final brt corridor line3 v4-f1.pdf (01)
DESCRIPTION
Line3TRANSCRIPT
Airport Railway Station
32
1
SHEET OF
PLANE NUMBER:
1
CONTENTS:DATE:
MARCH 2013
NAME OF DRAWING:
ALIGNMENT.DWG
0
SCALES:
ORIGINAL A-3 GRAPHICS
PLAN VIEW
CONSULTANTS:CLIENT/OWNER:
BRT AND CORRIDOR RESTRUCTURING IMPLEMENTATION STUDY
AND PRELIMINARY DESIGN WORK FOR THE UTTARA -
- MOHAKHALI - RAMNA - SADARGHAT CORRIDOR IN DHAKA
1:2000
LEGEND:
1. Right of Way
2. Proposed pavement edge
3. Proposed road marking
4. Proposed cycle lane
5. Footpath edge
6. Proposed BRT lane
7. Proposed General Traffic lane
8. Proposed Flyover
9. Proposed BRT staton
10. Proposed pedestrian area
11. Underpass access
01