final design of cathodic protection system for the west

13
Authorize final design of Cathodic Authorize final design of Cathodic Authorize final design of Cathodic Authorize final design of Cathodic Protection System for the West Valley Protection System for the West Valley Feeder No 2 Feeder No 2 Feeder No. 2 Feeder No. 2 Corporate Resources Group December 2009

Upload: others

Post on 18-Dec-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Authorize final design of CathodicAuthorize final design of CathodicAuthorize final design of Cathodic Authorize final design of Cathodic Protection System for the West Valley Protection System for the West Valley Feeder No 2Feeder No 2Feeder No. 2Feeder No. 2

Corporate Resources Group December 2009

Appropriate Appropriate $240,000 in $240,000 in budgeted fundsbudgeted funds

Authorize final design of a Cathodic Protection SystemAuthorize final design of a Cathodic Protection SystemAuthorize final design of a Cathodic Protection System Authorize final design of a Cathodic Protection System for the West Valley Feeder No. 2 Pipelinefor the West Valley Feeder No. 2 Pipeline

Corporate Resources Group December 2009

CASTAIC DAM& LAKE

West Valley Feeder No. 2

MORRIS RESERVOIR

LIVE OAK RESERVOIR

SILVERWOODLAKE

Upper FeederRialto

Santa A

na

* Jensen Plant

LAKEPERRIS

GARVEY RESERVOIR

Middle

Feeder

Lower

Upper

Valley

Calabasas  Feeder

LAKEMATHEWS

DIAMOND VALLEY LAKE

EL TORO

SANTIAGO RESERVOIR

PERRIS

Colorado River

EL TORO RESERVOIR

LAKE SKINNERSAN JOAQUIN RESERVOIR

Corporate Resources Group December 2009

CASTAIC DAM& LAKE

West Valley Feeder No. 2

MORRIS RESERVOIR

LIVE OAK RESERVOIR

SILVERWOODLAKE

Upper FeederRialto

Santa A

na

*

LAKEPERRIS

GARVEY RESERVOIR

Middle

Feeder

Lower

Upper

Valley

Calabasas  Feeder

•• 8.78.7--mile longmile long•• 103103--inch diam. welded steel pipeinch diam. welded steel pipe

LAKEMATHEWS

DIAMOND VALLEY LAKE

EL TORO

SANTIAGO RESERVOIR

PERRIS

Colorado River•• 9696--inch diam. prestressed concrete cylinder pipe (PCCP)inch diam. prestressed concrete cylinder pipe (PCCP)•• Constructed in 1973Constructed in 1973•• Serves San Fernando Valley, western LA County, and Serves San Fernando Valley, western LA County, and southern Ventura Countysouthern Ventura County EL TORO

RESERVOIRLAKE SKINNERSAN JOAQUIN

RESERVOIR

southern Ventura Countysouthern Ventura County

Corporate Resources Group December 2009

Induced stray currents cause corrosion & loss of metal in pipelinep pe e

High voltage power line parallels West Valley Feeder No. 2

Impressed Current Cathodic Protection System installed toImpressed Current Cathodic Protection System installed to protect pipe

Recent developments show Impressed Current CathodicProtection Systems protect steel pipe but cause wires in PCCP to become more brittle

Galvanic Cathodic Protection System does not cause wires to become brittle

Corporate Resources Group December 2009

Replace impressed current cathodic protection Replace impressed current cathodic protection p p pp p psystem with galvanic cathodic protection system system with galvanic cathodic protection system for both welded steel and PCCP sectionsfor both welded steel and PCCP sections•• Install test installation at 1 locationInstall test installation at 1 location•• Perform final design for 26 locationsPerform final design for 26 locations

Corporate Resources Group December 2009

Labor

Owner Costs (Permitting, R‐O‐W, PM) $  79,500

Final Design $112,500

Metropolitan Force Installation (test install) $  12,000

Materials, Supplies & Incidentals $    5,400, pp $ ,

Equipment use $    1,200

Remaining Budget $ 29 400Remaining Budget $  29,400               

TotalTotal $240,000$240,000

Corporate Resources Group December 2009

Estimated Construction Cost Range is $850,00 - $1,000,000

PhasePhase 20102010 2011201120092009

Final Design

Construction

Construction CompletionCompletionBoard Action Final Design

Corporate Resources Group December 2009

Construction CompletionCompletionBoard Action Final Design

Option # 1Option # 1

Adopt CEQA determination

Appropriate $ 240 000 in budgeted fundsAppropriate $ 240,000 in budgeted funds

Authorize final design of a galvanic cathodic protection system for West Valley Feeder No 2system for West Valley Feeder No. 2 

Option # 2

Do not authorize final design phase activitiesDo not authorize final design phase activities 

Corporate Resources Group December 2009

Option #1

Corporate Resources Group December 2009

Corporate Resources Group December 2009

AC Power Source

Impressed Currents Galvanic Anodes

Rectifier

DC

_

Anode Well+ _

_Pipeline Pipeline

+

Sacrificial Anodes

AnodeGroundbed+

Corporate Resources Group December 2009

Groundbed

GPS antennaGPS antenna

Recording meterRecording meter

ff

Corporate Resources Group December 2009

Reference Reference electrodeelectrode