1 CITY OF PHOENIX REQUEST FOR BIDS AVIATION DEPARTMENT PHOENIX DEER VALLEY AIRPORT (DVT) CONSTRUCT RUN-UP AREAS ADJACENT TO TAXIWAY C DESIGN-BID-BUILD PROJECT NO. AV31000082-1 FAA AIP NO. 3-04-0028-037-2017 July 10, 2017 Pre-Bid Meeting

Upload: others

Post on 06-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

1

CITY OF PHOENIX REQUEST FOR BIDS

AVIATION DEPARTMENT

PHOENIX DEER VALLEY AIRPORT (DVT) CONSTRUCT RUN-UP AREAS ADJACENT TO TAXIWAY C

DESIGN-BID-BUILDPROJECT NO. AV31000082-1 FAA

AIP NO. 3-04-0028-037-2017

July 10, 2017

Pre-Bid Meeting

Page 2: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

2

Emeka Ekpe, Contracts Specialist Point of Contact for RFB QuestionsOffice of the City [email protected] (602) 256-4107

Joanne McLaughlin, Business Relations Programs Assistant Point of Contact for DBE RequirementsEqual Opportunity Department [email protected] (602) 534-1279

Marci Thies, Labor Compliance Supervisor Point of Contact for Labor Compliance / Davis Bacon RequirementsStreet Transportation Department [email protected] (602) 261-8287

Rubben Lolly, Project ManagerAviation Department Representative

Welcome and Introductions

Page 3: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

3

Sign-in please

Sign-in sheet and PowerPoint will be posted on Procurement’s website:http://phoenix.gov/streets/procurement/current-opportunities

Click on respective project, then click on:■ Planholder List ■ RFQ / RFB ■ Addendums / Notifications (if applicable)

Please hold questions until Q&A period

This is the ONLY opportunity to discuss this project with City staff

Meeting Overview

Page 4: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

4

DBE Program Requirements

Labor Compliance / Davis Bacon Requirements

Project Description and Scope of Work

Submittal Requirements

Bids Due Date

Questions?

Agenda

Page 5: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

The City of Phoenix strives to advance the economic growth of businesses through its

Disadvantaged Business Enterprise (DBE) Program.

The City ensures compliance with federal regulations on all federally funded projects.

The City encourages the participation of DBE firms throughout ALL phases of contracts.

DBE Program

Page 6: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

.

The DBE Program provides socially (minority and woman-owned firms) and economically disadvantaged business owners: • Certification• Procurement opportunities• Construction subcontracting utilization• Small business development services • Technical assistance/educational services • Networking opportunities

DBE Program

Page 7: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

DBE Requirements The City has not established a race-and

gender-conscious DBE participation goal Current focus is Small Business Outreach

The FAA approved a triennial DBE goal of 4.44%for fiscal years 2016-19, to be achieved through fosteringSmall Business participation and outreach requirements.

Project is in part funded by FAA and is subject to 49 CFR Part 26 and USDOT DBE Program

Page 8: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

Certified DBE FirmsTo participate in this opportunity as a DBE, only firms certified by the City or

another AZUCP member in the specified scopes of work shall be

considered in calculating DBE participation.

Eligible DBEs can be found at: https://utracs.azdot.gov

Page 9: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

www.azutracs.azdot.govDBE Firms

Page 10: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

OUTREACH EFFORTS-ATTACHMENT AAll Submitters must provide at submittal: Documents in a separate sealed envelope Must complete and submit Columns A – D Failure to submit = Non-Responsive

Above are due at the time of the bid, statement of qualifications,

or proposal submittal.

DBE Requirements

Page 11: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

OUTREACH EFFORTS - ATTACHMENT AAll Submitters must provide within

3 Business Days of the bid deadline:Documents in a separate sealed envelopeMUST complete and submit Columns E and F Submittal of all related Supporting Documentation MUST include:

Copies of the actual solicitations sent to DBEs & Small Businesses Names of the DBEs & Small Businesses whom bidder negotiated with

and the firms that have been selected to participate in the contract MUST demonstrate how, when, and the name of the person to whom

the bidder specifically communicated its selection decisions Outcomes to each DBE and Small Business NOT selected Documentation may be in the form of a letter, e-mail, telephone log, or

other acceptable communication

DBE Requirements

Page 12: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

OUTREACH EFFORTS - ATTACHMENT BSmall Business Utilization Commitment

All Submitters must provide within3 Business Days of the bid deadline:

Documents to be included in the separate sealed envelope

The successful bidder must ensure the DBE and SmallBusiness participation percentages proposed inAttachment A add up to the TOTAL percentage stated inAttachment B

The successful bidder will be contractually obligated toachieve the participation percentage in Attachment B

DBE Requirements

Page 13: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

For more information please contact:

Joanne McLaughlinEqual Opportunity Specialist

[email protected]

Equal Opportunity Department

Page 14: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

QUESTIONS?

Page 15: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

CITY OF PHOENIX LABOR COMPLIANCE OFFICE

Monitors and enforces the federal labor standards on federally funded Capital Improvement Construction.

Applies to all federally funded contracts in excess of $2000 with few exceptions

All contractors and subcontractors, including lower-tiers, working on the project are covered

Page 16: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

DBRA (Davis-Bacon & Related Acts)

Davis-Bacon Act (DBA)

Copeland Anti-Kickback Act

Contract Work Hours and Safety Standards Act (CWHSSA)

Page 17: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

FEDERAL REGULATIONS

Code of Federal Regulations, Title 29 Part 3

Code of Federal Regulations, Title 29 Part 5

FHWA 1273 / LCP Tracker

Wage Decision

Page 18: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

Labor Compliance Pre-Construction Conference

Labor Compliance Office, (602) 261-8287

Websites available:– http://www.dol.gov/dol/esa/programs/dbra

TECHNICAL ASSISTANCE

Page 19: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

19

Labor Compliance Questions

QUESTIONS??

Page 20: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

20

Project Description & Scope of Work

Project Location

Project Description & Scope of Work

Phasing, Job Site Access & Restrictions

Miscellaneous Project Information

Questions

Page 21: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

21

Project Location

Page 22: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

22

Proposed Project Areas

Page 23: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

23

Provide two new aircraft run-up areas at the west and east ends

of Taxiway ‘C’ with associated electrical and signage.

Major work elements include

Demolition of existing run-up area asphaltic concrete (AC)

pavement

Construction of nearly 20,000 SY of new AC Pavement

Excavation of existing west basin to add additional capacity

Grading and drainage improvements

Project Description / Scope of Work

Page 24: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

24

Salvaging (Blade and stockpile along west haul route with

placement of dust palliative) and replacing existing crushed

aggregate(“Palm Springs Rock”) slope protection

Installation of storm drain pipe, manholes and catch basins

Installation of LED and incandescent edge lights

Removal of chain-link fence and installation of approximately

520 feet of CMU block wall

Construction and Removal of two temporary run-up areas,

including removal and replacement of conduit and edge

lights.

Project Description / Scope of Work (Cont)

Page 25: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

25

Project Description / Scope of Work (Cont.) Run Up Area Pavement Section

3” P-401 asphalt over, 5” P-209 aggregate base over, 8” P-155 lime treated subgrade.

Taxiway D Pavement Section 6.5” P-401 asphalt over, 11.5” P-209 aggregate base over, 8” P-155 lime treated subgrade.

Temporary Run-Up Apron Pavement Section 3” P-401 asphalt over, 5” P-208 aggregate base over, 12” P-152 Subgrade Prep

Page 26: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

26

Project Description / Scope of Work (Cont.)

Rocks and cobbles will be encountered and must be removed prior to lime treatment (2-1/2” and larger)

Page 27: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

Phasing ,Job Site Access & Restrictions

27

The Project is divided into 8 phases with subsequent sub phases

Phases 1-4 are located on the west side of the Airport

Phases 5-8 are located on the east side of the Airport

Primary Access for Phases 1 – 4 will be through the access gate

on W Williams Drive to the west staging area.

Primary access for phases 5-8 will be through Airport Access

Gate #7 to the east staging area

Contractor shall limit activities to designated haul routes and

staging areas.

Page 28: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

Phasing ,Job Site Access & Restrictions Cont.

Contractor Shall not use airport service roads for hauling

operations

Some phases require nighttime-work only

Caution should be taken to protect a fiber optic line south of

project area designated for grading and electrical installation.

Contractor is responsible for locating utilities

28

Page 29: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

West Run-Up Area Access and Staging

29

W. Williams Drive

Page 30: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

East Run-Up Area Access and Staging

30

Page 31: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

Project Description - Misc. An airport access badge will be required

Construction equipment cannot traverse on any new

pavement

Airfield lighting and NAVAIDS must remain operational

throughout project

Access to the fueling station must be maintained at all

times

NOTAMS require 72 hour advanced notice

31

Page 32: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

Contractor provide quality controls – City QA

Follow all federal, state and local permitting requirements

Coordinate Owner / Project issues

Maintain a safe & secure work site at all times

Must use the City’s web based project management system:

UNIFIER - Training provided at no cost

NTP will be issued for the Contract once the NTP from FAA

has been issued.

32

Project Description (Documentation)

Page 33: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

Lead Base Paint

Contact Theodore Iniguez (602) 571-2638.

Removal and disposal by others.

Removal during start of each phase.

Contractor to cooperate and provide access.

33

Page 34: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

COP Planning and Environmental

Test for lead and asbestos containing materials

Remove any lead and asbestos containing materials

discovered onsite.

Review all Safety Data Sheets.

Approve locations of all disposal sites.

Approve all materials disposed offsite.

Approve paint materials.

P&E Contact: Theodore Iniguez (602) 571-2638

34

Page 35: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

35

QUESTIONS?

Page 36: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

36

Bidders Should Review: Information for Bidders (IFB) Section:

Bid Submittal ChecklistItems due at time of bid submittal

Post-Bid Submittal ChecklistItems due 3 days after bid opening by 5:00 p.m. AZ Time

E-mail to: [email protected]

Non-Responsive =Failure to provide Bid Bond

Failure to submit all required Bid-and-Post Bid documentsFailure to acknowledge / signatures as required

Page 37: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

37

Receipt of Bid after the specified cut-off date and time

Deposit of Bid in the wrong location

Violating the “Contact with City Employees” policy

Failure to provide Bid Bond

Grounds for Disqualification

Page 38: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

38

2:00 P.M. Arizona local time

Tuesday, July 25, 2017

City Hall, 200 W. Washington Street

6th Floor, Submittal Box

Bid Due Date

Page 39: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

39

https://www.phoenix.gov/streets/procurement/current-opportunities

Request for Qualifications / Request for Bids

Notifications / Addendum (if any)

Plan Holder List

Award / Bid Tabulation

Pre-Bid / Pre-Submittal Power Point Presentation

Pre-Bid / Pre-Submittal Sign-in sheet

Sign up for Procurement Newsletter

Street Transportation DepartmentProcurement Section WEBPAGE

Page 40: Final 6-28-17 Pre-Bid Presentation - AV31000082-1 FAA...2 Emeka Ekpe, Contracts Specialist Point of Contact for RFB Questions Office of the City Engineer emeka.ekpe@phoenix.gov (602)

40

E-mail your questions to:

[email protected] Ekpe

Contract Specialist(602) 256-4107

OPEN FOR QUESTIONS&

Thank You for Attending!!!

Questions After Today