![Page 1: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/1.jpg)
FINAL DESIGN REPORT/FINALEIS/FINAL SECTION 4(F)
EVALUATION
PIN 0054.05.103NY Route 347 Safety and Mobility Improvement
Project
Northern State Parkway to NY Route 25ATowns of Smithtown, Islip & Brookhaven
Suffolk County
May 2007
Cultural Resources Technical Report
Volume II, Appendix K
U.S. Department of TransportationFederal Highway Administration
NEW YORK STATE DEPARTMENT OF TRANSPORTATIONELIOT SPITZER, Governor ASTRID C. GLYNN, Acting Commissioner
![Page 2: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/2.jpg)
CULTURAL RESOURCES ASSESSMENT
Table of Contents
Appendix A. Letter from NYSOPRHP, dated July 14, 1995. Appendix B. Letter from New York State Museum, dated October 23, 2006. Appendix C. Correspondence between NYSOPRHP, NYSM and NYSDOT concerning
eligibility of architectural sites. Appendix D. Correspondence between NYSOPRHP, NYSM and NYSDOT concerning
eligibility of archeological sites, MOA, and Data Recovery Plan. Appendix E. NYS OPRHP adverse effect determination & MOA with Findings
Documentation and ACHP recommendations. Appendix F. Letter from ACHP declining further involvement. Appendix G. FHWA Findings Concurrence Request. Appendix H. Sensitive Material Documents1. Appendix I. Letter from FHWA, dated March 29, 2007 [Concurrence with 36 CFR Part 800]
1 Sensitive Material Documents have been excluded from the FEIS and have been made part of the Administrative Record. These documents can not be released under the Freedom of Information Law (FOIL), but can be obtained upon request, when deemed appropriate.
![Page 3: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/3.jpg)
APPENDIX A: Letter from NYSOPRHP, dated July 14, 1995.
![Page 4: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/4.jpg)
![Page 5: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/5.jpg)
APPENDIX B: Letter from New York State Museum, dated October 23, 2006.
![Page 6: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/6.jpg)
![Page 7: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/7.jpg)
APPENDIX C: Correspondence between NYSOPRHP, NYSM and NYSDOT concerning eligibility of architectural sites.
![Page 8: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/8.jpg)
![Page 9: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/9.jpg)
![Page 10: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/10.jpg)
![Page 11: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/11.jpg)
APPENDIX D: Correspondence between NYSOPRHP, NYSM and NYSDOT concerning eligibility of archeological sites, MOA, and Data Recovery Plan.
![Page 12: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/12.jpg)
![Page 13: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/13.jpg)
![Page 14: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/14.jpg)
![Page 15: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/15.jpg)
![Page 16: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/16.jpg)
APPENDIX E: NYS OPRHP adverse effect determination & MOA with Findings Documentation and ACHP recommendations.
![Page 17: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/17.jpg)
![Page 18: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/18.jpg)
![Page 19: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/19.jpg)
![Page 20: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/20.jpg)
![Page 21: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/21.jpg)
![Page 22: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/22.jpg)
![Page 23: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/23.jpg)
APPENDIX F: Letter from ACHP declining further involvement.
![Page 24: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/24.jpg)
![Page 25: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/25.jpg)
APPENDIX G: FHWA Findings Concurrence Request.
![Page 26: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/26.jpg)
![Page 27: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/27.jpg)
APPENDIX H: Sensitive Material Documents
![Page 28: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/28.jpg)
The following documents are confidential and not available for general distribution. 1. Cultural Resources Survey Report, PIN TRN 1.95, RTE 347 Pre-Reconnaissance
Corridor Study, Towns of Smithtown, Islip and Brookhaven Suffolk County, NY (1989) conducted by the New York State Museum (NYSM) on behalf of the New York State Department of Transportation (NYSDOT).
2. Cultural Resources Reconnaissance Survey Report (2005-2006) conducted by NYSM on
behalf of NYSDOT; Including Volume I: Archeological Reconnaissance Survey, Volume II: Architectural Survey and Volume III Project and Architectural Survey Maps.
3. End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary
Gentile NYSDOT October 24, 2006).
4. Cultural Resources Data Recovery Plan for The Naimia (NYSM # 11658) Site (November 2006) prepared by NYSM on behalf of NYSDOT.
5. Cultural Resources Site Examination Report, PIN 0054.05.124, NYS Route 347 from
Northern State Parkway to NYS Route 25A, Town of Smithtown, Suffolk County, New York (April 2007), conducted by NYSM on behalf of NYSDOT.
![Page 29: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/29.jpg)
APPENDIX I: Letter from FHWA, dated March 29, 2007
![Page 30: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) …...End of Field Letter Phase II Site Examinations (from Daniel Mazeau NYSM to Gary Gentile NYSDOT October 24, 2006). 4. Cultural](https://reader035.vdocument.in/reader035/viewer/2022081620/6110f3abc2529a192e02b118/html5/thumbnails/30.jpg)