrofit -

Replacement of tunnel lights and lighting control system.

Work includes installation of conduit, wires, mounting

hardware and LED fixtures. Safety Project. Will use Toll

Credits to match STPL.

STPL - STP Local 6/1/2020 3163 3163

Los Angeles A, City of Citywide Citywide LA0G1156 LA11G3 19-00 (LA11G3) Intersection Improvement Unit 16 - Upgrade or

replace exstg or install new st ltg equipment at intersections

throughout Los Angeles. High voltage series circuits and lights

wil be converted to low voltage. Work incl installation of new

poles, foundations, conduit, wires, pullboxes and luminaires.

Safety Project. Will use Toll Credits to match STPL.

STPL - STP Local 1/31/2022 456 456

Los Angeles A, City of Clybourn Ave. area Lankershim Blvd. area LA0G1152 LA11G3 19-00 (LA11G3) Riverside Dr. Lighting Improvement Unit 1 - Replace

exstg high voltage ltg sys w/ low volt. Work incl removal of

exstg poles; installation of new ltg poles, conduit, wires,

fndtns, pullboxes, lums; possible upgrade of exstg low volt

lums, and conversion of other lgts on side sts on same high

volt ckt, if any. Safety Project. Uses Toll Credit of $137 for

construction phase.. Toll Credits - Local and State Hwyof $172

will be used to match FY17 federal funds for the CON phase

STPL - STP Local 6/30/2020 1500 1500

Los Angeles A, City of Flower St. Lake St. LA0G1154 LA11G3 19-00 (LA11G3) Olympic Bl - Flower St to Lake St - Replace exstg high

voltage ltg sys w/ low voltage. Incl removal of exstg equipment

and installation of conduit, wires, foundations, pullboxes,

luminiares; upgrade of exstg low volt lums and conversion of

lgts on the same high volt ckt on connecting sts, if any. Safety

Project. Will use Toll Credits to match STPL.

STPL - STP Local 6/30/2021 1414 1414

Los Angeles A, City of 36th St. 43rd St. LA0G1150 LA11G3 19-00 (LA11G3) Main St. Ltg Imprvmnt Unit 1 - Main St. from 60' N/O

36th St. to 43rd St, incl Main/36th Pl (both)/Broadway Pl

intersection. Repl high volt ltg sys with low volt - remove

poles; install new ltg poles/conduit/wires/fndtns/pbs/lums;

change lums to LED, & convert other lgts on side sts connected

to same series ckt, if any. Sfty Proj. Will use Toll Credits to

match STPL.

STPL - STP Local 9/30/2020 1478 1478

Los Angeles A, City of Lankershim Bl Camarillo Bl LA0G1153 LA11G3 19-00 (LA11G3) Riverside Dr. Lighting Improvement Unit 2. Replace

poles, conduit, wires, foundations, pullboxes, luminiares;

upgrade luminaires and/or convert lgts on side sts connected

to same high voltage circuit or at intersection, if any. See

Comments for project boundaries. Safety Project. Toll Credit

will be used to match STPL.

STPL - STP Local 9/30/2021 1200 1200

Los Angeles County MTA NA N/A LAG3001 LA11G3 19-00 Regionwide safety and operational improvements. STPL - STP Local 12/30/2020 6000 4000 4000 8000

Whittier, City of Dorland Street Pleasant Way LA0G357 LA11G3 19-00 Widening and realignment of Norwalk Boulevard at Whittier

Boulevard (SR 72) to create a southbound auxiliary travel lane

and dedicated right turn only lanes.

STPL - STP Local 9/30/2022 415 415

7753 17103 7771 24874

Prior FY2019 FY2020 FY2021 FY2022 FY2023 FY2024TOTAL (2019-2024)

71257 57918 27846 85764GRAND TOTAL

TOTAL STPL

Wil Ridder, (213) 922-2887, [email protected] Page 3 of 3 Printed: 1/25/2018 at 10:18 AM

#19-00 LA LA11G3 Safety and Operating Improvements

Page 29: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G4 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

La Verne, City of LSSTPL008 LA11G4 19-00 Route 30: Construction of medians and installation of

irrigation and landscaping along Baseline Road in the City of La

Verne

CITY 6/30/2019 300 300

Los Angeles County MTA N/A N/A LAG4001 LA11G4 19-00 Regionwide preservation, planting, landscaping and

beautification enhancements.

CITY 12/30/2023 4,000 260 260 2,000 2,000 4,520

4,000 560 260 2,000 2,000 4,820

Los Angeles County Wilmington Fishburn LAE1903 LA11G4 19-00 RANDOLPH STREET IMPROVEMENTS BETWEEN WILMINGTON

AVENUE AND FISHBURN. Involves reconstruction and

resurfacing of existing pavement, landscaping, reconstruction

of curb ramps, curb and gutter, provision of sidewalks,

planting and removal of trees, manhole reconstruction, and

removal of abandoned railroad tracks at some locations(no

additional through travel lanes)CALIFORNIA'S EARMARK

REPURPOSING EFFORT 2016-DEMO ID: CA508

COUNTY 8/17/2020 10 10

10 10

Los Angeles County Wilmington Fishburn LAE1903 LA11G4 19-00 RANDOLPH STREET IMPROVEMENTS BETWEEN WILMINGTON

AVENUE AND FISHBURN. Involves reconstruction and

resurfacing of existing pavement, landscaping, reconstruction

of curb ramps, curb and gutter, provision of sidewalks,

planting and removal of trees, manhole reconstruction, and

removal of abandoned railroad tracks at some locations(no

additional through travel lanes)CALIFORNIA'S EARMARK

REPURPOSING EFFORT 2016-DEMO ID: CA508

DEMOSTL 8/17/2020 960 960

960 960

Los Angeles County MTA N/A N/A LAG4001 LA11G4 19-00 Regionwide preservation, planting, landscaping and

beautification enhancements.

Measure R 12/30/2023 5,000 5,000 10,000

5,000 5,000 10,000

Los Angeles County MTA N/A N/A LAG4001 LA11G4 19-00 Regionwide preservation, planting, landscaping and

beautification enhancements.

MR15 12/30/2023 4,000 2,000 2,000 4,000

4,000 2,000 2,000 4,000

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of January 25, 2018

LA11G4- Group Projects for planting, landscaping, transportation system betterments, beautification and scenic easements throughout the County (no lane additions). Projects are consistent with 40CFR part 93.126, 127, 128, exempt tables 2 & 3 categories. Non Reportable TCM.

TOTAL CITY

TOTAL COUNTY

TOTAL DEMOSTL

TOTAL MEASURE R

TOTAL MR15

Wil Ridder, (213) 922-2887, [email protected] Page 1 of 2 Printed: 1/25/18 at 10:11 AM

#19-00 LA LA11G4 Landscaping

Page 30: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G4 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of January 25, 2018

LA11G4- Group Projects for planting, landscaping, transportation system betterments, beautification and scenic easements throughout the County (no lane additions). Projects are consistent with 40CFR part 93.126, 127, 128, exempt tables 2 & 3 categories. Non Reportable TCM.

Los Angeles County MTA N/A N/A LAG4001 LA11G4 19-00 Regionwide preservation, planting, landscaping and

beautification enhancements.

PC20 12/30/2023 4,000 2,000 2,000 4,000 8,000

4,000 2,000 2,000 4,000 8,000

Los Angeles County MTA N/A N/A LAG4001 LA11G4 19-00 Regionwide preservation, planting, landscaping and

beautification enhancements.

PC40 12/30/2023 4,000 2,000 2,000 5,000 9,000

4,000 2,000 2,000 5,000 9,000

Los Angeles County MTA N/A N/A LAG4001 LA11G4 19-00 Regionwide preservation, planting, landscaping and

beautification enhancements.

PROPA 12/30/2023 4,000 2,000 2,000 4,000

4,000 2,000 2,000 4,000

Glendale, City of Glendale Ave Pacific Ave, LA0G1358 LA11G4 19-00 SR -134 Freeway Cap Preliminary Engineering: The purpose of

this project is to perform preliminary Eng. for a “freeway cap”

over the 134 Freeway through downtown Glendale between

Glendale and Pacific Ave. Utilizing Toll Credits.

STPL - STP Local 12/1/2019 500 500

La Verne, City of LSSTPL008 LA11G4 19-00 Route 30: Construction of medians and installation of

irrigation and landscaping along Baseline Road in the City of La

Verne

STPL - STP Local 6/30/2019 250 250

Los Angeles County Wilmington Fishburn LAE1903 LA11G4 19-00 RANDOLPH STREET IMPROVEMENTS BETWEEN WILMINGTON

AVENUE AND FISHBURN. Involves reconstruction and

resurfacing of existing pavement, landscaping, reconstruction

of curb ramps, curb and gutter, provision of sidewalks,

planting and removal of trees, manhole reconstruction, and

removal of abandoned railroad tracks at some locations(no

additional through travel lanes)CALIFORNIA'S EARMARK

REPURPOSING EFFORT 2016-DEMO ID: CA508

STPL - STP Local 8/17/2020 1,300

Los Angeles County MTA N/A N/A LAG4001 LA11G4 19-00 Regionwide preservation, planting, landscaping and

beautification enhancements.

STPL - STP Local 12/30/2023 10,500 2,000 2,000 2,000 2,000 8,000

11,800 2,250 2,500 2,000 2,000 8,750

PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

31,800 16,780 15,760 13,000 4,000 49,540GRAND TOTAL

TOTAL PC20

TOTAL PC40

TOTAL PROPA

TOTAL STPL

Wil Ridder, (213) 922-2887, [email protected] Page 2 of 2 Printed: 1/25/18 at 10:11 AM

#19-00 LA LA11G4 Landscaping

Page 31: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G5 Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

Los Angeles County MTA N/A N/A LAG5001 LA11G5 19-00 Countywide directional and informational systems. CITY 12/30/2040 8,000 4,000 4,000 7,000 15,000

Palmdale, City of 3rd Street East 8th Street East LAE2246 LA11G5 19-00 RANCHO VISTA BLVD - WIDEN INTERSECTION AT 3RD ST EAST

AND INTERSECTION AT 8TH ST. EAST/LOCKHEED WAY - 6

LANES; MODIFY TRAFFIC SIGNALS, DRAINAGE, SIDEWALKS,

MEDIANS, UTILITY RELOCATIONS. No through lane additions.

CALIFORNIA'S EARMARK REPURPOSING EFFORT 2016-DEMO

ID: CA551

CITY 12/31/2021 1,500 6,500 6,500

9,500 4,000 10,500 7,000 21,500

Los Angeles County MTA N/A N/A LAG5001 LA11G5 19-00 Countywide directional and informational systems. MR15 12/30/2040 7,000 3,500 3,500 7,000

7,000 3,500 3,500 7,000

Los Angeles County MTA N/A N/A LAG5001 LA11G5 19-00 Countywide directional and informational systems. Measure R 12/30/2040 5,000 5,000 10,000

5,000 5,000 10,000

Los Angeles County MTA N/A N/A LAG5001 LA11G5 19-00 Countywide directional and informational systems. PC20 12/30/2040 7,000 3,500 3,500 2,000 9,000

7,000 3,500 3,500 2,000 9,000

Los Angeles County MTA N/A N/A LAG5001 LA11G5 19-00 Countywide directional and informational systems. PC40 12/30/2040 7,000 3,500 3,500 5,000 5,000 17,000

7,000 3,500 3,500 5,000 5,000 17,000

Los Angeles County MTA N/A N/A LAG5001 LA11G5 19-00 Countywide directional and informational systems. PROPA 12/30/2040 7,000 3,500 3,500 7,000

7,000 3,500 3,500 7,000

Azusa, City of Foothill Boulevard Palm Drive LA0G1020 LA11G5 19-00 Construct a new traffic signal at the intersection of Foothill

Boulevard and Palm Drive. Using Toll Credits.

STPL - STP Local 9/30/2022 320 320

Los Angeles County MTA N/A N/A LAG5001 LA11G5 19-00 Countywide directional and informational systems. STPL - STP Local 12/30/2040 6,000 3,000 3,000 5,000 5,000 16,000

Palmdale, City of 3rd Street East 8th Street East LAE2246 LA11G5 19-00 RANCHO VISTA BLVD - WIDEN INTERSECTION AT 3RD ST EAST

AND INTERSECTION AT 8TH ST. EAST/LOCKHEED WAY - 6

LANES; MODIFY TRAFFIC SIGNALS, DRAINAGE, SIDEWALKS,

MEDIANS, UTILITY RELOCATIONS. No through lane additions.

CALIFORNIA'S EARMARK REPURPOSING EFFORT 2016-DEMO

ID: CA551

STPL - STP Local 12/31/2021 1,500

7,500 3,000 3,320 5,000 5,000 16,320

PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

45,000 26,000 32,820 19,000 10,000 87,820

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of January 25, 2018

LA11G5- Group projects for directional and informational signage on local roads throughout the County. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories. Directional and informarmational signs, sign removals, and/or systems to improve or upgrade signage mechanisms.

TOTAL STPL

GRAND TOTAL

TOTAL CITY

TOTAL MR15

TOTAL MEASURE R

TOTAL PC20

TOTAL PC40

TOTAL PROPA

Wil Ridder, (213) 922-2887, [email protected] Page 1 of 1 Printed: 1/25/2018 at 10:28 AM

#19-00 LA LA11G5 Signage

Page 32: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

LA11G5N Backup Listing

IMPLEMENTING AGENCY FROM TO PROJECT ID GROUP ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

Los Angeles County MTA various various LSTMP230 LA11G5N 19-00 Regionwide directional and informational system - Non

reportable TCM

CITY 12/31/2040 1,000 500 500 1,000

Santa Monica, City of NA NA LAF3704 LA11G5N 19-00 Santa Monica Multi-Modal Travel & Parking System. Create a

multi-modal parking reservation system that includes trip

planning tools, real-time traveler information systems,

dynamic signage, and static signage within the City of Santa

Monica.

CITY 12/31/2018 443

1,443 500 500 1,000

Santa Monica, City of NA NA LAF3704 LA11G5N 19-00 Santa Monica Multi-Modal Travel & Parking System. Create a

multi-modal parking reservation system that includes trip

planning tools, real-time traveler information systems,

dynamic signage, and static signage within the City of Santa

Monica.

LTF 12/31/2018 665

665

Los Angeles County MTA various various LSTMP230 LA11G5N 19-00 Regionwide directional and informational system - Non

reportable TCM

MR15 - Measure R 15% Local

Return

12/31/2040 1,000 500 500 1,000

1,000 500 500 1,000

Los Angeles County MTA various various LSTMP230 LA11G5N 19-00 Regionwide directional and informational system - Non

reportable TCM

PC40 12/31/2040 1,000 500 500 1,000

1,000 500 500 1,000

Los Angeles County MTA various various LSTMP230 LA11G5N 19-00 Regionwide directional and informational system - Non

reportable TCM

PROPA 12/31/2040 1,000 1,000 1,000

1,000 1,000 1,000

Los Angeles County MTA various various LSTMP230 LA11G5N 19-00 Regionwide directional and informational system - Non

reportable TCM

STPL 12/31/2040 1,000 500 500 1,000

1,000 500 500 1,000

PRIOR FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 TOTAL

(2019-

2024)

6,108 2,000 3,000 5,000

LA11G5N- Group projects for directional and informational signage on local roads throughout the County. Projects are consistent with 40CFR part 93.126,127,128, exempt tables 2 & 3 categories. Directional and informarmational signs, sign removals, and/or systems to improve or upgrade signage mechanisms, Non reportable TCMs,

project split from LA11G5.

Los Angeles County Metropolitan Transportation Authority (LACMTA) Transportation Improvement Program (TIP) Group Project Listing as of January 25, 2018

TOTAL STPL

GRAND TOTAL

TOTAL CITY

TOTAL LTF

TOTAL MR15

TOTAL PC40

TOTAL PROPA

Wil Ridder, (213) 922-2887, [email protected] Page 1 of 1 Printed: 1/25/2018 at 10:48 AM

#19-00 LA LA11G5N Signage, Non-reportable TCMs

Page 33: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

Note id: 24

1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most currentlistings:

http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html

2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of thefederal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies for funding.

3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details seeChapter 3 of the Local Assistance Procedures Manual.

4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans.

5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed byCaltrans.

6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is theresponsibility of the MPOs and their local agencies.

7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP forbridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STPfunds with Regional STP funds.

8) Corrections to this report should be addressed to the District Local Assistance Engineer:

http://www.dot.ca.gov/hq/LocalPrograms/dlae.htm

Notes:

10/26/2017, 1:40 PM

Caltrans, Division of Local Assistance Page 110/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 34: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Agoura Hills BRIDGE NO. 53C0290, ROADSIDE DRIVE OVER MEDEA CREEK, 0.3 MI E KANAN RD. Bridge rehabilitation. Widen existing 2-lane bridgeto a 2-lane bridge with shoulders, shoulders and one sidewalk, no added lane capacity. 10/6/2010: Toll Credits programmed for PE & CON.9/7/2012: Toll credits used for R/W.

Fund Source Summary:

PER/W

Total 462,500

CON

Total

2,840,400

462,500

160,000 160,000

160,000 3,462,900

462,500

2,840,4002,840,400

Phase Summary:

Fed $

Local AC

Local Match

Total 462,500

LSSRP Bond

Total160,000 3,462,900

160,000 3,462,900

462,500 2,840,400

2,840,400

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3704

5435(017)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 462,500

LSSRP Bond

Total462,500

462,500

462,500

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total160,000 160,000

160,000 160,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,840,400

2,840,400

2,840,400

2,840,400

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 210/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 35: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Bell BRIDGE NO. 53C0159, GAGE AVE, OVER LOS ANGELES RIVER, 500 W/O LONG BEACH FWY. Rehabilitate bridge. Widen existing 4 lanebridge to include standard lane width, shoulder and sidewalk. (No added capacity)

Fund Source Summary:

PER/W

Total

CON

Total

16,318,000

582,800 2,331,200 2,914,000

250,000 250,000

582,800 2,581,200 19,482,00016,318,00016,318,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total515,953 2,285,136 17,247,415

66,847 296,064 2,234,585

582,800 2,581,200 19,482,000

14,446,325

1,871,675

16,318,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4314

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total515,953 2,063,811 2,579,764

66,847 267,389 334,236

582,800 2,331,200 2,914,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total221,325 221,325

28,675 28,675

250,000 250,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total14,446,325

1,871,675

16,318,000

14,446,325

1,871,675

16,318,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 310/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 36: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Bell BRIDGE NO. 53C0445, SLAUSON AVE, OVER LOS ANGELES RIVER, 3/4 MI E ATLANTIC BLVD. Replace existing 4 lane bridge with 4 lanebridge. No added capacity. Scope is not clear.

Fund Source Summary:

PER/W

Total

CON

Total

14,973,546

535,000 2,138,847 2,673,847

100,000 100,000

535,000 2,238,847 17,747,39314,973,54614,973,546

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total473,636 1,982,051 15,711,767

61,365 256,796 2,035,626

535,000 2,238,847 17,747,393

13,256,080

1,717,466

14,973,546

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4315

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total473,636 1,893,521 2,367,157

61,365 245,326 306,690

535,000 2,138,847 2,673,847

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 88,530

11,470 11,470

100,000 100,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total13,256,080

1,717,466

14,973,546

13,256,080

1,717,466

14,973,546

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 410/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 37: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Burbank BRIDGE NO. 53C1902, 53-1087, OLIVE AVE, OVER FRONT ST, SPTCO, FLOWER, AT INTERSTATE 5. Bridge widening, to accommodateshoulders, and rehabilitation. No added lane capacity.

Fund Source Summary:

PER/W

Total 1,500,000

CON

Total

15,954,000

1,500,000 3,000,000

2,000,000 2,000,000

3,500,000 20,954,000

1,500,000

15,954,00015,954,000

Phase Summary:

Fed $

Local AC

Local Match

Total

172,050

1,500,000

LSSRP Bond

Total3,098,550 18,550,576

401,450 2,403,424

3,500,000 20,954,000

1,327,950 14,124,076

1,829,924

15,954,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3777

5200(040)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

172,050

1,500,000

LSSRP Bond

Total1,327,950 2,655,900

172,050 344,100

1,500,000 3,000,000

1,327,950

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,770,600 1,770,600

229,400 229,400

2,000,000 2,000,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total14,124,076

1,829,924

15,954,000

14,124,076

1,829,924

15,954,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 510/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 38: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Burbank BRIDGE NO. 53C1903, 53-1088, MAGNOLIA BL OVER FRONTAGE RD & SPTCO, AT INTERSTATE 5. Bridge rehabilitation and widening.No added lanes.

Fund Source Summary:

PER/W

Total 1,500,000

CON

Total

10,764,000

1,000,000 2,500,000

1,500,000 1,500,000

2,500,000 14,764,000

1,500,000

10,764,00010,764,000

Phase Summary:

Fed $

Local AC

Local Match

Total

172,050

1,500,000

LSSRP Bond

Total2,213,250 13,070,569

286,750 1,693,431

2,500,000 14,764,000

1,327,950 9,529,369

1,234,631

10,764,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Change!3814

5200(041)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

172,050

1,500,000

LSSRP Bond

Total885,300 2,213,250

114,700 286,750

1,000,000 2,500,000

1,327,950

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,327,950 1,327,950

172,050 172,050

1,500,000 1,500,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total9,529,369

1,234,631

10,764,000

9,529,369

1,234,631

10,764,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 610/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 39: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Culver City BRIDGE NO. PM00167, Bridge Preventive Maintenance Program (BPMP) various bridges in Culver City. See Caltrans Local Assistance HBPwebsite for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

1,461,600

261,000 261,000

261,000 1,722,6001,461,6001,461,600

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total231,063 1,525,018

29,937 197,582

261,000 1,722,600

1,293,954

167,646

1,461,600

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4549

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total231,063 231,063

29,937 29,937

261,000 261,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,293,954

167,646

1,461,600

1,293,954

167,646

1,461,600

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 710/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 40: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Downey BRIDGE NO. 53C0080, FLORENCE AVE OVER SAN GABRIEL RIVER, 0.2 MI W SAN GAB RIV FWY. Project Studies Only. Project studiesto scope the HBP project correctly.

Fund Source Summary:

PER/W

Total 100,000CON

Total

200,000 300,000

200,000 300,000

100,000

Phase Summary:

Fed $

Local AC

Local Match

Total

11,470

100,000

LSSRP Bond

Total177,060 265,590

22,940 34,410

200,000 300,000

88,530

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4096

5334(045)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

11,470

100,000

LSSRP Bond

Total177,060 265,590

22,940 34,410

200,000 300,000

88,530

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 810/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 41: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Downey BRIDGE NO. 53C0085, FLORENCE AVE OVER RIO HONDO, 1 MI W PARAMOUNT BLVD. Bridge Rehabilitation, no added capacity.

Fund Source Summary:

PER/W

Total 330,000

CON

Total

1,847,000

330,000

2,177,000

330,000

1,847,0001,847,000

Phase Summary:

Fed $

Local AC

Local Match

Total

37,851

330,000

LSSRP Bond

Total1,927,298

249,702

2,177,000

292,149 1,635,149

211,851

1,847,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3951

5334(044)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

37,851

330,000

LSSRP Bond

Total292,149

37,851

330,000

292,149

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,635,149

211,851

1,847,000

1,635,149

211,851

1,847,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 910/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 42: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Glendora BRIDGE NO. 53C0780, LONE HILL AVE OVER SAN DIMAS WASH, 0.1 MI N FOOTHILL FWY. Bridge rehabilitation. Widen bridge to addshoulders and sidewalks. No added capacity.

Fund Source Summary:

PER/W

Total 300,000

CON

Total

1,204,000

300,000

200,000 200,000

200,000 1,704,000

300,000

1,204,0001,204,000

Phase Summary:

Fed $

Local AC

Local Match

Total

34,410

300,000

LSSRP Bond

Total177,060 1,508,551

22,940 195,449

200,000 1,704,000

265,590 1,065,901

138,099

1,204,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4026

5204(018)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

34,410

300,000

LSSRP Bond

Total265,590

34,410

300,000

265,590

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total177,060 177,060

22,940 22,940

200,000 200,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,065,901

138,099

1,204,000

1,065,901

138,099

1,204,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 1010/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 43: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Industry BRIDGE NO. 53C0289, AZUSA AVE OVER VALLEY BL/ARENTH AV/SPRR, 1 MI N POMONA FWY. Bridge Painting

Fund Source Summary:

PER/W

Total 327,000

CON

Total

9,826,530

327,000

10,153,530

327,000

9,826,5309,826,530

Phase Summary:

Fed $

Local AC

Local Match

Total

37,507

327,000

LSSRP Bond

Total8,988,920

-0 1,164,610

10,153,530

289,493 8,699,427

1,127,103

9,826,530

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4050

5342(004)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

37,507

327,000

LSSRP Bond

Total289,493

37,507

327,000

289,493

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total8,699,427

-0 1,127,103

9,826,530

8,699,427

1,127,103

9,826,530

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 1110/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 44: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Industry BRIDGE NO. 53C1020, NELSON AVE OVER PUENTE CREEK, 0.5 MI S/O SUNSET AVE. Bridge replacement . Widen existing bridge tocurrent standards (no added capacity).

Fund Source Summary:

PER/W

Total

CON

Total

2,017,400

360,250 360,250

50,000 50,000

360,250 50,000 2,427,6502,017,4002,017,400

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total318,929 44,265 2,149,199

41,321 5,735 278,451

360,250 50,000 2,427,650

1,786,004

231,396

2,017,400

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Change!4261

5342(006)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total318,929 318,929

41,321 41,321

360,250 360,250

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265 44,265

5,735 5,735

50,000 50,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,786,004

231,396

2,017,400

1,786,004

231,396

2,017,400

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 1210/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 45: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Irwindale BRIDGE NO. 53C0072, ARROW HWY OVER SAN GABRIEL RIVER, 0.5 MI E SAN GAB RIV FWY. Bridge Rehabilitation, widen toaccomodate standard lanes, shoulders and sidewalks. No added capacity.

Fund Source Summary:

PER/W

Total 900,000

CON

Total

4,897,760

900,000

500,000 500,000

500,000 6,297,760

900,000

4,897,7604,897,760

Phase Summary:

Fed $

Local AC

Local Match

Total

103,230

900,000

LSSRP Bond

Total442,650 5,575,407

57,350 722,353

500,000 6,297,760

796,770 4,335,987

561,773

4,897,760

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3904

5345(006)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

103,230

900,000

LSSRP Bond

Total796,770

103,230

900,000

796,770

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total442,650 442,650

57,350 57,350

500,000 500,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,335,987

561,773

4,897,760

4,335,987

561,773

4,897,760

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 1310/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 46: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Irwindale BRIDGE NO. 53C0375, FOOTHILL BLVD OVER SAN GABRIEL RIVER, 1/2 MI W IRWINDALE AVE. Bridge Rehabilitation. Widen bridge toaccommodate shoulders and sidewalks. No added capacity.

Fund Source Summary:

PER/W

Total 2,000,000

CON

Total

14,500,000

2,000,000

16,500,000

2,000,000

14,500,00014,500,000

Phase Summary:

Fed $

Local AC

Local Match

Total

229,400

2,000,000

LSSRP Bond

Total14,607,450

1,892,550

16,500,000

1,770,600 12,836,850

1,663,150

14,500,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3920

5345(007)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

229,400

2,000,000

LSSRP Bond

Total1,770,600

229,400

2,000,000

1,770,600

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total12,836,850

1,663,150

14,500,000

12,836,850

1,663,150

14,500,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 1410/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 47: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Irwindale BRIDGE NO. PM00089, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Irwindale. See Caltrans Local AssistanceHBP website for backup list of projects.

Fund Source Summary:

PER/W

Total 85,500

CON

Total

356,300 356,300

32,079 117,579

32,079 356,300 473,879

85,500

Phase Summary:

Fed $

Local AC

Local Match

Total

9,807

85,500

LSSRP Bond

Total28,400 315,432 419,525

3,679 40,868 54,354

32,079 356,300 473,879

75,693

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4037

5345(009)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

9,807

85,500

LSSRP Bond

Total28,400 104,093

3,679 13,486

32,079 117,579

75,693

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total315,432 315,432

40,868 40,868

356,300 356,300

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 1510/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 48: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Long Beach BRIDGE NO. 53C0024, RAVENNA DR OVER RIVO ALTO CANAL, 0.1MI S/O 2ND STREET. Bridge Replacement. Replace 2 lane bridge with 2 lane bridge. 8/13/2016: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total

CON

Total

3,640,000

620,000 620,000

160,000

620,000 4,420,0003,640,000

160,000

3,800,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total620,000 4,420,000

620,000 4,420,000

3,800,000

3,800,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4389

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total620,000 620,000

620,000 620,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total160,000

160,000

160,000

160,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,640,000

3,640,000

3,640,000

3,640,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 1610/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 49: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Long Beach BRIDGE NO. 53C0209, 2ND ST OVER MARINE STADIUM & APPIAN, 0.3 MI W/O PACFC CST HWY. Bridge Rehabilitation. Rehabilitation,replace concrete deck and barrier rail. (No added capacity)

Fund Source Summary:

PER/W

Total

CON

Total

8,573,040

250,000 1,530,900 1,780,900

250,000 1,530,900 10,353,9408,573,0408,573,040

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total221,325 1,355,306 9,166,343

28,675 175,594 1,187,597

250,000 1,530,900 10,353,940

7,589,712

983,328

8,573,040

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4402

5108(177)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total221,325 1,355,306 1,576,631

28,675 175,594 204,269

250,000 1,530,900 1,780,900

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total7,589,712

983,328

8,573,040

7,589,712

983,328

8,573,040

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 1710/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 50: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Long Beach BRIDGE NO. 53C0218, CLARK AVE, OVER LOS CERRITOS DRAIN CHAN, 100 S/O SPRING STREET. Rehabilitate bridge. Widen existing 6lane bridge to 6 lane bridge with standard lanes and shoulders and sidewalks. (No added capacity).

Fund Source Summary:

PER/W

Total

CON

Total

1,148,000

205,000 205,000

50,000

205,000 1,403,0001,148,000

50,000

1,198,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total181,487 1,242,076

23,514 160,924

205,000 1,403,000

1,060,589

137,411

1,198,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4477

5108(173)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total181,487 181,487

23,514 23,514

205,000 205,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265

5,735

50,000

44,265

5,735

50,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,016,324

131,676

1,148,000

1,016,324

131,676

1,148,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 1810/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 51: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Long Beach BRIDGE NO. 53C0729, WARDLOW RD OVER PALO VERDE DRAIN, 50 W/O LOS COYOTES DIAG. Bridge Rehabilitation. Widen 5 lanebridge to provide standard lanes, shoulders and sidewalks. No added capacity.

Fund Source Summary:

PER/W

Total

CON

Total

1,526,000

272,500 272,500

100,000

272,500 1,898,5001,526,000

100,000

1,626,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total241,244 1,680,742

31,256 217,758

272,500 1,898,500

1,439,498

186,502

1,626,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4468

5108(174)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total241,244 241,244

31,256 31,256

272,500 272,500

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530

11,470

100,000

88,530

11,470

100,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,350,968

175,032

1,526,000

1,350,968

175,032

1,526,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 1910/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 52: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Long Beach BRIDGE NO. PM00152, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Long Beach. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

129,300

43,100 43,100

43,100 172,400129,300129,300

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total38,156 152,626

4,944 19,774

43,100 172,400

114,469

14,831

129,300

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4452

5108(171)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total38,156 38,156

4,944 4,944

43,100 43,100

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total114,469

14,831

129,300

114,469

14,831

129,300

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 2010/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 53: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles BRIDGE NO. 53C0011, SOTO STREET, OVER VALLEY BLVD/SPTCO, 0.6 MI NORTH OF I-10. Rehabilitate 4-lane bridge & widen to includeshoulders, add sidewalk, and upgrade bridge railings. No added lane capacity.

Fund Source Summary:

PER/W

Total

2,888,000

4,461,900

CON

Total

12,213,990 2,718,090 14,932,080

1,573,900

2,888,000

12,213,990 2,718,090 19,393,980

1,573,900

Phase Summary:

Fed $

Local AC

Local Match

Total

892,380

4,461,900

LSSRP Bond

Total16,788,890

1,400,945 311,765 2,605,090

10,813,045 2,406,32512,213,990 2,718,090 19,393,980

3,569,520 13,219,370

-13,219,370

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

1400

5006(193)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

314,780

1,573,900

LSSRP Bond

Total1,259,120

314,780

1,573,900

1,259,120

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

577,600

2,888,000

LSSRP Bond

Total2,310,400

577,600

2,888,000

2,310,400

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total13,219,370

1,400,945 311,765 1,712,710

10,813,045 2,406,325

12,213,990 2,718,090 14,932,080

13,219,370

-13,219,370

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 2110/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 54: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles BRIDGE NO. 53C0045, BEVERLY-FIRST ST, OVER BEVERLY/GLENDALE SEP, 0.5 MI S/O US 101. Rehabilitate 4-lane bridge & widen toinclude shoulders, sidewalks, upgrade bridge railings, Seismic Retrofit. No added lane capacity.

Fund Source Summary:

PER/W

Total

360,000

11,751,530

CON

Total

9,451,780 4,000,657 13,452,437

1,939,750

350,000 710,000

4,000,657 350,000 16,102,187

1,939,750

Phase Summary:

Fed $

Local AC

Local Match

Total8,367,661

1,513,361

11,751,530

LSSRP Bond

Total

848,780 848,780

11,909,443 309,855 14,089,806

-389,905 40,145 1,163,602

-8,367,6614,000,657 350,000 16,102,187

1,870,508

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

1387

5006(170)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

387,950

1,939,750

LSSRP Bond

Total1,551,800

387,950

1,939,750

1,551,800

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

41,292

360,000

LSSRP Bond

Total309,855 628,563

40,145 81,437

350,000 710,000

318,708

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

8,367,661

1,084,119

9,451,780

LSSRP Bond

Total

848,780 848,780

11,909,443 11,909,443

-389,905 694,215

-8,367,661

4,000,657 13,452,437

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 2210/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 55: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles BRIDGE NO. 53C1882, HYPERION AVE, OVER RIVERSIDE DRIVE, OVER RIVERSIDE DR. LSSRP Seismic Retrofit, Preliminary Engineeringonly, Construction to be done under 53C1881 Glendale - Hyperion complex of bridges

Fund Source Summary:

PER/W

Total 1,052,500CON

Total

1,052,500

1,052,500

1,052,500

Phase Summary:

Fed $

Local AC

Local Match

Total

210,500

1,052,500

LSSRP Bond

Total842,000

210,500

1,052,500

842,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3124

5006(337)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

210,500

1,052,500

LSSRP Bond

Total842,000

210,500

1,052,500

842,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

TotalPrior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 2310/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 56: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles BRIDGE NO. 53C1930, STATE STREET, OVER METROLINK & BUSWAY, BTW MCALLISTER/POMEROY AV. Rehabilitate 4-lane bridge &widen to include shoulders, sidewalk, upgrade bridge railings. No added lane capacity.

Fund Source Summary:

PER/W

Total

3,000,000

4,733,160

CON

Total

11,996,976

485,000 2,218,160

1,500,000 4,500,000

485,000 1,500,000 18,715,136

1,733,160

11,996,97611,996,976

Phase Summary:

Fed $

Local AC

Local Match

Total

690,732

4,733,160

LSSRP Bond

Total388,000 1,327,950 16,379,301

97,000 172,050 2,335,835

485,000 1,500,000 18,715,136

4,042,428 10,620,923

1,376,053

11,996,976

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

1455

5006(284)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

346,632

1,733,160

LSSRP Bond

Total388,000 1,774,528

97,000 443,632

485,000 2,218,160

1,386,528

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

344,100

3,000,000

LSSRP Bond

Total1,327,950 3,983,850

172,050 516,150

1,500,000 4,500,000

2,655,900

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total10,620,923

1,376,053

11,996,976

10,620,923

1,376,053

11,996,976

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 2410/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 57: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles BRIDGE NO. PM00123, Bridge Preventive Maintenance Program (BPMP), various bridges in the City of LosAngeles. See Caltrans Local Assistance HBP web site for backup list of bridges

Fund Source Summary:

PER/W

Total 200,000

CON

Total

3,960,737

1,320,245

5,280,982

200,000

3,960,737

1,120,245

5,080,982

Phase Summary:

Fed $

Local AC

Local Match

Total

22,940

200,000

LSSRP Bond

Total4,675,253

605,729

5,280,982

177,060 4,498,193

582,789

5,080,982

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4270

5006(838)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

22,940

200,000

LSSRP Bond

Total1,168,813

151,432

1,320,245

177,060 991,753

128,492

1,120,245

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,506,440

454,297

3,960,737

3,506,440

454,297

3,960,737

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 2510/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 58: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0084, SLAUSON AVE, OVER SAN GABRIEL R BOH(AT&SF), 1 MI E ROSECRANS BLVD. LSSRP Seismic Retrofit

Fund Source Summary:

PER/W

Total

CON

Total

1,680,000 1,680,0001,680,000 1,680,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

192,696 192,696

1,487,304 1,487,304

192,696 -192,696

1,487,304 -1,487,3041,680,000 1,680,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

2442

5953(402)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

TotalPrior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

192,696 192,696

1,487,304 1,487,304

192,696 -192,696

1,487,304 -1,487,304

1,680,000 1,680,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 2610/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 59: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0440, ARROW HIGHWAY OVER LITTLE DALTON WASH, 1/2 MI W AZUSA AVE. Bridge Rehabilitation. Widen 4 lane bridgeto provide standard shoulders and sidewalks. Not capacity increasing.

Fund Source Summary:

PER/W

Total

CON

Total

1,484,000

265,000 265,000

265,000 1,749,0001,484,0001,484,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total234,605 1,548,390

30,396 200,610

265,000 1,749,000

1,313,785

170,215

1,484,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4450

5953(745)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total234,605 234,605

30,396 30,396

265,000 265,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,313,785

170,215

1,484,000

1,313,785

170,215

1,484,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 2710/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 60: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0488, SOLEDAD CYN RD, OVER SANTA CLARA RIV BR, 0.3 MI E AGUA DULCE CY RD. Replace 2 lane bridge with 2lane bridge.

Fund Source Summary:

PER/W

Total 1,462,500

CON

Total

8,400,000 8,400,000

1,462,500

8,400,000 9,862,500

1,462,500

Phase Summary:

Fed $

Local AC

Local Match

Total

167,749

1,462,500

LSSRP Bond

Total7,436,520 8,731,271

963,480 1,131,229

8,400,000 9,862,500

1,294,751

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

489

5953(045)5953(602)

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

167,749

1,462,500

LSSRP Bond

Total1,294,751

167,749

1,462,500

1,294,751

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total7,436,520 7,436,520

963,480 963,480

8,400,000 8,400,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 2810/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 61: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0517, SAN FRCSQUTO CA RD, OVER SAN FRANCISQUITO CYN CRK, 9.7 MI N BOUQUET CYN RD. Replace 2 lanebridge with 2 lane bridge.

Fund Source Summary:

PER/W

Total 1,461,159

CON

Total

9,800,000

1,461,159

11,261,159

1,461,159

9,800,0009,800,000

Phase Summary:

Fed $

Local AC

Local Match

Total

167,595

1,461,159

LSSRP Bond

Total9,969,504

1,291,655

11,261,159

1,293,564 8,675,940

1,124,060

9,800,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3238

5953(507)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

167,595

1,461,159

LSSRP Bond

Total1,293,564

167,595

1,461,159

1,293,564

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total8,675,940

1,124,060

9,800,000

8,675,940

1,124,060

9,800,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 2910/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 62: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0518, SAN FRCSQUTO CA RD, OVER SAN FRANCISQUITO CYN CRK, 1/2MI S OF WAT&POWER PNS. Replace 2 lane FO bridge with new 2 lane bridge.

Fund Source Summary:

PER/W

Total 701,000

CON

Total

2,940,000

701,000

3,641,000

701,000

2,940,0002,940,000

Phase Summary:

Fed $

Local AC

Local Match

Total

80,405

701,000

LSSRP Bond

Total3,223,377

417,623

3,641,000

620,595 2,602,782

337,218

2,940,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3333

5953(579)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

80,405

701,000

LSSRP Bond

Total620,595

80,405

701,000

620,595

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,602,782

337,218

2,940,000

2,602,782

337,218

2,940,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 3010/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 63: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0519, SAN FRCSQUTO CA RD, OVER SAN FRANCISQUITO CYN CRK, 1MI S OF WAT&POW PENSTKS. Replace FO 2lane bridge with new 2 lane bridge.

Fund Source Summary:

PER/W

Total 692,000

CON

Total

2,940,000

692,000

3,632,000

692,000

2,940,0002,940,000

Phase Summary:

Fed $

Local AC

Local Match

Total

79,372

692,000

LSSRP Bond

Total3,215,410

416,590

3,632,000

612,628 2,602,782

337,218

2,940,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3271

5953(583)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

79,372

692,000

LSSRP Bond

Total612,628

79,372

692,000

612,628

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,602,782

337,218

2,940,000

2,602,782

337,218

2,940,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 3110/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 64: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0555, SOLEDAD CANYON RD, OVER SP/UP RR, 1/8 MI E AGUA DULCE CYN R. Replace existing 2 lane bridge with new2 lane bridge. MTA is funding additional bridge length if spanning more than one track.

Fund Source Summary:

PER/W

Total 430,000

CON

Total

2,800,000 2,800,000

430,000

2,800,000 3,230,000

430,000

Phase Summary:

Fed $

Local AC

Local Match

Total

49,321

430,000

LSSRP Bond

Total2,478,840 2,859,519

321,160 370,481

2,800,000 3,230,000

380,679

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3418

5953(635)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

49,321

430,000

LSSRP Bond

Total380,679

49,321

430,000

380,679

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,478,840 2,478,840

321,160 321,160

2,800,000 2,800,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 3210/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 65: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0617LR, PECK RD, OVER SAN GABRIEL RIV, 1300'S POMONA FWY. Rehabilitate and Widen bridge, no added lanes

Fund Source Summary:

PER/W

Total 1,225,000

CON

Total

7,420,000

1,225,000

8,645,000

1,225,000

7,420,0007,420,000

Phase Summary:

Fed $

Local AC

Local Match

Total

140,508

1,225,000

LSSRP Bond

Total7,653,419

991,582

8,645,000

1,084,493 6,568,926

851,074

7,420,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3421

5953(590)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

140,508

1,225,000

LSSRP Bond

Total1,084,493

140,508

1,225,000

1,084,493

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total6,568,926

851,074

7,420,000

6,568,926

851,074

7,420,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 3310/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 66: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0620, MALIBU CYN RD, OVER MALIBU CREEK, 4 MI S VENTURA FWY. Replace 2 lane bridge with 2 lane bridge.

Fund Source Summary:

PER/W

Total 1,010,000

CON

Total

12,460,000

1,010,000

13,470,000

1,010,000

12,460,00012,460,000

Phase Summary:

Fed $

Local AC

Local Match

Total

115,847

1,010,000

LSSRP Bond

Total11,924,991

1,545,009

13,470,000

894,153 11,030,838

1,429,162

12,460,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3332

5953(586)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

115,847

1,010,000

LSSRP Bond

Total894,153

115,847

1,010,000

894,153

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total11,030,838

1,429,162

12,460,000

11,030,838

1,429,162

12,460,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 3410/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 67: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0907, WILMINGTON AVE OVER COMPTON CREEK, 1/2 MI S ROSECRANS AVE. Replace 4 lane bridge with a 4 lanebridge.

Fund Source Summary:

PER/W

Total 858,750

CON

Total

9,005,950 9,005,950

749,450 1,608,200

749,450 9,005,950 10,614,150

858,750

Phase Summary:

Fed $

Local AC

Local Match

Total

98,499

858,750

LSSRP Bond

Total663,488 7,972,968 9,396,707

85,962 1,032,982 1,217,443

749,450 9,005,950 10,614,150

760,251

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3580

5953(615)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

98,499

858,750

LSSRP Bond

Total663,488 1,423,739

85,962 184,461

749,450 1,608,200

760,251

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total7,972,968 7,972,968

1,032,982 1,032,982

9,005,950 9,005,950

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 3510/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 68: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0925, COMPTON BLVD OVER COMPTON CREEK, 0.2 MI E OF WILMINGTON AV. Replace 5 lane bridge with a 5 lanebridge.

Fund Source Summary:

PER/W

Total 646,250

CON

Total

6,506,373 6,506,373

515,602 1,161,852

515,602 6,506,373 7,668,225

646,250

Phase Summary:

Fed $

Local AC

Local Match

Total

74,125

646,250

LSSRP Bond

Total456,462 5,760,092 6,788,680

59,140 746,281 879,545

515,602 6,506,373 7,668,225

572,125

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3581

5953(621)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

74,125

646,250

LSSRP Bond

Total456,462 1,028,588

59,140 133,264

515,602 1,161,852

572,125

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,760,092 5,760,092

746,281 746,281

6,506,373 6,506,373

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 3610/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 69: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0967, LTTLE TUJUNGA CYN OVER BUCK CANYON, 6 MI N OF FOOTHILL BLVD. Replace existing 2 lane bridge with 2lane bridge. 8/13/2010: Toll Credits programmed for PE & CON.

Fund Source Summary:

PER/W

Total 290,000

CON

Total

2,800,000 2,800,000

290,000

2,800,000 3,090,000

290,000

Phase Summary:

Fed $

Local AC

Local Match

Total 290,000

LSSRP Bond

Total2,800,000 3,090,000

2,800,000 3,090,000

290,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3574

5953(623)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 290,000

LSSRP Bond

Total290,000

290,000

290,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,800,000 2,800,000

2,800,000 2,800,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 3710/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 70: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0969, LTTLE TUJUNGA CYN ROAD, OVER PACOIMA CREEK, 9 MI N OF FOOTHILL BLVD. Replace 2 lane bridge with new 2 lane bridge.

Fund Source Summary:

PER/W

Total 620,068

CON

Total

2,940,000 2,940,000

620,068

2,940,000 3,560,068

620,068

Phase Summary:

Fed $

Local AC

Local Match

Total

71,122

620,068

LSSRP Bond

Total2,602,782 3,151,728

337,218 408,340

2,602,782 -2,602,7822,940,000 3,560,068

548,946

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3331

5953(576)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

71,122

620,068

LSSRP Bond

Total548,946

71,122

620,068

548,946

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,602,782 2,602,782

337,218 337,218

2,602,782 -2,602,782

2,940,000 2,940,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 3810/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 71: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0970, CIRCLE TRAIL, OVER TOPANGA CANYON CREEK, 25' W/O TOPANGA CYN BLVD. Replace existing 2 lane bridge with new 2 lane bridge 4/5/2010: Toll Credits programmed for PE & Con.

Fund Source Summary:

PER/W

Total 239,000

CON

Total

1,337,000

239,000

1,576,000

239,000

1,337,0001,337,000

Phase Summary:

Fed $

Local AC

Local Match

Total 239,000

LSSRP Bond

Total1,576,000

1,576,000

239,000 1,337,000

1,337,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3417

5953(636)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 239,000

LSSRP Bond

Total239,000

239,000

239,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,337,000

1,337,000

1,337,000

1,337,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 3910/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 72: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C0973, DEL MAR AVE, OVER ALHAMBRA WASH, 0.1 MI S VALLEY BLVD. Rehabilitate & widen bridge (no added lanes),upgrade bridge railings. (Local STPL Toll Credits added to project under Admin. Mod. #15-20.)

Fund Source Summary:

PER/W

Total 937,500

CON

Total

4,615,065 1,474,075 6,089,140

305,000 1,242,500

4,920,065 1,474,075 7,331,640

937,500

Phase Summary:

Fed $

Local AC

Local Match

Total

187,500

937,500

LSSRP Bond

Total4,329,717 1,304,999 6,384,716

590,348 169,076 946,924

4,920,065 1,474,075 7,331,640

750,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

1104

5217(001)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

187,500

937,500

LSSRP Bond

Total244,000 994,000

61,000 248,500

305,000 1,242,500

750,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total4,085,717 1,304,999 5,390,716

529,348 169,076 698,424

4,615,065 1,474,075 6,089,140

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 4010/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 73: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County BRIDGE NO. 53C1403, THE OLD RD, OVER CASTAIC CREEK, 0.8 MI N STATE HWY 126. LSSRP Seismic Retrofit.

Fund Source Summary:

PER/W

Total 826,525

CON

Total

2,520,000

450,000 1,276,525

450,000 3,796,525

826,525

2,520,0002,520,000

Phase Summary:

Fed $

Local AC

Local Match

Total

94,802

826,525

LSSRP Bond

Total

289,044

398,385 3,361,064

51,615 146,417

450,000 3,796,525

731,723

289,044

2,230,956

2,520,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

2668

5953(062)5953(650)

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

94,802

826,525

LSSRP Bond

Total398,385 1,130,108

51,615 146,417

450,000 1,276,525

731,723

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

289,044

2,230,956

2,520,000

289,044

2,230,956

2,520,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 4110/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 74: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County Federally mandated Inspection Program. Los Angeles County inspection of local agency owned bridges withing LA County (except LA Citybridges). State pays match.

Fund Source Summary:

PER/W

Total 7,662,442

CON

Total

7,662,442 2,964,941 2,965,000 13,592,3832,964,941 2,965,000 13,592,383

Phase Summary:

Fed $

Local AC

Local Match

Total

878,882

7,662,442

LSSRP Bond

Total2,624,862 2,624,915 12,033,337

340,079 340,086 1,559,046

2,964,941 2,965,000 13,592,383

6,783,560

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3154

5953(508)5953(551)5953(633)5953(657)5953(675)5953(716)5953(761)

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

0

LSSRP Bond

Total

0

0

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

878,882

7,662,442

LSSRP Bond

Total2,624,862 2,624,915 12,033,337

340,079 340,086 1,559,046

2,964,941 2,965,000 13,592,383

6,783,560

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 4210/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 75: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County NBIL004, Bridge Inventory Permits System. County wide system to implement permits for extra legal load vehicles. Will be extended statewide.Requires FHWA oversight. PE phase only. No capital work involved. State pays match - (20.30.010.320)

Fund Source Summary:

PER/W

Total 1,350,000

CON

Total

1,350,000 1,350,0001,350,000

Phase Summary:

Fed $

Local AC

Local Match

Total

154,845

1,350,000

LSSRP Bond

Total1,195,155

154,845

1,350,000

1,195,155

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3813

5953(659)Project #:

CON Summary:

Fed $

Local AC

Local Match

Total

154,845

1,350,000

LSSRP Bond

Total1,195,155

154,845

1,350,000

1,195,155

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 4310/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 76: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Los Angeles County PM00043, Bridge Preventive Maintenance Program, various locations within the County of Los Angeles. See Caltrans Local Assistance HBPwebsite for backup list of bridges. Other Federal funds must be programmed in SCAG FTIP.

Fund Source Summary:

PER/W

Total 15,212,706

CON

Total

6,882,575 11,117,425 45,747,732

39,107 8,369,238

39,107 11,117,425 54,116,970

8,330,131

27,747,73227,747,732

Phase Summary:

Fed $

Local AC

Local Match

Total

1,744,897

15,212,706

LSSRP Bond

Total34,621 9,842,256 47,909,754

0 4,486 1,275,169 6,207,216

39,107 11,117,425 54,116,970

13,467,809 24,565,067

3,182,665

27,747,732

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3471

5953(652)5953(666)5953(673)5953(674)5953(678)5953(679)

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

955,466

8,330,131

LSSRP Bond

Total34,621 7,409,286

4,486 959,952

39,107 8,369,238

7,374,665

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

789,431

6,882,575

LSSRP Bond

Total9,842,256 40,500,467

0 -0 1,275,169 5,247,265

11,117,425 45,747,732

6,093,144 24,565,067

3,182,665

27,747,732

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 4410/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 77: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Paramount BRIDGE NO. 53C0190L, ROSECRANS AVE EAST, OVER LOS ANGELES RIVER, 0.1 MI E LONG BEACH FWY. Bridge Rehabilitation. Widenexisting 3 lane bridge to include shoulders and sidewalk. Also increase approach roadway width.

Fund Source Summary:

PER/W

Total

CON

Total

11,539,000

309,000 927,000 1,236,000

100,000 100,000

309,000 927,000 100,000 12,875,00011,539,00011,539,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total273,558 820,673 88,530 11,398,238

35,442 106,327 11,470 1,476,763

309,000 927,000 100,000 12,875,000

10,215,477

1,323,523

11,539,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4313

5336(018)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total273,558 820,673 1,094,231

35,442 106,327 141,769

309,000 927,000 1,236,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 88,530

11,470 11,470

100,000 100,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total10,215,477

1,323,523

11,539,000

10,215,477

1,323,523

11,539,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 4510/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 78: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Paramount BRIDGE NO. 53C0190R, ROSECRANS AVE EAST, OVER LOS ANGELES RIVER, 0.1 MI E LONG BEACH FWY. Bridge Rehabilitation. Widenexisting 3 lane bridge to include standard lane width, shoulders and sidewalk (No added capacity). Scope is not clear.

Fund Source Summary:

PER/W

Total

CON

Total

9,860,000

264,000 792,000 1,056,000

100,000 100,000

264,000 792,000 100,000 11,016,0009,860,0009,860,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total233,719 701,158 88,530 9,752,465

30,281 90,842 11,470 1,263,535

264,000 792,000 100,000 11,016,000

8,729,058

1,130,942

9,860,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4312

5336(019)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total233,719 701,158 934,877

30,281 90,842 121,123

264,000 792,000 1,056,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 88,530

11,470 11,470

100,000 100,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total8,729,058

1,130,942

9,860,000

8,729,058

1,130,942

9,860,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 4610/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 79: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Pasadena BRIDGE NO. 53C1041, HOLLY STREET OVER ARROYO BL & ARROYO SECO, 0.2 MI W VENTURA FWY. Bridge rehabilitation andpotential voluntary seismic retrofit for historic bridge. (No added capacity) SCOPE NEEDS CLARIFICATION. 2/12/2013: Toll Creditsprogrammed for PE & CON.

Fund Source Summary:

PER/W

Total 275,000

CON

Total

8,500,000

1,000,000 1,275,000

1,000,000 9,775,000

275,000

8,500,0008,500,000

Phase Summary:

Fed $

Local AC

Local Match

Total 275,000

LSSRP Bond

Total1,000,000 9,775,000

1,000,000 9,775,000

275,000 8,500,000

8,500,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4049

5064(078)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 275,000

LSSRP Bond

Total1,000,000 1,275,000

1,000,000 1,275,000

275,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total8,500,000

8,500,000

8,500,000

8,500,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 4710/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 80: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Santa Clarita BRIDGE NO. 53C1777 R&L, SIERRA HWY, OVER SANTA CLARA RIVER, 0.3 MI S SOLEDAD CYN RD. Replace L (SB) bridge, Rehabilitate R (NB) bridge. Not adding lanes.

Fund Source Summary:

PER/W

Total

222,000

1,461,849

CON

Total

10,882,653 10,882,653

1,239,849

222,000

10,882,653 12,344,502

1,239,849

Phase Summary:

Fed $

Local AC

Local Match

Total

273,399

1,461,849

LSSRP Bond

Total9,634,413 10,822,863

1,248,240 1,521,639

10,882,653 12,344,502

1,188,450

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

792

5450(008)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

247,936

1,239,849

LSSRP Bond

Total991,913

247,936

1,239,849

991,913

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

25,463

222,000

LSSRP Bond

Total196,537

25,463

222,000

196,537

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total9,634,413 9,634,413

1,248,240 1,248,240

10,882,653 10,882,653

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 4810/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 81: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Santa Clarita PM00024, Bridge Preventive Maintenance Program, various locations in the City of Santa Clarita. See Caltrans Local Assistance HBP web sitefor backup list of bridges.

Fund Source Summary:

PER/W

Total 1,031,904

CON

Total

876,904 279,947 1,156,851

155,000

279,947 1,311,851

155,000

Phase Summary:

Fed $

Local AC

Local Match

Total

118,359

1,031,904

LSSRP Bond

Total247,837 1,161,382

32,110 150,469

279,947 1,311,851

913,545

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3393

5450(073)5450(080)5450(086)

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

17,779

155,000

LSSRP Bond

Total137,222

17,779

155,000

137,222

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

100,581

876,904

LSSRP Bond

Total247,837 1,024,160

32,110 132,691

279,947 1,156,851

776,323

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 4910/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 82: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Santa Clarita BRIDGE NO. PM00140, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Santa Clarita. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

140,825 140,825

50,000 50,000

50,000 140,825 190,825

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265 124,672 168,937

5,735 16,153 21,888

50,000 140,825 190,825

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4335

5450(095)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265 44,265

5,735 5,735

50,000 50,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total124,672 124,672

16,153 16,153

140,825 140,825

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 5010/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 83: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Torrance BRIDGE NO. 53C0852, PRAIRIE AVE OVER BNSF, 0.5 MI S OF 190TH ST. Bridge Rehabilitation. Deck rehabilitation, seismic retrofit andlane widening (no added capacity).

Fund Source Summary:

PER/W

Total 451,000

CON

Total

3,160,000

451,000

3,611,000

451,000

3,160,0003,160,000

Phase Summary:

Fed $

Local AC

Local Match

Total

51,730

451,000

LSSRP Bond

Total3,196,818

414,182

3,611,000

399,270 2,797,548

362,452

3,160,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4164

5249(026)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

51,730

451,000

LSSRP Bond

Total399,270

51,730

451,000

399,270

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total2,797,548

362,452

3,160,000

2,797,548

362,452

3,160,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 5110/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 84: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Torrance BRIDGE NO. 53C1656, PRAIRIE AVE OVER MOBIL OIL CO ACCESS RD, 0.2 MI S/O 190TH ST. Bridge Rehabilitation, Retrofit existing steelarch culvert with concrete CIP arch and micropiles. (Scope not clear)

Fund Source Summary:

PER/W

Total

CON

Total

990,000

50,000 127,000 177,000

50,000 50,000

50,000 177,000 1,217,000990,000990,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265 156,698 1,077,410

5,735 20,302 139,590

50,000 177,000 1,217,000

876,447

113,553

990,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4144

5249(025)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265 112,433 156,698

5,735 14,567 20,302

50,000 127,000 177,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total44,265 44,265

5,735 5,735

50,000 50,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total876,447

113,553

990,000

876,447

113,553

990,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 5210/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 85: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Vernon BRIDGE NO. 53C0868, 26TH ST, OVER LOS ANGELES RIVER, 0.2 MI W SOTO ST. Rehabilitation (HBRR) No added lane capacity.

Fund Source Summary:

PER/W

Total

CON

Total

7,000,000

1,200,000 1,200,000

300,000

1,200,000 8,500,0007,000,000

300,000

7,300,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,062,360 7,525,050

137,640 974,950

1,200,000 8,500,000

6,462,690

837,310

7,300,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

926

5139(005)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,062,360 1,062,360

137,640 137,640

1,200,000 1,200,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total265,590

34,410

300,000

265,590

34,410

300,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total6,197,100

802,900

7,000,000

6,197,100

802,900

7,000,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 5310/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 86: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Westlake Village BRIDGE NO. 53C0828, Lindero Canyon road OVER Triunfo Creek, 1.5 miles south of Ventura Freeway (Hwy 101). Scour Countermeasureproject. Scour Mitigation at Pier 2 and the immediate surrounding area.

Fund Source Summary:

PER/W

Total 120,000

CON

Total

605,000

130,000 250,000

130,000 855,000

120,000

605,000605,000

Phase Summary:

Fed $

Local AC

Local Match

Total

13,764

120,000

LSSRP Bond

Total115,089 756,932

14,911 98,069

130,000 855,000

106,236 535,607

69,394

605,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4142

5431(009)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

13,764

120,000

LSSRP Bond

Total115,089 221,325

14,911 28,675

130,000 250,000

106,236

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total535,607

69,394

605,000

535,607

69,394

605,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 5410/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 87: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

07 Los Angeles

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Number of Projects:

MPO Summary:

Fed $

Local AC

Local Match

Total for all Phases

8,367,661

8,700,409

68,668,743

LSSRP Bond

Total

848,780 192,696 1,330,520

22,298,390 4,188,338 4,586,850 24,435,927 27,457,558 13,777,720 375,582,639

2,412,426 1,384,323 594,275 2,956,045 2,834,808 1,422,280 45,608,976

2,445,385 6,496,411 -4,090,086

28,004,981 12,069,072 5,181,125 27,391,972 26,394,976 15,200,000 422,522,135

51,600,674

289,044

227,237,182

25,304,410

-13,219,370

239,611,266

Totals:

Los Angeles County Metropolitan Transportation Auth.

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

53

Caltrans, Division of Local Assistance Page 5510/26/2017, 1:40 PM Det2 FL4 SmlTxt brf

#19-00 LA LA000800 HBP

Page 88: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS01

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

SHOPPAC 2018/19 29910 Route 001: In Long Beach, At Lakewood Boulevard (Route 19) And Los Alamitos Traffic Circle. Install Pavement

Delineation, Overhead Guide Signs And Associated Roadway Improvements.

19-00 16H-003 4470

30180 Route 057: In San Dimas And Glendora, From Route 10 To Route 210. Roadside Safety Improvements. 19-00 2016

SHOPP

3560

30190 Route 210: In The Cities Of Monrovia, Duarte, Irwindale, Azusa And Glendora, From Huntington Drive To Route

57. Roadside Safety Improvements.

19-00 2016

SHOPP

7254

30360 Route 210: In Pasadena, Arcadia And Monrovia, From Route 710 To Huntington Drive. Roadside Safety

Improvements.

19-00 2016

SHOPP

3772

30410 Route 091: In Bellflower, From Downey Avenue To San Gabriel River Bridge. Roadside Safety Improvements. 19-00 2016

SHOPP

3240

30420 Route 010: In The Cities Of Los Angeles And Santa Monica, From Route 1/10 Separation Bridge To West Of

Crenshaw Boulevard. Roadside Safety Improvements.

19-00 2016

SHOPP

4021

30430 Route 010: In The City Of Los Angeles, From Route 5 To West Of Route 710. Roadside Safety Improvements. 19-00 2016

SHOPP

3498

30910 Route 110: In The City Of Los Angeles, From Vernon Avenue To Route 101. Upgrade Metal Beam Guardrail To

Midwest Guardrail System, End Treatments, And Crash Attenuators.

19-00 2016

SHOPP

6341

31070 Route 118: In Mission Hills, From Woodley Avenue To Route 405. Pave Areas Beyond Gore, Install Access

Gates, Construct Maintenance Vehicle And Shoulder Pullouts, Upgrade And Relocate Irrigation Systems.

19-00 2016

SHOPP

3754

31080 Route 014: In And Near Santa Clarita, From Route 5 To Canyon Park Boulevard. Construct Roadside Safety

Improvements.

19-00 2016

SHOPP

3652

30400 Route 605: In And Near Industry, From South Of Route 60 To Valley Boulevard. Roadside Safety

Improvements.

19-00 16H-002 3995

33160 Route 110: In The City Of Los Angeles, At The Northbound Route 110 Connector To Eastbound Route 91.

Apply High Friction Bauxite Surface Treatment (Hfbst), Install High Visibility Thermoplastic Lane And Edge Lines

And Upgrade Guardrail To Current Standard

19-00 16H-005 2922

33270 Route 005: In The City Of Los Angeles, At The Westbound Route 10 Connector To Southbound Route 5. Apply

High Friction Surface Treatment (Hfst) And Upgrade Lighting.

19-00 16H-005 2754

2018/19 Total 53233

2019/20 30370 Route 101: In The City Of Los Angeles, From Highland Avenue To South Of Parkway Calabasas. Upgrade

Median Concrete Barrier To Meet The Current Standards.

19-00 2016

SHOPP

26060

FTIP ID: LALS01 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Collision Reduction Program.

Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And Table 3 Categories.

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 4 Printed: 4/25/2018: 1:57 PM

#19-00 LA LALS01 SHOPP Collision Reduction Program

Page 89: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS01

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS01 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Collision Reduction Program.

Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And Table 3 Categories.

SHOPPAC 2019/20 31100 Route 210: In Pasadena, At The Route 210/134/710 Interchange. Roadside Safety Improvements. 19-00 2016

SHOPP

4070

31110 Route 014: In And Near Lancaster, From Vincent Ramp Undercrossing To Avenue K 8 Overcrossing. Roadside

Safety Improvements.

19-00 2016

SHOPP

3908

31640 Route 105: In And Near Downey, From Garfield Avenue To East Of Woodruff Avenue. Roadside Safety

Improvements.

19-00 2016

SHOPP

1951

31880 Route 605: In Irwindale, At The Route 605 Northbound Ramp To Westbound Live Oak Avenue. Realign And

Widen Ramp, Construct Retaining Wall, Install Concrete Barrier And Replace Guardrail.

19-00 16H-005 6213

33290 Route 138: In Palmdale, At The Intersection Of Avenue R-8. Upgrade Traffic Signal System, Curb Ramps And

Install Drainage Inlets.

19-00 16H-017 3197

2019/20 Total 45399

SHOPPAC Total 98632

SHOPPAC-P 2018/19 27510 Route 001: In The City Of Los Angeles (Pacific Palisades), From North Of Temescal Canyon Road To Bay Club

Drive. Construct Shoulders And Upgrade Guardrail.

19-00 16H-002 12545

29230 Route 005: In The City Of Los Angeles, Near Glendale, At Northbound Off-Ramp To Colorado Freeway

Extension. Widen Off-Ramp, Replace Mbgr With Concrete Barrier, And Widen La River Bridge To Reduce Truck

Off-Tracking.

19-00 CTC VOTE 8311

29510 Route 999 (Various): In The City Of Los Angeles On Route 5 From Filmore Street To Rinaldi Street, Also On

Route 118 From Route 405 To West Of San Fernando Road. Enhance Highway Worker Safety By Paving Misc.

Areas, Install Access Gates And Maint. Vehicle

19-00 16H-019 4468

29520 Route 210: In And Near Glendale And La Canada Flintridge, From Lowell Avenue To Waltonia Drive. Enhance

Highway Worker Safety By Installing Access Gates And Maintenance Vehicle Pullouts, And Pave Misc. Areas.

19-00 2016

SHOPP

3276

29580 Route 060: In And Near Monterey Park And Montebello, From Mednick Avenue To Markland Drive. Enhance

Highway Worker Safety By Installing Maintenance Vehicle Pullouts, Access Gates And Other Measures.

19-00 16H-002 4624

29590 Route 110: In The City Of Los Angeles, In Southeast Los Angeles, From Slauson Avenue To 37Th Street.

Enhance Highway Worker Safety By Installing Maintenance Vehicle Pullouts, Access Gates And Other

Measures.

19-00 2016

SHOPP

3084

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 2 of 4 Printed: 4/25/2018: 1:57 PM

#19-00 LA LALS01 SHOPP Collision Reduction Program

Page 90: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS01

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS01 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Collision Reduction Program.

Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And Table 3 Categories.

SHOPPAC-P 2018/19 29600 Route 010: In The City Of Los Angeles, From West Boulevard To Hoover Street. Enhance Highway Worker

Safety By Installing Maintenance Vehicle Pullouts, Access Gates And Other Measures.

19-00 16H-002 3380

29610 Route 405: In Long Beach And Signal Hill, From Los Cerritos Channel To Pacific Avenue. Enhance Highway

Worker Safety By Miscellanous Paving, Relocating Irrigation, And Other Measures.

19-00 16H-002 3941

29620 Route 091: In Long Beach, From The Los Angeles River Bridge To Downey Avenue. Enhance Highway Worker

Safety By Miscellanous Paving, Relocating Irrigation, And Other Measures.

19-00 16H-001 3587

29630 Route 405: In And Near The Cities Of Inglewood, Los Angeles, And Culver City, From 105 To Port Road.

Enhance Highway Worker Safety By Replacing Crash Cushions, Miscellanous Paving, And Other Measures.

19-00 16H-002 4006

29640 Route 005: In The City Of Los Angeles, At Route 5/10/60 Interchange. Enhance Highway Worker Safety By

Modifying Irrigation, Miscellanous Paving, And Other Measures.

19-00 16H-003 7672

29690 Route 210: In And Near La Canada Flintridge And Pasadena From Waltonia Drive To Route 134/210

Interchange. Enhance Highway Worker Safety By Installing Maintenance Vehicle Pullouts, Access Gates And

Other Measures.

19-00 PM 3630

29860 Route 101: In The City Of Los Angeles, From Grand Avenue To Sunset Boulevard. Enhance Highway Worker

Safety By Modifying Irrigation, Miscellanous Paving, And Other Measures.

19-00 2016

SHOPP

2690

29930 Route 001: In Malibu, From Puerco Canyon Road To Corral Canyon Road. Reconstruct Raised Median Island. 19-00 16H-002 6958

29960 Route 027: Near Topanga, From Route 1 To Mulholland Drive. Enhance Highway Worker Safety By Installing

Weed Barrier, Paving Maintenance Vehicle Pull-Outs, And Other Measures.

19-00 16H-002 2300

30980 Route 605: In Pico Rivera And Whittier, From Telegraph Road To Rose Hills Road; Also In El Monte And

Baldwin Park From Romona Boulevard To Route 210 (Pm 20.9/25.6). Replace Damaged Concrete Slabs, Grind

And Groove Concrete Pavement To Increase Roadway Su

19-00 2016

SHOPP

6100

31840 Route 005/010: In The City Of Los Angeles, From State Street To North Of Route 10; Also On Route 10 From

West Of Route 5 To West Of Soto Street (Pm S0.4/19.0); Apply High Friction Surface Treatment (Hfst) To

Connectors And Ramp.

19-00 2016

SHOPP

4406

31700 Route 014: Near Santa Clarita, On The Sierra Highway Southbound On-Ramp; Also In Palmdale On The

Palmdale Boulevard Northbound Off-Ramp (Pm R59.55). Apply High Friction Surface Treatment (Hfst) On

Ramps.

19-00 16H-014 1448

33170 Route 001: In The City Of Los Angeles, At North Fries Avenue. Install New Traffic Signal And Surveillance

System, Safety Lighting, Pedestrian Crosswalks And Upgrade Ada Curb Ramps.

19-00 16H-005 1530

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 3 of 4 Printed: 4/25/2018: 1:57 PM

#19-00 LA LALS01 SHOPP Collision Reduction Program

Page 91: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS01

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS01 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Collision Reduction Program.

Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And Table 3 Categories.

SHOPPAC-P 2018/19 31880 Route 605: In Irwindale, At The Route 605 Northbound Ramp To Westbound Live Oak Avenue. Realign And

Widen Ramp, Construct Retaining Wall, Install Concrete Barrier And Replace Guardrail.

19-00 16H-005 1232

33020 Route 001: In Long Beach, At Pacific Avenue. Install Left-Turn Phasing, Ladder Striping Crosswalks And

Upgrade Signals And Curb Ramps To Meet Current Standards.

19-00 16H-005 1146

33160 Route 110: In The City Of Los Angeles, At The Northbound Route 110 Connector To Eastbound Route 91.

Apply High Friction Bauxite Surface Treatment (Hfbst), Install High Visibility Thermoplastic Lane And Edge Lines

And Upgrade Guardrail To Current Standard

19-00 16H-005 304

33270 Route 005: In The City Of Los Angeles, At The Westbound Route 10 Connector To Southbound Route 5. Apply

High Friction Surface Treatment (Hfst) And Upgrade Lighting.

19-00 16H-005 215

2975U Route 110: In Los Angeles County, In Los Angeles And South Pasadena, From College Street Overcrossing To

Grand Avenue Overcrossing. [Ea 2975U = Ea 29750 + 29530]

19-00 PM 11750

2018/19 Total 102603

SHOPPAC-P Total 102603

Grand Total 201235

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 4 of 4 Printed: 4/25/2018: 1:57 PM

#19-00 LA LALS01 SHOPP Collision Reduction Program

Page 92: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS02

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

SHOPPAC 2018/19 25310 Route 213: In Rancho Palos Verdes, From Caddington Drive To Peninsula Verde Drive. Replace Two Damaged

Drainage Systems. (G13 Contingency Project)

19-00 16H-002 906

30450 Route 057: In And Near Diamond Bar, From The Orange County Line To Route 60. Pavement Rehabilitation.

(G13 Contingency Project)

19-00 2016

SHOPP

1950

30960 Route 210: In The City Of Los Angeles, From Route 5 To North Wheatland Avenue. Rehabilitate Roadway. 19-00 2016

SHOPP

125442

31040 Route 138: Near Gorman And Lancaster, From Route 5 To Route 14. Rehabilitate Pavement. (G13 Contingency

Project)

19-00 2016

SHOPP

2470

31170 Route 134: In The Cities Of Los Angeles, Burbank, Glendale And Pasadena, From Route 170 To Route 210.

Rehabilitate Pavement, Upgrade Guardrail And Ada Curb Ramps To Current Standards.

19-00 2016

SHOPP

42010

31180 Route 107: In Torrance, From Route 1 To Redondo Beach Boulevard. Pavement Rehabilitation. (G13

Contingency Project)

19-00 2016

SHOPP

1526

31340 Route 710: In The Cities Of Los Angeles And Monterey Park, From Olympic Boulevard To Ramona Boulevard.

Rehabilitate Culverts.

19-00 2016

SHOPP

1764

31350 Route 001: In The Cities Of Los Angeles And Malibu, From South Of Tenescal Canyon Road To Ventura County

Line; Also In Ventura County, From Los Angeles County Line To Tonga Street (Pm 0.0/0.9). Rehabilitate

Culverts.

19-00 2016

SHOPP

6577

31360 Route 005: Near Pyramid Lake, 4.4 Miles North Of Templin Highway. Remove And Replace Two Sections Of

Damaged Reinforced Concrete Pipe. (G13 Contingency Project)

19-00 CTC VOTE 2563

31370 Route 134: In Glendale, From East Of Concord Street Overcrossing To West Of Chevy Chase Drive

Undercrossing At Three Locations. Restore Culvert Systems. (G13 Contingency Project)

19-00 2016

SHOPP

650

31380 Route 110: Near Gardena, South Of Redondo Beach Boulevard. Replace Culvert. 19-00 2016

SHOPP

3410

31690 Route 001: In Santa Monica, At Mcclure Tunnel Bridge No. 53-0008. Enhance Safety Lighting Inside Tunnel. 19-00 2016

SHOPP

5790

31750 Route 999 (Various): In The Cities Of Los Angeles, Hollywood, Long Beach And Signal Hill On Route 5 From

Simons Underpass To Eastern Avenue; On Routes 101, 405 And 710 At Various Locations. Replace 9 Pump

Plants. (G13 Contingency Project)

19-00 2016

SHOPP

830

32660 Route 110: In Los Angles County, In Highland Park And South Pasadena, From South Of Avenue 60 To North

Of Avenue 64. Place High Friction Surface Treatment (Hfst).

19-00 16H-017 4835

2018/19 Total 200723

FTIP ID: LALS02 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Pavement Resurfacing And/Or Rehabilitation - Shopp Roadway

Preservation Program . Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Pavement Resurfacing And/Or

Rehabilitation, Emergency Relief (23 U.S.C. 125), Widening Narrow Pavements Or Reconstructing Bridges (No Additional Travel Lanes)

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 5 Printed: 4/25/2018: 1:57 PM

#19-00 LALS02 SHOPP Roadway Preservation

Page 93: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS02

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS02 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Pavement Resurfacing And/Or Rehabilitation - Shopp Roadway

Preservation Program . Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Pavement Resurfacing And/Or

Rehabilitation, Emergency Relief (23 U.S.C. 125), Widening Narrow Pavements Or Reconstructing Bridges (No Additional Travel Lanes)

SHOPPAC

2019/20 30390 Route 010: In Baldwin Park And West Covina, From Route 605 To Citrus Avenue. Rehabilitate Roadway. 19-00 2016

SHOPP

74770

30750 Route 101: In The Cities Of Los Angeles, Calabasas And Agoura Hills, From Route 170 To Kanan Road.

Rehabilitate Pavement, Construct And Upgrade Ada Curb Ramps.

19-00 2016

SHOPP

16709

30970 Route 005: In San Fernando, From Route 118 To Route 210. Rehabilitate Roadway. 19-00 2016

SHOPP

53220

31730 Route 999 (Various): In Various Cities, On Route 60 From Route 5 To San Bernardino County Line; Also On

Route 710, From Ocean Boulevard To Valley Boulevard (Pm 5.6/T27.4). Replace Existing Signs With Retro-

Reflective Sheeting.

19-00 2016

SHOPP

4000

33760 Route 014: In Los Angeles County, Near Southbound Offramp To Sierra Highway. Replace Damaged Drainage

System That Includes 17 Culverts.

19-00 16H-019 6451

33800 Route 005: In The City Of Los Angeles, On The Northbound Connector At The Route 5/110 Separation. Replace

Compromised 18 Inch Reinforced Concrete Culvert (Rcp).

19-00 16H-019 7506

2019/20 Total 162656

2020/21 30110 Route 060: In And Near Monterey Park, Montebello, Rosemead, And South El Monte, From Route 710 To

Route 605. Rehabilitate Pavement. (G13 Contingency Project)

19-00 16H-003 83880

30740 Route 138: In Palmdale, From 30Th Street E. To E. Avenue S. Pavement Rehabilitation. (G13 Contingency

Project)

19-00 16H-003 11066

25310 Route 213: In Rancho Palos Verdes, From Caddington Drive To Peninsula Verde Drive. Replace Two Damaged

Drainage Systems. (G13 Contingency Project)

19-00 16H-002 2085

30450 Route 057: In And Near Diamond Bar, From The Orange County Line To Route 60. Pavement Rehabilitation.

(G13 Contingency Project)

19-00 2016

SHOPP

20750

31040 Route 138: Near Gorman And Lancaster, From Route 5 To Route 14. Rehabilitate Pavement. (G13 Contingency

Project)

19-00 2016

SHOPP

23994

31180 Route 107: In Torrance, From Route 1 To Redondo Beach Boulevard. Pavement Rehabilitation. (G13

Contingency Project)

19-00 2016

SHOPP

12644

31370 Route 134: In Glendale, From East Of Concord Street Overcrossing To West Of Chevy Chase Drive

Undercrossing At Three Locations. Restore Culvert Systems. (G13 Contingency Project)

19-00 2016

SHOPP

2120

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 2 of 5 Printed: 4/25/2018: 1:57 PM

#19-00 LALS02 SHOPP Roadway Preservation

Page 94: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS02

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS02 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Pavement Resurfacing And/Or Rehabilitation - Shopp Roadway

Preservation Program . Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Pavement Resurfacing And/Or

Rehabilitation, Emergency Relief (23 U.S.C. 125), Widening Narrow Pavements Or Reconstructing Bridges (No Additional Travel Lanes)

SHOPPAC 2020/21 31750 Route 999 (Various): In The Cities Of Los Angeles, Hollywood, Long Beach And Signal Hill On Route 5 From

Simons Underpass To Eastern Avenue; On Routes 101, 405 And 710 At Various Locations. Replace 9 Pump

Plants. (G13 Contingency Project)

19-00 2016

SHOPP

4325

32340 Route 005: Near Castaic And Valencia, From 0.2 Mile North Of Lake Hughes Road Undercrossing To 0.7 Mile

South Of Vista Del Lago Road Overcrossing. Cold Plane Pavement And Place Rubberized Hot Mix Asphalt

Concrete (Rhma), Repair Drainage Systems, And Perf

19-00 16H-019 49740

2020/21 Total 210604

2021/22 32030 Route 605: In Various Cities, From Orange County Line To Telegraph Road. Replace Structural Section On

Lanes 3 And 4 And Other Damaged Concrete Slabs On Other Lanes. Cold Plane And Overlay Rubberized Hot

Mix Asphalt (Rhma-G) On Right Shoulders And Apply

19-00 16H-019 133895

32160 Route 001: In And Near Redondo Beach, From Orange County Line To South Of Topaz Street. Upgrade Ada

Curb Ramps, Upgrade Metal Beam Guardrail, Cold Plane Pavement, And Place Hot Mix Asphalt (Hma) And

Rubberized Hot Mix Asphalt Concrete (Rhma) To Rehabilit

19-00 16H-019 53264

32550 Route 605: In The Cities Of Irwindale And Baldwin Park, From Route 10 Interchange To The End Of The

Freeway At Route 210. Grind Mainline Pavement And Replace Damaged Stabs With Jointed Plain Concrete

Pavement (Jpcp) Rapid Strength Concrete And/Or Individ

19-00 16H-019 32367

32580 Route 001: In And Near Redondo Beach, From Topaz Street To Dewey Street. Upgrade Ada Curb Ramps And

Metal Beam Guardrail, Repair Concrete Pavement, Replace Asphalt Concrete Pavement With Portland Cement

Concrete At Intersections, Cold Plane Pavement, And

19-00 16H-019 64120

2021/22 Total 283646

SHOPPAC Total 857629

SHOPPAC-P 2016/17 20212 Route 710: In Commerce And Bell From South Atlantic Blvd To Triggs Street. Rehabilitate Roadway. 19-00 CTC VOTE 500

30210 Route 999 (Various): In And Near The City Of Los Angeles, On Route 118 From Ventura County Line To Route

210; Also On Route 27 (Topanga Canyon Boulevard) From Devonshire Street To Route 118. Rehabilitate

Pavement.

19-00 14H-449 33750

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 3 of 5 Printed: 4/25/2018: 1:57 PM

#19-00 LALS02 SHOPP Roadway Preservation

Page 95: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS02

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS02 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Pavement Resurfacing And/Or Rehabilitation - Shopp Roadway

Preservation Program . Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Pavement Resurfacing And/Or

Rehabilitation, Emergency Relief (23 U.S.C. 125), Widening Narrow Pavements Or Reconstructing Bridges (No Additional Travel Lanes)

SHOPPAC-P 2016/17 30600 Route 999 (Various): In Santa Clarita And San Fernando Valley, On Route 5 From North Of Balboa Boulevard

To Route 5; Also On Route 14, From Route 5 To South Of Sierra Highway. Control Slope Erosion, Improve

Drainage, Reconstruct Concrete Barrier, And Imp

19-00 PM 7913

2016/17 Total 42163

2018/19 20212 Route 710: In Commerce And Bell From South Atlantic Blvd To Triggs Street. Rehabilitate Roadway. 19-00 CTC VOTE 171951

25262 Route 005: In And Near Santa Clarita, From 0.5 Miles South Of I-5/Sr-14 Separation To 1.7 Miles North Of Lake

Hughes Road Undercrossing. Rehabilitate Pavement.

19-00 16H-001 171689

30080 Route 101: In The City Of Los Angeles, From Route 5 To Route 110. Rehabilitate Pavement. 19-00 16H-002 20005

3009U Route 110: In And Near The Cities Of Los Angeles And Carson, From Gaffey Street To College Street. Extend

Service Life Of Existing Pavement And Install Concrete Barrier And Metal Beam Guardrail.

19-00 16H-003 40482

30110 Route 060: In And Near Monterey Park, Montebello, Rosemead, And South El Monte, From Route 710 To

Route 605. Rehabilitate Pavement. (G13 Contingency Project)

19-00 16H-003 9109

30150 Route 999 (Various): In The Cities Of Santa Monica And Los Angeles, On Route 10 From Route 1 To Route

5/101 Interchange; Also On Route 1 From Mcclure Tunnel To Lincoln Boulevard. Rehabilitate Pavement. (G13

Contingency Project)

19-00 CTC VOTE 45251

30300 Route 187: In The City Of Los Angeles, On Venice Boulevard, From Lincoln Boulevard To Route 10. .

Rehabilitate Pavement.

19-00 CTC VOTE 15628

30770 Route 605: In And Near Pico Rivera And Industry, From Rose Hills Road To Valley Boulevard. Pavement

Rehabilitation.

19-00 CTC VOTE 3009

30780 Route 405: In The City Of Los Angeles, Near Westwood And Sherman Oaks, From 0.3 Mile South Of National

Blvd Uc To 0.2 Mile North Of Ventura Uc. Pavement Rehabilitation.

19-00 PM 3784

30790 Route 101: In The City Of Los Angeles, Near Hollywood, From Route 110 To North Of Pilgrimage Overcrossing.

Pavement Rehabilitation.

19-00 16H-002 3795

30130 Route 005: In Burbank, From Verdugo Avenue To Magnolia Boulevard. Rehabilitate Pavement. 19-00 PM 18500

30740 Route 138: In Palmdale, From 30Th Street E. To E. Avenue S. Pavement Rehabilitation. (G13 Contingency

Project)

19-00 16H-003 1524

30800 Route 005: In The Cities Of Los Angeles, Glendale And Burbank, From Main Street To South Of Verdugo

Avenue. Pavement Rehabilitation.

19-00 CTC VOTE 5837

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 4 of 5 Printed: 4/25/2018: 1:57 PM

#19-00 LALS02 SHOPP Roadway Preservation

Page 96: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS02

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS02 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Pavement Resurfacing And/Or Rehabilitation - Shopp Roadway

Preservation Program . Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Pavement Resurfacing And/Or

Rehabilitation, Emergency Relief (23 U.S.C. 125), Widening Narrow Pavements Or Reconstructing Bridges (No Additional Travel Lanes)

SHOPPAC-P 2018/19 32030 Route 605: In Various Cities, From Orange County Line To Telegraph Road. Replace Structural Section On

Lanes 3 And 4 And Other Damaged Concrete Slabs On Other Lanes. Cold Plane And Overlay Rubberized Hot

Mix Asphalt (Rhma-G) On Right Shoulders And Apply

19-00 16H-019 1960

32160 Route 001: In And Near Redondo Beach, From Orange County Line To South Of Topaz Street. Upgrade Ada

Curb Ramps, Upgrade Metal Beam Guardrail, Cold Plane Pavement, And Place Hot Mix Asphalt (Hma) And

Rubberized Hot Mix Asphalt Concrete (Rhma) To Rehabilit

19-00 16H-019 1680

32340 Route 005: Near Castaic And Valencia, From 0.2 Mile North Of Lake Hughes Road Undercrossing To 0.7 Mile

South Of Vista Del Lago Road Overcrossing. Cold Plane Pavement And Place Rubberized Hot Mix Asphalt

Concrete (Rhma), Repair Drainage Systems, And Perf

19-00 16H-019 100

32550 Route 605: In The Cities Of Irwindale And Baldwin Park, From Route 10 Interchange To The End Of The

Freeway At Route 210. Grind Mainline Pavement And Replace Damaged Stabs With Jointed Plain Concrete

Pavement (Jpcp) Rapid Strength Concrete And/Or Individ

19-00 16H-019 1375

32580 Route 001: In And Near Redondo Beach, From Topaz Street To Dewey Street. Upgrade Ada Curb Ramps And

Metal Beam Guardrail, Repair Concrete Pavement, Replace Asphalt Concrete Pavement With Portland Cement

Concrete At Intersections, Cold Plane Pavement, And

19-00 16H-019 1960

2018/19 Total 517639

SHOPPAC-P Total 559802

Grand Total 1417431

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 5 of 5 Printed: 4/25/2018: 1:57 PM

#19-00 LALS02 SHOPP Roadway Preservation

Page 97: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS04

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

SHOPPAC 2018/19 29180 Route 999 (Various): In Pasadena, At Orange Grove Boulevard-E134/134 Overcrossing No. 53-2269S; Also On

Route 710, At Union Street Overcrossing No. 53-2537 (Pm R32.5). Bridge Seismic Retrofit And Bridge Rail

Ugrade.

19-00 16H-014 9843

30480 Route 405: In Carson, At Dolores Yard Overhead Bridge No. 53-1168. Upgrade Bridge Drainage System. 19-00 2016

SHOPP

2846

31790 Route 101: Near Encino, At Encino Pedestrian Overcrossing. Replace Pedestrian Overcrossing. 19-00 16H-014 12607

2018/19 Total 25296

2019/20 30160 Route 999 (Various): In Compton, On Route 91 At Compton Creek Bridge Overhead And Off-Ramp (No 53-

2235 And 53-2237S) And Artesia-Santa Fe Undercrossing 53-2238K; Also In Long Beach On Routes 710 And

110, At Harbor Scenic Drive Overhead No. 53-2934 (Pm 6.

19-00 2016

SHOPP

2785

30560 Route 001: In The City Of Los Angeles, At Wilmington Overhead Bridge No. 53-0352. Paint And Repair Bridge

Deck.

19-00 2016

SHOPP

5986

30930 Route 210: In Los Angeles County On Routes 210, 405 And 605 At Various Locations. Bridge Seismic Retrofit

And Bridge Rail Upgrade At Five Locations.

19-00 2016

SHOPP

7157

31420 Route 005: In The City Of Los Angeles, At Sun Valley Overhead Bridge No. 53-1134. Paint Bridge And Replace

Deck Drain Systems.

19-00 2016

SHOPP

10949

31680 Route 010: In El Monte, At Rio Hondo Busway Bridge No. 53-2637. Replace Bridge Deck. 19-00 2016

SHOPP

3998

34210 Route 005: In Los Angeles County, At Various Locations. Establish Standard Vertical Clearance. 19-00 16H-013 504540

2019/20 Total 535415

2020/21 27540 Route 001: In Long Beach, At Alamitos Bay Bridge No. 53-0064. Seismic Retrofit. (G13 Contingency Project) 19-00 16H-006 17362

30160 Route 999 (Various): In Compton, On Route 91 At Compton Creek Bridge Overhead And Off-Ramp (No 53-

2235 And 53-2237S) And Artesia-Santa Fe Undercrossing 53-2238K; Also In Long Beach On Routes 710 And

110, At Harbor Scenic Drive Overhead No. 53-2934 (Pm 6.

19-00 2016

SHOPP

12712

34330 Route 060: In The City Of Industry At Hacienda Boulevard Undercrossing (Uc) No. 53-1789 (Pm 15.93),

Stemson Avenue Uc No. 53-1784 (Pm 16.30), Azusa Avenue Overcrossing No. 53-1785 (Pm 17.97) And

Fullerton Road Uc No. 53-1786 (Pm 19.46). Improve Freight C

19-00 16H-019 51550

2020/21 Total 81624

FTIP ID: LALS04 , 999 - 0.0 / 0.0 - Route 999: In L.A. Grouped Projects For Bridge Rehabilitation And Reconstruction - Shopp Program.

Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Widening Narrow Pavements Or Reconstructing Bridges

(No Additional Travel Lanes).

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 3 Printed: 4/25/2018: 2:06 PM

#19-00 LA LALS04 SHOPP Bridge Rehabilitation

Page 98: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS04

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS04 , 999 - 0.0 / 0.0 - Route 999: In L.A. Grouped Projects For Bridge Rehabilitation And Reconstruction - Shopp Program.

Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Widening Narrow Pavements Or Reconstructing Bridges

(No Additional Travel Lanes).

SHOPPAC

2021/22 32100 Route 405: In Long Beach, At The San Gabriel River (Bridge No. 53-1185) And Sb La-605 To Nb I-405

Connector (Bridge No. 53 -1737H); Also In Orange County On I-405 At The Sb 405 To Nb 605 Connector

(Bridge No. 55-0413F; 12-Ora-405-Pm 24.1). Retrofit Scour

19-00 16H-016 29065

32870 Route 010: In El Monte, At Peck Road Undercrossing No. 53-0661. Paint Steel Portion Of Bridge For

Preventative Maintenance To Preserve And Extend The Life Of Bridge.

19-00 16H-019 2739

2021/22 Total 31804

SHOPPAC Total 674139

SHOPPAC-P 2018/19 27540 Route 001: In Long Beach, At Alamitos Bay Bridge No. 53-0064. Seismic Retrofit. (G13 Contingency Project) 19-00 16H-006 7927

29140 Route 001: In Malabu, From Guernsey Avenue To Trancas Canyon Road/Broad Beach Road. Replace Bridge. 19-00 16H-002 13965

29170 Route 091: In Long Beach, At Butler-Artesia Undercrossing (Br. No. 53-2169). Replace barrier and flashing

beacons

19-00 PM 2078

29660 Route 010: In The City Of Los Angeles, At Santa Monica Viaduct (Br. No. 53-1301). Paint And Rehabilitate

Bridge.

19-00 16H-003 77518

30570 Route 110: In The City Of Los Angeles, At Los Angeles River Bridge (No. 53-0421R/L). Spot Blast, Clean, And

Paint Steel Bridge Members.

19-00 PM 7664

31800 Route 010: In Alhambra, Monterey Park, San Gabriel, Rosemead And El Monte, From Fremont Avenue

Undercrossing No. 53-647 To Rio Hondo No. 53-657. Reconstruct, Repair, Clean And Seal Bridge Decks.

Repair Bridge Railing, Repair Or Replace Approach/Departu

19-00 14H-494 12712

32100 Route 405: In Long Beach, At The San Gabriel River (Bridge No. 53-1185) And Sb La-605 To Nb I-405

Connector (Bridge No. 53 -1737H); Also In Orange County On I-405 At The Sb 405 To Nb 605 Connector

(Bridge No. 55-0413F; 12-Ora-405-Pm 24.1). Retrofit Scour

19-00 16H-016 2140

32870 Route 010: In El Monte, At Peck Road Undercrossing No. 53-0661. Paint Steel Portion Of Bridge For

Preventative Maintenance To Preserve And Extend The Life Of Bridge.

19-00 16H-019 141

34330 Route 060: In The City Of Industry At Hacienda Boulevard Undercrossing (Uc) No. 53-1789 (Pm 15.93),

Stemson Avenue Uc No. 53-1784 (Pm 16.30), Azusa Avenue Overcrossing No. 53-1785 (Pm 17.97) And

Fullerton Road Uc No. 53-1786 (Pm 19.46). Improve Freight C

19-00 16H-019 3320

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 2 of 3 Printed: 4/25/2018: 2:06 PM

#19-00 LA LALS04 SHOPP Bridge Rehabilitation

Page 99: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS04

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS04 , 999 - 0.0 / 0.0 - Route 999: In L.A. Grouped Projects For Bridge Rehabilitation And Reconstruction - Shopp Program.

Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Widening Narrow Pavements Or Reconstructing Bridges

(No Additional Travel Lanes).

SHOPPAC-P 2018/19 Total 127465

SHOPPAC-P Total 127465

Grand Total 801604

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 3 of 3 Printed: 4/25/2018: 2:06 PM

#19-00 LA LALS04 SHOPP Bridge Rehabilitation

Page 100: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS06

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

SHOPPAC 2018/19 30510 Route 405: In Van Nuys, Near Saticoy Street. Replace And Install Weight In Motion System. 19-00 CTC VOTE 4666

31190 Route 605: In Various Cities, From Orange County Line To Route 210; Also On Route 2 At The Tmc (Pm R18.7)

And Route 5 (Pm 6.8). Upgrade Transportation Management System.

19-00 2016

SHOPP

13612

31200 Route 110: In The Cities Of San Pedro, Carson, Gardena And Los Angeles, From Gaffey Street To Route 5;

Also On Route 2 At The Tmc Building (Pm 18.7), Route 5 At Route 10 Interchange (Pm 16.9) And Route 405 At

Route 105 Interchange (Pm 21.3). Upgrade And

19-00 2016

SHOPP

38547

33860 Route 999 (Various): In And Near Carson, On Route 91 From Route 110 To Orange County Line; Also On

Route 2 (Pm R18.7), Route 5 (Pm 6.8), Route 405 (Pm 21.1). Upgrade The Existing Transportation Management

System (Tms) Elements To Improve Traffic Monitori

19-00 16H-017 511

2018/19 Total 57336

2020/21 33500 Route 999 (Various): In Los Angeles County, On Route 110 From Gaffey Street To Route 405; Also On Route

210 (Pm R0.0/R35.8), Route 605 (Pm 19.9/26.0), Route 710 (Pm 5.0/9.4) And Route 2 (Pm R18.7). Install

Wireless Bluetooth™ Detection System To Monitor

19-00 16H-017 1883

32710 Route 999 (Various): In And Near The City Of Los Angeles, From Eb Route 60/5 Separation To Route 605; Also

On Route 2 (Pm R18.7), Route 5 (Pm 6.8), Route 10 (Pm 18.3), And Route 605 (Pm 20.2). Upgrade The

Existing Transportation Management System (Tms) E

19-00 16H-019 9350

32720 Route 999 (Various): In And Near Santa Monica, From Lincoln Boulevard To Mcclure Tunnel; Also On Route 10

(Pm 2.1/18.3), Route 2 (Pm R18.7), Route 101 (Pm 11.8), And Route 105 (Pm R1.95). Upgrade The Existing

Transportation Management System (Tms) Elemen

19-00 16H-019 24077

2020/21 Total 35310

2021/22 33780 Route 999 (Various): In Los Angeles County, From Routes 5/10 To Route 405, Route 2 At Route 134 (Pm

R18.7) And Route 10 At Route 5/10 (Pm 18.3). Upgrade Transportation Management System (Tms) Elements

Including Closed Circuit Television (Cctv) Cameras, R

19-00 16H-019 14764

33790 Route 999 (Various): In The City Of Los Angeles, On Route 134 From Route 170 To Routes 210/710; Also On

Route 2 At Route 134 (Pm R18.7), On Route 10 At Routes 5/10 (Pm 18.3), And On Route 101 Near Pleasant

Valley Road (Pm 11.8). Upgrade Transportation Ma

19-00 16H-019 12519

33860 Route 999 (Various): In And Near Carson, On Route 91 From Route 110 To Orange County Line; Also On

Route 2 (Pm R18.7), Route 5 (Pm 6.8), Route 405 (Pm 21.1). Upgrade The Existing Transportation Management

System (Tms) Elements To Improve Traffic Monitori

19-00 16H-017 16458

FTIP ID: LALS06 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Mobility Program. Projects Are

Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And Table 3 Categories.

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 3 Printed: 4/25/2018: 2:11 PM

#19-00 LA LALS06 SHOPP Mobility Program

Page 101: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS06

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS06 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Mobility Program. Projects Are

Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And Table 3 Categories.

SHOPPAC 2021/22 Total 43741

SHOPPAC Total 136387

SHOPPAC-P 2018/19 28910 Route 405: In Carson, From Avalon Boulevard To Main Street. Reconstruct Commerical Vehicle Enforcement

Facility.

19-00 16H-002 7557

29850 Route 405: In The City Of Los Angeles, Near Bel Air, From Sunset Boulevard To South Of Bel Air Crest Road.

Upgrade Existing Temporary Ramps. [No Lane Addition]

19-00 CTC VOTE 23250

30460 Route 105 From Pm 0 To 18.2 And On Various Routes (2, 5, 10, 105, 405, 605), At Various Locations, In

Various Cities. Upgrade The Existing Communication System To All Fiber Optic Communications.

19-00 PM 9315

34040 Route 999 (Various): In Los Angeles County In Various Cities On Route 5 Between Lakewood Blvd (Sr 19) And

Avenue 26, Other Various Routes And Locations, And Various Transportation Management Center Hubs.

Repair And Rehabilitate The Rms, Vds And Commun

19-00 16H-014 27888

34050 Route 999 (Various): In Los Angeles County In Various Cities On Route 10 Between Caesar Chavez Avenue

And Indian Hill Blvd, Other Various Routes And Locations, And Various Transportation Management Center

Hubs. Repair And Rehabilitate The Rms, Vds, And

19-00 16H-014 20842

34060 Route 999 (Various): In Los Angeles And Ventura Counties In Various Cities On Route 2 Between Riverside

Drive And Stonecrest Drive, Other Various Routes And Locations, And Various Transportation Management

Center Hubs. Repair And Rehabilitate The Rms, V

19-00 16H-014 27991

33500 Route 999 (Various): In Los Angeles County, On Route 110 From Gaffey Street To Route 405; Also On Route

210 (Pm R0.0/R35.8), Route 605 (Pm 19.9/26.0), Route 710 (Pm 5.0/9.4) And Route 2 (Pm R18.7). Install

Wireless Bluetooth™ Detection System To Monitor

19-00 16H-017 40

32710 Route 999 (Various): In And Near The City Of Los Angeles, From Eb Route 60/5 Separation To Route 605; Also

On Route 2 (Pm R18.7), Route 5 (Pm 6.8), Route 10 (Pm 18.3), And Route 605 (Pm 20.2). Upgrade The

Existing Transportation Management System (Tms) E

19-00 16H-019 30

32720 Route 999 (Various): In And Near Santa Monica, From Lincoln Boulevard To Mcclure Tunnel; Also On Route 10

(Pm 2.1/18.3), Route 2 (Pm R18.7), Route 101 (Pm 11.8), And Route 105 (Pm R1.95). Upgrade The Existing

Transportation Management System (Tms) Elemen

19-00 16H-019 539

33780 Route 999 (Various): In Los Angeles County, From Routes 5/10 To Route 405, Route 2 At Route 134 (Pm

R18.7) And Route 10 At Route 5/10 (Pm 18.3). Upgrade Transportation Management System (Tms) Elements

Including Closed Circuit Television (Cctv) Cameras, R

19-00 16H-019 438

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 2 of 3 Printed: 4/25/2018: 2:11 PM

#19-00 LA LALS06 SHOPP Mobility Program

Page 102: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS06

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS06 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Mobility Program. Projects Are

Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And Table 3 Categories.

SHOPPAC-P 2018/19 33790 Route 999 (Various): In The City Of Los Angeles, On Route 134 From Route 170 To Routes 210/710; Also On

Route 2 At Route 134 (Pm R18.7), On Route 10 At Routes 5/10 (Pm 18.3), And On Route 101 Near Pleasant

Valley Road (Pm 11.8). Upgrade Transportation Ma

19-00 16H-019 454

2018/19 Total 118344

SHOPPAC-P Total 118344

Grand Total 254731

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 3 of 3 Printed: 4/25/2018: 2:11 PM

#19-00 LA LALS06 SHOPP Mobility Program

Page 103: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS07

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

SHOPPAC 2018/19 23830 Route 110: In The City Of Los Angeles, From 120Th Street To 3Rd Street At Various Locations. Construct

Gross Solid Removal Devices, Biofiltration Devices, And Detention Basin.

19-00 2016

SHOPP

15869

25940 Route 210: Near Sylmar, San Fernando And Sunland, From Route 5 To Wheatland Avenue. Construct Storm

Water Treatment Best Management Practices To Reduce Trash Total Maximum Daily Load (Tmdl).

19-00 16H-019 22776

27610 Route 110: In The Cities Of Los Angeles And Carson, From L Street To 223Rd Street. Construct Storm Water

Treatment Best Management Practices.

19-00 2016

SHOPP

14355

30440 Route 710: In East Los Angeles, From Route 5 To North Of Floral Drive; Also On Route 60 (Pm R2.9/R3.8),

From West Of Marina Avenue Pedestrian Overcrossing To Mednick Avenue. Stabilize Soil And Erosion Control.

19-00 2016

SHOPP

4725

30490 Route 001: In Various Cities, From Calle Mayor To Ventura County Line; Also On Routes 23 And 27, At Various

Locations. Construct Storm Water Treatment Best Management Practices.

19-00 2016

SHOPP

8808

30650 Route 066: In La Verne And Pomona, From Baseline Road To Towne Avenue. Construct And Upgrade Curb

Ramps And Sidewalks To Comply With Ada Standards.

19-00 16H-007 6033

30660 Route 213: In The Cities Of Rancho Palos Verdes, Lomita And Los Angeles, From W 25Th Street To W Carson

Street At Various Locations. Upgrade Curb Ramps, Sidewalks And Driveways To Meet Ada Standards. (G13

Contingency Project)

19-00 2016

SHOPP

976

30700 Route 107: In Torrance, From Route 1 To Redondo Beach Boulevard. Construct Curb Ramps And Reconstruct

Driveways/Sidewalks To Meet Ada Standards. (G13 Contingency Project)

19-00 2016

SHOPP

717

31140 Route 101: In The City Of Los Angeles, From Beaudry Avenue To Hollywood Boulevard. Stabilize Soil And

Erosion Control.

19-00 2016

SHOPP

4874

31740 Route 105: In Willowbrook And Lynwood, From Main Street To Mona Boulevard. Storm Water Mitigation

Including Planting Of Vegetation And The Installation Of Irrigation Systems. (G13 Contingency Project)

19-00 CTC VOTE 5092

2018/19 Total 84225

2019/20 26080 Route 010: In The Cities Of Los Angeles, Alhambra, El Monte, Monterey Park And Rosemead, From Central

Avenue To Cogswell Road; Also On Route 405 From Cherry Avenue To South Alameda Street (Pm 4.8/8.5).

Construct Storm Water Treatment Best Management Prac

19-00 2016

SHOPP

32800

28830 Route 002: In Los Angeles County In Various Cities On Routes 60, 66, 164 And 210 At Various Locations.

Construct And Install Storm Water Treatment Best Management Practices.

19-00 2016

SHOPP

8866

30170 Route 210: In The Cities Of Monrovia, Duarte, Irwindale And Azusa, From Myrtle Avenue To Azusa Avenue.

Stabilize Soil And Erosion Control.

19-00 2016

SHOPP

4724

FTIP ID: LALS07 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Mandates Program. Projects Are

Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And 3 Categories.

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 3 Printed: 4/25/2018: 2:17 PM

#19-00 LA LALS07 SHOPP Mandates

Page 104: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS07

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS07 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Mandates Program. Projects Are

Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And 3 Categories.

SHOPPAC 2019/20 31160 Route 134: In And Near Burbank, From Bob Hope Drive To Victory Boulevard/Riverside Drive. Stabilize Soil And

Erosion Control.

19-00 2016

SHOPP

3134

31770 Route 001: In Los Angeles And Ventura Counties, On Various Routes, At Various Locations. Stabilize Soil And

Erosion Control.

19-00 2016

SHOPP

2301

2019/20 Total 51825

2020/21 30660 Route 213: In The Cities Of Rancho Palos Verdes, Lomita And Los Angeles, From W 25Th Street To W Carson

Street At Various Locations. Upgrade Curb Ramps, Sidewalks And Driveways To Meet Ada Standards. (G13

Contingency Project)

19-00 2016

SHOPP

4744

30700 Route 107: In Torrance, From Route 1 To Redondo Beach Boulevard. Construct Curb Ramps And Reconstruct

Driveways/Sidewalks To Meet Ada Standards. (G13 Contingency Project)

19-00 2016

SHOPP

5029

2020/21 Total 9773

SHOPPAC Total 145823

SHOPPAC-P 2018/19 28660 Routes 405, 091, 022 & Various: In Long Beach, Signal Hill And Lakewood On Various Routes At Various

Locations. Mitigate For Stormwater Quality By Installing Bio-Filtration Swales, Basins, Media Filters And Gross

Solid Removal Devices, And Other Best Man

19-00 PM 15887

28670 Route 001: In The Cities Of Los Angeles, Long Beach, Signal Hill, Lakewood, Carson, And Hawthorn On

Various Routes At Various Loaction. Mitigate For Stormwater Quality By Using Best Management Practices

(Bmp'S).

19-00 16H-003 29906

28990 Route 019: In Lakewood, Bellflower, Paramount And Downey, From Del Amo Boulevard To Gardendale Street.

Upgrade Curb Ramps And Sidewalks To Americans With Disabilities Act (Ada) Standards.

19-00 16H-003 8111

29100 Route 014: In And Near Santa Clarita And Palmdale, From Sand Canyon Road Overcrossing To Avenue S

Undercrossing. Upgrade Curb Ramps And Sidewalks To Americans With Disabilities Act (Ada) Standards.

19-00 2016

SHOPP

3003

29110 Route 101: In And Near Calabasas, Agoura Hills And West Lake Village, From Las Virgenes Road To Lindero

Canyon Road; Also In And Near The Cities Of Camarillo, Oxnard, And Ventura From Pleasant Valley Road To

Padre Juan Canyon Road. Upgrade To Ada Standar

19-00 16H-003 4231

29120 Route 057: In San Dimas And Glendora From Route 10 To Route 210, Also On Route 60 In And Near The

Cities Of Los Angeles, Monterey Park, And Montebello. Construct Americans With Disabilities Act (Ada) Curb

Ramp Improvements.

19-00 16H-002 5117

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 2 of 3 Printed: 4/25/2018: 2:17 PM

#19-00 LA LALS07 SHOPP Mandates

Page 105: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS07

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

FTIP ID: LALS07 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements - Shopp Mandates Program. Projects Are

Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And 3 Categories.

SHOPPAC-P 2018/19 30040 Route 101: In The Cities Of Los Angeles And Calabasas, At Various Locations From Alameda Street To Mureau

Road. Mitgate For Stormwater Quality By Installing Best Management Practices (Bmp'S) And Stabilizing Soil

Erosion.

19-00 2016

SHOPP

32950

31230 Route 014: In And Near Santa Clarita, From North Of Sierra Highway To South Of Soledad Canyon Road, At

Various Locations. Install Storm Water Mitigation Devices.

19-00 16H-003 19985

31250 Route 005: Near Gorman, From Route 138 To South Of Frazier Mountain Park Road, At Various Locations.

Install Storm Water Mitigation Devices.

19-00 16H-003 15988

31260 Route 005: Near Gorman, From North Of Vista Del Lago Road To Route 138, At Various Locations. Construct

Storm Water Mitigation Devices.

19-00 16H-003 12056

31280 Route 014: Near Santa Clarita And Palmdale At Various Locations, From South Of Soledad Canyon Road To

South Of Mountain Spring Road. Install Storm Water Mitigation Devices.

19-00 16H-003 12698

2018/19 Total 159932

SHOPPAC-P Total 159932

Grand Total 305755

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 3 of 3 Printed: 4/25/2018: 2:17 PM

#19-00 LA LALS07 SHOPP Mandates

Page 106: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS08

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

SHOPPAC 2021/22 4X970 Route 001: In Malibu, South Of Big Rock Drive. Shoreline Embankment Restoration By Installing Rock Slope

Protection (Rsp) Armament.

19-00 16H--019 14300

2021/22 Total 14300

SHOPPAC Total 14300

SHOPPAC-P 2018/19 32610 Route 047: In San Pedro, At The Park And Ride Lot, Near The Eastbound Harbor Boulevard Off-Ramp.

Construct Solder Pile Wall To Stabilize The Existing Eroding Slope And Repair Drainage System.

19-00 16H-014 2968

33340 Route 001: In Malibu, From Sea Vista Drive To Via Escondido Drive. Construct Tie Back Anchor System And

Micro/Sheet Piles On Southbound Side Of Highway And Shoring Wall With Tie Backs On Northbound Side Of

Highway To Prevent Further Landslide Distress An

19-00 CTC VOTE 15921

1XE70 Route 107: In Torrance, From Route 1 To Fashion Way. Replace Asphalt Concrete (Ac) Pavement And Overlay,

Repair Localized Failed Areas And Slurry Left Turn Pockets In Both Directions.

19-00 16H-019 6850

1XF20 Route 002: Near Big Pines, At 0.5 Mile West Of Grassy Hollow Visitor Center. Replace Damaged Drainage

Pipe, Fill The Sinkhole And Repair The Pavement.

19-00 16H-019 1100

4X970 Route 001: In Malibu, South Of Big Rock Drive. Shoreline Embankment Restoration By Installing Rock Slope

Protection (Rsp) Armament.

19-00 16H--019 1600

2018/19 Total 28439

SHOPPAC-P Total 28439

Grand Total 42739

FTIP ID: LALS08 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Emergency Repair - Shopp Emergency Response Program.

Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Repair Damage Caused By Natural Disasters, Civil

Unrest, Or Terrorist Acts. This Applies To Damages That Do Not Qualify For Federal Emergency Relief Funds Or To Damages That

Qualify For Federal Emergency Relief Funds But Extend Beyond The Federally Declared Disaster Period.

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 1 Printed: 4/25/2018: 2:23 PM

#19-00 LA LALS08 SHOPP Emergency Response

Page 107: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^LALS09

County LA

STATUS (Multiple Items)

EA (All)

Doc Year 2019

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htm

FUND NAME YEAR EA5 Project Desciption FTIP

Amend#

Doc TOTAL COST

SHOPPAC-P 2018/19 4T340 Route 105: In Los Angeles County, Relinquish Drainage Facilities. 19-00 16/17

MINOR

756

3P960 Route 405: Construct New Maintenance Crew Building To Meet The Demands Of Two Crews With Sufficient

Restrooms And Lockers, Demolish Existing Building, Remove The Existing Leased Office Trailer And Install

Accessible Parking Adjacent To The New Building.

19-00 16/17

MINOR

2130

3P680 Route 210: In Los Angeles County, Modify Traffic Signal And Pedestrian Crossing At Westbound Off-Ramp To

Azusa Avenue/First Street.

19-00 17/18

MINOR

1130

4T630 Route 091: In Los Angeles County, Regrade Slope And Improve Drainage. 19-00 16/17

MINOR

1445

4T870 Route 405: In Los Angeles County, Route 405 At La Tijera Boulevard Overcrossing, Upgrade Metal Beam

Guardrail (Mbgr) To Concrete Barrier.

19-00 17/18

MINOR

960

4T880 Route 187: In Los Angeles County, Venice Boulevard At Grand View Boulevard, Install Left Turn Signal Phasing

And Upgrade Americans With Disabilities Act (Ada) Infrastructure.

19-00 16/17

MINOR

920

4T950 Route 405: Modify Existing Wildlife Fencing. 19-00 16/17

MINOR

2379

3P790 Route 001: In Los Angeles County, In The City Of Malibu On The Pacific Coast Highway Near West Of Tuna

Canyon Road. Repair Drainage Benches On Hillside.

19-00 17/18

MINOR

910

4T890 Route 999 (Various): In Los Angeles County, On Routes 91, 105, 164, 710 At Various Locations. Upgrade

Damage End Treatments.

19-00 17/18

MINOR

910

4T980 Route 005: In Los Angeles County, In The City Of Burbank On Southbound Route 5 At Hollywood Way. Install

Traffic Signal.

19-00 17/18

MINOR

1510

4T990 Route 001: In Los Angeles County, In The City Of Hermosa Beach On Herondo Street And Artesia Boulevard.

Ada Curb Ramps.

19-00 17/18

MINOR

1320

4U020 Route 105: In Los Angeles County, In The City Of Los Angeles Between San Gabriel River And Flatbush

Avenue. Construct Class 3 Bike Path. Financial Contribution Only (Fco).

19-00 17/18

MINOR

1170

2018/19 Total 15540

SHOPPAC-P Total 15540

Grand Total 15540

FTIP ID: LALS09 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements, Shoulder Improvements, Pavement

Resurfacing And/Or Rehabilitation - Minor Program. Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 And Table 3

Categories - Rr/Hwy Crossing, Safer Non-Fed Aid Sys Rds, Shlder Improv, Traffic Control Devices & Operating Assistance Other Than

Signalizpavement Resurfacing And/Or Rehabilitation.

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 1 Printed: 4/25/2018: 2:30 PM

#19-00 LA LALS09 SHOPP Safety - Minor Program

Page 108: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

ORANGE

COUNTY

Page 109: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

HBP GROUP PROJECTS(In $000's)

RTIP # DESCRIPTION PHASE 18/19 19/20 Beyond TotalHuntington Beach PM00036, Bridge Preventive Maintenance Program, various locations. E $0 $0 $0 $927,397

R $0 $0 $0 $50,000C $0 $0 $0 $4,203,366

Laguna Niguel

BRIDGE NO. 55C0506, PASEO DE LA COLINA, OVER SCRRA,BNSF RY,AMTRAK,ETC, HBP Seismic Retrofit. No adding lane capacity.(Voluntary Seismic) Fed Proj: BRLSZ-5458(012)

E $0 $0 $0 $0R $0 $0 $0 $0C $0 $0 $0 $0

Newport Beach

BRIDGE NO. 55C0015, PARK AVE, OVER GRAND CANAL, 0.1 MI E OF MARINE AVE. Replace two lane bride with two lane bridge. (Replacement will satisfy LSSRP Seismic Retrofit) 7/22/2011: Toll Credits programmed for PE & CON. Fed Proj: BRLO-5151(026) E $0 $0 $0 $0

R $0 $0 $0 $0C $0 $0 $0 $0

Rancho Santa Margarita

PM00035, Bridge Preventive Maintenance Program. Various locations in the City of Rancho Santa Margarita. See Caltrans Local Assistance HBP website for backup list of bridges.

E $0 $0 $0 $1,022,250R $0 $0 $0 $0C $5,238,000 $0 $447,750 $5,685,750

Huntington Beach

BRIDGE NO. 55C0258, GILBERT DR OVER SHELTER CHANNEL, 0.4 MI E/O ADMIRALTY DR. Preventative Maintenance project to replacebearing, repair steel girders, paint structural steel, polyester overlay. 4/5/2010: Toll Credits programmed for PE & Con. E $0 $0 $0 $424,300

R $0 $0 $0 $0C $0 $0 $2,377,300 $2,377,300

Huntington Beach

BRIDGE NO. 55C0259, DAVENPORT DR OVER WEATHERLY CHANNEL, 0.3 MI W/O SAYBROOK LN. Bridge Preventive Maintenance Project. Replace bearings, repair steel girders, paint steel, deck overlay and patch unsound concrete. 4/5/2010: Toll Credits programmed for PE & Con.

E $0 $0 $0 $428,900R $0 $0 $0 $0C $0 $0 $2,403,000 $2,403,000

Huntington Beach

BRIDGE NO. 55C0282, ADMIRALTY DRIVE OVER QUEEN ELIZABETH PASSAGE, 0.1 MI NE/O PAC COAST HWY. Rehabilitate bridge.4/5/2010: Toll Credits programmed for PE & Con. E $0 $0 $0 $585,000

R $0 $25,000 $0 $25,000C $0 $0 $3,280,000 $3,280,000

Grouped Projects for Bridge Rehabilitation and Reconstruction - HBP Program - Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Widening narrowpavements or reconstructing bridges (no additional travel lanes).

#19-00 ORA ORA020501_HBP

Page 110: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

HBP GROUP PROJECTS(In $000's)

RTIP # DESCRIPTION PHASE 18/19 19/20 Beyond Total

Grouped Projects for Bridge Rehabilitation and Reconstruction - HBP Program - Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Widening narrowpavements or reconstructing bridges (no additional travel lanes).

Orange County

BRIDGE NO. 55C0400, EDINGER AVE OVER BOLSA CHICA CHANNEL, 1.7 MI W/O BOLSA CHICA RD.Replace two lane bride with two lane bridge including shoulders and sidewalk on one side. (No added capacity) E $0 $0 $0 $0

R $0 $0 $0 $0C $0 $0 $0 $16,122,717

Huntington Beach

BRIDGE NO. 55C0284, HUMBOLDT DRIVE OVER SHORT CHANNEL, 0.1 MI W/O SAYBROOK LN. Rehabilitate bridge. 4/5/2010: TollCredits programmed for PE & Con. E $0 $0 $0 $502,000

R $0 $25,001 $0 $25,001C $0 $0 $2,814,000 $2,814,000

OrangeBRIDGE NO. PM00086, Bridge Preventative Maintenance Program (BPMP) various bridges in City of Orange. E $0 $0 $0 $250,000

R $0 $0 $0 $0C $1,665,720 $0 $0 $1,665,720

Santa Ana

BRIDGE NO. 55C0513, FAIRVIEW STREET OVER SANTA ANA RIVER CHANNEL, 0.2 MI S/O WESTMINSTER AV. Bridge Rehabilitation. Widen bridge to accommodate shoulders and sidewalks. No added Capacity E

RC

Santa Ana

BRIDGE NO. PM00087, Developing of the Bridge Preventative Maintenance Plan by the City of Santa Ana. (Project Studies Only - for developing projects list- NOT for project development) E

RC

Orange County

BRIDGE NO. 55C0172, MODJESKA CANYON RD OVER SANTIAGO CREEK, 0.1 MI N/O MODJESKA GR RD. Replace existing two lanebridge with new two lane bridge. 3/18/2013: Toll Credits programmed for PE, R/W, & CON E $0 $0 $0 $355,000

R $0 $0 $0 $0C $0 $0 $1,152,000 $1,152,000

Orange County

BRIDGE NO. 55C0174, SILVERADO CNYN RD. OVER SILVERADO CANYON CREEK, 1.6 MI E/O SANTIAGO ROAD. Replace existing twolane bridge with two lane bridge. 3/14/2013: Toll Credits programmed for PE & CON E $0 $0 $0 $421,500

R $0 $0 $0 $0C $0 $0 $1,436,400 $1,436,400

Orange County

BRIDGE NO. 55C0175, SILVERADO CANYN RD OVER LADD CANYON, 2.2 MI. E/O SANTIAGO ROAD. Bridge replacement project.Replace 2 lane bridge with 2 lane bridge (no added capacity). 2/14/2013: Toll Credits programmed for PE & CON. E $0 $160,000 $0 $359,250

R $0 $0 $0 $0C $0 $0 $1,115,800 $1,115,800

#19-00 ORA ORA020501_HBP

Page 111: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

HBP GROUP PROJECTS(In $000's)

RTIP # DESCRIPTION PHASE 18/19 19/20 Beyond Total

Grouped Projects for Bridge Rehabilitation and Reconstruction - HBP Program - Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Widening narrowpavements or reconstructing bridges (no additional travel lanes).

Orange County

BRIDGE NO. 55C0177, SILVERADO CANYN RD OVER SILVERADO CANYON CREEK, 4.4 MI. E/O SANTIAGO ROAD. Replace existing twolane bridge with two lane bridge. E $0 $44,274 $0 $386,000

R $0 $0 $0 $0C $0 $0 $1,237,600 $1,237,600

Orange County

BRIDGE NO. PM00108, BRIDGE PREVENTIVE MAINTENANCE PROGRAM (BPMP) for various bridges in the County of Orange. E $0 $0 $0 $437,400

R $0 $0 $0 $0C $0 $0 $1,749,550 $1,749,550

AnaheimBRIDGE NO. PM00121, BRIDGE PREVENTIVE MAINTENANCE PROGRAM (BPMP), various bridges in the City of Anaheim. E $0 $0 $0 $206,000

R $0 $0 $0 $0C $0 $618,180 $0 $618,180

Placentia

BRIDGE NO. 55C0192, GOLDEN AVENUE OVER CARBON CANYON CHANNEL, 0.2 MI W/O ROSE DRIVE. Bridge Replacement. Replaceexisting 2 lane bridge with 2 lane bridge. E $0 $0 $0 $590,000

R $0 $0 $0 $0C $0 $0 $2,688,750 $2,688,750

PHASE 18/19 19/20 Beyond TotalHBR amount E $885,300 $204,274 $0 $7,386,526

R $0 $47,133 $0 $91,398C $6,111,863 $547,275 $25,630,580 $50,284,400

Total $6,997,163 $798,682 $25,630,580 $57,762,324

Local Match E $114,700 $0 $0 $508,471R $0 $2,868 $0 $8,603C $791,857 $70,905 $1,271,570 $4,465,733

Total $906,557 $73,773 $1,271,570 $4,982,807

LSSRP E $0 $0 $0 $0R $0 $0 $0 $0C $0 $0 $0 $0

Total $0 $0 $0 $0

Grand Total E $1,000,000 $204,274 $0 $7,894,997R $0 $50,001 $0 $100,001C $6,903,720 $618,180 $26,902,150 $54,750,133

Total $7,903,720 $872,455 $26,902,150 $62,745,131

#19-00 ORA ORA020501_HBP

Page 112: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

REGIONAL MPO ATP PROJECTSORA150104

Regional MPO ATP Projects ‐ ORA150104

ID Co Agency Project Title Fund Source  Total  18‐19 19‐20 20‐21 RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE Notes

0761 ORA Santa Ana Maple Bicycle Trail Safety Enhancements Total 1,101  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  Trail Improvements, ramps, and cut outsFederal ATP ‐ ‐ ‐ ‐ State Only FundedState ATP 1,101 ‐ ‐ ‐Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐

0728 ORA Laguna Hills La Paz Sidewalk Widening Total ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sidewalk Construction(REMOVED FROM PROGRAM) Federal ATP ‐ ‐ ‐ ‐ State Only Funded

State ATP ‐ ‐ ‐ ‐ Project Removed from ATPAgency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐

0745 ORA Orange Co County Bicycle Loop, Segments F and H Total 525 ‐ ‐ ‐ ‐ ‐ ‐ ‐  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ PreconstructionFederal ATP ‐ ‐ ‐ ‐ State Only FundedState ATP 465 ‐ ‐ ‐Agency 60 ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐

0753 ORA Santa Ana Monte Vista Elementary SRTS Enhancements Total 430 ‐ ‐ ‐ ‐ ‐ ‐ ‐  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Intersection ImprovementsFederal ATP ‐ ‐ ‐ ‐ State Only FundedState ATP 430 ‐ ‐ ‐Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐

0743 ORA Orange Co Bicycle Loop ‐ Segment D Total ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  PreconstructionFederal ATP ‐ ‐ ‐ ‐ State Only FundedState ATP ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐

0720 ORA Garden Grove Harbor & Twintree HAWK Total 160  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  CrossingsFederal ATP ‐ ‐ ‐ ‐ State Only FundedState ATP 160 ‐ ‐ ‐Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐

0747 ORA San Clemente Concordia School Ped/Bike Improv. Total 1,180  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  Intersection ImprovementsFederal ATP ‐ ‐ ‐ ‐ State Only FundedState ATP 126 ‐ ‐ ‐Agency 1,054 ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐

ORA La Habra La Habra Union Pacific Rail Line Bikeway Easement from Beach Boulevard to Guadalupe Park Total 527  527  ‐  ‐  527  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  Right of way purchase for Class IFederal ATP ‐ ‐ ‐ ‐ State Only FundedState ATP 466 466 ‐ ‐ 466Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐Local 61 61 ‐ ‐ 61

ORA Garden Grove First Mile Bicycle and Pedestrian Trail Expansion on the PE ROW and Education/Encouragement Activities Total 1,941  1,522  ‐  ‐  ‐  1,522  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  Class I and EncouragementFederal ATP 1,891 1,472 ‐ ‐ 1,472 Federally FundedState ATP ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐Local 50 50 ‐ ‐ 50

ORA La Habra Guadalupe Park Reconstruction Project Total 400  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  Design OnlyFederal ATP ‐ ‐ ‐ ‐ State Only FundedState ATP 340 ‐ ‐ ‐Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐Local 60 ‐ ‐ ‐

GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES ‐ PROJECTS CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEOGRIES ‐ BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON‐MOTORIZED). (REGIONAL ATP FUNDED) Toll Creditfor ATP‐MPO.

FY20‐21FY19‐20FY18‐19

#19-00 ORA ORA150104_REG_ATP

Page 113: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

REGIONAL MPO ATP PROJECTSORA150104

Regional MPO ATP Projects ‐ ORA150104

ID Co Agency Project Title Fund Source  Total  18‐19 19‐20 20‐21 RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE Notes

GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES ‐ PROJECTS CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEOGRIES ‐ BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON‐MOTORIZED). (REGIONAL ATP FUNDED) Toll Creditfor ATP‐MPO.

FY20‐21FY19‐20FY18‐19

ORA San Clemente Shorecliffs Middle School Safe Routes to School Pedestrian Improvement Project Total 878  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  Bulb outs and crossings. SRTSFederal ATP ‐ ‐ ‐ ‐ State Only FundedState ATP 869 ‐ ‐ ‐Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐Local 9 ‐ ‐ ‐

ORA Santa Ana Safe Routes to Schools Enhancements for Sepulveda Elementary Total 310  255  ‐  ‐  ‐  255  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  Bulb Outs and crossings. SRTSFederal ATP ‐ ‐ ‐ ‐ State Only FundedState ATP 310 255 ‐ ‐ 255Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐

ORA Santa Ana Lincoln Pedestrian Pathway Connectivity Total 1,230  1,030  ‐  ‐  ‐  1,030  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  Pedestrian pathway between Park AvenFederal ATP 1,230 1,030 ‐ ‐ 1,030 State Only FundedState ATP ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐

#19-00 ORA ORA150104_REG_ATP

Page 114: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

REGIONAL MPO ATP PROJECTSORA150104

Regional MPO ATP Projects ‐ ORA150104

ID Co Agency Project Title Fund Source  Total  18‐19 19‐20 20‐21 RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE Notes

GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES ‐ PROJECTS CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEOGRIES ‐ BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON‐MOTORIZED). (REGIONAL ATP FUNDED) Toll Creditfor ATP‐MPO.

FY20‐21FY19‐20FY18‐19

ORA Fountain Valley Fountain Valley Pedestrian Pathway Improvement within School Zones Total 296  ‐  296  ‐  ‐  ‐  ‐  ‐  ‐  296  ‐  ‐  ‐  ‐  ‐  ‐  Construct 85 curb ramps on sidewalks Federal ATP ‐ ‐ ‐ ‐State ATP 226 ‐ 226 ‐ 226Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐Local 70 ‐ 70 ‐ 70

ORA Orange County La Habra Union Pacific Rail Line Bikeway (Walnut to Cypress) Total 975  975  ‐  ‐  975  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  Acquire appx 2,600 feet of bikeway easeFederal ATP ‐ ‐ ‐ ‐State ATP 863 863 ‐ ‐ 863Agency 112 112 ‐ ‐ 112CMAQ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐

ORA Seal Beach Lampson Avenue Bike Lane Gap Closure Project Total 1,265  ‐  130  1,100  ‐  ‐  ‐  ‐  ‐  ‐  ‐  130  ‐  1,100  ‐  ‐  Class II bike lanes, revised striping, signinFederal ATP ‐ ‐ ‐ ‐State ATP 637 ‐ 105 505 105 505Agency 628 ‐ 25 595 25 595CMAQ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐

Total ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ Federal ATP ‐ ‐ ‐ ‐State ATP ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐

Total ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐  ‐ Federal ATP ‐ ‐ ‐ ‐State ATP ‐ ‐ ‐ ‐Agency ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐Local ‐ ‐ ‐ ‐

Programming TotalsFund Source  Total  18‐19 19‐20 20‐21 RW CON PAED PSE RW CON PAED PSE RW CON PAED PSE

Federal ATP 3,121 2,502 ‐ ‐ ‐ 2,502 ‐ ‐  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐State ATP 5,993 1,584 331 505 1,329 255 ‐ ‐  ‐ 226 ‐ 105 ‐ 505 ‐ ‐Agency 1,854 112 25 595 112 ‐ ‐ ‐  ‐ ‐ ‐ 25 ‐ 595 ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐  ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐Local 250 111 70 ‐ 61 50 ‐ ‐  ‐ 70 ‐ ‐ ‐ ‐ ‐ ‐Total 11,218 4,309 426 1,100 1,502 2,807 ‐ ‐  ‐ 296 ‐ 130 ‐ 1,100 ‐ ‐

20‐21FY19‐20FY18‐19

#19-00 ORA ORA150104_REG_ATP

Page 115: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

 2019 FTIP STATEWIDE ATP PROJECTSORA150107

Statewide ATP Projects ‐ ORA150107

ID Co Agency Project Title Fund Source  Total  18‐19 RW CON PAED PSE Notes

ORA Anaheim Western Avenue Pedestrian Signal 400  ‐  ‐  ‐  ‐  ‐ Federal ATP 400 ‐State ATP ‐ ‐Agency ‐ ‐CMAQ ‐ ‐

ORA Anaheim South Street Sidewalk Gap Closure 796 ‐ ‐ ‐ ‐ ‐Federal ATP 796 ‐State ATP ‐ ‐Agency ‐ ‐CMAQ ‐ ‐

ORA Anaheim Cerritos Avenue Sidewalk Gap Closure 1,209 ‐ ‐ ‐ ‐ ‐Federal ATP 1,209 ‐State ATP ‐ ‐Agency ‐ ‐CMAQ ‐ ‐

ORA Santa Ana SRTS Enhancements for Heninger Elementary 480 ‐ ‐ ‐ ‐ ‐Federal ATP 480 ‐State ATP ‐ ‐Agency ‐ ‐CMAQ ‐ ‐

ORA Santa Ana SRTS Enhancements for King Elementary 500  ‐  ‐  ‐  ‐  ‐ Federal ATP 500 ‐State ATP ‐ ‐Agency ‐ ‐CMAQ ‐ ‐

ORA Santa Ana SRTS Enhancements for Washington Elementary 780  ‐  ‐  ‐  ‐  ‐ Federal ATP 780 ‐State ATP ‐ ‐Agency ‐ ‐CMAQ ‐ ‐

ORA Santa Ana Complete Streets Plan 300  ‐  ‐  ‐  ‐  ‐ Federal ATP 300 ‐State ATP ‐ ‐Agency ‐ ‐CMAQ ‐ ‐

ORA Santa Ana City of Santa Ana‐ Civic Center Bike Boulevard 3,729  3,063  ‐  3,063  ‐  ‐  Bike boulevard, signals, signage, stripingFederal ATP ‐ ‐State ATP 3,729 3,063 3,063Agency ‐ ‐CMAQ ‐ ‐

Programming TotalsFund Source  Total  18‐19 RW CON PAED PSE

Total 8,194 3,063 ‐ 3,063 ‐ ‐Federal ATP 4,465 ‐ ‐ ‐ ‐ ‐State ATP 3,729 3,063 ‐ 3,063 ‐ ‐Agency ‐ ‐ ‐ ‐ ‐ ‐CMAQ ‐ ‐ ‐ ‐ ‐ ‐Total 8,194 3,063 ‐ 3,063 ‐ ‐

GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES ‐ PROJECTS CONSISTENT WITH 40 CFR PART 93.126 EXEMPT TABLES 2 ANDTABLE 3 CATEOGRIES ‐ BICYCLE AND PEDESTRIAN FACILITIES (BOTH MOTORIZED AND NON‐MOTORIZED). (STATEWIDE ATP FUNDED) Toll Credit for ATP. State only funded.

FY18‐19

FY18‐19

#19-00 ORA ORA150107_STATE_ATP

Page 116: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

GROUP PROJECT LISTING(in $000's)

COLLISION REDUCTIONRTIP # DESCRIPTION PHASE 18/19 19/20 20/21 21/22 Total

ORA001102

In Orange County, in Laguna Beach, at the intersection of Route 133 (Laguna Canyon Road) Northbound and north of Canyon Acres Drive. This safety project proposes to enhance safety by extending the northbound lane-reduction transition. E $ 1,100 1,100$ EA 0N870 R $ 1,042 1,042$

C $ 1,304 1,304$

ORA001102In Orange County, in Santa Ana, from south of 4th street to Broadway, Roadside Safety. E $ 675 675$ EA 0N5100 R -$

C $ 2,225 2,225$

ORA001102In Orange County, in Irvine, and Costa Mesa, from Von Karmen Avenue to west of Harbor Blvd. Roadside safety improvements. E $ 675 675$ EA 0N5200 R

C $ 2,225 2,225$

ORA001102In Orange County, in Orange, from La Veta Avenue to Rte. 91. Roadside safety improvements. E $ 740 740$ EA 0N5300 R

C $ 2,360 2,360$

ORA001102

In Orange County, in and near Laguna Beach and Irvine, from El Toro Road to Rte. 241. Flatten steep embnakments, replace and upgrade guardrail and terminal systems, install thrie-beam median barrier and replace K-rail with concrete barrier. E $ 2,580 2,580$ EA 0N6600 R $ 70 70$

C $ 8,910 8,910$

ORA001102

In Orange County, in San Juan Capistrano, Laguna Nigel, Laguna Hills, Aliso Viejo, Laguna Beach, Irvine, Newport Beach, and Costa Mesa from Rte. 5 to Rte. 405. Upgrade highway safety features. E $ 3,330 3,330$ EA 0N7200 R $ 58 58$

C $ 19,700 19,700$

ORA001102

In Orange County, near San Juan Capistrano, from east of Antonio Parkway/La Pata Avenue to west of Conrock entrance. Landscape and plant establishment project. E $ 400 400$ EA 0L7220 R $ 20 20$

C $ 1,470 1,470$

ORA001102

In Orange County, in Irvine & Costa Mesa, on Rte. 405 from Jamboree Road Overcrossing to Rte. 73/405 separation. Close gaps in the existing median barrier with permanent concrete medan barrier type 60 E $ 1,500 1,500$ EA 0P2200 R

C $ 3,710 3,710$

ORA001102In Orange County, in Newport Beach on Rte. 73 SB off ramp to MacArthur Blvd. Modify existing lane configuration on the off-ramp. E $ 2,000 2,000$ EA 0N8600 R $ 49 49$

C $ 5,254 5,254$

Grouped Projects for Safety Improvements - SHOPP Collision Reduction Program Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Railroad/highway crossing,Shoulder imp, traffic control devices,ops assistance Intersection signalization projects Pavement marking, Lighting improvements

1 of 35/11/2018

4:22 PM

#19-00 ORA ORA001102_SHOPP_CR

Page 117: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

GROUP PROJECT LISTING(in $000's)

COLLISION REDUCTIONRTIP # DESCRIPTION PHASE 18/19 19/20 20/21 21/22 Total

Grouped Projects for Safety Improvements - SHOPP Collision Reduction Program Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Railroad/highway crossing,Shoulder imp, traffic control devices,ops assistance Intersection signalization projects Pavement marking, Lighting improvements

ORA001102

In Orange County, in the unincorporated area of Orange County and the Cleveland national Forest, on Rte. 74 from 0.90 mile west of San Juan Fire Station to the Orange/Riverside County Line. Correct supever elevation. E $ 7,791 7,791$ EA 0P0300 R $ 1,737 1,737$

C $ 42,817 42,817$

ORA001102

In Orange County, in Huntington Beach, Westminster, and Garden Grove on Rte. 39 at the intersection with Heil Avenue and MacDonald St. Modify existing signs and add lighting E $ 1,250 1,250$ EA 0P0100 R $ 820 820$

C $ 2,290 2,290$

ORA001102In Orange County, in Tustin, on Rte. 55 northbound off-ramp to 4th street. Modify existing signals and add lighting. E $ 527 527$ EA 0N630 R $ 11 11$

C $ 964 964$

ORA001102

In Orange County, in Huntington Beach and Seal Beach, on Route 1 at 6th Street and on Route 1 at Seal Beach Boulevard. Modify existing traffic signals and add lighting. E $ 562 562$ EA 0N850 R $ 288 288$

C $ 1,221 1,221$

ORA001102In Orange County, in orange and Santa Ana, on Rte. 22 between Lewis Street and 400 feet east of Bristol St. E $ 1,838 1,838$ EA 0P5200 R $ 5 5$

C $ 5,072 5,072$

ORA001102

In Orange County, in Laguna Beach, on southbound Route 73, from Route 133 to 0.2 mile north of Route 133. Modify superelevation, install drainage inlets, place OGAC and place pavement delineation. E $ 637 637$ EA 0N8400 R - -$

C $ 1,390 1,390$

ORA001102

In Orange County, in Garden Grove, on Route 22 WB on-ramp from Euclid St. Place OGFC (Open Graded Friction Course)non-rubberized to reduce wet surface collisions. E $ 381 381$ EA 0P980 R - -$

C $ 681 681$

ORA001102

In Orange County, in La Habra, on State Route (SR 39) at Fashion Square Lane signalized intersection. Modify existing traffic signals and add lighting. E $ 505 505$ EA 0Q290 R $ 10 10$

C $ 969 969$

ORA001102

In Orange County, in Anaheim on I-5 NB at Harbor Blvd. and I-5 SB on ramp at Harbor Blvd. Modify signal system and surface treatment of high friction surface treatment E $ 1,285 1,285$ EA 0Q3000 R $ 18 18$

C $ 1,925 1,925$

2 of 35/11/2018

4:22 PM

#19-00 ORA ORA001102_SHOPP_CR

Page 118: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

GROUP PROJECT LISTING(in $000's)

COLLISION REDUCTIONRTIP # DESCRIPTION PHASE 18/19 19/20 20/21 21/22 Total

Grouped Projects for Safety Improvements - SHOPP Collision Reduction Program Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Railroad/highway crossing,Shoulder imp, traffic control devices,ops assistance Intersection signalization projects Pavement marking, Lighting improvements

ORA001102

In Orange County, in Buena Park, on Route 91 EB on-ramp from NB Route 39 (Beach Boulevard). Place OGFC (Open Graded Friction Course) non-rubberized to reduce wet surface collisions. E $ 360 360$ EA 0Q0400 R $ - -$

C $ 860 860$ Sub-total SHOPP Funds $ 35,529 $ 102,082 137,611$

ORA001102 SHOPP Funds (EA 0P94U1)In Orange County, in the City of Laguna Beach and In County of Orange. E $ 5,872 5,872$ Widening & Drainage improvement R $4,013 $4,013EA 0P94U1 (combined from Eas 0N0600 & 0Q3600) EA 0N0600 is from ORA001102, EA 0Q3600 is from ORA001103. C $ 7,542 $7,542Total SHOPP Funds - EA 0P94U1. -$ 17,427$ 17,427$

County of Orange FundsIn Orange County, in the City of Laguna Beach and In County of Orange. E 3,731$ 3,731$ Widening & Drainage improvement R 3,592$ 3,592$ EA 0P94U1 C 14,475$ 14,475$ Total County of Orange Funds 21,798$ 21,798$

Total Project EA 0P94U1 - County of Orange Funds plus SHOPP Funds -$ 39,225$ 39,225$

Total SHOPP Funds 35,529$ 119,509$ 155,038$

Total SHOPP and County Funds 35,529$ 141,307$ 176,836$

3 of 35/11/2018

4:22 PM

#19-00 ORA ORA001102_SHOPP_CR

Page 119: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

GROUP PROJECT LISING(in $000's)

ROADWAY PRESERVATION PROJECTSSHOPP Projects

RTIP # DESCRIPTION PHASE 18/19 19/20 20/21 21/22 Total

ORA001103In Orange County, in the city of Anaheim, from west of Lakeview Avenue to Orange/Riverside County line. Pavement rehab. E $ 1,740 $ 1,740 EA 0N3200 R

C $ 7,490 $ 7,490

ORA001103In Orange County, in Newport Beach, from north of Superior Avenue to 60th street. Rehab. Drainage system. E $ 650 $ 650 EA 0N9300 R $ 10 $ 10

C $ 1,495 $ 1,495

ORA001103In Orange County, in Garden Grove, at Haster Street westbound off-ramp. Upgrade drainage system. E $ 644 $ 644 EA 0N9200 R $ 356 $ 356

C $ 1,617 $ 1,617

ORA001103

In Orange County, in Laguna Beach and Newport Beach on Rte. 1 from 1000 feet south of Vista Del Sol in Laguna Beach to Newport Coast Drive. The project is to pave 0.2 foot of rubberized Hot Mix Asphalt Concrete. E $ 3,200 $ 3,200 EA 0H1500 R $ 65 $ 65 SB1 Acceleration SHOPP Amendment - August 2017 CTC Approval C $ 15,110 $ 15,110

ORA001103

In Orange County on NB and SB SR-1 from Warner Avenue in the City of Huntington Beach to LA/ORA County Line. Proposes to resurface 27 lane miles of pavement E $ 4,652 $ 4,652

EA 0P5900 - SB1 SHOPP Amendment - October 2017 CTC Approval R $ 1,356 $ 1,356 C $ 11,128 $ 11,128

ORA001103In Orange County, on Rte. 90, between Harbor Blvd. and Randolph Avenue in the Cities of Fullerton and Brea. Pavement Rehab. E $ 1,727 $ 1,727 EA 0P5800 R $ 129 $ 129 SB1 SHOPP Amendment - October 2017 CTC Approval C $ 10,477 $ 10,477

ORA001103

In Orange County, on NB I-5 at the Avenida Pico off-ramp (PM 3.29) in the City of San Clemente. Restore hydraulic capacity to the 625 feet of concrete trapezaoidal channel. E $ 1,415 $ 1,415 EA 0P7000 R $ 126 $ 126 SB1 SHOPP Amendment - October 2017 CTC Approval C $ 3,386 $ 3,386

ORA001103

In orange County, along SR-39 between Auto Center Drive and Craig Avenue, in the City of Buena Park. Upgrade existing drainage elements in order to address flooding that occurs on the roadway during rain events. $ 870 $ 870 EA 0F9700 $ 567 $ 567 SB1 SHOPP Amendment - October 2017 CTC Approval $ 3,132 $ 3,132 Total SHOPP Projects $ 11,385 $ 59,957 $ 71,342

Grouped Projects for Pavement resurfacing and/or rehabilitation - SHOPP Roadway Preservation Program. Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Pavement resurfacing and/or rehabilitation, Emergency relief (23 U.S.C. 125), Widening narrow pavements or reconstructing bridges (no additional travel lanes)

1 of 15/11/2018

4:37 PM

#19-00 ORA ORA001103_SHOPP_RPP

Page 120: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 REGIONAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

GROUP PROJECT LISTING(in $000's)

ROADSIDE PRESERVATION PROJECTS - PLANTING Total

RTIP # DESCRIPTION PHASE 18/19 19/20 20/21 21/22 630$

ORA001104In Orange County, along various routes, Upgrade and retrofit changeable message signs with safety cabling and brackets. E 630$ EA 0M3700 R -$ 630$ Project use as place holder for future project within ORA001104 C 630$

-$ -$ -$ $1,260

TOTAL $1,260

Grouped Projects for Shoulder Improvements - SHOPP Roadside Preservation Program. Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Fencing, Safety roadside rest areas

1 of 15/11/2018

5:07 PM

#19-00 ORA ORA001104_SHOPP_RSPP

Page 121: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

GROUP PROJECT LISTING(in $000's)

MOBILITY PROJECTSRTIP # DESCRIPTION PHASE 18/19 19/20 20/21 21/22 Total

ORA001105

In Orange County, in Anaheim, at the Commercial Vehicle Enforcement Facility (CVEF), Peralta Weigh Station (Eastbound). Rehab and upgrade CVEF. E $2,015 $2,015EA 0N4900 R $10 $10

C $8,179 $8,179

ORA001105In roange County, in Santa Ana and Tustin, from Dyer Road on ramp to Edinger Avenue off-ramp. Construct northbound Aux. Lane. E $3,700 $3,700EA 0G9500 R $27,200 $27,200

C $15,900 $15,900

ORA001105In Orange County, Anaheim, Santa Ana, Fullerton and Buena Park. Install & modify Intelligent Transportation system (ITS) elements. E $3,353 $3,353EA 0P42U1 R $180 $180(Combined from 0N9000,0P4100 & 0P4200 to be come 0P42U1) C $10,850 $10,850

ORA001105

In Orange County, on I-5 from PM 33.0/ to 43.2. on SR-57 from PM 10.7/16.6. SR-91 from PM R2.6 to R4.1 and 0.0/7.2. Implemente ICM to reduce congestion by leveraging unused capacity along project corridors. E $6,030 $6,030EA 0P6700 R $320 $320SB1 Acceleration Delivery, August 2017 CTC approval C $17,323 $17,323

ORA001105

In Orange County, at various routes and locations (Route 5, 405, 605). Construction of inductive system, vehicle detection system and ramp metering systems. E $2,060 $2,060EA 0Q6900 R $24 $24SB1 Acceleration Delivery, October 2017 CTC approval C $8,330 $8,330

ORA001105

In Orange County, on SR-1 between Crystal Heights Drive and First Street in the cities of Newport Beach, Huntingt5on Beach and Seal Beach. Remove and replace all existing signal lights at 20 intersections along SR-1. E $6,190 $6,190EA 0P6800 R $1,435 $1,435 SB1 SHOPP Amendment - October 2017 CTC Approval C $16,462 $16,462Total $10,204 $119,357 $129,561

Grouped Projects for Safety Improvements - SHOPP Mobility Program. Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Railroad/highway crossing, Safer non-Federal-aid system roads, Shoulder imp, traffic control devices ops assistance.Intersection signalization projects, Pavement marking demo,Lighting

1 of 15/11/2018

5:16 PM

#19-00 ORA ORA001105_SHOPP_MP

Page 122: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

GROUP PROJECTS(in $000's)

MANDATE PROJECTSRTIP # DESCRIPTION PHASE 18/19 19/20 20/21 21/22 Total

ORA001108

In Orange County, in San Juan Capistrano from Rte. 5 to the San Juan Capistrano City Line. Upgrade pedestrain facilities to meet current ADA standards. E $1,230 1,230$ EA 0M0900 R $722 722$

C $2,217 2,217$

ORA001108In Orange County, in Laguna Beach, from south of Ruby Street to Ledroit St. Upgrade pedestrian facilities to ADA Standards. E $3,050 3,050$ EA 0M8200 R $2,265 2,265$

C $5,166 5,166$

ORA001108

In Orange County, in Fullerton and Placentia, from Orangethorpe Avenue to Lambert Road. Upgrade pedestrian facilities to meet ADA standards. E $1,165 1,165$ EA 0M4800 R $21 21$

C $1,810 1,810$

ORA001108In Orange County, in Brea from east of Chino Hills State Park entrance to east of Olinda Drive. Storm watermitigation. E $1,256 1,256$ EA 0N7300 R $580 580$

C $3,885 3,885$

ORA001108

In Orange County, in San juan Capistrano, from El Horno Street to south of Junipero Serra Road. Also in Irvine, from Rte. 133 to south of Sand Canyon (PM 23.2/R23.7). Reconstruct slope and apply vegetation to control sediment transport. E $1,000 1,000$ EA 0P0900 R $50 50$

C $3,379 3,379$

Total $7,165 $20,631 27,796$

Grouped Projects for Safety Improvements - SHOPP Mandates Program. Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Railroad/highway crossing, Safer non-Federal-aid system roads, Shoulder imp, traffic control devices and ops assistance other than signalization projects, Lighting imp

1 of 15/15/2018

3:24 PM

#19-00 ORA ORA001108_SHOPP_MANDATE

Page 123: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTYGROUP PROJECTS

(in 000'S)

Bridge PreservationRTIP # DESCRIPTION PHASE 18/19 19/20 20/21 21/22 Total

ORA001109In Orange County, in Laguna Beach, at Rte. 133 (Broadway Street). Replace bridge. E $ 920 920$ EA 0M9900 R $ 1,330 1,330$

C $ 2,150 2,150$ Total 4,400$

Grouped Projects for Bridge Rehabilitation and Reconstruction - SHOPP Program. Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Widening narrow pavements or reconstructing bridges (no additional travel lanes).

1 of 11

3:35 PM

#19-00 ORA ORA001109_SHOPP_BP

Page 124: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTYGROUP PROJECTS

(IN $000'S)

EMERGENCY RESPONSE PROJECTSRTIP# DESCRIPTION PHASE 18/19 19/20 20/21 21/22 Total

ORA082603

In Orange County, in Newport Beach, at North AM Newport Bay Bridge (No. 55-0614). Rebuild failed slope paving and bike trail and construct out off wall) E $1,200 $1,200EA 0N9100 R $30 $30Project use as place holder for future project within ORA082603 C $1,583 $1,583Total $2,813 $2,813

Grouped Projects for Emergency Repair - SHOPP Emergency Response Program. Scope: Projects are consistent with 40 CFR Part 93.126 ExemptTables 2 categories - Repair damage caused by natural disasters, civil unrest, or terrorist acts. This applies to damages that do not qualify for FederalEmergency Relief funds or to damages that qualify for federal Emergency Relief funds but extend beyond the Federally declared disaster period

1 of 15/15/2018

2:56 PM

#19-00 ORA ORA082603 SHOPP ERP

Page 125: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAMORANGE COUNTY

GROUP PROJECT LISTING(in $000's)

FACILITIESRTIP # DESCRIPTION PHASE 18/19 19/20 20/21 21/22 Total

ORA084402In Orange County, construct wash rack within Bolsa Maintenance Station to meet water discharge standards E $130 $130EA 12-0K9100 R $0Place hodler for future project within ORA084402 C $450 $450

SUB-TOTAL $580

Grouped Projects for Purchase of office, shop, and operating equipment for existing facilities. Scope - Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Purchase of office, shop, and operating equipment for existing facilities

1 of 1

#19-00 ORA ORA084402_SHOPP_LB

Page 126: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

RIVERSIDE

COUNTY

Page 127: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

Note id: 24

1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most currentlistings:

http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html

2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of thefederal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies for funding.

3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details seeChapter 3 of the Local Assistance Procedures Manual.

4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans.

5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed byCaltrans.

6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is the responsibility of the MPOs and their local agencies.

7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP forbridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STPfunds with Regional STP funds.

8) Corrections to this report should be addressed to the District Local Assistance Engineer:

http://www.dot.ca.gov/hq/LocalPrograms/dlae.htm

Notes:

3/29/2018, 2:44 PM

Caltrans, Division of Local Assistance Page 13/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 128: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Cathedral City BRIDGE NO. 00L0029, CATHEDRAL CANYON, OVER WHITEWATER RIVER, CATHEDRAL CITY. Replace 4 lane low water crossing with 4lane bridge

Fund Source Summary:

PER/W

Total

850,261

2,750,261

CON

Total

19,362,000

1,900,000

850,261

22,112,261

1,900,000

19,362,00019,362,000

Phase Summary:

Fed $

Local AC

Local Match

Total

315,455

2,750,261

LSSRP Bond

Total19,575,985

2,536,276

22,112,261

2,434,806 17,141,179

2,220,821

19,362,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3226

NBIL(504)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

217,930

1,900,000

LSSRP Bond

Total1,682,070

217,930

1,900,000

1,682,070

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

97,525

850,261

LSSRP Bond

Total752,736

97,525

850,261

752,736

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total17,141,179

2,220,821

19,362,000

17,141,179

2,220,821

19,362,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 23/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 129: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Hemet BRIDGE NO. 56C0262, STETSON AVENUE OVER HEMET CHANNEL, 0.4 MI. W/O CAWSTON AVE.. Replace 2 lane bridge with new twolane bridge.

Fund Source Summary:

PER/W

Total 50,000

CON

Total

955,000 955,000

50,000

955,000 1,005,000

50,000

Phase Summary:

Fed $

Local AC

Local Match

Total

5,735

50,000

LSSRP Bond

Total845,462 889,727

109,539 115,274

845,462 -845,462955,000 1,005,000

44,265

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3975

5186(014)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

5,735

50,000

LSSRP Bond

Total44,265

5,735

50,000

44,265

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total845,462 845,462

109,539 109,539

845,462 -845,462

955,000 955,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 33/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 130: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Indian Wells BRIDGE NO. 56C0493, FRED WARING DRIVE OVER WHITEWATER RIVER, 0.1 MI. W/O ELDORADO DR. Replace existing 6-lane with6-lane bridge. High Cost Agreement required prior to programming CON in FTIP . Scope not clear.

Fund Source Summary:

PER/W

Total 500,000

CON

Total

44,944,000

175,000 4,770,000

600,000

175,000 50,314,000

500,000

44,944,000

4,095,000

600,000

49,639,000

Phase Summary:

Fed $

Local AC

Local Match

Total

57,350

500,000

LSSRP Bond

Total154,928 44,542,984

20,073 -0 5,771,016

175,000 50,314,000

442,650 43,945,407

5,693,593

49,639,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4285

5401(008)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

57,350

500,000

LSSRP Bond

Total154,928 4,222,881

20,073 -0 547,119

175,000 4,770,000

442,650 3,625,304

469,697

4,095,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total531,180

68,820

600,000

531,180

68,820

600,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total39,788,923

5,155,077

44,944,000

39,788,923

5,155,077

44,944,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 43/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 131: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Indio BRIDGE NO. 56C0084, JACKSON ST, OVER WHITEWATER RIVER, 0.2 MI SOUTH OF I-10. LSSRP Seismic Retrofit

Fund Source Summary:

PER/W

Total 65,027

CON

Total

2,421,768 2,421,768

65,027

2,421,768 2,486,795

65,027

Phase Summary:

Fed $

Local AC

Local Match

Total

7,459

65,027

LSSRP Bond

Total

277,777 277,777

2,143,991 2,201,560

277,777 -277,777 7,459

2,143,991 -2,143,9912,421,768 2,486,795

57,568

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

2788

5275(012)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

7,459

65,027

LSSRP Bond

Total57,568

7,459

65,027

57,568

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

TotalPrior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

277,777 277,777

2,143,991 2,143,991

277,777 -277,777

2,143,991 -2,143,991

2,421,768 2,421,768

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 53/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 132: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Indio BRIDGE NO. 56C0283, SB INDIO BLVD OVER UP RR & AMTRAK, 0.3 MI W/O JEFFERSON STR. Project Studies, Project scoping only.

Fund Source Summary:

PER/W

TotalCON

Total

385,000 385,000

385,000 385,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total340,841 340,841

44,160 44,160

385,000 385,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

New!4631

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total340,841 340,841

44,160 44,160

385,000 385,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 63/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 133: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Indio BRIDGE NO. 56C0291, JACKSON STREET OVER INDIO BOULEVARD, AT INDIO BOULEVARD. Project Studies, Project scoping only.

Fund Source Summary:

PER/W

TotalCON

Total

580,000 580,000

580,000 580,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total513,474 513,474

66,526 66,526

580,000 580,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

New!4630

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total513,474 513,474

66,526 66,526

580,000 580,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 73/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 134: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Indio BRIDGE NO. 56C0292, N/B INDIO BLVD., OVER WHITEWATER RIVER, 0.8 MI. NW/O MONROE ST. LSSRP Seismic Retrofit and installscour countermeasure.

Fund Source Summary:

PER/W

Total 195,779

CON

Total

2,532,700

129,822 325,601

50,000 50,000

129,822 50,000 2,908,301

195,779

2,532,7002,532,700

Phase Summary:

Fed $

Local AC

Local Match

Total

22,456

195,779

LSSRP Bond

Total

5,735 247,603

114,931 44,265 2,574,719

14,891 85,979

129,822 50,000 2,908,301

173,323

241,868

2,242,199

48,633

2,532,700

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

1847

5275(021)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

22,456

195,779

LSSRP Bond

Total114,931 288,255

14,891 37,346

129,822 325,601

173,323

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

5,735 5,735

44,265 44,265

50,000 50,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

241,868

2,242,199

48,633

2,532,700

241,868

2,242,199

48,633

2,532,700

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 83/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 135: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Indio BRIDGE NO. 56C0293, S/B INDIO BLVD., OVER WHITEWATER RIVER, 0.8 MI NW/O MONROE STREET. Install scour countermeasure.

Fund Source Summary:

PER/W

Total 75,600

CON

Total

423,200

75,600

498,800

75,600

423,200423,200

Phase Summary:

Fed $

Local AC

Local Match

Total

8,671

75,600

LSSRP Bond

Total441,588

57,212

498,800

66,929 374,659

48,541

423,200

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3309

5275(017)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

8,671

75,600

LSSRP Bond

Total66,929

8,671

75,600

66,929

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total374,659

48,541

423,200

374,659

48,541

423,200

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 93/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 136: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Indio BRIDGE NO. PM00188, Bridge Preventive Maintenance Program (BPMP) various bridges in The City of Indio See Caltrans Local AssistanceHBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

6,378,804

1,138,531 1,138,531

172,500

1,138,531 7,689,8356,378,804

172,500

6,551,304

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,007,941 6,807,811

130,590 882,024

1,138,531 7,689,835

5,799,869

751,435

6,551,304

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

New!4614

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,007,941 1,007,941

130,590 130,590

1,138,531 1,138,531

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total152,714

19,786

172,500

152,714

19,786

172,500

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,647,155

731,649

6,378,804

5,647,155

731,649

6,378,804

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 103/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 137: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Lake Elsinore BRIDGE NO. 56C0309, CASINO DR, OVER SAN JACINTO RIVER, 0.2 MI N/W RAILROD CYN RD. LSSRP Seismic Retrofit

Fund Source Summary:

PER/W

Total

CON

Total

4,600,000

560,000 560,000

560,000 5,160,0004,600,0004,600,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

527,620

495,768 4,568,148

64,232 64,232

560,000 5,160,000

527,620

4,072,380

4,600,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

2794

5074(007)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total495,768 495,768

64,232 64,232

560,000 560,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

527,620

4,072,380

4,600,000

527,620

4,072,380

4,600,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 113/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 138: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Moreno Valley BRIDGE NO. PM00147, Bridge Preventive Maintenance Program (BPMP) various bridges in the City of Moreno Valley. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

6,077,486

1,179,214 1,179,214

1,179,214 7,256,7006,077,4866,077,486

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,043,958 6,424,357

135,256 832,343

1,179,214 7,256,700

5,380,398

697,088

6,077,486

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4419

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,043,958 1,043,958

135,256 135,256

1,179,214 1,179,214

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total5,380,398

697,088

6,077,486

5,380,398

697,088

6,077,486

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 123/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 139: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Palm Springs BRIDGE NO. 56C0408, S PALM CANYON DR. OVER TAHQUITZ CREEK CHANNEL, 0.4 MI. S/O RAMON ROAD. Replace 4 lane bridge withnew 4 lane bridge.

Fund Source Summary:

PER/W

Total 889,000

CON

Total

7,068,000

373,000 1,262,000

840,000 840,000

373,000 840,000 9,170,000

889,000

7,068,0007,068,000

Phase Summary:

Fed $

Local AC

Local Match

Total

101,968

889,000

LSSRP Bond

Total330,217 743,652 8,118,201

42,783 96,348 1,051,799

373,000 840,000 9,170,000

787,032 6,257,300

810,700

7,068,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3974

5282(042)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

101,968

889,000

LSSRP Bond

Total330,217 1,117,249

42,783 144,751

373,000 1,262,000

787,032

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total743,652 743,652

96,348 96,348

840,000 840,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total6,257,300

810,700

7,068,000

6,257,300

810,700

7,068,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 133/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 140: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Palm Springs BRIDGE NO. 56C0409, E PALM CANYON DR OVER PALM CANYON WASH, 0.5 MI. E/O FARREL DRIVE. Bridge rehabilitation project.Widen existing 4 lane bridge to add shoulders and sidewalk (no added capacity).

Fund Source Summary:

PER/W

Total 890,000

CON

Total

7,264,600

408,000 1,298,000

500,000 500,000

408,000 500,000 9,062,600

890,000

7,264,6007,264,600

Phase Summary:

Fed $

Local AC

Local Match

Total

102,083

890,000

LSSRP Bond

Total361,202 442,650 8,023,120

46,798 57,350 1,039,480

408,000 500,000 9,062,600

787,917 6,431,350

833,250

7,264,600

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3979

5282(041)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

102,083

890,000

LSSRP Bond

Total361,202 1,149,119

46,798 148,881

408,000 1,298,000

787,917

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total442,650 442,650

57,350 57,350

500,000 500,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total6,431,350

833,250

7,264,600

6,431,350

833,250

7,264,600

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 143/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 141: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Rancho Mirage BRIDGE NO. 00L0046, FRANK SINATRA DRIVE OVER WHITEWATER RIVER. Construct new four lane bridge to replace existing four lanelow water crossing. High Cost Project agreement required.

Fund Source Summary:

PER/W

Total 1,800,000

CON

Total

35,290,000

1,800,000 3,600,000

500,000 500,000

2,300,000 39,390,000

1,800,000

35,290,00035,290,000

Phase Summary:

Fed $

Local AC

Local Match

Total

206,460

1,800,000

LSSRP Bond

Total2,036,190 34,871,967

263,810 4,518,033

2,300,000 39,390,000

1,593,540 31,242,237

4,047,763

35,290,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3624

NBIL(514)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

206,460

1,800,000

LSSRP Bond

Total1,593,540 3,187,080

206,460 412,920

1,800,000 3,600,000

1,593,540

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total442,650 442,650

57,350 57,350

500,000 500,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total31,242,237

4,047,763

35,290,000

31,242,237

4,047,763

35,290,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 153/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 142: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Riverside County BRIDGE NO. 56C0071, MSSN BL/BUENA VST, OVER SANTA ANA RIVER, 1.47 MI W/O SH 91 ON 7TH. Combined funding of LSSRPSeismic Retrofit and HBP funds for the replacement project (High cost project agreement required). Replace existing 4 lane bridge with 4 lanebridge.

Fund Source Summary:

PER/W

Total 2,426,956

CON

Total

47,564,000

2,183,000 4,609,956

500,000 500,000

2,683,000 52,673,956

2,426,956

47,564,00047,564,000

Phase Summary:

Fed $

Local AC

Local Match

Total

278,372

2,426,956

LSSRP Bond

Total

57,350 5,512,941

2,375,260 46,632,253

250,390 528,762

2,683,000 52,673,956

2,148,584

5,455,591

42,108,409

47,564,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

2787

5956(086)5956(192)

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

278,372

2,426,956

LSSRP Bond

Total1,932,610 4,081,194

250,390 528,762

2,183,000 4,609,956

2,148,584

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

57,350 57,350

442,650 442,650

500,000 500,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total

5,455,591

42,108,409

47,564,000

5,455,591

42,108,409

47,564,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 163/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 143: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Riverside County BRIDGE NO. 56C0099, RAILROAD AVE OVER FORNAT WASH, 2.9 MI. W/O VERBENIA AVE. Replace existing two lane bridge with two lane bridge. 10/9/2012: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 339,000

CON

Total

1,897,000

297,000 636,000

50,000 50,000

347,000 2,583,000

339,000

1,897,0001,897,000

Phase Summary:

Fed $

Local AC

Local Match

Total 339,000

LSSRP Bond

Total347,000 2,583,000

347,000 2,583,000

339,000 1,897,000

1,897,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4023

5956(228)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 339,000

LSSRP Bond

Total297,000 636,000

297,000 636,000

339,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total50,000 50,000

50,000 50,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,897,000

1,897,000

1,897,000

1,897,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 173/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 144: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Riverside County BRIDGE NO. 56C0101, RAILROAD AVENUE OVER EAST CHANNEL STUBBE WASH, 0.2 MI. W/O VERBENIA AVE.. Replace two lanebridge with two lane bridge. 10/9/2012: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 351,000

CON

Total

1,963,000

318,000 669,000

50,000 50,000

368,000 2,682,000

351,000

1,963,0001,963,000

Phase Summary:

Fed $

Local AC

Local Match

Total 351,000

LSSRP Bond

Total368,000 2,682,000

368,000 2,682,000

351,000 1,963,000

1,963,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4022

5956(229)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 351,000

LSSRP Bond

Total318,000 669,000

318,000 669,000

351,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total50,000 50,000

50,000 50,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,963,000

1,963,000

1,963,000

1,963,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 183/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 145: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Riverside County BRIDGE NO. 56C0102, CHUCKWALLA VLY RD OVER AZTEC DITCH, 0.2 MI E/O CORN SPRNGS RD. Bridge Replacement. Replaceexisting 2 lane bridge with 2 lane bridge (no added capacity). 11/4/2013: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 336,000

CON

Total

1,879,000

228,000 564,000

20,000 20,000

248,000 2,463,000

336,000

1,879,0001,879,000

Phase Summary:

Fed $

Local AC

Local Match

Total 336,000

LSSRP Bond

Total248,000 2,463,000

248,000 2,463,000

336,000 1,879,000

1,879,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4171

5956(239)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 336,000

LSSRP Bond

Total228,000 564,000

228,000 564,000

336,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total20,000 20,000

20,000 20,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,879,000

1,879,000

1,879,000

1,879,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 193/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 146: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Riverside County BRIDGE NO. 56C0103, CHUCKWALLA VLY RD OVER TARANTULA DITCH, 1.5 MI E/O CORN SPRNGS RD. Replace existing 2 lane bridgewith 2 lane bridge. 7/20/2012: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 299,000

CON

Total

1,673,000

265,000 564,000

20,000 20,000

285,000 2,257,000

299,000

1,673,0001,673,000

Phase Summary:

Fed $

Local AC

Local Match

Total 299,000

LSSRP Bond

Total285,000 2,257,000

285,000 2,257,000

299,000 1,673,000

1,673,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3965

5956(227)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 299,000

LSSRP Bond

Total265,000 564,000

265,000 564,000

299,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total20,000 20,000

20,000 20,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,673,000

1,673,000

1,673,000

1,673,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 203/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 147: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Riverside County BRIDGE NO. 56C0104, CHUCKWALLA VLY RD OVER SUTRO DITCH, 3 MI. E/O CORN SPRINGS RD. Replace existing 2 lane bridge with 2lane bridge. 7/20/2012: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 333,000

CON

Total

1,866,000 1,866,000

231,000 564,000

20,000 20,000

251,000 1,866,000 2,450,000

333,000

Phase Summary:

Fed $

Local AC

Local Match

Total 333,000

LSSRP Bond

Total251,000 1,866,000 2,450,000

251,000 1,866,000 2,450,000

333,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3966

5956(226)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 333,000

LSSRP Bond

Total231,000 564,000

231,000 564,000

333,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total20,000 20,000

20,000 20,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,866,000 1,866,000

1,866,000 1,866,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 213/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 148: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Riverside County BRIDGE NO. 56C0108, CHUCKWALLA VLY RD OVER ACARI DITCH, 6.3 MI E/O CORN SPRNGS RD. Replace existing two lane bridge withtwo lane bridge. 9/14/2012: Toll Credits programmed for PE, R/W, & CON.

Fund Source Summary:

PER/W

Total 333,000

CON

Total

1,866,600

231,000 564,000

40,000 40,000

271,000 2,470,600

333,000

1,866,6001,866,600

Phase Summary:

Fed $

Local AC

Local Match

Total 333,000

LSSRP Bond

Total271,000 2,470,600

271,000 2,470,600

333,000 1,866,600

1,866,600

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

3976

5956(225)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 333,000

LSSRP Bond

Total231,000 564,000

231,000 564,000

333,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total40,000 40,000

40,000 40,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,866,600

1,866,600

1,866,600

1,866,600

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 223/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 149: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Riverside County BRIDGE NO. 56C0523, GILMAN SPRINGS RD. OVER POTRERO CREEK, 0.5 MI. SE/O SANDERSON AV. Replace existing 2-lane bridgewith a 2-lane bridge on a new road alignment (roadway realignment scope not clear). No increase capacity.

Fund Source Summary:

PER/W

Total 50,000

CON

Total

8,133,000

850,000 810,000 1,710,000

700,000 700,000

850,000 1,510,000 10,543,000

50,000

8,133,0008,133,000

Phase Summary:

Fed $

Local AC

Local Match

Total

5,735

50,000

LSSRP Bond

Total752,505 1,336,803 9,333,718

97,495 173,197 1,209,282

850,000 1,510,000 10,543,000

44,265 7,200,145

932,855

8,133,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4160

5956(238)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

5,735

50,000

LSSRP Bond

Total752,505 717,093 1,513,863

97,495 92,907 196,137

850,000 810,000 1,710,000

44,265

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total619,710 619,710

80,290 80,290

700,000 700,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total7,200,145

932,855

8,133,000

7,200,145

932,855

8,133,000

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 233/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 150: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Riverside County BRIDGE NO. PM00076, Bridge Preventive Maintenance Program, various locations in Riverside County. See Caltrans Local Assistance HBP web site for backup list of bridges.

Fund Source Summary:

PER/W

Total 475,455

CON

Total

3,497,695 3,497,695

504,709 980,164

504,709 3,497,695 4,477,859

475,455

Phase Summary:

Fed $

Local AC

Local Match

Total

54,535

475,455

LSSRP Bond

Total446,819 3,096,509 3,964,249

57,890 401,186 513,610

504,709 3,497,695 4,477,859

420,920

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

4003

5956(224)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

54,535

475,455

LSSRP Bond

Total446,819 867,739

57,890 112,425

504,709 980,164

420,920

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total3,096,509 3,096,509

401,186 401,186

3,497,695 3,497,695

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 243/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 151: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Riverside County BRIDGE NO. PM00180, Bridge Preventive Maintenance Program (BPMP) various bridges in Riverside County. See Caltrans Local AssistanceHBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

744,028

148,864 148,864

148,864 892,892744,028744,028

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total131,789 790,477

17,075 102,415

148,864 892,892

658,688

85,340

744,028

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

New!4604

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total131,789 131,789

17,075 17,075

148,864 148,864

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total658,688

85,340

744,028

658,688

85,340

744,028

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

Caltrans, Division of Local Assistance Page 253/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 152: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2016/17-2021/22 Highway Bridge Program

District: County:Responsible Agency

08 Riverside

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Number of Projects:

MPO Summary:

Fed $

Local AC

Local Match

Total for all Phases

1,166,279

12,159,078

LSSRP Bond

Total

5,735 57,350 277,777 6,565,940

3,388,771 1,149,119 942,587 6,968,671 6,940,277 3,005,731 215,520,776

439,051 530,461 122,122 616,193 234,094 147,664 19,425,882

2,989,453 -2,989,453

3,827,822 4,674,768 1,064,709 7,642,214 4,462,695 3,153,395 241,512,599

10,992,799

6,225,079

182,132,821

16,170,018

204,527,918

Totals:

Riverside County Transportation Commission

Prior 16/17 17/18 18/19 19/20 20/21 21/22 Beyond

24

Caltrans, Division of Local Assistance Page 263/29/2018, 2:44 PM Det2 FL4 SmlTxt brf

#19-00 RIV RIV050201 HBP

Page 153: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Prgm Yr (FFY) Agency Project Title/Description Project Scope

Federal Funds

(STPL) 000's

State/Local

Funds - 000s Total Project Cost Column1

16/17 Banning Ramsey St. Pavement Rehab Hargrave St. to W/O Hathaway St. Intersection $ 182 $ 295 477$

16/17 Canyon Lake Railroad Canyon Rehab Goetz Rd. to Lake Elsinore city limits 37 5 42$

16/17 Corona Ontario Ave. Pavement Rehab California Ave. to Magnolia Ave. 832 108 940$

16/17 Hemet Gilbert St. Pavement Rehab Acacia Ave to Stetson Ave. 443 75 518$

16/17 Jurupa Valley Van Buren Blvd. Limonite Ave. to 56th St. 387 449 836$

16/17 San Jacinto San Jacinto Ave. Pavement Rehab Seventh St. to Midway 290 310 600$

-$

-$

-$

-$

-$

FFY 16/17 Total 2,171$ 1,242$ 3,413$

1920 Beaumont Eight Street Pavement Rehab

Pennsylvania Ave (WB limit) to Xenia Ave (EB

limit) 220 212 432.00$

19/20 Calimesa Calimesa Ave. & Avenue L Pavement Rehab

Calimesa Ave from Sandalwood to Ave L., &

Avenue L from Calimesa Blvd. to Calimesa and

Ave. L 54 7 61.00$

19/20 Temecula Winchester Rd. Pavement Rehab Jefferson Ave. to Ynez Rd. 646 530 1,176.00$

-$

-$

-$

-$

-$

-$

FFY 19/20 Total 920$ 749$ 1,669$

-$

-$

-$

-$

-$

-$

-$

-$

-$ -$ -$

Combined FFYs 3,091.00$ 1,991.00$ 5,082.00$

2017 FTIP - RIVERSIDE COUNTY GROUPED PROJECTS

RIV130401 - Grouped Projects for Pavement Resurfacing and/or Rehabilitation on the Local Roads System

As of 5/18/2017

#19-00 RIV RIV130401 STPL

Page 154: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Prog Year Agency Project Title/Description Project ScopeCity Funds (ENG) 

000'sCity Funds (CON) 000's

State/Local Funds ‐ 000s Total Project Cost

18/19 Moreno Valley Kitching St. Pavement Rehab Cottonwood Ave to Alessandro Blvd 50$                                  $                      450  $                   ‐    500$                                   

18/19 Moreno Valley Kitching St. Pavement RehabKitching St. Pavement Rehab from John F. 

Kennedy Dr to Iris Ave.  $                                 50   $                      500   $                   ‐    550$                                    

18/19 Moreno Valley Heacock St. Pavement RehabHeacock St. Pavement Rehab from Alessandro 

Blvd to Cottonwood Ave.  $                               120   $                      480   $                   ‐    600$                                    FY 18/19 Total 220$                               1,430$                  ‐$                1,650$                               

19/20 Moreno Valley Alessandro Blvd Pavement Rehab Merwin St to Gilman Springs Rd 50$                                  $                  1,150  $                   ‐    1,200$                               19/20 Moreno Valley Moreno Beach Drive Pavement Rehab Ironwood Ave to Locust Ave  $                                 50  $                  1,050  $                   ‐    1,100$                               

FY 19/20 Total 100$                               2,200$                  ‐$                2,300$                               

Combined FFYs 320$                     3,630$           ‐$          3,950$                     

2019 FTIP ‐ RIVERSIDE COUNTY GROUPED PROJECTS RIV130808 ‐ Grouped Projects for Pavement Resurfacing and/or Rehabilitation in Riverside County/City of Moreno Valley

As of 5/29/2018

#19-00 RIV RIV130808 LOCAL

Page 155: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Prgm Yr (FFY) Agency Project Title/Project Limits Project Scope

Agency funds

000's Other Total Project Cost

17/18 Hemet

State St. Multi-Use Trail - State St to

Domenigoni Parkway

Construct a Multi-Use Trail from State St. to

Domenigoni Parkway - Completing a 2 -mile

segment for the Salt Creek Multi-Modal Trail $ 678 $ - 678$

FY 17/18 Total 678$ -$ 678$

18/19 Hemet

Lyon Ave. Multi-Use Trail - One mile N/O

Domenigoni Pkwy

Construct a Multi-Use Trail one mile N/O

Domenigoni Parkway/Salt Creek to Domenigoni

Pkwy/Salt Creek $ 678 $ - 678$

18/19 Hemet

Cawston Ave. Multi-Use Trail - 1.75 Miles N/O

Domenigoni Pkwy/Salt Creek to Domenigoni

Pkwy/Salt Creek

Construct a Multi-Use Trail 1.75 miles N/O

Domenigoni Parkway/Salt Creek to Domenigoni

Pkwy/Salt Creek $ 1,224 $ - 1,224$

FY 18/19 Total 1,902$ -$ 1,902$

20/21 Hemet

Warren Rd. Multi-Use Trail - 2 miles N/O

Domenigoni Pkwy/Salt Creek to Domenigoni

Pkwy/Salt Creek

Construct a Multi-Use Trail 2-mies N/O

Domenigoni Parkway/Salt Creek to Domenigoni

Pkwy/Salt Creek $ 1,356 $ - 1,356$

FY 20/21 Total 1,356$ -$ 1,356$

Combined FFYs 3,936$ -$ 3,936$

2019 FTIP - RIVERSIDE COUNTY GROUPED PROJECTS

RIV141202 - Grouped Projects

GROUPED PROJECTS FOR BICYCLE AND PEDESTRIAN FACILITIES - NON-MOTORIZED: PROJECTS ARE CONSISTENT WITH

40 CFR PART 93.126 EXEMPT TABLES 2 AND TABLE 3 CATEGORIES - BICYCLE AND PEDESTRIAN FACILITIES (BOTH

MOTORIZD AND NON-MOTORIZED)

As of 1/3/2018

#19-00 RIV RIV141202 AGENCY

Page 156: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Prgm Yr (FFY) Agency Project Title/Description Project Scope

Federal Funds

(ATP) 000's ATP State-only

State/Local

Funds - 000s Total Project Cost

16/17

County of Riverside

Public Health

SRTS East Riverside - Downtown Riverside to

the west, Box Springs, Mountain to the east,

Hunter Industrial Park to the north, and

Victoria and Canyon Crest to the south.

County of Riverside SRTS East Riverside -

Implement a comprehensive safe routes to school

program in the Eastside and University

neighborhoods of Riverside, including a

Chaperone Program comprised of community

volunteers who encourage active transportation

in safe environment. $ - $ 500 $ 128 628$

16/17 Moreno Valley*

Juan Bautista De Anza Multi-Use Trail -

segment beginning at El Potrero Park and

terminating at Iris Ave.

Construction of Juan Bautista De Anza Multi-Use

Tr (PA&ED) $ 115 $ - $ - 115$

FFY 16/17 Total 115$ 500$ 128$ 743$

17/18 Moreno Valley* Juan Bautista De Anza Multi-Use Trail

Construction of Juan Bautista De Anza Multi-Use

Tr (Design & R/W) $ 191 $ - $ - 191$

FFY 17/18 Total 191$ -$ -$ 191$

18/19 Moreno Valley* Juan Bautista De Anza Multi-Use Trail

Construction of Juan Bautista De Anza Multi-Use

Tr (cons phase) $ 1,125 $ - $ - 1,125$

FFY 18/19 Total 1,125$ -$ -$ 1,125$

Combined FFYs 1,431$ -$ 128$ 2,059$

*Toll credit utilization for FY16/17, FY17/18, and FY18/19.

2017 FTIP - RIVERSIDE COUNTY GROUPED PROJECTS

RIV160402 - Grouped Projects for Bicycle and Pedestrian Facilities funded with ATP Cycle 2

As of 5/30/2018

#19-00 RIV RIV160402 ATP

Page 157: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Agency CountyDistrict

EA Notes Project DescriptionProgram

Year (FFY)Federal Funds

State Funds

Total Project Cost

Caltrans Riverside 1C083

New: SHOPP Amendment

#16H-019 approved by CTC October 18-19, 2017

On I-10 in and near Blythe, from Teed Ditch Bridge to Arizona State line. Cold plane mainline pavement and overlay with Portland Cement Concrete (PCC). The shoulders and ramps will be milled and overlaid with Hot Mix Asphalt (HMA-A). A two-lane temporary detour will be constructed in the median for traffic handling. PA&ED is the only authorized phase. Also see Resolution FP-17-13 approved by CTC October 18-19, 2017 allocation of PA&ED for $9,000,000.

2017/18 9,000$ -$ 9,000$

Caltrans Riverside 1E840

Update: SHOPP

Amendment #16H-014

approved by CTC June 28-

29, 2017. Update: 2016

SHOPP Amendment

16H-001 approved by CTC May 18-

19, 2016

On SR-62 in and near Yucca Valley and Twentynine Palms, from north of Indian Avenue to Utah Trail; Also, in San Bernardino County (PM 0.0/15.1 and PM 29.3/33.6). Pavement Rehabilitation.

2017/18 47,444$ -$ 47,444$

Caltrans Riverside 1C060 On I-10 in and near Indio, from Monterey Avenue to Jefferson Overcrossing. Rehabilitate pavement. 2017/18 17,915$ -$ 17,915$

Caltrans Riverside 1C081

New: SHOPP Amendment #16H-019

approved by CTC October 18-19, 2017

On I-10 in and near Coachella, from 0.5 mile east of Coachella Canal to Hazy Gulch Bridge. Cold plane pavement and overlay with Portland Cement Concrete (PCC). Construct eastbound truck climbing lane. A one-lane temporary detour will be constructed in the median for traffic handling. PA&ED is the only authorized phase - all other phases future funding in 2021/22. Also see Resolution FP-17-13 approved by CTC October 18-19, 2017 allocation of PA&ED for $7,000,000.

2017/18 7,000$ -$ 7,000$

RIVLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2017 FTIP Amendment Modification #17-16

#19-00 RIV RIVLS02 SHOPP

Page 158: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

RIVLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2017 FTIP Amendment Modification #17-16

Caltrans Riverside 1C380

Update: SHOPP Amendment #16H-014 approved by CTC June 28-29, 2017. Update:

SHOPP Amendment #16H-012 approved by CTC May 17-18,

2017. New: SHOPP

Amendment #16H-000 CTC

approved 3/18/16. Not on HQ SHOPP list

7/27/16. G13 Contingency

Project HQ list 8/23/16.

On I-10 in and near Beaumont and Banning, from Pennsylvania Avenue to Route 111. Rehabilitate roadway. (All phases programmed by CTC was G13 Contingency Project.)

2017/18 206,223$ -$ 206,223$

Caltrans Riverside 0Q753

Delete: SHOPP

Amendment #16H-012

approved by CTC May 17-

18, 2017. Update: SHOPP

Amendment #14H-492. Not on HQ SHOPP

list 7/27/16. G13

Contingency Project HQ list

8/23/16.

On SR-60 in and near the city of Riverside, from west of Valley Way to Routes 60/91/215 Junction. Rehabilitate roadway. (Project deleted and combined with EA 0Q752 as EA 0Q75U.)

2017/18 -$ -$ -$

FY 2017-2018 100% SHOPP funded Sub-total Sub-total 287,582$ -$ 287,582$

#19-00 RIV RIVLS02 SHOPP

Page 159: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

RIVLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2017 FTIP Amendment Modification #17-16

Caltrans Riverside 1F142

New: 2016 SHOPP

Amendment 16H-000 CTC

approved 3/18/16. Not

on HQ SHOPP list 7/27/16.

G13 Contingency

Project HQ list 8/23/16.

On I-15 in and near Terra Cotta, from Nichols Road to north of Glen Ivy. Concreate pavement slab replacement. (PA&ED, PS&E & R/W programmed by CTC, but not on HQ G13 list 8/23/16, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG.) Resolution FP-17-24 approved by CTC allocate PS&E for $926,000 and R/W for $10,000.

2018/19 $2,054 $ - $2,054

Caltrans Riverside 1F143

New: 2016 SHOPP

Amendment 16H-000 CTC

approved 3/18/16. Not

on HQ SHOPP list 7/27/16.

On I-15 in and near Corona, from south of Ontario Avenue to Route 60. Concrete pavement slab replacement. 2018/19 $30,783 $ - $30,783

Caltrans Riverside 1F690

New: 2016 SHOPP

Amendment 16H-000 CTC

approved 3/18/16. Not

on HQ SHOPP list 7/27/16.

G13 Contingency

Project HQ list 8/23/16.

On SR-79 near Temecula, from San Diego County line to Temecula city limits. Pavement rehabilitation. (PA&ED, PS&E & R/W programmed by CTC, but not on HQ G13 list 8/23/16, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG.)

2018/19 $827 $ - $827

#19-00 RIV RIVLS02 SHOPP

Page 160: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

RIVLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2017 FTIP Amendment Modification #17-16

Caltrans Riverside 1C090

Update: SHOPP

Amendment #16H-014

approved by CTC June 28-

29, 2017. Update: 2016

SHOPP Amendment

#16H-00 CTC Approved

3/18/16 - see FTIP ID

RIV120201 for funding info.

On SR-60 near Beaumont, from Gilman Springs Road to 1.4 miles west of Jack Rabbit Trail. Rehabilitate pavement. ($15 million in construction capital only)(Project being combine with FTIP ID RIV120201 for construction also see for $15M SHOPP funding from EA 1C090.)

2018/19 $0 -$ $0

Caltrans Riverside 1E770

New: 2016 SHOPP

Amendment #16H-000 CTC

Approved 3/18/16 Moved from RIVLS01

per HQ SHOPP list

7/27/16

On SR-74 near Lake Elsinore, at 0.8 mile west of Grand Avenue. Stabilize slope to protect safety of traveling public. 2018/19 $1,902 $ - $1,902

FY 2018-2019 100% SHOPP funded Sub-total Sub-total $35,566 -$ $35,566

Caltrans Riverside 1F141

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16. Not

on HQ SHOPP list 7/27/16.

G13 Contingency

Project HQ list 8/23/16.

On I-15 in and near Temecula, from Rainbow Valley Boulevard to Front Street. Rehabilitate roadway. (PA&ED, PS&E & R/W programmed by CTC in FFY 2019/20 $2,234M, but not on HQ G13 list 8/23/16, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG.) Resolution FP-17-24 approved by CTC allocate PS&E for $1,200,000 and R/W for $10,000.

2019/20 $2,234 $ - $2,234

#19-00 RIV RIVLS02 SHOPP

Page 161: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

RIVLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2017 FTIP Amendment Modification #17-16

Caltrans Riverside 1C082

New: SHOPP Amendment

#16H-019 approved by CTC October 18-19, 2017

On I-10 near Blythe, from Rice Road/SR-177 to Teed Ditch Bridge. Cold plane mainline pavement and overlay with Portland Cement Concrete (PCC). The shoulders and ramps will be milled and overlaid with Hot Mix Asphalt (HMA-A). A two-lane temporay detour will be construted in the median for traffic handling. Also see Resolution FP-17-13 approved by CTC October 18-19, 2017 allocation of PA&ED for $16,900,000.

2019/20 339,373$ -$ 339,373$

Caltrans Riverside 1F371

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16.

Moved from RIVLS01 per

HQ SHOPP list 7/27/16.

On SR-60 in the cities of Eastvale, Jurupa Valley, Riverside and Moreno Valley, from Hamner Avenue to Gilman Springs Road; also on Route 91 from Route 15 to Madison Street. Replace existing guide signs with retro-reflective sheeting.

2019/20 $2,212 $ - $2,212

FY 2019-2020 100% SHOPP funded Sub-total Sub-total $343,819 -$ $343,819

Caltrans Riverside 1F141

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16. Not

on HQ SHOPP list 7/27/16.

G13 Contingency

Project HQ list 8/23/16.

On I-15 in and near Temecula, from Rainbow Valley Boulevard to Front Street. Rehabilitate roadway. (PA&ED, PS&E & R/W programmed by CTC in FFY 2019/20 $2,234M, but not on HQ G13 list 8/23/16, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG.) Resolution FP-17-24 approved by CTC allocate PS&E for $1,200,000 and R/W for $10,000.

2020/21 $40,071 $ - $40,071

#19-00 RIV RIVLS02 SHOPP

Page 162: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

RIVLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2017 FTIP Amendment Modification #17-16

Caltrans Riverside 0Q753

Delete: SHOPP

Amendment #16H-012

approved by CTC May 17-

18, 2017. Update: SHOPP

Amendment #14H-492. Not on HQ SHOPP

list 7/27/16. G13

Contingency Project HQ list

8/23/16

On SR-60 in and near the city of Riverside, from west of Valley Way to Routes 60/91/215 Junction. Rehabilitate roadway. (Project deleted and combined with EA 0Q752 as EA 0Q75U.)

2020/21 -$ -$ -$

Caltrans Riverside 1F142

New: 2016 SHOPP

Amendment 16H-000 CTC

approved 3/18/16. Not

on HQ SHOPP list 7/27/16.

G13 Contingency

Project HQ list 8/23/16.

On I-15 in and near Terra Cotta, from Nichols Road to north of Glen Ivy. Concreate pavement slab replacement. PA&ED, PS&E & R/W programmed by CTC, but not on HQ G13 list 8/23/16, have to program construction support/capitation in FFY 2019/20 per HQ direction to SCAG.) Resolution FP-17-24 approved by CTC allocate PS&E for $926,000 and R/W for $10,000.

2020/21 $24,109 $ - $24,109

Caltrans Riverside 1F690

New: 2016 SHOPP

Amendment 16H-000 CTC

approved 3/18/16. Not

on HQ SHOPP list 7/27/16.

G13 Contingency

Project HQ list 8/23/16.

On SR-79 near Temecula, from San Diego County line to Temecula city limits. Pavement rehabilitation. (PA&ED, PS&E & R/W programmed by CTC, but not on HQ G13 list 8/23/16, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG.)

2020/21 $9,542 $ - $9,542

FY 2020-2021 100% SHOPP funded Sub-total Sub-total $73,722 -$ $73,722

#19-00 RIV RIVLS02 SHOPP

Page 163: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

RIVLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2017 FTIP Amendment Modification #17-16

Caltrans Riverside 1C083

New: SHOPP Amendment

#16H-019 approved by CTC October 18-19, 2017

On I-10 in and near Blythe, from Teed Ditch Bridge to Arizona State line. Cold plane mainline pavement and overlay with Portland Cement Concrete (PCC). The shoulders and ramps will be milled and overlaid with Hot Mix Asphalt (HMA-A). A two-lane temporary detour will be constructed in the median for traffic handling. PA&ED is the only authorized phase. Also see Resolution FP-17-13 approved by CTC October 18-19, 2017 allocation of PA&ED for $9,000,000.

2021/22 257,127$ -$ 257,127$

FY 2021-2022 100% SHOPP funded Sub-total Sub-total 257,127$ -$ 257,127$

TOTAL 100% SHOPP funded TOTAL 997,816$ -$ 997,816$

2017 FTIP Amendment #17-16: New: Add: EA: 1C082, 1C083

Kerrie Hudson, Caltrans District 8 FTIP Manager

#19-00 RIV RIVLS02 SHOPP

Page 164: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Agency CountyDistrict

EA Notes Project Description

Program Year (FFY)

Federal Funds

State Funds

Total Project Cost

Caltrans Riverside 1F560

New: 2016 SHOPP CTC

Approved 3/18/16, can't

Federalize per HQ 2015 -

Per SCAG need to

include on HQ 2016

SHOPP list 7/26/16.

In Riverside County, on Routes 10, 62, 74, 86, 86S, 111 and 95 at various locations. Advance Mitigation. (Financial Contribution Only). (Instructed by SCAG to add because project is listed on HQ 2016 SHOPP list 7/26/16, per HQ direction.)

2018/19 7,765$ -$ 7,765$

FY 2018-19 100% SHOPP AC funded Sub-total Sub-total 7,765$ -$ 7,765$

Total 100% SHOPP AC funded Total 7,765$ -$ 7,765$ 2017 FTIP Amendment #17-1 Add: 1F560Kerrie Hudson, Caltrans District 8 FTIP Manager

RIVLS03 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement Rehabilitation - SHOPP Roadside Preservation 2017 FTIP Amendment #17-1

#19-00 RIV RIVLS03A SHOPP

Page 165: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Agency CountyDistrict

EA Notes Project DescriptionProgram Year

(FFY) Federal FundsState Funds

Total Project Cost

Caltrans Riverside 0R350

Update: SHOPP Amendment #16H-002

approved by CTC June 29-

30, 2016

Between Banning and Blythe on Routes 10 and 111, at Bridges No. 56-0003, 56-0241R, and 56-0596. Seismic Retrofit. 2016-17 8,107$ -$ 8,107$

Caltrans Riverside 0Q890

Update: SHOPP Amendment #16H-002

approved by CTC June 29-

30, 2016

In Riverside and San Bernardino Counties, on Routes 10, 111, and 215 at various locations. Rehabilitate 9 structures. 2016-17 3,463$ -$ 3,463$

FY 2016-2017 100% SHOPP AC funded Sub-total Sub-total 11,570$ -$ 11,570$

Caltrans Riverside 1E570

Update: SHOPP

Amendment 16H-009 CTC

approved December 7-8,

2016 New: 2016 SHOPP Amendment

#16H-000 CTC approved

3/18/16

On I-10 near Palm Springs, at Whitewater River Bridge No. 56-0004 L/R. Bridge rehabilitation and scour mitigation. 2018/19 15,133$ $ - 15,133$

RIVLS06 Exempt Grouped Projects for Bridge Rehabilitation and Reconstruction - SHOPP Program - 2017 FTIP Administrative Modification #17-13

#19-00 RIV RIVLS06 SHOPP

Page 166: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Agency CountyDistrict

EA Notes Project DescriptionProgram Year

(FFY) Federal FundsState Funds

Total Project Cost

RIVLS06 Exempt Grouped Projects for Bridge Rehabilitation and Reconstruction - SHOPP Program - 2017 FTIP Administrative Modification #17-13

Caltrans Riverside 1F410

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16

On I-10 near Desert Center, at Palen Ditch Bridge No. 56-0040 R/L. Bridge rail replacement. 2018/19 1,212$ $ - 1,212$

Caltrans Riverside 1E720

Update: SHOPP

Amendment #16H-014

approved by CTC June 28-

29, 2017. New: 2016 SHOPP Amendment

#16H-000 CTC approved

3/18/16

On I-10 in Riverside County, on Routes 10 and 91, at various locations; also in San Bernardino County, on Routes 10 and 15, at various locations. Repair bridge deck.

2018/19 3,132$ $ - 3,132$

FY 2018-2019 100% SHOPP AC funded Sub-total Sub-total 19,477$ -$ 19,477$

Caltrans Riverside 1C680

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16.

On SR-74 in and near the cities of Lake Elsinore, Perris, Menifee and Hemet, at Leach Canyon Channel Bridge No. 56--750 and Blue Ridge Wash Bridge No. 56-0257; also on Routes 79 and 371, at Arroyo Seco Bridge, Temecula Creek Bridge, and Cahuilla Bridge. Bridge rail replacement.

2019/20 4,811$ $ - 4,811$

FY 2019-2020 100% SHOPP AC funded Sub-total Sub-total 4,811$ -$ 4,811$

TOTAL 100% SHOPP AC funded TOTAL 35,858$ -$ 35,858$

2017 FTIP #17-13: Update: EAs: 1E720 Kerrie Hudson, Caltrans District 8 FTIP Manager

#19-00 RIV RIVLS06 SHOPP

Page 167: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

RIVLS08 EXEMPT GROUPED PROJECTS SAFETY IMPROVEMENTS, SHOULDER IMPROVEMENTS, PAVEMENT RESURFACING AND/OR REHABILITATION Minor Program 2017 FTIP Administrative #17-13

Agency CountyDistrict

EA Notes Project Description

Program Year (FFY)

Federal Funds

State Funds**

Total Project Cost

Caltrans Riverside 0J780

Update Minor FY

2016/17 HQ Approved

July 7, 2016

On SR-79 construct 4 turn-outs for northbound and southbound traffic. 2016/17 $1,200 -$ $1,200

Caltrans Riverside 1E971

Update: Resolution

G-05-16 approved by CTC May 17-

18, 2017. New Minor FY 2016/17

HQ Approved

July 7, 2016

On SR-62 reconstruct metal beam guardrail (MBGR). 2016/17 $725 -$ $725

Caltrans Riverside 0M311

Update: Resolution

G-05-16 approved by CTC

June 28-29, 2017. New Minor FY

2016/17 HQ Approved

July 7, 2016

On SR-91 install curb ramps, push buttons, and resurface crosswalk areas. 2016/17 $668 -$ $668

FY 2016-2017 100% SHOPP-AC funded Minor Program Sub-total Subtotal $2,593 -$ $2,593

#19-00 RIV RIVLS08 SHOPP

Page 168: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Riverside 0P490

New: FY 2017/18

Lump Sum SHOPP Minor

Programs Resolution FM-16-05 approved by CTC

June 28-29, 2017.

In the cCity of Riverside, on Route 60 from westbound 60 to southbound 215 connector and eastbound 60 to northbound 215 connector; on Route 215, from northbound 215 to northbound 215 connector; on Route 91 from eastbound 91 to westbound 60 connector. Replace existing metal beam guardrail with concrete barrier.

2017/18 $1,715 0 $1,715

Caltrans Riverside 1H090

Update: FY 2017/18

Lump Sum SHOPP Minor

Programs Resolution FM-16-05 approved by CTC

June 28-29, 2017. New Minor FY

2016/17 HQ Approved

July 7, 2016

On I-15 in Riverside County, in the City of Norco at the Second Street northbound off-ramp. Construct a second left-turn lane. 2017/18 $1,165 -$ $1,165

#19-00 RIV RIVLS08 SHOPP

Page 169: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Riverside 1E972

Update: FY 2017/18

Lump Sum SHOPP Minor

Programs Resolution FM-16-05 approved by CTC

June 28-29, 2017. New Minor FY

2016/17 HQ Approved December

6, 2016

SR-111, in Riverside County, in the city of Palm Springs at various locations. Reconstruct guardrail. 2017/18 $1,350 -$ $1,350

Caltrans Riverside 1G721

New: FY 2017/18

Lump Sum SHOPP Minor

Programs Resolution FM-16-05 approved by CTC

June 28-29, 2017.

I-15 in Riverside County, in Lake Elsinore from 0.5 mile south of and 0.2 mile north of Main Street. Install new ramp metering systems at northbound and southbound on-ramps. (Financial Contribution Only (FCO).

2017/18 $476 $ - $476

FY 2017-2018 100% SHOPP-AC funded Minor Program Sub-total Subtotal $4,706 -$ $4,706

#19-00 RIV RIVLS08 SHOPP

Page 170: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Riverside 1F920

Update: 2016

SHOPP Amendment #16H-000

CTC approved 3/18/16

On I-10 in the cities of Calimesa and Beaumont, from Cherry Valley Boulevard to 14th Street/San Timeteo Canyon Road; also on Routes 60 and 86 at various locations. Install Changeable Message Signs.

2018/19 $4,683 $ - $4,683

FY 2018-2019 100% SHOPP-AC funded Minor Program Sub-total Subtotal $4,683 -$ $4,683

TOTAL 100% SHOPP AC funded TOTAL $11,982 -$ $11,982

2017 FTIP #17-13: Update: EA: 1E971, 1E972, 1H090 & 0M311 New: EA: 1G721 & 0P490Kerrie Hudson, Caltrans District 8 FTIP Manager

#19-00 RIV RIVLS08 SHOPP

Page 171: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Agency CountyDistrict

EA Notes Project Description

Program Year (FFY)

Federal Funds

State Funds

Total Project

Cost

Caltrans Riverside 1C6102016 SHOPP

per HQ list 7/27/16

On I-15 in and near Norco, from 6th Street to south of 68th Street. Sediment stabilization and erosion control. 2016/2017 2,563$ -$ 2,563$

Caltrans Riverside 1C620

Update: SHOPP

Amendment #16H-002

approved by CTC June 29-

30, 2016

On SR-111 at Salton Sea, from Riverside/Imperial County line to east of Cleveland Street. Sediment stabilization and erosion control. 2016/2017 $2,416 -$ 2,416$

FY 2016-2017 100% SHOPP AC funded Sub-total 4,979$ -$ 4,979$

Caltrans Riverside 0R310

Update: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16

On SR-74 in Lake Elsinore, from west of Grand Avenue to north of Lakeshore Drive. Reconstruct sidewalks and curb ramps. 2017/2018 3,849$ $ - 3,849$

Caltrans Riverside 0R301

New/Split from EA 0R330:

SHOPP Amendment approved by

CTC June 28-29, 2017.

SR-111, in Palm Springs from Gateway Drive to Golf Club Drive. Reconstruct sidewalks and construct curb ramps. 2017/18 5,285$ -$ 5,285$

RIVLS09 Exempt Grouped Projects for Safety Improvements - SHOPP Mandates Program - 2017 FTIP Amendment Modification #17-17

#19-00 RIV RIVLS09 SHOPP

Page 172: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

RIVLS09 Exempt Grouped Projects for Safety Improvements - SHOPP Mandates Program - 2017 FTIP Amendment Modification #17-17

Caltrans Riverside 0R300

Delete/Split into Eas 0R301 &

0R302 SHOPP Amendment approved by

CTC June 28-29, 2017.

Update: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16 per HQ list 7/27/16 G-

12

On SR-111 in Palm Springs, from Gateway Drive to Golf Club Drive. Reconstruct sidewalks and curb ramps. 2017/2018 -$ $ - -$

FY 2017-2018 100% SHOPP AC funded Sub-total 9,134$ -$ 9,134$

Caltrans Riverside 1C590

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16

On SR-74 in and near Lake Elsinore, from 1.7 miles east of El Cariso Road to Lehr Drive. Stabilize slopes to decrease sediment transport. 2018/19 4,205$ $ - 4,205$

FY 2018-2019 100% SHOPP AC funded Sub-total 4,205$ -$ 4,205$

Caltrans Riverside 1F590

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16.

Update per HQ SHOPP list

7/27/16 G-12

On SR-74 in Hemet, from Warren Avenue to Soboba Street. Construct and upgrade pedestrian facilities to current Americans with Disability Act standards. 2019/20 6,526$ $ - 6,526$

Caltrans Riverside 0R302

New/Split from EA 0R330:

SHOPP Amendment approved by

CTC June 28-29, 2017.

SR-111, in Palm Springs from Gateway Drive to Golf Club Drive. Reconstruct sidewalks and construct curb ramps. 2019/20 14,901$ -$ 14,901$

#19-00 RIV RIVLS09 SHOPP

Page 173: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

RIVLS09 Exempt Grouped Projects for Safety Improvements - SHOPP Mandates Program - 2017 FTIP Amendment Modification #17-17

Caltrans Riverside 1F600

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16

On SR-79 in Hemet, from East Florida Avenue to East Menio Avenue. Construct and upgrade pedestrian facilities to current Americans with Disability Act standards. 2019/20 4,116$ $ - 4,116$

Caltrans Riverside 1C660

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16

On I-215 in Murrieta and Menifee, from route 215 to north of Scott Road. Stabilize slopes to decrease sediment transport. 2019/20 11,298$ $ - 11,298$

Caltrans Riverside 1C580

Delete SHOPP Amendment

#16H-020 approved by

CTC December 6-7,

2017. New: 2016 SHOPP Amendment

#16H-000 CTC approved 3/18/16

On I-15 in Temecula and Murrieta, from 0.2 miles south of Winchester Road/Banana Avenue to 0.2 mile south of Warm Springs Creek Bridge; also from Temescal Wash Bridge to Parkridge Avenue Undercrossing (PM 40.8/41.8). Stabilize slopes to decrease seiment transport.

2019/20 -$ $ - -$

FY 2019-2020 100% SHOPP AC funded Sub-total 36,841$ -$ 36,841$

TOTAL 100% SHOPP AC funded TOTAL 55,159$ -$ 55,159$

2017 FTIP Amendment #17-17: Delete: EA: 1C580Kerrie Hudson, Caltrans District 8 FTIP Manager

#19-00 RIV RIVLS09 SHOPP

Page 174: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Agency County District EA Notes Project Description

Program Year

(Federal FY) Federal Funds

State Funds

Total Project Cost

Caltrans Riverside 1C640

Update: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16

In and near the city of Riverside, on Route 60 from Milliken Avenue to Routes 60/91/215 Junction; also on Route 91 from Spruce Street to Routes 60/91/215 Junction. Replace transportation wireless communication system with fiber optic infrastructure.

2016/17 3,254$ -$ 3,254$

FY 2016-2017 100% SHOPP AC funded Sub-total Subtotal 3,254$ -$ 3,254$

Caltrans Riverside 1F920

Update: SHOPP

Amendment #16H-014

approved by CTC June 28-

29, 2017. Update: 2016

SHOPP Amendment

#16H-000 CTC approved

3/18/16. Moved from RIVLS08 per HQ SHOPP

list 7/27/16

On I-10 in the cities of Calimesa and Beaumont, from Cherry Valley Boulevard to 14th Street/San Timeteo Canyon Road; also on Routes 60 and 86 at various locations. Install Changeable Message Signs.

2017/18 $4,683 $ - $4,683

FY 2017-2018 100% SHOPP AC funded Sub-total Subtotal 4,683$ -$ 4,683$

RIVLS10 Exempt Grouped Projects for Safety ImprovementsSHOPP Mobility Program

2017 FTIP Amendment Modification #17-11

#19-00 RIV RIVLS10 SHOPP

Page 175: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Riverside 1G190

Delete/Split: SHOPP

Amendment 16H-007

approved by CTC October 19-20, 2016. See

Split Eas 1G192 and SBD

1G191. New: 2016 SHOPP Amendment

#16H-000 CTC approved 3/18/16

On SR-91 in the cities of Corona and Riverside, from Route 15 to Adams Street; also in Upland and Rancho Cucamonga on Route 210 from Los Angeles County line to east of Etiwanda Avenue. HOV lane operational improvement.

2018/19 -$ $ - -$

Caltrans Riverside 1G192

New/Split from 1G190: SHOPP

Amendment 16H-007

approved by CTC October 19-20, 2016. Also see SBd 1G191

for split.

On SR-91 in the cities from Corona and Riverside, from Route 15/91 separator to Adams Street overcrossing. Convert existing limited access HOV lanes to continuous access HOV lanes to allow safer ingress and egress movements for HOV.

2018/19 774$ -$ 774$

Caltrans Riverside 1H530

New: SHOPP Amendment

#16H-014 approved by CTC June 28-

29, 2017.

In Riverside and San Bernadino Counties, on various routes and at various locations. Repair and replace vehicle detection equipment impacting the operation of the District TMC.

2018/19 6,892$ -$ 6,892$

FY 2018-2019 100% SHOPP AC funded Sub-total Subtotal 7,666$ -$ 7,666$

Total 100% SHOPP AC funded 15,603$ -$ 15,603$

2017 FTIP Amendment Modification #17-11: New EA: 1H530. Update: EA: 1F920

#19-00 RIV RIVLS10 SHOPP

Page 176: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Agency County District EA Notes Project Description

Program Year (FFY)

Federal Funds

State Funds

Total Project Cost

Caltrans Riverside 1H310

New: SHOPP Amendment #16H-007

approved by CTC October 19-

20, 2016

On I-15 in Temecula, from 1.1 miles north of Truck Inspection Station to Temecula River Bridge. Remove fire damaged trees, reconstruct barrier railing and install erosion control measures.

2016/17 $ 710 $0 $ 710

Caltrans Riverside 1H780

New: SHOPP Amendment #16H-012

approved by CTC May 17-18,

2017

On SR-91 near Corona, at 0.1 mile north of Route 71. Reconstruct embankment washout, replace damaged fence and metal beam guardrailing and repair damaged culvert.

2016/17 $ 825 0 $ 825

RIVLS12 Exempt Grouped Projects for Emergency Repair-SHOPP Emergency Response Program

2017 FTIP Administrative Modification #17-13

#19-00 RIV RIVLS12 SHOPP

Page 177: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Riverside 1H890

New: Emergency G-11 approved by CTC June 28-

29, 2017

SR-243 near Mountain Center, from 0.2 mile north of Franklin Drive to 0.6 mile south of Poppet Flats Road. A series of heavy storms in February 2017 caused a washout and culvert failure at six locations. The eroding slope cllapsed resulting in culvert damage. The project will reconstruct embankments, repair drainage systems, repair roadway, place armament of shotcrete and wire mesh on slope, place slurry and compaction grouting, reconstruct metal beam guardrail, and provide traffic control. The work is necessary to prevent further erosion, aviod lane loss and restore traveler safety.

2016/17 $1,700 0 $ 1,700

Caltrans Riverside 1H730

New: SHOPP Amendment #16H-012

approved by CTC May 17-18,

2017

In Jurupa Valley and Ontario, on Route 15 at Philadelphia Street Undercrossing Bridge No. 56-0696; also in San Bernardino County on Route 15 in Rancho Cucamonga, at Fourth Street Undercrossing Bridge No. 54-0912 (PM 0.0 to PM 3.1) and on Route 210 in the City of San Bernadino at Cajon Boulevard Overhead Bridge No. 54-0946R (PM R21.7). Reconstruct eroded structural backfill of bridge embankments, repair eroded slopes and repair drainage system.

2016/17 $ 730 0 $ 730

FY 2016-2017 100% SHOPP AC funded Total Subtotal 3,965$ -$ 3,965$

#19-00 RIV RIVLS12 SHOPP

Page 178: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Riverside 1G000

New: SHOPP Amendment 16H-002 approved by CTC June 29-30,

2016

US-95 near Blythe, from north of Palo Verde Dam Road to the San Bernardino County line. Restore storm eroded embankments with rock slope protection and replace culverts. A previous Emergency Opening EA 08-1F800 repaired roadway.

2019/20 13,122$ -$ 13,122$

FY 2019-2020 100% SHOPP AC funded Total Subtotal 13,122$ -$ 13,122$

TOTAL 100% SHOPP AC funded TOTAL 17,087$ -$ 17,087$ 2017 FTIP #17-13: Add New: EA 1H890Kerrie Hudson, Caltrans District 8 FTIP Manager

#19-00 RIV RIVLS12 SHOPP

Page 179: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

SAN BERNARDINO

COUNTY

Page 180: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

IMPLEMENTING AGENCY SUB PROJECT ID GROUP PROJECT ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2018/2019 FY2019/2020 FY2020/2021 FY2021/2022 FY2022/2023 FY2023/2024 TOTAL

VARIOUS AGENCIES ATP02-08-092S 20151501 19 - 00 Etiwanda Corridor Improvements CITY FUNDS 12/30/2020 0 221 221

0 221 221

VARIOUS AGENCIES ATP02-08-092S 20151501 19 - 00 Etiwanda Corridor Improvements ACTIVE

TRANSPORTATI

ON PROGRAM

12/30/2020 72 557 629

72 557 629

850Grouped Project TOTAL

2019 Federal Transportation Improvement Program

Amendment #19-00

San Bernardino County

Group Project Listing

(in $000`s)

20151501 - Grouped Projects for Bicycle and pedestrian facilities funded with ATP Cycle 2 funds (State - Non SRTS): Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities

(both motorized and Non-motorized). Toll credits to match ATP.

TOTAL CITY

TOTAL ATP

#19-00 SBD 20151501 ATP BIKE AND PED

Page 181: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 Federal Transportation Improvement Program

Amendment #19-00

San Bernardino County

Group Project Listing

(in $000`s)

IMPLEMENTING AGENCY SUB PROJECT ID GROUP PROJECT ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2018/2019 FY2019/2020 FY2020/2021 FY2021/2022 FY2022/2023 FY2023/2024 TOTAL

VARIOUS AGENCIES 20151502.1 20151502 19 - 00 Willow Street Shared Use Paseo CITY FUNDS 12/31/2020 685 685

VARIOUS AGENCIES 20151502.2 20151502 19 - 00 Regional Connector Project CITY FUNDS 12/31/2020 0 909 909

VARIOUS AGENCIES 20151502.3 20151502 19 - 00 Big Bear Blvd. Pedestrian and

Bicycle Mobility Project

CITY FUNDS 12/31/2020 380 380

1,065 909 1,974

VARIOUS AGENCIES 20151502.1 20151502 19 - 00 Willow Street Shared Use Paseo ACTIVE

TRANSPORTATI

ON PROGRAM

12/31/2020 1,200 1,200

VARIOUS AGENCIES 20151502.2 20151502 19 - 00 Regional Connector Project ACTIVE

TRANSPORTATI

ON PROGRAM

12/31/2020 516 3,120 3,636

VARIOUS AGENCIES 20151502.3 20151502 19 - 00 Big Bear Blvd. Pedestrian and

Bicycle Mobility Project

ACTIVE

TRANSPORTATI

ON PROGRAM

12/31/2020 1,519 1,519

VARIOUS AGENCIES 20151502.4 20151502 19 - 00 Sidewalk Gap Closure SRTS

Project

ACTIVE

TRANSPORTATI

ON PROGRAM

12/31/2020 482 1,671 2,153

VARIOUS AGENCIES 20151502.5 20151502 19 - 00 Yucca Valley Elementary School

Sidewalks

ACTIVE

TRANSPORTATI

ON PROGRAM

12/31/2020 1,026 1,026

4,743 4,791 9,534

11,508Grouped Project TOTAL

20151502 - Grouped Projects for Safety Imprvmnts - (State - SRTS): Projects consistent w/ 40 CFR Part 93.126 Exempt Tables 2&3 categories - Railroad/highway crossing, safer non-Fed-aid system roads, shoulder imprvmnts, traffic control

devices and operating assistance other than signalization projects, intersection signalization projects at individual intersections, pvmnt marking. Toll Credits to match ATP

TOTAL CITY

TOTAL ATP

#19-00 SBD 20151502 STATE SRTS

Page 182: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

IMPLEMENTING AGENCY SUB PROJECT ID GROUP PROJECT ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2018/2019 FY2019/2020 FY2020/2021 FY2021/2022 FY2022/2023 FY2023/2024 TOTAL

VARIOUS AGENCIES 8-Apple Valley-1 20171402 19 - 00 Apple Valley South ‐ Safe Routes

to School

CITY FUNDS 12/31/2022 79 745 824

VARIOUS AGENCIES 8-Apple Valley-2 20171402 19 - 00 Bear Valley Road Class 1 Bike

Path Connector

CITY FUNDS 12/31/2022 207 207

VARIOUS AGENCIES 8-BB Lake-1 20171402 19 - 00 Alpine Pedal Path Rathbun Creek

Extension

CITY FUNDS 12/31/2022 0 198 198

VARIOUS AGENCIES 8-Highland-1 20171402 19 - 00 City Creek/Alabama Street

Bikeways

CITY FUNDS 12/31/2022 0 205 589 794

VARIOUS AGENCIES 8-Ontario-1 20171402 19 - 00 Sultana Elementary and De Anza

Middle School Pedestrian

Improvements

CITY FUNDS 12/31/2022 32 196 228

VARIOUS AGENCIES 8-Redlands-1 20171402 19 - 00 East Valley Corridor Bike Route

Interconnect Project

CITY FUNDS 12/31/2022 0 521 56 577

VARIOUS AGENCIES 8-Rialto-2 20171402 19 - 00 Cactus Avenue Multi‐Use Path CITY FUNDS 12/31/2022 122 392 514

VARIOUS AGENCIES 8-Victorville-1 20171402 19 - 00 City of Victorville ‐ Arrowhead

Drive/Seventh Ave Complete

Streets

CITY FUNDS 12/31/2022 0 974 974

VARIOUS AGENCIES 8-Yucaipa-1 20171402 19 - 00 Safe Routes to Dunlap

Elementary School

CITY FUNDS 12/31/2022 0 130 130

VARIOUS AGENCIES 8-Yucca Valley-2 20171402 19 - 00 Onaga Trail Pedestrian

Improvements

CITY FUNDS 12/31/2022 0 13 182 195

440 2,439 935 827 4,641

VARIOUS AGENCIES 8-Apple Valley-1 20171402 19 - 00 Apple Valley South ‐ Safe Routes

to School

ACTIVE

TRANSPORTATI

ON PROGRAM

12/31/2022 333 3,137 3,470

VARIOUS AGENCIES 8-Apple Valley-2 20171402 19 - 00 Bear Valley Road Class 1 Bike

Path Connector

ACTIVE

TRANSPORTATI

ON PROGRAM

12/31/2022 792 792

VARIOUS AGENCIES 8-BB Lake-1 20171402 19 - 00 Alpine Pedal Path Rathbun Creek

Extension

ACTIVE

TRANSPORTATI

ON PROGRAM

12/31/2022 0 788 788

VARIOUS AGENCIES 8-Fontana-1 20171402 19 - 00 Fontana Safe Routes to Schools

Pedestrian Improvements

ACTIVE

TRANSPORTATI

ON PROGRAM

12/31/2022 10 157 191 1,560 1,918

VARIOUS AGENCIES 8-Ontario-1 20171402 19 - 00 Sultana Elementary and De Anza

Middle School Pedestrian

Improvements

ACTIVE

TRANSPORTATI

ON PROGRAM

12/31/2022 178 1,100 1,278

1,313 4,082 1,291 1,560 8,246

VARIOUS AGENCIES 8-Highland-1 20171402 19 - 00 City Creek/Alabama Street

Bikeways

ACTIVE

TRANSPORTATI

ON PROGRAM -

MPO

12/31/2022 0 817 2,354 3,171

VARIOUS AGENCIES 8-Redlands-1 20171402 19 - 00 East Valley Corridor Bike Route

Interconnect Project

ACTIVE

TRANSPORTATI

ON PROGRAM -

MPO

12/31/2022 0 1,863 200 2,063

VARIOUS AGENCIES 8-Rialto-2 20171402 19 - 00 Cactus Avenue Multi‐Use Path ACTIVE

TRANSPORTATI

ON PROGRAM -

MPO

12/31/2022 300 960 1,260

VARIOUS AGENCIES 8-SB County-3 20171402 19 - 00 Sunburst Ave Class II Bike

Lanes, Joshua Tree

ACTIVE

TRANSPORTATI

ON PROGRAM -

MPO

12/31/2022 20 1,098 1,118

20171402 - Grouped Projects for Bicycle and pedestrian facilities - Non - Motorized (ATP Cycle 3 State/MPO): Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (Non-

motorized)

TOTAL CITY

TOTAL ATP

2019 Federal Transportation Improvement Program

Amendment #19-00

San Bernardino County

Group Project Listing

(in $000`s)

#19-00 SBD 20171402 BIKE AND PED

Page 183: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

IMPLEMENTING AGENCY SUB PROJECT ID GROUP PROJECT ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2018/2019 FY2019/2020 FY2020/2021 FY2021/2022 FY2022/2023 FY2023/2024 TOTAL

20171402 - Grouped Projects for Bicycle and pedestrian facilities - Non - Motorized (ATP Cycle 3 State/MPO): Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Bicycle and pedestrian facilities (Non-

motorized)

2019 Federal Transportation Improvement Program

Amendment #19-00

San Bernardino County

Group Project Listing

(in $000`s)

VARIOUS AGENCIES 8-Victorville-1 20171402 19 - 00 City of Victorville ‐ Arrowhead

Drive/Seventh Ave Complete

Streets

ACTIVE

TRANSPORTATI

ON PROGRAM -

MPO

12/31/2022 0 1,329 1,329

VARIOUS AGENCIES 8-Yucaipa-1 20171402 19 - 00 Safe Routes to Dunlap

Elementary School

ACTIVE

TRANSPORTATI

ON PROGRAM -

MPO

12/31/2022 0 402 402

VARIOUS AGENCIES 8-Yucca Valley-2 20171402 19 - 00 Onaga Trail Pedestrian

Improvements

ACTIVE

TRANSPORTATI

ON PROGRAM -

MPO

12/31/2022 0 52 724 776

320 3,789 2,732 3,278 10,119

23,006

TOTAL ATP-MPO

Grouped Project TOTAL

#19-00 SBD 20171402 BIKE AND PED

Page 184: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Page 1 of 3

Agency County District EA Notes Project Description

Program Year

(Federal FY) Federal Funds

State Funds

Total Project Cost

Caltrans SBd 1G450New: SHOPP

Amendment #16H-007 approved by CTC October 19-

20, 2016

On SR-62 in Twentynine Palms, from Utah Trail intersection to 0.3 mile east of Utah Trail. Install traffic signals meeting current ADA standards, crosswalks and flashing beacon system.

2018/19 $2,366 -$ $2,366

Caltrans SBd 1F362

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16. G-13 Contingency

Project on HQ list 8/23/16. Not on HQ SHOPP

list 7/27/16.

On SR-210 in San Bernardino County, on Routes 71, 210, 215 and 259 at various locations. Replace existing guide signs with Type XI reflectivity. (PA&ED, PS&E, RW phases are programmed by CTC, but not on HQ G13 list 8/23/16, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG.)

2018/19 $957 $ - $957

Caltrans SBd 1C270

New: 2016 SHOPP CTC

Approved 3/18/16

On I-10 in Redlands, from Mountain View Avenue to California Street. Gore and slope paving, construct access roads and maintenance vehicle pull outs, vegetation control under guardrail systems, remove dead plant material and relocate electrical and irrigation systems.

2018/19 $3,086 $ - $3,086

FY 2018-19 100% SHOPP AC funded Sub-total $6,409 $0 $6,409

Caltrans SBd EA 1E060

New: SHOPP Amendment

#16H-009 CTC approved

December 7-8, 2016

On SR-18 in Victorville, from Amargosa Road to Cobalt Road. Construct raised curb median. 2019/20 $9,571 $ - $9,571

SBDLS01 Exempt Grouped Projects for Safety Improvements - SHOPP Collision Reduction Program - 2019 FTIP

#19-00 SBD SBDLS01 SHOPP COLLISION

Page 185: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Page 2 of 3

Agency County District EA Notes Project Description

Program Year

(Federal FY) Federal Funds

State Funds

Total Project Cost

SBDLS01 Exempt Grouped Projects for Safety Improvements - SHOPP Collision Reduction Program - 2019 FTIP

Caltrans SBd 1C290

New: 2016 SHOPP CTC

Approved 3/18/16

On I-10 in Redlands, from east of Tennessee Street to Route 38 (Orange Street). Roadside safety improvements. 2019/20 $2,501 $ - $2,501

Caltrans SBd 1C280

New: 2016 SHOPP CTC

Approved 3/18/16

On I-10 in Redlands, from west of Univeristy Avenue to west of Ford Street. Roadside safety improvements. 2019/20 $2,501 $ - $2,501

Caltrans SBd 1C330New: 2016

SHOPP CTC Approved 3/18/16

On I-10 in Colton, from west of Rancho Avenue to Warm Creek Bridge. Roadway safety improvements. 2019/20 $3,386 $ - $3,386

Caltrans SBd 1C300

New: 2016 SHOPP CTC

Approved 3/18/16

On I-10 in Redlands and Yucaipa, from Wabash Avenue to County Line Road. Construct roadside safety improvements. 2019/20 $3,086 $ - $3,086

Caltrans SBd 1C720New: 2016

SHOPP CTC Approved 3/18/16

On I-15 near Barstow, from Harvard Road to Rasor Road. Re-grade and flatten median cross slope. 2019/20 $17,278 $ - $17,278

Caltrans SBd 0R142New: 2016

SHOPP CTC Approved 3/18/16

On I-40 in and near Needles, from 4.5 miles east of Homer Wash to Arizona state line. Regrade and flatten median cross slope. 2019/20 $32,340 $ - $32,340

Caltrans SBd 0R150New: 2016

SHOPP CTC Approved 3/18/16

On I-40 near Essex, from west of Kelbaker Road to Essex Road. Re-grade and flatten median cross slope. 2019/20 $35,088 $ - $35,088

Caltrans SBd 1F780

New: 2016 SHOPP

Amendment #16-011 CTC

approved March 15-16, 2017

Near Needles, from Route 62 to 0.8 mile south of Route 40. Construct ground-in shoulder and centerline rumble strips. 2019/20 $3,230 -$ $3,230

#19-00 SBD SBDLS01 SHOPP COLLISION

Page 186: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Page 3 of 3

Agency County District EA Notes Project Description

Program Year

(Federal FY) Federal Funds

State Funds

Total Project Cost

SBDLS01 Exempt Grouped Projects for Safety Improvements - SHOPP Collision Reduction Program - 2019 FTIP

Caltrans SBd 1F770

New: 2016 SHOPP

Amendment #16-011 CTC

approved March 15-16, 2017

In and near Barstow, from 0.1 mile north of Boone Road to 0.7 mile south of Rimrock Road. Construct ground-in shoulder and centerline ruble strips.

2019/20 $3,893 -$ $3,893

Caltans SBd 1C260

New: 2016 SHOPP CTC

Approved 3/18/16. Project

not on HQ SHOPP list

7/27/16On I-10 in Loma Linda, from Richradson Street to Sterling Avenue. Roadside safety improvements. 2019/20 $1,864 $ - $1,864

FY 2019-20 100% SHOPP AC funded Sub-total $114,738 $0 $114,738

Caltrans SBd 1F362

G-13 Contingency

Project on HQ list 8/23/16. Not on HQ SHOPP

list 7/27/16. New: 2016

SHOPP Amendment

#16H-000 CTC approved 3/18/16.

On SR-210 in San Bernardino County, on Routes 71, 210, 215 and 259 at various locations. Replace existing guide signs with Type XI reflectivity. (PA&ED, PS&E, RW phases are programmed by CTC, but not on HQ G13 list 8/23/16, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG.)

2020/21 $2,271 $ - $2,271

FY 2020-21 100% SHOPP AC funded Sub-total $2,271 -$ $2,271

TOTAL 100% SHOPP AC funded Total $123,418 $0 $123,4182019 FTIPKerrie Hudson, Caltrans District 8 FTIP Manager

#19-00 SBD SBDLS01 SHOPP COLLISION

Page 187: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Page 1 of 4

Agency County District EA Notes Project Description

Program Year

(Federal FY) Federal FundsState Funds

Total Project Cost

Caltrans SBd 1E780

New: 2016 SHOPP CTC

Approved 3/18/16.

Project moved from SBDLS01 per HQ SHOPP

list 7/27/16.

On SR-330 near Smiley Park, from 6.9 miles south of Running Springs to 3.4 miles east of Fork City Creek Bridge. Construct rockfall barrier to stabilize hillside slopes.

2018/19 $3,291 $ - $3,291

FY 2018-19 100% SHOPP AC funded Sub-total Sub-total $3,291 -$ $3,291

Caltrans SBd 0G800

New: 2016 SHOPP CTC

Approved 3/18/16.

Project moved from SBDLS01 per HQ SHOPP

list 7/27/16.

On SR-38 near Big Bear Lake, from Zaca Road to Route 18. Replace culverts. 2019/20 $7,434 $ - $7,434

SBDLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2019 FTIP

#19-00 SBD SBDLS02 SHOPP ROADWAY PRESERVATION

Page 188: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Page 2 of 4

Agency County District EA Notes Project Description

Program Year

(Federal FY) Federal FundsState Funds

Total Project Cost

SBDLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2019 FTIP

Caltrans SBd 1F361

New: 2016 SHOPP CTC

Approved 3/18/16.

Project moved from SBDLS01 per HQ SHOPP

list 7/27/16.

On SR-60 in Pomona, Chino and Ontario, from Los Angeles County line to Riverside County line. Replace existing signs with retro-flective sheeting.

2019/20 $1,957 $ - $1,957

Caltrans SBd 0K122

New: 2016 SHOPP

Amendment 16H-000 CTC

approved 3/18/16. moved from SBDLS01.

G-13 Contingency

Project on HQ list 8/23/16. Not on HQ SHOPP

list 7/27/16.

On I-15 in Hesperia and Victorville, from Route 395 to north of Majave Drive. Rehabilitate roadway. (PA&ED, PS&E, RW phases are programmed by CTC, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG/project not exempt.)

2019-20 2,420$ $ - 2,420$

#19-00 SBD SBDLS02 SHOPP ROADWAY PRESERVATION

Page 189: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Page 3 of 4

Agency County District EA Notes Project Description

Program Year

(Federal FY) Federal FundsState Funds

Total Project Cost

SBDLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2019 FTIP

Caltrans SBd 0K123

New: 2016 SHOPP CTC

Approved 3/18/16 moved from SBDLS01 per HQ SHOPP

list 7/27/16.

On I-15 in Barstow, from Outlet Center Drive to Mojave River Bridge. Rehabilitate pavement. 2019-20 30,718$ $ - 30,718$

Caltrans SBd 0K121

New: 2016 SHOPP CTC

Approved 3/18/16 moved from SBDLS01 per HQ SHOPP

list 7/27/16.

On I-15 near Fontana, from Sierra Avenue to Devore Road. Rehabilitate roadway. 2019-20 25,944$ -$ $25,944

Caltrans SBd 1F132

New: 2016 SHOPP CTC

Approved 3/18/16

On US-95 near Needles, from Goffs Road to Nevada State line. Rehabilitate pavement. 2019/20 5,504$ $ - 5,504$

Caltrans SBd 1F131

New: 2016 SHOPP CTC

Approved 3/18/16

On US-95 near Needles, from Route 62 to south of Havasu Lake Road. Rehabilitate pavement. 2019/20 11,912$ $ - 11,912$

#19-00 SBD SBDLS02 SHOPP ROADWAY PRESERVATION

Page 190: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Page 4 of 4

Agency County District EA Notes Project Description

Program Year

(Federal FY) Federal FundsState Funds

Total Project Cost

SBDLS02 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement RehabilitationSHOPP Roadway Preservation Program

2019 FTIP

Caltrans SBd 1F133

New: 2016 SHOPP CTC

Approved 3/18/16

On SR-62 near Vidal, from west of Route 95 to Nevada State line; also on Route 95 at various locations. Rehabilitate pavement and upgrade guardrail.

2019/20 10,841$ $ - 10,841$

FY 2019-20 100% SHOPP AC funded Sub-total Sub-total $96,730 -$ $96,730

Caltrans SBd 0K122

New: 2016 SHOPP

Amendment 16H-000 CTC

approved 3/18/16. moved from SBDLS01.

G-13 Contingency

Project on HQ list 8/23/16. Not on HQ SHOPP

list 7/27/16.

On I-15 in Hesperia and Victorville, from Route 395 to north of Majave Drive. Rehabilitate roadway. (PA&ED, PS&E, RW phases are programmed by CTC, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG/project not exempt.)

2020/21 170,729$ $ - 170,729$

FY 2020-21 100% SHOPP AC funded Sub-total Sub-total 170,729$ -$ 170,729$

Total 100% SHOPP AC funded Total $270,750 $0 $270,750

2019 FTIP

Kerrie Hudson, Caltrans District 8 FTIP Manager

#19-00 SBD SBDLS02 SHOPP ROADWAY PRESERVATION

Page 191: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Agency CountyDistrict

EA Notes Project DescriptionProgram

Year (FFY) Federal FundsState

FundsTotal Project

Cost

Caltrans SBd 1H660

Resolution FP-17-03 PA&ED Programming Approved by

CTC August 16-17, 2017. New:

SHOPP Amendment #16H-016

approved by CTC June 28-29, 2017 for

PA&ED phase only per CTIPS

on July 21, 2017.

At Clyde V. Kane Roadside Rest Areas. Transportation infrastructure improvement for zero-emission vehicle charging.

2018/19 $259 -$ $259

Caltrans SBd 1F440

New: 2016 SHOPP CTC

Approved 3/18/16 moved from SBDLS01 per HQ SHOPP

list 7/27/16

On I-10 in Colton, from west of Rancho Avenue to Warm Creek Bridge. Upgrade irrigation systems.

2018/19 $2,488 $ - $2,488

FY 2018-19 100% SHOPP AC funded Sub-total Sub-total $2,747 -$ $2,747

SBDLS03 Exempt Grouped Projects for Pavement Resurfacing and/or Pavement Rehabilitation - SHOPP Roadside Preservation 2019 FTIP

#19-00 SBD SBDLS03 SHOPP PAVEMENT RESURFACING

Page 192: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans SBd 0G860

New: 2016 SHOPP CTC

Approved 3/18/16

On I-40 near Needles, west of Goffs Road at John Wilkie Safety Roadside Rest Area. Reconstruct safety roadside rest area.

2019-20 11,000$ $ - $11,000

FY 2019-20 100% SHOPP AC funded Sub-total Sub-total 11,000$ -$ 11,000$

Total 100% SHOPP AC funded Total $13,747 -$ $13,7472019 FTIP Kerrie Hudson, Caltrans District 8 FTIP Manager

#19-00 SBD SBDLS03 SHOPP PAVEMENT RESURFACING

Page 193: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Agency CountyDistrict

EA Notes Project Description

Program Year

(Federal FY)

Federal Funds

State Funds

Total Project Cost

Caltrans SBd 1G210

New: 2016 SHOPP CTC

Approved 3/18/16. Project

moved from SBDLS011 per HQ SHOPP list

7/27/16

On SR-210 in Rancho cucamonga and Fontana, from East Avenue to west of Beech Avenue; also on Route 15 at Route 210/15 Separation. Install Transportation Management System elements.

2018/19 3,290$ $ - 3,290$

FY 2018-19 100% SHOPP AC funded Sub-total Sub-total 3,290$ -$ 3,290$

Total 100% SHOPP AC funded Total 3,290$ -$ 3,290$

2019 FTIP

Kerrie Hudson, Caltrans District 8 FTIP Manager

SBDLS04 Exempt Grouped Projects for Safety Improvements - SHOPP Mobility Program 2019 FTIP

#19-00 SBD SBDLS04 SHOPP MOBILITY

Page 194: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Page 1 of 2

Agency CountyDistrict

EA Notes Project DescriptionProgram

Year (FFY) Federal FundsState

FundsTotal Project

Cost

Caltrans SBd 1F730

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16. G-13 Contingency

Project on HQ list 8/23/16.

On I-215 in Colton, from 0.3 mile south to 0.3 north of Washington Avenue Overcrossing No. 54-0530. Replace overcrossing. (PA&ED, PS&E, RW phases are programmed by CTC, but not on HQ G13 list 8/23/16, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG.)

2019-20 8,017$ $ - 8,017$

FY 2019-20 100% SHOPP AC funded Total Sub-total 8,017$ -$ 8,017$

Caltrans SBd 1F730

New: 2016 SHOPP

Amendment #16H-000 CTC

approved 3/18/16. G-13 Contingency

Project on HQ list 8/23/16.

On I-215 in Colton, from 0.3 mile south to 0.3 north of Washington Avenue Overcrossing No. 54-0530. Replace overcrossing. (PA&ED, PS&E, RW phases are programmed by CTC, but not on HQ G13 list 8/23/16, have to program construction support/capital in FFY 2020/21 per HQ direction to SCAG.)

2020/21 19,661$ $ - 19,661$

FY 2020-21 100% SHOPP AC funded Total Sub-total 19,661$ -$ 19,661$

SBDLS07 Exempt Grouped Projects for Bridge Rehabilitation and ReconstructionSHOPP Bridge Preservation Program

2019 FTIP

#19-00 SBD SBDLS07 SHOPP BRIDGE REHAB

Page 195: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Page 2 of 2

Agency CountyDistrict

EA Notes Project DescriptionProgram

Year (FFY) Federal FundsState

FundsTotal Project

Cost

SBDLS07 Exempt Grouped Projects for Bridge Rehabilitation and ReconstructionSHOPP Bridge Preservation Program

2019 FTIP

Caltrans SBd 0R380

New Long Lead: SHOPP

Amendment #16H-014

approved by CTC June 28-29,

2017.

I-40 near Needles, from Park Moabi Road to Topock Road at the Colorado River Bridge No. 54-0415. Bridge rehabilitation and/or replacement. Caltrans will be the Lead Agency and share half of all costs with ADOT per a signed Letter of Intent. PA&ED and R/W are the only authorized phase. All other phases are preliminary estimates for information only: PS&E $3,759, Con Sup $8,332 and Con $28,800.

2023/24 3,250$ -$ 3,250$

FY 2023-24 100% SHOPP AC funded Total Sub-total 3,250$ -$ 3,250$

Total 100% SHOPP AC funded Sub-total 30,928$ -$ 30,928$

2019 FTIP

Kerrie Hudson, Caltrans District 8 FTIP Manager

#19-00 SBD SBDLS07 SHOPP BRIDGE REHAB

Page 196: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Page 1 of 1

Agency CountyDistrict

EA Notes Project DescriptionProgram Year (Federal FY)

Federal Funds

State Funds

Total Project Cost

Caltrans SBd 1H271

New: SHOPP Amendment #16H-012

approved by CTC May 17-

18, 2017

I-15 in Victorville, near Palmdale Road (Route 18) and Route 15. Restore vegetation and irrigation system due to fire damage. 2018/19 $2,401 -$ $2,401

FY 2018-19 100% SHOPP AC funded Sub-total Sub-total 2,401$ -$ 2,401$

Caltrans SBd 1G010

New: SHOPP Amendment

16H-002 approved by

CTC June 29-30, 2016

SR-62 near Vidal Junction, from west of Route 95 to west of Parker Dam Road. Restore storm eroded embankments with rock slope protection. A previous Emergency Opening EA 08-1F660 repaired roadway.

2019/20 12,739$ -$ 12,739$

Caltrans SBd 1H290

New: 2016 SHOPP

Amendment #16H-011

approved by CTC March 15-

16, 2017

Near Cedar Glen, at 0.1 mile south of Hospital Road. Widen shoulder and replace guard rail with concreate barrier mounted on soldier pile wall. 2019/20 5,617$ -$ 5,617$

FY 2019-20 100% SHOPP AC funded Sub-total Sub-total 18,356$ -$ 18,356$

TOTAL 100% SHOPP AC funded 20,757$ -$ 20,757$

2019 FTIP

Kerrie Hudson, Caltrans District 8 FTIP Manager

SBDLS09 Exempt Grouped Projects for Emergency RepairSHOPP Emergency Response Program

2019 FTIP

#19-00 SBD SBDLS09 SHOPP EMERGENCY

Page 197: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Agency CountyDistrict

EA Notes Project Description

Program Year

(Federal FY)

Federal Funds

State Funds

Total Project Cost

Caltrans SBd 0R432

Split/New: SHOPP

Amendment #16H-017

approved by CTC August 16-

17, 2017.

At various locations, from Eagle Mountain Drive to Route 38/18 Separation. Sediment control and stabilization. (Split from EA 0R430).

2019/20 1,062$ -$ 1,062$

FY 2019-20 100% SHOPP AC funded Sub-total 1,062$ -$ 1,062$

Total 100% SHOPP AC funded Total 1,062$ -$ 1,062$

2019 FTIP

Kerrie Hudson, Caltrans District 8 FTIP Manager

SBDLS011 Exempt Grouped Projects for Safety Improvements - SHOPP Mandates Program 2019 FTIP

#19-00 SBD SBDLS011 SHOPP MANDATES

Page 198: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

VENTURA

COUNTY

Page 199: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Modified: 12/20/2017j jjMPO FTIP ID: VEN54032CTIP ID:

Agency County District EA (if applicable) Project Title Project Description Program

YearEarmark

Repurposing STPL CITY/County Total Project Cost Toll Credit

Prior Years 7 $5,181,000 $3,341,000 $8,522,000

Moorpark Ventura 7 Rehabilitation of Roads on the Federal Aid System

Rehabilitation of City Roads on the Federal Aid System 2018/19 $200,000 $0 $200,000 $23,000

Santa Paula Ventura 7 Street Resurfacing at Various

Locations Street Resurfacing at Various Locations 2018/19 $77,000 $0 $77,000 $9,000

Camarillo Ventura 7 Pavement Rehabilitation On System Roads

Pavement Resurfacing on Earl Joseph Drive from Ponderosa Dr. to Las Posas Road, including associated improvements

2018/19 $342,000 $0 $342,000 $39,000

Ojai Ventura 7 Road Rehabilitation Road Rehabilitation at Various Locations 2018/19 $200,000 $26,000 $226,000

Oxnard Ventura 7Vineyard/Patterson Resurfacing - Oxnard Boulevard to Gonzales Road

Resurface Vineyard Avenue / Patterson Road from Oxnard Boulevard to Gonzales Road

2018/19 977,000.00$ $1,044,000 $244,000 $2,265,000 $120,000

City of Simi Valley

Ventura 7 Annual Major Streets Rehabilitation Program

First Street from Fitzgerald Road to Bluegrass Street and Fitzgerald Road from Appleton Road to Sequoia Avenue

2018/19 $1,714,000 $429,000 $2,143,000

City of Simi Valley

Ventura 7 Annual Major Streets Rehabilitation Program

Cochran Street from Sycamore Drive to Sequoia Avenue 2018/19 $382,000 $95,000 $477,000

Port Hueneme Ventura 7 Street Rehabilitation at Various

LocationsRehabilitation / Overlay at Various Locations Citywide 2018/19 $200,000 $0 $200,000 $23,000

Total $3,073,000 $7,244,000 $4,135,000 $14,452,000 $214,000

GROUPED PROJECT LISTINGREHABILITATION & RECONSTRUCTION PROJECTS

#19-00 VEN VEN54032 Pavement Resurf. - Rehab

Page 200: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

Note id: 24

1) This is the FTIP lump sum “backup” list for HBP funded projects. Please see the Local Assistance web site for the most currentlistings:

http://www.dot.ca.gov/hq/LocalPrograms/hbrr99/HBP_FSTIP.html

2) The purpose of this list is to show which projects being advanced by local agencies have met the eligibility requirements of thefederal Highway Bridge Program and have been prioritized for funding by the Department in cooperation with local agencies for funding.

3) Contractual funding levels are determined at time of federal authorization/obligation for given phase of work. For details seeChapter 3 of the Local Assistance Procedures Manual.

4) For FTIP/FSTIP purposes, Federal Highway Bridge Program (HBP) funding constraint is managed by Caltrans.

5) Prop 1B bond funds for the Local Seismic Safety Retrofit Program (LSSRP) used for matching federal funds are also managed byCaltrans.

6) Financial constraint of LOCAL matching funds (including regional STIP funds) and LOCAL Advance Construction (AC) is the responsibility of the MPOs and their local agencies.

7) Some projects show that they are programmed using State STP funds. These funds are HBP funds transferred to the STP forbridge work that is not ordinarily eligible for HBP funds. See the HB Program Guidelines for details. Do not confuse these STPfunds with Regional STP funds.

8) Corrections to this report should be addressed to the District Local Assistance Engineer:

http://www.dot.ca.gov/hq/LocalPrograms/dlae.htm

Notes:

10/26/2016, 10:10 AM

Caltrans, Division of Local Assistance Page 110/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 201: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amounts programmed in the FTIP.

HBP-ID Project Description

Oxnard BRIDGE NO. 52C0095, CHANNEL ISLANDS BL, OVER EDISON CANAL, 0.2 MI E OF HARBOR BLVD. Bridge rehabilitation. No added lanecapacity.

Fund Source Summary:

PER/W

Total 86,101

CON

Total

2,138,732

86,101

2,224,833

86,101

2,138,7322,138,732

Phase Summary:

Fed $

Local AC

Local Match

Total

9,876

86,101

LSSRP Bond

Total1,969,645

255,188

2,224,833

76,225 1,893,419

245,313

2,138,732

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3401

5129(070)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

9,876

86,101

LSSRP Bond

Total76,225

9,876

86,101

76,225

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,893,419

245,313

2,138,732

1,893,419

245,313

2,138,732

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 210/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 202: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Oxnard BRIDGE NO. 52C0108, CHANNEL ISLANDS BL, OVER MANDALAY BAY, 0.4 MI E OF HARBOR BLVD. Bridge rehabilitation. No addinglanes.

Fund Source Summary:

PER/W

Total 26,856

CON

Total

360,969

26,856

387,825

26,856

360,969360,969

Phase Summary:

Fed $

Local AC

Local Match

Total

3,080

26,856

LSSRP Bond

Total343,341

44,484

387,825

23,776 319,566

41,403

360,969

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3402

5129(069)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

3,080

26,856

LSSRP Bond

Total23,776

3,080

26,856

23,776

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total319,566

41,403

360,969

319,566

41,403

360,969

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 310/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 203: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Simi Valley BRIDGE NO. 52C0115, COCHRAN STREET OVER LAS LLAJAS CREEK, 0.4 MI E TAPO ST. Widen existing four lane bridge toaccommodate center turn lane, sidewalks, curb and gutter. No added lane capacity.

Fund Source Summary:

PER/W

Total 155,750

CON

Total

872,750 872,750

155,750

40,000 40,000

40,000 872,750 1,068,500

155,750

Phase Summary:

Fed $

Local AC

Local Match

Total

17,865

155,750

LSSRP Bond

Total35,412 772,646 945,943

4,588 100,104 122,557

40,000 872,750 1,068,500

137,885

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3703

5405(064)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

17,865

155,750

LSSRP Bond

Total137,885

17,865

155,750

137,885

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

R/W Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total35,412 35,412

4,588 4,588

40,000 40,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total772,646 772,646

100,104 100,104

872,750 872,750

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 410/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 204: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Simi Valley BRIDGE NO. 52C0150, MADERA ROAD OVER UP RR AMTRAK METROLINK, 0.3 MI S OF STATE RTE 118. Repair deck spalls andoverlay deck with PCC seal coat and construct MBGR on Northeast approach.

Fund Source Summary:

PER/W

Total

CON

Total

354,500

66,000 66,000

66,000 420,500354,500354,500

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total58,430 372,269

7,570 48,231

66,000 420,500

313,839

40,661

354,500

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4075

5405(077)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total58,430 58,430

7,570 7,570

66,000 66,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total313,839

40,661

354,500

313,839

40,661

354,500

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 510/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 205: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Simi Valley BRIDGE NO. 52C0206, LOS ANGELES AVE, OVER ARROYO SIMI, 0.1 MI W OF FIRST STREET. Bridge Rehabilitation. Widen existing6-lane bridge wide enough to accommodate sidewalks and bike lanes (no added capacity)

Fund Source Summary:

PER/W

Total

CON

Total

9,510,000

100,000 1,700,000

100,000 11,210,0009,510,000

1,600,000

11,110,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 9,924,213

11,470 1,285,787

100,000 11,210,000

9,835,683

1,274,317

11,110,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4074

5405(076)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 1,505,010

11,470 194,990

100,000 1,700,000

1,416,480

183,520

1,600,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total8,419,203

1,090,797

9,510,000

8,419,203

1,090,797

9,510,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 610/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 206: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Simi Valley BRIDGE NO. 52C0231, BARNARD STREET OVER LAS LLAJAS CREEK, 0.5 MI W STEARNS ST. Widen existing 2-lane bridge with a 2-lanebridge wide enough to accommodate shoulders (no added capacity)

Fund Source Summary:

PER/W

Total

CON

Total

254,000

15,000 74,800

15,000 328,800254,000

59,800

313,800

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total13,280 291,087

1,721 37,713

15,000 328,800

277,807

35,993

313,800

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4073

5405(075)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total13,280 66,220

1,721 8,580

15,000 74,800

52,941

6,859

59,800

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total224,866

29,134

254,000

224,866

29,134

254,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 710/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 207: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Ventura County BRIDGE NO. 52C0053, BRIDGE ROAD OVER SANTA PAULA CREEK, EAST OF SR 150. Rehabilitate historic bridge. No added lanecapacity. 9/27/2016: Toll Credits programmed for PE & CON.

Fund Source Summary:

PER/W

Total

CON

Total

1,125,000

600,000 600,000

600,000 1,725,0001,125,0001,125,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total600,000 1,725,000

600,000 1,725,000

1,125,000

1,125,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

New!4454

Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total600,000 600,000

600,000 600,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total1,125,000

1,125,000

1,125,000

1,125,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 810/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 208: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Ventura County BRIDGE NO. 52C0157, WHEELER CYN RD OVER TODD BARRANCA, 2.55 MI N OF FOOTHILL RD. Bridge Preventive Maintenance.(Sealing cracks, scour countermeasure, railing) 9/21/2010: Toll credits used for PE. 10/5/2012: Toll credits used for CON.

Fund Source Summary:

PER/W

Total 107,500

CON

Total

248,080 248,080

107,500

248,080 355,580

107,500

Phase Summary:

Fed $

Local AC

Local Match

Total 107,500

LSSRP Bond

Total248,080 355,580

248,080 355,580

107,500

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3664

5952(151)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 107,500

LSSRP Bond

Total107,500

107,500

107,500

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total248,080 248,080

248,080 248,080

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 910/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 209: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Ventura County BRIDGE NO. 52C0165, MUPU RD OVER SANTA PAULA CREEK, 0.2 MI E OF SR 150. Rehabilitate bridge. No added lane capacity. 9/21/2010: Toll credits used for PE. 10/25/2012: Toll credits used for CON.

Fund Source Summary:

PER/W

Total 125,000

CON

Total

621,266 621,266

125,000

621,266 746,266

125,000

Phase Summary:

Fed $

Local AC

Local Match

Total 125,000

LSSRP Bond

Total621,266 746,266

621,266 746,266

125,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

3660

5952(152)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total 125,000

LSSRP Bond

Total125,000

125,000

125,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total621,266 621,266

621,266 621,266

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 1010/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 210: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Ventura County BRIDGE NO. PM00091, Bridge Preventive Maintenance Program (BPMP) various bridges in the County of Ventura. See Caltrans LocalAssistance HBP website for backup list of projects.

Fund Source Summary:

PER/W

Total

CON

Total

100,000 100,000100,000 100,000

Phase Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 88,530

11,470 11,470

100,000 100,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

4045

5952(173)Project #:

PE Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

TotalPrior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

CON Summary:

Fed $

Local AC

Local Match

Total

LSSRP Bond

Total88,530 88,530

11,470 11,470

100,000 100,000

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

Caltrans, Division of Local Assistance Page 1110/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 211: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2014/15-2019/20 Highway Bridge Program

District: County:Responsible Agency

07 Ventura

See the appropriate FTIP/FSTIP for current funding commitments. This listing provides the backup project information to support the lump sum amountsprogrammed in the FTIP.

HBP-ID Project Description

Number of Projects:

MPO Summary:

Fed $

Local AC

Local Match

Total for all Phases

30,821

501,207

LSSRP Bond

Total

88,530 904,758 160,239 772,646 600,000 16,761,873

11,470 4,588 20,761 100,104 1,805,431

100,000 909,346 181,000 872,750 600,000 18,567,304

470,386 13,765,314

1,637,687

15,403,001

Totals:

Ventura County Transportation Commission

Prior 14/15 15/16 16/17 17/18 18/19 19/20 Beyond

10

Caltrans, Division of Local Assistance Page 1210/26/2016, 10:10 AM Det2 FL4 SmlTxt brf

#19-00 VEN VENLS07 HBP

Page 212: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-19 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^VENLS01County VENSTATUS (Multiple Items)EA (All)Doc Year 2017

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP

Amend#Doc PAED PSE ENG COST RW sup RW cap RW COST CON sup CON cap CON COST TOTAL COST

SHOPPAC 2017/18 29540 Route 101: In The City Of Ventura, At The Route 33 Interchange. Enhance Highway Worker Safety By Miscellanous Paving, Replacing Crash Cushions, And Other Measures.

17-19 CTC VOTE 115 1130 1245 30 0 30 700 1931 2631 3906

2017/18 Total 115 1130 1245 30 0 30 700 1931 2631 3906

2018/19 31650 Route 118: In Simi Valley, From First Street To Yosemite Street. Construct Maintenance Vehicle Pullouts And Access Roads, Pave Gore Areas, Install Smart Irrigation Controllers And Access Gates. Plant Vines At Bridge Wingwalls.

17-17 16H-020 710 1420 2130 40 10 50 1292 3250 4542 6722

33110 Route 101: In Ventura County, In And Near Various Cities, At Various Locations, From 0.2 Mile North Of Westlake Boulevard To 0.3 Mile North Of Hobson Road. Upgrade Guardrails, End Treatments And Bridge Connections, Add Vegetation Control Under Guardrails

17-19 2018 SHOPP 392 1733 2125 0 0 0 0 0 0 2125

33230 Route 033: In Ventura County, Near City Of Ojai, North Of North Fork Matilija Creek Bridge No. 52-450. Widen The Roadway By Four Feet, Upgrade Rock Block Barrier, And Place High Friction Surface Treatment (Hfst).

17-19 2018 SHOPP 660 1460 2120 0 0 0 0 0 0 2120

33900 Route 101: In Ventura County, In And Near Various Cities, At Various Locations, From 0.2 Mile South Of Lakeview Canyon Road To Hobson Road Undercrossing. Upgrade Guardrails, End Treatments And Bridge Connections, Add Vegetation Control Under Guardrails,

17-19 2018 SHOPP 950 2800 3750 0 0 0 0 0 0 3750

2018/19 Total 2712 7413 10125 40 10 50 1292 3250 4542 14717

2021/22 33110 Route 101: In Ventura County, In And Near Various Cities, At Various Locations, From 0.2 Mile North Of Westlake Boulevard To 0.3 Mile North Of Hobson Road. Upgrade Guardrails, End Treatments And Bridge Connections, Add Vegetation Control Under Guardrails

17-19 2018 SHOPP 0 0 0 20 29 49 1750 9776 11526 11575

33230 Route 033: In Ventura County, Near City Of Ojai, North Of North Fork Matilija Creek Bridge No. 52-450. Widen The Roadway By Four Feet, Upgrade Rock Block Barrier, And Place High Friction Surface Treatment (Hfst).

17-19 2018 SHOPP 0 0 0 40 64 104 1550 3080 4630 4734

33900 Route 101: In Ventura County, In And Near Various Cities, At Various Locations, From 0.2 Mile South Of Lakeview Canyon Road To Hobson Road Undercrossing. Upgrade Guardrails, End Treatments And Bridge Connections, Add Vegetation Control Under Guardrails,

17-19 2018 SHOPP 0 0 0 35 80 115 2000 6470 8470 8585

2021/22 Total 0 0 0 95 173 268 5300 19326 24626 24894

SHOPPAC Total 2827 8543 11370 165 183 348 7292 24507 31799 43517

SHOPPAC-P 2016/17 27360 Route 126: In And Near Santa Paula And Fillmore, From Hallock Drive To E Street. Construct Median Barrier And Roundabouts. 17-00 PM 1600 5950 7550 650 4200 4850 6000 58100 64100 765002016/17 Total 1600 5950 7550 650 4200 4850 6000 58100 64100 76500

SHOPPAC-P Total 1600 5950 7550 650 4200 4850 6000 58100 64100 76500

Grand Total 4427 14493 18920 815 4383 5198 13292 82607 95899 120017

FTIP ID: VENLS01 , 999 - 0.0 / 0.0 - Route 999: Grouped Proj For Safety Improv - Shopp Collision Reduct Proj Consistent W/ 40 Cfr Part 93.126 Exempt Tables 2 & Table 3 Cat - Rr/Hwy Xing, Safer Non-Fed-Aid Sys Rds, Shoulder Improv, Traff Control Dev & Oper Assist Oth Than Signalization Proj, Intrsction Signalization Proj @ Indivi Intersections, Pavemnt Marking Demo, Truck Climb Lanes Outside Urb Areas, Lightng Improv, Emergency Truck Pullovers

FTIP project listing: D7 FTIP SUMMARY Page 1 of 1 Printed: 3/26/2018: 2:13 PM

#19-00 VEN VENLS01 SHOPP Safety Improvements

Page 213: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-19 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^VENLS02County VENSTATUS (Multiple Items)EA (All)Doc Year 2017

3 Administrative Login To Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP

Amend#Doc PAED PSE ENG COST RW sup RW cap RW COST CON sup CON cap CON COST TOTAL COST

SHOPPAC 2016/17 30220 Route 126: In And Near The Cities Of Ventura And Santa Paula, From Route 101 To Haun Creek Bridge. Rehabilitate Pavement. 17-19 CTC VOTE 120 1040 1160 50 170 220 1930 15837 17767 1914730140 Route 126: In And Near Fillmore, From Haun Creek Bridge To Los Angeles County Line. Pavement Rehabilitation. 17-19 CTC VOTE 220 1450 1670 130 360 490 3186 22928 26114 2827430760 Route 118: In Moorpark And Simi Valley, From East Of Arroyo Simi Overhead To Los Angeles County Line. Pavement Rehabilitation. 17-19 CTC VOTE 200 1120 1320 50 150 200 925 2292 3217 4737

2016/17 Total 540 3610 4150 230 680 910 6041 41057 47098 52158

2017/18 30330 Route 001: Near Oxnard, From Los Angeles County Line To South Of Sycamore Canyon Road. Rehabilitate Pavement. 17-19 16H-014/CTC VOTE 44 1100 1144 60 66 126 970 4875 5845 711530340 Route 033: In And Near The City Of Ventura, From Route 101 To South Of Park View Drive. Rehabilitate Pavement. 17-19 CTC VOTE 80 1600 1680 25 20 45 1785 12309 14094 1581930350 Route 023: In Thousand Oaks, From Carlisle Road To Route 101. Rehabilitate Pavement. 17-19 16H-014/CTC VOTE 277 750 1027 20 20 40 900 3646 4546 5613

2017/18 Total 401 3450 3851 105 106 211 3655 20830 24485 28547

2018/19 30250 Route 023: In And Near Cities Of Thousand Oaks And Moorpark, From Route 101 To Route 118. Rehabilitate Pavement. 17-17 16H-020 1300 7500 8800 100 860 960 17000 92445 109445 11920532370 Route 150: In Ventura County, In And Near Cities Of Ojai, Mira Monte And Meiners Oaks, From Burham Road To Gorham Road: Also On Route 33

From 33/150 Junction To Meiners Road. Cold Plane And Overlay Pavement, Upgrade Guardrail And Signs.17-19 2018 SHOPP 600 1500 2100 0 0 0 0 0 0 2100

32390 Route 001: In Ventura County, In The City Of Ventura, From North 101 Junction-Solimar Undercrossing To Hobson County Park Road. Cold Plane And Overlay Pavement, Upgrade Guardrail/End Treatment, Install Traffic Signs And Crosswalks.

17-19 2018 SHOPP 625 1850 2475 0 0 0 0 0 0 2475

2018/19 Total 2525 10850 13375 100 860 960 17000 92445 109445 123780

2019/20 30240 Route 101: Near Sea Cliff, From Padre Juan Canyon Road Overcrossing To Punta Gorda Pedestrian Undercrossing. Rehabilitate Roadway. 17-14 CTC VOTE 300 1700 2000 200 70 270 2100 19270 21370 236402019/20 Total 300 1700 2000 200 70 270 2100 19270 21370 23640

2020/21 32370 Route 150: In Ventura County, In And Near Cities Of Ojai, Mira Monte And Meiners Oaks, From Burham Road To Gorham Road: Also On Route 33 From 33/150 Junction To Meiners Road. Cold Plane And Overlay Pavement, Upgrade Guardrail And Signs.

17-19 2018 SHOPP 0 0 0 250 221 471 1700 5588 7288 7759

2020/21 Total 0 0 0 250 221 471 1700 5588 7288 7759

2021/22 32390 Route 001: In Ventura County, In The City Of Ventura, From North 101 Junction-Solimar Undercrossing To Hobson County Park Road. Cold Plane And Overlay Pavement, Upgrade Guardrail/End Treatment, Install Traffic Signs And Crosswalks.

17-19 2018 SHOPP 0 0 0 60 14 74 3350 10200 13550 13624

2021/22 Total 0 0 0 60 14 74 3350 10200 13550 13624

SHOPPAC Total 3766 19610 23376 945 1951 2896 33846 189390 223236 249508

SHOPPAC-P 2016/17 25190 Route 101: In La Conchita, From 0.6 Mile North Of Mobil Peir Undercrossing To Santa Barbra County Line. Rehabilitate Pavement. 17-00 PM 240 1123 1363 10 0 10 1123 10720 11843 132162016/17 Total 240 1123 1363 10 0 10 1123 10720 11843 13216

SHOPPAC-P Total 240 1123 1363 10 0 10 1123 10720 11843 13216

Grand Total 4006 20733 24739 955 1951 2906 34969 200110 235079 262724

FTIP ID: VENLS02 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Pavement Resurfacing And/Or Rehabilitation - Shopp Roadway Preservation Program Scope: Projects Are Consistent With 40 Cfr Part 93.126 Exempt Tables 2 Categories - Pavement Resurfacing And/Or Rehabilitation, Emergency Relief (23 U.S.C. 125), Widening Narrow Pavements Or Reconstructing Bridges (No Additional Travel Lanes)

FTIP project listing: D7 FTIP SUMMARY Page 1 of 1 Printed: 3/26/2018: 2:13 PM

#19-00 VEN VENLS02 SHOPP Pavement Resurf. & Rehab

Page 214: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-14 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^VENLS03County VENSTATUS (Multiple Items)EA (All)Doc Year 2017

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP Amend# Doc TOTAL COST

SHOPPAC 2017/18 31960 Route 001: Near The City Of Ventura, At Ventura Overhead No. 52-0040. Replace Corroded Steel Spans Of Bridge And Upgrade Bridge Railing To Current Standards.

17-14 16H-019 1200

32300 Route 033: Near Ojai, At North Fork Matilija Creek No. 52-0173. Paint Steel Portion Of Bridge And Replace Missing Rivets Of Bottom Flanges For Preventative Maintenance To Preserve And Extend The Life Of Bridge.

17-14 16H-019 320

2017/18 Total 1520

2018/19 29130 Route 033: Near Oak View, At San Antonio Creek Bridge (Br. No. 52-0065). Scour Mitigation And Bridge Rail Upgrade. 17-13 16H-011 87172018/19 Total 8717

2019/20 29650 Route 001: Near Sea Cliff, At Willow Creek Bridge No. 52-003; Also In Ojai, On Route 33 At North Fork Matilija Bridges No. 52-0044 (Pm 15.8) And No. 52-0173 (Pm16.1). Upgrade Bridge Railings To Meet Current Standards.

17-06 16H-009 7086

2019/20 Total 7086

2021/22 31960 Route 001: Near The City Of Ventura, At Ventura Overhead No. 52-0040. Replace Corroded Steel Spans Of Bridge And Upgrade Bridge Railing To Current Standards.

17-14 16H-019 9238

32300 Route 033: Near Ojai, At North Fork Matilija Creek No. 52-0173. Paint Steel Portion Of Bridge And Replace Missing Rivets Of Bottom Flanges For Preventative Maintenance To Preserve And Extend The Life Of Bridge.

17-14 16H-019 2210

2021/22 Total 11448

SHOPPAC Total 28771

SHOPPAC-P 2016/17 31060 Route 126: Near Santa Paula, South Of Route 126 And West Of Briggs Road Between Mission Rock Road And Pinkerton Road. Required Off-Site Mitigation Along The Santa Clara River For Impacts Incurred From Two Bridge Projects (Ea 07-1760U And 07-0607U).

17-01 14H-496 5611

2016/17 Total 5611

SHOPPAC-P Total 5611

Grand Total 34382

FTIP ID: VENLS03 , 999 - 0.0 / 0.0 - Route 999: Lump Sum At Various Locations In Ventura County, Bridge Preservation Projects (Projects Are Consistent With 40 Cfr Part 93.126,127,128, Exempt Tables 2 & 3)

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 1 Printed: 10/12/2017: 2:18 PM

#19-00 VEN VENLS03 Bridge Preservation

Page 215: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-19 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^VENLS08County VENSTATUS (Multiple Items)EA (All)Doc Year 2017

3 Administrative Login To Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP

Amend#Doc PAED PSE ENG COST RW sup RW cap RW COST CON sup CON cap CON COST TOTAL COST

SHOPPAC 2016/17 29040 Route 101: In The City Of Ventura, At Ash Street Pedestrian Overcrossing. Upgrade Pedestrian Overcrossing To Americans With Disabilities Act (Ada) Standards.

17-01 16H-002 102 850 952 15 31 46 500 568 1068 2066

31240 Route 126: In And Near Santa Paula, From East Of Todd Road To West Of S. Hallock Drive. Storm Water Mitigation. 17-19 CTC VOTE 570 2000 2570 50 168 218 1666 5680 7346 101342016/17 Total 672 2850 3522 65 199 264 2166 6248 8414 12200

2017/18 31220 Route 126: In And Near The City Of Ventura, At Various Locations From West Of Victoria Avenue To East Of Route 118. Install Storm Water Mitigation Devices.

17-19 16H-014/CTC VOTE 714 2230 2944 20 24 44 1450 4930 6380 9368

31330 Routes 023, 101, 118, 126 And Var: In Various Cities, At Various Locations On Various Routes, Install Storm Water Mitigation Devices. 17-13 CTC VOTE 350 1100 1450 17 37 54 1098 530 1628 31322017/18 Total 1064 3330 4394 37 61 98 2548 5460 8008 12500

2018/19 31130 Route 101: In The City Of Ventura, From South Of Seaward Avenue To Ventura River. Stabilize Soil And Erosion Control. 17-19 16H-014/CTC VOTE/2018 SHOPP 394 1303 1697 24 20 44 959 1823 2782 452331150 Route 126: In Santa Paula, From Peck Road To Santa Paula Creek. Stabilize Soil And Install Irrigation System. (G13 Contingency Project) 17-19 16H-014/CTC VOTE/2018 SHOPP 368 1292 1660 102 30 132 1379 2431 3810 560232270 Route 999 (Various): In Ventura County, At Various Locations On Routes 101, 34 And 150. Construct And Install Stormwater Treatment Bmps

Including Biofiltration Swales, Gross Solid Removal Devices And Austin Vault Sand Filters.17-19 2018 SHOPP 2500 2650 5150 0 0 0 0 0 0 5150

32320 Route 033: In Ventura County, Near Cities Of Ventura And Ojai, From North Of Sycamore Drive To Fairview Road. Construct And Upgrade Curb Ramps, Sidewalks And Driveways To Meet Current Ada Standards.

17-19 2018 SHOPP 980 4620 5600 0 0 0 0 0 0 5600

33600 Route 118: In Ventura County, Near The City Of Ventura, From County Drive To Santa Clara River. Construct Stormwater Treatment Bmp Infiltration Basin.

17-19 2018 SHOPP 950 1961 2911 0 0 0 0 0 0 2911

33920 Route 118: In Ventura County, In And Near Cities Of Ventura And Moorpark, From North Route 126 Junction To 0.3 Mile West Of Princeton Avenue. Reconstruct Curb Ramps, Construct New Sidewalks, Install Accessible Pedestrian Signals And Upgrade Thermoplastic

17-19 2018 SHOPP 1000 2000 3000 0 0 0 0 0 0 3000

2018/19 Total 6192 13826 20018 126 50 176 2338 4254 6592 26786

2019/20 30670 Route 150: In And Near Cities Of Ojal And Santa Paula, From Route 33 To Route 126. Construct And Upgrade Curb Ramps And Sidewalks To Comply With Ada Standards.

17-19 CTC VOTE/2018 SHOPP 1300 1000 2300 100 556 656 1000 4549 5549 8505

2019/20 Total 1300 1000 2300 100 556 656 1000 4549 5549 8505

2021/22 32270 Route 999 (Various): In Ventura County, At Various Locations On Routes 101, 34 And 150. Construct And Install Stormwater Treatment Bmps Including Biofiltration Swales, Gross Solid Removal Devices And Austin Vault Sand Filters.

17-19 2018 SHOPP 0 0 0 40 126 166 3750 10340 14090 14256

32320 Route 033: In Ventura County, Near Cities Of Ventura And Ojai, From North Of Sycamore Drive To Fairview Road. Construct And Upgrade Curb Ramps, Sidewalks And Driveways To Meet Current Ada Standards.

17-19 2018 SHOPP 0 0 0 1100 4141 5241 3798 6481 10279 15520

33600 Route 118: In Ventura County, Near The City Of Ventura, From County Drive To Santa Clara River. Construct Stormwater Treatment Bmp Infiltration Basin.

17-19 2018 SHOPP 0 0 0 44 10 54 1680 6011 7691 7745

33920 Route 118: In Ventura County, In And Near Cities Of Ventura And Moorpark, From North Route 126 Junction To 0.3 Mile West Of Princeton Avenue. Reconstruct Curb Ramps, Construct New Sidewalks, Install Accessible Pedestrian Signals And Upgrade Thermoplastic

17-19 2018 SHOPP 0 0 0 1624 2941 4565 1500 3944 5444 10009

2021/22 Total 0 0 0 2808 7218 10026 10728 26776 37504 47530

SHOPPAC Total 9228 21006 30234 3136 8084 11220 18780 47287 66067 107521

Grand Total 9228 21006 30234 3136 8084 11220 18780 47287 66067 107521

FTIP ID: VENLS08 , 999 - 0.0 / 0.0 - Route 999: Group Proj Listing Mandates (Scope: Proj Consistent W/ 40 Cfr Part 93.126 Exempt Tables 2 &3 Cat - Rr/Hwy Xing, Safer Non-Fed-Aid System Rds, Shoulder Impr, Traffic Control Devices & Oper Assistance Oth Than Signalization Proj, Intersection Signalization Proj At Individ Intersections, Pavement Marking Demo, Truck Climbing Lanes Outside Urbanized Area, Lighting Improv, Emer Truck Pullovers)

FTIP project listing: D7 FTIP SUMMARY Page 1 of 1 Printed: 3/26/2018: 2:16 PM

#19-00 VEN VENLS08 SHOPP Storm Water-Ped Improv.

Page 216: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2017 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 17-19 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^VENLS10County VENSTATUS (Multiple Items)EA (All)Doc Year 2017

3 Administrative LoginTo Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2017.htmFUND NAME YEAR EA5 Project Desciption FTIP

Amend#Doc TOTAL COST

SHOPPAC 2016/17 1XA70 Route 118: In Los Angeles County, Near City Of Camarillo, From Sand Canyon Road To Balcom Canyon Road. Repair Slope Washout And Drainage Systems.

17-19 16H-011 750

1XC50 Route 034: In Los Angeles County, In Camarillo, From Los Posas Road To 0.4 Mile West Of Pleasant Valley Road. Remove And Replace Damaged Drainage Systems, Remove Debris From Channel, And Repair Roadway.

17-19 16H-012 645

1XC90 Route 033: In Los Angeles County, Near Mira Monte, From Matilija Hot Springs Road To 1.9 Miles South Of Apache Canyon Road. Remove Multiple Slide Debris, Stabilize Slopes, And Repair Drainage Systems.

17-19 16H-014 3660

1XE10 Route 150: In Los Angeles County, Near City Of Mira Monte, From 1.0 Mile East Of Mission Ranch Road To 2.8 Miles West Of Santa Ana Road. Remove Rock Slide Debris, Stabilize Slope Including Removing Loose Boulders, And Install A Cable Netting Drapery Syst

17-19 16H-012 820

2X050 Route 001: In Los Angeles County, Near The City Of Ventura, From Solimar Undercrossing To Mobile Pier Road; Also On Route 101 From Main Street To Santa Barbara County Line. Repair Sinkhole, Reconstructc Washouts, And Repair Drainage Systems.

17-19 16H-014 4015

2016/17 Total 9890

2017/18 33350 Route 107: Near Point Mugu State Park, At Big Sycamore Creek No. 52-0011. Shoreline Embankment Restoration By Replacing Rock Slope Protection(Rsp), Constructing Seawalls And Secant Retaining Wall, And Upgrade Guardrail.

17-17 CTC VOTE 2300

2017/18 Total 2300

2021/22 33350 Route 107: Near Point Mugu State Park, At Big Sycamore Creek No. 52-0011. Shoreline Embankment Restoration By Replacing Rock Slope Protection(Rsp), Constructing Seawalls And Secant Retaining Wall, And Upgrade Guardrail.

17-17 CTC VOTE 19661

2021/22 Total 19661

SHOPPAC Total 31851

SHOPPAC-P 2016/17 30520 Route 033: Near Ojai, Near Nroth Fork Matilija Creek Bridge. Construct Retaining Wall, Stream Rock Weirs And Fish Habitat Structures. 17-01 PM 71222016/17 Total 7122

SHOPPAC-P Total 7122

Grand Total 38973

FTIP ID: VENLS10 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Emergency Repair - Shopp Emergency Response Program Scope: Proj Consistent W/ 40 Cfr Part 93.126 Exempt Tables 2 Categories - Repair Damage Caused By Natural Disasters, Civil Unrest, Or Terrorist Acts. This Applies To Damages That Don'T Qualify For Fed Emer Relief Funds Or To Damages That Qualify For Fed Emer Relief Funds But Extend Beyond The Fed-Declared Disaster Period

FTIP project listing.xlsm: D7 FTIP SUMMARY Page 1 of 1 Printed: 3/22/2018: 1:45 PM

#19-00 VEN VENLS10 SHOPP Emergency Repair

Page 217: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

DISTRICT 7 - 2019 FTIP PIRS: MPO= SCAG: CYLCE= FTIP AMENDMENT#: 19-00 with federal approval date = ACTIVE) [PROJECT LISTING]

FTIP ID # ^VENLS13County VENSTATUS (Multiple Items)EA (All)Doc Year 2019

3 Administrative Login To Locate and Print SCAG FTIP sheet, go to: http://www.dot.ca.gov/hq/transprog/federal/ftip_amendments/scag_2019.htmFUND NAME YEAR EA5 Project Desciption FTIP

Amend#Doc TOTAL COST

SHOPPAC-CT MINOR2016/17 4T820 Route 150: In Ventura County: In Order To Comply With Current Design Standards, Upgrade Existing And Replace Damaged Metal Beam Guardrail (Mbgr) Terminals At Various Locations.

17-01 16/17 MINOR

1000

4T830 Route 118: In Ventura County: Install Traffic Signal At Route 118 Eastbound On/Off Ramps At Collins Drive. 17-01 16/17 MINOR

737

2016/17 Total 1737

SHOPPAC-CT MINOR Total 1737

SHOPPAC-P 2018/19 4T860 Route 118: In Ventura County, At Balcom Canyon Road. Install Traffic Signal. 19-00 17/18 MINOR

1160

4U000 Route 101: In Ventura County, In The City Of Thousand Oaks At Lakeview Canyon Road To Moorpark Road. Planting, Upgrade Irrigation Soffit Lighting.

19-00 17/18 MINOR

1562

2018/19 Total 2722

SHOPPAC-P Total 2722

Grand Total 4459

FTIP ID: VENLS13 , 999 - 0.0 / 0.0 - Route 999: Grouped Projects For Safety Improvements, Shoulder Improvements, Pavement Resurfacing And/Or Rehab-Minor Program. Projects Consistent With 40Cfr Part93.126 Exempt Tables 2 And 3 Categories – Railroad/Highway Crossing, Safer Nonfederalaid System Roads, Shoulder Improvements, Traffic Control Devices & Operating Assist Other Than Signalization, Intersection Signalization At Individual Intersections

FTIP project listing: D7 FTIP SUMMARY Page 1 of 1 Printed: 6/29/2018: 11:34 AM

#19-00 VEN VENLS13 SHOPP Safety Improvements

Page 218: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

New Freedom (5310) 19-00

Grouped Project Listing07-VEN051005 07-VEN051005($'s in Thousands) ($ in thousands)

Agency Project Description Program Year

Sec 5310Oxnard

Sec 5310T.O.

Sec 5310 Small Urb LTF PVT Toll

CreditsTotal Project Cost Comments

VCTC Program Administration 2018/19 56 34 90$ Area Agency on Aging Area Agency on Aging Medi-Ride Operating 2018/19 287 30 133 70 450$ Thousand Oaks Senior DAR Intercity between Thousand Oaks/Moorpark 2018/19 73 20 93$ Thousand Oaks Thousand Oaks Group Travel Training 2018/19 20 6 26$

VCTC Program Administration 2019/20 28 47 75$ Area Agency on Aging Area Agency on Aging Medi-Ride Operating 2019/20 176 45 74 35 295$ Thousand Oaks Senior DAR Intercity between Thousand Oaks/Moorpark 2019/20 45 10 55$ Thousand Oaks Thousand Oaks Group Travel Training 2019/20 10 3 13$

VCTC Program Administration 2020/21 28 17 45$ Area Agency on Aging Area Agency on Aging Medi-Ride Operating 2020/21 99 45 74 35 218$ Thousand Oaks Senior DAR Intercity between Thousand Oaks/Moorpark 2020/21 40 10 50$ Thousand Oaks Thousand Oaks Group Travel Training 2020/21 10 3 13$

VCTC Program Administration 2021/22 28 17 45$ Area Agency on Aging Area Agency on Aging Medi-Ride Operating 2021/22 99 45 74 35 218$ Thousand Oaks Senior DAR Intercity between Thousand Oaks/Moorpark 2021/22 40 10 50$ Thousand Oaks Thousand Oaks Group Travel Training 2021/22 10 3 13$

GRAND TOTAL 801$ 528$ -$ 420$ -$ 175$ 1,749$

#19-00 VEN VEN051005 FTA Section 5310

Page 219: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

12/1/2017

Agency County District-EA (if applicable) Project Title Project Description Program

Year Sec 5307 Ox Sec 5307 TO Sec 5307 SV Sec 5307 Cam LTF PVT Total Project Comments

($'s in Thousands)

Ventura County Ventura Human Services Work Transport

Operations of Specialized Transportation Service 18/19 $83 $17 $0 $0 $103 $0 $203 TDC=$25

CalVans Ventura CalVans Vanpool Operating Assistance for Vanpools throughout County 18/19 $19 $6 $0 $0 $0 $25

Ventura County Ventura Human Services Work Transport

Operations of Specialized Transportation Service 19/20 $100 $42 $0 $0 $155 $0 $297 TDC=$12

CalVans Ventura CalVans Vanpool Operating Assistance for Vanpools throughout County 19/20 $10 $3 $0 $0 $0 $0 $13

Ventura County Ventura Human Services Work Transport

Operations of Specialized Transportation Service 20/21 $24 $6 $0 $0 $6 $0 $36 TDC=$12

CalVans Ventura CalVans Vanpool Operating Assistance for Vanpools throughout County 20/21 $10 $3 $0 $0 $0 $13

Ventura County Ventura Human Services Work Transport

Operations of Specialized Transportation Service 21/22 $24 $6 $0 $0 $6 $0 $36 TDC=$12

CalVans Ventura CalVans Vanpool Operating Assistance for Vanpools throughout County 21/22 $10 $3 $0 $0 $0 $13

TOTAL $ 636

2019 FTIP VEN070202($s in Thousands)

JARC GROUPED PROJECT LISTING

#19-00 VEN VEN070202 JARC Projects

Page 220: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

VARIOUS

COUNTY

Page 221: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

ID FTIP ID RTP ID Co Agency Project Title TotalProjectCost 

 TotalFund

Request 

 Local Match  16‐17 RW CON PAED PSE DAC Plan

0534 ATPSCAG_RP1 REG0704 RIV Western Riverside COG Wester Riverside County Subregional Active Transportation Plan 333 333 333 333 333 3330541 ATPSCAG_RP1 REG0704 SBD Barstow City of Barstow's Active Transportation Plan 300 300 300 300 300 2000473 ATPSCAG_RP1 REG0704 LA San Gabriel Valley COG SGV Regional Active Transportation Planning Initiative 643 643 643 6430399 ATPSCAG_RP1 REG0704 LA Huntington Park Randolph St Shared Use Bik/Trail Rails to Trails Project Study 400 400 400 400 4000570 ATPSCAG_RP1 REG0704 RIV State Coastal Conservancy Santa Ana River Trail and Parkway 218 197 21 197 197 1970453 ATPSCAG_RP1 REG0704 LA MTA Metro Blue Line First/Last Mile Plan 280 280 280 280 280 2800406 ATPSCAG_RP1 REG0704 LA Lancaster SRTS ‐ Master Plan 366 322 44 322 322 322 3220726 ATPSCAG_RP1 REG0704 ORA Irvine Citywide Bicycle, Ped, Motorist Safety Program 500 500 500 465 350536 ATPSCAG_RP1 REG0704 SBD SANBAG SANBAG Points of Interest Ped Plan 400 400 400 400 400 4000489 ATPSCAG_RP1 REG0704 LA Vernon City of Vernon Bicycle Master Plan 60 53 7 53 53 53 530558 ATPSCAG_RP1 REG0704 SBD Rim of the World Recreation and Park Rim of the World Active Transportation Program 285 285 285 285 285 2850734 ATPSCAG_RP1 REG0704 ORA OCTA Orange County Sidewalk Inventory 185 163 22 163 163 163 163

Total: 3,970 3,876 94 3,876 ‐ 3,841  35 ‐ 2,733  2,036

Cycle 1 Regional Active Transportation Program  Planning Projects (SCAG)

#19-00 VAR SCAGATP_RP1 ATP

Page 222: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

FTIP ID RTP ID Co Agency Project Title TotalProjectCost 

 TotalFund

Request 

 Local Match 

 16‐17 

17‐18 18‐19 RW CON PAED PSE DAC Plan

ATPSCAG_RP1 REG0704 IMP Imperial County Pedestrian Master Plan 100  100  ‐ 100 ‐ ‐ ‐ 100 ‐ ‐ 100 ‐     ATPSCAG_RP1 REG0704 LA City of Bellflower Bellflower and Paramount Joint Active Transportation Plan 125  100  25 100 ‐ ‐ ‐ 100 ‐ ‐ 100ATPSCAG_RP1 REG0704 LA City of Irwindale Citywide Non Motorized Design Guidelines and Active Transportation Action Plan 154  154  ‐ 154 ‐ ‐ ‐ 154 ‐ ‐ 154 154ATPSCAG_RP1 REG0704 LA City of Santa Clarita Junior High and High School SRTS Plan 200  160  40 160 ‐ ‐ ‐ 160 ‐ ‐ 160 ‐     ATPSCAG_RP1 REG0704 ORA Orange County Transportation Authority Active Transportation Plan 350  280  70 280 ‐ ‐ ‐ 280 ‐ ‐ 280 280ATPSCAG_RP1 REG0704 SBD City of Grand Terrace ATP Planning 295  295  ‐ 295 ‐ ‐ ‐ 295 ‐ ‐ 295 295ATPSCAG_RP1 REG0704 LA City of Downey Pedestrian Plan 300  300  ‐ ‐ 150 150 ‐ 300 ‐ ‐ 300 300ATPSCAG_RP1 REG0704 ORA City of Santa Ana Citywide SRTS Plan 615  615  ‐ 615 ‐ ‐ ‐ 615 ‐ ‐ 615 615

Total: 2,139  2,004  135 1,704  150 150 ‐ 2,004 ‐ ‐ 2,004 1,644

Cycle 2 Active Transportation Program Regional Planning Projects (SCAG)

#19-00 VAR SCAGATP_RP1 ATP

Page 223: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Project Sponsor Project Title FY 16‐17 FY 17‐18 FY 18‐19 FY 19‐20 PE ROW CON Total

SCAG

Planning activities conducted pursuant to titles 23 and 49 U.S.C. Grouped listing of Cycle 1 and Cycle 2 and Cycle 3 of the Active Transportation Program Planning grants.  Active Transportation Plans for five cities and Greenway Feasibility Study, San Gabriel Valley

220$         423$         643$         643$        

* in thousands

Grouped Project Listing ‐ SCAGATP_RP1*

#19-00 VAR SCAGATP_RP1 ATP

Page 224: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

IMPLEMENTING AGENCY FROM TO SUB PROJECT ID GROUP PROJECT ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2018/2019 FY2019/2020 FY2020/2021 FY2021/2022 FY2022/2023 FY2023/2024 TOTAL

SCAG Citywide Citywide 2 SCAGATP17-01 19 - 00 La Puente SRTS Plan ACTIVE

TRANSPORTAT

ION PROGRAM -

MPO

12/31/2019 25 150 25 200

SCAG Citywide Citywide 3 SCAGATP17-01 19 - 00 Montclair Active Transportation

Plan

ACTIVE

TRANSPORTAT

ION PROGRAM -

MPO

12/31/2019 25 150 25 200

SCAG Citywide Citywide 4 SCAGATP17-01 19 - 00 Palm Springs Pedestrian and

SRTS Plan

ACTIVE

TRANSPORTAT

ION PROGRAM -

MPO

12/31/2019 25 150 25 200

SCAG Citywide Citywide 5 SCAGATP17-01 19 - 00 San Bernardino Active

Transportation Plan

ACTIVE

TRANSPORTAT

ION PROGRAM -

MPO

12/31/2019 15 150 35 200

SCAG Ciywide Citywide 6 SCAGATP17-01 19 - 00 San Gabriel SRTS Plan ACTIVE

TRANSPORTAT

ION PROGRAM -

MPO

12/31/2019 0 150 50 200

SCAG Reservation Wide Reservation Wide 7 SCAGATP17-01 19 - 00 Soboba Indians (San Jacinto) AT

Plan

ACTIVE

TRANSPORTAT

ION PROGRAM -

MPO

12/31/2019 115 48 163

205 798 160 $1,163

$1,163

SCAGATP17-01 - SCAG Active Transportation Local Planning Initiative: Grouped Projects for Planning activities - Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Planning activities conducted pursuant to titles 23 and 49 U.S.C.

TOTAL ATP-MPO

2019 Federal Transportation Improvement Program

Amendment #19-00

Various

Group Project Listing

(in $000`s)

Grouped Project TOTAL

#19-00 VAR SCAGATP17-01 PLANNING

Page 225: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

2019 Federal Transportation Improvement Program

Amendment #19-00

Various

Group Project Listing

(in $000`s)

IMPLEMENTING AGENCY FROM TO SUB PROJECT ID GROUP PROJECT ID FTIP PROJECT DESCRIPTION SOURCE PROJECT COMP DATE PRIOR FY2018/2019 FY2019/2020 FY2020/2021 FY2021/2022 FY2022/2023 FY2023/2024 TOTAL

SCAG Citywide Citywide SCAGATP17-03.1 SCAGATP17-03 19 - 00 Beverly Hills Pedestrian

Awareness Campaign

ACTIVE

TRANSPORTAT

ION PROGRAM -

MPO

12/31/2020 0 80 89 169

SCAG Manhattan Beach Redondo Beach SCAGATP17-03.2 SCAGATP17-03 19 - 00 Hermosa Beach A Safer

Prospect Ave

ACTIVE

TRANSPORTAT

ION PROGRAM -

MPO

6/30/2020 0 80 100 180

SCAG Buena Park Huntington Beach SCAGATP17-03.3 SCAGATP17-03 19 - 00 Bueana Park: Explore Beach

Blvd

ACTIVE

TRANSPORTAT

ION PROGRAM -

MPO

12/30/2020 0 75 125 200

0 235 314 549

549Grouped Project TOTAL

SCAGATP17-03 - SCAG Safety/Encouragement Campaign Phase 2: Grouped Projects for Planning activities: Scope: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories - Planning activities conducted pursuant to titles 23 and 49 U.S.C.

TOTAL ATP-MPO

#19-00 VAR SCAGATP17-03 SAFETY

Page 226: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Division of Local Assistance Highway Safety Improvement Program (HSIP)2019 SCAG FTIP (SCAG015) Back-Up List, sorted by MPO, Agency and Unique Project ID

Statewide (all MPO's)

3/27/018

Unique Project ID HR3Eligibility* District Agency MPO Project Location Description of Work Current Total Project

Cost EstimateCurrent Programmed

Federal Funds Other/Local FundsFederal Funds

Programmed under "Prior"

Federal Funds Programmed in

2018/19

Federal Funds Programmed in

2019/20

Federal Funds Programmed in

2020/21

Federal Funds Programmed in

2021/22

Approved Federal Funds

H8‐12‐001 No 12 Anaheim SCAG Euclid Street between Glenoaks Avenue and Crescent Avenue.

Construct new median island; and complete signal modifications at intersection of EuclidSt. and Glenoaks Ave (new mast arms with left turn phasing, Emergency Vehicle Preemption systems, intersection lighting, new hardware). $1,242,900 $1,118,610 $124,290 $0 $0 $1,118,610 $0 $0 $1,118,610

H8‐12‐002 No 12 Anaheim SCAG

Ten high priority guardrail locations, including: Santa Ana Canyon Rd. (3 locations), GerdaSt. at Deana St., Hacienda St., Gilbuck St., Anaheim Blvd., La Palma Ave., Placentia Ave., and Fairmont Blvd. Upgrade existing guardrails. $598,400 $598,400 $0 $0 $598,400 $0 $0 $0 $598,400

H8‐12‐003 No 12 Anaheim SCAGTen corridors including Anaheim Blvd., Ball Rd., Broadway, Cerritos Ave., Crescent St., East St., La Palma Ave., Lincoln Ave., State College Blvd., and Sunkist St. Replace 672 existing pedestrian crossing heads with pedestrian countdown heads. $250,000 $250,000 $0 $0 $250,000 $0 $0 $0 $250,000

HSIP7‐12‐001 No 12 Anaheim SCAG The intersection of East Katella Ave. and S. Douglass Rd

Modify signal on Douglass Rd. (northside of Katella Ave.) and Katella Ave. (eastside ofDouglass Rd.), including installation of pole, foundation, mast arm signals, electronic sign guides, and new hardware.   $245,000 $208,250 $36,750 $25,500 $0 $0 $182,750 $0 $208,250

HSIP6‐07‐002 No 7 Azusa SCAGOne‐mile segment of Arrow Highway between Citrus Ave and approx. 500' west of Azusa Ave Install raised medians $613,300 $490,600 $122,700 $0 $490,600 $0 $0 $0 $490,600

HSIP6‐08‐003 No 8 Barstow SCAG Various locations throughout Barstow Upgrade traffic signals; Install pedestrian countdown head $892,200 $802,900 $89,300 $90,000 $0 $0 $712,900 $0 $802,900

HSIP6‐08‐004 No 8 Barstow SCAG Barstow Rd (SR 247)/E Rimrock Rd Install protected left‐turn phasing $200,000 $180,000 $20,000 $0 $180,000 $0 $0 $0 $180,000

HSIP7‐07‐001 No 7 Bell SCAGVarious intersections in the City of Bell, principally on Atlantic Avenue, Florence Avenue and Gage Avenue

Installation of pedestrian countdown signal heads and upgrading pedestrian ramps to ADA standards $165,000 $148,500 $16,500 $0 $0 $0 $148,500 $0 $148,500

H8‐07‐001 No 7 Bell Gardens SCAG The intersection of Eastern Avenue at Lubec Street.Install protected‐permissive left‐turn phases and signal heads on new poles where left turn lanes already exist for north/southbound directions. $220,000 $220,000 $0 $0 $220,000 $0 $0 $0 $220,000

H8‐07‐002 No 7 Bell Gardens SCAG The intersection of Garfield Avenue at Loveland Street.Install protected‐permissive left‐turn phases and signal heads on new poles where left turn lanes already exist for north/southbound directions. $220,000 $220,000 $0 $0 $220,000 $0 $0 $0 $220,000

H8‐07‐003 No 7 Carson SCAG

Six (6) Intersections ‐Avalon Blvd at Victoria Street, Main Street at Sepulveda Blvd, Main Street at 220th Street, Main Street at 223rd Street, Figueroa Street at 223rd Street, and Figueroa Street at Torrance Blvd.

Construct intersection upgrades (new signal heads, ADA ramps, service upgrades, LEDsafety lighting, bike detection, audible pedestrian signals, signal poles, signal mast arms, signal cabinets, raised medians, signing, striping, and left‐turn phasing) $1,912,100 $1,720,890 $191,210 $0 $1,720,890 $0 $0 $0 $1,720,890

HSIP6‐07‐004 No 7 Carson SCAG Various locations on Figueroa St, Main St, Victoria St, and Carson St in Carson  Install bike lanes $1,487,200 $1,352,790 $134,410 $143,900 $0 $0 $1,208,890 $0 $1,208,890

HSIP6‐07‐005 No 7 Carson SCAGVarious locations on University Dr, Avalon, Central Ave, Del Amo Blvd, and 223rd St in Carson Install bike lanes $1,389,100 $1,263,440 $125,660 $134,400 $1,263,440 $0 $0 $0 $1,263,440

HSIP7‐07‐002 No 7 Carson SCAG Intersection of 190th St/Victoria Ave and Figueroa StInstall Protected Left Turns, Upgrade Signal Hardware, Improve Curb Ramps, install countdown pedestrian heads, upgrade APS $202,400 $202,400 $0 $0 $0 $0 $202,400 $0 $202,400

H8‐08‐001 No 8 Cathedral City SCAG Twenty (20) intersections throughout the City of Cathedral City. Install advanced dilemma zone detection and countdown pedestrian signal heads. $1,674,000 $1,674,000 $0 $0 $0 $1,674,000 $0 $0 $1,674,000

HSIP7‐07‐003 No 7 Cerritos SCAG Bloomfield Avenue & 166th Street in the City of CerritosModification of the existing traffic signal from a protective‐permissive signal to a fully protected signal $360,000 $360,000 $0 $0 $0 $0 $360,000 $0 $360,000

HSIP6‐08‐005 No 8 Chino SCAG Edison Ave/Ramona Avenue, Edison Ave/Yorba Ave, and Edison Ave/Monte Vista Ave Upgrade traffic signals; Install protected left‐turn phasing $978,500 $880,600 $97,900 $49,500 $831,100 $0 $0 $0 $880,600

H8‐08‐002 No 8 Chino Hills SCAG Forty‐six (46) signalized intersections throughout the City of Chino Hills. Install signalized timers and pedestrian countdown heads. $114,400 $114,400 $0 $0 $114,400 $0 $0 $0 $114,400

H8‐07‐004 No 7 Commerce SCAG E Gage Avenue south of Slauson Ave and Washington Ave just west of the I‐5 freeway.Construct crosswalks, sidewalks and curb ramps, and install signage, pavement markings and pedestrian countdown heads. $173,700 $156,330 $17,370 $0 $156,330 $0 $0 $0 $156,330

HSIP7‐07‐004 No 7 Commerce SCAG

Signalized Intersections on the following corridors: Eastern Ave from Randolf St to StevensPl: Telegraph Rd from Garfield to Atlantic Blvd; Atlantic from Ferguson Dr to Sheila St; Garfield from Flotilla to Randolph St; Slauson from Eastern to Gage. Upgrade traffic interconnected system at 39 intersections $1,039,200 $935,280 $103,920 $0 $0 $0 $0 $935,280 $935,280

MPO:

Backup List Updated On:

Page 1 of 10 Printed On:  4/11/2018

#19-00 SCAG015_HSIP

Page 227: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Division of Local Assistance Highway Safety Improvement Program (HSIP)2019 SCAG FTIP (SCAG015) Back-Up List, sorted by MPO, Agency and Unique Project ID

Unique Project ID HR3Eligibility* District Agency MPO Project Location Description of Work Current Total Project

Cost EstimateCurrent Programmed

Federal Funds Other/Local FundsFederal Funds

Programmed under "Prior"

Federal Funds Programmed in

2018/19

Federal Funds Programmed in

2019/20

Federal Funds Programmed in

2020/21

Federal Funds Programmed in

2021/22

Approved Federal Funds

H8‐07‐005 No 7 Compton SCAG The Compton Blvd. corridor between Willowbrook Avenue and Central Avenue.Install bike lanes and lighting along the corridor, and enhance pedestrian crossings at fifteen (15) intersections.  $1,298,000 $1,168,200 $129,800 $0 $1,168,200 $0 $0 $0 $1,168,200

H8‐07‐006 No 7 Compton SCAG Twenty (20) intersections.  Install Pedestrian Countdown Heads. $249,800 $249,800 $0 $0 $249,800 $0 $0 $0 $249,800

HSIP7‐07‐005 No 7 Compton SCAG Compton Boulevard, from Willowbrook Avenue to eastern City limits. Installation of raised medians and Class II bicycle lanes $1,928,400 $1,691,098 $237,302 $0 $0 $0 $0 $1,691,098 $1,691,098

HSIP6‐12‐001 No 12 Costa Mesa SCAG On Harbor Blvd between Wilson St and 19th St Install raised medians $788,400 $538,600 $249,800 $105,000 $0 $0 $433,600 $0 $538,600

HSIP7‐12‐002 No 12 Costa Mesa SCAG Fairview Rd between Baker St and Adams Ave Construct raised directional median to restrict left turns, construct new traffic signal. $700,600 $630,540 $70,060 $0 $0 $0 $0 $630,540 $630,540

HSIP7‐07‐006 No 7 Cudahy SCAG Along Salt Lake Ave between Walnut St & Patata St/Atlantic Ave. Installation of pedestrian safety enhancements (advisory signage, crossings) $396,500 $363,180 $33,320 $27,000 $0 $0 $336,180 $0 $363,180

HSIP7‐07‐007 No 7 Culver City SCAG

Twelve signalized intersections on the arterial network throughout the city:  2 onSepulveda Blvd; 7 on Washington Blvd; 1 on Washington Pl; 1 on Culver Blvd; and 1 on Green Valley Circle.

Replace existing permissive left‐turn movements with protected/permissive left‐turnphases (including new signal standards, mast arms, indications, detection, wiring, and controller upgrades) $2,083,300 $2,083,300 $0 $0 $0 $0 $0 $2,083,300 $2,083,300

HSIP2‐07‐002 7 Diamond Bar SCAG Golden Springs Drive, Between  Lemon Ave. And Brea Canyon Rd. Install Frontage Road, Street Lightings, And Median Island Improvemts. $476,300 $400,000 $76,300 $0 $0 $0 $400,000 $0 $400,000

H8‐07‐007 No 7 Downey SCAG Imperial Highway between Old River School Road and Woodruff Avenue.Upgrade signals to provide separate left‐turn phasing at 3 intersections and provide various safety improvements at other intersections. $1,243,100 $1,243,100 $0 $0 $1,243,100 $0 $0 $0 $1,243,100

HSIP6‐07‐008 No 7 Downey SCAG Firestone Blvd between Westerly City Limits and Old River School Rd  Install raised median, left‐turn lanes, signs, striping, and other safety improvements $333,100 $143,000 $190,100 $0 $143,000 $0 $0 $0 $143,000

HSIP7‐07‐008 No 7 Downey SCAGParamount Boulevard ‐ Gardendale Street to Telegraph Road Traffic signal upgrades: Fiber optic cable, new controllers, signal hardware, equipment, 

intersection pedestrian countdown signal heads, safety lighting $1,926,300 $1,926,300 $0 $0 $0 $0 $0 $1,926,300 $1,926,300

HSIP7‐07‐009 No 7 Downey SCAGStewart and Gray ‐ Old River School Road to Firestone Boulevard Traffic signal upgrades: Fiber optic cable, new controllers, appurtenant equipment, 

intersection pedestrian countdown signal heads, safety lighting $2,029,800 $2,029,800 $0 $0 $0 $0 $0 $2,029,800 $2,029,800

H8‐08‐003 No 8 Eastvale SCAG Forty‐six (46) intersections throughout the City of Eastvale.

Retrofit existing traditional pedestrian crossings with Countdown Pedestrian Signals atforty‐six (46) locations and install audible APS Controller Units at twenty‐two (22) locations.   $250,000 $206,500 $43,500 $0 $206,500 $0 $0 $0 $206,500

HSIP7‐08‐003 No 8 Fontana SCAG Ten signalized intersections along Sierra Avenue from Valley Blvd. to Arrow BlvdImplementing an adaptive traffic management system "ATMS" along ten (10) signalized intersection arterial $400,000 $400,000 $0 $0 $0 $0 $400,000 $0 $400,000

H8‐12‐004 No 12 Fullerton SCAG Seventeen (17) unsignalized intersections. Install pedestrian warning flashing beacons. $286,200 $286,200 $0 $0 $286,200 $0 $0 $0 $286,200

H8‐12‐005 No 12 Fullerton SCAG Eighty‐four (84) signalized intersections throughout the city. Install 589 pedestrian countdown signal heads. $136,600 $136,600 $0 $0 $136,600 $0 $0 $0 $136,600

H8‐12‐006 No 12 Garden Grove SCAG Intersection of Garden Grove Boulevard and Ninth/Nina Street.

Install protected left‐turn phasing to east/west approaches and install secondary trafficsignal heads to east/west approaches to provide safe stopping space for vehicles crossing intersection.  $194,000 $194,000 $0 $0 $194,000 $0 $0 $0 $194,000

H8‐12‐007 No 12 Garden Grove SCAG Intersection of Magnolia Street and Orangewood Avenue. Install protected left‐turn phasing. $217,000 $217,000 $0 $0 $217,000 $0 $0 $0 $217,000

H8‐12‐008 No 12 Garden Grove SCAG Ninety‐nine (99) signalized intersections citywide.  Install 612 pedestrian countdown signal heads. $202,000 $202,000 $0 $0 $202,000 $0 $0 $0 $202,000

HSIP7‐12‐003 No 12 Garden Grove SCAG Intersection of Haster Street and Lampson Ave Provide protected left‐turn phase $220,000 $220,000 $0 $0 $0 $0 $220,000 $0 $220,000

H8‐07‐008 No 7 Glendale SCAG

Various locations along N. Verdugo Road between Canada Blvd (south‐split near GlendaleCommunity College) and Canada Blvd (north‐split near Menlo Drive), including five (5) signalized intersections, and the overall roadway segment.

Install safety improvements, including dynamic speed warning signs, traffic signal visibility improvements, and dilemma zone detection. $1,259,200 $1,259,200 $0 $0 $1,259,200 $0 $0 $0 $1,259,200

H8‐08‐004 No 8 Grand Terrace SCAGThree (3) uncontrolled four‐way stop intersections and two (2) signalized intersections along Mt. Vernon Avenue.

Upgrade intersection and crosswalk pavement markings, install advanced speed feedback warning signs,  and install segment lighting. $435,700 $435,700 $0 $0 $435,700 $0 $0 $0 $435,700

Page 2 of 10 Printed On:  4/11/2018

#19-00 SCAG015_HSIP

Page 228: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Division of Local Assistance Highway Safety Improvement Program (HSIP)2019 SCAG FTIP (SCAG015) Back-Up List, sorted by MPO, Agency and Unique Project ID

Unique Project ID HR3Eligibility* District Agency MPO Project Location Description of Work Current Total Project

Cost EstimateCurrent Programmed

Federal Funds Other/Local FundsFederal Funds

Programmed under "Prior"

Federal Funds Programmed in

2018/19

Federal Funds Programmed in

2019/20

Federal Funds Programmed in

2020/21

Federal Funds Programmed in

2021/22

Approved Federal Funds

H8‐07‐009 No 7Hawaiian Gardens SCAG

Various signalized intersections along Carson St. between Western City Limit (Pioneer Blvdand Eastern City Limit (Bloomfield Ave). Install traffic signal hardware improvements. $397,500 $397,500 $0 $0 $0 $397,500 $0 $0 $397,500

H8‐07‐010 No 7Hawaiian Gardens SCAG Various intersections on Norwalk Blvd between 214th St and 226th St. Install traffic signal improvements. $516,000 $464,400 $51,600 $0 $0 $464,400 $0 $0 $464,400

HSIP7‐07‐010 No 7 Hawthorne SCAG 1.3 mile section of 120th Street from Prairie Avenue to Felton Avenue

Traffic signal upgrades (upgrade signals, controllers and detection) and coordination ateight signalized intersections and improve crossings and signage at spot locations in the corridor $1,500,800 $1,305,800 $195,000 $0 $0 $0 $0 $1,305,800 $1,305,800

H8‐08‐005 No 8 Hemet SCAG

Signalized intersections on the following corridors: Cawston Ave, Domenigoni Pkwy, KirbySt, Latham Ave, Lyon Ave, Sanderson Ave, State St, and Stetson St; Mountain Ave & Soboba St, Warren Rd & Mustang Wy. Install LED luminaire safety lighting and pedestrian countdown signal heads. $985,900 $985,900 $0 $0 $985,900 $0 $0 $0 $985,900

HSIP7‐08‐004 No 8 Hesperia SCAG On Main Street at Balsam AvenueConstruct raised curb island median, install street lighting, and improve signing and striping  $232,300 $209,070 $23,230 $0 $0 $0 $209,070 $0 $209,070

H8‐08‐006 No 8 Highland SCAG Intersection of Palm Avenue and Cypress Street. Install Traffic Signal. $257,600 $231,840 $25,760 $0 $231,840 $0 $0 $0 $231,840

HSIP6‐12‐002 No 12Huntington Beach SCAG Main St/17th St, Main St/ Utica Ave, Bolsa Chica St/Pearce Dr Upgrade traffic signals; Install protected left‐turn phasing $748,400 $675,900 $72,500 $24,000 $651,900 $0 $0 $0 $651,900

HSIP6‐12‐003 No 12Huntington Beach SCAG Gothard St/Center Ave Upgrade traffic signals (interconnect); Install protected left‐turn phasing $409,300 $369,500 $39,800 $12,000 $357,500 $0 $0 $0 $369,500

HSIP6‐12‐004 No 12Huntington Beach SCAG Newland St/Slater Ave Upgrade traffic signals; Install protected left‐turn phasing $351,000 $317,100 $33,900 $12,000 $305,100 $0 $0 $0 $317,100

HSIP6‐12‐005 No 12Huntington Beach SCAG Newland St/Ellis Ave and on Newland St between Ellis Ave and Garfield Ave Upgrade traffic signals (interconnect); Install protected left‐turn phasing $410,400 $370,500 $39,900 $12,000 $358,500 $0 $0 $0 $370,500

HSIP6‐12‐006 No 12Huntington Beach SCAG On Goldenwest St between Heil Ave and Warner Ave Upgrade traffic signals (interconnect); Install protected left‐turn phasing $316,100 $285,600 $30,500 $12,000 $273,600 $0 $0 $0 $285,600

HSIP6‐12‐007 No 12Huntington Beach SCAG  Gothard St/Slater Ave Upgrade traffic signals (interconnect); Install protected left‐turn phasing $321,300 $290,300 $31,000 $12,000 $278,300 $0 $0 $0 $290,300

HSIP6‐12‐008 No 12Huntington Beach SCAG On Newland St between Warner Ave and Ellis Ave Upgrade traffic signals (interconnect) $310,100 $280,200 $29,900 $12,000 $268,200 $0 $0 $0 $280,200

H8‐11‐008 No 11 Imperial County SCAG SR‐86 at Heber Curve.Eliminate curve; install 4‐way stop; install southbound left turn lane and dedicated westbound right turn lane; and add intersection lighting.   $2,500,000 $2,250,000 $250,000 $0 $0 $2,250,000 $0 $0 $2,250,000

HSIP7‐11‐013 Yes 11 Imperial County SCAG Intersection of Keystone Road at Austin Road in Imperial CountyIntersection Improvements; install intersection lighting; paving of the intersection, including rumble strips; and flashing beacons at stop signs and intersection warning signs.  $233,200 $209,880 $23,320 $0 $0 $0 $209,880 $0 $209,880

HSIP7‐11‐014 Yes 11 Imperial County SCAG Weiman Road at Cady Road in Imperial County. Intersection lighting, advance curve warning signs (flashing beacons), flashing beacon stop sign, upgraded chevron signs with fluorescent sheeting and installation of rumble strips. $150,500 $135,450 $15,050 $0 $0 $0 $135,450 $0 $135,450

HSIP7‐11‐015 Yes 11 Imperial County SCAGForrester Road, Evan Hewes Highway, Dogwood Road, Keystone Road, Marina Drive. Imperial County Major Corridor Sign Audit. 

Traffic sign audit at five (5) Roadway Corridors in Imperial County. Replacement ofapproximately one hundred forty three (143) current traffic signs on Forrester Road with high visibility/high reflective signs. $136,500 $132,500 $4,000 $75,000 $0 $0 $57,500 $0 $132,500

H8‐08‐007 No 8 Indio SCAG Twenty‐one (21) intersections throughout the City of Indio.  Install signal timers and pedestrian countdown heads. $250,000 $250,000 $0 $0 $250,000 $0 $0 $0 $250,000

H8‐08‐008 No 8 Indio SCAG Avenue 44 from Monroe Street to Palo Verde Avenue.Construct Road Diet (reduce travel lanes from four to two with a two‐way left turn lane, and install bike lanes and space for street parking).   $366,800 $330,120 $36,680 $0 $330,120 $0 $0 $0 $330,120

HSIP7‐08‐005 No 8 Indio SCAG Intersection of Doctor Carreon Boulevard and Oasis StreetReplace existing permissive left‐turn phases and signal heads with protected left‐turn phases and signal heads on existing poles with larger mast arms. $105,000 $100,000 $5,000 $0 $0 $0 $100,000 $0 $100,000

HSIP7‐08‐006 No 8 Indio SCAG On Monroe Street at 11 intersections from Oleander Avenue to Comet Lane. To improve signal timing (coordination, phases, red, yellow, or operation) $378,800 $368,800 $10,000 $0 $0 $0 $368,800 $0 $368,800

H8‐07‐011 No 7 Inglewood SCAG Centinela Ave between La Cienega Blvd and La Brea Ave.

Construct raised center medians and install traffic signal improvements includingprotected left turn phasing at the intersections of Centinela at Beach, Centinela at Eucalyptus, and Centinela at La Brea. $1,530,800 $344,430 $153,080 $0 $0 $344,430 $0 $0 $1,377,720

Page 3 of 10 Printed On:  4/11/2018

#19-00 SCAG015_HSIP

Page 229: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Division of Local Assistance Highway Safety Improvement Program (HSIP)2019 SCAG FTIP (SCAG015) Back-Up List, sorted by MPO, Agency and Unique Project ID

Unique Project ID HR3Eligibility* District Agency MPO Project Location Description of Work Current Total Project

Cost EstimateCurrent Programmed

Federal Funds Other/Local FundsFederal Funds

Programmed under "Prior"

Federal Funds Programmed in

2018/19

Federal Funds Programmed in

2019/20

Federal Funds Programmed in

2020/21

Federal Funds Programmed in

2021/22

Approved Federal Funds

H8‐07‐012 No 7 Inglewood SCAG La Brea Avenue between 64th Street and Beach Avenue. Install traffic signal improvements. $193,800 $193,800 $0 $0 $193,800 $0 $0 $0 $193,800

H8‐07‐013 No 7 Inglewood SCAG Prairie Avenue between Grace Avenue and 111th Street. Install traffic signal improvements. $875,400 $218,850 $0 $0 $0 $218,850 $0 $0 $875,400

H8‐07‐014 No 7 Inglewood SCAG Various signalized intersections throughout the City of Inglewood. Install pedestrian countdown signal heads. $207,900 $207,900 $0 $0 $207,900 $0 $0 $0 $207,900

HSIP7‐08‐007 No 8 Jurupa Valley SCAGIntersections in a 1.41 mile segment of Pedley Road from Jurupa Road on the north to 60thStreet on the south.

Add left‐turn lanes to 7 unsignalized intersection along Pedley Road and modify stormdrain under‐crossings by relocating headwalls away from the travel lanes and adding guardrails at the headwall abutments $1,300,900 $1,170,810 $130,090 $0 $0 $0 $0 $1,170,810 $1,170,810

H8‐07‐015 No 7 La Puente SCAG Eight (8) crosswalk locations throughout the City of La Puente.Install Rectangular Rapid Flashing Beacons (RRFBs), curb extensions, advanced pavement markings, warning signs, and high visibility crosswalks. $783,600 $783,600 $0 $0 $0 $783,600 $0 $0 $783,600

HSIP7‐08‐008 No 8 La Quinta SCAG Various streets throughout the City of La Quinta

Upgrade traffic signal interconnect network including the installation of new fiber opticinterconnect, replacing existing wired interconnect with fiber optic cables and all contingent work to improve signal timing and coordination. $1,971,000 $1,971,000 $0 $100,000 $0 $0 $0 $1,871,000 $1,971,000

HSIP7‐08‐009 No 8 La Quinta SCAG Various Intersections throughout the City of La Quinta

Upgrade all intersection safety lighting and street name signs to more visible LED type andupgrade the traffic signal cabinet at 8 intersections and cabinet controller at 15 intersections. $1,260,400 $1,134,300 $126,100 $135,000 $0 $0 $999,300 $0 $1,134,300

H8‐07‐016 No 7 La Verne SCAG Fruit Street between Baseline Road and Foothill Boulevard.Install protected left turn phase improvements at Baseline Road, and install raised mediansalong Fruit Street from south of Interstate 210 Freeway to north of Foothill Boulevard. $881,900 $793,710 $88,190 $0 $793,710 $0 $0 $0 $793,710

H8‐07‐017 No 7 La Verne SCAG Intersection of Durward Way at White Avenue.  Install signals, lighting and raised medians. $280,000 $252,000 $28,000 $0 $252,000 $0 $0 $0 $252,000

HSIP7‐07‐011 No 7 La Verne SCAG

Foothill Boulevard (State Route 66) Corridor (1.5 miles) from Damien Ave. in the west toTowne Center Dr. in the east Wheeler Avenue, Emerald Avenue and Fruit Street/White Avenue

Installation of larger signal heads, signal masts & reflective back plates at 3 majorintersections; left turn signal phase at Foothill Blvd./Emerald Ave.; and installation of pedestrian countdown signals at 8 intersections $409,200 $409,200 $0 $0 $0 $0 $409,200 $0 $409,200

H8‐08‐009 No 8 Lake Elsinore SCAG Eight (8) intersections throughout the city. Install advanced dilemma zone detection, flashing warning beacons, and left turn phasing. $825,300 $825,300 $0 $0 $0 $825,300 $0 $0 $825,300

H8‐07‐018 No 7 Lancaster SCAG Intersection of Sierra Highway at Avenue G. Install a new traffic signal, and install advance "Signal Ahead" signs and flashing beacons. $526,700 $526,700 $0 $0 $526,700 $0 $0 $0 $526,700

H8‐07‐019 No 7 Lancaster SCAG Intersection of Avenue I at 60th Street West.Modify the existing traffic signal to provide east/west protected left turn phasing, and install advance "Signal Ahead" signs and flashing beacons. $214,000 $214,000 $0 $0 $214,000 $0 $0 $0 $214,000

HSIP6‐07‐012 No 7 Lancaster SCAG On E Avenue I between Challenger Way and Price LaneInstall sidewalks and bike lanes, curb ramps, curb extension, and crosswalks; Upgrade signals $1,368,400 $1,231,400 $137,000 $96,500 $0 $0 $1,134,900 $0 $1,231,400

HSIP6‐07‐013 No 7 Lancaster SCAG On E Avenue I between Price Lane and 35th St EastInstall sidewalks and bike lanes, curb ramps, curb extension, and crosswalks; Upgrade signals $1,647,500 $1,482,600 $164,900 $116,200 $0 $0 $1,366,400 $0 $1,482,600

HSIP7‐07‐012 No 7 Lancaster SCAG10th Street West from Lancaster Boulevard to Avenue J, Avenue J from 10th Street West to Challenger Way 

Construct sidewalk, curb and gutter and curb ramps, install new striping to accommodatenew bike lanes and some on‐street parking.  Construct mid‐block crossings and median refuge islands.   $2,729,700 $2,456,730 $272,970 $0 $0 $0 $0 $2,456,730 $2,456,730

H8‐07‐020 No 7 Long Beach SCAGVarious locations on Anaheim Street between the Los Angeles River and Pacific Coast Highway. Install controlled‐access medians, signal upgrades, and pedestrian refuges. $3,326,300 $2,993,670 $332,630 $0 $0 $2,993,670 $0 $0 $2,993,670

H8‐07‐021 No 7 Long Beach SCAGTen (10) signalized intersections on Los Coyotes Diagonal from Outer Traffic Circle to Carson Street.

Install new traffic signal poles, indications and related equipment to accommodate the protected left turn phasing.  $872,200 $872,200 $0 $0 $872,200 $0 $0 $0 $872,200

H8‐07‐022 No 7 Long Beach SCAG Eighteen (18) uncontrolled intersections.Install enhanced pedestrian crossings, including high visibility crosswalks along with yield triangles, new pedestrian signs and solar powered warning flashers. $250,000 $250,000 $0 $0 $250,000 $0 $0 $0 $250,000

H8‐07‐023 No 7 Los Angeles SCAG

Fifteen (15) intersections: 42nd Pl/Central Av, Superior St/Zelzah Av, Parthenia St/WIllisAv, Romaine St/Vine St, 111th St/Avalon Bl, Sunnyslope Av/Vanowen St, Olympic Bl/Serrano Av, 84th St/84th Pl/Figueroa St, and the other seven (7) intersections. Install new traffic signals at existing partially stop controlled intersections. $5,284,000 $4,755,600 $528,400 $0 $0 $4,755,600 $0 $0 $4,755,600

H8‐07‐024 No 7 Los Angeles SCAG

Twenty (20) intersections: Lindley Av/Sherman Wy, Compton Av/Imperial Hwy, FoothilBl/Osborne St, Lassen St/Sepulveda Bl, Florence Av/Van Ness Av, Balboa Bl/Parthenia St, Tampa Av/Victory Bl, Union Av/Washington Bl, and the other twelve (12) intersections.

Modify traffic signals to install protected phasing operations (19 locations for left‐turn and1 for pedestrian scramble); upgrade signal indication sizes, install APS devices, and install/upgrade curb ramps. $5,827,111 $5,244,400 $582,711 $0 $0 $5,244,400 $0 $0 $5,244,400

HSIP6‐07‐014 No 7 Los Angeles SCAG

Vineland Ave./Magnolia Blvd., Woodman Ave./Woodman Place, Vineland Ave./RiversideDr., Van Nuys Blvd./Vanowen St., Nordhoff St./Van Nuys Blvd, Pacific Ave./Rose Ave, S. Western Ave./W. Vernon Ave Upgrade traffic signals; Install protected left‐turn phasing $856,000 $770,300 $85,700 $154,060 $0 $0 $616,240 $0 $770,300

Page 4 of 10 Printed On:  4/11/2018

#19-00 SCAG015_HSIP

Page 230: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Division of Local Assistance Highway Safety Improvement Program (HSIP)2019 SCAG FTIP (SCAG015) Back-Up List, sorted by MPO, Agency and Unique Project ID

Unique Project ID HR3Eligibility* District Agency MPO Project Location Description of Work Current Total Project

Cost EstimateCurrent Programmed

Federal Funds Other/Local FundsFederal Funds

Programmed under "Prior"

Federal Funds Programmed in

2018/19

Federal Funds Programmed in

2019/20

Federal Funds Programmed in

2020/21

Federal Funds Programmed in

2021/22

Approved Federal Funds

HSIP6‐07‐015 No 7 Los Angeles SCAGVentura Blvd/Lemona Ave, Ventura Blvd/Columbus Ave, Ventura Blvd/Calhoun Ave, S Crest Dr/W Pico Blvd, Alhambra Ave/Lowell Ave Install traffic signals $1,123,400 $1,010,900 $112,500 $202,180 $0 $0 $808,720 $0 $1,010,900

HSIP6‐07‐017 No 7 Los Angeles SCAGOlympic Blvd/Orme Ave, Olympic Blvd/Camulos St, Olympic Blvd/S Evergreen Ave, Olympic Blvd/S Dacotah St Install Activated Pedestrian Warning Devices (APWDs); construct bulb‐outs $1,072,000 $964,800 $107,200 $192,960 $0 $0 $771,840 $0 $964,800

HSIP6‐07‐018 No 7 Los Angeles SCAG Main St between W Slauson Ave and W 92nd St‐E 92nd StRoad diet (reduce travel lanes); install refuge islands, rectangular rapid flashing beacons; upgradestriping, existing pedestrian crossings. $775,600 $697,900 $77,700 $139,577 $0 $0 $558,323 $0 $697,900

HSIP6‐07‐019 No 7 Los Angeles SCAGW 3rd St/Hoover St, W Anaheim St/Bay View Ave, W Anaheim St/N Marine Ave, and E Century Blvd/Wadsworth Ave Install a traffic signals $1,200,000 $1,080,000 $120,000 $216,000 $0 $0 $864,000 $0 $1,080,000

HSIP6‐07‐020 No 7 Los Angeles SCAG Citywide list of 46 locations including W 3rd St/S Van Ness Ave, etc Install Rectangular Rapid Flashing Beacons $1,433,600 $1,290,200 $143,400 $258,300 $0 $0 $1,031,900 $0 $1,290,200

HSIP7‐07‐013 No 7 Los Angeles SCAGCitywide list of 28 locations starting with Adams Bl & West View St; Avalon Bl & 90th St; Avalon Bl & 97th St; etc. Install rectangular rapid flashing beacons (RRFBs) at uncontrolled locations. $4,140,800 $3,726,720 $414,080 $745,380 $0 $0 $0 $2,981,340 $3,726,720

HSIP7‐07‐014 No 7 Los Angeles SCAG

17 locations in City of LA.  Manchester Av at Normandie, Hoover, Vermont & Broadway. Imperial & Figueroa, Carson & Western. Victory at Laurel Cyn & Coldwater Cyn.  Crenshaw & Stocker, MLK & Vermont,Lincoln & Rose, Amigo/Rinaldi/118 Fwy

Modify traffic signals by installing turn phasing, upgrading signal indication sizes, install audible pedestrian devices $4,496,900 $4,496,900 $0 $0 $0 $0 $0 $4,496,900 $4,496,900

HSIP7‐07‐015 No 7 Los Angeles SCAG Crenshaw Boulevard from Florence Avenue to 79th StreetConstruct raised medians, and curb extensions, install rectangular rapid flashing beacons, modify signals $2,320,000 $1,776,380 $543,620 $417,600 $0 $0 $0 $1,358,780 $1,776,380

H8‐07‐026 No 7Los Angeles County SCAG

Intersections of Olympic Boulevard at Garfield Avenue and Whittier Boulevard at Eastern Avenue, located in the unincorporated County area of East Los Angeles.

Install various traffic signal improvements, including upgrading standards, mastarms,vehicle heads, protected left‐turn phasing, bicycle and vehicle detection, ADA access ramps, communication, and other associated equipment. $763,000 $763,000 $0 $0 $763,000 $0 $0 $0 $763,000

H8‐07‐027 No 7Los Angeles County SCAG

Intersections of Covina Boulevard at Hollenbeck Avenue, Cypress Street at Vincent Avenueand Workman Mill Road at Lomitas Avenue, located in the unincorporated County area of San Gabriel Valley.

Install various traffic signal equipment upgrades, including upgrading standards,mastarms, vehicle heads, bicycle and vehicle detection, access ramps, communication, andother associated equipment. $1,252,100 $1,252,100 $0 $0 $1,252,100 $0 $0 $0 $1,252,100

H8‐07‐028 No 7Los Angeles County SCAG

Intersections of 120th Street at Normandie Avenue and 120th Street at Compton Avenue, located in the unincorporated County areas of West Athens and Willowbrook.

Install various traffic signal equipment upgrades, including upgrading standards,mastarms, vehicle heads, bicycle and vehicle detection, protected‐permissive left‐turn phasing, access ramps, communication, and other associated equipment. $957,800 $957,800 $0 $0 $957,800 $0 $0 $0 $957,800

H8‐07‐029 No 7Los Angeles County SCAG

Intersections of Amar Rd at Baldwin Park Blvd, Badillo St at Irwindale Ave, Santa Anita Aveat Freer St, and Temple Ave at Azusa Ave, in various city/county shared‐jurisdiction locations in the San Gabriel Valley area.

Install various traffic signal equipment upgrades, including upgrading standards,mastarms, vehicle heads, protected left‐turn phasing, bicycle and vehicle detection, access ramps, communication, and other associated equipment. $1,217,200 $1,217,200 $0 $0 $1,217,200 $0 $0 $0 $1,217,200

H8‐07‐030 Yes 7Los Angeles County SCAG

Intersections of Las Virgenes Road at Mulholland Highway and at Piuma Road, in Unincorporated County Area.

Install traffic signal improvements: upgrade 8" vehicle heads to 12"; install video detectionBattery Back‐up and CCTV systems; and establish communications with LA County Traffic Management Center (TMC). $112,400 $112,400 $0 $0 $112,400 $0 $0 $0 $112,400

H8‐07‐031 Yes 7Los Angeles County SCAG Glendora Mountain Road from Big Dalton Canyon Road to East Fork Road.

Remove existing centerline striping and install recessed thermoplastic striping and recessed pavement markers $921,500 $828,000 $93,500 $0 $828,000 $0 $0 $0 $828,000

H8‐07‐032 Yes 7Los Angeles County SCAG

Bouquet Canyon Road between one mile south of Elizabeth Lake Road and the City of Santa Clarita Boundary Line. Install chevron signs, curve advance warning signs, and variable speed warning signs. $536,000 $536,000 $0 $0 $536,000 $0 $0 $0 $536,000

H8‐07‐033 Yes 7Los Angeles County SCAG

San Francisquito Canyon Road between Elizabeth Lake Road and the City of Santa Clarita Boundary Line, and Lake Hughes Road between Elizabeth Lake Road and Ridge Route Road. Install chevron signs and advance curve warning signs. $1,086,500 $1,086,500 $0 $0 $1,086,500 $0 $0 $0 $1,086,500

HSIP6‐07‐027 No 7Los Angeles County SCAG Various locations throughout  unincorporated areas of Los Angeles County Upgrade crosswalk; Install signs and pavement markings $583,700 $525,200 $58,500 $92,900 $0 $0 $432,300 $0 $525,200

HSIP6‐07‐031 No 7Los Angeles County SCAG

Various locations throughout the unincorporated Los Angeles Counties of Willbrook and West Rancho Dominguez Install bike lanes; Road Diet (reduce travel lanes) $1,630,600 $1,467,400 $163,200 $244,500 $0 $0 $1,222,900 $0 $1,467,400

HSIP6‐07‐032 No 7Los Angeles County SCAG

On Washington Blvd between Bellford Ave and N Altadena Dr, On N Altadena Dr between Canyon Close Rd and E Washington Blvd Install bike lanes; Road Diet (reduce travel lanes) $1,956,000 $1,492,100 $463,900 $32,400 $1,459,700 $0 $0 $0 $1,492,100

HSIP6‐07‐034 Yes 7Los Angeles County SCAG On Lake Hughes Rd between Elizabeth Lake Rd and Mile Marker 17.2 Install guardrails and pavement markers $405,000 $364,500 $40,500 $63,000 $0 $0 $301,500 $0 $364,500

HSIP6‐07‐035 No 7Los Angeles County SCAG

On Bouquet Canyon Rd between 1 mile south of Elizabeth Lake Rd and Blue Cloud Rd; On San Francisqutio Canyon Rd between Elizabeth Lake Rd and Copper Hill Dr Install guardrails and centerline recessed pavement markers $1,132,000 $1,018,700 $113,300 $144,000 $0 $0 $874,700 $0 $1,018,700

H8‐08‐010 No 8 Menifee SCAG

Signalized intersections on the following corridors: Murrieta Road, Menifee Road, NewportRoad, Goetz Road, Haun Road, McCall Boulevard, La Piedra Road, Antelope Road, and Sco  Road.

Install pedestrian countdown signal heads, APS push buttons, ADA‐compliant curb ramps and crosswalk striping.  $936,700 $936,700 $0 $0 $936,700 $0 $0 $0 $936,700

Page 5 of 10 Printed On:  4/11/2018

#19-00 SCAG015_HSIP

Page 231: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Division of Local Assistance Highway Safety Improvement Program (HSIP)2019 SCAG FTIP (SCAG015) Back-Up List, sorted by MPO, Agency and Unique Project ID

Unique Project ID HR3Eligibility* District Agency MPO Project Location Description of Work Current Total Project

Cost EstimateCurrent Programmed

Federal Funds Other/Local FundsFederal Funds

Programmed under "Prior"

Federal Funds Programmed in

2018/19

Federal Funds Programmed in

2019/20

Federal Funds Programmed in

2020/21

Federal Funds Programmed in

2021/22

Approved Federal Funds

HSIP7‐08‐010 No 8 Menifee SCAG

Signalized intersections on the following corridors on the west side of Menifee: McCalBlvd, Murrieta Road, Newport Rd, Goetz Rd, La Piedra Rd, Haun Rd, Normandy Rd, and SunCity Blvd.

Install wireless interconnect system including radios, controllers, and relatedcommunication equipment upgrades to improve safety and operations via optimized traffic signal timing coordination.  $511,700 $496,700 $15,000 $0 $0 $0 $496,700 $0 $496,700

HSIP7‐08‐011 No 8 Menifee SCAG

Signalized intersections on the following corridors on the east side of Menifee: Menifee RdBriggs Rd, McCall Blvd, Newport Rd, Lindenberger Rd, Antelope Rd, Holland Rd, and Scott Rd. 

Install wireless interconnect system including radios and related communicationequipment upgrade to improve safety and operations via optimized traffic signal timing coordination.  $509,900 $494,900 $15,000 $0 $0 $0 $494,900 $0 $494,900

H8‐12‐009 No 12 Mission Viejo SCAG Thirty‐nine (39) signalized intersection locations within the City of Mission Viejo. Install pedestrian countdown signal heads. $204,300 $204,300 $0 $0 $204,300 $0 $0 $0 $204,300

HSIP7‐07‐016 No 7 Montebello SCAGThe intersections of Via Campo and Findlay Avenue; Garfield Avenue and Whittier Boulevard; and Garfield Avenue and Via Campo

Upgrade signal hardware, improve signal timing and operation

$860,000 $860,000 $0 $0 $0 $0 $860,000 $0 $860,000

HSIP7‐07‐019 No 7 Monterey Park SCAGThree downtown intersections in Monterey Park; Garfield Ave & Hellman Ave, Garfield Ave & Emerson Ave, and Alhambra Ave & Hellman Ave with Almansor St

Improve signal timing at 3 downtown intersections. Add Left turn phase to 2 intersections.Add Left turn lane and phase at 1 intersection. Improve signal hardware at 2 of them and install pedestrian countdown signal heads at all 3 $329,800 $312,160 $17,640 $0 $0 $0 $312,160 $0 $312,160

H8‐08‐011 No 8 Moreno Valley SCAG Citywide locations. Upgrade existing guardrails. $779,900 $194,975 $0 $0 $0 $194,975 $0 $0 $779,900

H8‐08‐012 No 8 Moreno Valley SCAG Seven locations citywide. Upgrade existing marked crosswalks on arterials. $250,000 $100,000 $0 $0 $0 $100,000 $0 $0 $250,000

H8‐08‐013 No 8 Moreno Valley SCAG Lasselle Street from south city limit to College Drive.Install high‐friction surface treatment at spot locations; install speed control system on ten(10) signalized intersections. $522,300 $130,575 $0 $0 $0 $130,575 $0 $0 $522,300

HSIP7‐08‐012 No 8 Moreno Valley SCAG 65 signalized intersections citywide Install advanced dilemma zone detection systems $3,841,900 $3,841,900 $0 $125,000 $0 $0 $0 $3,716,900 $3,841,900

HSIP7‐08‐013 No 8 Moreno Valley SCAG Kitching Street between Sunnymead Boulevard and Alessandro Boulevard Conduct Road Safety Audit and implement eligible recommended improvements $140,000 $140,000 $0 $25,000 $0 $0 $115,000 $0 $140,000

HSIP7‐08‐014 No 8 Moreno Valley SCAG Ironwood Avenue from 500' west of Lasselle Street to Nason Street Conduct Road Safety Audit and implement eligible recommended improvements $350,000 $350,000 $0 $62,500 $0 $0 $287,500 $0 $350,000

H8‐07‐034 No 7 Norwalk SCAGPioneer Boulevard between 166th Street (South City Limits) and Lakeland Road (North City Limits).

Upgrade signals to provide separate left‐turn phasing at eight (8) intersections and providevarious safety improvements at adjacent intersections. $2,911,000 $2,911,000 $0 $0 $2,911,000 $0 $0 $0 $2,911,000

H8‐07‐035 No 7 Norwalk SCAGPioneer Boulevard between 166th Street (South City Limits) and Lakeland Avenue (North City Limits).

Update signal timing and coordinated operations of fifteen (15) signalized intersections,construct a fiber‐optic communication network to integrate with the City's Traffic Management Center (TMC).  $1,281,700 $640,850 $640,850 $0 $640,850 $0 $0 $0 $640,850

H8‐07‐036 No 7 Norwalk SCAGNorwalk Boulevard from 166th Street (South City Limits) to Rosecrans Avenue; and from Adoree Street to Lakeland Road (North City Limits).

Upgrade signals to provide separate left turn phasing at six (6) intersections and provide various safety improvements at adjacent intersections. $2,294,500 $2,294,500 $0 $0 $2,294,500 $0 $0 $0 $2,294,500

H8‐07‐037 No 7 Norwalk SCAGNorwalk Boulevard from 166th Street (South City Limits) to Rosecrans Avenue; and from Adoree Street to Lakeland Road (North City Limits).

Update signal timing and coordinated operations of eleven (11) signalized intersections,construct a fiber‐optic communication network to integrate with the City's Traffic Management Center (TMC).  $1,135,100 $567,550 $567,550 $0 $567,550 $0 $0 $0 $567,550

HSIP6‐07‐037 No 7 Norwalk SCAG On Rosecrans Ave between Studebaker Rd and Carmenita Rd Upgrade traffic signals (interconnect); Install pedestrian countdown heads $1,267,800 $1,140,900 $126,900 $133,560 $1,007,340 $0 $0 $0 $1,140,900

HSIP6‐07‐038 No 7 Norwalk SCAG On Studebaker Rd between Alondra Blvd and Rosecrans Ave Upgrade traffic signals (interconnect)and curb ramps; Install pedestrian countdown heads $801,700 $721,300 $80,400 $85,140 $636,160 $0 $0 $0 $721,300

HSIP6‐07‐039 No 7 Norwalk SCAGOn San Antonio Ave‐Norwalk Blvd between Rosecrans Ave and Civic Center Dr, and  On Civic Center Dr between Norwalk Blvd and Bloomfield Ave

Upgrade traffic signals (interconnect)and curb ramps; install pedestrian countdown signal heads $897,600 $807,600 $90,000 $95,130 $712,470 $0 $0 $0 $807,600

HSIP7‐07‐020 No 7 Norwalk SCAG Alondra Boulevard between Piuma Avenue and Shoemaker AvenueTraffic signal upgrades including fiber optic cable, new controllers, signal head upgrades, pedestrian countdown signal heads, and new traffic poles $1,155,000 $1,155,000 $0 $0 $0 $0 $0 $1,155,000 $1,155,000

HSIP7‐07‐021 No 7 Norwalk SCAGFirestone Boulevard between West City Limits (Interstate 605) and Rosecrans Ave (Interstate 5)

Traffic signal upgrades: fiber optic cable, new controllers, appurtenant equipment and intersection pedestrian countdown signal heads $1,502,200 $1,502,200 $0 $0 $0 $0 $0 $1,502,200 $1,502,200

HSIP7‐07‐022 No 7 Norwalk SCAG

Studebaker Road between Rosecrans Avenue and Cecilia StreeTraffic signal upgrades:  fiber optic cable, new controllers, appurtenant equipment and intersection pedestrian countdown signal heads $1,125,300 $1,125,300 $0 $0 $0 $0 $0 $1,125,300 $1,125,300

H8‐12‐010 No 12 Orange SCAG Intersection of Chapman Avenue at Batavia Street. Install protected left‐turn phasing for northbound and southbound approaches. $399,800 $399,800 $0 $0 $0 $399,800 $0 $0 $399,800

Page 6 of 10 Printed On:  4/11/2018

#19-00 SCAG015_HSIP

Page 232: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Division of Local Assistance Highway Safety Improvement Program (HSIP)2019 SCAG FTIP (SCAG015) Back-Up List, sorted by MPO, Agency and Unique Project ID

Unique Project ID HR3Eligibility* District Agency MPO Project Location Description of Work Current Total Project

Cost EstimateCurrent Programmed

Federal Funds Other/Local FundsFederal Funds

Programmed under "Prior"

Federal Funds Programmed in

2018/19

Federal Funds Programmed in

2019/20

Federal Funds Programmed in

2020/21

Federal Funds Programmed in

2021/22

Approved Federal Funds

H8‐12‐011 No 12 Orange SCAG Intersection of Chapman Avenue at Feldner Street. Install protected left‐turn phasing for northbound and southbound approaches. $248,500 $248,500 $0 $0 $248,500 $0 $0 $0 $248,500

H8‐12‐012 No 12 Orange SCAG Intersection of Chapman Avenue at Flower Street. Install protected left‐turn phasing for northbound and southbound approaches. $248,500 $248,500 $0 $0 $248,500 $0 $0 $0 $248,500

H8‐12‐013 No 12 Orange SCAG

Three arterial road segments: La Veta Avenue from Flower St. to Bedford St., CollinsAvenue from Wanda Rd. to Bond Ave., and Chapman Avenue from Jamboree Rd. to OrangePark Blvd.

Install Radar Feedback Speed Signs at specific locations with a history of speed related accidents. $300,500 $300,500 $0 $0 $300,500 $0 $0 $0 $300,500

HSIP7‐12‐004 No 12 Orange SCAG The intersection of Glassell St. and Meats Ave. Install protected left‐turn phasing for northbound and southbound approaches. $249,300 $249,300 $0 $0 $0 $0 $249,300 $0 $249,300

HSIP7‐12‐005 No 12 Orange SCAG The intersection of Glassell St. and Collins Ave. Install protected left‐turn phasing for northbound and southbound approaches $281,900 $281,900 $0 $0 $0 $0 $281,900 $0 $281,900

HSIP7‐12‐006 No 12 Orange SCAG At 33 signalized intersections within the City of Orange Install pedestrian countdown signals (PCS), new crosswalk striping and battery back‐ups $350,600 $350,600 $0 $0 $0 $0 $350,600 $0 $350,600

HSIP7‐12‐007 No 12 Orange SCAG At 12 signalized intersections within the City of Orange Upgrade the accessible pedestrian signals (APS)  $178,000 $178,000 $0 $0 $0 $0 $178,000 $0 $178,000

HSIP7‐12‐008 No 12 Orange County SCAG Santiage Canyon Rd between State Rte 241 and N. Live Oak

Provide High Friction Surface Treatment ( HFST), install flashing beacon systems,delineators and reflectors. Increase bicycle safety by striping a buffer zone, install rumble strips and upgrade signage $2,158,600 $1,942,740 $215,860 $0 $0 $0 $1,942,740 $0 $1,942,740

H8‐07‐038 No 7 Oxnard SCAGIntersections along Oxnard Blvd (at Fourth St, Seventh St & Date St) and Channel Islands Blvd (at J St, Statham Blvd & Gisler Ave) and the intersection of Ventura Rd at Seventh St.   Modify traffic signals. $1,461,800 $1,445,100 $16,700 $0 $0 $1,445,100 $0 $0 $1,445,100

HSIP7‐07‐023 No 7 Oxnard SCAGAt  5 intersections along Saviers Road, and the intersection of Oxnard Boulevard and Fifth Street in the city of Oxnard. Install intersection lighting and convert signal to mast arm $885,600 $869,780 $15,820 $78,210 $0 $0 $791,570 $0 $869,780

H8‐08‐014 No 8 Palm Springs SCAG Fourteen (14) intersections throughout the city.Modify traffic signal for improved visibility, install advanced dilemma zone detection, and add protected left‐turn phasing $2,686,600 $2,686,600 $0 $0 $0 $2,686,600 $0 $0 $2,686,600

H8‐08‐015 No 8 Palm Springs SCAG Gene Autry Trail from Salvia Road to 1600 ft south of Salvia Road. Install flashing beacon and delineators. $370,900 $370,900 $0 $0 $0 $370,900 $0 $0 $370,900

HSIP7‐08‐015 No 8 Palm Springs SCAG Various intersections (19) throughout the City of Palm Springs. Modify traffic signal and install advanced dilemma zone detection. $3,325,200 $3,325,200 $0 $295,000 $0 $0 $3,030,200 $0 $3,325,200

H8‐07‐039 No 7 Palmdale SCAG Intersection of Avenue S‐8 at 40th Street East. Convert an existing two‐way stop to a roundabout. $2,910,603 $2,910,603 $0 $0 $0 $2,910,603 $0 $0 $2,910,603

H8‐07‐040 No 7 Palmdale SCAG Various unsignalized crosswalk locations throughout the City of Palmdale.Upgrade existing unsignalized crosswalk locations with high visibility ladder crosswalks, markings and signage. $249,700 $249,700 $0 $0 $249,700 $0 $0 $0 $249,700

H8‐07‐041 No 7 Palmdale SCAG Various locations citywide. Upgrade guardrail and end treatments. $599,800 $599,800 $0 $0 $0 $599,800 $0 $0 $599,800

H8‐07‐042 No 7Palos Verdes Estates SCAG Eleven (11) locations throughout the City. 

Upgrade existing metal beam guardrails to Midwest Guardrail System (MGS) standards, including new end treatments and beam sections, and relocate guardrails to correct locations. $243,400 $243,400 $0 $0 $243,400 $0 $0 $0 $243,400

H8‐07‐043 0 7 Pasadena SCAGIntersections of Lake Ave/Orange Grove Blvd, Mountain Street‐Seco Street/Lincoln Avenue, and Lincoln Avenue/Forest Avenue.

Modify traffic signal to install Left‐turn signals, install corner curb extension, install leftturn pockets, modify striping to simplify movements and minimize conflicts, install enhanced signage, and additional signal heads. $665,600 $599,040 $66,560 $0 $599,040 $0 $0 $0 $599,040

H8‐07‐044 No 7 Pico Rivera SCAGIntersections of Washington Blvd/Crossway Drive, Paramount Blvd/Beverly Blvd, Whittier Blvd/Lindsey Ave, Rosemead Blvd/Gallatin Rd, and Paramount Blvd/Rex Road.

Install improved signal hardware (three intersections); and convert pedestal‐mounted to signal mast arms (two intersections). $696,300 $696,300 $0 $0 $0 $696,300 $0 $0 $696,300

HSIP7‐07‐024 No 7 Pico Rivera SCAG

A total of 19 high capacity intersections located along Beverly Boulevard, ParamountBoulevard, Rosemead Boulevard, Slauson Avenue and Whittier Boulevard in the City of Pico Rivera

Install signal hardware (12" LED lenses, backplates, signal timing/emergency vehicle preemption upgrades) & pedestrian countdown signal heads $853,100 $853,100 $0 $0 $0 $0 $0 $853,100 $853,100

H8‐07‐045 No 7 Pomona SCAGIntersections of Towne Avenue and Philadelphia Street, Garey Avenue and Rio Rancho Road/Philadelphia Street. Modify two existing traffic signals to provide protected left turn phases.  $662,600 $662,600 $0 $0 $0 $662,600 $0 $0 $662,600

HSIP6‐08‐013 No 8 Rancho Mirage SCAG 27 intersections throughout Rancho Mirage Upgrade traffic signals (interconnect); install pedestrian countdown signal heads $1,857,400 $1,486,000 $371,400 $2,000 $1,484,000 $0 $0 $0 $1,486,000

Page 7 of 10 Printed On:  4/11/2018

#19-00 SCAG015_HSIP

Page 233: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Division of Local Assistance Highway Safety Improvement Program (HSIP)2019 SCAG FTIP (SCAG015) Back-Up List, sorted by MPO, Agency and Unique Project ID

Unique Project ID HR3Eligibility* District Agency MPO Project Location Description of Work Current Total Project

Cost EstimateCurrent Programmed

Federal Funds Other/Local FundsFederal Funds

Programmed under "Prior"

Federal Funds Programmed in

2018/19

Federal Funds Programmed in

2019/20

Federal Funds Programmed in

2020/21

Federal Funds Programmed in

2021/22

Approved Federal Funds

HSIP6‐08‐014 No 8 Rancho Mirage SCAGOn Monterey Ave between Gran Via‐Avenida Las Palmas and Dinah Shore Dr, On Dinah Shore Dr between Monterey Ave and Key Largo Ave Upgrade traffic signals (interconnect); install pedestrian countdown signal heads $638,200 $574,200 $64,000.00 $70,800 $503,400 $0 $0 $0 $574,200

H8‐08‐016 No 8 Redlands SCAG Various locations throughout the city. Install emergency vehicle preemption at signalized intersections. $1,188,000 $1,188,000 $0 $0 $0 $1,188,000 $0 $0 $1,188,000

H8‐08‐017 No 8 Redlands SCAG Various locations throughout the City. Install pedestrian countdown heads at signalized intersections.  $244,400 $244,400 $0 $0 $244,400 $0 $0 $0 $244,400

HSIP7‐08‐016 No 8 Redlands SCAG

Redlands Blvd (at the intersections of State, Ninth, Seventh and Fifth)‐Cajon Street (Vine Street)‐Orange Street (Shoppers Lane) Install rectangular rapid flashing beacons $300,300 $270,270 $30,030 $0 $0 $0 $270,270 $0 $270,270

H8‐08‐018 No 8 Rialto SCAGFour (4) intersections: Baseline Rd at Sycamore Ave, Baseline Rd at Eucalyptus Ave, Etiwanda Ave at Cedar Ave, and Riverside Ave at Alder Ave. Provide protected left turn phase; Improve signal hardware. $990,000 $990,000 $0 $0 $0 $990,000 $0 $0 $990,000

H8‐08‐019 No 8 Rialto SCAG Baseline Road from Willow Avenue to Meridian Avenue. Construct a 12‐ft wide raised center median and ADA curb ramps. $1,174,800 $264,330 $117,480 $0 $0 $264,330 $0 $0 $1,057,320

HSIP7‐08‐017 No 8 Rialto SCAGOn Merrill Ave from East City Limits to West City Limits, and South Riverside Ave from Slover Ave to Aqua Mansa Rd. Install 4.5 miles of Class II bike lanes $218,000 $196,200 $21,800 $0 $0 $0 $196,200 $0 $196,200

H8‐08‐020 No 8 Riverside SCAG All currently interconnected traffic signals within the city.Install new model 2070 controllers, with an upgraded controller software and central system. $1,119,800 $559,900 $559,900 $0 $559,900 $0 $0 $0 $559,900

HSIP7‐08‐002 No 8 Riverside SCAG Various Locations throughout the CityInstall High Friction Surface Treatment at five Locations, Construct 2 HAWK Signals, deploy new signal timing plans for 35 traffic signals in the Downtown Area $1,291,800 $1,098,030 $193,770 $0 $0 $0 $0 $1,098,030 $1,098,030

H8‐08‐021 Yes 8 Riverside County SCAGGilman Springs Road between approx. 8,900 ft S/O Alessandro Blvd and approx. 5,100 ft S/O Bridge St, in the Moreno Valley area. 

Construct eight (8) ft paved shoulders,  centerline/edgeline rumble stripes and other incidental work.  $9,818,400 $1,979,140 $1,901,840 $0 $0 $1,979,140 $0 $0 $7,916,560

H8‐08‐022 No 8 Riverside County SCAG

Reche Vista Dr between City of Moreno Valley & Reche Canyon Rd, Reche Canyon Rdbetween Reche Vista Dr & approx. 500 ft north of Woodson Rd, and La Sierra Ave between El Sobrante Rd & Orchard View Ln. Upgrade existing guardrail/end treatments. $1,200,000 $1,200,000 $0 $0 $0 $1,200,000 $0 $0 $1,200,000

HSIP6‐08‐019 No 8 Riverside County SCAG Grapefruit Blvd (SR111)/62nd AveInstall traffic signal; upgrade railroad crossing; widen roadway; and install other safety improvements $1,357,600 $1,221,800 $135,800 $171,000 $0 $0 $1,050,800 $0 $1,221,800

HSIP7‐08‐018 No 8 Riverside County SCAG

The proposed project is located on Cajalco Road, between a point approx. 1,000' west ofBrown Street and a approx. point 1,000' east of Day Street, in the Perris area of Unincorporated Riverside County. 

Roadway improvements to accommodate a two‐way left‐turn lane, traffic signal modifications $4,789,400 $3,680,460 $1,108,940 $0 $0 $0 $0 $3,680,460 $3,680,460

HSIP7‐08‐019 No 8 Riverside County SCAG

Project is located at 2 separate locations; Harrison St between 54th Ave and 81st Ave(Thermal area), and San Timoteo Canyon Rd between Redlands Blvd and the City of Beaumont limits (Moreno Valley area). 

Conduct a Roadway Safety Audit, install centerline rumble stripe, upgrade painted edgelinewith thermoplastic striping, and install/upgrade signs with new fluorescent sheeting (regulatory or warning) $985,800 $887,220 $98,580 $153,000 $0 $0 $734,220 $0 $887,220

HSIP4‐07‐009 7 Rosemead SCAG SR 19 (Rosemead Blvd.) between Valley Blvd. and the RR grade crossing at Grand Ave. Construct sidewalks; install safety lighting and bike lanes; upgrade traffic signals $479,400 $430,900 $48,500 $23,803.18 $0 $0 $407,096.82 $0 $430,900

HSIP7‐07‐025 No 7 Rosemead SCAG At the intersection of Mission Dr/Ivar Ave. Install pedestrian HAWK system $241,300 $241,300 $0 $0 $0 $0 $241,300 $0 $241,300

H8‐07‐046 No 7 San Fernando SCAG

Nine (9) intersections along the Metrolink rail corridor (1st St at Hubbard Ave & MaclayAvenue; San Fernando Rd at Brand Blvd, Hubbard Ave & Maclay Ave; and Truman St at Brand Blvd, Hubbard Ave, Maclay Ave & Wolfskill St).

Install larger signal heads, additional street lighting, and protected left turn phase signals where left turn lanes already exist. $1,096,000 $1,096,000 $0 $0 $1,096,000 $0 $0 $0 $1,096,000

HSIP7‐07‐026 No 7 San Fernando SCAGGlen Oaks Boulevard, from Hubbard St. in the west (western city limit) and Arroyo St. in east (eastern city limit)

Install protective left turn phasing at intersections, installation of raised medians at approaches, and the improvement of signal hardware $1,380,400 $1,380,400 $0 $0 $0 $0 $0 $1,380,400 $1,380,400

H8‐07‐047 No 7 San Gabriel SCAG Intersection of San Gabriel Blvd and Roses Road.Install a pedestrian actuated overhead flashing beacon with pedestrian crossing signage, curb ramps, pedestrian ahead signage, etc.  $270,200 $270,200 $0 $0 $270,200 $0 $0 $0 $270,200

HSIP7‐07‐027 No 7 San Gabriel SCAG

Located in the City of San Gabriel, which included 4 spot location improvements at theintersections of Las Tunas Dr/Mission Drive, Las Tunas Dr/Del Mar Ave, Las Tunas Dr/Country Club Dr, & San Gabriel Blvd/Live Oak St.

Installation of safety enhancements (ex: left turn phasing, RRFB, at existing uncontrolled crosswalks) $569,800 $569,800 $0 $0 $0 $0 $569,800 $0 $569,800

H8‐08‐023 No 8 San Jacinto SCAG Sanderson Avenue between Ramona Expressway and Cottonwood Avenue.

Widen paved shoulders, install crash impact attenuators around fixed objects, installcenterline rumble strips, add safety lighting, install radar speed limit signs and re‐stripe roadway. $1,011,600 $820,440 $191,160 $0 $0 $820,440 $0 $0 $820,440

H8‐12‐014 No 12 Santa Ana SCAG Intersection of Main Street and 15th Street. Install a new traffic signal. $408,800 $408,800 $0 $0 $0 $408,800 $0 $0 $408,800

Page 8 of 10 Printed On:  4/11/2018

#19-00 SCAG015_HSIP

Page 234: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Division of Local Assistance Highway Safety Improvement Program (HSIP)2019 SCAG FTIP (SCAG015) Back-Up List, sorted by MPO, Agency and Unique Project ID

Unique Project ID HR3Eligibility* District Agency MPO Project Location Description of Work Current Total Project

Cost EstimateCurrent Programmed

Federal Funds Other/Local FundsFederal Funds

Programmed under "Prior"

Federal Funds Programmed in

2018/19

Federal Funds Programmed in

2019/20

Federal Funds Programmed in

2020/21

Federal Funds Programmed in

2021/22

Approved Federal Funds

H8‐12‐015 No 12 Santa Ana SCAG Intersections of 1st Street at Jackson Street and 5th Street at Euclid Street.Install left turn phasing (east and west directions at 1st Street at Jackson Street and north and south directions at 5th Street and Euclid Street). $726,200 $726,200 $0 $0 $0 $726,200 $0 $0 $726,200

HSIP7‐12‐009 No 12 Santa Ana SCAG At 74 intersections located within the City of Santa AnaUpgrade non‐standard 8 inch vehicle head with 12 inch vehicle head assembly and associated hardware $655,600 $655,600 $0 $0 $0 $0 $0 $655,600 $655,600

HSIP7‐12‐010 No 12 Santa Ana SCAG At 14 uncontrolled crosswalks within the City of Santa AnaInstallation of rectangular rapid flashing beacons, advanced "yield" markings, additional striping and signage  $545,400 $545,400 $0 $0 $0 $0 $0 $545,400 $545,400

HSIP7‐12‐011 No 12 Santa Ana SCAG East and west directions at Euclid Street and Hazard Avenue. Installation of left turn phasing for east and west directions $306,400 $306,400 $0 $54,000 $0 $0 $252,400 $0 $306,400

HSIP7‐12‐012 No 12 Santa Ana SCAG Along Flower Street from Civic Center Drive to Warner AveInstallation of bicycle lanes along 2.5 mile corridor of Flower Street and protected left turn phasing at two intersections $945,000 $850,500 $94,500 $0 $0 $0 $0 $850,500 $850,500

H8‐07‐048 No 7 Santa Clarita SCAGSoledad Canyon Road at the intersections of Oak Springs Canyon Road, Rue Entree, Flowerpark Drive, Poppy Meadow Street, and Shadow Pines Boulevard.

Replace existing permissive and protected‐permissive signal traffic controls with protected left‐turn phases. $519,700 $519,700 $0 $0 $519,700 $0 $0 $0 $519,700

H8‐07‐049 No 7 Santa Clarita SCAG Various locations throughout the City. Upgrade existing guardrail and end treatments.  $1,182,500 $1,182,500 $0 $0 $1,182,500 $0 $0 $0 $1,182,500

HSIP7‐07‐028 No 7 Santa Clarita SCAG

Intersections of Copper Hill Drive/Copperstone Drive, Copper Hill Drive/Camino del ArteDrive,  McBean Parkway/Summerhill Lane, and Soledad Canyon Road/Gailxy Avenue in the City of Santa Clarita

Modify intersections, including revising existing raised medians on major streets to createdirectional openings to restrict left‐turns from the minor street, and provide for circulation changes.  $263,400 $204,660 $58,740 $0 $0 $0 $204,660 $0 $204,660

HSIP7‐07‐029 No 7 Santa Clarita SCAG Intersection of Seco Canyon Road and Garzota Drive in the City of Santa ClaritaModify existing signal traffic controls to provide protected left‐turn phase for northbound and southbound left‐turn movements. $211,300 $200,800 $10,500 $0 $0 $0 $200,800 $0 $200,800

HSIP7‐07‐030 No 7 South El Monte SCAGThe intersections of Santa Anita Avenue with Klingerman Street, Rush Street, and Central Avenue

Provide protected left turn phases at all three intersections; convert signals to mast armson the Klingerman Street approaches at the Santa Anita Avenue and Klingerman Street intersection. $597,000 $537,300 $59,700 $0 $0 $0 $537,300 $0 $537,300

H8‐07‐050 No 7 South Gate SCAG Long Beach Boulevard between Santa Ana Street and Tweedy Boulevard. Construct raised center median, re‐stripe roadway corridor, and adjust utilities to grade. $1,650,900 $371,452.50 $165,090 $0 $0 $371,452.50 $0 $0 $1,485,810

HSIP7‐07‐033 No 7 South Gate SCAG On Garfield Avenue between Southern Avenue and Howery Street Construct raised center median  $1,710,700 $1,539,630 $171,070 $0 $0 $0 $0 $1,539,630 $1,539,630

HSIP6‐07‐050 No 7 South Pasadena SCAG Mission St/Diamond Ave, Mission St/Fairview Ave, and Fremount Ave/Lyndon St Upgrade crosswalks; Install in‐roadway warning lights  $264,962 $238,465 $26,497 $30,000 $211,465 $0 $0 $0 $211,465

HSIP7‐07‐034 No 7 South Pasadena SCAG On Fair Oaks Avenue between Huntington Drive and Hope Street.

Improve signal timing on Fair Oaks Avenue between Huntington Drive and Hope StreetProvide software updates to existing signal controllers. Implement advance loop detection on Fair Oaks Avenue. $315,900 $315,900 $0 $47,500 $0 $0 $268,400 $0 $315,900

HSIP7‐08‐020 No 8 Temecula SCAGSignalized intersections along the following corridors within the City Limits: Winchester Road, Rancho California Road, and Temecula Parkway. 

Install fiber optic communication system upgrades including: conduit, cable, controllersand related communication equipment to improve safety and operations via optimized traffic signal timing coordination $1,321,200 $1,208,200 $113,000 $0 $0 $0 $0 $1,208,200 $1,208,200

HSIP7‐08‐001 No 8Twentynine Palms SCAG State Route 62 between Encelia Avenue and Larrea Avenue (approximately 0.6 miles).

Install sidewalk infrastructure on the south side of the highway and across a culvert.  Pedestrian crossing signage and high‐visibility crosswalk pavement markings will be installed at Encelia and Larrea Avenues. $783,900 $606,510 $177,390 $0 $0 $0 $0 $606,510 $606,510

H8‐07‐051 Yes 7 Ventura County SCAGPleasant Valley Road between Dodge Road and Hailes Road  (East of the City of Oxnard and State Route 1). Widen pavement and install striping to accommodate two‐way left‐turn lane. $1,312,000 $975,000 $337,000 $0 $0 $975,000 $0 $0 $975,000

H8‐07‐052 Yes 7 Ventura County SCAG Intersection of Las Posas Road at Fifth Street (South of the City of Camarillo).

Construct raised median; construct pavement; pavement delineation, striping, and signing;signal modifications; replace longer single railroad gate with two shorter opposing gates for southbound traffic only (northerly leg only of intersection). $870,000 $757,500 $112,500 $0 $0 $757,500 $0 $0 $757,500

HSIP7‐07‐035 No 7 Ventura County SCAGThe project is located in the unincorporated area of Ventura County known as the Yerba Buena Area on Yerba Buena Road, Deer Creek Road, Pacific View Road, and Cotharin Road.Install 12,000 lf of guardrail at various locations on four roadways $1,370,000 $1,370,000 $0 $200,000 $0 $0 $0 $1,170,000 $1,370,000

H8‐07‐053 No 7 Whittier SCAG Forty (40) signalized intersections within the City of Whittier.Install LED countdown pedestrian heads, Accessible Pedestrian Signals (APS) with ADA compliant push buttons. $256,000 $250,000 $6,000 $0 $250,000 $0 $0 $0 $250,000

H8‐07‐054 No 7 Whittier SCAGLa Serna Drive from Whittier Boulevard (State Route 72) to Youngwood Drive adjacent to La Serna High School.

Construct new sidewalks and ADA compliant wheelchair access ramps; install new centerline striping, Class II Bike Lanes, Sharrow pavement markings & Signing. $134,000 $120,600 $13,400 $0 $120,600 $0 $0 $0 $120,600

H8‐07‐055 No 7 Whittier SCAG Twenty‐two (22) various locations of guard rails within the City of Whittier. Upgrade guardrails. $363,000 $363,000 $0 $0 $0 $363,000 $0 $0 $363,000

Page 9 of 10 Printed On:  4/11/2018

#19-00 SCAG015_HSIP

Page 235: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

Caltrans Division of Local Assistance Highway Safety Improvement Program (HSIP)2019 SCAG FTIP (SCAG015) Back-Up List, sorted by MPO, Agency and Unique Project ID

Unique Project ID HR3Eligibility* District Agency MPO Project Location Description of Work Current Total Project

Cost EstimateCurrent Programmed

Federal Funds Other/Local FundsFederal Funds

Programmed under "Prior"

Federal Funds Programmed in

2018/19

Federal Funds Programmed in

2019/20

Federal Funds Programmed in

2020/21

Federal Funds Programmed in

2021/22

Approved Federal Funds

H8‐08‐024 No 8 Wildomar SCAG Various locations throughout the City of Wildomar. Upgrade existing guardrails and associated improvements. $177,800 $177,800 $0 $0 $177,800 $0 $0 $0 $177,800

H8‐08‐025 0 8 Wildomar SCAG Various locations throughout the City of WildomarInstall pedestrian countdown heads, ADA compliant push buttons, and crosswalk striping and markings. $127,000 $127,000 $0 $0 $127,000 $0 $0 $0 $127,000

H8‐12‐016 No 12 Yorba Linda SCAG

Fifty‐two (52) signalized intersections along various streets. Major streets include ImperialHighway, Bastanchury Road, Yorba Linda Avenue, Orangethorpe Avenue, Rose Drive, Prospect Avenue, and Fairmont Boulevard. 

Update existing pedestrian signal heads to be ADA compliant. Update existing pedestrianheads with new countdown sequence modules and push buttons with large button activators. $249,700 $249,700 $0 $0 $249,700 $0 $0 $0 $249,700

H8‐08‐026 No 8 Yucca Valley SCAG Intersections on Yucca Trail between Warren Vista and Avalon Avenue.Widen Yucca Trail to construct left turn lanes along the roadway segment; and widen Warren Vista to construct left turn lanes at the intersection of Yucca Trail. $1,232,400 $1,109,160 $123,240 $0 $0 $1,109,160 $0 $0 $1,109,160

Total(SCAG) $198,806,076 $171,856,208.50 $16,288,610 $5,748,500.18 $46,397,605 $42,420,635.50 $31,401,959.82 $46,024,908 $182,322,566

Page 10 of 10 Printed On:  4/11/2018

#19-00 SCAG015_HSIP

Page 236: FINAL 2019 FEDERAL TRANSPORTATION ...ftip.scag.ca.gov › Documents › F2019-FTIP_ProjectListingB.pdfFINAL 2019 FEDERAL TRANSPORTATION IMPROVEMENT PROGRAM (FISCAL YEAR 2018/19-2023/24)

MAIN OFFICE900 Wilshire Blvd., Ste. 1700 Los Angeles, CA 90017 Phone: (213) 236-1800

IMPERIAL COUNTY REGIONAL OFFICE1503 North Imperial Avenue, Suite 104 El Centro, CA 92243 Phone: (760) 353-7800

ORANGE COUNTY REGIONAL OFFICEOCTA Building 600 South Main Street, Suite 1233Orange, CA 92868 Phone: (714) 542-3687

RIVERSIDE COUNTY REGIONAL OFFICE3403 10th Street, Suite 805 Riverside, CA 92501 Phone: (951) 784-1513

SAN BERNARDINO COUNTY REGIONAL OFFICESanta Fe Depot 1170 West 3rd Street, Suite 140 San Bernardino, CA 92418 Phone: (909) 806-3556

VENTURA COUNTY REGIONAL OFFICE950 County Square Drive, Suite 101 Ventura, CA 93003 Phone: (805) 642-2800

AJ 2810