Page 1 Interior BOQ DESCRIPTION UNIT QTY. (FLOORWISE) RATE A TOTAL 1 smt 5 20 50 10 40 125 1a Lumpsum 0 0 0 0 1 1 TOTAL OF (I) DEMOLITION WORKS B PLASTER OF PARIS PUNNING - - 1 smt 0 10 20 10 10 50 - - SR. 8th floor Oval 1st floor Oval 2nd floor Oval Training room Belicia Workstatio n area - Belicia Demolition of existing wall, partitions, panellings, removing existing floor/wall tiles/ marble/stone, skirting and stripping neeru plaster from walls and columns, flooring, framework, doors and windows, frames, shutters, ceiling material, skirting, structural supports, pantry counters, marble / granite, electrical fittings, fixtures, wiring, ducting, grills and all connected plumbing and fixed furniture items such as panelling, partitions etc. and all other items of work and carting away debris from site so that bare site is made available. The contractor should thoroughly examine the complete site, ascertain the value of demolition involved vis a vis the tender and quote as per the floor area and drawing issued and towards jobs to be executed and quote a per sft/L.S. price towards all of the demolition works. This Cutting the glass/Gypsum board wherever Note: Pattas to be paid for separately only on civil areas such as brick work and siporex blocks. Providing and applying 6mm to 12mm thk. Gypsum Plaster to masonry and concrete surfaces, to proper line, level and plumb, finished absolutely smooth. Rate to include all requisite scaffolding, grooves and 'pattas' as indicated and GI edge protection strips on exposed corners. All complete as per Architect's instructions and specifications. Providing and fixing pattas in Gypsum Plaster of sizes upto 100mm - 150mm on walls & all other locations suchas underside of staircases

Upload: sarvajeet-verma

Post on 27-Oct-2015

54 views

Category:

Documents


3 download

DESCRIPTION

Interior decoration work Boq

TRANSCRIPT

Page 1: Final BOQ

Page 1 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

A 8th floor Oval TOTAL

1 smt 5 20 50 10 40 125

1a Cutting the glass/Gypsum board wherever required Lumpsum 0 0 0 0 1 1

TOTAL OF (I) DEMOLITION WORKS

B PLASTER OF PARIS PUNNING - -

1 smt 0 10 20 10 10 50

- -

1st floor Oval

2nd floor Oval

Training room Belicia

Workstation area -Belicia

Demolition of existing wall, partitions, panellings, removing existing floor/wall tiles/ marble/stone, skirting and stripping neeru plaster from walls and columns, flooring, framework, doors and windows, frames, shutters, ceiling material, skirting, structural supports, pantry counters, marble / granite, electrical fittings, fixtures, wiring, ducting, grills and all connected plumbing and fixed furniture items such as panelling, partitions etc. and all other items of work and carting away debris from site so that bare site is made available. The contractor should thoroughly examine the complete site, ascertain the value of demolition involved vis a vis the tender and quote as per the floor area and drawing issued and towards jobs to be executed and quote a per sft/L.S. price towards all of the demolition works. This however shall also include discounts towards all fixed and loose furniture items, values which may be recovered by the contractor upon selling. All complete as per Architects instructions.

Note: Pattas to be paid for separately only on civil areas such as brick work and siporex blocks.

Providing and applying 6mm to 12mm thk. Gypsum Plaster to masonry and concrete surfaces, to proper line, level and plumb, finished absolutely smooth. Rate to include all requisite scaffolding, grooves and 'pattas' as indicated and GI edge protection strips on exposed corners. All complete as per Architect's instructions and specifications. Providing and fixing pattas in Gypsum Plaster of sizes upto 100mm - 150mm on walls & all other locations suchas underside of staircases or as indicated by architect as per design upto 12mm thk. Pattas to have either straight or bevelled edge as per drawing or as per Architects instructions and specifications.

Page 2: Final BOQ

Page 2 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

C STONE FLOORING, DADO, SKIRTING - -

Flooring material shall be 19 mm or 20 mm thick. - General Notes : -

i) -

ii) -

iii) -

iv) -

v) -

vi) -

vii) -

viii) -

ix) -

x) -

xi) -

xii) -

xiii) -

xiv) All flooring to be machine cut. - xv) -

xvi) -

Mode of Measurement:i) All marble over 150mm in width to be measured in sft. ii) All marble below upto 150mm width to be measured in rft.iii) For curved flooring, circular and elliptical shapes etc. plines on computer to be furnished and measurements to be on the basis of the same.iv) All wastages as per design should be on account of the contractor. All basic prices to include all applicable taxes and to be for prices delivered to sit, including all cartage upto respective floors.

All flooring to be of samples and lots approved by Architect. All lots to be consistent. Sorting to be done by Contractor to ensure that marble laid in various areas is consistent with in the vicinity. Lots should not be mixed within one zone. Architects approval to be sought on sorting of all marbles..

Joint patterns to be followed. No extra cuts for variable joint patterns, shall be paid for wastage.

Flooring to be continuously protected with POP over plastic of good quality throughout construction procedure and re - polished with tin - oxide etc. after uncovering and to be delivered in a finished condition free of scratches, lines and any other deformities.

All procured flooring materials must necessarily be pre- polished.

All composite marble should be coated with Aquamix or equivalent sealants, to provide a five year guarantee. Marble should be coated from below, on the thickness as well as from above and in between joints of adjacent slabs.

All dados may have marbles with 'V' grooves of variable thicknesses & 'L' grooves at junctions or bevelled or profiled edges at junctions.

For bigger grooves in marble cladding in height, extra plaster to be paid for separately. However, no extras for grooves & profiling & polishing of marble. This is incase wherever full marble thickness is seen over grooves.

All joints to be repainted in same colour as marble or any varying colour as per instructions of architect.

Skirtings to have profiled edges upto 6mm , 12mm or 19mm , as per Architects instructions. No extra cost to be paid for plaster chipping, required to adjust skirtings levels. However, cost of mouldings to be indicated separately, so as to deduct cost towards the same, incase profiling is avoided.

No extra cost towards grooves at junction of marble and surface above, whether gypsum or carpentered items.

All SS required towards cladding of onyx, to be of grade 304 and to be profiled in shapes as required. Basic cost of steel labour to be indicated separately per kg. & shop drawing to be approved by Architect prior to commencement.

For all marble / granite to be dry clad, stainless steel brackets to be used. Marble / Granite to be atleast 1 1/2: thk. No grooves and profiling to be paid for separately. Shop drawing for cladding procedure, to be approved by Architect.

All onyx to have 12mm thk. Clear perspex as a backing for reinforcement for cladding, wherever backlit or otherwise. Cost to include cost of perspex. However, perspex cost to be separately indicated in case not used.

All necessary cut outs in walls, clearing up plaster towards work required for services, not to be paid for separately, even if it is conducted subsequent to work completion. No extra for marble cutting, edge finishing required for junction boxes of electrical works, etc.

Basic prices indicated are for purposes of calculating percentage marble in composite patterns and shall not be paid separately.

Page 3: Final BOQ

Page 3 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

xvii) -

- -

1 smt 0 15 0 0 0 15

- -

D TILED FLOORING, DADO, SKIRTING - -

1 smt 0 0 15 5 10 30

- - - -

TOTAL OF CIVIL WORKS (B+C+D) - - -

E PAINTING AND POLISHING WORKS - -

1 smt 10 20 75 50 125 280

- 2 smt 5 5 25 10 20 65

- 3 smt 0 0 5 10 10 25

- TOTAL OF (E) PAINTING & POLISHING WORKS -

- F FALSE CEILING WORKS -

- Note : - * Ceiling to be paid as per area (Pline on computer) in plan only. -

-

-

Rates requested in tender towards pattas lesser than 150mm are to be applied only incase of deviation.

Providing and Laying Vinyl Flooring of approved sample. Basic cost Rs. 100/- per sq.ft.

Note: Tiles to be approved by the Architect. All flooring to be protected by P.O.P. over plastic during construction. Flooring to be handed over free of scratches and cracks etc. Tiles to be neatly cut at Junction Box locations. Tiles should have 57% recycled content.

Providing and laying approved, 600mm x 600mm Vitrified Tile flooring over 38mm thk. 1:6 cement (20% fly-ash cement to be used) slurry. Flooring to be laid in proper line and level. Top layer for fixing to be 6mm thk. white cement (20% fly-ash cement to be used) float 1:4. Flooring to be in proper line, level and all joints to be of same colour as flooring and to be repointed in white cement (20% fly-ash cement to be used). Cost to also include neat cutting of tiles at all junction box locations . Fooring to be handed over in finished conditon, free from cracks. All complete as per Architect's instructions & specifications.Basic cost of Vitrified Tiles @ Rs.70/- per sft .

Providing and Applying Royal Shine paint (VOC content for non-flat paints - 150 g/l and VOC for flat paints - 50 g/l) of approved make and shade on wall. Rate to include sand papering to clean the surface, applying double boiled linseed oil / cement (20% fly-ash cement to be used) primer and lambi putty to full surface 3 times thereafter painting in 3 coats of paint. All complete as per Architect's instructions and specifications.

Providing and applying paint in ceiling as per specification and approved sample.

Providing and Applying Textured paint (VOC content for non-flat paints - 150 g/l and VOC for flat paints - 50 g/l) of approved make & shades to walls / partitions including surface preparation, as per manufacturers specifications etc. All complete as per Architects instructions and specifications.

* No vertical dimensions of Gypsum ceiling behind cornices to be paid for separately.

*Cost of ceiling also to include providing grooves at junctions of Gypsum & wooden ceiling & all other places wherever required as per instructions of architect.

Page 4: Final BOQ

Page 4 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

-

-

-

-

- 1 smt 5 3 20 10 10 48

- -

sq. mtr 5 7 0 10 20 42

- TOTAL OF (F) FALSE CEILING WORKS -

- G CARPENTRY -

- a PANELLING:- - 1. smt 0 20 0 20 40 80

-

Cost of ceiling to include cost of lighting troughs, coffers, pattas, verticals,grooves etc complete. Cost also to include Cornices on verticals of lighting troughs also flat verticals.

For circular, elliptical ceilings/lighting troughs, P lines on computers shall determine areas.

False Ceiling material to be post consumer / post industrial. Recycle content (25% to 40%).

Acoustic Ceiling to have zero VOC, rapidaly renewable (cotton fabric).

Providing and fixing 12mm thk. plain Gypsum False Ceiling manufactured by Gypsum India on G.I. frame work, in G.I. vertical supports at every 450mm c/c and horizontal runners at every 900mm c/c in brass screws to proper line and level.Cost to be inclusive of making holes and required framing for fixing electrical fix-tures, A.C. grills etc. Area of electrical fixtures will be paid full with ply on top of ceiling fixed to G.I. supports to receive spotlights including cutting hole etc., complete. G.I. metal frame to be of 22 gauge folded strip of 50mm width to be used. All complete as per Architects instructions and specifications. The grid of frame work to be supported at every 1500mm x 1500mm interval by M.S. Rod anchored to the slab to support the G.I. framework. All vertical G.I. framework to be anchored to the slab by means of anchor fasteners including all lighting troughs, coffers, cornices and all other related works.

ARMSTRONG SUSPENSION SYSTEM accessories manufactured and supplied by Armstrong World Industries consisting of M6 Anchor Fasteners with Vertical Hangers made of Galvanised steel of size 26 x 26 x 25 x 1.2mm with a Galvanised Thickness of 80gsm, A pre Straightened Hanger wire of dia – 2.68 mm of 1.83 m length., thickness of 80gsm and a tensile strength of 344-413 MPa, along with Adjustable hook clips of 0.8mm thick, galvanised spring steel for 2.68 mm with a minimum pull strength of 110 kg. The adjustable clip also consists of a 3.5 mm aquiline wire to be used with the main runner.

Providing, constructing & fixing panelling in 50mm x 38mm section or aluminium framework of 50mm x 25mm section at every 600mm c/c covered with 12 mm thk. of approved make. Pattern of panelling to be as indicated in drawing with extra pattas MDF of required thickness to be provided so as to produce dubbed panel as required.However cost for pattas to be reimbursed seperately if exceeding width of 150mm MDF panelling to be finished in veneer, laminate, gypsum board, fabric over soft board or mirror as indicated. Grooves to be provided at junction of skirting & flooring to enable carpets to slide in. Cost also to include 50mm thick glass wood insulation.

Panelling to be paid for only upto bottom of cornices below ceiling. MDF panelling to be as per elevations indicated in drawing & required surface differences not to be paid for separately. Thicker localized panelling for achieving line,level, plumb in case of workmanship differences not to be paid for separately. Only elevational surface of panelling to be measured upto a thickness of 75mm. For thickness exceeding 75mm side surfaces to form quantities in Sq.mt.

Page 5: Final BOQ

Page 5 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

-

-

- 3 smt 0 0 5 5 5 15

4 smt 25 0 0 0 0 25

- -

Cost also to include 50mm thick glass wool insulation as required and as per specification mentioned in Volume II.

Panelling to be paid for only on civil items and not on existing partitions. For thickness of panelling quantities upto 75mm thk. to be included in cost of panelling. For borders from 75mm to 150mm cost that of skirting cost; and for thickness exceeding 150mm, panelling to be measured on Sq.mt. basis (conversion). Cost also to include providing grooves and pattas in MDF, wherever required so as to produce dubbed panel as required in existing panelling, wherever required.

Providing, constructing and fixing in place bandsof width 450 mm and thickness of 75 mm to have necessary wooden framing to get desired rounding and to be covered with 6mm thk. recycled MDF.

Providing, constructing & fixing in place 10mm thk. frosted toughned glass (specified in suggested vendors list) panelling with necessary metal frame work to hold the glass and to be away from the back of the wall/partitions by 50mm. Cost of the glass panelling to also include the 38mm wide brushed finished stainless steel patti at equal intervals as per approved design and as per instructions.

Page 6: Final BOQ

Page 6 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

b PARTITIONS - -

1 Smt. 0 0 10 0 0 10

- -

2 smt 0 0 4 0 0 4

- FINISHING ITEMS: - FOR PANELLING & PARTITIONS -

- -

- -

1 -

Basic cost of veneer @Rs.100/- per sft. smt 0 0 7 0 0 7 -

2 smt 0 0 7 0 0 7

- - - -

H DOORS AND FRAMES - i Notes : - ii -

iii -

iv -

v -

-

- I FRAMES. - 1 nos 2 1 0 0 2 5

- II DOORS:- -

- -

FINISHING ITEMS FOR DOORS : - -

2 smt 10 5 0 0 10 25

- I STORAGE - i NOTES: -

Providing , constructing and fixing in place gypsum board partition of overall thickness of 75mm. Partition to have 12mm thk. Gypboard covering done from both sides on existing support members of the partition over the false ceiling. Cost to be inclusive of 50mm thk.glass wool insulation

Providing, constructing and fixing in place Sliding folding partition of partly glazed with proper aluminum sections. The glass would be covered with the privacy film.

Note: Pattas and all other surfaces in excess of 150mm to be converted to Sq.Ft. for mode of measurement. Surfaces upto 75mm not to be considered separately for measuremen

Providing & fixing veneer over existing MDF panelling / partition as per design and/or instructions of architects & finishing the same with melamine polished.

Do-do as above but with 1.5mm laminate of make Greenlam/VIR/Formica/Décor Plus or equivalent Basic cost of laminate Rs. 1000 per sheet

Cost of wood frame for glass partitions to be included in cost of glass partitions.

All doors to have concealed door closures of Dorma or equivalent make.

For doors in tiolets or places where floor spring boxes cannot be installed, concealed door closures of Dorma or equivalent make to be provided.

Frames for doors within wooden partitions to be included in the cost of partitions.

All doors to have Door Locks of Golden/Dorset/Kich or equivalent make.

Providing, constructing & fixing in place CP Teak door with frame 900mm x 2400mm in wood of overall thickness 600mm x 1800mm with necessary rebates of 12mm to 19mm x 38mm as per thickness of door with moulding at edge of frame. Frame to be secured into brick/siporex wall by means of M.G. fishtailed holdfasts 3 nos. on each side 225mm x 450mm x 150mm.

Providing and fixing with 1.5mm laminate of make Greenlam/VIR/Formica/Décor Plus or equivalent.

Page 7: Final BOQ

Page 7 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

ii -

iii -

iv -

v -

-

- -

1 rmt 0 0 5 0 0 5

- -

- 2 smt 0 0 10 10 0 20

- 3 Rate only -

-

-

-

- -

J TABLES - -

All hardware including handles, hinges, locks, sliding channels, castors etc. to be of approved make and finish as per instructions of the Architect.

All exposed surfaces of MDF/particle board (prelaminated eco-board/rapidly renewable wood) to be finished with 1mm thick laminate of approved shade & finish. All internal surfaces of ply/particle board to be finished with 1mm thick laminate of approved shade and finish or with approved balancing laminate in case of prelaminated particle board. All complete as per the instructions of the Architect.

All exposed edges of MDF/particle board (prelaminated eco-board/rapidly renewable wood) to be finished with PVC lipping of approved finish and thickness. All complete as per instructions of the Architect.

Rate to include all requisiet grooves of dimensions as indicated by the Architect at site whether or not incorporated in the drawing or its bills of quantities.

Drawer with in built filing system to accommodate one row of files.

Providing and constructing pelmets in 19 mm thk. MDF inner surface of the pelmet to be finished with enamel paint.

Note:- 1.5mm thk. laminate of Alphaica, Virlaminate or Greenlam make to be approved by Client before procurement.

Providing, constructing and fixing in place storage units 375mm deep to be made of 19mm thk prelaminated MDF in white laminated with shutters in cp teaking framing and 6mm thk MDF on both sides inside to be prelaminated white laminted and outside to be finished in approved laminate. Cost also to include recycled wood edges and lipping patti as per drawing and as per Architect's instructions. Storage unit to have provision of 8 mm thk and 150 mm wide frosted glass panelling at equal intervals. Glass panel to be openable type vaulted by means of 12mm dia brush s.s. studs at top and bottom to access light behind. Side or two ends of the storage to have provision of indirect lighting as indicated in the drawings. Storage to have provision for shelves in prelaminated MDF as per requirement and as per architects instructions. Cost to be inclusive of all grooves as indicated SOS hinges, godrej multi purpose rocks, ball catch, s.s. finish handles etc. where ever required.

Providing, constructing & fixing in place storage cupboards 375 mm deep as per drawings to be constructed of 19 mm thk. commercial ply to be finished with 1.5 mm thk. laminate of approved make.

Legs & base to be as per drawing constructed of 1st B.T.C. to be melamine polished. Skirting of storage to be dubbed in by a requisite dimension & groove 19 mm to 25 mm to be provided to enable carpet to slide in. Cost of storage to include cost of all verticals in commercial ply & folding shelves in commercial ply as required for placement of files.

Provisions of space for printers to be made as indicated in drawing with all necessary cut-outs to enable paper rolls to be connected to printer etc. complete. Brass couplings of 25 mm width to be provided around cut-out as shown in the drawings.

Cost also to include postformed edges on top of storage all around . Also to be included is pattas, inlay pattis and grooves wherever required.

Page 8: Final BOQ

Page 8 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

-

- 1 No. 0 0 1 0 0 1

-

-

-

-

-

- -

2 No. 0 0 1 0 0 1

-

- TOTAL OF CARPENTARY -

- K Nos. 0 0 0 20 5 25

L Removing the existing workstations and fixing it another area Nos. 0 3 3 0 3 9 with electrical connections of Raw, UPS, Data/Voice, floorchipping etc.

M MISCELLANEOUS. - - -

1 smt15

0 0 20 0 35

2 Vertical Blinds of Vista make with basic cost Rs. 100 per sq. ft. 0 0 10 0 0 10

TOTAL OF (L) MISCELLANEOUS

GRAND TOTAL

Cost of table also to include cost of 100mm high fasia above table finished in 1.5mm thk. laminate on front and on edges.

Providing and constructing Reception table of size 1200 x 750mm (approx) to be constructed as follows:

Table to be in 2 levels. Upper level at 1050mm height to be in marble with appropriate M.S. frame work.

Lower level to be 750mm high with top in 25mm thk. MDF finished in laminate of appvd. Sample. Sides of the table to eb finished in polished steel. Table to have 2 sets of pedestal units with drawers as per requirement.

Provision of cutouts in tables to be made wherever required for pulling of wires etc. and the same to have brass couplings of and appropraite gauge, shape and size as instructed by the architect. Provision of C.P.U. and all other equipment to be made by addition of shelves as required. Storage width 450mm x 675mm ht. one for every 1200mm length.

All hardware in brass with hinges of SOS type of sheraton make. Cost to include cost of handles, knobs, locks etc. and as per architect's instructions.

Please note that the size is approximate and may change by few inches based on site conditions

Do-do as 1 but Security table 1200 x 500mm (approx) to be finished in veneer and melamine polished. Table to have provision for drawers and storage unit as require. Cost to be inclusive of hardware.

Please note that the size is approximate and may change by few inches based on site conditions

Providing & installing the Workstation of size 1200 mm x 600mm using 75mm framework in aluminum of height 1200mm & the table top in particle board finished in Laminate of approved shape & the bottom panels are made of prelaminated boards & the table top panels will be fabric, Filled with Acoustical Tile solution without glass wool to provide, Keyboard tray, soft board & the white board with wire management at the skirting lvl for data & power below the table top . Between two workstation a fabric panel partition of 75mm thk should be introduced.Pedestal of 2 ft ht included,raw power,ups power and voice provisions included.

Safety film on glass ( basic cost of the film is around 60 to 65 rs. per sq. ft.)

Page 9: Final BOQ

Page 9 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

A 8th floor Oval TOTAL

1 smt 5 20 50 10 40 125

1a Cutting the glass/Gypsum board wherever required Lumpsum 0 0 0 0 1 1

TOTAL OF (I) DEMOLITION WORKS

B PLASTER OF PARIS PUNNING - -

1 smt 0 10 20 10 10 50

- -

1st floor Oval

2nd floor Oval

Training room Belicia

Workstation area -Belicia

Demolition of existing wall, partitions, panellings, removing existing floor/wall tiles/ marble/stone, skirting and stripping neeru plaster from walls and columns, flooring, framework, doors and windows, frames, shutters, ceiling material, skirting, structural supports, pantry counters, marble / granite, electrical fittings, fixtures, wiring, ducting, grills and all connected plumbing and fixed furniture items such as panelling, partitions etc. and all other items of work and carting away debris from site so that bare site is made available. The contractor should thoroughly examine the complete site, ascertain the value of demolition involved vis a vis the tender and quote as per the floor area and drawing issued and towards jobs to be executed and quote a per sft/L.S. price towards all of the demolition works. This however shall also include discounts towards all fixed and loose furniture items, values which may be recovered by the contractor upon selling. All complete as per Architects instructions.

Note: Pattas to be paid for separately only on civil areas such as brick work and siporex blocks.

Providing and applying 6mm to 12mm thk. Gypsum Plaster to masonry and concrete surfaces, to proper line, level and plumb, finished absolutely smooth. Rate to include all requisite scaffolding, grooves and 'pattas' as indicated and GI edge protection strips on exposed corners. All complete as per Architect's instructions and specifications. Providing and fixing pattas in Gypsum Plaster of sizes upto 100mm - 150mm on walls & all other locations suchas underside of staircases or as indicated by architect as per design upto 12mm thk. Pattas to have either straight or bevelled edge as per drawing or as per Architects instructions and specifications.

AMOUNT

-

- - -

- - -

-

- -

Page 10: Final BOQ

Page 10 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

C STONE FLOORING, DADO, SKIRTING - -

Flooring material shall be 19 mm or 20 mm thick. - General Notes : -

i) -

ii) -

iii) -

iv) -

v) -

vi) -

vii) -

viii) -

ix) -

x) -

xi) -

xii) -

xiii) -

xiv) All flooring to be machine cut. - xv) -

xvi) -

Mode of Measurement:i) All marble over 150mm in width to be measured in sft. ii) All marble below upto 150mm width to be measured in rft.iii) For curved flooring, circular and elliptical shapes etc. plines on computer to be furnished and measurements to be on the basis of the same.iv) All wastages as per design should be on account of the contractor. All basic prices to include all applicable taxes and to be for prices delivered to sit, including all cartage upto respective floors.

All flooring to be of samples and lots approved by Architect. All lots to be consistent. Sorting to be done by Contractor to ensure that marble laid in various areas is consistent with in the vicinity. Lots should not be mixed within one zone. Architects approval to be sought on sorting of all marbles..

Joint patterns to be followed. No extra cuts for variable joint patterns, shall be paid for wastage.

Flooring to be continuously protected with POP over plastic of good quality throughout construction procedure and re - polished with tin - oxide etc. after uncovering and to be delivered in a finished condition free of scratches, lines and any other deformities.

All procured flooring materials must necessarily be pre- polished.

All composite marble should be coated with Aquamix or equivalent sealants, to provide a five year guarantee. Marble should be coated from below, on the thickness as well as from above and in between joints of adjacent slabs.

All dados may have marbles with 'V' grooves of variable thicknesses & 'L' grooves at junctions or bevelled or profiled edges at junctions.

For bigger grooves in marble cladding in height, extra plaster to be paid for separately. However, no extras for grooves & profiling & polishing of marble. This is incase wherever full marble thickness is seen over grooves.

All joints to be repainted in same colour as marble or any varying colour as per instructions of architect.

Skirtings to have profiled edges upto 6mm , 12mm or 19mm , as per Architects instructions. No extra cost to be paid for plaster chipping, required to adjust skirtings levels. However, cost of mouldings to be indicated separately, so as to deduct cost towards the same, incase profiling is avoided.

No extra cost towards grooves at junction of marble and surface above, whether gypsum or carpentered items.

All SS required towards cladding of onyx, to be of grade 304 and to be profiled in shapes as required. Basic cost of steel labour to be indicated separately per kg. & shop drawing to be approved by Architect prior to commencement.

For all marble / granite to be dry clad, stainless steel brackets to be used. Marble / Granite to be atleast 1 1/2: thk. No grooves and profiling to be paid for separately. Shop drawing for cladding procedure, to be approved by Architect.

All onyx to have 12mm thk. Clear perspex as a backing for reinforcement for cladding, wherever backlit or otherwise. Cost to include cost of perspex. However, perspex cost to be separately indicated in case not used.

All necessary cut outs in walls, clearing up plaster towards work required for services, not to be paid for separately, even if it is conducted subsequent to work completion. No extra for marble cutting, edge finishing required for junction boxes of electrical works, etc.

Basic prices indicated are for purposes of calculating percentage marble in composite patterns and shall not be paid separately.

AMOUNT

- -

- - -

-

-

-

-

-

-

-

-

-

-

-

-

- -

-

Page 11: Final BOQ

Page 11 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

xvii) -

- -

1 smt 0 15 0 0 0 15

- -

D TILED FLOORING, DADO, SKIRTING - -

1 smt 0 0 15 5 10 30

- - - -

TOTAL OF CIVIL WORKS (B+C+D) - - -

E PAINTING AND POLISHING WORKS - -

1 smt 10 20 75 50 125 280

- 2 smt 5 5 25 10 20 65

- 3 smt 0 0 5 10 10 25

- TOTAL OF (E) PAINTING & POLISHING WORKS -

- F FALSE CEILING WORKS -

- Note : - * Ceiling to be paid as per area (Pline on computer) in plan only. -

-

-

Rates requested in tender towards pattas lesser than 150mm are to be applied only incase of deviation.

Providing and Laying Vinyl Flooring of approved sample. Basic cost Rs. 100/- per sq.ft.

Note: Tiles to be approved by the Architect. All flooring to be protected by P.O.P. over plastic during construction. Flooring to be handed over free of scratches and cracks etc. Tiles to be neatly cut at Junction Box locations. Tiles should have 57% recycled content.

Providing and laying approved, 600mm x 600mm Vitrified Tile flooring over 38mm thk. 1:6 cement (20% fly-ash cement to be used) slurry. Flooring to be laid in proper line and level. Top layer for fixing to be 6mm thk. white cement (20% fly-ash cement to be used) float 1:4. Flooring to be in proper line, level and all joints to be of same colour as flooring and to be repointed in white cement (20% fly-ash cement to be used). Cost to also include neat cutting of tiles at all junction box locations . Fooring to be handed over in finished conditon, free from cracks. All complete as per Architect's instructions & specifications.Basic cost of Vitrified Tiles @ Rs.70/- per sft .

Providing and Applying Royal Shine paint (VOC content for non-flat paints - 150 g/l and VOC for flat paints - 50 g/l) of approved make and shade on wall. Rate to include sand papering to clean the surface, applying double boiled linseed oil / cement (20% fly-ash cement to be used) primer and lambi putty to full surface 3 times thereafter painting in 3 coats of paint. All complete as per Architect's instructions and specifications.

Providing and applying paint in ceiling as per specification and approved sample.

Providing and Applying Textured paint (VOC content for non-flat paints - 150 g/l and VOC for flat paints - 50 g/l) of approved make & shades to walls / partitions including surface preparation, as per manufacturers specifications etc. All complete as per Architects instructions and specifications.

* No vertical dimensions of Gypsum ceiling behind cornices to be paid for separately.

*Cost of ceiling also to include providing grooves at junctions of Gypsum & wooden ceiling & all other places wherever required as per instructions of architect.

AMOUNT

-

- - -

- -

-

- -

-

- - -

- -

- -

- -

- - - - -

-

-

Page 12: Final BOQ

Page 12 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

-

-

-

-

- 1 smt 5 3 20 10 10 48

- -

sq. mtr 5 7 0 10 20 42

- TOTAL OF (F) FALSE CEILING WORKS -

- G CARPENTRY -

- a PANELLING:- - 1. smt 0 20 0 20 40 80

-

Cost of ceiling to include cost of lighting troughs, coffers, pattas, verticals,grooves etc complete. Cost also to include Cornices on verticals of lighting troughs also flat verticals.

For circular, elliptical ceilings/lighting troughs, P lines on computers shall determine areas.

False Ceiling material to be post consumer / post industrial. Recycle content (25% to 40%).

Acoustic Ceiling to have zero VOC, rapidaly renewable (cotton fabric).

Providing and fixing 12mm thk. plain Gypsum False Ceiling manufactured by Gypsum India on G.I. frame work, in G.I. vertical supports at every 450mm c/c and horizontal runners at every 900mm c/c in brass screws to proper line and level.Cost to be inclusive of making holes and required framing for fixing electrical fix-tures, A.C. grills etc. Area of electrical fixtures will be paid full with ply on top of ceiling fixed to G.I. supports to receive spotlights including cutting hole etc., complete. G.I. metal frame to be of 22 gauge folded strip of 50mm width to be used. All complete as per Architects instructions and specifications. The grid of frame work to be supported at every 1500mm x 1500mm interval by M.S. Rod anchored to the slab to support the G.I. framework. All vertical G.I. framework to be anchored to the slab by means of anchor fasteners including all lighting troughs, coffers, cornices and all other related works.

ARMSTRONG SUSPENSION SYSTEM accessories manufactured and supplied by Armstrong World Industries consisting of M6 Anchor Fasteners with Vertical Hangers made of Galvanised steel of size 26 x 26 x 25 x 1.2mm with a Galvanised Thickness of 80gsm, A pre Straightened Hanger wire of dia – 2.68 mm of 1.83 m length., thickness of 80gsm and a tensile strength of 344-413 MPa, along with Adjustable hook clips of 0.8mm thick, galvanised spring steel for 2.68 mm with a minimum pull strength of 110 kg. The adjustable clip also consists of a 3.5 mm aquiline wire to be used with the main runner.

Providing, constructing & fixing panelling in 50mm x 38mm section or aluminium framework of 50mm x 25mm section at every 600mm c/c covered with 12 mm thk. of approved make. Pattern of panelling to be as indicated in drawing with extra pattas MDF of required thickness to be provided so as to produce dubbed panel as required.However cost for pattas to be reimbursed seperately if exceeding width of 150mm MDF panelling to be finished in veneer, laminate, gypsum board, fabric over soft board or mirror as indicated. Grooves to be provided at junction of skirting & flooring to enable carpets to slide in. Cost also to include 50mm thick glass wood insulation.

Panelling to be paid for only upto bottom of cornices below ceiling. MDF panelling to be as per elevations indicated in drawing & required surface differences not to be paid for separately. Thicker localized panelling for achieving line,level, plumb in case of workmanship differences not to be paid for separately. Only elevational surface of panelling to be measured upto a thickness of 75mm. For thickness exceeding 75mm side surfaces to form quantities in Sq.mt.

AMOUNT

-

-

-

-

- -

-

-

- - - - -

-

Page 13: Final BOQ

Page 13 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

-

-

- 3 smt 0 0 5 5 5 15

4 smt 25 0 0 0 0 25

- -

Cost also to include 50mm thick glass wool insulation as required and as per specification mentioned in Volume II.

Panelling to be paid for only on civil items and not on existing partitions. For thickness of panelling quantities upto 75mm thk. to be included in cost of panelling. For borders from 75mm to 150mm cost that of skirting cost; and for thickness exceeding 150mm, panelling to be measured on Sq.mt. basis (conversion). Cost also to include providing grooves and pattas in MDF, wherever required so as to produce dubbed panel as required in existing panelling, wherever required.

Providing, constructing and fixing in place bandsof width 450 mm and thickness of 75 mm to have necessary wooden framing to get desired rounding and to be covered with 6mm thk. recycled MDF.

Providing, constructing & fixing in place 10mm thk. frosted toughned glass (specified in suggested vendors list) panelling with necessary metal frame work to hold the glass and to be away from the back of the wall/partitions by 50mm. Cost of the glass panelling to also include the 38mm wide brushed finished stainless steel patti at equal intervals as per approved design and as per instructions.

AMOUNT

-

-

-

-

- -

Page 14: Final BOQ

Page 14 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

b PARTITIONS - -

1 Smt. 0 0 10 0 0 10

- -

2 smt 0 0 4 0 0 4

- FINISHING ITEMS: - FOR PANELLING & PARTITIONS -

- -

- -

1 -

Basic cost of veneer @Rs.100/- per sft. smt 0 0 7 0 0 7 -

2 smt 0 0 7 0 0 7

- - - -

H DOORS AND FRAMES - i Notes : - ii -

iii -

iv -

v -

-

- I FRAMES. - 1 nos 2 1 0 0 2 5

- II DOORS:- -

- -

FINISHING ITEMS FOR DOORS : - -

2 smt 10 5 0 0 10 25

- I STORAGE - i NOTES: -

Providing , constructing and fixing in place gypsum board partition of overall thickness of 75mm. Partition to have 12mm thk. Gypboard covering done from both sides on existing support members of the partition over the false ceiling. Cost to be inclusive of 50mm thk.glass wool insulation

Providing, constructing and fixing in place Sliding folding partition of partly glazed with proper aluminum sections. The glass would be covered with the privacy film.

Note: Pattas and all other surfaces in excess of 150mm to be converted to Sq.Ft. for mode of measurement. Surfaces upto 75mm not to be considered separately for measuremen

Providing & fixing veneer over existing MDF panelling / partition as per design and/or instructions of architects & finishing the same with melamine polished.

Do-do as above but with 1.5mm laminate of make Greenlam/VIR/Formica/Décor Plus or equivalent Basic cost of laminate Rs. 1000 per sheet

Cost of wood frame for glass partitions to be included in cost of glass partitions.

All doors to have concealed door closures of Dorma or equivalent make.

For doors in tiolets or places where floor spring boxes cannot be installed, concealed door closures of Dorma or equivalent make to be provided.

Frames for doors within wooden partitions to be included in the cost of partitions.

All doors to have Door Locks of Golden/Dorset/Kich or equivalent make.

Providing, constructing & fixing in place CP Teak door with frame 900mm x 2400mm in wood of overall thickness 600mm x 1800mm with necessary rebates of 12mm to 19mm x 38mm as per thickness of door with moulding at edge of frame. Frame to be secured into brick/siporex wall by means of M.G. fishtailed holdfasts 3 nos. on each side 225mm x 450mm x 150mm.

Providing and fixing with 1.5mm laminate of make Greenlam/VIR/Formica/Décor Plus or equivalent.

AMOUNT

- - -

-

-

- - - - -

- - -

- - -

- - - - - -

-

-

-

-

- - -

- - - - - - -

- - -

Page 15: Final BOQ

Page 15 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

ii -

iii -

iv -

v -

-

- -

1 rmt 0 0 5 0 0 5

- -

- 2 smt 0 0 10 10 0 20

- 3 Rate only -

-

-

-

- -

J TABLES - -

All hardware including handles, hinges, locks, sliding channels, castors etc. to be of approved make and finish as per instructions of the Architect.

All exposed surfaces of MDF/particle board (prelaminated eco-board/rapidly renewable wood) to be finished with 1mm thick laminate of approved shade & finish. All internal surfaces of ply/particle board to be finished with 1mm thick laminate of approved shade and finish or with approved balancing laminate in case of prelaminated particle board. All complete as per the instructions of the Architect.

All exposed edges of MDF/particle board (prelaminated eco-board/rapidly renewable wood) to be finished with PVC lipping of approved finish and thickness. All complete as per instructions of the Architect.

Rate to include all requisiet grooves of dimensions as indicated by the Architect at site whether or not incorporated in the drawing or its bills of quantities.

Drawer with in built filing system to accommodate one row of files.

Providing and constructing pelmets in 19 mm thk. MDF inner surface of the pelmet to be finished with enamel paint.

Note:- 1.5mm thk. laminate of Alphaica, Virlaminate or Greenlam make to be approved by Client before procurement.

Providing, constructing and fixing in place storage units 375mm deep to be made of 19mm thk prelaminated MDF in white laminated with shutters in cp teaking framing and 6mm thk MDF on both sides inside to be prelaminated white laminted and outside to be finished in approved laminate. Cost also to include recycled wood edges and lipping patti as per drawing and as per Architect's instructions. Storage unit to have provision of 8 mm thk and 150 mm wide frosted glass panelling at equal intervals. Glass panel to be openable type vaulted by means of 12mm dia brush s.s. studs at top and bottom to access light behind. Side or two ends of the storage to have provision of indirect lighting as indicated in the drawings. Storage to have provision for shelves in prelaminated MDF as per requirement and as per architects instructions. Cost to be inclusive of all grooves as indicated SOS hinges, godrej multi purpose rocks, ball catch, s.s. finish handles etc. where ever required.

Providing, constructing & fixing in place storage cupboards 375 mm deep as per drawings to be constructed of 19 mm thk. commercial ply to be finished with 1.5 mm thk. laminate of approved make.

Legs & base to be as per drawing constructed of 1st B.T.C. to be melamine polished. Skirting of storage to be dubbed in by a requisite dimension & groove 19 mm to 25 mm to be provided to enable carpet to slide in. Cost of storage to include cost of all verticals in commercial ply & folding shelves in commercial ply as required for placement of files.

Provisions of space for printers to be made as indicated in drawing with all necessary cut-outs to enable paper rolls to be connected to printer etc. complete. Brass couplings of 25 mm width to be provided around cut-out as shown in the drawings.

Cost also to include postformed edges on top of storage all around . Also to be included is pattas, inlay pattis and grooves wherever required.

AMOUNT

-

-

-

-

-

- - -

- -

- -

- -

-

-

-

- -

Page 16: Final BOQ

Page 16 Interior BOQ

SR. NO. DESCRIPTION UNIT QTY. (FLOORWISE) RATE

-

- 1 No. 0 0 1 0 0 1

-

-

-

-

-

- -

2 No. 0 0 1 0 0 1

-

- TOTAL OF CARPENTARY -

- K Nos. 0 0 0 20 5 25

L Removing the existing workstations and fixing it another area Nos. 0 3 3 0 3 9 with electrical connections of Raw, UPS, Data/Voice, floorchipping etc.

M MISCELLANEOUS. - - -

1 smt15

0 0 20 0 35

2 Vertical Blinds of Vista make with basic cost Rs. 100 per sq. ft. 0 0 10 0 0 10

TOTAL OF (L) MISCELLANEOUS

GRAND TOTAL

Cost of table also to include cost of 100mm high fasia above table finished in 1.5mm thk. laminate on front and on edges.

Providing and constructing Reception table of size 1200 x 750mm (approx) to be constructed as follows:

Table to be in 2 levels. Upper level at 1050mm height to be in marble with appropriate M.S. frame work.

Lower level to be 750mm high with top in 25mm thk. MDF finished in laminate of appvd. Sample. Sides of the table to eb finished in polished steel. Table to have 2 sets of pedestal units with drawers as per requirement.

Provision of cutouts in tables to be made wherever required for pulling of wires etc. and the same to have brass couplings of and appropraite gauge, shape and size as instructed by the architect. Provision of C.P.U. and all other equipment to be made by addition of shelves as required. Storage width 450mm x 675mm ht. one for every 1200mm length.

All hardware in brass with hinges of SOS type of sheraton make. Cost to include cost of handles, knobs, locks etc. and as per architect's instructions.

Please note that the size is approximate and may change by few inches based on site conditions

Do-do as 1 but Security table 1200 x 500mm (approx) to be finished in veneer and melamine polished. Table to have provision for drawers and storage unit as require. Cost to be inclusive of hardware.

Please note that the size is approximate and may change by few inches based on site conditions

Providing & installing the Workstation of size 1200 mm x 600mm using 75mm framework in aluminum of height 1200mm & the table top in particle board finished in Laminate of approved shape & the bottom panels are made of prelaminated boards & the table top panels will be fabric, Filled with Acoustical Tile solution without glass wool to provide, Keyboard tray, soft board & the white board with wire management at the skirting lvl for data & power below the table top . Between two workstation a fabric panel partition of 75mm thk should be introduced.Pedestal of 2 ft ht included,raw power,ups power and voice provisions included.

Safety film on glass ( basic cost of the film is around 60 to 65 rs. per sq. ft.)

AMOUNT

-

-

-

-

-

- - - -

-

-

Page 17: Final BOQ

BILL OF QUANTITY OF ELECTRICAL WORK FOR PROPOSED OFFICE OF CRISIL.

SR. DESCRIPTION OF ITEM UNIT QTY. RATE (Rs.) AMOUNT (Rs.)NO. MAT. INST. TOTAL MAT. INST. TOTAL

1 POINT WIRING :1.1 Supply & Installation of concealed point wiring using

600V grade 1.5 sqmm copper conductor PVC insulated wires (with proper R,Y,B color code ) pulled through

for drops to light fittings) laid concealed over false ceiling or in wall chases including circuit wires from the relevant DB and also including insulated green color copper earth wire for each circuit and providing modular grid plate type switches,sockets (MK-Wraparound/Legrand/ Clipsal/ABBROMA-Tressa/Siemens/Equivalent Approved by Consultant)Each light point to be terminated using 5A connector or 5Atwo/three pin female socket as directed at site. Each circuit feeding not more than 12 points/800 watts asper following configuration:(DBs located at locations )

1.1.1 Primary/First light point including the cost of 5A switchas described above Pts 3 0 0 0 0

1.1.2 Secondary light points looped from the above primary point Pts 15 0 0 0 0

1.1.3 Primary/First light point directly taken from DB withoutany switch (emergency lights) Pts 2 0 0 0 0

1.1.4 Secondary light points looped from the above primary point Pts 4 0 0 0 0

1.1.5 5A plug point on wall/skirting etc. for general purpose, circuit from the PDB (international socket)( up to 4 points looped) including cost of socket and switch. Pts 6 0 0 0 0

1.1.6 15A Plug Point directly taken from DB using 2.5 Sqmm wires Pts 9 0 0 0 0

1.2 S & I of UPS Power point wiring for points on workstations

copper conductor PVC sheathed white color flexible cable pulled through already laid floor raceways and taken upto table top using metal rigid or flexible conduits run within

wired together forming one point. .Switch & Sockets to be of same make as per item 1.1 above. The earth wire of 3 core flexible cable to be of yellow-green color only. Cost to include white colour flexible cable + switch-sockets + flex conduit. Each table to be taken as one point. (ONLY Six tables served by one circiut from UPSDB) Pts 45 0 0 0 0

1.3 S & I of medium guage M.S. conduits including all accessories, clamps, spacers, bends, tee, cross etc. as required at site for miscellaneous use in following sizes:

1.3.1 20mm dia Mtr-RO

1.3.2 25mm dia Mtr 80

1.3.3 40mm dia Mtr 35

1.3.4 50mm dia Mtr- RO

as required at site for miscellaneous use in following sizes:1.3.a S & I of medium guage PVC conduits including all

accessories, clamps, spacers, bends, tee, cross etc. as required at site for miscellaneous use in following sizes:

1.3.1a 20mm dia Mtr-RO

1.3.2a 25mm dia Mtr 80

1.3.3a 40mm dia Mtr 50

1.3.4a 50mm dia Mtr- RO

1.4 S & I of DB 8-Way, SPN having (UPS power)a) 1 No., 15A, DP, Isolator as Incomerb) 6 Nos., 15 A, SP, MCB Outgoing(Make: Hager/Siemens/Legrand/Schneider) Full Set as above Set 1

1.5 S & I of DB similar to above but 8-Way, SPN having below mentioned switchgears for PDB

b) 6 Nos., 15 A, SP, MCB Outgoing(Make: Hager/Siemens/Legrand/Schneider) Full Set as above Set 1

1.6 S & I of DB similar to above but 8-Way, SPN having below mentioned switchgears for ACDBa) 1 No., 40A, DP, ELCB(100mA) Incomerb) 6 Nos., 15 A, SP, MCB Outgoing(Make: Hager/Siemens/Legrand/Schneider) Full Set as above Set 1

1.7 S & I of 32A/ 40A, Double Pole MCB in powder coated metal box for supplying power to AC units. Nos 1

1.8 S & I of 10/15/20A,DP,MCB , in powder coated metal box for supplying power to equipment etc. Nos 3

1.9 S & I of 25A,DP, MCB , in powder coated metal box for supplying power to equipment etc. Nos 2

2 Removal of Input/output breaker of 40 and 20 kVA UPS and reinstallation of same on 1st floor. Lumpsump

2.1 Power Cabling for Input and Output of 40 and 20 kVA UPS at 1st floor Lumpsump2.2 Lumpsump

3 Supply installation of 2 x 2 electrical fitting. Make Wipro/Bajaj nos. 4

4 Nos. 150

medium guage M S conduits (including flexible conduits

for Pantry/hand dryer / zerox machine/Ac units etc.(two points per Ckt) including cost of switch socket.

/ table for computers using 3C X 1.5 Sqmm copper

partitions.Each point consisting of 3 nos.of international sockets controlled by 1no 5A, switch located below the table

a) 1 No., 32A, DP, DP, ELCB(100mA) Incomer

Removing the electrical cable from Ground floor Electrical room, shifting to 2nd floor/1st floor , redirecting the cable laying etc.

SITC of Data/Voice point ( supply of CAT6 UTP cable, IOs, faceplate-4port) , surface box/ concealed box etc. Laying of Cat6 UTP Cable per point, Numbering of Cables both the ends, Termination of Information Outlet, Jackpanel, Fixing of Faceplates, Labelling of Faceplates and Jackpanels, testing of all the above by means of Fluke tester, Installation of Patchcords, dressing of the same. (Each workstation will have 2 data/2 voice points)- total workstations -35 nos.

D49
Ajay Kamble: Belicia : 20 points in training room/recreation room. 1st floor : UPS room- 2no. Hub room- 2 no., workstation area - 3 nos. 2nd floor- workstation area - 2 no. Siva's cabin and admin team room : 10 nos., Reception : 4 nos.
Page 18: Final BOQ

BILL OF QUANTITY OF FIRE & SECURITY SYSTEMS FOR M/s CRISIL LTD.

Sr. Item Qty. Unit Supply (Rs.)

No. Unit Rate Amount

MAKE: BOSCH PUBLIC ADDRESS SYSTEM

1 1 Lumpsum

2

150 Mtr

POLYCAB/CALLIPLAST/KEI/RR

3

100 Mtr

4

a GI Perforated Cable trays -100x 35 50 Mtrs

b GI Perforated Cable trays -200x 35 25 Mtrs

c Powder Coated 18 Gauge Truncking - 200 x 5025 Mtrs

Profab / Hitech

Total

Removal & reInstallation Testing ,commissioning of , PA system complete as per Clients Instructions:

Control Cables : 2C x 1.0 mm2, Stranded Copper conductor,Type AST 1 PVC insulated, Armoured FRLS Cable 650 V as per IS 1554, with GI saddle spacers every 0.3 mtr with Single compression Cable Glands, ABS Junction Boxes (wherever required), terminals, Ferruling complete.

CAT-5 Cable in Medium MS Conduits with Saddle Spacers at every 0.3 Mtr completeGI Cable trays/Truncking with wall/ceiling mounted C clamps.

Page 19: Final BOQ

BILL OF QUANTITY OF FIRE & SECURITY SYSTEMS FOR M/s CRISIL LTD.

Installation (Rs.)

Unit Rate Amount

Page 20: Final BOQ

BILL OF QUANTITY OF FIRE & SECURITY SYSTEMS FOR M/s CRISIL LTD.

Sr. Item Qty. Unit Supply (Rs.) Installation (Rs.)

No. Unit Rate Amount Unit Rate

FIRE ALARM SYSTEM

1

1 Set

2

a GI Perforated Cable trays -100x 3550 Mtrs

b GI Perforated Cable trays -200x 3525 Mtrs

c25 Mtrs

Profab / Hitech

3

150 Mtrs

4

150 Mtrs

POLYCAB/CALLIPLAST/KEI/RR

Total

Removal & reInstallation Testing ,commissioning of , Analouge Addressable Main Fire Alarm with Power supply & battery backup and repeater fire panel complete as per Clients Instructions:

GI Cable trays/Truncking with wall/ceiling mounted C clamps.

Powder Coated 18 Gauge Truncking - 200 x 50

Control Cables : 2C x 1.5 mm2, Stranded Copper conductor,Type AST 1 PVC insulated,Armoured FRLS Cable 650 V as per IS 1554, with GI saddle spacers every 0.3 mtr with Single compression Cable Glands, ABS Junction Boxes (wherever required ), terminals, Ferruling complete.

Control Cables : 2 PAIR x 1.5 mm2, Stranded Copper conductor,Type AST1 PVC insulated,Armoured FRLS Cable 650 V as per IS 1554, with GI saddle spacers every 0.3 mtr with Single compression Cable Glands, ABS Junction Boxes (wherever required), terminals, Ferruling complete.

Page 21: Final BOQ

BILL OF QUANTITY OF FIRE & SECURITY SYSTEMS FOR M/s CRISIL LTD.

Installation (Rs.)

Amount

Page 22: Final BOQ

BILL OF QUANTITY OF FIRE & SECURITY SYSTEMS FOR M/s CRISIL LTD.

Sr. Item Qty. Unit Supply (Rs.) Installation (Rs.)

No. Unit Rate Amount Unit Rate

CARD ACCESS CONTROL SYSTEM

1

8 Input / Output card per controller

Automatic locking & unlocking of the doors

4 Readers 1 Set

2 Reader 1 SetSOLUS - IPW 04

2 2 No

HID

3 6 No

BEL

4 L or Z Bracket 6 No

DORMA/SB/INGERSOLRAND

5 6 No

11 6 No

12

a 8 c x 0.75 Sq.mm 150 Mtrs

b 4c x 0.75 Sq.mm 100 Mtrsc 2c x 0.75 Sq.mm 50 Mtrs

POLYCAB/CALLIPLAST/KEI/RR

13

150 Mtrs

BEC / WIMCO / AKG

Total

Removal & reInstallation Testing ,commissioning of ,CCTV complete as per Clients Instructions:

Local, Global, Soft, Hard Anti-pass back supported

Smart Card Reader (iClass reader) - 3" Read Range

Electromagneitc Lock with builtin Magnetic contacts Doors. 600 lbs capacity

Emergency Release Switch in Green Polycarbonate housing,push to breakglass type.

iClass smart cards (2 KB, 2 applications) (Corporate 1000 format)

AB Copper flexible Cable PVC insulated, shielded FRLS Sheathed layed in below 25/20 mm MS Conduit

ISI Marked MS Conduits-25 mm with fittings and flexible conduits for all drops complete with GI saddle and spacers @ 0.3 mtr

Page 23: Final BOQ

BILL OF QUANTITY OF FIRE & SECURITY SYSTEMS FOR M/s CRISIL LTD.

Installation (Rs.)

Amount

Page 24: Final BOQ

BILL OF QUANTITY OF FIRE & SECURITY SYSTEMS FOR M/s CRISIL LTD.

Sr.

No.

12

6

Page 25: Final BOQ

BILL OF QUANTITY OF FIRE & SECURITY SYSTEMS FOR M/s CRISIL LTD.

Item

CCTV Surveillance System

Removal & reInstallation Testing ,commissioning of CCTV system complete as per Clients Instructions:RG 6 Co axial cable GI wire FRLS Armoured Cable with G.I Saddles & Spacers at 0.3 mtrPolycab/Uniflex/Calliplast/KEI

2 Core x 0.75 Sq.mm sheathed FRLS Armoured Cable Polycab/Uniflex/Calliplast/KEI

Total

Page 26: Final BOQ

BILL OF QUANTITY OF FIRE & SECURITY SYSTEMS FOR M/s CRISIL LTD.

Qty. Unit Supply (Rs.) Installation (Rs.)

Unit Rate Amount Unit Rate Amount (D)

1 Nos200 Mtrs

200 Mtrs

Page 27: Final BOQ

Description Qty Units Cost (In Rs.)

Rate Amount

1.0 Supply of split AC unit

Supply, installation, testing & commissioning of split AC.The units should be complete with indoor unit,condensing unit, Controls, control panel, control wiring betweenindoor and outdoor unit, power cabling in between the outdoor unitsand the isolator/ MCB, insulated refrigerant piping, drain piping. Thewiring and insulated refrigerant piping should be based on thedistance between indoor unit and condensing unit as 30 Rmt. Theinsulated drain piping to be PVC 40mm dia. for 1 unit being 15Maway. The insulated drain piping to be PVC 40mm dia All the drainpipes shall be properly insulated with 13mm thick closed celltubular Armaflex insulation. Units shall have cordless remote. Yourprice should include refrigerant and drain piping necessaryinsulation for discharge, suction line and drain line & cabling basedon power being provided within 2M of the indoor unit

1.1 Supply of 1.0 TR Split AC unit 1 Nos.

1.2 Supply of 1.5 TR Split AC unit 2 Nos.

1.3 Supply of 2.0 TR Split AC unit 1 Nos.

1.4 Installation of 1.0 TR split AC unit 1 Nos.

a Voltage Stabilizer

b Installation Charges

c Copper Piping

d Interconecting cable

e Drai n Pipe

f G.I Stand duly epoxy painted for condenser unit

1.5 Installation of 1.5 TR split AC unit 2 Nos.

a Voltage Stabilizer

b Installation Charges

c Copper Piping

d Interconecting cable

e Drain Pipe

f G.I Stand duly epoxy painted for condenser unit

1.6 Installation of 2.0 TR split AC unit 1 Nos

a Voltage Stabilizer

b Installation Charges

c Copper Piping

d Interconecting cable

e Drain Pipe

f G.I Stand duly epoxy painted for condenser unit

1.7 Removing, of existing Split/Window AC unit

a 1 TR 1 Nos

b 1.5 TR 1 Nos

c 2 TR 1 Nos

TOTAL

2.0 SHEET METAL WORKS

2.1 Fabrication, supply, installation, testing &commissioning ofGI ducting completewith splitter dampers, turningvanes,access doors, supports etc. as per as per site conditions

a 1.2mm thk Plenum 5 Sq.mt.b 1.0mm Ducting 3 Sq.mt.c 0.8mm Ducting 5 Sq.mt.d 0.63mm Ducting 2 Sq.mt.

All the supports of the duct will be galvanised threaded rods andchannelsM.S. Angle flanges for ducting

2.2 Insulation

a

6mm thick 15 sq.mt

2.3 Grilles/Diffusers

a Aluminium supply & return Air sloted Diffusers . QR Nob Aluminium supply air diffuser with damper QR Noc Aluminium supply air grill with damper QR Nod Aluminium return air grill without damper QR No

Note If required Contractor should blank off the extra portion of grillewithout additional cost and provide deflection of 0 deg or 30 degwithout extra cost

2.4 Supply, installation, testing and commissioning of return air louvers 10 Sq.mt.

2.5 Silicon sealant for longitudinal joints as per specification. 1 Lot

TOTAL

Sr. No.

Providing and fixing closed cell Nitrile insulation 9m.m thick on duct complete as per specification and drawings.

Providing, fixing, testing and commissi-oning supply and return air grilles/ diffusers as per specifications and drawings including fixing frame of G.I./wooden in false ceiling/walls.

Page 28: Final BOQ

Description Qty Units Cost (In Rs.)

Rate

1.0 700 sq.ft

2.0 Installation of carpet 700 sq.ft.

TOTAL

Sr. No.

Supply of carpets at site (Tile format. Basic cost of Carpet- Rs. 80/sq.ft) to match the existing shade and type of the installed carpet tiles at various locations.

Page 29: Final BOQ

Cost (In Rs.)

Amount