final draft flood study report - kempsey shire · a3 gis map file :...
TRANSCRIPT
Final Draft Flood Study Report
Lower Macleay Flood Study
Appendix C. Model Calibration – March 2001 Flood Event
!(!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!( !(
!(
!(
!(
!(
!(
!(
!(
!(
!(
400
350
20030
0
294mm
269mm 225mm
427mm
346mm
184mm
244mm
191mm
392mm
236mm
232mm
KempseyAirport Kempsey
(Wide St)
Willawarrin(Denleigh)
Wittitrin
Smoky Cape
Macksville Country Club
Crescent Head
Eungai(Searles Rd)
Collombatti(Benbullen)
Green Valley
1 of 1SHEETGDA 1994 MGA Zone 56
DRAWN
CHECK
PROJECT Lower Macleay Flood Study
TITLE Modelled Rainfall Distributionfo Local CatchmentsMarch 2001 Event
A3
GIS
MA
P fi
le :
IA17
6800
_R01
_Fig
C-1
_200
1_R
Fdis
tr_0
1
PROJECT # MAP # REV
1DATE
LC
AH
VER
1
12/10/2018
FIGURE C-1
!«N#Legend
2001 Event Rainfall Isohyet
!( Rainfall StationAdopted Rainfall Temporal Distribution
Kempsey (Pluvio)Euroka (Daily, scaled to Kempsey Pluvio)Smoky Cape (scaled to 200mm and to Kempsey Pluvio)TUFLOW Model Extent
J:\IE\Projects\04_Eastern\IA176800\06 Technical\Spatial\ArcMap\R02 Calibration Report\IA176800_R01_FigC-1_2001_RFdistr_01.mxd
COPYRIGHT : The concepts and information contained in this document are the intellectual property of Jacobs. Use or copying of the document in whole or in part without writtenpermission of Jacobs constitutes an infringement of copyright.
0 5 102.5Kilometres
IA176800
Total rainfall depths are for the period9am 6 March to 9am 12 March 2001.
Final Draft Flood Study Report
Lower Macleay Flood Study
Figure C-2 Inflow and Tailwater Boundary Hydrographs and Cumulative Rainfall, March 2001
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
7
53
2
5
4
43
4
8
10
2
5
4
2
6
2
5
6
105
3
2
7.44
4.8
4.34
4.5
3.44
2.75
2.12
1.35
3.1
2.94
7.44
5.06
4.33
4.53
3.46
2.71
2.242.01
1.33
2.89
3.13
1 of 1SHEETGDA 1994 MGA Zone 56
DRAWN
CHECK
PROJECT Lower Macleay Flood Study
TITLE Model Calibration March 2001 Event
A3
GIS
MA
P fi
le :
IA17
6800
_R03
_Fig
C-3
_200
1_d_
H_c
al_0
2
PROJECT # MAP # REV1
DATE
LC
AH
VER1
4/07/2019
FIGURE C-3
!«N#Legend
Depth (m)0 - 0.20.2 - 0.50.5 - 11 - 22 - 33 - 4> 4
Flood Level 1m Contour (m AHD)Flood Level 0.2m Contour (m AHD)Observed Peak Flood Level (m AHD)Modelled Peak Flood Level (m AHD)Limit of Mapping
J:\IE\Projects\04_Eastern\IA176800\06 Technical\Spatial\ArcMap\R02 Calibration Report\IA176800_R03_FigC-3_2001_d_H_cal_02.mxd
LIMITATIONS: This mapping is based ondata and assumptions identified in theLower Macleay Flood Study prepared by Jacobs. Jacobs does not warrant, guarantee or make representations regarding the currency and accuracy ofinformation contained in this map.
0 5 102.5Kilometres
IA176800
Final Draft Flood Study Report
Lower Macleay Flood Study
Figure C-4 Observed vs Modelled stage hydrograph, Kempsey Traffic Bridge, March 2001
Final Draft Flood Study Report
Lower Macleay Flood Study
Figure C-5 Observed vs Modelled stage hydrograph, Smithtown, March 2001
Final Draft Flood Study Report
Lower Macleay Flood Study
Figure C-6 Observed vs Modelled stage hydrograph, South West Rocks, March 2001
Final Draft Flood Study Report
Lower Macleay Flood Study
Figure C-7 Modelled water surface profile. Comparison to observed flood marks, Kempsey CBD TUFLOW and RUBICON. March 2001