final draft idp- may 08 -...
TRANSCRIPT
uMngeni
Richmond
Impendle
Mkhambathini
Mpofana
Msunduzi
uMshwathi
2
PREPARED BY:
THE UMGUNGUNDLOVU DISTRICT MUNICIPALITY
PLANNING AND IMPLEMENTATION MANAGEMENT SUPPORT CENTRE
LED BY:
MR TLS KHUZWAYO
ACTING MUNICIPAL MANAGER
TEL: 033 – 897 6763
SUPPORTED BY: MANAGEMENT
Postal address: P O Box 3235 Pietermaritzburg 3200
Head Office physical address: 242 Langalibalele Street Pietermaritzburg 3201
For further information: Bongiwe Xaba Acting Executive Manager Planning and Implementation Management Support TEL: 033 8976754 CELL: 0828031145 Email: [email protected]
uuMMGGUUNNGGUUNNDDLLOOVVUU DDIISSTTRRIICCTT MMUUNNIICCIIPPAALLIITTYY CCOOUUNNCCIILL RREEPPRREESSEENNTTEEDD BBYY HIS WORSHIP, THE MAYOR
COUNCILLOR Y BHAMJEE
HER WORSHIP, THE DEPUTY MAYOR
COUNCILLOR TT ZONDI
THE HONOURABLE SPEAKER
COUNCILLOR GH ZONDI
CHIEF WHIP
COUNCILLOR MA LUKHELE
EXECUTIVE COMMITTEE
COUNCILLOR TR ZUMA
COUNCILLOR TR ZUNGU COUNCILLOR NBZ CELE COUNCILLOR JB MTOLO COUNCILLOR PBHENGU COUNCILLOR S MCHUNU
4
TABLE OF CONTENTS SECTION A: EXECUTIVE SUMMARY SECTION B: SITUATIONAL ANALYSIS SECTION C: DEVELOPMENT STRATEGIES SECTION D: SPATIAL DEVELOPMENT FRAMEWORK SECTION E: SECTOR INVOLVEMENT SECTION F: IMPLEMENTATION PLAN SECTION G: PROJECTS SECTION H: FINANCIAL PLAN SECTION I: ORGANISATIONAL PERFORMANCE MANAGEMENT SYSTEM SECTION J: ANNEXURES SECTION K: APPENDICES:
5
SECTION A
EXECUTIVE SUMMARY
6
UMGUNGUNDLOVU DISTRICT MUNICIPALITY MAP
%
%
%
%%
%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
% %
%
KZ 221
KZ 22 3
KZ 22 2
KZ 227
KZ 22 4
KZ 226
KZ 22 5
KZ D M A22Cool Air
New Hanover
Pi ter marit zburg
Richm ond
Im pendl e
Howi ck
Hil ton
Ashbur ton
Wart burg
Mooi Ri ver
RosettaDalt on
Cam perdo wn
Crai gie Burn
Bli nkw ater
Hi ghm oor Nature Reserve
Kark l oof
Kam berg Natur eReserve
Alberts Fall s
Umgeni Vlei Nature Reserve
Mi dmar
Queen El izabet h ParkDoreen Cl ar k
M po fa na
uM n geni
Im pend le
Richm o nd
M su nd uzi
uM shw athi
M kh am b athini
YOR K
BY R NE
EST ON
DA R GLE
LOTEN I
G OMA NE
NZIN GA
BO S TO N
KA MB ER G
ROS ETT A
TW EE DIE
CR A MO N D
KA ME NS I
FOXH IL L
ND A LEN I
RI ETV LEI
THE N DE LE
HI GH MO OR
BA LG OW A N
MPOL W EN I
FAW N LE AS
ED EN D AL E
COL EF OR D
HOP EW E LL
MID D EL RU S
LID GET TO N
NO OD S BE R G
ELA ND S K O P
MK HO ND E NI
G OOD H O PE
WI N DY H I LL
SC H ROE D ER S
CIB ELICH LE
MAS H IN G EN I
THOR N V ILLE
BI SH OP TO W E
MID - ILL OVU
MO U N T A LID A
LION S R IV ER
MO U N T E LIA S
HE LLA H EL LA
BA YN E SFI ELD
JOU B E RTS VL EI
TUN GA 'S H ILL
ALB ER T FA LLS
O TTO'S B LU FF
TAY LO R 'S H ALT
CL AN SYN D IC A TE
MOR TON 'S DR I FT
HA R DE N H EI GH T S
TAB LE MO UN TA IN
FO RT NO TT IN GH AM
HILD CO TE S TAT IO N
AP PEL SB O SC H MISS ION
TAB L E MO UN TA IN R AN GE
SW A YIM AN E
N
EW
S
uM gu ngund lovu
D ist r ict M un icipa lity
DATA SO UR C E SMun ici pa l D em arc ati on B oard
D ep t . O f T ran sp ortDept . Lo cal G overn m ent and Trad iti on al Af fa irs
S ta tis tic s So u th Afri ca
242 Lon g m arke t S tre etP O B o x 32 35Pieterm ar itzb u rg3200
Te l : (0 33) 89 7 67 96
E-M ail : khave e@ um d m .go v.za
Distric t B ase M ap
R EV ISIO N
D ATE
SC A LE
1:700000
30 -11-2004
KZ 22 3 1 6 79 .37
KZ 22 2 1 5 68 .30
KZ 22 1 1 9 24 .55
KZ 22 6 766 .00
KZ 22 5 649 .79
KZ 22 4 947 .90
KZ 22 7 1 13 3.62
KZ DM A22 276 .23 12
33 569
553 22 3
10 8 0 37
73 896
36 819
Po pulatio nAr eaNAM E
9 189 .5 3 92 7 8 45Grand T ota l for uM gu ngu nd lovu DM
Mpof an a LM
uM ngeni LM
uM shwa thi LM
Mkham bathin i LM
Msu nd uz i LM
Im pendle LM
Ric hmond LM
Dist rict Management Ar ea
59 067
63 222
Cen sus 200 1
S ta t ist ics So uth Afr ica
Sm a ll T ow ns , Vil lag es & Se ttl em en ts%
M ain A ccess R oa ds
R oad N etw ork
M uni ci pal B ou nda rie s
Sett lem ents
M ajo r D am s
N ature C onse rvat io n Ar eas
U rba n C en tr es
Tr iba l Au th ori ti es
LE GE N D
M AP 1
7
MAP OF LOCAL MUNICIPALITIES WITHIN THE DISTRICT
8
THE INTEGRATED DEVELOPMENT PLANNING PROCESS AT UMGUNGUNDLOVU
UMDM council adopted its second IDP for 2006-2011 in June 2007 after a participatory process that started towards the end of 2006. This process involved workshops and meetings with various stakeholders. The 2007/2008 IDP process entailed the review of the vision and mission, and the spatial development framework (SDF) of UMDM based on the achievements and changes that occurred during the past term and as well as the new legislative capital status of the district. In complying with the Municipal Finance Management Act 56, 2003, and the guidelines and requirements by Treasury the district produced the Service and Budget Implementation Plans (SDBIPs). The SDBIP will be used as a management, implementation and monitoring tool for the district, as well as a basis for developing performance agreements for the Municipal Manager and the Strategic Executive Managers as stated in Section 57 of the Municipal Systems Act 32, 2000. This document represents the Integrated Development Plan Review for the 2008/2009 financial year, prepared by uMgungundlovu District Municipality(UMDM). This IDP has been prepared in-house since 2004 with the assistance of the Planning and Implementation Management Support (PIMS) Centre. In order to improve participation and ownership by all stakeholders, a task team was formed which comprised managers from five departments of the district (i.e Finance, Community, Corporate, Technical services and the Office of the Municipal Manager). To strengthen horizontal and vertical alignment workshops and meetings were held with local municipalities as well as sector departments. Public participation was undertaken in the form of Izimbizos and advertisement in the local newspaper.
9
UMGUNGUNDLOVU DISTRICT AT A GLANCE
The uMgungundlovu District is located within the KwaZulu Natal Midlands Collectively Umgungundlovu accounts for approximately 9 190 km2 of land area with an estimated population of 927 846. The study area represents a diverse range of settlement including major urban centres, secondary and local centres as well as semi-rural and rural residential settlement. Consequently a diverse range of development needs exists across the district. Within the boundaries of the district there are 7 Local Municipalities, being
• Msunduzi with its administrative seat in Pietermaritzburg; • Mkhambathini with its administrative seat in Camperdown; • Richmond with its administrative seat in Richmond; • uMgeni with its administrative seat in Howick and Hilton; • Impendle with its administrative seat in Impendle; • Mooi Mpofana with its administrative seat in Mooi River and • uMshwati with its administrative seat in New Hanover • District Management Area KZDMA22.
10
SECTION B SITUATIONAL ANALYSIS
11
POPULATION AND HOUSEHOLD DISTRIBUTION
Table1: Population Distribution and Households in the District and Province Munic Code Name Population Population as % of
District Population as % of
Province
KZ221 uMshwathi 108037 11.64% 1.15%
KZ222 uMngeni 73896 7.96% 0.78%
KZ223 Mooi Mpofana 36819 3.97% 0.39%
KZ224 Impendle 33569 3.62% 0.36%
KZ225 Msunduzi 553223 59.62% 5.87%
KZ226 Mkhambathini 59067 6.37% 0.63%
KZN227 Richmond 63222 6.81% 0.67%
DC22 UMgungundlovu 927845 100% 9.84%
Figure 1: Comparison of Population Distribution in 1996 and 2001
12
813.1
3.82.87.1
5.3
59.7
811.6
3.63.9 6.86.3
59.6
0
10
20
30
40
50
60
70
uMsh
wat
hi
UM
ngen
i
Mpo
fana
Impe
ndle
Msu
nduz
i
Mkh
amba
thin
i
Ric
hmon
d
1996
2001
Msunduzi is the most populated municipality in the uMgungundlovu District Municipality jurisdiction contributing 59.62% of the district’s population and contributing 6.25% of the Provincial Households. Mkhambathini and Richmond contribute to the Provincial Households by a mere 1.2% combined. Impendle is contributing the least number of Households in the Province with only 0.35%. uMshwathi is a predominantly rural municipality with 81% of its households situated in rural areas, contributing to over a fifth of the district’s rural households and 2% of the province’s rural households. However Impendle and Mkhambathini are the most rural municipalities in the district with only 1% and 2% urban households, respectively.The predominantly rural municipalities such as Impendle, Richmond and Umshwathi experienced negative population growth during this period. This could be attributed to a range of factors including migration of people to urban areas in search of employment opportunities and better access to basic services and public facilities.
13
%
%
%
%%
%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
% %
%
YOR K
BY RNE
EST ON
DAR GLE
LOTENI
GOMANE
NZI N GA
BOS TON
KA MB ERG
ROS ETT A
TW EE DI E
CR AMON D
KA ME NS I
FOXH IL L
ND ALEN I
RI ETV LEI
THE N DE LE
HI GH MOOR
BA LGOW AN
MPOL WENI
FAW NLE AS
ED END AL E
COL EFOR D
HOP EW E LL
MID DEL RU S
LID GET TON
NOODS BE RG
ELA ND S K OP
MK HO ND E NI
GOOD H OPE
WI NDY H I LL
SCH ROE DERS
CI B ELI CHLE
MAS H INGEN I
THORN V ILLE
BI SHOP TOW E
MID -ILL OVU
MOUN T ALIDA
LION S R IV ER
MOUN T E LIA S
HE LLA HEL LA
BAYNE SFI ELD
JOUB E RTS VL EI
TUN GA 'S H ILL
ALB ERT FA LLS
OTTO'S B LU FF
TAY LOR'S H ALT
CL AN SYND IC ATE
MORTON 'S DRI FT
HAR DE N HEI GH TS
TAB LE MO UN TA IN
FO RT NOTT IN GH AM
HI LD CO TE S TAT ION
AP PEL SB OSCH MI SS ION
SWA YIM AN E
GCUM ISA T .A.
EM BO -T IM UNI
NXAMAL ALA T.A.
INADI I T. A.
VU MAKW EN ZA
MAF UNZ E T .A.
MANYAVU T .A.
MPUM UZ A IIT .A.
NTANZ I T .A.
MT HUL INI T .A.
MP UM UZ A IT .A.
VU MIN DABA T .A.
MAPUM UL O T .A.
INADI II T .A.
ESI PAH LENI T.A.
MAPUM UL O T .A.
MASIHAM BIS ANE T .A.
BASOT HO T . A.
NXAMAL ALA T.A.
XI MBA T.A.
INADI T .A.
ISIMAH LA T .A.
UMACAL A-G W AL A T. A.
NX AMAL ALA T.A.
INADI T .A.
INADI I II T .A.
Cool Air
New Hanover
Pitermaritzburg
Richmond
Impendle
Howick
Hilton
Ashburton
Wartburg
Mooi River
RosettaDalton
Camperdown
KZ221
KZ223
KZ222
KZ227
KZ224
KZ226
KZ225
KZDMA22
Mpofana
uMngeni
Impendle
Richmond
Msunduzi
uMshw athi
Mkhambathini
N
EW
S
uMgungundlovu
D istr ict Municipality
242 La nga libalel e Stree tP O Box 32 35Pietermar itzburg3200
Te l : (0 33) 89 7 67 96
E-M ail : khave e@ umdm.gov.za
Populatio n Density
REVISIO N
DATE
SCALE
1:700000
01/10/2007
Sma ll Towns, Vil lages & Se ttl emen ts%
Main Access Roa ds
Road N etwork
Municipal B oundarie s
Sett lem ents
Majo r Dams
Urban Cen tres
Tr iba l Au th ori ti es
Munic ipality by Population D ensity/Square K ilometre
KZ22 1 - 68
KZ22 2 - 44
KZ22 3 -1 5
KZ22 4 - 38
KZ22 5 - 80 8
KZ22 6 - 49
KZ22 7 -5 1
KZDMA2 2 - 3
LEGEND
Map 2: Population Density in the District
14
Table 2: Distribution of Households
Municipality No. of Households
Households as % of District
Households as % of
Province
No. of Rural Households
Rural hh as % of District
Rural hh as % of
Province
No. of Urban
Households
Urban hh District
Urban hh as % of
Province
UMgungundlovu 216646 100% 10.38% 89949 100% 9.32% 126707 100% 11.30%
UMshwathi 23737 10.96% 1.14% 19261 21.41% 2.00% 4475 3.53% 0.40%
uMngeni 20487 9.46% 0.98% 8470 9.42% 0.88% 12016 9.48% 1.07%
Mooi Mpofana 9597 4.43% 0.46% 5561 6.18% 0.58% 4035 3.18% 0.36%
Impendle 7344 3.39% 0.35% 7269 8.08% 0.75% 74 0.06% 0.01%
Msunduzi 130387 60.18% 6.25% 27467 30.54% 2.85% 102930 81.23% 9.18%
Mkhambathini 12551 5.79% 0.60% 12322 13.70% 1.28% 230 0.18% 0. 02%
Richmond 12533 5.79% 0.60% 9589 10.66% 0.99% 2947 2.33% 0.26%
(Source: DC22 Capacity Assessment Report on Municipal Functions – MDB 2006/07)
Table 3: Number of Persons per Household
Size of the Household (Number of
persons) Impendle Mkhambathini Mpofana Msunduzi Richmond uMngeni uMshwathi District
1 7.27% 2.41% 4.12% 3.23% 5.38% 3.92% 4.46% 4.40%
2 7.88% 6.63% 6.47% 10.22% 11.15% 8.93% 7.20% 8.36%
3 7.88% 6.02% 13.53% 15.75% 8.85% 12.54% 14.58% 11.31%
4 21.21% 14.16% 19.41% 22.90% 16.54% 17.24% 19.21% 18.67%
5 12.73% 10.84% 17.65% 17.68% 16.15% 19.44% 17.32% 15.97%
6 9.70% 8.73% 10.00% 9.60% 10.38% 12.23% 10.46% 10.16%
7 9.70% 10.84% 6.47% 6.36% 12.31% 8.93% 7.38% 8.86%
8 7.27% 6.93% 4.71% 4.28% 5.77% 5.49% 4.46% 5.56%
>9 16.36% 33.43% 17.65% 9.96% 13.46% 11.29% 14.92% 16.73% Source: Final LED Assessment Report UMDM – November 2006
15
Table above indicates that the mode for a number of persons in a UMDM household is 4. That means that generally, UMDM households have 4
members. Exceptions are however recorded for uMngeni at 5 persons per household and Mkhambathini at over 9 persons per household.
1.2.2 GENDER AND AGE DISTRIBUTION
Figure 2: Age Distribution
9%
12%
11%
11%10%9%
7%
7%
5%
5%4% 3% 2% 5%
0-4
5-9
10-14
15-19
20-24
25-29
30-34
35-39
40-44
45-49
50-54
55-59
60-64
65-above
Source: MDB 2006
Quality of life survey conducted by the district in 2006 confirms the 2001 census data which indicates that 69% of the total population is below 34 years of age with the majority being within a school going age (5 to 24 years of age). There has been no remarkable change in population structure between 2001 and 2005. A generally low representation of the children reflects the impact of family planning measures and is consistent with the increase in the number of small families. On the other,
This This This This sounds asounds asounds asounds as as as as a bell of warning about the impact of HIV and bell of warning about the impact of HIV and bell of warning about the impact of HIV and bell of warning about the impact of HIV and AIDS. It could be interpreted to mean that there are less babies AIDS. It could be interpreted to mean that there are less babies AIDS. It could be interpreted to mean that there are less babies AIDS. It could be interpreted to mean that there are less babies born or thaborn or thaborn or thaborn or that survive. This should be investigated further. survive. This should be investigated further. survive. This should be investigated further. survive. This should be investigated further.
16
Figure 3 : Gender
2.77 3.84
1.5 1.62
2.91 3.36
2.18 2.62
2.29 2.58
3.36 3.41
1.73 2.14
0% 20% 40% 60% 80% 100%
Umshwati
Umngeni
Mooi Mpofana
Impendle
Msunduzi
Mkhambathini
Richmond
Males
Females
Source: uMgungundlovu Quality of Life Survey: October 2006
In all LMs, the average number of females per household exceeded the average number of males. The greatest difference occurred in Umshwathi (2.77 males compared to 3.84 females) and the smallest in Umngeni (1.5 versus 1.62). This indicates the importance of women and gender issues in development planning and service delivery programs.
17
Table 4 & 5: Age-Gender Distribution
MALE Umshwathi Umngeni Mpofana Impendle Msunduzi Mkhambathini
Richmond Total
<1 3.8 0.9 3.9 1.7 1.7 2.0 13.7 3.7
1-5 9.7 2.8 9.9 9.1 9.0 9.9 6.8 8.7
6-10 15.3 11.5 13.2 12.9 10.7 10.9 5.6 11.9
11-17 22.4 12.9 17.3 15.4 12.0 16.0 7.2 15.6
18-24 12.2 11.5 17.6 14.3 15.4 17.8 12.2 14.9
25-34 12.8 22.8 12.2 18.4 21.7 15.1 12.8 16.0
49 11.6 22.1 14.4 14.0 18.0 14.7 22.2 15.8
50-65 7.2 11.7 8.8 9.7 7.2 11.5 12.8 9.5
>65 4.9 3.8 2.7 4.4 4.4 2.3 6.6 4.0
Total 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
FEMALE Umshwathi Umngeni Mpofana Impendle Msunduzi Mkhambathini Richmond Total
<1 2.6 2.3 2.9 1.7 7.6 2.7 11.5 4.1
1-5 9.5 6.5 10.4 6.8 6.4 7.0 4.2 7.7
6-10 11.8 6.5 11.0 9.2 7.4 9.9 6.9 9.6
11-17 12.7 28.9 15.8 15.7 11.6 17.0 8.9 15.0
18-24 21.2 12.6 14.7 15.2 14.4 17.7 13.6 16.4
25-34 14.3 11.0 15.5 19.7 15.7 16.5 15.2 15.7
35-49 14.6 17.5 17.8 14.1 21.6 18.9 19.3 17.5
50-65 6.1 9.1 7.9 11.2 8.5 6.8 12.9 8.4
>65 7.3 5.6 4.0 6.4 6.7 3.3 7.5 5.7
In relation to the economically most active age categories of 25-34 and 35-49, there were higher concentrations in Msunduzi than elsewhere. Additionally, Impendle had more 25-34 year olds. In relation to the older economically active category (50-65) as well as the oldest group (65+), Richmond emerged with the highest concentrations. District population is balanced in terms of age structure.
18
Figure 4: Proportions of males and females
4.1 3.7
7.7 8.7
9.6 11.9
15 15.6
16.4 14.9
15.7 16
17.5 15.8
8.4 9.5
5.7 4
0 5 10 15 20 25 30 35
<1
1-5
6-10
11-17
18-24
25-34
49
50-65
>65
FEMALE
MALE
Source: uMgungundlovu Quality of Life Survey: October 2006
The proportion of babies aged less than one year was much higher in Richmond than elsewhere. In contrast, the proportion of all children aged 5 years or less was much lower in uMngeni than elsewhere. Richmond also had a lower concentration of people in the 6-10 and 11-17 year categories than was the case in the other six LMs, while 11-17 year old females were disproportionately present in uMngeni. Could this be indicative of a selective rate of decline in fertility? Research into this is recommended.
19
HOUSING AND LAND TENURE IN THE DISTRICT
Housing
Table 6: Housing Tenure by LM
Umshwathi
Umngeni
Mooi Mpofana
Impendle
Msunduz
Mkhambathini
Richmond
Total
Owner 86,4% 98,3% 84,0% 95,2% 86,5% 97,8% 81,9% 90,3%
Tenant 6,0% 1,7% 8,3% 0,3% 9,7% 0,0% 1,6% 4,1% Other tenure 7,6% 0,0% 7,7% 4,5% 3,8% 2,2% 16,5% 5,6%
Total 100,0% 100,0 100,0% 100,0% 100,0% 100,0% 100,0% 100,0 UMDM: Quality of Life and Client Satisfaction Survey – October 2006
The vast majority (90%) own their homes, with just 4% tenants and 6% are neither owners nor tenants of the dwelling in which they live. Home ownership range from 98% in Umngeni to 82% in Richmond.
20
Figure 7: Dwelling Types by Local Municipality
1
76
24
0
53
11
48
30
59
3
62
10
22
67
48
20
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Umshwati Umngeni Mooi Mpofana Impendle Msunduzi Mkhambathini Richmond Total
Other
Traditional dwelling
Backyard shack
Shack
Backyard room
Room/flatlet
Retiremenmt unit
Cluster
Flat
Formal house
Table 7:Dwelling Type by LM
Umshwathi Umngeni Mooi Mpofana Impendle Msunduzi Mkhambathini Richmond Total
Traditional dwelling 58,5 2,8 62,0 96,6 22,2 66,9 19,6 48,4
Formal house 1,4 75,8 24,0 2,1 52,6 11,0 48,1 29,7
Shack in settlement 6,2 3,9 0,3 6,7 7,3 17,5 5,2
Room/ flatlet 12,7 4,8 2,4 4,3 0,3 0,5 4,0
Backyard room 10,8 4,2 6,7 2,6 3,7
Cluster 3,0 14,8 0,3 2,4 3,2
Backyard shack 4,3 1,4 1,5 1,8 0,6 1,1 1,6
Flat 0,8 1,8 1,5 9,5 1,4
Retirement unit 2,2 0,3 1,1 0,5
Other 0,9 1,8 13,9 2,4
Total in % 100,0 100,0 100,0 100,0 100,0 100,0 100,0 100,0
21
There are two predominant dwelling types in the District Municipality, namely traditional dwellings (48%) and formal houses (30%). Traditional
dwellings reflect the rural nature of the district. There are also sizeable proportions living in shack settlements (5%), rooms or flat lets (4%),
backyard rooms (4%) and cluster units (3%). By local municipality, traditional dwellings are the most common form of housing in Impendle (97%),
Mkhambathini (67%), Mooi Mpofana (62%) and Umshwathi (59%). Formal houses are most common in Umngeni (76%), Msunduzi (53%) and
Richmond (48%). The highest incidence of shack settlements is in Richmond (18%).
22
%
%
%
%%
%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
% %
%
%
%
%%
%%%
%
%%
% %
%
%
%
%
%%% %%%
%%
%
%
%
%
%%
%%%
%%
% %
%
Cr aigie Bur n
Bl i nk w ater
Hi gh mo o r Natu re Reser ve
Ka rk lo of
Ka mb erg N atu reReser ve
Al b ert s Fa ll s
Umg en i Vl ei Natu re Reser ve
Mi dm ar
Qu een El i zab eth ParkDo ree n Cla rk
K Z 22 1
K Z 22 3
K Z 22 2
K Z 22 7
K Z 22 4
K Z 22 6
K Z 22 5
K Z D M A 2 2
M p o fa na
u M n ge n i
Im pe nd le
R ic h m o n d
M su n d uz i
u M s h w a th i
M kh am b a th i n i
YO R K
BY R NE
EST O N
DA R G LE
LO TEN I
G O M A NE
NZI N G A
BO S TO N
KA MB ER G
RO S E TT A
TW EE DI E
CR A MO N D
KA M E NS I
FO XH IL L
ND A LEN I
RI ETV L EI
THE N DE LE
HI G H MO O R
BA LG O W A N
M PO L W EN I
FAW N LE AS
ED EN D AL E
CO L EFO R D
HO P EW E LL
M ID D EL RU S
LID G E T TO N
NO O D S BE R G
EL A ND S K O P
MK HO ND E NI
G O O D H O PE
WI N DY H I LL
SC H RO E D ER S
CI B ELI CH L E
M AS H IN G EN I
THO R N V IL LE
BI SH O P T O W E
M ID - ILL O V U
M O U N T A L ID A
L IO N S R IV E R
MO U N T E L IA S
HE LLA H EL L A
BA Y N E SFI ELD
JO U B E RT S VL EI
T UN G A 'S H ILL
ALB ER T F A LL S
O TTO 'S B LU FF
TAY LO R 'S H AL T
CL AN SY N D IC A TE
M O R TO N 'S DR I FT
HA R DE N H EI G H TS
TAB LE MO UN TA IN
F O RT NO TT IN G H AM
HI LD CO T E S TAT IO N
AP PEL S B O SC H M I SS IO N
SW A YIM AN E
G C U M IS A T .A .
EM B O -T IM U N I
N X A M A L A LA T.A .
IN A D I I T. A .
VU M A K W E N ZA
MA F U N Z E T .A .
MA N Y A V U T .A .
MP U M U Z A IIT .A .
N TA N Z I T .A .
MT H U L IN I T .A .
MP U M U Z A IT .A .
VU MIN D A B A T .A .
MA P U M U L O T .A .
IN A D I II T .A .
ES I PA H LE N I T.A .
MA P U M U L O T .A .
MA S IH A M B IS A N E T .A .
B A S OT H O T . A .
N X A MA L A LA T.A .
XI MB A T.A .
IN A D I T .A .
IS IMA H LA T .A .
U MA C A L A -G W A L A T. A.
N X A MA L A LA T.A .
IN A D I T .A .
IN A D I I II T .A .
Co o l A i r
New Han o ver
Pi ter mar i tzb ur g
Ri ch mo nd
Im pe nd l e
Ho wi ck
Hi l to n
Ash bu rt on
W artb u rg
Mo oi Ri ve r
Ro sett a
Dal to n
Cam p erd o wn
BI R DS S PR U IT
SC O TTS H O EK
RI ET VA L LE I
VA ALK O P & D A DE LFO N TE IN
BR O O K D AL ES
CA MP ER D O W N
S PI TZK O P O F Z AN D F O NT EIN
LAN G E H O O P
LIN W O O D
SA PPI
AS HL E Y
RI E T VA LL E I
BR A CO
E VE R D O N
LO T 5 0
NA AU W P O O R T
SPR I NG G R O VE
NO O I T G E DA C HT
HI L TO N
G RE EN H IL L
DA R G LE
LO T 5 3
ZO U TPA NS V AL LEY
PR O C E S K R AA L
EPW O RTH
KA R K LO O F
PET RU S S TRO O M
O TTO 'S B LU F FHE B RO N
G RO O T V AL LE I
BU S HY P AR K
O NV ER W A CH T
LAM O NT S VA LE
DE M AG T E N BU R G
UI TVL UG T
PE T RU S S T RE AM
SH O R TTS R ETR EA T
WE L TE VR ED E N
WE LG E VO N D EN
O CK E RT S K R A AL
BLA C K W O O D
TW EE DI E HA LL
G EE LH O UT B O O M
CL U N Y PA R K
S H AF T O N
HA PP Y HI LL
AL LE M A N S DR I F T
PEP P E R TR E E S
VA ALK O P / D AD EL FO N TE I N
WI N TER H O EK
DU A RT C AS TLE
WE LTE VR ED E N
G O UD I NA
PR O U DF O O T
BE R G V LE ET
WA TE RF ALL VI EW
KA N G AS HE S VA LLE Y
TW EE F O N TE IN EN
STA NG ER H O E K
DU N B AR E STA TE
WO O DL AN D S
BA LMO R A LSH AN D O N
HO N I G K R AN TZ
KI LLA RN E Y
BU C K AN
RI E T SP R UI T
FORDOUN
STAGS
MOUNT WEST
KAMBERG
INHLUZANI
SHAFTON
BRACO
ALLENDALE
RIPLEYBRAYHILL
MAXWELL
STOCKTON
MOUNT DESIRE
COLLEGIATE
LOT 53
MACPHAIL
KRUISFONTEIN
LOVO DALE
GUILFORD
SHANDON
WESTON TRAINING SCHOOL
MANOR FARM
MOUNT VICTORIA
PETRUS STROOM
PAARDE KRAAL
GEELHOUT BOOM
BROADMOOR
ALLEMANS DRIFT
SWEETHOME
STRATHFIELDSAYE
DELECTABLE DALE
HEBRONDARGLE
HOPEDALE
WOODSTOCK
WILDE ALS SPRUIT
VLAK PLAATS
SPITZE KOP
LEEUW BOSCH
BELVIDERE
HALLIWELL
FIELDEN
SHAWLANDS
RENSBURG
MARITZ DAAL
CLEVELAND
WATERVAL
LANGEOPDRAVENDE
STREHLA
HOPE VALLEY
NIEKERKS FONTEIN
DOORNKLOOF
LOT 72
RIVERHOLM
ONVERWACHT
NARNIA
ARLINGTON
SPRING GROVE
BOSCH HOEK
WARSASH
POORTJE
LOT 67
BARKSTON ASH
EVANSDALE
HIGHGATE
CONNINGTON
LITTLE HARMONY
SWEET HOME
DRIE FONTEINEN
UMLAAS
MIDDLEBURG
HILTON
HEBRON A
MARSHLANDS
VAALKOP & DADELFONTEIN
BOSCH FONTEIN
MIDDEL BOSCH
INGOMANKULU
ROBIN HOODS WELL
STERTRIEMFONTEIN
LANGEWACHT
KILLARNEY
JAVA HEIGHTS
BEVERLEY
FOUNTAIN HALL
THE GRANGE
VAALE KOP
RIET SPRUIT
WOODLANDS
WELTEVREDEN
HAWKLEE
ROSLIN
KORT KRANS KLOOF
KRUYS FONTEIN & WELTEVREDEN
ROODE KRANS
KAR KLOOF
GOWRIE
N
EW
S
uM gu n g un d lo v u
D ist r ic t M u n ic ip a l ity
2 42 Lo n g m a rk e t S tre e tP O B o x 32 3 5P ie t erm a r itz b u rg3 20 0
Te l : (0 3 3) 8 9 7 67 9 6
E -M ail : k h a v e e@ um d m .g o v.z a
O n g o in g L an d R e fo rm , R e s ti tu ti o n , La b o u r T en an t s & H o u s i n g P ro je c ts
R EV ISIO N
D AT E
SC A LE
1 :7 0 0 0 0 0
08 /02 /20 05
H o u s ing P ro je c t s%
M u n ic ip a l B o u nd arie s
S m a ll T o w n s , V il lag es & S e t t lem e n ts%
M a in A c ce ss R o a ds
R o a d N e tw or k
S e tt le d R e st i tu t ion
S e tt le m e n t La n d A c qu is it io n
T ra n s fe rr ed L a nd
R e s t it u t io n C la im s
L ab o u r T e n a n ts
M a jo r D am s
N a t u re C o n s e rv a t io n A r e as
U r b a n C e n tr es
T riba l Au t h o r itie s
L E G E N D
01/10/2007
242 Langalibalele StreetP O Box 3235Pietermaritzburg
3200
Tel : (033) 897 6796
Map 3: Land Reform and Land Restitution
23
Implications Implications Implications Implications
The districtThe districtThe districtThe district is a generally rural area with a high representation of traditional settlements. is a generally rural area with a high representation of traditional settlements. is a generally rural area with a high representation of traditional settlements. is a generally rural area with a high representation of traditional settlements.
They account for about 30% of the total district area, yet they accommodate the They account for about 30% of the total district area, yet they accommodate the They account for about 30% of the total district area, yet they accommodate the They account for about 30% of the total district area, yet they accommodate the
majority of the population. Rural housing program should be intensified in areas such majority of the population. Rural housing program should be intensified in areas such majority of the population. Rural housing program should be intensified in areas such majority of the population. Rural housing program should be intensified in areas such
as Impenas Impenas Impenas Impendle and Mkhambathini. dle and Mkhambathini. dle and Mkhambathini. dle and Mkhambathini.
Slums clearance programs should be prioritized in more urban municipalities, particularly Slums clearance programs should be prioritized in more urban municipalities, particularly Slums clearance programs should be prioritized in more urban municipalities, particularly Slums clearance programs should be prioritized in more urban municipalities, particularly
The Msunduzi Municipality. Consideration should also be given to site and service The Msunduzi Municipality. Consideration should also be given to site and service The Msunduzi Municipality. Consideration should also be given to site and service The Msunduzi Municipality. Consideration should also be given to site and service
schemes to address housing needs arising from urbanization. schemes to address housing needs arising from urbanization. schemes to address housing needs arising from urbanization. schemes to address housing needs arising from urbanization.
Security of tenure particularly in the commercial farmlands in respect of the labour tenants Security of tenure particularly in the commercial farmlands in respect of the labour tenants Security of tenure particularly in the commercial farmlands in respect of the labour tenants Security of tenure particularly in the commercial farmlands in respect of the labour tenants
and the occupiers should be promoted. and the occupiers should be promoted. and the occupiers should be promoted. and the occupiers should be promoted.
Urban land reform should also be prioritized so as to upgrade the tenure rights ofUrban land reform should also be prioritized so as to upgrade the tenure rights ofUrban land reform should also be prioritized so as to upgrade the tenure rights ofUrban land reform should also be prioritized so as to upgrade the tenure rights of people people people people holding inferior tenure rights as holding inferior tenure rights as holding inferior tenure rights as holding inferior tenure rights as a result of the apartheid past.a result of the apartheid past.a result of the apartheid past.a result of the apartheid past.
24
B3.1.2 HEALTH Table 8:Mortality / Births / Infant mortality
Mortality 9786 deaths in hospital within the District
Birth 17117
Infant Mortality 1.40%
Source: Health Department:: November 2006
B3.1.3 DISABILITY Table 9: Indicating Disability by local municipality
Richmond
uMshwathi
uMngeni
Mpofana
Impendle
Msunduzi
Mkhambathini
uMgungundlovu
Sight 3.82% 0.36% 2.09% 1.17% 3.07% 2.12% 0.00% 12.63% Hearing 2.29% 1.42% 2.09% 1.17% 3.07% 1.81% 0.68% 12.53% Communication 0.76% 0.53% 0.38% 1.17% 4.29% 1.50% 4.73%
13.36% Physical 8.02% 1.60% 5.13% 2.92% 10.43% 4.82% 7.09% 40.01% Intellectual 0.76% 0.36% 1.14% 0.00% 0.00% 2.28% 1.69% 6.23% Emotional 0.38% 1.07% 0.95% 0.58% 0.00% 0.41% 0.00% 3.39% Multiple 0.00% 0.00% 0.19% 0.00% 0.61% 0.73% 3.72% 5.25%
Source: LED Assessment Report UMDM – November 2006 There are very few people with disabilities in the region. The majority of the labour force is thus able to work.
25
B3.1.4 HIV/AIDS
It is estimated that the 36.2% of KwaZulu-Natal’s population is HIV positive. It can be assumed that uMgungundlovu will also experience the impact of the disease socially, economically and in development planning. The likely effect of HIV/AIDS on social systems are: � Poorer households are more vulnerable and the epidemic is likely to deepen poverty and compromise upward mobility;
� Changing demand for housing, education and other community facilities;
� A greater demand for health care facilities; and
� A greater demand for financial support for orphans.
The likely effect of HIV/AIDS on the economic systems are: � A shift from savings to current expenditure, thus limiting fixed investment and economic growth;
� Possibility of “technological deepening” of the economy as a result of higher absenteeism rates;
� Withdrawal of healthy workers to care for affected family members;
� Further erosion of household savings and skills shortage; and
� Increased spending on pharmaceuticals and funerals.
B3.1.5 EDUCATION
1.8.1 EDUCATION STATISTICS IN KWAZULU-NATAL IN 2004
The statistics indicates a very serious concern in that very few learners progress to post-school educational institutions in the province.
Educational and skills levels will thus continue to be a growth constraint.
26
Table 10: Public Schools
Learners, Educators &
Institutions
Public Schools
Primary Schools Secondary
Schools
Combined
Schools
Total (Public)
Learners 1,607,435 891,790 172,470 2,671,695
Institutions 3,831 1,489 373 5,693
Table 11:Independent Schools
Learners, Educators &
Institutions
Independent Schools
Primary Schools Secondary
Schools
Combined
Schools
Total (Independent)
Learners 10,334 9,133 27,014 46,481
Institutions 54 33 85 172
27
Table 12: Other Education Programmes
Learners,
Educators &
Institutions
Other Education Programmes
ABET ELSEN Public FET Pre-primary/
ECD
Public HE Total (Other)
Learners 12,002 10,578 65,073 25,342 87,527 200,522
Institutions 139 62 9 471 4 685
UKZN:2007
28
Table 13:Indicating Level of Education by Local Municipalities
Education (Number of
persons) Impendle
Mkhambatini
Mpofana
Msunduzi
Richmond
uMngeni
uMswathi
District
None 14.96% 22.73% 8.24% 9.06% 14.04% 21.08% 13.37% 14.78%
1st/ 2nd School year 1.57% 2.07% 0.59% 1.13% 0.88% 2.41% 2.07% 1.53%
Std1/ grade3 1.57% 2.48% 2.35% 1.94% 1.75% 2.01% 1.51% 1.95%
Std2/ grade4 1.57% 4.13% 3.53% 2.27% 1.32% 3.01% 2.82% 2.66%
Std 3/ grade 5 4.72% 2.48% 4.12% 3.61% 3.07% 4.62% 5.27% 3.99%
Std 4/ grade 6 3.94% 4.96% 1.76% 1.24% 4.39% 4.62% 3.95% 3.55%
Std 5/ grade 7 4.72% 2.48% 9.41% 6.26% 12.28% 14.26% 10.17% 8.51%
Std 6/ grade 8 3.15% 6.61% 4.12% 6.58% 5.70% 8.03% 5.27% 5.64%
Std 7/ grade 9 6.30% 0.41% 6.47% 4.91% 6.58% 7.63% 6.59% 5.56%
Std 8/ grade 10 4.72% 10.74% 10.00% 10.03% 7.46% 10.04% 9.42% 8.92%
Std 9/ grade 11 8.66% 7.85% 17.65% 9.33% 6.58% 4.22% 15.44% 9.96% Std 10/ grade
12 30.71% 27.69% 27.06% 30.04% 18.42% 14.26% 19.02% 23.89%
Post-matric dip 2.36% 2.07% 3.53% 11.11% 10.96% 2.41% 4.52% 5.28% Technikon
Degree 5.51% 0.41% 1.18% 0.65% 3.07% 0.60% 0.56% 1.71% University
Degree 5.51% 2.89% 0.00% 0.92% 2.63% 0.60% 0.00% 1.79%
Other 0.00% 0.00% 0.00% 0.92% 0.88% 0.20% 0.00% 0.28%
Source: LED Assessment Report UMDM – November 2006 According to Table above, Mkhambathini has the highest rate of persons with “none” education (i.e. people with no education at all) at 22.73%,
followed by uMngeni at 21.08%. Mpofana, on the other hand had the lowest is Mpofana at 8.24%, Msunduzi following at 9.06% the UMDM
aggregate was 14.78 % “none”. Whilst Impendle had the highest number of people with a standard 10 or grade 12 at 30.71%, followed by
Msunduzi at 30.04%, uMngeni had the lowest at 14.26, and Richmond at 18.42%. the UMDM aggregate was 23.89%. On the post standard 10
qualifications – (listed as post-matric diploma, technikon degree, university degree and other)
29
The key issue in regards to education is the congestion of classrooms implying the need to construct more classrooms rather than more schools, improving services such as sanitation and water and the quality of education. Libraries and study centres are of key importance to a functioning education system. At presents this type of facility is located in the “major” urban areas (old TLCs) of the District, with limited provision for the vast rural population. A policy is required to ensure that such facilities are available to specifically the rural learners who often do not have appropriate facilities for studying and research. A further issue relating to education to be noted is the lack of appropriate, work orientated subjects being offered. The need to prepare pupils for their entry into the labour market is therefore not addressed.
1.12.1 Fire Services in the District There are six fire stations within the jurisdiction of the uMgungundlovu District Municipality. Table 14: Mooi River Fire Station which covers the following areas: DESCRIPTION RESPONSE TIME Balgowan (Boundary with Estcourt) ± 20 minutes Hidcote ± 10 minutes Middelrus – Rural area ± 1 hour Tetronet High Risk ± 10 minutes Bruntville ± 5 minutes Mooi River Textiles (High Risk) ± 5 minutes Giants Castle – Rural area ± 1 hour Kamberg – Rural area ± 1 hour Rosetta - village ± 15 minutes Nottingham Road - village ± 20 minutes LPG Storage area in Nottingham Road – High Risk
± 20 minutes
Fort Nottingham - village ± 30 minutes Dargle - village ± 40 minutes Mount West – village ± 15 minutes Craigieburn Dam - village ± 1 hour Available fire engine Toyota Landcruiser Required type of fire engines - 1 major pumper
30
1 water tanker 1 land cruiser Table 15: uMshwathi fire Station which covers the following areas: DESCRIPTION RESPONSE TIME Appelsbosch - village ± 50 minutes Union co-operation – high risk factory ± 12 minutes Noordsburg Sugar Mill- high risk ± 20 minutes Seven Oaks Pine factory – high risk ± 25 minutes E & C Charcoal – between Dalton and Seven Oaks – high risk
± 20 minutes
Eskom Power Plant (Mpolweni) ± 15 minutes Holly brothers Creosote factory – high risk (between Wartburg and Bruyns Hill)
± 25 minutes
Schroders Pine factory – high risk (between New Hanover and Wartburg)
± 10 minutes
Ashton Sawmill – high risk (between New Hanover and Seven Oaks)
± 15 minutes
Swayimane – rural area ± 30 minutes Wartburg – town ± 15minutes Bruyans Hill - rural ± 20 minutes Dalton – town ± 15 minutes Harburg – town ± 20 minutes Noordsburg – village ± 20 minutes Mpolweni – rural ± 15 minutes Cramond – village/rural ± 25 minutes Seven Oaks ± 20 minutes Rietvlei /rural ± 25 minutes Table mountain - village ± 30 minutes Creosote factory in Cramond ± 20 minutes Available fire engine Toyota Landcruiser Required type of fire engines - 1 major pumper, 1 water tanker, 1 land cruiser
31
High Risk Areas
• Union co-operation and the response time is ± 12 minutes from the fire station • Noordburg sugar mill Response time from the fire station ± 20 minutes • Seven Oaks Pine factory Response time from the fire station ± 25 minutes • E and C Charcoal Response time from the fire station ± 20 minutes • Eskom Power Plant Response time from the fire station ± 15 minutes • Holly Brother factory Response time from the fire station ± 20 minutes • Schroders Pine factory Response time from the fire station ± 25 minutes • Ashwton sawmill Response time from the fire station ± 15 minutes • Appelsbotch Hospital Response time from the fire station ± 55 minutes Table 16: Impendle fire Station which covers the following areas: DESCRIPTION RESPONSE TIME Gomane – 5 km ± 15 min Shnabamkhosi – 2 km ± 5 min Novuka – 5km ± 15 min Khetha – 6 km ± 15 min Madithini - 12 km ± 20 min Inzinga – 19km ± 25 min Nguga - 27 km ± 40 min Makhuzeni – 25 km ± 40 min Swamp – 18 km ± 35 min Howick – 64 km ± 45 min Elanskop - 32 km ± 29 min Boston – 20 km ± 24 min Willow – 2km ± 5 min Loteni - 55 km ± 1 hour 35 min Stoffle Town - 40 km ± 1 hour Mbaniliyezwe - 16 km ± 25 min Dargle - 25 km ± 40 min Mackesm - 10 km ± 20 min
32
Available fire engine Toyota Landcruiser Required type of fire engines - 1 major pumper 1 water tanker 1 land cruiser Table 17: Howick Fire Station which covers the following areas: DESCRIPTION RESPONSE TIME Hilton -15 km ± 20 min Mpophomeni - 15km ± 20 min Kwa-Haza - 25 km ± 35 min Impendle - 64 km 1 hour ± 30 min Karkloof - 15 km ± 20 min Curry Post -25 km ± 35 min Balgowan – 45 km 1 hour Nottingham Road - 65 km 1 hour ± 30 min Sweetwaters - 30 km ± 40 min Lion Rivers - 25 km ± 40 min Howick West - 12 km ± 17 min Merrival - 15 km ± 20 min Dargle - 20 km ± 35 min Elandskop - 45 km ± 1 hour Mafakthini – 35 km ± 40 min Cedara - 12 km ± 20 min Available fire engine Toyota Landcruiser Required type of fire engines - 1 major pumper 1 water tanker 1 land cruiser High Risk Areas BTR Rubber factory Old Age Home Pertonet
33
Timber factory Hospitals N3 Highways Schools Residential Areas Colleges Farms/ Forrestry Table 18: Ashburton fire Station which covers the following areas: DESCRIPTION RESPONSE TIME Lynfield Park - 2 km ± 6 min Umlass Road – 4 km ± 8 min Camperdown – 6 km ± 11 min Eston Garage – 15 min ± 25 min Mid Illovo – 17 km ± 30 min Available fire engine Toyota Landcruiser Required type of fire engines - 1 major pumper 1 water tanker 1 land cruiser High Risk Areas Camperdown – garage, shopping centre, residential, chicken farms, schools and agriculture Umlaas Road – Industrial, garage, shops, residential, agriculture Eston – Garage, agriculture, sugar mill, game reserve, chicken farms Lyn Field Park – residential, game reserve, lion park, school
34
Table 19: Richmond fire Station which covers the following areas:
DESCRIPTION RESPONSE TIME Burnton - 12 km ± 9 min Umkomaas - 20.7 km ± 15 min Hopewell – 28 km ± 20 min Hopewell – 28 km ± 20 min Inslazuka – 10.7 km ± 7 min Eston - 6 km ± 4 min Available fire engine Toyota Landcruiser Required type of fire engines - 1 major pumper 1 water tanker 1 land cruiser High Risk Areas Pilsons Garage Engen Garage Shell Garage Andersons Garage and Transport Natal Forest Products 3 x plank factory Residential (formal) and informal Supermarket and small shops Eskom sub stations Calls attended in any given month Average ± 100 calls that includes the following catorgries: vegetation and rubbish fires dwelling / houses motor vehicle accidents miscellaneous calls eg. mountain rescue
35
Disaster Management in the District
STATUS QUO CHALLENGES
1. Disaster Management Plan: Disaster Risk Assessment (KPA 2)
• Draft template risk as guidelines send to the local municipalities
Local municipalities have employed Disaster Management coordinators that need training and National Disaster Management Framework that will enable them to developed their own Local Disaster Management Plans
2. Public Awareness Education: Disaster Risk Reduction (KPA 3)
• Trained 800 communities members on public safety - First Aid - Fire Fighting - Social Crime - Road Safety Basic Disaster Management
The District is in a process of purchasing the Emergency Satellite containers for Local Municipalities to develop a pilot project. The containers will be utilized by the volunteers trained to mobilize disaster management functions.
3. Response and Recovery ( KPA 4)
(i) Disaster Management Tools budgeted at R616 000.00 to purchase i.e. sponges, mattresses, blankets, tents, generators and emergency lamps
(ii) Emergency response to affected communities in progress through available resources as mentioned above to respond to constant risks such as fire, floods, snow, hailstorm and evictions.
Lack of sustainable programs in form of liaising with organs of state such as Education Department, Housing Department, Health Department and Social Development Department. Education Department - school emergency plan
- Poor school infrastructure - Substance abuse
Housing Department
- Social Housing and Emergency Housing
Health Department - Development of (ORT) outbreak response team to
coordinate communicable disease management i.e. cholera
36
Social Development Social Welfare in community i.e. job creation and poverty alleviation
ISSUES Installation of two way radios Installation of the backup generator Connection of the software Employment of qualified staff members for key positions Fully fledged disaster centre that incorporates fire and water services Soft wares to cater for fire and water services Training of newly employed staff members and retraining of old staff members Training of community structures e.g. Policing Forums. Ward Committees, Community Development Workers
37
Implications Implications Implications Implications
Generally, affordability level is too low with the most affected municipalities being Generally, affordability level is too low with the most affected municipalities being Generally, affordability level is too low with the most affected municipalities being Generally, affordability level is too low with the most affected municipalities being
Mooi Mpofana, Richmond and Mkhambathini. Mooi Mpofana, Richmond and Mkhambathini. Mooi Mpofana, Richmond and Mkhambathini. Mooi Mpofana, Richmond and Mkhambathini.
Household food security is emerging as one of the critical issues that require Household food security is emerging as one of the critical issues that require Household food security is emerging as one of the critical issues that require Household food security is emerging as one of the critical issues that require
imimimimmediate attention. This could be in the form of food parcels, but more mediate attention. This could be in the form of food parcels, but more mediate attention. This could be in the form of food parcels, but more mediate attention. This could be in the form of food parcels, but more
sustainable programs should be developed. sustainable programs should be developed. sustainable programs should be developed. sustainable programs should be developed.
Free Basic Education should be promoted as a means to assist a relatively high Free Basic Education should be promoted as a means to assist a relatively high Free Basic Education should be promoted as a means to assist a relatively high Free Basic Education should be promoted as a means to assist a relatively high
number of households that cannot afford to send their children number of households that cannot afford to send their children number of households that cannot afford to send their children number of households that cannot afford to send their children to school. to school. to school. to school.
Otherwise, there is a danger of illiteracy reproducing itself.Otherwise, there is a danger of illiteracy reproducing itself.Otherwise, there is a danger of illiteracy reproducing itself.Otherwise, there is a danger of illiteracy reproducing itself.
There is a need to improved access to primary health care in line with the policy and There is a need to improved access to primary health care in line with the policy and There is a need to improved access to primary health care in line with the policy and There is a need to improved access to primary health care in line with the policy and
standards set by the Department of Health. standards set by the Department of Health. standards set by the Department of Health. standards set by the Department of Health.
Housing delivery should be intensified, as a relativHousing delivery should be intensified, as a relativHousing delivery should be intensified, as a relativHousing delivery should be intensified, as a relatively large number of households ely large number of households ely large number of households ely large number of households
cannot afford their own housing. This should be done proactively so as to cannot afford their own housing. This should be done proactively so as to cannot afford their own housing. This should be done proactively so as to cannot afford their own housing. This should be done proactively so as to
prevent the emergence of informal settlements. prevent the emergence of informal settlements. prevent the emergence of informal settlements. prevent the emergence of informal settlements.
Programs for the provision of free basic services suchPrograms for the provision of free basic services suchPrograms for the provision of free basic services suchPrograms for the provision of free basic services such as water and electricity as water and electricity as water and electricity as water and electricity
should be intensified sshould be intensified sshould be intensified sshould be intensified so as to improve access to these services. o as to improve access to these services. o as to improve access to these services. o as to improve access to these services.
38
ECONOMIC DEVELOPMENT Table 20: District in Context of the Province, Socio Economic Conditions
2004 Province uMgungundlovu
Expressed as a % of Province
Population Size 9,843,947 990,795 10.07
Per Annum Population Growth Rate (1996 – 2004)
1.49 1.57
Total Number of Households 2,281,752 248,693 10.90
Human Development Index 0.57 0.59
Gini Coefficient 0.65 0.62
Number of People in Poverty 5,315,493 506,909 9.54
Percentage of People in Poverty 54.0% 51.2%
Poverty gap (R million) 8,819 843
Number of People Living with Less than $1 per day
1,189,284 89,782 7.55
Education, Number of People with No Schooling 652,567 52,123 7.99
Education, Number of People with Matric Only 1,315,660 149,775 11.38
Education, Number of People with Matric & Diploma
168,369 22,152 13.16
Education, Number of People with Matric & Bachelors Degree
71,396 8,907 12.48
Education, Number of People with Matric & Masters Degree
12,752 2,022 15.86
Functional literacy: age 20+, completed grade 7 or higher
69.6% 75.4%
Population Density (number of people per km²) 106.52 114.30
Urbanization Rate (% of people living in urban areas)
47.5% 64.6%
Economically Active Population (EAP) 3,472,305 416,109 11.98
EAP as % of Total Population 35.3% 42.0%
Unemployment Rate (broad definition) 46.7% 47.2%
Total Employment in Agriculture 126,983 23,054 18.16
39
Table 6:District in Context of the Province, Socio Economic Conditions
2004 Province uMgungundlovu
Expressed as a % of Province
Total Employment in Mining 7,322 340 4.65
Total Employment in Manufacturing 303,568 22,922 7.55
Total Employment in Electricity 9,153 1,300 14.20
Total Employment in Construction 107,836 8,511 7.89
Total Employment in Trade 397,034 35,465 8.93
Total Employment in Transport 94,825 8,247 8.70
Total Employment in Finance 139,581 14,191 10.17
Total Employment in Community services 342,938 42,584 12.42
Total Employment in Households 134,444 16,666 12.40
Total Number of People in Formal Employment 1,663,682 173,281 10.42
Annual Total Personal Income (R million, current prices)
165,361 17,405 10.53
Annual per Capita Income (Rand, current prices)
16,798 17,567
Annual per Household Income (Rand, current prices)
72,471 69,987
Annual Total Disposable Income (R million, current prices)
147,389 15,558 10.56
Annual Expenditure (R 1000) 167,079,456 17,646,780 10.56 (Source; Global Insight)
The following is a summary of the main findings of the economic comparison as illustrated in table 5.2:
• The district contributes12% to the total remuneration generated in the province.
• The district accounts for 8% of total turnover.
• Wages in the district is higher that wages elsewhere in the province, except Ethekwini.
• The pace of job creation in the district is faster than in the province
• Prices are increasing at a faster rate that in the rest of the province
40
• Almost 50% of all additions to commercial property can be found in the district
• House prices are fairly moderate compared to prices in the rest of the province.
• The district economy is the fastest growing economy as measured by the increase in economic activity in the province.
• Residents with in the district have a greater propensity to spend/shop in comparison with residents outside the district.
• Average personal income levels are marginally higher with in the district compared to the rest of the province.
Table 21: District in Context of the Province, Socio Economic Conditions
2004 Province uMgungundlovu Expressed as a %
of Province
Remuneration (R’m, average per quarter) 19,801 2,531 12.78
Turnover (R’m, average per quarter)) 113,997 9,535 8.36
Wages per R1 of Sale (cents) 17 26 152.94 Number of Claims for Unemployment benefits (average per month) 7,562 1,289 17.04 Number of New Job Postings (Index, average per month) 118 130 110.00 Number of Building Plans Approved (average per month) 874 85 9.68 Rand Value of Building Plans Approved (average per month) 248,120,932 24,557,862 9.90 Rand Value per Building Plan Approved (average per month) 282,905 292,181 103.28 Additions to Commercial Property in m² (average per month) 3,533 1,609 45.54 Additions to Industrial Property in m² (average per month) 5,546 186 3.36 Number of Civil Cases for Debt (average per month) 12,134 1,610 13.27
CPI (%, average per month) 1.16 1.38 119.25
Food Inflation (%, average per month) 1.23 1.29 105.01 Number of New Vehicle sales (Passenger, average per month) 1,927 252 13.08
41
Number of New Vehicle sales (Commercial, average per month) 743 133 17.96
Table 22: District in Context of the Province, Socio Economic Conditions
2004 Province uMgungundlovu Expressed as a %
of Province
Live vehicle population (Heavy and light load, average per month) 133,076 30,174 22.67 Live vehicle population (Passenger and mini bus, average per month) 346,177 66,136 19.10
EPI Index (average per month) 115 189 164.95 Electricity Consumption by the Municipality (Index, average per month) 2.96 1.12 37.98 Electricity Consumption by Households (Index, average per month) 3.19 1.01 31.64 Electricity Consumption by Commercial Users (Index, average per month) 3.21 1.22 37.95
Water Consumption (average kl/d per month) 1,522,023 127,737 8.39
Retail Activity (Index, average per month) 207 400 193.38
Number of Houses Sold (average per month) 1,347 95 7.05 Average Selling Price of a Houses (average per month) 772,808 430,313 55.68 Number of Bank Teller Transactions (Index, average per month) 108 107 98.43 Number of Bank ATM Transactions (Index, average per month) 106 99 94.02 Rand Value of Bank Withdrawal Transactions (Index, average per month) 105 114 108.40
Diesel Consumption (liters, average per month) 86,393,486 12,505,444 14.47
Petrol Consumption (liters, average per month) 95,119,312 15,240,978 16.02 (Source; Coetzee)
(Index, January 2003 = 100)
42
Table 23:Provincial Budget Dynamics
Expenditure per department (R'000) April - June 2006
Current Transfers and
Subsidies Capital % of total spending
Office of the Premier 51236 16284 2323 0.88
Provincial Parliament 22445 3920 2803 0.37
Agriculture and Environmental Affairs 199009 88464 13445 3.81
Economic Development 17548 85 139 0.23
Education 3286927 266328 8725 45.12
Provincial Treasury 45683 47 805 0.59
Health 2356192 97271 177393 33.33
Housing 66281 236388 1201 3.85
Safety and Security 22804 -8 1238 0.30
The Royal Household 6435 38 1059 0.10
Traditional and Local Government Affairs 71341 2975 1309 0.96
Transport 200317 15473 283974 6.33
Welfare and Population Development 97592 65544 4405 2.12
Works 79501 801 1889 1.04
Arts. Culture and Tourism 27639 26543 807 0.70
Sport and Recreation 21030 42 519 0.27
Total 6571980 820195 502034 100.00
Spending allocation as a % of total spending 83.25 10.39 6.36
43
Table 24: Structure of the District Economy
Type As a % of Total Number of Businesses
Agriculture, Forestry, Hunting 0.52
Farming 2.73
Mining 0.00
Quarrying 0.05
Manufacturing 2.46
Electricity, Gas & Water 0.29
Construction 3.56
Educational Institutions 0.63
Catering & Accommodation 3.58
Wholesale & Retail 7.13
Transport, Storage & Communications 1.01
Banks 0.03
Insurance 0.15
Pension & Medical Aid Funds 0.03
Real Estate & Business Service 73.48
Building Societies 0.01
Central Government 0.04
Local Government 0.09
Provincial Government 0.02
Social & Personal Services 4.15
Taxis 0.03
Total 100.00
(RSC Levy data-base)
44
Comparing the structure of the district economy with the structure of the provincial economy indicates a greater dependence on the service sector and a lesser dependence on the primary and secondary sectors Table 25:Municipality in Context of the District, Socio Economic Conditions
Richmond Msunduzi Impendle uMngeni Mpofana uMshwathi
Total Population in 1996 67,782 601,831 39,674 56,290 23,791 90,974
Total Population in 2004 75,860 682,031 44,655 61,165 25,753 101,330
Population growth rates in 1996
1.7% 2.2% 1.7% 1.6% 1.4% 1.6%
Population growth rates in 2004
1.2% 1.3% 1.3% 0.8% 0.7% 1.1%
Human Development Index (HDI) 1996
0.42 0.60 0.40 0.58 0.49 0.41
Human Development Index (HDI), 2004
0.46 0.62 0.45 0.61 0.52 0.47
Gini coefficient, 1996 0.60 0.57 0.52 0.59 0.59 0.57
Gini coefficient, 2004 0.64 0.60 0.59 0.62 0.60 0.64
Number of people in poverty, 1996
41.2% 52.0% 36.5% 58.9% 35.4% 44.3%
Number of people in poverty, 2004
63.6% 45.5% 73.8% 44.5% 60.7% 71.4%
(Stats SA, Census, 2001)
45
Table 26: Municipality in Context of the District, Socio Economic Conditions
Richmond Msunduzi Impendle uMngeni Mpofana uMshwathi
Percentage of people living with less than $1 per day, 1996
7.6% 3.2% 7.3% 2.9% 4.3% 6.7%
Percentage of people living with less than $1 per day, 2004
15.3% 7.0% 15.4% 7.9% 11.8% 15.2%
Percentage of people living with less than $2 per day, 1996
20.6% 8.4% 24.1% 10.0% 19.3% 21.5%
Percentage of people living with less than $2 per day, 2004
27.7% 13.4% 31.4% 15.9% 25.9% 28.7%
Number of 15 + Pupils Less than Matric, 1996
503 3,632 169 337 336 130
Number of 15 + Pupils Less than Matric, 2004
308 1,969 97 182 186 77
Number of Pupils 15 + Matric Only, 1996
3,513 76,583 1,700 6,843 1,708 4,778
Number of Pupils 15 + Matric Only, 2004
6,279 118,919 3,217 10,251 2,545 8,565
Number of Pupils Matric and Masters, 1996
0 774 0 80 13 31
Number of Pupils Matric and Masters, 2004
0 1,821 0 91 109 0
Functional literacy: age 20+, completed grade 7 or higher, 1996
11,931 230,496 8,412 18,373 5,878 18,396
Functional literacy: age 20+, completed grade 7 or higher, 2004
22,721 347,224 14,022 30,156 10,350 32,264
Population density (number of people per km²), 1996
50.56 550.92 23.95 35.22 15.12 64.69
(Stats SA, Census, 2001)
46
Table 27: Municipality in Context of the District, Socio Economic Conditions
Richmond Msunduzi Impendle uMngeni Mpofana uMshwathi
Population density (number of people per km²), 2004
56.59 624.33 26.95 38.27 16.36 72.05
Urbanization rate (% of people living in urban areas), 1996
6.0% 72.1% 0.3% 62.9% 37.0% 5.6%
Urbanization rate (% of people living in urban areas), 2004
3.3% 83.0% 0.2% 89.9% 46.3% 4.0%
Economically active population (EAP), 1996
17,973 228,973 8,379 20,694 6,875 24,332
Economically active population (EAP), 2004
24,393 311,194 11,572 27,067 8,943 32,940
Number of unemployed people, 1996 6,401 91,720 4,597 6,042 1,301 9,328
Number of unemployed people, 2004 10,467 151,047 7,412 10,184 2,145 15,259
Unemployment rate (%), 1996 35.6% 40.1% 54.9% 29.2% 18.9% 38.3%
Unemployment rate (%), 2004 42.9% 48.5% 64.0% 37.6% 24.0% 46.3%
Formally Employed People Agriculture, 1996
6,190 2,901 1,257 2,364 2,442 5,526
Formally Employed People Agriculture, 2004
6,970 3,219 1,422 2,608 2,622 6,213
Formally Employed People Mining, 1996
0 248 0 26 0 156
Formally Employed People Mining, 2004
0 140 0 26 0 174
Formally Employed People Manufacturing, 1996
473 20,173 60 1,576 526 2,202
Formally Employed People Manufacturing, 2004
375 15,200 31 1,089 278 2,171
Formally Employed People Electricity, 1996
31 1,081 0 124 38 16
(Stats SA, Census, 2001)
47
Table 28: Municipality in Context of the District, Socio Economic Conditions
Richmond Msunduzi Impendle uMngeni Mpofana uMshwathi
Formally Employed People Electricity, 2004
31 1,089 0 125 38 16
Formally Employed People Construction, 1996
78 3,379 117 224 39 92
Formally Employed People Construction, 2004
68 3,263 84 182 28 107
Formally Employed People Trade, 1996
329 11,909 132 735 421 470
Formally Employed People Trade, 2004
370 14,796 122 769 395 703
Formally Employed People Transport, 1996
28 5,505 14 204 131 168
Formally Employed People Transport, 2004
19 4,449 11 141 79 160
Formally Employed People Finance, 1996
96 8,493 14 359 108 97
Formally Employed People Finance, 2004
118 11,317 15 419 117 145
Formally Employed People Community Services, 1996
674 24,174 446 1,273 594 779
Formally Employed People Community Services, 2004
910 32,583 603 1,713 793 1,057
Formally Employed People Households, 1996
581 14,754 84 1,437 301 530
Formally Employed People Households, 2004
547 13,902 79 1,354 284 500
Formally Employed People – Total, 1996
8,480 92,617 2,124 8,322 4,600 10,037
Formally Employed People – Total, 2004
9,408 99,956 2,367 8,427 4,635 11,245
(Stats SA, Census, 2001)
48
Table 29: Municipality in Context of the District, Socio Economic Conditions
Richmond Msunduzi Impendle uMngeni Mpofana uMshwathi
Formally Employed People - % Agriculture, 1996
73.0% 3.1% 59.2% 28.4% 53.1% 55.1%
Formally Employed People - % Agriculture, 2004
74.1% 3.2% 60.1% 30.9% 56.6% 55.3%
Formally Employed People - % Mining, 1996
0.0% 0.3% 0.0% 0.3% 0.0% 1.6%
Formally Employed People - % Mining, 2004
0.0% 0.1% 0.0% 0.3% 0.0% 1.6%
Formally Employed People - % Manufacturing, 1996
5.6% 21.8% 2.8% 18.9% 11.4% 21.9%
Formally Employed People - % Manufacturing, 2004
4.0% 15.2% 1.3% 12.9% 6.0% 19.3%
Formally Employed People - % Electricity, 1996
0.4% 1.2% 0.0% 1.5% 0.8% 0.2%
Formally Employed People - % Electricity, 2004
0.3% 1.1% 0.0% 1.5% 0.8% 0.1%
Formally Employed People - % Construction, 1996
0.9% 3.6% 5.5% 2.7% 0.8% 0.9%
Formally Employed People - % Construction, 2004
0.7% 3.3% 3.5% 2.2% 0.6% 0.9%
Formally Employed People - % Trade, 1996
3.9% 12.9% 6.2% 8.8% 9.2% 4.7%
Formally Employed People - % Trade, 2004
3.9% 14.8% 5.1% 9.1% 8.5% 6.2%
Formally Employed People - % Transport, 1996
0.3% 5.9% 0.6% 2.4% 2.8% 1.7%
Formally Employed People - % Transport, 2004
0.2% 4.5% 0.5% 1.7% 1.7% 1.4%
49
(Stats SA, Census, 2001)
Table 30: Municipality in Context of the District, Socio Economic Conditions
Richmond Msunduzi Impendle uMngeni Mpofana uMshwathi
Formally Employed People - % Finance, 1996
1.1% 9.2% 0.7% 4.3% 2.4% 1.0%
Formally Employed People - % Finance, 2004
1.2% 11.3% 0.6% 5.0% 2.5% 1.3%
Formally Employed People - % Community Services, 1996
8.0% 26.1% 21.0% 15.3% 12.9% 7.8%
Formally Employed People - % Community Services, 2004
9.7% 32.6% 25.5% 20.3% 17.1% 9.4%
Formally Employed People - % Households, 1996
6.8% 15.9% 3.9% 17.3% 6.6% 5.3%
Formally Employed People - % Households, 2004
5.8% 13.9% 3.3% 16.1% 6.1% 4.4%
Number of households by income category R0 - R2400, 1996
549 2,553 211 136 40 611
Number of households by income category R0 - R2400, 2004
1,550 6,908 581 667 255 2,244
Number of households by income category R360 000 +, 1996
196 1,966 26 158 85 46
Number of households by income category R360 000 +, 2004
290 7,501 55 696 103 257
Personal Income Annual, 1996 (R - million current prices)
415 7,070 154 661 151 418
Personal Income Annual, 2004 (R - million current prices)
756 13,965 274 1,262 242 905
(Stats SA, Census, 2001)
50
Table 31: Municipality in Context of the District, Socio Economic Conditions
Richmond Msunduzi Impendle uMngeni Mpofana uMshwathi
Personal Income Annual per capita income (Rand, current prices), 1996
6,124 11,748 3,873 11,744 6,361 4,600
Personal Income Annual per capita income (Rand, current prices), 2004
9,971 20,476 6,136 20,636 9,414 8,931
Personal Income - Annual per Household, 1996
29,879 51,969 22,498 51,156 34,331 21,097
Personal Income - Annual per Household, 2004
41,253 80,285 29,840 80,707 44,735 34,582
Annual total disposable income (R million, current prices), 1996
366 6,117 139 568 133 376
Annual total disposable income (R million, current prices), 2004
687 12,446 253 1,125 221 827
Annual total disposable income (R million, constant 2000 prices), 1996
497 8,302 188 772 180 510
Annual total disposable income (R million, constant 2000 prices), 2004
538 9,750 198 881 173 648
Total Annual Expenditure, 1996 (R 1000)
414,058 6,975,614 155,718 649,709 149,749 422,547
Total Annual Expenditure, 2004 (R 1000)
782,288 14,108,694 290,613 1,266,888 250,893 947,404
Annual Retail Trade Sales, 1996 (R 1000)
150,039 2,470,349 35,033 212,623 44,669 118,295
Annual Retail Trade Sales, 2004 (R 1000)
290,056 4,863,550 48,201 394,025 80,271 248,972
(Stats SA, Census, 2001)
51
Table 32: Municipality in Context of the District, Socio Economic Conditions
Richmond Msunduzi Impendle uMngeni Mpofana uMshwathi
Gross Value Added by Region (GVA-R), 1996 (Current Prices, R1 000)
219,483 6,548,676 84,240 420,620 142,333 466,936
Gross Value Added by Region (GVA-R), 2004 (Current Prices, R1 000)
385,573 13,138,247 143,529 783,890 238,598 906,088
Gross Value Added by Region (GVA-R), 1996 (Constant 2000 Prices, R1 000)
273,030 8,754,334 106,637 556,349 178,720 576,596
Gross Value Added by Region (GVA-R), 2004 (Constant 2000 Prices, R1 000)
285,910 10,120,381 109,529 584,733 171,158 663,824
Gross Value Added by Region (GVA-R), 1997 Average Annual Growth (Constant 2000 Prices)
0.8% 0.5% -3.9% -3.5% 0.0% 0.4%
Gross Value Added by Region (GVA-R), 2004 Average Annual Growth (Constant 2000 Prices)
2.4% 5.1% 2.0% 4.4% 3.2% 3.8%
GVA-R per Capita, 1996 (Constant 2000 Prices)
4,580 16,288 3,076 11,243 8,450 7,203
GVA-R per Capita, 2004 (Constant 2000 Prices)
4,192 16,406 2,731 10,697 7,389 7,381
Gross Domestic Product by Region (GDP-R), 1996 (Constant 2000 Prices, R1 000)
310,470 9,802,386 122,029 632,860 201,040 655,315
Gross Domestic Product by Region (GDP-R), 2004 (Constant 2000 Prices, R1 000)
318,038 11,189,223 121,944 654,261 190,300 747,956
(Stats SA, Census, 2001)
52
Table 33: Municipality in Context of the District, Socio Economic Conditions
Richmond Msunduzi Impendle uMngeni Mpofana uMshwathi
Gross Domestic Product by Region (GDP-R), Average Annual growth 1997
1.2% 0.6% -3.4% -3.2% 0.2% 0.5%
Gross Domestic Product by Region (GDP-R), Average Annual growth, 2004
2.1% 5.0% 1.7% 4.1% 3.1% 3.9%
Gross Domestic Product by Region (GDP-R), Per Capita Current Prices, 1996 (Constant 2000 Prices)
3,592 11,999 2,372 8,345 6,585 5,688
Gross Domestic Product by Region (GDP-R), Per Capita Current Prices 2004 (Constant 2000 Prices)
5,745 21,716 3,649 14,595 10,428 10,241
Labour Remuneration, 1996 (Current prices, R 1000)
103,209 4,059,274 38,790 246,082 73,946 156,413
Labour Remuneration, 2004 (Current prices, R 1000)
188,497 7,562,014 67,927 437,112 119,850 322,905
Gross Operating Surplus, 1996 (Current prices, R 1000)
116,274 2,489,401 45,451 174,539 68,388 310,523
Gross Operating Surplus, 2004 (Current prices, R 1000)
197,075 5,576,232 75,602 346,778 118,748 583,183
(Stats SA, Census, 2001)
Tables above supply information on occupation levels per municipality. The number of people, especially women, in elementary occupations
throughout the province, but especially in the less developed local municipalities, must be a serious concern. These occupations are normally
very low paid, requiring very little education or skills levels. These occupations also have very little opportunities for progress. The dependence
on the primary sector is again clearly visible. The more developed local economies clearly have more people in professional occupations, whether
it’s a cause or a consequence is debatable, but the fact remains higher levels of education and skills contributes to development. It is also very
interesting to note the large differences between the males and females in the technicians and associate professionals occupations. Females
outnumber males throughout the district and sometimes in very significant numbers. The very low numbers of people involved in craft and related
trades indicates very low technical skill levels in the district.
53
Table 34: Occupation amongst the employed aged 15-65 years- uMshwathi
Males Females Males Females
Legislators; senior officials and managers 268 92 2.43% 1.02%
Professionals 187 102 1.78% 1.24%
Technicians and associate professionals 267 508 2.42% 5.66%
Clerks 436 367 3.95% 4.09% Service workers; shop and market sales workers 607 199 5.51% 2.22%
Skilled agricultural and fishery workers 996 865 9.03% 9.63%
Craft and related trades workers 1266 269 11.48% 3.00% Plant and machine operators and assemblers 2453 141 22.25% 1.57%
Elementary occupations 3612 5415 32.76% 60.31% Occupations unspecified and not elsewhere classified 0 0 0.00% 0.00%
Undetermined 933 1020 8.46% 11.36% (Stats SA, Census, 2001)
Table 36: Occupation amongst the employed aged 15-65 years - uMngeni
Males Females Males Females
Legislators; senior officials and managers 948 303 7.73% 3.05%
Professionals 947 632 7.93% 6.70%
Technicians and associate professionals 756 975 6.16% 9.82%
Clerks 444 887 3.62% 8.93% Service workers; shop and market sales workers 984 644 8.02% 6.49%
Skilled agricultural and fishery workers 1328 677 10.82% 6.82%
Craft and related trades workers 1285 352 10.47% 3.55% Plant and machine operators and assemblers 1866 216 15.21% 2.18%
Elementary occupations 2960 4477 24.13% 45.09% Occupations unspecified and not elsewhere classified 0 0 0.00% 0.00%
Undetermined 751 766 6.12% 7.71% (Stats SA, Census, 2001)
Table 35: Occupation amongst the employed aged 15-65 years - Mpofana
Males Females Males Females
Legislators; senior officials and managers 244 73 4.08% 2.10%
Professionals 165 87 2.65% 2.41%
Technicians and associate professionals 233 253 3.89% 7.26%
Clerks 190 303 3.17% 8.70%
Service workers; shop and market sales workers 454 256 7.58% 7.35%
Skilled agricultural and fishery workers 995 339 16.62% 9.73%
Craft and related trades workers 487 139 8.13% 3.99%
Plant and machine operators and assemblers 945 66 15.78% 1.89%
Elementary occupations 2104 1836 35.14% 52.71%
Occupations unspecified and not elsewhere classified 0 0 0.00% 0.00%
Undetermined 170 131 2.84% 3.76% (Stats SA, Census, 2001)
Table 37: Occupation amongst the employed aged 15-65 years: Impendle
(Stats SA, Census, 2001)
Males Females Males Females
Legislators; senior officials and managers 45 6 4.25% 0.91%
Professionals 17 26 1.27% 3.19%
Technicians and associate professionals 59 138 5.57% 20.91%
Clerks 8 39 0.76% 5.91%
Service workers; shop and market sales workers 106 45 10.01% 6.82%
Skilled agricultural and fishery workers 145 37 13.69% 5.61%
Craft and related trades workers 88 14 8.31% 2.12%
Plant and machine operators and assemblers 179 3 16.90% 0.45%
Elementary occupations 272 244 25.68% 36.97% Occupations unspecified and not elsewhere classified 0 0 0.00% 0.00%
Undetermined 140 108 13.22% 16.36%
54
Table 38: Occupation amongst the employed aged 15-65 years -
Msunduzi
Males Females Males Females
Legislators; senior officials and managers 4370 1720 6.84% 3.02%
Professionals 5099 4386 8.48% 8.22% Technicians and associate professionals 6115 8855 9.57% 15.56%
Clerks 5068 9326 7.93% 16.38% Service workers; shop and market sales workers 9384 5317 14.68% 9.34% Skilled agricultural and fishery workers 1023 588 1.60% 1.03%
Craft and related trades workers 10685 2574 16.72% 4.52% Plant and machine operators and assemblers 8953 1476 14.01% 2.59%
Elementary occupations 9048 18831 14.16% 33.08% Occupations unspecified and not elsewhere classified 0 0 0.00% 0.00%
Undetermined 4161 3846 6.51% 6.76% (Stats SA, Census, 2001)
Table 39: Occupation amongst the employed aged 15-65 years -
Mkhambathini
Males Females Males Females
Legislators; senior officials and managers 304 61 4.37% 1.52%
Professionals 110 88 1.56% 2.18% Technicians and associate professionals 113 193 1.63% 4.80%
Clerks 166 191 2.39% 4.75% Service workers; shop and market sales workers 484 160 6.96% 3.98% Skilled agricultural and fishery workers 1079 683 15.52% 16.98%
Craft and related trades workers 506 126 7.28% 3.13% Plant and machine operators and assemblers 1106 36 15.91% 0.89%
Elementary occupations 2765 2231 39.77% 55.46% Occupations unspecified and not elsewhere classified 0 0 0.00% 0.00%
Undetermined 320 254 4.60% 6.31% (Stats SA, Census, 2001)
55
Table 40: Occupation amongst the employed aged 15-65 years - Richmond
Males Females Males Females
Legislators; senior officials and managers 264 104 4.19% 1.88%
Professionals 109 83 1.74% 1.54%
Technicians and associate professionals 193 344 3.06% 6.21%
Clerks 197 297 3.12% 5.36%
Service workers; shop and market sales workers 535 235 8.48% 4.24%
Skilled agricultural and fishery workers 996 979 15.79% 17.67%
Craft and related trades workers 657 328 10.42% 5.92%
Plant and machine operators and assemblers 1097 91 17.40% 1.64%
Elementary occupations 1808 2674 28.67% 48.27%
Occupations unspecified and not elsewhere classified 0 0 0.00% 0.00%
Undetermined 450 405 7.14% 7.31%
(Stats SA, Census, 2001)
Tables above supply information on the number of people employed
per economic sector. Except for Msunduzi the primary sector
(agriculture) is the dominant sector in terms of employment in the
district. The traditional male/female sectors are very visible.
Females are mostly dominant in the community; social and personal
services sector whereas males are mostly dominant in the
manufacturing sector. The dependence on agriculture especially in
less developed local municipalities is again very evident. The
wholesale and retail sectors in the non-Msunduzi municipalities are
relatively insignificant suggesting that the majority of consumers
spend their income in Msunduzi. The mining, electricity; gas and
water supply, transport; storage and communication sectors are
almost non-existent in the district, however this does not mean there
is no potential - for example the communication sector does have a
lot of potential.
56
Table 41: Work Status 2001 (numbers and percentages)
uM
sh
wath
i L
ocal
Mu
nic
ipality
Number As a
Percentage
Paid employee 18822 29.34%
Paid family worker 198 0.31%
Self-employed 667 1.04%
Employer 420 0.65%
Unpaid family worker 74 0.12%
Not applicable 43961 68.54% (Stats SA, Census, 2001)
Table 42: Work Status 2001 (numbers and percentages)
uM
ng
en
i L
ocal
Mu
nic
ipality
Number As a
Percentage
Paid employee 19715 39.78%
Paid family worker 191 0.39%
Self-employed 1848 3.73%
Employer 270 0.54%
Unpaid family worker 172 0.35%
Not applicable 27370 55.22% (Stats SA, Census, 2001)
Table 44: Work Status 2001 (numbers and percentages)
Mo
oi M
po
fan
a L
oc
al
Mu
nic
ipality
Number As a
Percentage
Paid employee 8664 36.23%
Paid family worker 104 0.43%
Self-employed 592 2.48%
Employer 67 0.28%
Unpaid family worker 37 0.15%
Not applicable 14453 60.43%
(Stats SA, Census, 2001)
Table 42: Work Status 2001 (numbers and percentages)
Imp
en
dle
Lo
cal
Mu
nic
ipality
Number As a
Percentage
Paid employee 1346 7.61%
Paid family worker 39 0.22%
Self-employed 166 0.94%
Employer 141 0.80%
Unpaid family worker 33 0.19%
Not applicable 15956 90.24% (Stats SA, Census, 2001)
Table 43: Work Status 2001 (numbers and percentages)
Msu
nd
uzi L
ocal
Mu
nic
ipality
Number As a
Percentage
17681
Paid employee 109260 29.74%
Paid family worker 1313 0.36%
Self-employed 8301 2.26%
Employer 1392 0.38%
Unpaid family worker 375 0.10%
Not applicable 246753 67.16% (Stats SA, Census, 2001)
Table 45: Work Status 2001 (numbers and percentages)
Mkh
am
bath
ini
Lo
cal M
un
icip
ality
Number As a Percentage
Paid employee 10105 28.76%
Paid family worker 179 0.51%
Self-employed 576 1.64%
Employer 82 0.23%
Unpaid family worker 35 0.10%
Not applicable 24163 68.76%
(Stats SA, Census, 2001)
57
Table 46: Work Status 2001 (numbers and percentages)
(Stats SA, Census, 2001)
Tables above supply information on the work status of people per
municipality. It is very interesting to note that the number of people
self-employed is greater than the number of employers; this could be
because of the fairly large size of the informal sector. Both self-
employed and employers are however much less than paid
employees. It thus seems that the preference is to be an employee
and not to become self employed. This is very much a product of the
national education system because learners are not educated in
basic business skills. The very low levels of self employment also
indicate very low levels of entrepreneurial spirit and/or very little
SMME support or misplaced SMME policy. The relatively large
number of self-employed in Msunduzi suggests that a necessary
condition for development is large numbers of self-employed people.
Table 47: Economically active population amongst those aged
15 to 65 years, 2001
Number As a Percentage
uM
sh
wa
thi L
oca
l M
un
icip
ali
ty
Employed 20181 31.46%
Unemployed 15553 24.25%
Scholar or student 11001 17.15%
Homemaker or housewife 5071 7.91%
Pensioner or retired person 3385 5.28% Unable to work due to illness or disability 1897 2.96% Seasonal worker not working presently 334 0.52%
Does not choose to work 2451 3.82%
Not applicable 4271 6.66% (Stats SA, Census, 2001)
Table 48: Economically active population amongst those aged
15 to 65 years, 2001
uM
ng
en
i L
oc
al M
un
icip
ali
ty
Number As a Percentage
Employed 22194 34.60%
Unemployed 11536 23.27%
Scholar or student 6483 13.08%
Homemaker or housewife 1692 3.41%
Pensioner or retired person 2106 4.25% Unable to work due to illness or disability 1400 2.82% Seasonal worker not working presently 359 0.72%
Does not choose to work 1296 2.61%
Not applicable 2499 5.04% (Stats SA, Census, 2001)
Ric
hm
on
d L
ocal
Mu
nic
ipality
Number As a Percentage
Paid employee 10663 27.82%
Paid family worker 243 0.63%
Self-employed 635 1.66%
Employer 273 0.71%
Unpaid family worker 41 0.11%
Not applicable 26471 69.07%
58
Table 49: Economically active population amongst those aged
15 to 65 years, 2001
Mo
oi M
po
fan
a L
oc
al
Mu
nic
ipa
lity
Number As a Percentage
Employed 9464 14.75%
Unemployed 7508 31.39%
Scholar or student 3528 14.75%
Homemaker or housewife 862 3.60%
Pensioner or retired person 641 2.68% Unable to work due to illness or disability 414 1.73% Seasonal worker not working presently 78 0.33%
Does not choose to work 709 2.96%
Not applicable 713 2.98% (Stats SA, Census, 2001)
Table 51:Economically active population amongst those aged
15 to 65 years, 2001
Imp
en
dle
Lo
ca
l M
un
icip
ali
ty
Number As a
Percentage
Employed 1724 2.69%
Unemployed 4947 27.98%
Scholar or student 4405 24.91%
Homemaker or housewife 2390 13.52%
Pensioner or retired person 1102 6.23% Unable to work due to illness or disability 614 3.47% Seasonal worker not working presently 189 1.07%
Does not choose to work 796 4.50%
Not applicable 1516 8.57% (Stats SA, Census, 2001)
Table 50: Economically active population amongst those aged
15 to 65 years, 2001
Th
e M
su
nd
uzi
Lo
ca
l M
un
icip
ali
ty
Number As a
Percentage
Employed 120642 32.84%
Unemployed 112391 30.59%
Scholar or student 63341 17.24%
Homemaker or housewife 15195 4.14%
Pensioner or retired person 15559 4.23% Unable to work due to illness or disability 9702 2.64% Seasonal worker not working presently 1778 0.48%
Does not choose to work 9999 2.72%
Not applicable 18784 5.11% (Stats SA, Census, 2001)
Table 52: Economically active population amongst those aged
15 to 65 years, 2001
Mk
ham
ba
thin
i L
oc
al M
un
icip
ali
ty
Number As a
Percentage
Employed 10978 17.11%
Unemployed 8493 24.17%
Scholar or student 6505 18.51%
Homemaker or housewife 2552 7.26%
Pensioner or retired person 1490 4.24% Unable to work due to illness or disability 1024 2.91% Seasonal worker not working presently 196 0.56%
Does not choose to work 1493 4.25%
Not applicable 2409 6.86% (Stats SA, Census, 2001)
59
Table 53: Economically active population amongst those aged
15 to 65 years, 2001
KZ
22
7:
Ric
hm
on
d L
oc
al
Mu
nic
ipa
lity
Number As a
Percentage
Employed 11854 18.48%
Unemployed 9107 23.76%
Scholar or student 6043 15.77%
Homemaker or housewife 2252 5.88%
Pensioner or retired person 1759 4.59% Unable to work due to illness or disability 1325 3.46% Seasonal worker not working presently 247 0.64%
Does not choose to work 2947 7.69% Not applicable 2795 7.29%
(Stats SA, Census, 2001)
60
Table 54: Business Confidence in the District Expected sales performance over the next 3 months?
% of total Less than ogive
Much better 15.38 15.38 Better 64.10 79.49 Same 5.38 94.87 worse 5.13 100.00 Much worse 0.00 100.00
Source:UKZN business confidence survey 2007 Expecting to expand my workforce during the year
% of total Less than ogive
Yes definitely 5.13 5.13 Yes 48.72 53.85 May be 25.64 79.49 No 15.38 94.87 Downsizing 5.13 100.00 Source:UKZN business confidence survey 2007 The Business Confidence Index for Pietermaritzburg and uMgungundlovu District at present is compared to in 2005 ( for South Africa at December 2006) and should be interpreted as follows, i.e a value of 50 is indicative of neutrality, 100 indicates extreme confidence and 0 indicates extreme lack of confidence. It seems that businesses are positive and confident about the current and future state of business in Pietermaritzburg and in uMgungundlovu district. Therefore, the impact of investment and business confidence is the increase of employment opportunities in the district.,the impact of growing economy, employment and higher income levels is the property boom in the District.
Have experienced an increase in economic activity in the local economy during the past year
% of total Less than ogive
Yes definitely 10.26 10.26 Yes 48.72 58.97 May be 15.38 74.36 No 20.51 94.87 Downsizing 5.13 100.00
Present business trading conditions
% of total Less than ogive
Excellent 7.69 7.69 Good 53.85 61.52 Fair 33.33 94.87 Poor 5.13 100.00 Very poor 0.00 100.00
61
SUMMARY AND CONCLUSIONS ON SOCIO-ECONOMIC ANALYSIS
It is evident that the district economy is a fairly small in terms of the provincial economy. It is also evident that the Msunduzi economy is the
dominant economy in the district. One can therefore expect that benefits will flow to the dominant partner, in this case from the 6 non-Msunduzi
economies to the Msunduzi economy to the provincial economy.
The benefits accruing from a provincial economic upswing will to a lesser degree filter through to the district economy and in particular the
Msunduzi economy. One can apply the 10% and 80% rule as determined in the study. There are some clear linkages though between the
provincial economy and the district economy and the Msunduzi economy and the 6 non-Msunduzi economies in terms of the flow of factors of
production and goods and services. The net beneficiaries seem to be the dominant economies in both cases.
Status quo/Situational analysis for tourism
The main objective of tourism is to promote economic growth and job creation through six key objectives that are levers for tourism growth. The key objectives are to increase in tourist volume, increase tourists spend, increase the length of stay, improve geographic spread, improve seasonality pattern and promote transformation. These objectives are also consolidated into three areas of tourism marketing strategy which is Leisure (both domestic and international), business tourism (MICE-meetings, incentives, conferences and exhibitions) and a new area of activity called events. Since tourism is controlled by the government but driven by the private sector, our aim is to create an environment that is conducive for tourism development. Our plan should be to support the industry in developing their plans for growth and to promote strategic alignment and partnership around a common vision in the tourism sector. This requires tourism to be managed in a responsible and sustainable manner in order to generate tourism revenue that is the basis for economic growth. Sustainable tourism is created through the ability to maximize the amount of money that can be generated from tourists visiting a specific tourism product within an area of attraction and categories range from the high spend ( international tourists) to the lower spend (domestic tourists). However, the key to this whole process is to understand where these tourists come from, what attract them, what their needs are and what they will spend money on. The tourism industry operates within a framework of visitor attractions and facilities. For tourism destinations to be successful, they must meet the current as well as future needs for tourists in terms of location, operations and development. This includes the need to upgrade and rejuvenate tired or stagnant products.
62
To achieve this, issues such as information management particularly primary data as well as secondary data as well as marketing are of paramount importance for economic development. All this should be understood with the context that tourism is market driven as opposed to a product driven industry and that is the major difference that sets tourism apart from other industries in that a tourism destination or product must attract the tourist market (demand) as opposed to taking the product into the market. Therefore we have to identify who the major tourists markets are, what product would attract them and what products would fulfill their demand. Current product availability is another key issue that needs to be looked at through product development.
TOURISM POTENTIAL
UMgungundlovu Districts is recognized by KZNTA as one of the significant and unique tourism destination. This is based on the district’s rich and
diverse natural resource base and strategic location of the district’s as well as a variety of tourism accommodation, which positions it to benefit
from the SADC development initiative.
EVENTING Umgungundlovu hosts a number of private international events, such as the Comrade Marathon, the Dusi Canoe Marathon and the Midmar Mile. However, we haven’t picky beg on these events to make sure that they bring the most required tourism revenue into our district nor promote our region on these events. STATISTICS The district is the third most visited destinations by domestic tourists after Durban and South Coast (Tourism KwaZulu-Natal Occasional Paper No. 43). Our biggest attraction is the Midlands Meander one of the most successful route in South Africa. On the international front, the Pietermaritzburg-Midlands region is the forth visited destination by international tourists that come to the province of kwaZulu-Natal. Twenty three percent of international tourists that came to KwaZulu-Natal visited the Pietermaritzburg-Midlands region (Tourism KwaZulu-Natal Ocassional Paper No. 42). However, the recent ten percent drop of international tourists in 2006 compare to 2005 highlight a need to engage in vigorous marketing of this province and the Pietermaritzburg-Midlands region. PRODUCT DEVELOPMENT Our region is regarded as one of the areas that are rich in culture and heritage; however, that opportunity has not been investigated and packaged accordingly. Since cultural experience is one of the core attractions that are in demand from international tourists that visits our province, a product development strategy rich in cultural experience needs to be investigated to develop this key tourist’s demand. Tourism growth requires a range of role players which include private sector as well as public sector to work together towards a common vision. This highlight the importance of strategic alignment with the private sector, the drivers of tourism towards a common vision.
63
Figure 9: Tourism Accommodation within the District
21%
4%
16%
14%18%
21%
5% 1%
Bed and Breakfast
Caravan and Camping Site
Guest Houses
Lodge (Bush and Country)
Hotel/ Inn/ Motel
Self-catering
Youth hostel/ Backpackers
Cave/ Rest/ Trail Huts
64
Table 55: Agricultural Land Potential
UMGUNGUNDLOVU AGRICULTURAL LAND POTENTIAL BY LOCAL MUNICIPALITY
Mkham
bath
ini
Msunduzi
Um
shw
ath
i
Mpofa
na
Impe
ndle
uM
ng
en
i
Ric
hm
ond
Tota
l (DM
)
65
Agricultural Land
Potential Area (ha) % Area (ha) % Area (ha) % Area (ha) % Area (ha) % Area (ha) % Area (ha) % Area (ha) % High Land Potential 10696.7671 12 15516.6653 25 59486.3071 32.7 11827.352 13 17898.8919 11 73636.27 60 189062.2570 22
Good Land Potential 38047.6945 41.6 27641.5080 45 79989.6128 44 96876.8795 59 7628.3667 8 119938.7157 77 25751.34 21 395874.1150 45
Moderately Good Land Potential 10072.564 11 12521.3701 20 28146.0279 15.5 35.4994371 0.021 60823.917 64 12429.3269 8 3 128496.4162 15
Restricted Land 12832.7765 14 6229.3343 10 1698.7592 1 26791.5889 16 9343.185 8 56895.6439 6.2 Very
Restricted 15311.6271 16.7 3255.4773 1.8 4054.79414 2 6312.3483 6 220.7469 0.1 3756.628 3 32911.6218 4 Low Land Potential 4230.1752 4.62 8391.6335 5 27280.0858 17 2103.2956 1.4 6189.865 5 48195.0553 5.5 Very Low 217.1328 0.24 10150.1523 6 10367.2851 1.1
Vlei 8318.0153 9 2744.7598 2 11062.7751 1.2 Total 91539 100 63393 100 181803 100 165189 100 94910 100 156683 100 123145 100 876662 100
66
%
%
%
%%
%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
% %
%
Cool Air
New Hanov er
Pi ter marit zburg
Richm ond
Im pendl e
Howi ck
Hil ton
Ashbur ton
Wart burg
Mooi Ri ver
Roset taDalt on
Cam perdo wn
Crai gie Burn
Bli nkw ater
Hi ghm oor Nature Reserv e
Kark l oof
Kam berg Natur e
Reserve
Alberts Fall s
Umgeni Vlei Nature Reserv e
Mi dmar
Queen El izabet h ParkDoreen Cl ar k
KZ 22 1
KZ 223
KZ 22 2
KZ 227
KZ 22 4
KZ 22 6
KZ 225
KZ D M A2 2
M po fa na
uM n ge ni
Im pe nd le
Ric hm o nd
M su nd uz i
uM s hw a thi
M kh am b a thini
YOR K
BY R NE
EST O N
DA R G LE
LOTEN I
G OMA NE
NZI N G A
BO S TO N
KA MB ER G
RO S ETT A
TW EE DI E
CR A MO N D
KA ME NS I
FOXH IL L
ND A LEN I
RI ETV LEI
THE N DE LE
HI GH MOO R
BA LG O W A N
MPOL W EN I
FAW N LE AS
ED EN D AL E
CO L EFO R D
HO P EW E LL
MID D EL RU S
LID G ET TON
NO OD S BE R G
ELA ND S K OP
MK HO ND E NI
G OO D H O PE
WI N DY H I LL
SC H RO E D ER S
CI B ELI CH LE
MAS H IN G EN I
THO R N V ILLE
BI SH O P TO W E
MID - ILL O VU
MO U N T A LID A
LION S R IV ER
MO U N T E LIA S
HE LLA H EL LA
BA YN E SFI ELD
JOU B E RTS VL EI
TUN GA 'S H ILL
ALB ER T FA LLS
O TTO 'S B LU FF
TAY LOR 'S H ALT
CL AN SYN D IC A TE
MOR TO N 'S DR I FT
HA R DE N H EI G H TS
TAB LE MO UN TA IN
FO RT NO TT IN GH AM
HI LD CO TE S TAT ION
AP PEL SB OSC H MI SS IO N
TAB LE MO UN TA IN R AN G E
SW A YIM AN E
M AP 13Ag ricu ltural P oten tial - La nd
Sma l l T o wn s, V i ll a ge s & Se ttle m e n ts%
Ma in A cce s s R o ad s
Mu n ic ip a l B o u n d a rie s
Na tu r e C o n se r va tio n A r e a s
Tr ib a l A u th o ri tie s
Ur b a n C e n tre s
Settl e m e nts
Ma jor D a ms
Ag ric ultura l P oten tia l - Lan d S uitab ility
hig h la n d po te n ti al
go o d la n d p o te n tia l
mo d e r a tel y g o o d la n d po te n tia l
re la ti ve ly go o d la n d p o te n tia l
lo w la n d p o te n tia l
po o r la n d p o ten ti a l
ve ry po o r la n d p o ten ti a l
LE G E N D
30/11 /2004
SC ALE
DATE
RE VI S IO N
N
EW
S
1:700000
67
Beef Production Potential For uMgungundlovu
The Umgungundlovu District agricultural Plan indicates that the district is suited to extensive cattle production. There are large areas of land that
are not being properly utilized due to improper stocking rates, lack of fenced camps( indiscriminate grazing that leads to veld degradation) and
improper burning regimes.
Beef farming works well in mixed-enterprise farming especially when coupled with enterprises like grain, orchard, vegetables and other crop
operations. Cattle can also make efficient use of feed resources that have little alternative use, such as crop residues, marginal cropland, and land
not suitable for tillage, or land that cannot produce crops other than grass.
The extensive beef enterprise can be less labour-intensive than other intensive enterprises but still requires good management practices. Proper
management and planning can make it possible to have key activities (e.g. calving, weaning, castration, and weighing) occurring at times when
labour is available.
Suitable Breeds
Both Bos taurus(e.g. Hereford, Angus) and Bos indicus (e.g. Nguni, Brahman) breeds and their crosses(e.g. Brangus, Bonsmara) may be farmed.. Bos taurus breeds have a traditionally lower resistance to tick borne diseases than Bos indicus breeds. When sourcing or buying in animals farmers should source cattle from areas climatically similar and having similar disease problems and tick resistance. This helps to minimise dipping costs and reduce losses from mortality and poor production It is advisable to only source local cattle that are adapted to the area to prevent losses.
68
Table 56: Recommended Field Crops Crop Average
Yield Tons/ha
Gross Margin R/Ha
Advantages Disadvantages Infrastructure
Dry Beans 2 900 Medium to low management skills. Used in a crop rotation program to improve soil nutrition. Crop residue can be used for animal feed
Relatively low gross margin. Require storage facilities
Fencing – Bonnox or 8 strand barbed wire. Storage facilities. Surface water drainage (contours)
No Till Dryland Maize
7 3000 Medium to low management skills. Used in a crop rotation program to improve soil nutrition. Crop residue can be used for animal feed
Relatively low gross margin. Require storage facilities
Fencing – Bonnox or 8 strand barbed wire. Storage facilities.Surface water drainage (contours)
No Till Maize - Irrigated
10 5000 Medium to low management skills. Used in a crop rotation program to improve soil nutrition. Crop residue can be used for animal feed. Will protect soil while cropping
Relatively low gross margin. Require storage facilities
Fencing – Bonnox or 8 strand barbed wire. Storage facilities.Surface water drainage (contours)
Cabbage 75 62000 Crop residue can be used as animal feed. High gross margin. Medium management skills required
Bulky to transport. Ideally needs to be irrigated.
Conservation structures. Fencing – Bonnox or barbed wire 8 strand
Potatoes 30 18000 High value crop High management skills required. Soil specific crop. Require specialised equipment.
Conservation structures. Fencing – Bonnox or barbed wire 8 strand Storage shed and sorting machine
Soybeans 2 500 Medium to Low Management skills required. Crop residue can be used as animal feed
Relatively low gross margin. Require storage facilities Require specialized harvesting equipment.
Conservation structures. Fencing – Bonnox or barbed wire 8 strand + storage shed
Carrots 35 45000 High value crop. High management, Labour intensive
Fencing – Bonnox + packshed required.
Tomatoes Irrigated
75 205 000 High value crop. High management, Labour intensive
Fencing – Bonnox + packshed required.
Lettuce 25 12000 Crop residue can be used as animal feed. High gross margin. Medium management skills required
Bulky to transport. Ideally needs to be irrigated.
Conservation structures. Fencing – Bonnox or barbed wire 8 strand
69
Implications for the DistrictImplications for the DistrictImplications for the DistrictImplications for the District
Some characteristics of the socio-demographic makeup of uMgungundlovu District include the following: � racial diversity within and between local municipalitiesracial diversity within and between local municipalitiesracial diversity within and between local municipalitiesracial diversity within and between local municipalities
� increasing income ineincreasing income ineincreasing income ineincreasing income inequalityqualityqualityquality
� population ageing, especially within the white populationpopulation ageing, especially within the white populationpopulation ageing, especially within the white populationpopulation ageing, especially within the white population
� an increasing number of children living in lowan increasing number of children living in lowan increasing number of children living in lowan increasing number of children living in low----income families, children overincome families, children overincome families, children overincome families, children over----represented in comparison with their represented in comparison with their represented in comparison with their represented in comparison with their
proportion within the general population.proportion within the general population.proportion within the general population.proportion within the general population.
� Domination of smaller households Domination of smaller households Domination of smaller households Domination of smaller households with not more than 6 members reflects the extent to which extended and probable with not more than 6 members reflects the extent to which extended and probable with not more than 6 members reflects the extent to which extended and probable with not more than 6 members reflects the extent to which extended and probable
compounded households have broken down in response to changes in the households survival strategies and economic compounded households have broken down in response to changes in the households survival strategies and economic compounded households have broken down in response to changes in the households survival strategies and economic compounded households have broken down in response to changes in the households survival strategies and economic
activities. This is a social response to the changes in the houactivities. This is a social response to the changes in the houactivities. This is a social response to the changes in the houactivities. This is a social response to the changes in the household survival strategies and an increase in the costs of sehold survival strategies and an increase in the costs of sehold survival strategies and an increase in the costs of sehold survival strategies and an increase in the costs of
living. living. living. living.
� Majority of households are dominated by women in terms of numbers. This situation is common mainly in predominantly Majority of households are dominated by women in terms of numbers. This situation is common mainly in predominantly Majority of households are dominated by women in terms of numbers. This situation is common mainly in predominantly Majority of households are dominated by women in terms of numbers. This situation is common mainly in predominantly
rural municipalities such as Umshwathi, Impendle and Mkhambathini areas.rural municipalities such as Umshwathi, Impendle and Mkhambathini areas.rural municipalities such as Umshwathi, Impendle and Mkhambathini areas.rural municipalities such as Umshwathi, Impendle and Mkhambathini areas. This has serious implications for the design This has serious implications for the design This has serious implications for the design This has serious implications for the design
and actual implementation of service delivery programs. In fact, such programs should be gender sensitive and prioritize and actual implementation of service delivery programs. In fact, such programs should be gender sensitive and prioritize and actual implementation of service delivery programs. In fact, such programs should be gender sensitive and prioritize and actual implementation of service delivery programs. In fact, such programs should be gender sensitive and prioritize
the needs of women. the needs of women. the needs of women. the needs of women.
� The age structure of the women and male population is generally theThe age structure of the women and male population is generally theThe age structure of the women and male population is generally theThe age structure of the women and male population is generally the same reflecting a balanced community. This same reflecting a balanced community. This same reflecting a balanced community. This same reflecting a balanced community. This
however, should not be overhowever, should not be overhowever, should not be overhowever, should not be over----emphasized given the potential impact of HIV and AIDS to the district population. This issueemphasized given the potential impact of HIV and AIDS to the district population. This issueemphasized given the potential impact of HIV and AIDS to the district population. This issueemphasized given the potential impact of HIV and AIDS to the district population. This issue is flagged for further investigation. is flagged for further investigation. is flagged for further investigation. is flagged for further investigation.
� High concentration of people within a working age coHigh concentration of people within a working age coHigh concentration of people within a working age coHigh concentration of people within a working age cohort in the Msunduzi and Umngeni Municipalities reflects the uneven hort in the Msunduzi and Umngeni Municipalities reflects the uneven hort in the Msunduzi and Umngeni Municipalities reflects the uneven hort in the Msunduzi and Umngeni Municipalities reflects the uneven
spread of employment opportunities within the District. It also poses a challenge of promoting investment and job creation spread of employment opportunities within the District. It also poses a challenge of promoting investment and job creation spread of employment opportunities within the District. It also poses a challenge of promoting investment and job creation spread of employment opportunities within the District. It also poses a challenge of promoting investment and job creation
in rural areas. It is equally important to note that this is the in rural areas. It is equally important to note that this is the in rural areas. It is equally important to note that this is the in rural areas. It is equally important to note that this is the age group that experiences needs such as housing and age group that experiences needs such as housing and age group that experiences needs such as housing and age group that experiences needs such as housing and
employment. employment. employment. employment.
70
ENVIRONMENTAL CONSIDERATIONS
In terms of the C-Plan and MINSET assessments undertaken by KZNCS, the Umgungundlovu District contains extensive areas of conservation significance. For comparative purposes, both classifications have been expressed as areas by Municipality. This shows that areas of the highest importance occur in uMngeni, Impendle, Mpofana and to a lesser extent Richmond and Msunduzi, although large areas across the District fall in the category “Negotiated Reserve”, which is the second highest category. This is because of the high levels of biodiversity in the District, the relatively low levels of land transformation that has occurred in some parts of the District, and the area’s importance as a water production region.
It must be stressed that these assessments are at a very broad and coarse scale, and that more detailed assessments, taking into account
existing land use and other factors, such as slope would need to be undertaken at a local municipal level. This should form part of the local Strategic Environmental Assessment (SEA), and would be one of the critical planning informants in local SDF’s.
The SEA’s must provide guidance in the identification of areas that have to be protected for biodiversity and conservation purposes, and should include the following essential environmental elements and areas:
• agricultural resources • ecosystems goods and services; and • natural resources
The District Municipality’s current Strategic Environmental Assessment / Integrated Environmental Management Plan was undertaken during 2003. In order to adequately integrate environmental sustainability into the strategic planning initiatives of the Municipality, it will be necessary to substantially review and update the SEA to bring it into line with legal and guideline requirements.
71
Map 4: MINSET
72
Table 57: C-Plan UMGUNGUNDLOVU CPLAN BY LOCAL MUNICIPALITY
Mkham
bath
ini
Msunduzi
Um
shw
ath
i
Mpofa
na
Impe
ndle
uM
ng
en
i
Ric
hm
ond
Tota
l (DM
)
C PLAN Area (ha)
% Area (ha)
% Area (ha)
% Area (ha)
% Area (ha)
% Area (ha) % Area (ha)
% Area (ha)
%
Initial Excluded
8800 12.6 2000 3.6 36399 23.7 2400 3 3200 5.2 20000 17 72799 9.3
1 Totally Irreplaceable
3200 6 7200 5 45599 27.604
39199 42.8 25199 20.7 17600 15 137997 16.7
> 0.8 < 1 11200 18 5600 4.1 400 0.3 4400 7.7 27199 21.7 2400 2 51199 7.7 > 0.6 - 0.8 3200 7.4 7200 12 6800 4.7 2800 4.8 2800 5.4 11600 10.7 8000 6.5 42399 7.4 > 0.4 - 0.6 5200 9.3 6400 10.4 6800 4.7 1600 2.3 2800 5.4 10000 9.3 14000 11.5 46799 7.6 > 0.2 - 0.4 17200 21.5 6800 11 32799 19.4 10800 8 2800 5.4 14800 13 31999 26 117198 15 > 0 – 0.2 42399 49.2 24400 39 66399 38.4 88798 57 24400 30.3 24000 19.4 26799 22 297194 36.3
Irreplaceable =0
Total 91539 100 63393 100 181803 100 165189 100 94910 100 156683 100 123145 100 876662 100
73
Water Resources
The District contains key water resources which are of importance at both a provincial and national level. These resources play critical roles in the provision of both potable and raw water to the urban and industrial centres within the uMgungundlovu District, and to the adjoining eThekwini Metropolitan area.
When mentioning water resources in the District, the Mgeni catchment immediately comes to mind. However, this is not the only catchment and water resource that needs to be considered in the development planning process. Although the Mgeni is the predominant catchment within the District, there are seven other catchments. An overview of these catchments, their associated resources and their importance to the region is provided in Table below:
Table 58: Key Water Resources Occurring in uMgungundlovu District Municipality
ID Water Resource
Type Catchment Importance
1 Meams Weir Dam Mooi Provides water for the Durban Pietermaritzburg economy 2 Little Mooi River Mooi Provides water for the Mpofana Municipality and the Durban – Pietermaritzburg economy. The headwaters of this
river are in KZDMA22 3 Mooi River Mooi Provides water for the Mpofana Municipality and the Durban-Pietermaritzburg economy. The headwaters of this
river are in KZDMA22 4 Craigieburn
Dam Dam Mooi Located on the Myamvubu River, a tributary of the Mooi River, this dam provides water for agricultural use.
5 Proposed Spring Grove Dam
Dam Mooi Will provide water for the Mpofana Municipality, the uMngeni Municipality and the Durban-Pietermaritzburg economy.
6 Mpofana River Mgeni This is the river that transfers the water from the existing Meams Weir and will transfer from the proposed Spring Grove Dam to Midmar Dam (via the Lions and Mgeni Rivers) for treatment for distribution to the Durban-Pietermaritzburg economy. The headwaters of this river are in the uMngeni Local Municipality.
7 Lions River Mgeni This is the river through which water is transferred form the Mooi Catchment to Midmar Dam for treatment and distribution to the Durban-Pietermaritzburg economy. The headwaters of this river are in the uMngeni Local Municipality.
8 Mgeni River Mgeni This is the river which provides water for the Durban-Pietermaritzburg economy. The headwaters of this major river are the Mgeni Vlei which is located in Impendle Local Municpality.
9 Midmar Dam Dam Mgeni This is the critical storage dam for the entire Durban-Pietermaritzburg economy (the entire Msunduzi Municipality) as well as for the uMngeni, uMshwathi, Richmond and Mkhambathini Local Municipalities. Current treatment costs are low due to the close proximity of the water treatment plan (WTP) tot he dam and the good water quality within the dam. However, if water quality deteriorates within the dam, treatment costs will increase drastically as there is insufficient distance between the dam and the WTP for in-stream purification to occur. The implication of
74
ID Water Resource
Type Catchment Importance
this is that the water tariff will increase thereby increasing the cost of water to everyone within the region. This will impact negatively on the alleviation of backlogs and the development of the economy.
10 Albert Falls Dam Mgeni This is a storage dam on the Mgeni River that is used in the transfer of raw water to Durban Heights WTP for distribution within eThekwini’s Central and Southern regions. If water quality deteriorates within this Dam, there is sufficient distance between Albert Falls Dam and Durban Heights WTP for in-stream purification to occur to a certain degree. However, treatment costs will again increase if the water quality is of an extremely poor standard.
11 Nagle Dam Dam Mgeni This is a storage dam on the Mgeni River that is used in the transfer of raw water to Durban Heights WTP for distribution within eThekwini’s Central and Southern regions. If water quality deteriorates within this Dam, there is insufficient distance between Nagle Dam and the Nagle Aqueducts, which transfer water to Durban Heights WTP for in-stream purification to occur. This means that treatment costs will rise, thereby increasing the water tariff.
12 Msunduzi River Mgeni This is a third-order tributary of the Mgeni River which flows through Edendale and Pietermaritzburg. The headwaters of this river occur in the Richmond Local Municipality.
13 Mlazi River Mlazi This river has its source in the Richmond Municipality, flowing through it and the Mkhambathini Municipality, providing good quality water for agriculture, forestry and domestic purposes.
14 Lovu River Lovu This river also originates in the Richmond Municipality, flowing through it and the Mkhambathini Municipality, providing good quality water for agriculture, forestry and domestic purposes.
15 Mkomazi River Mkomazi The lower portions of this major river form the boundary between Richmond Municipality and the Sisonke and Ugu District Municipalities. A small portion on the upper part of the river is situated within the Impendle Local Municipality.
16 Mdloti River Mdloti The headwaters of this river are located in uMshwathi Municipality, Hazelmere Dam, which is located on the Mdloti River, is the primary source of water for the North Coast. Hence ensuring the good quality of the headwaters of this river is important in the prevention of serious water supply problems which would have a negative impact on the region’s economy.
17 Mvoti River Mvoti The headwaters of this major river are located in uMshwathi Local Municipality. 18 Sundays Portions of this catchment occur within the Mpofana Local Municipality. Henley Dam Dam Mgeni Not used for storage purposes and only used as a recreational dam. The water quality is not very good.
Source: Umgeni Water, May 2007
75
Map 5: Water Resources in the District
Map above shows the location of all existing and proposed dams as well as the strategic quaternary catchments in the District. It also shows the strategic areas and the headwaters of the different catchments. The correct management of these resources is obviously important, and appropriate policies need to be included in the SDF of the District, and perhaps more importantly, the SDF’s of the local municipalities. There should be a
76
balance between the need to protect and manage these resources and appropriate levels of development, to ensure the sustainable and affordable supply of water.
Figure 8: Source of Water
15.7
16.5
4.75.6
34.6
4.3 0.0 7.5
0.0
3.8
2.6
0.8 2.7
0.4
0.9
No Access to Pipe
Pipe water(dwell)
Pipe water( yrd)
Pipe water<200m
Pipe water>200m
Regional Local Sch
Borehole
Spring
Rain-water tank
Dam/pool/stagnant
River/stream
Water vendor
Other
Not Applicable Src
Source: MDB 2006
Comparison of the quality of life survey results with the 2001 census data reveals some disparities in statistics with more than 32% of the district population have water within a 200m radius in terms of 2001 census data. 35% of the population obtains water from the regional/local water scheme. This situation seems to have improved as the survey reveals that about 47% of the district population has piped and pressured water within their yards. However, delivery of water in accordance with the government standards remains a key challenge for the district, particularly in rural municipalities such as Umshwathi, Mkhambathini and Impendle.
77
SPATIAL ANALYSIS The uMgungundlovu District Municipality is located in the Kwazulu Natal Midlands on a major transport route or corridor (N3) which serves as link between eThekwini and Gauteng. Such location creates numerous locational benefits and strengthens economic growth. The district comprises of seven local municipalities some of which are rural. Significant centres that are important at a district and provincial level are Pietermaritzburg and Howick, they have high order and diverse economic activity, tertiary education, diverse residential settlement and hospitals. These centers provide functional links in terms of hierarchy for corridors. The district is served by an extensive road network which allows for easy access which in turn leads to a comparative advantage in terms of economic development. The Spatial Development Framework suggests the hierarchy of access in terms of corridors including:
• The primary Provincial Priority Corridor being the N3 freeway, • The primary corridors R617 Howick –Boston- Underberg,R603Camperdown-Umbumbulu- South Coast and Msunduzi- Boston-Underberg
( P7-2) • Secondary Corridors being Howick –Mooi River (R103), Mooi- Greytown (R622)and Albert falls-Wartburg- North Coast (R641)
The continuation of these routes connects the district’s main centres to adjacent districts and urban centres. Most of these roads linking to the district have a provincial status and further provide vital links in order to realize the tourism potential of the district. The most significant areas of relative need are the traditional areas, which are characterised by few employment opportunities, inadequate
services and poor agricultural potential. There are some exceptions, as well as wide disparities between the service levels and degree of
accessibility of different rural settlements in these areas.
78
SECTION C.
DEVELOPMENT STRATEGIES
79
VISION STATEMENT
“uMgungundlovu District Municipality will evolve into a dynamic Metropolitan area, spreading its vibrant economic benefits to all
its citizens and places and will, through concerted integrated development and service delivery, realize improvements in the
overall quality of life”
MISSION STATEMENT The uMgungundlovu District Municipality will through sound governance
and community participation ensure the provision of equitable and sustainable services and economic growth
80
UMGUNGUNDLOVU DISTRICT MUNICIPALITY IS GUIDED BY
BATHO PELE PRINCIPLES
CONSULTATION You can tell us what
you want from us.
You will be asked for your views on existing
public services and may also tell us what new
basic services you would like. All levels of
society will be consulted and your feelings
will be conveyed to Ministers, MECs and
legislators.
THE PRINCIPLE
You should be consulted about the level and
quality of the public services you receive and, wherever possible, should be given a
choice about the services that are offered.
SERVICE STANDARDS
Insist that our promises are
kept.
All national and provincial government
departments will be required to publish
service standards for existing and new
services. Standards may not be
lowered! They will be monitored at least
once a year and be raised progressively.
THE PRINCIPLE
You should be told what level and quality
of public services you will receive so
that you are aware of what to expect.
ACCESS One and all should get
their fair share.
Departments will have to set targets for
extending access to public servants and
public services. They should implement
special programmes for improved service
delivery to physically, socially and culturally
disadvantaged persons.
THE PRINCIPLE
You and all citizens should have equal access
to the services to which you are entitled.
COURTESY Don’t accept insensitive treatment.
All departments must set standards
for the treatment of the public and
incorporate these into their Codes of
Conduct, vales and training
programmes. Staff performance will
be regularly monitored, and
discourtesy will not be tolerated.
THE PRINCIPLE
You should be treated with courtesy
and consideration
INFORMATION You’re entitled to full
particulars.
You will get full, accurate and up-to-date
facts about services you are entitled to.
Information should be provided at service
points and in local media and languages.
Contact numbers and names should appear in
all departmental communications.
THE PRINCIPLE
You should be given full, accurate information
about the public services you are entitled to
receive.
OPENNESS AND
TRANSPARENCY Administration must be
an open book.
You’ll have the right to know. Departmental
staff numbers, particulars of senior
officials, expenditure and performance
against standards will not be secret.
Reports to citizens will be widely published
and submitted to legislatures.
THE PRINCIPLE
You should be told how national and
provincial departments are run, how much
they cost, and who is in charge.
Information
Information
Information
REDRESS Your complaints must spark
positive action.
Mechanisms for recording any public
dissatisfaction will be established and
all staff will be trained to handle your
complaints fast and efficiently. You will
receive regular feedback on the
outcomes.
THE PRINCIPLE
If the promised standard of service is
not delivered, you should be offered an
apology
VALUE FOR MONEY
Your money should be
employed wisely.
You pay income tax, VAT and other
taxes to finance the administration of
the country. You have the right to
insist that your money should be used
properly. Departments owe you proof
that efficiency, savings and improved
service delivery are on the agenda.
THE PRINCIPLE
Public services should be provided
economically and efficiently in order to
give you the best possible value for
money.
81
5
In t ro d u c t io n – O u r L o c a l M u n ic ip a l it ie su M sh w a th i M u n ic ip a lit y ( K Z 2 2 1 ) u M sh w a th i M u n ic ip a lit y ( K Z 2 2 1 )
P o p u la t io n :1 3 0 5 8 2
M s u n d u z i M u n ic ip a lit y ( K Z 2 2 5 )M s u n d u z i M u n ic ip a lit y ( K Z 2 2 5 )P o p u la t io n : 5 2 4 9 4 8
M k h am b a th in i M u n ic ip a lit y ( K Z 2 2 6 )M k h am b a th in i M u n ic ip a lit y ( K Z 2 2 6 )
P o p u la t io n : 4 5 0 4 0
R ic h m o n d M u n ic ip a lit y ( K Z 2 2 7 ) R ic h m o n d M u n ic ip a lit y ( K Z 2 2 7 )
P o p u la t io n : 6 2 0 9 0
Im p e n d le M u n ic ip a lit y ( K Z 2 2 4 ) Im p e n d le M u n ic ip a lit y ( K Z 2 2 4 ) P o p u la t io n : 3 6 7 0 6
u M n g en i M u n ic ip a lit y ( K Z 2 2 2 )u M n g en i M u n ic ip a lit y ( K Z 2 2 2 )P o p u la t io n :6 9 7 4 0
M p o fa n a M u n ic ip a lit y ( K Z 2 2 3 )M p o fa n a M u n ic ip a lit y ( K Z 2 2 3 )
P o p u la t io n :2 5 8 1 5
82
The development strategies of the uMgungundlovu District Municipality are developed and structured according to the 5 National Key Performance Areas of the Five Year Local Government Strategic Agenda. A sixth key performance area: Social Development and Special programmes have been added.
1. INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION
2. BASIC SERVICE DELIVERY
3. LOCAL ECONOMIC DEVELOPMENT
4. MUNICIPAL FINANCIAL MANAGEMENT AND VIABILITY
5. GOOD GOVERNANCE AND PUBLIC PARTICIPATION
6. SOCIAL DEVELOPMENT AND SPECIAL PROGRAMMES
83
KEY PERFORMAANCE AREA 1: INSTITUTIONAL TRANSFORMATION AND ORGANISATIONAL DEVELOPMENT
POWERS AND FUNCTIONS OF UMGUNGUNDLOVU DISTRICT MUNICIPALITY
Function
District
Electricity Reticulation District is not performing the function due to Financial Constraints & because electricity Supply is done by Eskom
Fire Fighting Services District is performing the function to 6 LM’s Local Tourism District is performing the function Municipal Airports This is a district function which is current performed by Msunduzi LM
Municipal Planning District and locals are performing the function Municipal Public Transport District is performing the function Portable Water District is performing the function to 6 LM’s as @ 1/07/07 Sanitation District is performing the function to 6 LMs as @ 1/07/07 Cemeteries and Crematoria (Public Works)
District is performing the function
Municipal Market District is not performing the function Municipal Abottoirs No function in this district Municipal Roads District is performing the function Refuse Removal and Solid Waste District is performing the function, seeking clarity from dplg on dispute between district and LMs
Environmental Health Not performed due to Financial Resources Sewage District is performing the function
84
Table 59: Status of Powers and Functions MBD Code
Municipality Name
MBD 2002/2003 Recommendation to MEC
2003/2004 Recommendation
to MEC
2004/2005 Recommendation
to MEC
2005/2006 Recommendation
to MEC
2006/2007 Recommendation
to MEC DC 22 uMgungundlovu
District Municipality
The following Schedule 4 Part B powers and functions or aspects thereof in the local municipalities indicated in brackets: Local Tourism (KZ 227) Fire Fighting (KZ221, KZ222,KZ223,KZ224,KZ227)
Remove: Schedule 4 Part B: Local Tourism ( KZ 227)
No Change No Change No Change
KZ221 uMshwathi Municipality
No district functions allocated to the local municipality to perform in its local area
No Change No Change No Change No Change
KZ222 uMngeni Muncipality
No district functions allocated to the local municipality to perform in its local area
No Change No Change No Change No Change
KZ223 Mpofana Municipality
No district functions allocated to the local municipality to perform in its local area
No Change No Change No Change No Change
KZ224 iMpendle Municipality
No district functions allocated to the local municipality to perform in its local area
No Change No Change No Change No Change
KZ225 Msunduzi Municipality
84(1)(h)- municipal airports 84(1)(k)- fresh produce markets and abbaitoirs 84(1)(n)-muncipal public works relating to the above functions
No Change No Change No Change No Change
KZ226 Mkhambathini Municipalty
No district functions allocated to the local municipality to perform in its local area
No Change No Change No Change No Change
KZ227 Richmond Municipality
No district functions allocated to the local municipality to perform in its local area
No Change No Change No Change No Change
Source:DC22 Capacity Assessment Report on Municipal Functions - MDB 2006/07 DC22 has had a decrease in the number of function it performs from 12 in 2002 to just seven in 2006-yet staff increased from 153 in 2002 to 216 in 2006, and therefore staff budget increased from 28.44% during 2005/06 financial year to 40.98% during the year 06/07. KZ221performed 24 functions in 2004 although this has dropped to only nine functions in 2006. KZ222 performs the most number of functions out of all the local municipalities at 33 functions in 2006. KZ223 has remained fairlysteady in the number of functions performed since 2002 and performed a total of 20 functions in 2006. KZ224 has had a huge increase in the number of functions performed in
85
2006, from eight in 2005 to 25 in 2006. KZ225 performed 16 functions in 2006 while KZ225 performed only ten. KZ227 has had a steady increase in the number of functions performed since 2002 and was performing 27 functions in 2006. It would appear that the following functions are either not or are poorly performed within the district: • Municipal airport • Municipal public transport • Pontoons and ferries • Fencing and fences • Municipal abattoirs • Pounds
86
Table 60: Comparison between Number of Functions Performed
MBD Code
Municipality Name
2002 2003 2004 2005 2006
Number Performed
% Performed
Number Performed
% Performed
Number Performed
% Performed
Number Performed
% Performed
Number Performed
% Performed
DC 22 uMgungundlovu District Municipality
12 35.29% 8 23.53% 8 23.53% 8 23.53% 7 18.42%
KZ221 uMshwathi Municipality
17 50.00% 22 64.71% 24 70.59% 14 41.18% 9 23.68%
KZ222 uMngeni Muncipality
29 85.29% 29 85.29% 25 73.53% 27 79.41% 33 86.84%
KZ223 Mpofana Municipality
21 61.76% 19 55.88 21 61.76% 21 61.76% 20 52.63%
KZ224 iMpendle Municipality
13 38.24% 15 44.12% 15 44.12% 8 23.53% 25 65.79%
KZ225 Msunduzi Municipality
23 67.65% 23 67.65% 28 82.35% 26 76.47% 26 68.42%
KZ226 Mkhambathini Municipalty
11 32.35% 19 55.88% 9 26.47% 12 35.29% 10 26.32%
KZ227 Richmond Municipality
20 58.82% 23 67.65% 20 58.82% 25 73.53% 27 71.05%
Source:DC22 Capacity Assessment Report on Municipal Functions - MDB 2006/07
87
Figure 10: Number of Functions Performed with Some Capacity in 2002, 2003, 2004, 2005 and 2006.
Number of Functions Performed with some Capacity in 2003 to 2006
0
5
10
15
20
25
30
35
DC 22 KZ221 KZ222 KZ223 KZ224 KZ225 KZ226 KZ227
No o
f Functions
2002 2003 2004 2005 2006
Source:DC22 Capacity Assessment Report on Municipal Functions - MDB 2006/07
88
ORGANISATIONAL STRUCTURE AND POPULATION OF ORGANOGRAM (FILLED POSITIONS)
DEPARTMENT/BUSINESS UNITS
PERMANENT STAFF
CONTRACT STAFF
OTHER TOTAL
1.Municipal Manager’s office
• Municipal Manager • Office of the Mayor • Special Programme,
Intergovernmental Relations. • PIMS • PMS • Internal Audit • Water Services Authority
- 3 - - 3 1 2 5
1 16 4 - - - - -
2 106
5 19 4 - 3 1 2 111
2. Corporate Services
• Human Resources • IT • Administration and SG
- 6 Outsourced 28
- - - 11
- - - -
- 6 - 39
3. Community Services
• LED • Tourism • Disaster • Fire Services • Environmental Health
1 3 3 4 77 -
1 - - 35 26 5
- 2 3 3 39 102 5
4. Technical Services 16 - 1 intern 17 5. Financial Services
• Income • Budget • Expenditure • Supply chain
management
1 16 2 5 2
1 - - - 1
- - 1 intern - -
2 16 3 5 3
GRAND TOTAL 179 101 2 388
89
uMGUNGUNDLOVU DSTRICT MUNICIPALITY: PROPOSED MACRO STRUCTURE
Municipal Manager (0)
Department of Community
Services
Strategic Exec Manager (2)
Department of Economic Development
Strategic Exec Manager (2)
Department of Technical
Services
Strategic Exec Manager (2)
Department of Water and Sanitation Services
Strategic Exec Manager (2)
Department of Corporate Services
Strategic Exec Manager (2)
Department of Financial
Services
Strategic Exec Manager (2)
90
POLICIES
POLICY & DEPARTMENT BRIEF SUMMARY OF PLAN AND ITS IMPLEMENTATION STATUS
FOCUS FOR 2008/09
OFFICE OF THE MUMICIPAL MANAGER
Legal Representation for Councillors.
Vehicle Policy
Policy at draft stage To finalise and implement
FINANCIAL SERVICES
INCOME UNIT Credit Control and Debt Management Policy
policy document has been workshoped to councillors awaiting approval of a final document.
implementation of a policy and review if necessary.
Tariff Policy policy document has been workshoped to councillors awaiting approval of a final document
implementation of a policy and review if necessary.
BUDGET AND REPORTING UNIT Budget Policy
Assets Management Policy
91
POLICY & DEPARTMENT BRIEF SUMMARY OF PLAN AND ITS IMPLEMENTATION STATUS
FOCUS FOR 2008/09
EXPENDITURE UNIT
Project Management
Petty Cash
Payroll Policy
Creditors and Payments Policy
CORPORATE SERVICES
HUMAN RESOURCES
• Labour Relations and Business
Plan adopted and implemented To implement policy and review if necessary
• Employment policy
Plan adopted and implemented To implement policy and review if necessary
• Ethics Policy Plan adopted but not yet implemented To implement policy and review if necessary
• Staff Bursary Policy
Plan adopted and implemented To implement policy and review if necessary
92
POLICY & DEPARTMENT BRIEF SUMMARY OF PLAN AND ITS IMPLEMENTATION STATUS
FOCUS FOR 2008/09
• External Bursary Policy Plan adopted and implemented To implement policy and review if necessary
• Training and Development
Plan adopted and implemented To implement policy and review if necessary
• Acting policy Plan adopted and implemented To implement policy and review if necessary
• Secondment policy
•
Plan adopted and implemented To implement policy and review if necessary
• HIV and AIDS (in the workplace) Policy
Policy still in a draft form Council to approve policy
• Agreement on essential Services Policy
•
Policy adopted but not yet implemented To implement policy and review if necessary
• Occupational Health and Safety Policy
Plan adopted and implemented To implement policy and review if necessary
• Employee Assistant Programme Policy
Policy adopted but not yet implemented To implement policy and review if necessary
• Recruitment Policy
Plan adopted and implemented To implement policy and review if necessary
Sexual Harassment policy Policy still in a draft form To approve and implement policy
• Gender Equity Policy
Policy still in a draft form To approve and implement policy
93
POLICY & DEPARTMENT BRIEF SUMMARY OF PLAN AND ITS IMPLEMENTATION STATUS
FOCUS FOR 2008/09
• Induction policy
Policy partly implemented To implement policy fully
• Placement policy
Plan adopted and implemented To implement policy
94
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION PIMS STRATEGIC FOCUS AREA IDP
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to
achieve target Responsibility
Target dates for inputs
To spearhead the co-ordination of the IDP preparation and implementation
Workshop Managers on IDP
Increased accurate input by business units
50 000 EM:PIMS Continuous
Develop and Distribute templates to business units
Standardized inputs
Nil
EM:PIMS Continuous
Develop and distribute IDP Implementation Analysis templates
Ability of business units to identify issues for strategies development as well as to determine budget required to cover the backlogs
Nil
EM:PIMS July 2008
Include strategic partners in the IDP Process
• Aligned Programmes with service providers, parastatals and
45 000 EM:PIMS Continuous
95
government departments
• Alignment meetings and workshops
Working in close collaboration and sharing of resources with the PMS Unit
Aligned IDP & PMS
Nil
EM: PIMS
Continuous
To ensure alignment of IDP, budget and PMS
• Budget informed by IDP
• SDBIPs
Nil
EM:PIMS
Continuous
To provide Corporate Strategic and IDP support to deserving local Municipalities
Distribute limited HR and Technical resources to Local Municipality
support to Local Municipalities on IDP by PIMS staff
Nil
EM:PIMS
Continuous
Attendance of IDP engagements by district municipality
Nil
EM:PIMS
Continuous
To ensure timeous submission of IDPs by local municipalities
Submission of IDP on stipulated deadline
Nil
EM:PIMS
Continuous
To ensure alignment of IDP, budget and PMS
• Budget informed by IDP
• SDBIPs
Nil
EM:PIMS
Continuous
To ensure legislative
Adherence to process plans
EM:PIMS Continuous
96
compliance by Local Municipalities
and deadlines
To ensure learning and sharing within the district
Co-ordinate functional forums
EM:PIMS Continuous
IDP alignment meetings and workshops
Continuous
97
INPUTS TO THE 2008 / 2009 IDP
DEPARTMENT: OFFICE OF THE MUNICIPAL MANAGER
DIVISION: PERFORMANCE MANAGEMENT
KEY PERFORMANCE AREA: GOOD GOVERNANCE AND PUBLIC PARTICIPATION
Objectives Strategies KPIs Programmes and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
To improve the overall performance of the District Municipality
Continue striving towards becoming fully compliant in all areas of Performance Management
Fully compliant Organisational Performance Management System implemented
Performance Management
R 500,000 Fully compliant Organisational Performance Management System implemented by 30 June 09
Review Policy Framework
M: PM 30-Jul-08
Develop and submit Organisational scorecards (SDBIPs)
M: PM 25-Jul-08
98
Coordinate the submission of performance reports, including:
M: PM Monthly, quarterly and annually
Monthly Reports
M: PM Monthly
Quarterly Reports
M: PM Quarterly
Annual Report M: PM 31-May-09
Fully compliant Individual Performance Management System implemented
Performance Management
R 0 Fully compliant Individual Performance Management System implemented by 30 June 09
Review and submit Performance Agreements for Section 57 employees
M: PM 30-Jul-08
Review Individual Performance Plans of all Managers
M: PM 30-Jul-08
99
Provide advice and support during the appraisal of Managers
M: PM As required
Support provided to local municipalities
Performance Management
R 10,000 Support provided to local municipalities on request
Develop Organisational Performance Management Systems
M: PM As required
Develop Individual Performance Management Systems
M: PM As required
Provide advice and support on PM related matters
M: PM As required
100
Implemented team based non-monitory Service Excellence Awards Scheme
The Awards Scheme must be strictly focused on the improvement of service delivery and should be based on the implementation of the Batho Pele Project
R 500,000 Implemented team based non-monitory Service Excellence Awards Scheme 30 July 09
Conduct research
M: PM 30-Jul-09
Develop Policy Document
M: PM 30-Jul-09
Develop Process Plan setting out assessment criteria and process to be followed
M: PM 30-Jul-09
Administer the assessment and judging process
M: PM 30-Jul-09
101
Facilitate the development of trophies
M: PM 30-Jul-09
Arrange a prestigious awards ceremony
M: PM 30-Jul-09
Total budget R 1,010,000
102
DEPARTMENT: OFFICE OF THE MUNICIPAL
MANAGER
DIVISION: INTERNAL AUDIT STRATEGIC FOCUS AREA:
REGULATORY AUDIT & PERFORMANCE AUDIT
Objectives Strategies KPIs Programmes and/or Projects
Budget required to achieve target
Outputs Inputs Responsibility
Target dates for inputs
REGULATORY AUDIT • To provide
additional assurance regarding the quality and reliability of the financial information.
• To review the
adequacy of internal controls, polices and procedures and ensure compliance with legislation.
• To ensure that
risk management is implemented and monitored.
• Capacitate Internal Audit Unit with adequate resources and staff.
• Acquire the
necessary skills, equipment and/or
• Final audit reports submitted to Audit Committee
• Final audit
report submitted to Audit Committee
• Adoption &
Implementation of Risk Management Policy
Audit assignments as per approved Internal Audit Plan Risk Management policy in place
+/- R1,3m (Salaries for 5 new employees p.a.) +/- R25K (Office equipment)
• Quarterly internal audit reports
Risk assessment report
Adequate Human and capital resources Filling of critical posts in the Internal Audit Unit
EM: Internal Audit, Internal Auditors Senior Management, EM: Internal Audit
Implementation of approved organogram Annually Implementation of
103
• To ensure that a
Fraud Prevention Plan is developed and implemented.
• To introduce a
fraud reporting mechanism i.e. fraud hotline.
• To ensure
departmental growth and value added services.
software • Develop a
fraud prevention plan
• Budget for
specialized services
• Recruit specialists at competitive salary packages
• Recruitment of
suitably qualified individuals will relevant expertise
• Approved
Fraud Prevention Plan
• An effective
fraud hotline in use
• Effective
Forensic Audit and Computer Audit units
• Draft fraud policy • Arrange
workshops • Distribute to
management for comments
• Obtain approval • Workshops and
fraud awareness campaigns
• Advertise the fraud hotline number.
• Advertisement of
posts.
+/- R150K (audio and Computer equipment +/- R 900K (Salaries for 4 new employees)
An approved Fraud Prevention Plan An effective fraud hotline Appointment of suitably qualified individuals
Adequate Human and capital resources Adequate budgeting for required posts Adequate budgeting for required posts
All departments, EM: Internal Audit Senior Management, EM: Internal Audit Senior Management, EM: Internal Audit
approved organogram. Implementation of approved organogram Implementation of approved organogram
104
PERFORMANCE AUDIT
• To ensure functionality of the municipality’s performance management system.
• To ensure that
the municipality’s performance management system complies with the Municipal Systems Act.
• To assess the
extent to which performance measurements are reliable in measuring performance against performance indicators and performance targets.
• Capacitate Internal Audit Unit with adequate resources and staff.
• Design a
mechanism, system to audit the result of performance measurement
• Develop
performance Audit programs
• Quarterly audit reports submitted to Audit Committee
Quarterly audit reports submitted to Audit Committee
• Quarterly audit of PMS
Quarterly audit of PMS
Quarterly Internal Audit reports on PMS Quarterly Internal Audit reports on PMS
• Human and capital resources • Performance reports Human and capital resources, performance reports
• Heads of departments, EM: Internal Audit, PMS Audit Officer Heads of departments, EM: Internal Audit, PMS Audit Officer
Quarterly Quarterly
105
DEPARTMENT: COMMUNITY SERVICES
DIVISION: DEVELOPMENT PLANNING
STRATEGIC FOCUS AREA: DEVELOPMENT PLANNING MONITORING AND REPORTING
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates for
inputs
To strengthen the Spatial Development Framework by highlighting significant nodes that require promotion in the District and ensuring that they have a specific land development focus.
Alignment on an ongoing basis of the LUMS and the SDFs of the LMs to the District SDF review process
Implementation of the SDF and recommendations.
Ensuring all developments or activities are inline with the District SDF.
None
Coordinated and aligned development throughout the District.
Assist LMs with the alignment of their SDFs with the District SDF
Chief Town and Regional Planner
Ongoing
To promote environmental sustainability in the District and protection of the natural environment
Environmental principles applied to all plans and proposals within the District Municipality. Regulate developmental activities by providing comments on all development proposals
Review of the District Integrated Environmental Management Plan.
District Intergrated Environmental Management Plan. Create awareness programes fro protection of the environment.
450.000.00
Review of the District Integrated Environmental Management Plan by March 2009.
Ensure that Environmental issues are addressed at District and LMs level, during the review of the Integrated Environmental Management Plan. Consult stakeholders
Chief Town and Regional Planner
March 2009
106
on the Plan and refine where necessary. Appoint Environmental conservation Officer to implement the Plan. Implement the Plan
To facilitate and coordinate the provision of appropriately located and serviced housing throughout the District
Provide Town Planning advice in housing developments
All housing developments suitably located on serviced land to prevent informal settlements.
Facilitation and coordination of housing development throughout the District Municipality.
All housing developments in all LM to be suitably located and aligned to the District SDF and the Land Assessment for Housing Development Study.
Constantly monitor the implementation of the recommendations of the Land Assessment for Housing Development Framework
Chief Town and Regional Planner
Ongoing
To facilitate and coordinate land reform in the District
Provide Town and Regional Planning input to all land reform matters within the District
Communities settled in appropriate areas in terms of the District sector plans
Land reform
All developments/ projects resulting from land reform in line with Area Based Plans.
Provide input and support to the Dept of Land Affairs
Chief Town and Regional Planner
June 2008
To identify potential areas that can be developed for residential, offices and industrial purposes.
Undertake a detailed analysis of land and infrastructure for the entire district
District Wide land and infrastructure audit
450.000.00
Framework indicating the status of land and infrastructure within the District.
Ensure that all land audit of the Local Municipalities are incorporated to the District's land and infrastructure audit framework.
Chief Town and Regional Planner
March 2009
107
DEPARTMENT: COMMUNITY SERVICES
DIVISION: DEVELOPMENT PLANNING
STRATEGIC FOCUS AREA: GIS
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable, realistic and time related)
Inputs Responsibility Target dates
for inputs
1. Support decision-makers at all levels with access to accurate information
Enhance and make GIS data and tools easily accessible to staff in various departments and to external users and decision makers • Update and enhance the GIS data model so that it supports future enterprise-wide access, development, maintenance and solutions
•hardware updates • software migration 8.2 to 9.1 • revision of database model •geodatabase migration from 8.2 to 9.1
Systems Rollout
R 100 000
Hardware and Software System Installed, Configured and Operational
• Server Software migration from ArcGIS 8.2 to ArcGIS 9.1 • User Software migration from ArcGIS/SDE 8.2 to ArcGIS 9.1 • ArcIMS 5 Software Migration to Version 9 and improve Intranet Site with respect to GIS portal
Senior GIS Officer/Division/Service Provider
Dec 2007 – June 2008
108
Improve methods for generating maps and map books to increase efficiency and timeliness of service Continue development and maintenance on the enterprise-wide inventory of GIS software, data and applications Hold regular meetings with strategy staff to ensure that GIS is on track to meet needs and to support projects of the District Provide GIS training to District staff on GIS data and applications
• Migrate existing SDE 8.2 Geodatabase & Applications to SDE 9.1 Geodatabase Model • Standardise GIS Software Versions and Maintenance & Service Level Agreement Implementation • Acquire Software (Arcpublisher Mapping Application) for advanced user mapping analysis
109
2. Maintain up-to-date information on internal produced spatial datasets, assets and infrastructure
Maintain catalogue (Metadata) of data and information available in GIS Update District GIS data and implement maintenance plan to keep information in GIS current Update and enhance the GIS
• infrastructure data updates and maintenance plan • land use management systems (LUMS) data collection and management • tourism assets database acquisition and GIS integration • water infrastructure assets database acquisition and gis integration • orthophoto updates
Data Management
None
Databases designed and setup up for updating and capture. Integrated into District's Network for Accessibility and operations
• Utility Data Updates (Water, Infrastructure etc.) and Maintenance Plan • Base map, Cadastral and external data updates • Orthophoto Data Update Plan • Update map compositions on the ArcIMS Intranet Site
Senior GIS Officer/Division/ Internal Cap
July 2007 and ongoing
110
data model so that it supports enterprise-wide access, maintenance and solutions Develop data collection, creation, submission and storage standards to ensure GIS information is accurate and consistent Develop and maintain an enterprise-wide inventory of GIS software, data and applications
• Land Use Management Systems/Zoning Map Creation • Create GIS Data Standards and Metadata •Departmental Data Set Development, Integration and Management Support
111
3. Promote and support the use of technology to enable an efficient and effective business process
• Make GIS data and tools easily accessible to staff in various departments and external decision makers • Develop customised GIS tools to meet Departmental needs
• new viewing and analysis software rollout and gis training • review of internet mapping on www.umdm.gov.za
Systems Support & Improvements
R 100 000
Successful Installation and Training of various GIS desktop software applications
• Services Model Development for GIS • Cooperation and partnership development with Local Municipalities and Provincial
112
• Improve tracking of District projects that contribute information to or require information from the GIS database to improve communication and data sharing among departments • Hold regular meetings with strategy staff to ensure that GIS is on track to meet needs and to support projects of the District • Provide GIS training to staff on GIS data and applications
GIS Department (DIS DTLGA) • Field Applications (GPS/GIS) • Create Data Use / Licensing Agreement • Level 1 GIS Training and Support to Local Municipality Users • ArcIMS Intranet/Internet Site Development • Service Level Agreement Implementation • Standardize GIS Software Versions and Maintenance
4. Provide customised mapping, analysis and reporting solutions
Update and enhance the GIS data model so that it supports future enterprise-wide access, development,
• internet mapping software (arcims) configurations and application
GIS Products Support
R 25 000
Successful server based Installation, training on use of Internet based GISProvide
• Server Software migration from ArcGIS 8.2 to ArcGIS 9.1
Senior GIS Officer/Division/Service Provider
Dec 2007- June 2008
113
maintenance and solutions Develop customised GIS tools to meet Department needs
setups • review district business process modelling and interdepartmental data documentation (knowledge management)
report on Business process and Interdepartmental data documentation
• User Software migration from ArcGIS/SDE 8.2 to ArcGIS 9.1 • ArcIMS 5 Software Migration to Version 9 and improve Intranet Site with respect to GIS portal • Migrate existing SDE 8.2 Geodatabase & Applications to SDE 9.1 Geodatabase Model • Standardise GIS Software Versions and Maintenance & Service Level Agreement Implementation
114
• Acquire Software (Arcpublisher Mapping Application) for advanced user mapping analysis
5. Improvements to developing, implementing and maintaining data standards
• Update and enhance the GIS data model so that it supports future enterprise-wide access, development, maintenance and solutions • Develop data collection, creation, submission and storage standards to ensure GIS information is accurate and consistent • Develop and maintain an enterprise-wide inventory of GIS software, data and applications
• revision of database model • review data standards and ongoing metadata capture
Database Management
R 75 000
Develop sustainable scalable corporate GIS database (Geodatabase) Populate 9.2 ver geodatabase with updated Metadata
• Orthophoto Data and Update Plan • Shared Services Model Development for GIS • Review Cooperation and partnership development with Local Municipalities and Provincial GIS Department (DIS DTLGA) • Create Data Use / Licensing Agreement • District Business Process Modelling
115
and Interdepartmental Data Documentation (Knowledge Management)) • Digital Submittal Standard for Web Development and Access • Create GIS Data Standards and Metadata for internal/ external access and reporting
6. Administer program in a cost-effective and secure manner
• Monitor GIS costs, data distribution and map production costs to other agencies, businesses and public
• create cost savings/recovery plan • create data use/licensing agreement
Project Management & Costing
None
Create the various supporting documents and seek approval as internal policy
116
KEY PERFORMANCE AREA 2: BASIC SERVICES DELIVERY AND INFRASTRUCTURE
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA ACCESS TO EMETERIES AND CREMATORIA
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Cemetaries and crematoria:To continue implementing the Council's Integrated Cemetaries and Crematoria Policy (ICCP
Follow a phased appraoch to implement the ICCP
Completion of project and handed over to LM Completion
Trust Feed Cemetery construction - retention payment
74 637.08
Upgrade cemeteries
Achieve all activities for the upgrade of cemeteries
M: MF 30-Jun-08
Completion of project and handed over to LM Completion
Construct new Cemetery for Mpofana Municipality
886 522.73
Upgrade cemeteries
117
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA ACCESS TO EMETERIES AND CREMATORIA
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Completion of project and handed over to LM Completion
Co fund construction of Cemetery Extension at Mpophomeni Cemeteries
500 000.00
Upgrade cemeteries
Completion of project and handed over to LM Completion
Roads upgrade - Umsunduzi Municipality Cemetery
1 743 265.00
Upgrade cemeteries
Completion of project and handed over to LM Completion
Fencing at Impendle Municipality 92 950.00
Upgrade cemeteries
118
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA ACCESS TO ELECTRICITY
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
phased appraoch to provide bulk Electricity
Completion of project and handed over to Eskom
Schools electrification programme
500 000.00
Achieve all activities for the provision of bulk electricity.
Provide bulk Electricity
M: EF 30-Jun-08
Completion of project and handed over to Eskom
Bulk - Embo Thumini
1 300 000.00
Achieve all activities for the provision of bulk electricity.
M: EF 30-Jun-08
119
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA ACCESS TO ELECTRICITY
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Approval of Plan by Council
Review of ESDP
340 000.00
Achieve all activities for the provision of bulk electricity.
M: EF 30-Jun-08
Completion of project and handed over to Eskom
Increase in cost of Loteni electrical
260 000.00
Achieve all activities for the provision of bulk electricity.
M: EF 30-Jun-08
120
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA ACCESS ROADS AND STORMWATER
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Roads and stormwater: To implement the Council's and Municipal Infrastructure Grant (MIG) funded roads and stormwater projects
Follow the project cycle until project closure and handover
Completion of project and handed over to DOT
Construction of D1017
3,771,052.00
Construction of Road
Achieve all activities for the construction of District Road
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Completion of project and handed over to DOT
Construction of D1130
5,332,441.00
Construction of Road
Achieve all activities for the construction of District Road
M: MF 30-Jun-08
121
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA ACCESS ROADS AND STORMWATER
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Follow the project cycle until project closure and handover
Completion of project and handed over to DOT
Mooi River Village roads
Construction of Road
Achieve all activities for the construction of District Road
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Completion of project and handed over to DOT
Mooi River Taxi Rank
7,179,465.00
Construction of Road
Achieve all activities for the construction of District Road
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Completion of project and handed over to DOT
Upgrading roads in Nxamalala
3,811,410.00
Construction of Road
Achieve all activities for the construction of District Road
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Completion of project and handed over to DOT
Upgrading roads in Basotho
0.00 Construction of Road
Achieve all activities for the construction of District Road
M: MF 30-Jun-08
122
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA ACCESS ROADS AND STORMWATER
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Follow the project cycle until project closure and handover
Completion of project and handed over to DOT
Upgrading Embo Thumini roads
0.00 Construction of Road
Achieve all activities for the construction of District Road
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Completion of project and handed over to DOT
Hopewell roads and stormwater
820,604.00 Construction of Road
Achieve all activities for the construction of District Road
M: MF 03-Jul-08
123
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA SOLID WASTE REMOVAL
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Construct Perimeter Road -New England Road Landfill Site
950,000.00
Construction of Road withinset standards
Achieve all activities for the construction of Road
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Landfill Operators Training and Mentoring Project
100,000.00 Effective functioning of Landfill Site
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
124
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA SOLID WASTE REMOVAL
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
External Audits of Landfill Sites
400,000.00
Ensuring that Landfill Sites and managed and guided by Legislation
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Improving Equipment on Landfill Sites
1,800,000.00
Effective functioning of Landfill Site
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Develop uMshwathi Landfill Site
Provide and local Land fill site
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
125
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA SOLID WASTE REMOVAL
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Close Hilton Landfill Site
1,500,000.00
Closure implemented as per legal guidelines
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Leachate Study - New England Road
11,400.00
Effective functioning of Landfill Site
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Airspace Study - New England Road Landfill Site
20,000.00
Effective functioning of Landfill Site
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
126
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA SOLID WASTE REMOVAL
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Refuse Collection Projects
0.00
Effective functioning of Waste Function
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
IWMP Review
800,000.00
Inform the Waste function in terms of current legislation and procedures
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Airspace and State of Leachate at the uMngeni Landfill Site
30,000.00
Effective functioning of Landfill Site
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
127
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA SOLID WASTE REMOVAL
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Development of a District Landfill Site
600,000.00
Effective implementing the Waste function
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Installation of Weighbridges and Software on Landfill Sites
550,000.00
Effective functioning of Landfill Site and making self financially self sustaining
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Construction of Offices on Currys Post Landfill Site
350,000.00
Effective functioning of Landfill Site
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
128
DEPARTMENT: TECHNICAL SERVICES
DIVISION: STRATEGIC FOCUS AREA SOLID WASTE REMOVAL
Objectives Strategies KPIs Programme
s and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Feasibility into the development of Hazardous Cell on the New District Landfill Site
200,000.00
Effective functioning of Landfill Site
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Closure of Mpofana Landfill Site and Construction of Waste Transfer Station
800,000.00 Closure in terms of legislation
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
Follow the project cycle until project closure and handover
Commissioning of acitivies that enable the smooth implementation of the Waste function
Transfer of Waste Disposal Function to the UMDM from LM's.
300,000.00
Effective functioning of Landfill Site
Achieve all activities for effective implementation of Waste Function
M: MF 30-Jun-08
129
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: WSA
KPA: SANITATION
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
: Ensure access to efficient; affordable and sustainable water services for all consumers.
Identify communities without basic sanitation and implement projects to address the need.
To eradicate all the sanitation backlog by the year 2010 as per deadline by the government
Swayimane 6&9 Swayimane 10 Swayimane 11 Stoffelton Emakholweni Ndaleni Magoda Mvotislopes Inhlazuka
R77, 324 000 000.00
To have all the projects finished and every household within a district having a basic sanitation infrastructure by the year 2010
To have implementing agents helping the district in delivering the service efficiently and effectively.
Executive Manager: Water Services Authority
2010
To plan for delivery of sanitation service to the people.
To have WSDP re-done, so as to ensure proper planning for sanitation services.
To have a finished and reliable WSDP
Tender stage R1, 500 000.00
To have a finished and reliable WSDP
To have contributions from all stakeholders in compilling WSDP i.e. local municipalities, departments, communities etc.
Executive Manager: Water Services Authority
December 2008
130
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: WSA
KPA: SANITATION
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
To fulfill obligation to provide O&M for basic sanitation
Conduct research on different chemicals available in the market for reducing pit latrines contents and also research on manual vaccum machines.
To have set of approved chemicals to be used by householders in reducing pit contents. To have manual vacuum tankers used in emptying pits
Conduct pilot study on chemicals and manual vaccum machines.
R500 000
To have O& M programme up and running in the district
DWAF and district Technical Department to help in this regard and give guidance.
Executive Manager: Water Services Authority
December 2008
131
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: WSA
KPA: WATER
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to achieve
target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target
dates for inputs
To plan for affordable, economical, effective,
efficient and sustainable access to
water services.
Preparation of a Water Services Development Plan (WSDP)
Tender stage
Preparation of a WSDP, including a physical backlog study.
R1, 500. 000.00
A copy WSDP document and its summary.
Information from LMs, Umgeni Water, Comments from DWAF and the Public
WSA : EM December 2008
To ensure effective regulation of water service provision and providers
Formulate bylaws containing conditions for water services provision.
Draft WSA bylaws in the process of approval
R0
1. Copy of bylaws available at registry for public perusal.
2. Adoption and enforcement of bylaws in the provision of water
Council’s approval and adoption of WSA bylaws
EM: WSA June 2008
132
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: WSA
KPA: WATER
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to achieve
target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target
dates for inputs
services
To ensure the realization of the right of access to water services, particularly basic water services by communities. To ensure provision of effective, efficient and sustainable water
To finalize implementation of water services infrastructural projects and make future water services development plans To draw a contract between the WSA and the recently established (July 2007) internal
Number of projects are currently at implementation stage WSPU assumed operational responsibilities for providing
To be listed under the project list template Compilation of WSA & WSPU water provision contract
R784000.00
Operational and sustainable Community Water Supply Schemes Copy of WSA & WSPU water services provision contract. Provision of
MIG & Internal funds, WSA personnel and Implementing Agents Local Government support grant from DWAF
EM: WSA EM: WSA
Ongoing
June 2008
133
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: WSA
KPA: WATER
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to achieve
target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target
dates for inputs
services To ensure provision of Free Basic Water (FBW) To ensure good quality water provision. To ensure effective collection of revenue to cater for operation
Water Services Provision Unit (WSPU) Enforcement of WSA bylaws in the provision of water services Formulation, approval, adoption and implementation of a FBW policy Maintain an effective water quality monitoring programme Implementation
water services. FBW policy is at draft stage and in process of approval by Council Maintain an effective water quality monitoring programme with Umgeni Water Procurement process of the
None Ongoing water quality monitoring programme Procurement of billing system, training of billing personnel,
None R250.000.00 Covered under Finance: Income
water services in a sustainable manner and to the satisfaction of the consumers. Copy of approved FBW policy and its implementation thereof Monthly water quality monitoring reports received and sent to DWAF.
Use of call centre to report water provision- related issues. Approval of the FBW policy by Council Payment to Umgeni Water for service rendered.
EM: WSA EM: WSA EM: WSA EM: WSA and EM: Income
June 2008
Ongoing
Ongoing
April 2008
134
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: WSA
KPA: WATER
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to achieve
target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target
dates for inputs
and maintenance costs of water services provision To ensure extension of bulk water supply to our rural communities
of a billing system & revival of community water offices & branch officers Participation in DWAF’s Regional Bulk Water Scheme Programme
billing system is ongoing Number of bulk pipelines being planned and implemented by Umgeni Water as a bulk water supplier
transfer of consumers’ accounts from LMs Continous liaison meetinng with DWAF, LMs and uMgeni to plan for the implementation of the ff bulk water pipeline projects uMshwathi- Wartburg-Ozwathini, Garlington, Greater Mpofana
Bulk Water projects implemented by Umgeni Water. Future budgetary plans would be made for the connection of our schemes to the bulk pipeline.
Operational billing system and water revenue collection Connection of rural CWSS to the respective bulk water pipeline
Monitoring of the WQM contract and performance by WSA personnel Signing of the 5-year contract reviewable annually and addition of the Mpangisa scheme.
EM: WSA.
Ongoing
Ongoing
135
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: WSA
KPA: WATER
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to achieve
target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target
dates for inputs
Greater Impendle Richmond, Lion Park extension and possible connection of Mkhambathini schemes to the existing uMbumbulu pipeline
Covered under Finance: Income Umgeni Water, DWAF, LMs and WSA
KEY PERFORMANCE AREA 3: FINANCIAL VIABILITY AND MANAGEMENT
136
DEPARTMENT: FINANCIAL SERVICES
DIVISION: INCOME STRATEGIC FOCUS AREA: INCOME
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
To improve revenue collection
Review the billing system
% of revenue collected
Implement a new billing system
250000
85% of bills collected per month by 30 June 2008
Establish service needs
EM: IC 31-Aug-07
Develop specifications
EM: IC 30-Sep-07
Purchase system
EM: IC 31-Oct-07
Adapt system according to needs
EM: IC 30-Nov-07
Train users EM: IC 31-Dec-07
Carry out parallel testing
EM: IC 31-Jan-08
Conduct a test-run
EM: IC 28-Feb-07
Implement system
EM: IC 31-Mar-08
137
DEPARTMENT: FINANCIAL SERVICES
DIVISION: INCOME STRATEGIC FOCUS AREA: INCOME
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
To improve the collection & management of revenue & the setting of tariffs for services provided
Approve all relevant policies
To formulate & finalise a revenue & tariffs policy
Calculating new tariff for new services
Identify relevant cost in calculating a new tariff.
EM: IC
31-Mar-08 To promote economic activity & increase income base within the district
Perform all legislated powers and functions at a district level
Review existing service level agreement with LM’s and financial performance of each function
Engage in discussions with LM perfuming district function
Consensus reached between LM and DM about function to be transferred. The council to approve such transfer
Liaise with economic development on feasibility studies undertaken to perform the function at district level
EM: IC
31-May-08
138
DEPARTMENT: FINANCIAL SERVICES
DIVISION:
BUDGETING AND REPORTING
KPA: BUDGETING AND REPORTING
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Budget Linked to the IDP
District IDP Linked to the Local Municipalities IDP’s
The time deadlines for the budget process plan for the District to be at least 60 days in advance to the Local Municipalities
Departmental Meeting Budget consultation _ Izimbizo
Districts budget allocations to be advised to the Local Municipalities at least 100 days before the start of the Financial year.
CFO / EM: Budget and Reporting
Departmental Inputs to be submitted timeously to be interpreted to figures
Approved Budget
139
DEPARTMENT: FINANCIAL SERVICES
DIVISION:
BUDGETING AND REPORTING
KPA: BUDGETING AND REPORTING
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Reduce Long term Debt
Timeous repayments. Reduced operational spending and increased debt repayment amounts
Reduced Debt with the Financial Institutions. Reduced debt gearing ratio Reduced debt repayment period Reports prepared and submitted by the 10
th of
each month as prescribed by the MFMA Reports prepared and submitted by
Bi annually
Monthly Reports
1. Reduced long term loans 2. No new loans to be taken out. 3. Reduced draw down on the approved Financial Assistance
Quarterly Reviews And Expenditure Trends
Monthly Income and Expenditur
140
DEPARTMENT: FINANCIAL SERVICES
DIVISION:
BUDGETING AND REPORTING
KPA: BUDGETING AND REPORTING
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
e Reports the 10th of
Increase cash resources to fund operational budget Reduce variable costs and strive to improve service delivery with limited resources to improve profitability Variable costs like: Salaries, operations and maintenance. Increased Capital budget spending
Reported Increased collection rate Reduction of Employee Costs as a percentage to the total budget and operational budget Reported Increased Capital Projects implementation and
141
DEPARTMENT: FINANCIAL SERVICES
DIVISION:
BUDGETING AND REPORTING
KPA: BUDGETING AND REPORTING
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Grant dependency ratio reduced
increased customer satisfaction
Debt Recovery Reduce Long term Debt
1. Reduced long term loans 2. No new loans to be taken out. 3. Reduced draw down on the approved Financial Assistance
Timeous repayments. Reduced operational spending and increased debt repayment amounts
Reduced Debt with the Financial Institutions. Reduced debt gearing ratio Reduced debt repayment period
CFO / EM: Budget and Reporting
Bi annually
Expenditure Reports
Monthly Reports Quarterly Reviews And Expenditure Trends
Monthly Income and Expenditure Reports
In year monitoring reports as prescribed by the Treasury Guidelines
CFO / EM: Budget and Reporting
142
DEPARTMENT: FINANCIAL SERVICES
DIVISION:
BUDGETING AND REPORTING
KPA: BUDGETING AND REPORTING
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Increase cash resources to fund operational budget
Reported Increased collection rate
Reduce variable costs and strive to improve service delivery with limited resources to improve profitability Variable costs like: Salaries, operations and maintenance.
Reduction of Employee Costs as a percentage to the total budget and operational budget
Increased Capital budget spending
Reported Increased Capital Projects implementation and increased
143
DEPARTMENT: FINANCIAL SERVICES
DIVISION:
BUDGETING AND REPORTING
KPA: BUDGETING AND REPORTING
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
customer satisfaction
Grant dependency ratio reduced
144
DEPARTMENT: FINANCE
DIVISION:
SUPPLY CHAIN MANAGENENT
STRATEGIC FOCUS AREA: SUPPLY CHAIN MANAGEMENT
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to
achieve target
Inputs
Outputs (Specific, measurable, attainable, realistic and
time related)
Responsibility Target
dates for inputs
Service delivery and departmental support.
Specifications Design.
Procurement of goods and services.
Tender and quotation processes.
Needs; Staff and Offices and Office equipment
Community Structures eg: Roads, Community Halls or services
EM:SCM
Continuous
Economic Development
Specifications Design.
% of jobs created.
Tender and quotation processes.
Issuing of public tenders and quotations.
Medium size Businesses and job creations.
EM:SCM
Continuous
Economic Empowerment
Specifications Design.
Empowerment
Tender and quotation processes.
Issuing of public tenders and quotations.
SMME Sector and job creation.
EM:SCM
Continuous
145
KEY PERFORMANCE AREA 4: LOCAL ECONOMIC DEVELOPMENT
LED VISION GROWTH, PEACE AND PROSPERITY FOR ALL
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Develop, manage and Monitor LED Mechanisms for Implementation within the district Municipal area
To develop, approve and implement a District-wide LED Strategic Plan
Council adopted LED Strategic Plan and the implementation Plan thereof
Completion and Adoption of the Comprehensive District-Wide LED Strategic Plan and read for implementation By July 2008, have begun
N/A
Council approved and Adopted District-Wide LED Strategic Plan
Finalize Close-Out Stage of the Project Submit Final technical Report and necessary documents to Gijima KZN Submit Final LED Strategic
LED Unit
June 2008
May 2008
July 2008
Departmental support.
Identification of materials needed
Stores Management
Stock recording and stock taking
Stock levels
Service delivery support
EM:SCM
Continuous
146
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
implementation of some of the projects as contained in the LED Strategy with appropriate partners.
Plan to Council for approval and Adoption
To facilitate access and availability of resources for LED implementation (financial & Human Resources mobilization)
At least 10 potential project funding agencies engaged during 2008/2009 Financial year
Resource Mobilization activities
N/A
At least 10 potential project funding agencies engaged during 2008/2009 Financial year
Engage various potential funders regarding the implementation of the interventions contained in the District as well as Local Municipalities LED Strategic Plans
LED Unit
May 2009
147
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
To develop, implement and monitor District-aligned LED Strategic Plans for and in partnership the Seven Local Municipalities
Seven completed and adopted Local Municipalities LED Strategic Plans and Implementation frameworks thereof
Completion and adoption of a total of seven District-aligned local municipalities LED Strategic Plans
N/A
Completed and Adopted Seven LED Strategic Plans
Finalize Close Stage of the project Submit final Technical reports to Gijima KZN Submit Final LED Strategies to all Local Municipalities Facilitate Approval and Adoption by respective LM’s
LED Unit
August 2008
May 2008
May 2008
July 2008
148
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
To facilitate the Development
and strengthening of
hard and soft infrastructure
To facilitate the provision of the essential hard and soft infrastructure for business growth and development
Roaster Review report Key Sector Skills Development Audits
Develop a roster of all government owned land, buildings and other assets for each LM by mid 2009. This includes comments on state of repair as well as potential uses and broad cost of rehabilitation where necessary In partnership with relevant partners Review road, rail, water, energy and telecommunications
N/A
Complete government owned land and building Roaster Basic services review plans Key Sector Skills Development Plans
Develop a roster of all government owned land, buildings and other assets for each LM by mid 2009. This includes comments on state of repair as well as potential uses and broad cost of rehabilitation where necessary In partnership with relevant partners Review road, rail, water, energy and telecommunications infrastructure in
LED Unit (in partnership with Technical Services)
July 2009
149
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
infrastructure in the light of each target sector requirements and needs.
the light of each target sector requirements and needs. Engage immediately with the various private sector stakeholders regarding skills needed for target sectors and develop a tertiary institution investment and set up strategy Immediately engage with MERSETA, which is setting up satellite training centre for metal
150
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
workers in partnership with FETs currently, and ensure that a re training programme is implemented in Mpofana and Impendle (mid 2009) In partnership with Msunduzi and relevant roleplayers facilitate Upgrade Oribi to be able to handle A) Large Freight Planes (perishables destined for Dube and export, as well as large passenger
151
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
planes. Add cold storage facilities. By end 2009 in time for World Cup With the Chamber develop mentoring programmes where required and work experience programmes where possible.\ develop action plan
Facilitate and promote the development and support of the SMME and existing
To adopt and implement a District-Wide SMME Development & Support Plan in
A Council approved SMME development and Support Plan
Compilation of the UMDM SMME Database Establish and
300, 000 100, 000
Council Approved UMDM SMME database
Submit final SMME Plan to Council for adoption Develop and
LED Unit in partnership with SEDA and LM’s
July 2008 September
152
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
businesses within the District Municipal area
partnership with relevant parties
Council Approved UMDM SMME database Successfully conducted SMME and Entrepreneurship Workshops Council operational SMME Forum A District SMME Fair Terms of reference Council approved
Operate the UMDM SMME Stakeholder Forum Conduct Seven SMME Entrepreneurship Workshops/Campaigns within UMDM Hold a District-Wide SMME Fair Sponsor at Least Four SMMEs/Cooperatives to participate in Exhibitions and Shows Undertake SMME
400, 000 400, 000 200, 000 100, 000
Seven Successful SMME & Entrepreneurship Workshops A District-Wide SMME Annual Fair event A District-Wide SMME Forum N3 - SMME OpportunitiesStudy report SMME Target Sector reports/Plans
Implement Terms of Reference for SMME database Undertake UMDM SMME Database based on ToR Develop Terms of Reference for the Establishment of the SMME Forum Develop a brief action plan and submit to council for approval for conducting seven SMME and Entrepreneursh
2008
March 2009
August 2008
August 2008
153
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
SMME Study Report % of SMMEs accessing Finance SMME Target Sector Plans
Opportunities Study offered by N3 Highway Facilitate Access to Finance by SMMEs in partnership with Ithala and other financial institutions. Develop a package for SMMEs in each target sector With the CSIR in partnership assess the feasibility of setting up
Facilitation Facilitation Facilitation
ip Campaigns In partnership with SEDA and LMs facilitate the identification of qualifying SMME for sponsorship in the Exhibitions and shows in 2009 etc.. Develop Terms of Reference and proposed Plan for holding a District-Wide SMME Fair in 2009 Initiate the engagement with various sector players on packaging
October 2008
November 2008
January 2009
154
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
internet and digital communication centres combined with SMME service centres in a one stop shop by mid 2009 Facilitate access to various business development services in partnership with various roleplayers including KZNDED, FET Colleges, SEDA, LMs, etc…on an ongoing
Facilitation Facilitation
SMME sector Plans Develop Terms of reference for the feasibility Study of SMME opportunities along N3 Highway Conduct the N3 SMME Opportunities Study In partnership with various sector role-players continue to facilitate access to various business development services within
August 2008
April 2009
July 2008 and Ongoing
155
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Develop, adopt and implement a District-Wide Informal Economy Policy Framework
A Council approved District-wide Informal Economy Policy Framework Plan A Council approved Mkhambathini Feasibility Study Feasibility / Business Plan for the Establlishment of Business
basis. Facilitate the Development and implementation of SEDA One-Stop-Shop Centre Feasibility Study of Mkhambathini Business Hub with Cubic Stalls Establish Business
100, 000 200, 000 100, 000 200, 000
A Council approved District-wide Informal Economy Policy Framework Plan A Council approved Mkhambathini Feasibility Study Feasibility / Business Plan for the Establlishment of Business Information
the District
LED Unit
156
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Information Centres A Council approved Database for Informal Economy Business Management and Skills Training Provided Business Incubation Provided
Information Centres in two Local Municipalities Develop and Maintain a District-Wide Informal Economy Database Facilitate access to Business Management and related Skills Training for the targeted informal Economy players (at least within two of the LMs)
Centres A Council approved Database for Informal Economy Business Management and Skills Training Business Incubation Centre
157
DEPARTMENT: COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives / Goals
Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Provision of Business Incubation Development of Informal Economy By-Laws (Impendle, Mpofana, uMshwathi & Mkhambathini)
DEPARTMENT: COMMUNITY SERVICES
DIVISION: LED
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives Strategies KPIs Programme
s and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
158
DEPARTMENT: COMMUNITY SERVICES
DIVISION: LED
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives Strategies KPIs Programme
s and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Facilitate the development
and Support of key growth
sectors within the District and
thus create employment
and grow the economy
Facilitate the development and support in partnership with industry and key stakeholders of the following Sectors and Sub-Sectors:
• Wood and Wood Products
• Bio Fuels • Auto parts and
tools • Farm Irrigation
Equipment • Solar Water
Heating Units • Truck parts • Assembly of
sub systems for farm plant
• ICT embedded software
A Detailed Manufacturing Retention, Expansion and Attraction Sector Plan A Detailed Services Sector Retention,Expansion, & Attraction Plan A detailed Agriculture & Agro-Process Sector Plan A detailed Property Development Sector Plan
Development of a manufacturing Sector Plan Development of a Services Sector Plan Development of an Agriculture and Agro-processing Sector Plan Develop a Property Development Sector Plan (These plans should include employment and revenue targets as
150, 000 150, 000 150, 000 150, 000
A Detailed Manufacturing Retention, Exapansion and Attraction Sector Plan A Detailed Services Sector Retention,Expansion, & Attraction Plan A detailed Agriculture & Agro-Process Sector Plan A detailed Property Development Sector Plan
Develop Terms of reference for the sector plans Source funding for the implementation Implement projects
Manager: Local Economic Development
May 2009
159
DEPARTMENT: COMMUNITY SERVICES
DIVISION: LED
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives Strategies KPIs Programme
s and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
well as exact incentive packages and a cost benefit and break even analysis of incentive versus expected gains.. Review annually achievements against targets.
Services:
• Logistics • Plant hire and
servicing • Truck servicing • Cold supply
160
DEPARTMENT: COMMUNITY SERVICES
DIVISION: LED
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives Strategies KPIs Programme
s and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Chain management
• ICT embedded software
• Medical Services
• Education Services
• Property Development
• Agriculture and Agri-Process
•
161
DEPARTMENT: COMMUNITY SERVICES
DIVISION: LED
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives Strategies KPIs Programme
s and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Facilitate and Promote Trade and Investment within the District Municipal area.
Develop and Adopt a Council Investment Incentive Policy Framework plan Increase the level of inward investment in target sectors by 200% Retain existing businesses Motivate business expansion Attract new businesses Improve the local business climate
A Council approved Investment Incentive Policy Framework Plan
Facilitate the establishment of the UMDM Investment Unit Facilitate Investment promotion and Marketing in partnership with sector players Conduct Market research and Business Opportunity Development Create a series of inward fact finding missions for
154, 000 260, 400 600, 000
A Council approved Investment Incentive Policy Framework Plan Market Research and Business Opportunity Development Study
Submit Final Policy Framework to Council for Approval Submit to council a motivation for the establishment of the Investment Unit Develop Terms of Reference for the Market research and Business Opportunity Development Continue to work with TIKZN in facilitating trade and investment
LED Unit
September
2008
September 2008
October 2008
162
DEPARTMENT: COMMUNITY SERVICES
DIVISION: LED
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives Strategies KPIs Programme
s and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
target sectors by end 2008. By mid 2008 have identified sites and correct incentive packages for target sectors Annual business survey by target sector and LM to identify business needs Action research in focus groups in partnership with UKZN
within the District
163
DEPARTMENT: COMMUNITY SERVICES
DIVISION: LED
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives Strategies KPIs Programme
s and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
each sector annually. Begin immediately
LED Relationship Management, Communication and Coordination within the District Municipal area
Establish and manage a District-wide LED Multi-Stakeholder Forum with clear terms of reference and mandate
A Council Approved District-Wide LED multi-Stakeholder Forum / Structure With clear terms of reference
Establish the District-Wide LED Multi-Stakeholder Forum / Structure
100, 000
A Council Approved LED Forum A Council Approved terms of Reference A Council Approved LED
Develop Terms of Reference for the establishment of the Forum Submit for approval to Council the programme of action
Manager: LED
September 2008
164
DEPARTMENT: COMMUNITY SERVICES
DIVISION: LED
KPA: LOCAL ECONOMIC DEVELOPMENT
Objectives Strategies KPIs Programme
s and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Use a sector based task team approach to generate practical solutions and build trust among various LED Stakeholders within the district
A Council approved LED Communication Strategy linked to the Municipal-wide Communication Strategy
Develop a clear LED Communication Strategy / Guiding Document linked to the municipal master communication Plan Set up task teams of action oriented decision makers for each of the target sector
N/A N/A
Communication Strategy / Guidelines
Hold the 1st
District-Wide LED Forum Implement the Programme of action
November 2008
165
DEPARTMENT:
COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: TOURISM DEVELOPMENT
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
increase the number of domestic as well as international tourists into our region
marketing strategy
development of a tourism website
manage/monitor the development of the website
400 000 a website
solicite funding from the council to appoint a service provider
M.T 31-Aug-08
166
DEPARTMENT:
COMMUNITY SERVICES
DIVISION: ECONOMIC DEVELOPMENT
KPA: TOURISM DEVELOPMENT
Objectives Strategies KPIs Programmes
and / or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
to improve the district record keeping and data collection
market research and data collection
an up to data on tourism within the district
statistics of tourists visiting our region, list of graded and registered products within the district and statistics.
500 000
tourism statistics, a list of registered products
solicit funding to appoint a service provider
M. T 30-Oct-08
investigate the viability of opening a tourism information office for the district
information management strategy
a report on the proposed tourism office
feasibility study
150 000 tourism office plan
solicit funding to appoint a service provider
M. T 30-Nov-08
167
DEPARTMENT: COMMUNITY SERVICES
DIVISION:
ECONOMIC DEVELOPMENT
KPA: TOURISM DEVELOPMENT
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
increase communication between the district, local municipalities and tourism stakeholders
a communication strategy
communication strategy
meet with relevant stakeholders
communication strategy
consultation with local municipalities and stakeholders on how we should communicate
M.T 31-Dec-08
develop tourism products as per the tourism strategy
investigate the viability of project development
development plan
investigate product development
800 000
develop at least two tourism projects
solicit funding for project development
M.T 30-Sep-08
Tourism planning coordination and integration
ensure that there is tourism planning coordination in the district
planning coordination
cooperation with local municipalities and other stakeholders
good working relationship with all stakeholders including local municipalities
organize meeting with all relevant stakeholders
M.T ongoing
to bring in more people to the district thorough eventing
develop an eventing strategy
eventing strategy
investigate the type of events the district could be involved in
500 000 an eventing plan
consult local municipalities, tourism associations and other stakeholders on
M. T 30-Sep-08
168
DEPARTMENT: COMMUNITY SERVICES
DIVISION:
ECONOMIC DEVELOPMENT
KPA: TOURISM DEVELOPMENT
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
the type of events we can jointly host
169
KEY PERFORMANCE AREA 5: GOOD GOVERNANCE AND PUBLIC PARTICIPATION DEPARTMENT OFFICE OF THE MUNICIPAL MANAGER DIVISION MAYORS’PARLOUR STRATEGIC ISSUE: HIV/AIDS Objectives Strategies KPI Programmes & /
Projects Budget required to achieve target
Outputs (Specific, measurable, attainable, realistic and time bound)
Inputs Responsibility
Target dates for inputs
1. To facilitate and promote an enabling environment for HIV/AIDS responses to be effective throughout UMDM area of jurisdiction.
To form and establish an effective structure within the council, the DAC – District AIDS Council and, also LAC’s throughout the seven local municipalities, respectively.
A visible, decisive and effective DAC structure involving all government departments, other sectors, civil society and all other relevant stakeholders.
Formation & Establishment of a DAC – District AIDS Council.
R 300 000 A fully functional and effective District AIDS Council by August 2008
Coordinate multi-stakeholder workshop/summit involving all relevant personnel for the formation of a DAC. Place adverts on prominent local newspapers inviting all relevant and potential bodies/departments and other sectors to DAC formation processes.
HIV/AIDS Coordinator
July – August 2008 July 2008
170
To assist local municipalities in establishing functional LAC’s – Local AIDS Councils.
Existing LAC’s throughout the seven local municipalities.
Assist local municipalities establishing and launching LAC’s.
R 200 000 A fully collaborative, participatory and community driven Local AIDS Council by August 2008.
Convene meetings; consult local HIV/AIDS Coordinators on local Workshops/Summit to be held with all relevant stakeholders on HIV/AIDS.
HIV/AIDS Coordinator
August 2008
2. To effectively Manage HIV/AIDS responses throughout the District.
To formulate and develop a comprehensive District Wide HIV/AIDS Strategy on prevention, treatment, care, support, human & legal rights, monitoring, research and surveillance on HIV/AIDS throughout seven local municipalities.
A District Wide HIV/AIDS Strategic Plan. Approved by DAC and the Council.
Establishment and development of a multi-sectoral and multi-stakeholder participatory structure.
R 800 000 A DAC endorsed and Council approved HIV/AIDS District Wide Strategic Plan Document.
Coordinate and facilitate processes of engagements with other stakeholders throughout the District.
HIV/AIDS Coordinator
July – November 2008
Launch of an approved and finalized HIV/AIDS Strategic Plan Document.
R 250 000 A finalized, endorsed and approved document by council, and distributed to all seven local municipalities by
Distribute a final and approved HIV/AIDS Strategic Plan Document to all seven local municipalities.
HIV/AIDS Coordinator
1st
December 2008.
171
1st December
2008. Monitor,
coordinate and manage all programmes contained in the strategic plan document.
HIV/AIDS Coordinator
January 2008 – Ongoing until strategy review.
To access funding from donor agencies in implementing HIV/AIDS Programmes or / Projects highlighted in the HIV/AIDS Strategic Plan Document of uMgungundlovu District Municipality.
A number of privately funded HIV/AIDS Programmes or / Projects.
Funding Initiatives/Mobilization.
N/A A number of successfully donor funded HIV/AIDS Projects by June 2009.
Engage international, national, provincial and private donor agencies in accessing funding.
HIV/AIDS Coordinator
2008/09 Financial Year.
3. To mitigate impact of HIV/AIDS throughout the District.
Addressing the socio-economic impact of HIV/AIDS to affected/infected people and also rendering psychosocial, nutritional, material and educational support.
Reduced socio-economic burden caused by HIV/AIDS amongst people affected/infected with HIV/AIDS.
Facilitate improvement of access to counselling, support (psychosocial and material) and poverty reduction interventions.
N/A An increased level of support, counselling and poverty reduction interventions by June 2009.
Coordinate relevant lead sectors, departments, NGO’s, private sectors, government/semi-government structures, private
HIV/AIDS Coordinator
2008/09 Financial Year.
172
organisations and other stakeholders.
Establish Support Group Structures at local levels for people infected and affected by HIV/AIDS.
A number of support groups established at local level.
Education, psychosocial, nutritional and support programmes.
N/A Fully functioning Support Group Structures at local levels by June 2009.
Facilitate, coordinate and ensure existence of support groups at local levels throughout the District.
HIV/AIDS Coordinator
2008/09 Financial Year.
4. To aligning municipal responses on HIV/AIDS to bio-medical approaches.
To facilitate and coordinate access to health care services and facilities throughout the seven local municipalities.
Increased rate of bio-medical responses to HIV/AIDS throughout the District.
Facilitation and coordination of access to health care services and facilities.
N/A Reduction in the number of new infections and high incidences of safe sexual behaviours by June 2009.
Facilitate and coordinate engagements with relevant lead departments.
HIV/AIDS Coordinator
September 2008 – June 2009
To facilitate and coordinate access to ART throughout the District.
% increase on access to ART.
Support ART Roll Out Plan of KZN.
N/A % increase on access to ART throughout the District by June 2009.
Facilitate, coordinate and strengthen working relations with DOH on ART Roll Out Plan.
HIV/AIDS Coordinator
2008/09 Financial Year
Facilitate collaboration and cohesive working relations with leading and relevant sectors implementing
HIV/AIDS Coordinator
2008/09 Financial Year
173
an ART Roll Out Plan.
Facilitate established ongoing integrated multi-stakeholder responses to ART Roll Out Plan of KZN throughout the District.
HIV/AIDS Coordinator
2008/09 Financial Year
Coordinate integration of Home Care based initiatives on ART Roll Out Plan.
HIV/AIDS Coordinator
2008/09 Financial Year
Facilitate and help in the coordination and contribution of bio-medical contributions by DoH’s operational plan on Prevention, Treatment, Care and Support throughout the District.
HIV/AIDS Coordinator
2008/09 Financial Year
174
5. To ensure a multi-sectoral, multi-stakeholder, an integrated and comprehensive District response to HIV/AIDS.
To allow for an integrated, multi-sectoral and multi-stakeholder platform of researchers, specialists and academics on HIV/AIDS fraternity, issues and responses.
A fully functioning multi-sectoral and multi-stakeholder HIV/AIDS Advisory Structure.
HIV/AIDS Contemporary Responses/Interventions and Initiatives.
N/A A DAC endorsed structure serving as an Advisory Body on HIV/AIDS issues by March 2009.
Engage academics, professionals, research institutes, institutes of higher learning, and all other relevant & potential participants to this Advisory Structure.
HIV/AIDS Coordinator
September 2008
Submit report to DAC/Council for approval of the structure and terms of reference thereof.
HIV/AIDS Coordinator
January 2009
1st
Meeting of an HIV/AIDS Advisory Team.
HIV/AIDS Coordinator
1st March
2009
To ensure active participation of other stakeholders and sectors in knowledge/expertise sharing and the critic of a 2008/09 strategic plan of uMgungundlovu
Yearly HIV/AIDS District Summit.
Summit on HIV/AIDS
R 500 000.00
Coordinate and organize yearly HIV/AIDS District Summit for stakeholder participation by June 2009.
Coordinate multi-stakeholder summit.
HIV/AIDS Coordinator
May 2009
175
District Municipality.
Strengthening of intergovernmental relations (IGR) for better engagements on HIV/AIDS planning processes between sector departments and municipalities for 2008/09.
Facilitate and coordinate relations with other sector departments.
HIV/AIDS Coordinator
2008/09 Financial Year
176
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: MAYORS PALOUR
KPA: TRADITIONAL AFFAIRS
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
To create a dialogue between Traditional Leaders and UMDM
To have regular meetings with Amakhosi to discuss service delivery matters
Improved service delivery in Rural areas
Community outreach programmes
300 000 Service delivery
Developing Terms of Reference and have partnerships with relevant government departments
Manager: Mayors Parlour
June 2008
177
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: MAYORS PALOUR
KPA: ELDERLY PERSONS
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Ensure that they receive human rights as citizens of our district
Organize summit
Have report from the summit
Programmes to start after the summit
R300, 000.00
Programmes commences after obtaining a report from summit
Summit
UMDM coordinator.
1st December
178
DEPARTMENT OFFICE OF THE MUNICIPAL MANAGER DIVISION MAYORS’PARLOUR STRATEGIC ISSUE: OFFICE ON THE RIGHTS OF A CHILD (ORC) Objectives Strategies KPI Programmes & /
Projects Budget required to achieve target
Outputs (Specific, measurable, attainable, realistic and time bound)
Inputs Responsibility
Target dates for inputs
1. To communicate, facilitate and ensure mainstreaming of a child centred governance approach.
To facilitate and coordinate the strengthening processes for local municipalities’ fit to children rights issues and ensure mainstreaming processes as per Five Year Operational Plan.
A number of local municipality’s IDP submitted to Premier’s Office / ORC National Office. A number of information sharing workshops convened.
Mainstreaming ORC throughout the District.
R 100 000
Programmes & projects implemented as per the National Government’s Five Year Operational Plan by 2008/09
Coordinate ORC activities, information sharing workshops, and ORC Government’s response models.
HIV/AIDS Coordinator.
July 2008 – May 2009
2. To strengthen strategic children’s rights management and leadership throughout the District.
To establish a fully representative, multi-stakeholder, multi-sectoral, consolidated and integrated
A truly representative Children’s Rights Advisory Council.
Formation & establishment of a Children’s Rights Advisory Council
R 300 000
An integrated multi-stakeholder structure and representative Children’s Rights
Coordinate a multi-stakeholder workshops/departments/NGO’s/ CBO’s and other relevant
HIV/AIDS Coordinator
September 2008
179
structure on Children’s Rights issues.
Advisory Council by September 2008.
stakeholders for the formation of a truly representative Children’s Rights Advisory Council with child interest at heart.
Launch of a Children’s Rights Advisory Council.
R 150 000
Launch of a council approved Children’s Rights Advisory Council by November 2008.
Convene a multi-stakeholder summit on the launch of the Children’s Advisory Council.
HIV/AIDS Coordinator
November 2008.
3. To coordinate, facilitate and support Children’s Rights Initiatives for a better enhanced and accelerated implementation of ORC programmes within the District’s area of jurisdiction.
To coordinate operationalization of all Children’s Rights Activities and partaking of the District/Local Municipality to all ORC’s National Calendar Events/Programmes.
A number of children reached by the National Children’s Day and the Day of the African Child Programmes.
Coordination of CR Programmes/ ORC National Calendar Events.
R 100 000
A number of National Calendar Events attended / CR Programmes operationalized by UMDM throughout 2008/09 financial year.
Coordinate operationalization and support of all priority national events/CR Programmes.
HIV/AIDS Coordinator.
July 2008 – June 2009
4. To enhance management of integrated programme implementation, CR Constitutional mandates and accelerated delivery of basic ORC issues
To coordinate lead sector responses and collaboration on relevant sector/government CR programmes and ensuring strategic
A number of sector lead programmes / projects.
A coordinated sector lead responses on: - 2010 Soccer World Cup (Global Football Event) Child Trafficking; - Food Security & Nutrition Programme (Child Poverty);
N/A A coordinated sector responses to programmes / events throughout 2008/09 financial year.
Coordinate sector responses towards accelerated delivery of Key National Priority CR Programmes in
HIV/AIDS Coordinator.
2008/09 Financial year.
180
and programmes. fit across all sectors.
- ECD – Early Childhood Development; and - Crime Prevention & Public Safety Programme.
response to National Government’s Five Year Plan.
181
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: MAYORS PALOUR
KPA: INTER-GOVERNMENTAL RELATIONS
Objectives Strategies KPIs Programmes and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibilit
y Target dates
for inputs
To ensure that the UMDM Intergovernmental and Municipal International Relations functions properly as it is required by the Act.
To develop the intergovernmental and municipal international relations policy framework plan and strategies
Approval of both policies by the Council good relations with government departments
Facilitating district IGR meetings with provincial departments to align with IDP, Facilitate signing of MOU’s and exchange programmes with other district municipalities and international institutions Learning and sharing
500 000
Signing of MOU’s with International Countries and forming partnerships with governmental departments e.g Hague twinning progamme
Source funding from the relevant stakeholders to facilitate service delivery
Municipal Manager and the Manager: Mayors Parlour
June 2008
182
DEPARTMENT: OFFICE OF THE MUNICIPAL MANAGER
DIVISION: MAYORS PALOUR
STRATEGIC ISSUE: PUBLIC PARTICIPATION
Objectives
Strategies
KPIs Programmes and
/ or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable, realistic and time related)
Inputs Responsibility Target
dates for inputs
To enhance a dialogue and interaction between government and the people.
The UMDM to facilitate and manage relationships between various stakeholders by aligning the public participation programmes The UMDM to utlilise the services of the Communications Department as a tool to reach the public Ensure identification of community needs to enable the Council to take informed decisions
Izimbizo that includes all stakeholders Improved communication between uMDM and stakeholders Improved public participation in the planning processes of the district Regular consultation of the designated group Improved service delivery
Organise izimbizo, project launches and handovers, outreach campaigns, ward committee meetings, function arrangements
500 000
Incorporating the public views in our IDP Ensures communication of Council resolutions
Budget for all the Public Participation programmes
Manager: Mayors Parlour
April/Oct 2008
183
Ensure that Council responds to the needs of the designated group Utilize resources / services of other different governments in addressing the needs of the community
184
DEPARTMENT: OFFICE OF THE MUNICIPAL MANAGER
DIVISION: MAYORS PALOUR
STRATEGIC ISSUE: GENDER EQUITY
Objectives Strategies KPIs Programmes and
/ or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable, realistic and time related)
Inputs Responsibility Target dates
for inputs
Raising awareness about gender issues & domestic violence Raising awareness in women empowerment
Educate rural school children & rural man & women about gender issues and domestic violence Summit
Sensitized domestic violence and school violence Report from the summit
365 days “No Violence Against Women and Children Program • Break the
Cycle • Demand
Justice • Love
passionately • Stop aids • Stop rape • Stop domestic
violence. Summit
“R150 000.00 R300,000.00
Knowledge about constitutional rights Understanding of the needs from the community
Established forums and partnership with the Department of Justice and Constitutional Development to educate the community in Local Municipalities Summit
Gender Equity /Women Empowerment Coordinator, Gender equity/Women empowerment coordinator
1 July -Dec 2008 July 2008
Ensure inclusion of women in the Agriculture &
Increased number of women owning their
40% women running businesses in
Linking women with South African Women ’s Entrepreneur’s
R200 000
Women entrepreneur in
Ensure inclusion of women in the Agriculture &
Gender/ Empowerment Co-ordinator
4 August-March 2009
185
Construction sectors
businesses in the Agriculture and construction sectors
Agriculture and construction sectors
Network (SAWEN)
Agriculture and Construction Sectors
Construction sectors
Link women with SAWEN
Liaise with LED unit to ensure inclusion of women in business initiatives
Form partnership with DED in women empowerment campaigns
To ensure that women are given priority during supply chain processes
To facilitate and promote an enabling environment for Gender Forum throughout UMDM area of
To form and establish an effective Gender Forum structure in the District which includes Local Municipalities
A visible, decisive and effective District Gender Forum structure involving all government
Formation & Establishment of uMgungundlovu District Gender Forum.
R 500 000.00 A fully functional and effective District Gender Forum by August 2008
Coordinate multi-stakeholder workshop/summit involving all relevant personnel for the formation of a Gender Forum.
Gender/Woman Empowerement Co-ordinator
August 2008
186
jurisdiction. within the District, Government Departments, NGO, NPOs.
departments, other sectors, civil society and all other relevant stakeholders.
.
187
DEPARTMENT: OFFICE OF THE MUNICIPAL MANAGER
DIVISION: MAYORS PALOUR
STRATEGIC ISSUE: YOUTH DEVELOPMENT
Objectives Strategies KPIs Programmes and
/ or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable, realistic and time related)
Inputs Responsibility Target
dates for inputs
Create and maintain healthy relations with the relevant stakeholders. – Local Municipalities, Youth Organisations, Government Departments
o Establish a working Youth Forum with representatives from the relevant stakeholders
o District Youth Forum
o Continued co operation between the District and the relevant Stakeholders
Establishment of Youth Forum
R50 000
Existing district Youth Forum consisting of all Youth Co-ordinators from local municipalities by August 2008
Regular stakeholder’s meetings
Youth Coordinator
August 2008
Increase the number of Youth Entrepreneurs in the District
1. Strengthen relations with the Youth development friendly bank –Ithala for easy access to information and funding
Increased number of Youth entrepreneur introduced into the formal business banking Increased number of
Facilitate Youth Entrepreneurship development
R 50 000
At least 12 credit approval by Ithala for youth businesses a year. Youth friendly
Formal training on how to handle sustainable business through Dept of Labour and Dept of Economic Development Liaise with district LED unit to identify business
Youth Co ordinator
1 July 2008
188
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
2. ensure inclusion of youth in the supply chain processes
business dealings by the District with the Youth owned businesses
Input into the Supply Chain Management Policy Review
Supply Chain Process
opportunities for youth Link youth to business opportunities
Enrich and develop Youth through Tourism
Increased number of youth involved in tourism
Youth summit in tourism
45000 000
Liaise with relevant stakeholders for partnership
Youth Co-ordinator
February 2009
Promote Youth Participation in the mainstream economy by at least 60 % in the District
2010 Strategies to include youth involvement
Functions identified to be performed by Youth groups / companies
Create awareness of the impact of HIV/AIDS
Be part of the awareness programmes by other Municipalities and Government Departments
189
DIVISION: MAYORS PALOUR
KPA: SPORTS AND RECREATION PROMOTION
Objectives Strategies KPIs Programmes and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
To ensure the development of sports, arts and cultural activities within the jurisdiction of the district
To develop District Wide Sports ,Arts and Culture Strategy
Have report from the summit To implement and co-ordinate sports activities throughout the District Municipality To review District Forums. Relevant Structures. To implement National and Provincial Strategies. To forge partnership with relevant Stakeholders SALGA KZN Games 2008 participation
District Forums Formation and assessment of registered associations of all sporting codes Public launch and formal recognition of both structures as the coordinating body.
R200, 000.00
Department of Sports and Recreation / Depart. Of Arts and Culture and Sports Co coordinator
Youth Sports, Arts and Culture Coordinator.
2008/09
190
DEPARTMENT:
OFFICE OF THE MUNICIPAL MANAGER
DIVISION: MAYORS PALOUR
KPA: SPORTS AND RECREATION PROMOTION
Objectives Strategies KPIs Programmes and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
District Drama Workshop be implemented Umgungundlovu Cultural Cultural Carnival
Workshop on Script writing, Directing, Advanced acting, and Basic Marketing
Youth Sports, Arts Culture Coordinator
2008/09
191
192
DEPARTMENT: OFFICE OF THE MUNICIPAL MANAGER
DIVISION: MAYORS PALOUR
STRATEGIC ISSUE: COMMUNICATION
Objectives Strategies KPIs Programmes and /
or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable, realistic and time related)
Inputs Responsibility Target dates for
inputs
1. To build a positive image of UMDM
2. To communicate the new turn around strategy
3. To create synergies between our brand components
4. To build a strong brand that is respected by all our stakeholders
Is to align our tools( PR, advertising, events, CRM, public interactions media & publicity) with our vehicles ( LED, Special Programs, 2010 and Technical Services)
Have both Communications & Marketing Strategy and Policies approved by council Have more positive publicity Have political leadership more visible in media more partnerships /interactions with our stakeholders a concise communications and marketing calendar that will be informed by political leadership and GCIS Have Communications Forum with LM’s
These will be determined by vehicles ( LED, Special Programs, 2010 and Technical Services) plans for the year and will be subject to The Mayor’s approval
R 5 000 000
Media Campaign No. of positive publicity media coverage No. of negative media coverage Any advertising activities No. of events At least have the Communications Forums twice a year
Proper planning of all the Out puts and Proper monitoring of the media
This will be determined by the Communications & Marketing Calendar and Strategy
193
KEY PERFORMANCE AREA 6: SOCIAL DEVELOPMENT
DEPARTMENT: COMMUNITY SERVICES
DIVISION: SOCIAL DEVELOPMENT
STRATEGIC ISSUE: ENVIRONMENTAL HEALTH SERVICES
Objectives Strategies KPIs Programmes and
/ or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable, realistic and time related)
Inputs Responsibility Target
dates for inputs
Transfer of environmental health staff and service from the KZN Province and the Local Municipalities
Sign memorandum of transfer with Province and Locals
At least 3 meetings to be held with Province and Locals before the end of March 2008
Drafting of the memorandum of understanding /
agreement to be signed.
R10 000 000
Signed memorandum of understand ing/agreement with Province and Local by end March 2008
• Time for meetings
• Secretariat for meetings
EM Social Services
March 2008
Meetings with relevant stakeholders
Signing of agreement with relevant parties
194
DEPARTMENT: COMMUNITY SERVICES
DIVISION: FIRE
STRATEGIC ISSUE: FIRE FIGHTING
Objectives Strategies KPIs Programmes and
/ or Projects
Budget required to
achieve target
Outputs (Specific,
measurable, attainable, realistic and time related)
Inputs Responsibility Target
dates for inputs
To provide an efficient and effective fire fighting, rescue and emergency service to the community
Training of all fire fighters as per the National Fire Protection Association 1001 and 1002
Basic fire fighting course attended by all fire fighters including all fire fighter reservists
R 600 000 30 fire fighters will be trained for June 2008
• Skills audit, • appointment
of service providers,
• send fire fighters for training
C.F.O 30/06/2008
Save the lives ad properties of all members of the communities within the area of jurisdiction of the uMgungundlovu District Municipality.
Building of fire stations
Impendle fire station built and completed
1.5 million
by 30 June 2008 the fire station should be in a complete stage
• Identify site, drawing plan when the site is identified,
C.F.O 30/06/2008
Conduct fire safety awareness campaign
No of awareness and safety campaigns
R 200 000 150 schools visited by 30/06/2008
List of schools as per the local municipalities
C.F.O 30/06/2008
Recruitment of more fire fighters
All vacant fire fighter posts to be filled
6 million
60 permanent fire fighter recruits by 30/06/2008
Advertisement, selection process, appointment of fire fighters
C.F.O 30/06/2008
Quicker response to emergency
All fire calls - Incidents attended and
nil Vehicles in good condition/ up to standard,
C.F.O 30/06/2008
195
incidents specifications as per the South African National Standard 10090
training exercise and practices
196
DEPARTMENT: COMMUNITY SERVICES
DIVISION: DISASTER MANAGEMENT
KPA: SOCIAL SERVICES AND SPECIAL PROGRAMMES
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
KPA(1) Training of Personnel
Capacity building UMgungundlovu District Municipality staff and Local Municipality on Disaster Management
All Disaster Management Personnel Trained
Training on Public Safety Social Crime and Disaster Management
R 100,000.00
Qualified Disaster Management officers
Community Empowerment
Head Disaster Management Center
Ongoing
Institutional Capacity
Organize relevant role players of Disaster Management
Organs of the State
Establish forum
R100 000.00
Application of sustainable programme as proactive measure
Facilitate Mitigation Strategies
Head Disaster Management Center
Meetings are ongoing
KPA (3) Risk Reduction
Develop Risk Management Plan
Research and Priorities Element at Risk
Establish Task Team with Organs of State
District Disaster Management Plan R1,000000
Collect Local Municipalities Disaster Management Plan
Tender Process to Draft District Disaster Management Plan
Local Municipalities and District
Ongoing
KPA(4) Response and Recovery
Develop Software Purchase of GIS & GPS software
Risk Assessment N3 5m buffer
R3 000,000.00
Network of software that will be connected to Disaster Management Centre and
Tender Process
Head Disaster Management Center
2009/2010
197
DEPARTMENT: COMMUNITY SERVICES
DIVISION: DISASTER MANAGEMENT
KPA: SOCIAL SERVICES AND SPECIAL PROGRAMMES
Objectives Strategies KPIs Programmes
and / or Projects
Budget required
to achieve target
Outputs (Specific,
measurable, attainable,
realistic and time related)
Inputs Responsibility Target dates
for inputs
Department of Transport(DOT)
Emergency Relief Integrate Emergency Services & Public Safety
Draft Contingency plan
Exhibition R3 000,000.00
Mobilize Emergency Services 7 Public Safety
Draft Contingency plan
Head Disaster Management Centre
Ongoing
Response and Recovery
Mobile Communication Device
Purchase EMRS mobile disaster center
4X Emergency Tool for Communication & Assessment
R2 400,000.00
Mobile Units for Disaster Management
Tender process to purchase mobile units
Head Disaster Management Centre
Ongoing
198
SECTION D.
SPATIAL DEVELOPMENT
FRAMEWORK
199
UMDM REVIEWED SDF
• First, it is clear that a hierarchy of nodes and corridors is required, with the N3 National and Provincial priority corridor at the apex of that
hierarchy in terms of its ability to generate growth and employment, which is at the same time accessible to people in some of the fastest
growing yet poorest population areas of the District (e.g. Mpofana).
• Second, it is clear that Msunduzi is, and will remain, the primary node, and that almost all District corridors will be inevitably be arranged
to either traverse it, or provide cross-links between each other on its periphery
• Third, agriculture is an important employment bedrock for all of the inter-nodal zones, especially to the south and west of the District, and
the viability of tertiary and rural nodes are closely linked to this sector’s health; however:
• Fourth, and probably most importantly, most economic growth and new jobs – probably 90% of such – will derive in this district from the
non-agricultural and non-primary sectors, most particularly
� Services
� Manufacturing
� Construction
� Tourism
And, probably 90% of that will be aligned either along the provincial priority corridor, or along the District Primary corridors, as shown in
blue and purple respectively on figure 8.
These are mostly both intra-metropolitan corridors within Msunduzi and inter-urban corridors within the District, as such should be jointly
planned and facilitated, partly in terms of the intra-metropolitan corridor concepts referred to at the outset, and partly in terms of the inter-
urban concepts also referred to with locally sensitive emphases upon the core principles of
- Comparative advantage
- Efficiency
- Integration
200
Reviewed SDF MAP
201
Main Elements of the SDF Development Nodes (i) As set out in the PSEDS, the relative importance of development nodes is a reflection of their economic development potential.
(ii) The SDF must provide the spatial dimension of economic trends and objectives, and on this basis a hierarchy of nodes consisting of a primary node, secondary node, tertiary nodes, rural nodes and tourism nodes is proposed.
• The Primary Node, which consists of the urban complex of Pietermaritzburg / Ashburton / Edendale. This is a centre
with high levels of economic development and the potential for growth and expansion, serving the regional economy and beyond and is generally recognised as an emerging Metropolitan area.
• Secondary Nodes, which are urban centres with good existing levels of economic development and the potential for
growth, serving the sub-regional economy and beyond. The two proposed secondary nodes are the Howick / Hilton / Mphophomeni complex and the Camperdown / Cato Ridge area.
• Tertiary Nodes are centres with lower potential for economic growth and a relatively high dependence on agriculture, providing services mainly to the local economy. The proposed tertiary nodes are Mooi River / Bruntville, New Hanover / Wartburg and Richmond.
• Rural Nodes are centres which fulfil the function of a rural service centre to the surrounding area. The proposed rural nodes are Dalton / Cool Air, Impendle and Vulindlela. It should however be acknowledged that this type of node has the potential to provide a wider range of services which will be determined by local conditions. It is also possible that rural nodes can progress to the level of tertiary nodes as economic and social conditions change. Typical services that can be expected in these nodes can include: Police Services, Administration Services, Clinics, Low Level of retail services, Mobile Services, Pension Payout Points and a range of Social Facilities including Community Hall.
• Tourism Node: This node contains the villages of Rosetta and Nottingham Road which fall in separate municipalities but form one functional unit. Development in this node is primarily of a tourism nature, and this role needs to be consolidated and expanded. Given the location of the node, the type of existing development and the additional recreation and tourist potential that will be provided by the Spring Grove Dam, the node should be seen as the northern gateway to the District’s Tourist Routes, and should be planned accordingly. Environmental and Water Conservation should be a key element in the determination of potential development opportunities within this nodal area. Land uses which could detract from its tourist function should be discouraged.
(iii) It needs to be kept in mind that this proposed designation would apply at a District level. At the level of a local SDF,
centres would be assigned a different designation. For example, the Howick / Hilton / Mphophopmeni complex is the
202
primary node in terms of the local SDF. Similarly, Impendle would be the primary node in terms of the local SDF. At the provincial level, the converse would apply, with Msunduzi being classified as a secondary node in the PSEDS. More detailed planning of these nodes needs to be done as part of the local SDF’s. (see Chapter 5)
Development Corridors
(i) As discussed in Volume 1, the concept of development corridors is established in national and provincial policies. The PSEDS identifies industrial development as a key element to economic growth, with the primary zone of industrial potential being the corridor linking the two port nodes and extending to Howick. Tourism is identified as the next provincial priority, focusing on beach, cultural and eco-tourism.
(ii) The National Spatial Development Perspective (NSDP) sets the following categories of economic development potential:
• Production of high value, differentiated goods not strongly dependent on labour costs, focused on local & global
niche markets – i.e. manufacturing • Production of labour intensive, mass produced goods more dependant on labour costs, affordable transport
linkages – i.e. agriculture and mining • Innovation and experimentation – research and development • Retail and private sector services – large employer of skilled & semi skilled workers in advanced economies • Public service and administration.
(iii) In the PSEDS, two provincial priority corridors are identified, one of which, (code-named PC2) runs from eThekwini
through Msunduzi to uMngeni. This is the central axis of the District, and the PSEDS states that it has the potential to attract development in all the categories set in the NSDP.
(iv) In addition to this primary corridor, the PSEDS also identifies two secondary corridors which run through the
Umgungundlovu District, i.e:
• Kokstad – Umzimkhulu – Msunduzi; and • Msunduzi – Nkandla – Ulundi Both these corridors are categorised as having the potential to attract development in four of the six categories
(v) The corridors suggested in this SDF are based on the recommendations in the PSEDS, the various development informants identified in the earlier phase of the study and the goals and objectives of the SDF, with specific reference to
• the need to integrate district space and link the various nodes and opportunities into a meaningful whole;
203
• improve or extend access to areas with economic potential within areas of high poverty; • maximise interest opportunities and potentials within the district in way which promotes growth and investment, and • ensure the sustained growth of existing centres and corridors of economic development
(vi) Accordingly, the following corridors are suggested in the SDF
(a) Provincial Priority Corridor (PC2) Camperdown – Msunduzi – Mooi River (N3). The main function of this corridor is as a limited access, long distance movement corridor. However, along the urban component of the corridor it will attract the full range of urban uses. This development pressure should be accommodated on a planned basis, without undermining the corridor’s primary function. In this way, environmental objectives will be served and the existing and potential tourist routes can be protected. Development plans for this corridor are being formulated by the local Municipalities under the guidance of a Local Corridor Development Work Group, chaired by the District.
(b) Primary Corridors:
The rationale for these corridors is provided by the PSEDS, and provide the major linkages with the adjoining Districts to the north, south and east. In some cases, these routes serve as alternative routes to the major national routes. The primary function of these corridors is long distance traffic movement, but development should be encouraged at appropriate locations along the corridors. More detailed planning will be required as part of the local SDF’s. The following primary corridors are proposed: • Eastern Cape – Richmond – Msunduzi – Greytown (R56 and R33) • Camperdown – Umbumbulu – South Coast (R603) • Msunduzi – Boston – Underberg (P7-2) • Howick – Boston – Underberg (R617)
(c) Secondary Corridors:
These corridors link nodes inside the District, and also provide linkages with external nodes. In the case of the R103, it serves as both an established tourist route and an alternative route to the N3, which is problematic. The proposed secondary corridors are: • Howick – Mooi River (R103) • Mooi River – Greytown (R622) • Albert Falls – Wartburg – North Coast (R614)
204
(d) Tourism Link Route Upgrades One of the main objectives of the Tourist Strategy is to promote the District as a single brand, and to spread the successful development of the Midlands Meander to other areas with tourism potential. From a spatial development point of view, this can be achieved by:
• Improving linkages between the Midlands Meander and other existing or potential tourist routes • Improving access to the Drakensberg • Improving accessibility to areas with high scenic and landscape quality and other attractions The routes recommended for upgrading are aimed at achieving this.
(e) Ring Roads The proposed ring roads concept is intended to:
• Relieve congestion along the N3 and in the centre of the primary node • Address previous imbalances whereby areas such as Edendale were excluded from development • Provide access to future residential extensions of the primary node • Accommodate increased traffic in and around the primary node • Improve linkages from Camperdown to Howick • Provide the basic grid for mega-blocks to accommodate the expanding suburban centres to the south and south
east of the primary node • Reserve the approximate location of future transport corridors
(vii) It must be emphasized that the identification of corridors does not imply that development should be allowed to occur on
an ad-hoc basis along the length of such a corridor. As part of the local SDF’s, more detailed planning of the corridors will be required.
Agricultural Priority Areas
These are the areas where high potential agricultural land exists, and where non agricultural development which would detract from the production potential of these areas should be discouraged. At a local level, more detailed agricultural assessments must be done to determine the location of high potential land, and appropriate control measures should form part of local SDF’s and LUMS
Strategic Water Production Areas
These areas contain the strategic headwater areas of the major water courses in the District. Land transformation in these areas should not be allowed unless it can be shown that it would improve water quality.
205
CONCLUSION
As pointed out in the Municipality’s District Wide Integrated Local Economic Development (LED) Strategic Framework Plan (2007), there is significant potential for economic development in the district, mainly driven by the growth in and around Msunduzi, the dominant economy in the district. This dominance is likely to continue, which has spatial implications in the sense that the focus of economic growth will be around the main N3 axis, which forms the spine of the region. This has been recognized in the Provincial Spatial Economic Development Strategy (PSEDS), which identifies two provincial priority corridors for mixed economic development, one of which is the Ethekwini / Msunduzi / uMngeni Corridor the PSEDS also recommends a hierarchy of nodes and this planning concept forms the basis of the District’s SDF Review. The primary function of spatial planning at a District level is to: • Interpret the relevant national and provincial planning and development policies, and apply it to the District context and in so doing • Provide a guidance framework for local spatial development frameworks.
These aspects have been covered in this review, and various actions have been identified which need to be taken up by the District and Local Municipalities as outlined in the following paragraphs.
Planning Actions at a District Level
• The more detailed planning of that part of the N3 Corridor which passes through Mkhambathini / Msunduzi / uMngeni and up to Howick is already being co-ordinated by the District under the guidance of a Local Corridor Development Work Group which will also be responsible for liaison with the Ethekwini Metro Council to ensure integrated and co-ordinated development along the interface of the District and the Metropolitan area. From this planning initiative, recommendations will emerge on the upgrading and extension of infrastructure which needs to be integrated into the Capital Investment Programme of the District, Local Municipalities and other relevant Service Providers.
• In consultation with the Department of Transport, the various tourism routes that are recommended for upgrading in this review
need to be assessed and prioritized. This can either be achieved through the review of the District’s Integrated Transport Plan or as a separate exercise, provided that the conclusions are brought into the District’s IDP and Capital Investment Programme.
• The District’s current Strategic Environmental Assessment / Integrated Environmental Management Plan needs to be substantially
reviewed and updated to bring it in line with legal and guideline requirements, as identified by the DAEA. The review will need to focus on agricultural resources, ecosystems goods and services and natural resources. As is the case with the District SDF environmental planning initiatives at a District level need to provide guidance for local plans.
206
• The formulation of a Catchment Management Strategy (CMS) for the Mvoti to Mzimkulu Water Management Area (WMA) and
other related planning actions as required by the relevant water legislation needs to be undertaken. This will include water resource management plans and land use plans for all the dams in the District which have recreational potential. Such planning should be undertaken at a local municipal level with the District playing a co-ordinating role.
• Planning for the future development of the proposed Rosetta / Nottingham Road Tourism Node in relation to Springgrove Dam
should be co-ordinated by the District.
• The Intergovernmental Relations Forum that has been established should probably be the mechanism to address the above actions. It could also be responsible for actions such as standardization of land designations to be used in local SDF’s and LUMS.
Planning Actions at a Local Level
• The more detailed planning of the various corridors and nodes, taking into account the local context and economic potentials as identified in the District Wide LED needs to be undertaken as part of the Local SDF or in the form of Local Area Plans. In the case of the nodes, a more accurate cadastral demarcation will be required in order to meet the requirements set out in the DFA principles.
• Tourism has been identified as one of the potential growth sectors with further expansion potential especially in the peripheral
municipalities. It is therefore important at a local level that more detailed planning of the tourism industry be undertaken with an emphasis on the type of tourism that will be encouraged along the various routes as identified in this review, and taking into account the recommendations in the draft tourism strategy and the District Wide LED.
• As pointed out in the previous chapters of this report, more comprehensive analysis of agriculture land taking into account all
factors influencing production potential needs to be undertaken as part of the local SDF’s, and the implications thereof accommodated in the LUMS. In addition, a mechanism to monitor the transformation of high potential agricultural land needs to be established and maintained in such a way that it can assist the relevant authorities in land use decision making.
• The outcomes of the Area Based Management Initiatives currently being undertaken by the Department of Land Affairs should be
interpreted and included into Spatial Planning Initiatives at a District and Local level. • Local SDF’s and LUMS should be informed by SEA’s and EMP’s which should take into account the guidelines set out in the
National Department of Environmental Affairs document entitled “Environmental Sustainability Toolkit for Integrated Development Planning in KwaZulu Natal.” (April 2007).
207
• In order to achieve a variety of development objectives the concept of Transport Bypass Routes or Ring Roads has been identified in the Local SDF Review initiative for Msunduzi. This concept has implications at a District level but more detailed feasibility assessments and alignment identification will be undertaken as part of the SDF Review and the local Integrated Transport Plan.
It should be kept in mind that the SDF forms an integral part of the Municipality’s IDP and that it should be viewed as a dynamic planning tool that needs to be examined on an annual basis as part of the Municipality’s IDP Review process.
208
SECTION E
SECTOR INVOLVEMENT
The district held a service providers alignment workshop on the 26th
March 2008. the aim of the workshop was for sector departments and parastatals to present the plans for implementation in the district during the 2008-2009 financial year.
209
UMNGENI WATER
210
Setting the Scene
• 4 storage dams: Mearns Weir, Midmar Dam, Alberts Fall Dam & Nagle
Dam. Primary water resources for the economic hub of KZN.
• 2 water treatment plants: Midmar WTP & D.V. Harris WTP.
• Water demands are growing in the 5%-6% range.
160.0
170.0
180.0
190.0
200.0
210.0
220.0
230.0
240.0
250.0
260.0
270.0
280.0
Jan-9
8
Jul-9
8
Jan-9
9
Jul-
99
Jan
-00
Jul-
00
Jan-0
1
Jul-0
1
Jan-0
2
Jul-0
2
Jan-0
3
Jul-0
3
Jan-0
4
Ju
l-0
4
Jan-0
5
Ju
l-0
5
Jan-0
6
Jul-0
6
Jan-0
7
Jul-0
7
Jan-0
8
Ju
l-0
8
Jan-0
9
Ju
l-0
9
Av
era
ge
Da
ily S
ale
s (
Ml/
da
y)
-5.0%
-4.0%
-3.0%
-2.0%
-1.0%
0.0%
1.0%
2.0%
3.0%
4.0%
5.0%
6.0%
7.0%
8.0%
9.0%
10.0%
11.0%
12.0%
13.0%
14.0%
15.0%
Year-
on
-Ye
ar
Gro
wth
TOTAL INLAND SALES (Including EWS Umlaas)
12 Mth MA TOTAL INLA ND SALES (Inc Ethekwini Sales)
Inland F02/03 projection
Inland F03/04 projection
Inland F04/05 projection
F05/06 projection Inland
F06/07 Proj. Total Inland Sales (Incl EWS Umlaas)
F07/08 Total Inland Sales (Incl eThekwini Umlaas)
F08/09 Total Inland Sales (Incl eThekwini Umlaas)
Yr-Yr Growth %
The Mooi-Mgeni Transfer Scheme Phase II
• Purpose: To augment the water supply for the region.
• Consists of the construction of the Proposed Spring Grove Dam.
• This proposed dam is located on the Mooi River in the local
municipalities of Mpofana and uMngeni near the town of Rosetta.
• This project is being implemented by DWAF.
• Status: EIA is being finalised and the ROD is expected at the end of this
year. Construction is therefore anticipated to commence next year.
211
The MkomaziWater Supply Project
• Purpose: If water demands continue to grow at current rates, then even
with water demand management initiatives in place, the safe assured yield
may be exceeded when MMTS-2 is commissioned. The purpose is therefore
to augment the water resources.
• A DWAF-UW collaboration which will be composed of 2 phases.
• Phase 1 will involve the construction of Smithfield Dam, located along
the central reaches of the Mkomazi River, midway between Lundy’s Hill
Bridge and Deepdale (IngweLocal Municipality). A tunnel & WTP in
Richmond Local Municipality will transfer the water to the UmlaasRoad
Reservoir in Mkhambathini Local Municipality.
• Phase 2 will be implemented once the yield of the Smithfield Dam has
been fully utilisedand will involve the construction of a second dam
(ImpendleDam) upstream of the proposed Smithfield Dam (Impendle
Local Municipality).
• Status: The feasibility studies for both the water resource and water
infrastructure components are anticipated to begin late this year.
Greater Mpofana Bulk Water Supply Project
• Purpose: To ensure that the areas in & surrounding Mooi River, Rosetta,
Nottingham Road, Balgowan, Lidgetton & Lions River have a reliable water
supply that will sustain the current growth into the future.
• This project will be located in the Mpofana and uMngeni Local
Municipalities.
• This project has the potential to serve areas in the Muden/Rocky Drift &
Msinga areas in the future.
• Status: The detailed feasibility investigation of this project is anticipated
to commence this year.
212
Midmar Water Treatment Plant Upgrade
• Purpose: To upgrade the current WTP to meet increasing demands and
to match the available water resources once MMTS-2 is commissioned.
• The Midmar WTP is located in uMngeni Local Municipality.
• This project will consist of the design, installation & commissioning of a
new filter plant, sludge plant centrifuge & outlet works.
• The design phase of this project is anticipated to commence during this
year.
Howick North/Lions River Bulk Water Supply Project
• Purpose: To provide bulk potable water for the new developments
occurring in uMngeni Municipality.
• This project will consist of a new reservoir and rising main.
• Status: The detailed feasibility study of this project is anticipated to
being this year.
213
The Howick-West to Mpophomeni Pipeline
• Purpose: To augment the existing Howick-West to Mpophomeni 250mm
diameter AC pipeline.
• This project is located in the uMngeni Municipality.
• Status: This project is in the design phase.
The Groenekloof to Garlington Pipeline
• Purpose: To serve new housing, commercial and light industrial
developments north of Hilton Gardens & to augment the existing Hilton
water supply network.
• This project is located in uMngeni Local Municipality.
• Status: This project is currently in the design phase and negotiations
are in process with regard to the funding of this project.
• Construction of this project is anticipated to be completed in the
2010/2011 financial year.
214
Midmar Balancing Reservoir Upgrade
• Purpose: The Midmar Balancing Reservoir storage capacity be upgraded
from 45Ml to 165Ml to provide the balancing storage required for the
water demands that are currently being met and that are projected.
• This reservoir is located in uMngeni Local Municipality.
• This project will be undertaken in phases with the construction of an
additional 60Ml compartment by 2010 and a further 60Ml by 2015.
Worlds View Reservoir Upgrade
• Purpose: To upgrade the Worlds View Reservoir storage capacity to
160Ml to meet current and projected water demands.
• This reservoir is located in The Msunduzi Municipality.
• It is anticipated that the construction of 2 additional 40Ml/day
compartments will be completed by 2010.
215
Umlaas Road Reservoir Upgrade
• Purpose: To provide at least 12 hours of balancing storage at the
Umlaas Road Reservoir.
• This reservoir is located in the Mkhambathini Local Municipality.
• It is recommended that an additional 45Ml reservoir be constructed by
June 2010.
Augmentation of the ’61 Pipeline System
• Purpose: It has been identified that certain critical sections of the ’61
Pipeline System have reached design capacity & require immediate
augmentation in order to ensure continuity of supply to the Durban-
Pietermaritzburg region.
• The identified sections are: D.V. Harris to Worlds View Reservoir; ED2 to
ED4 and ED4 to Umlaas Road Reservoir.
• These sections of the pipeline system occur in The Msunduzi
Municipality.
• Status: These projects are in the design phase.
• All of the above projects need to be commissioned by December 2009.
216
Richmond Pipeline
• Purpose: To provide bulk potable water for the areas adjacent to the
P5-4 road leading to the town of Richmond.
• This pipeline is located in the Richmond and The Msunduzi Local
Municipalities and areas that will benefit from this pipeline are Edendale,
Thornville, Baynesfield, Hopewell, Ambleton, the town of Richmond,
Ndaleni, Smozomeni and kwaMagoda.
• Status: Construction is anticipated to begin this year.
Augmentation & Extension of the Wartburg Bulk System
• Purpose: The augmentation of the existing Greater Wartburg Bulk
Water Supply System and the extension of this system to supply the areas
of Greater Efaye and Ozwathini.
• This project is located in the uMshwathi Local Municipality and a portion
of The Msunduzi Municipality.
• This project will be undertaken in 3 phases.
• Status: Phase 1 of this project is currently in the design phase.
Implementation is anticipated to commence in the 2009/2010 financial
year. Phases 2 & 3 are anticipated to commence in the 2011/2012
financial year.
217
Upgrade of Bruyns Hill Reservoir
• Purpose: To upgrade the current 400kl reservoir to 4Ml to provide a
minimum of 24 hours peak balancing storage for current demands and
additional storage capacity for anticipated growth in water demands.
• This reservoir is located in uMshwathi Local Municipality.
• Status: This project is in the design phase.
Summary
First phase should be constructed by 2010
100,000uMngeniMidmar Balancing Reservoir Upgrade
In design phase3,000uMngeniGroenekloof to Garlington Pipeline
In design phase20,000uMngeniHowick-West to MpophomeniPipeline
Detailed feasibility due to begin this year
Cost to be estimateduMngeniHowick North/Lions River Bulk Water Supply Project
Design due to begin this year
95,000uMngeniMidmar WTP Upgrade
Detailed feasibility due to begin this year
77,500Mpofana; uMngeniGreater MpofanaBulk Water Supply Project
Feasibility studies due to begin late this year
DWAF-UW ProjectIngwe; Richmond; Mkhambathini; Impendle
Mkomazi Water Supply Project
Construction due to being next year
DWAF ProjectMpofana; uMngeniMooi-MgeniTransfer Scheme Phase II
StatusTotal Project Cost
R’000s(Unescalated; 2007 Base Year)
Located in Municipality
Project
218
Summary
In the design phase8,000uMshwathiUpgrade of BruynsHill Reservoir
Phase 1 is in the design phase
375,500The Msunduzi; uMshwathi
Augmentation & Extension of the Wartburg Bulk System
Construction is anticipated to begin this year
100,000The Msunduzi; Richmond
Richmond Pipeline
In design phase269,000The MsunduziAugmentation of the ’61 Pipeline System
Construction should be completed by 2010
Cost to be estimatedMkhambathiniUmlaas Road Reservoir Upgrade
Construction should be completed by 2010
50,000The MsunduziWorlds View Reservoir Upgrade
StatusTotal Project Cost
R’000s(Unescalated; 2007 Base Year)
MunicipalityProject
Contact Details
Mark BremnerPlanning Engineer :
033 341 1174Tel No:
Monica MalungaArea Manager for the Msunduzi WSA:
033 846 1825Tel No:
Alka RamnathPlanner:
033 341 1115Tel No:
033 239 9530 Tel No:
Jerry ZikhaliArea Manager for the Umgungundlovu WSA:
219
DEPARTMENT OF TRANSPORT Road Classification and Surface Type per Local Council
UMSHWATHI VULINDLELA MPUMALANGA TOTALS
DESRCIPTION KZ 221 KZ 222 KZ 223 KZ 224 KZ 225 KZ 226 KZ 227
Road Classification
Provincial Road 451.24 309.49 292.51 162.67 145.35 235.89 210.38 1807.53
District Road 251.13 156.68 122.37 84.83 129.91 161.63 147.86 1054.41
Access or Local Road 72.39 41.63 21.99 54.14 128.74 86.41 48.24 453.54
TOTALS 774.76 507.80 436.87 301.64 404.00 483.93 406.48 3315.48
Surface Type
Blacktop Surfaced 316.38 194.85 147.07 37.45 96.12 141.71 117.85 1051.43
Gravel 458.38 312.95 289.8 264.19 307.88 342.22 288.63 2264.05
220
2008-09
BASKET Umshwathi KZ 221 Mpumalanga KZ 226/7
Vulindlela KZ 222 - 5 TOTALS
Safety Maintenance 4,328,636 3,536,188 6,505 7,871,329
Local Roads 3,700,000 5,441,625 12,334,350 21,475,975
Routine Maintenance 6,074,175 6,925,907 12,906,963 25,907,045
Zibambele Contarctors 5,795,690 6,739,510 5,409,780 17,944,980
Re - Gravelling 6,883,032 9,358,402 17,531,027 33,772,461
TOTALS 26,781,533 32,001,632 48,188,625 106,971,790
2009-2010
BASKET Umshwathi KZ 221 Mpumalanga KZ 226/7
Vulindlela KZ 222 - 5 TOTALS
Safety Maintenance 4,122,510 3,367,798 6,195,884 13,686,192
Local Roads 4,400,000 5,300,000 9,800,000 19,500,000
Routine Maintenance 5,784,929 6,596,102 12,292,345 24,673,376
Zibambele Contarctors 5,795,690 6,739,510 5,409,780 17,944,980
Re - Gravelling 6,555,744 8,912,764 16,696,216 32,164,724
TOTALS 26,658,873 30,916,174 50,394,225 107,969,272
221
2010-2011
BASKET Umshwathi KZ 221 Mpumalanga KZ 226/7
Vulindlela KZ 222 - 5 TOTALS
Safety Maintenance 3,710,259 3,031,019 5,576,295 12,317,573
Local Roads 2,300,000 3,300,000 7,400,000 13,000,000
Routine Maintenance 5,142,159 5,863,202 10,926,529 21,931,890
Zibambele Contarctors 5,795,690 6,739,510 5,409,780 17,944,980
Re - Gravelling 6,007,443 8,617,330 15,299,801 29,924,574
TOTALS 22,955,551 27,551,061 44,612,405 95,119,017
222
UMSHWATHI KZ 221 - 20010/11
Contract Description Budget Km/m/m2/no Start End Stage
Safety Maintenance - Guardrails : Purchase 180,000 2010/04/01 2011/03/31 Open
Safety Maintenance - Guardrails : Installation 200,000 2010/04/01 2011/03/31 1
Safety Maintenance - Roadmarking : Painting 1,300,000 2010/04/01 2011/03/31 Open & 2
Safety Maintenance - Roadmarking : Studs 240,000 2010/04/01 2011/03/31 Open
Safety Maintenance - Roadmarking : Studs Installation Contract No 1 200,000 2010/04/01 2011/03/31
1
Safety Maintenance - Blacktop Patching : Materials 500,000 2010/04/01 2011/03/31 Open
Safety Maintenance - Blacktop Patching : Contract 1 200,000 2010/04/01 2011/03/31 1
Safety Maintenance - Blacktop Patching : Contract 2 200,000 2010/04/01 2011/03/31 1
Safety Maintenance - Blacktop Patching : Contract 3 200,000 2010/04/01 2011/03/31 1
Safety Maintenance - Blacktop Patching : Contract 4 200,000 2010/04/01 2011/03/31 1
Safety Maintenance - Blacktop Patching : Contract: Materials/Plant 550,000 2010/04/01 2011/03/31 Open
Safety Maintenance - Signs : Installation 200,000 2010/04/01 2011/03/31 1
Safety Maintenance - Signs : Purchase 150,000 2010/04/01 2011/03/31 Open
4,328,636.00 4,320,000.00
Const. of Nkunshini - 700,000 2010/04/01 2010/10/31 3
Const. of Hlope Road - 750,000 2010/04/01 2010/10/31 3
Const. of Ekhamanzi Road - 0 - 1.8 650,000 1.8 2010/04/01 2010/10/31 3
Const. of OL 01879 - 850,000 2010/04/01 2010/10/31 3
Const. of Elangeni Structure 450,000 2010/04/01 2010/10/31 2
3,700,000.00 3,400,000.00 1.80
Other equipment 1,300,000 2010/04/01 2011/03/31 Dept
Civil material 500,000 2010/04/01 2011/03/31 Dept
Routine Maintenance - Blading 625,000 2010/04/01 2011/03/31 Dept
Fuel and Oil Blading 650,000 2010/04/01 2011/03/31 Open
Routine maintenance-Blading of local roads-1 300,000 2010/04/01 2011/03/31 2
Routine Maintenance - New Hanover-specialised 200,000 2010/04/01 2011/03/31 1
Routine Maintenance - Fawnleas-specialised 200,000 2010/04/01 2011/03/31 1
Routine Maintenance - Swaymani-specialised 200,000 2010/04/01 2011/03/31 1
Routine Maintenance - Appelsbosch specialised 200,000 2010/04/01 2011/03/31 1
Routine Maintenance - New Hanover-labour based - Pipe Desilting 125,000 2010/04/01 2011/03/31 1
223
Routine Maintenance - Swaymani-labour based - Pipe Desilting 125,000 2010/04/01 2011/03/31 1
Routine Maintenance - Fawnleas-labour based- Pipe Desilting 125,000 2010/04/01 2011/03/31 1
Routine Maintenance - Appleboch-labour based - Pipe Desilting 125,000 2010/04/01 2011/03/31 1
Routine Maintenance - Grass Cutting-Fawnleas / New Hanover 125,000 2010/04/01 2011/03/31 1
Routine Maintenance - Grass Cutting-Swaymani / Appelsbosch 125,000 2010/04/01 2011/03/31 1
Routine Maintenance - Noxious Weeds 200,000 2010/04/01 2011/03/31 Dept
Routine Maintenance - Fence & Km Posts 100,000 2010/04/01 2011/03/31 Open
Routine Maintenance - Patch Gravelling 450,000 2010/04/01 2011/03/31 2
Routine Maintenance - Signs : Purchase 200,000 2010/04/01 2011/03/31 Dept
Routine Maintenance - Signs : Installation & km Posts 200,000 2010/04/01 2011/03/31 1
6,074,175.00 6,075,000.00
Zibambele - Materials 152,000 2010/04/01 2011/03/31 Open
Zibambele - Contractors 5,643,690 2010/04/01 2011/03/31 Dept
5,795,690.00 5,795,690.00
Re-gravelling of D239 from Km 0- 4.2 950,000 4.20 2010/04/01 2011/03/31 3
Re-gravelling of D82 from Km 0- 6.8 1,500,000 6.80 2010/04/01 2011/03/31 Dept
Re-gravelling of D2167 from Km 0- 7.3 1,550,000 7.30 2010/04/01 2011/03/31 3
Re-gravelling of D1013 from Km 0- 3.2 700,000 3.20 2010/04/01 2011/03/31 3
Re-gravelling of D708 from Km 0- 3.3 700,000 3.30 2010/04/01 2011/03/31 Dept
Re-gravelling of D2165 from Km 0- 3.5 800,000 3.50 2010/04/01 2011/03/31 Dept
Re-gravelling of D1620 from Km 0- 3.3 650,000 3.30 2010/04/01 2011/03/31 3
6,883,531.00 6,850,000.00 31.60
26,782,032.00 26,440,690.00
224
UMSHWATHI KZ 221 - 2009/10
Contract Description Budget Km/m/m2/no Start End Stage
Safety Maintenance - Guardrails : Purchase 160,000 2009/04/01 2010/03/31 Open
Safety Maintenance - Guardrails : Installation 200,000 2009/04/01 2010/03/31 1
Safety Maintenance - Roadmarking : Painting 1,000,000 2009/04/01 2010/03/31
Open & 2
Safety Maintenance - Roadmarking : Studs 200,000 2009/04/01 2010/03/31 Open Safety Maintenance - Roadmarking : Studs Installation Contract No 1 200,000 2009/04/01 2010/03/31 1b
Safety Maintenance - Blacktop Patching : Materials 600,000 2009/04/01 2010/03/31 Open
Safety Maintenance - Blacktop Patching : Contract 1 200,000 2009/04/01 2009/10/31 1
Safety Maintenance - Blacktop Patching : Contract 2 200,000 2009/04/01 2009/10/31 1
Safety Maintenance - Blacktop Patching : Contract 3 200,000 2009/10/01 2010/03/31 1
Safety Maintenance - Blacktop Patching : Contract 4 200,000 2009/10/01 2010/03/31 1
Safety Maintenance - Blacktop Patching : Contract: Materials/Plant 600,000 2009/04/01 2010/03/31 Open
Safety Maintenance - Signs : Purchase 160,000 2009/04/01 2010/03/31 Open
Safety Maintenance - Signs : Installation 200,000 2009/04/01 2010/03/31 1
4,122,510.00 4,120,000.00
Const. Of A 2824 ( km 0 – 2.8) 1,000,000 2.8 2009/04/01 2009/10/31 3
Const. Of Hlathikhulu Road (km 0 – 2.5) 850,000 2.5 2009/04/01 2009/10/31 3
Const. Of Nazo Road (Km 0 – 2.0) 700,000 2 2009/04/01 2009/10/31 3
Const. Of Ntintisa Road (0 - 4.5 ) 1,400,000 4.5 2009/04/01 2009/10/31 4
Const. Of Ekupholeni Road ( 0 - 1.5 ) 450,000 1.5 2009/04/01 2009/10/31 2
4,400,000.00 4,400,000.00 13.30
Other equipment 1,100,000 2009/04/01 2010/03/31 Dept
Civil material 500,000 2009/04/01 2010/03/31 Dept
Routine Maintenance - Blading 650,000 2009/04/01 2010/03/31 Dept
Fuel and Oil Blading 550,000 2009/04/01 2010/03/31 Open
Routine maintenance-Blading of local roads-1 250,000 2009/04/01 2010/03/31 2
Routine Maintenance - New Hanover-specialised 200,000 2009/04/01 2010/03/31 1
225
Routine Maintenance - Fawnleas-specialised 200,000 2009/04/01 2010/03/31 1
Routine Maintenance - Swaymani-specialised 200,000 2009/04/01 2010/03/31 1
Routine Maintenance - Appelsbosch specialised 200,000 2009/04/01 2010/03/31 1
Routine Maintenance - New Hanover-labour based - Pipe Desilting 140,000 2009/04/01 2010/03/31 1
Routine Maintenance - Swaymani-labour based - Pipe Desilting 140,000 2009/04/01 2010/03/31 1
Routine Maintenance - Fawnleas-labour based- Pipe Desilting 140,000 2009/04/01 2010/03/31 1
Routine Maintenance - Appleboch-labour based - Pipe Desilting 140,000 2009/04/01 2010/03/31 1
Routine Maintenance - Grass Cutting-Fawnleas / New Hanover 130,000 2009/04/01 2010/03/31 1
Routine Maintenance - Grass Cutting-Swaymani / Appelsbosch 130,000 2009/04/01 2010/03/31 1
Routine Maintenance - Noxious Weeds 200,000 2009/04/01 2010/03/31 Dept
Routine Maintenance - Fence & Km Posts 100,000 2009/04/01 2010/03/31 Open
Routine Maintenance - Patch Gravelling 400,000 2009/04/01 2010/03/31 2
Routine Maintenance - Signs : Purchase 200,000 2009/04/01 2010/03/31 Dept
Routine Maintenance - Signs : Installation & km Posts 200,000 2009/04/01 2010/03/31 1
5,784,929.00 5,770,000.00
Zibambele - Materials 152,000 2009/04/01 2010/03/31 Open
Zibambele - Contractors 5,643,690 2009/04/01 2010/03/31 Dept
5,795,690.00 5,795,690.00
Re-gravelling of P150 from Km 5-15 2,200,000 10.00 2009/04/01 2010/03/31 Dept
Re-gravelling of P558 from Km 0 – 8.08 1,850,000 8.08 2009/04/01 2010/03/31 Dept
Re-gravelling of P526 from Km 0 – 3.41 780,000 3.41 2009/04/01 2010/03/31 3
Re-gravelling of D668 from Km 0 – 4.01 925,000 4.01 2009/04/01 2010/03/31 3
Re-gravelling of D75 from Km 0 – 3.58 800,000 3.58 2009/04/01 2010/03/31 3
6,555,744.00 6,555,000.00 29.08
26,658,873.00 26,640,690.00
226
UMSHWATHI KZ 221 - 2008/9
Contract Description Budget Km/m/m2/no Start End Stage
Safety Maintenance - Guardrails : Purchase 150,000 2008/04/01 2009/03/31 Open
Safety Maintenance - Guardrails : Installation 200,000 2008/05/01 2008/10/31 1
Safety Maintenance - Roadmarking : Painting 1,000,000 2008/05/01 2008/10/31 Open & 2
Safety Maintenance - Roadmarking : Studs 200,000 2008/05/01 2008/10/31 Open
Safety Maintenance - Roadmarking : Studs Installation Contract 200,000 2008/06/01 2008/08/31 1
Safety Maintenance - Blacktop Patching : Materials 400,000 2008/04/01 2009/03/31 Open
Safety Maintenance - Blacktop Patching : Contract No 1 200,000 2008/05/01 2008/07/31 1
Safety Maintenance - Blacktop Patching : Contract No 2 200,000 2008/08/01 2008/09/30 1
Safety Maintenance - Blacktop Patching : Contract No 3 200,000 2008/10/01 2008/12/31 1
Safety Maintenance - Blacktop Patching : Contract: Materials/Plant 600,000 2008/05/01 2008/07/31 Open
Safety Maintenance - Signs : Insatllation 200,000 2008/05/01 2009/03/31 1
Safety Maintenance - Signs : Purchase 150,000 2008/05/01 2009/03/31 Dept
3,710,259.00 3,700,000.00
Const. Of Gomva Rd – A 3550 (km 2.0 – 5) 850,000 3 2008/04/01 2008/10/31 3
Const. Of Vundla Rd – A 5147 (km 0 – 1.8) 500,000 1.8 2008/04/01 2008/10/31 2
Const. Of L 677 Extension (km 0 – 2) 550,000 2 2008/04/01 2008/10/31 3
Const. Of A 2823 (km 0 – 1.5) 400,000 1.5 2008/04/01 2008/10/31 2
2,300,000.00 2,300,000.00 8.30
Other equipment 820,000 2008/04/01 2009/02/28 Dept
Civil material 400,000 2008/04/01 2009/02/28 Dept
Routine Maintenance - Blading 500,000 2008/10/01 2009/02/28 Dept
Fuel and Oil Blading 550,000 2008/04/01 2009/03/31 Open
Routine maintenance-Blading of local roads-1 250,000 2008/10/01 2009/02/28 2
Routine Maintenance - New Hanover-specialised 200,000 2008/05/01 2009/02/01 1
Routine Maintenance - Fawnleas-specialised 200,000 2008/05/01 2009/02/01 1
Routine Maintenance - Swaymani-specialised 200,000 2008/05/01 2009/02/01 1
Routine Maintenance - Appelsbosch specialised 200,000 2008/05/01 2009/02/01 1
Routine Maintenance - New Hanover-labour based - Pipe Desilting 125,000 2008/04/01 2008/07/31 1
Routine Maintenance - Swaymani-labour based - Pipe Desilting 125,000 2008/12/01 2009/02/28 1
227
Routine Maintenance - Fawnleas-labour based- Pipe Desilting 125,000 2008/04/01 2008/07/31 1
Routine Maintenance - Appleboch-labour based - Pipe Desilting 125,000 2008/04/01 2008/07/31 1
Routine Maintenance - Grass Cutting-Fawnleas / New Hanover 125,000 2008/10/01 2008/11/30 1
Routine Maintenance - Grass Cutting-Swaymani / Appelsbosch 125,000 2008/10/01 2008/11/30 1
Routine Maintenance - Noxious Weeds 200,000 2008/09/01 2009/02/28 Dept
Routine Maintenance - Fence & Km Posts 75,000 2008/04/01 2008/11/30 Open
Routine Maintenance - Patch Gravelling 400,000 2008/07/01 2008/08/31 2
Routine Maintenance - Signs : Purchase 200,000 2008/05/01 2008/12/31 Dept
Routine Maintenance - Signs : Installation & km Posts 200,000 2008/05/01 2008/12/31 1
5,142,159.00 5,145,000.00
Zibambele - Materials 152,000 2008/04/01 2009/03/31 Open
Zibambele - Contractors 5,643,690 2008/04/01 2009/03/31 Dept
5,795,690.00 5,795,690.00
Re-gravelling of P149 from Km 0 – 10 1,950,000 10.00 2008/07/01 2008/12/31 Dept
Re-gravelling of D40 from Km 0 – 7 1,350,000 7.00 2008/07/01 2008/10/31 Dept
Re-gravelling of D1628 from Km 0 - 1.83 380,000 1.83 2008/06/01 2008/07/31 2
Re-gravelling of D457 from Km 6 - 12.2 1,250,000 6.20 2008/06/01 2008/08/31 4
Re-gravelling of P150 0-5km 1,080,000 5.00 2008/07/01 2008/10/31 4
6,007,443.00 6,010,000.00 30.03
22,955,551.00 22,950,690.00
228
KZN DEPARTMENT OF TRANSPORT
Vulindlela KZ 222-225 - 2008/9
Contract Description Budget Km/m/m2/no Start End Stage
Safety Maintenance - Guardrails : Purchase 250,000 2008/04/01 2009/03/31 Open
Safety Maintenance - Guardrails : Installation-Taylors Halt 200,000 2008/05/01 2008/10/31 1
Safety Maintenance - Guardrails : Installation-Nottingham road 200,000 2008/05/01 2008/10/31 1
Safety Maintenance - Roadmarking : Painting 1,625,000 2008/06/01 2008/12/31 Open & 2
Safety Maintenance - Roadmarking : Installation of Studs No 1 200,000 2008/05/01 2008/07/31 1
Safety Maintenance - Roadmarking : Installation of Studs No 2 200,000 2008/05/01 2008/07/31 1
Safety Maintenance - Roadmarking : Studs 400,000 2008/05/01 2008/07/31 Open
Safety Maintenance - Blacktop Patching : Materials 500,000 2008/04/01 2008/03/31 Open
Safety Maintenance - Blacktop Patching : Contract 1 200,000 2008/05/01 2008/06/30 1
Safety Maintenance - Blacktop Patching : Contract 2 200,000 2008/08/01 2008/09/30 1
Safety Maintenance - Blacktop Patching : Contract 3 200,000 2008/08/01 2008/09/30 1
Safety Maintenance - Blacktop Patching : Contract 4 200,000 2008/10/01 2008/12/31 1
Safety Maintenance - Blacktop Patching : Contract: Materials/Plant 800,000 2008/05/01 2008/09/30 Open
Safety Maintenance - Signs : Installation 200,000 2008/05/01 2008/02/28 1
Safety Maintenance - Signs : Purchase 200,000 2008/05/01 2008/02/28 Open
5,576,295.00 5,575,000
Const of A3621 Msinga Road, 0.0-0.6km 350,000 0.60 2008/05/01 2008/06/30 2
Const of Mlotshwa Road,A3649,1.5km 580,000 1.50 2008/06/01 2008/07/31 2
Construction Of Zazele Road, OL54923, 0-1.5 580,000 1.50 2008/07/01 2008/08/31 2
Const of Lameka Road, A3614,1.8km 700,000 1.80 2008/07/01 2008/09/30 2
Const of Jobosi Road,A3709,1.5km 580,000 1.50 2008/06/01 2008/07/31 2
Const of Mvelweni Road,A3717,1.5km 580,000 1.50 2008/06/01 2008/08/31 2
Const of Mbhele Road, OL54928, 2.5km 850,000 2.50 2008/09/01 2008/11/30 3
Constr. Of Khokho Road 0-1.0 km 260,000 1.00 2008/05/01 2008/06/30 2
Rockydrift 1, OL54929, 0-1.8km 650,000 1.80 2008/05/01 2008/06/30 2
Constr. Of Mhlophe Road, OL54926, 0-1.5km 580,000 1.50 2008/07/01 2008/09/30 3
Khetha Road, OL54925, 0 - 4.2km 1,190,000 4.20 2008/09/01 2008/11/30 4
Const of Shayamoya Road, OL54927, 0-1.3km 500,000 1.30 2008/07/01 2008/09/30 2
7,400,000.00 7,400,000 20.70
229
Other equipment 1,550,000 2008/04/01 2009/02/28 Open
Civil material 450,000 2008/04/01 2009/02/28 Open
Fuel and Oil - Routine Maintenance 1,100,000 2008/04/01 2009/02/28 Open
Fuel and Oil - Blading 900,000 2008/04/01 2009/03/31 Departmental
Routine Maintenance - Blading 1,200,000 2008/10/01 2009/02/28 DOT
Routine maintenance-Blading of local roads-1 300,000 2008/08/01 2008/10/31 2
Routine maintenance-Blading of local roads-2 300,000 2008/10/01 2008/12/31 2
Routine maintenance-Blading of local roads-3 300,000 2008/12/01 2009/02/28 2
Routine Maintenance - Impendle-specialised 200,000 2008/05/01 2009/02/01 1
Routine Maintenance - Impendle-Pipe desilting 1 150,000 2008/06/01 2008/07/31 1
Routine Maintenance - Impendle-labour based-1 150,000 2008/04/01 2008/07/31 1
Routine Maintenance - Howick-specialised 200,000 2008/05/01 2009/02/01 1
Routine Maintenance - Howick-Pipe desilting 1 150,000 2008/06/01 2008/07/31 1
Routine Maintenance - Howick-labour based-1 150,000 2008/04/01 2008/07/31 1
Routine Maintenance - Mooi river-specialised 200,000 2008/05/01 2009/02/01 1
Routine Maintenance - Mooi River-Pipe desilting 1 150,000 2008/06/01 2008/07/31 1
Routine Maintenance - Mooi river-labour based-1 150,000 2008/04/01 2008/07/31 1
Routine Maintenance - Taylors Halt-specialised 200,000 2008/05/01 2009/02/01 1
Routine Maintenance - Taylors halt-Pipe desilting 1 150,000 2008/06/01 2008/07/31 1
Routine Maintenance - Taylors halt-labour based-1 150,000 2008/04/01 2008/07/31 1
Routine Maintenance - Grass Cutting-Taylors halt - 1 150,000 2008/11/01 2008/12/31 1
Routine Maintenance - Grass Cutting-Mooi River - 1 150,000 2008/11/01 2008/12/31 1
Routine Maintenance - Grass Cutting-Nottingham road - 1 150,000 2008/11/01 2008/12/31 1
Routine Maintenance - Grass Cutting-Howick -1 150,000 2008/11/01 2008/12/31 1
Routine Maintenance - Noxious Weeds 325,000 2008/09/01 2009/02/28 Open
Routine Maintenance - Fence & Km Posts 100,000 2008/04/01 2009/02/28 Open
Routine Maintenance - Patch Gravelling 500,000 2008/07/01 2008/09/30 2
Routine Maintenance - Patch Gravelling 500,000 2008/07/01 2008/09/30 2
Routine Maintenace - Crack Sealing 100,000 2008/07/01 2008/10/31 Open
Routine Maintenance - Signs : Purchase 300,000 2008/05/01 2009/02/28 Open
Routine Maintenance - Signs & km Markers : Installation 200,000 2008/05/01 2008/10/31 1
Routine Maintenance - Signs & km markers: Installation 200,000 2008/11/01 2009/02/28 1
10,926,529.00 10,925,000
Zibambele - Materials 144,000 2006/04/01 2006/03/31 Open
Zibambele - Contractors 5,265,780 2007/04/01 2008/03/31 Zibamb.
5,409,780.00 5,409,780
230
Re-gravelling of D768 from Km 0-3.9 800,000 3.90 2008/05/01 2008/07/31 3
Re-gravelling of D494 from Km 0-4.8 1,000,000 4.80 2008/08/01 2008/11/30 3
Re-gravelling of P133 from Km0-9.5km 1,600,000 9.50 2008/08/01 2008/11/30 DOT
Re-gravelling of D1140 from Km 0 - 4km 1,300,000 4.00 2008/11/01 2009/02/28 DOT
Re-gravelling of P 175 from Km 0-22 2,000,000 10.00 2008/06/01 2008/10/31 DOT
Re-gravelling of D1234 from Km 0 - 2.06km 600,000 2.06 2008/06/01 2008/09/30 3
Re-gravelling of D2065 from Km 0-4.16 850,000 4.16 2008/04/01 2008/06/30 DOT
Re-gravelling of D290 from Km 0-3.5 700,000 3.50 2008/06/01 2008/08/31 2
Re-gravelling of D1128 from Km 0-6.9 1,250,000 6.90 2008/07/01 2008/10/31 4
Re-gravelling of P144 km 0-11.5 2,200,000 11.50 2008/08/01 2008/11/30 4
Re-gravelling of P130 km 14-24 1,800,000 10.00 2008/07/01 2008/09/30 4
Regravelling of P145 km 0-10 1,200,000 6.00 2008/04/01 2008/07/31 DOT
15,299,801.00 15,300,000 76.32
44,612,405.00 44,609,780
231
KZN DEPARTMENT OF TRANSPORT
Vulindlela KZ 222-225 - 2009/10
Contract Description Budget Km/m/m2/no Start End Stage
Safety Maintenance - Guardrails : Purchase 250,000 2009/04/01 2010/02/28 Open
Safety Maintenance - Guardrails : Installation-Taylors Halt 200,000 2009/06/01 2010/01/31 1
Safety Maintenance - Guardrails : Installation-Nottingham road 200,000 2009/06/01 2010/01/31 1
Safety Maintenance - Roadmarking : Painting 1,850,000 2009/06/01 2010/01/31 Open & 2
Safety Maintenance - Roadmarking : Installation of Studs No 1 200,000 2009/06/01 2010/01/31 1
Safety Maintenance - Roadmarking : Installation of Studs No 2 200,000 2009/06/01 2010/01/31 1
Safety Maintenance - Roadmarking : Studs 400,000 2009/06/01 2010/01/31 Open
Safety Maintenance - Blacktop Patching : Materials 750,000 2009/04/01 2010/02/28 Open
Safety Maintenance - Blacktop Patching : Contract 1 200,000 2009/05/01 2009/10/31 1
Safety Maintenance - Blacktop Patching : Contract 2 200,000 2009/05/01 2009/10/31 1
Safety Maintenance - Blacktop Patching : Contract 3 200,000 2009/11/01 2010/02/28 1
Safety Maintenance - Blacktop Patching : Contract 4 200,000 2009/11/01 2010/02/28 1
Safety Maintenance - Blacktop Patching : Contract: Materials/Plant 950,000 2009/05/01 2010/02/28 Open
Safety Maintenance - Signs : Installation 200,000 2008/05/01 2008/02/28 1
Safety Maintenance - Signs : Purchase 200,000 2009/04/01 2010/02/28 Open
6,195,884.00 6,200,000.00
Constr. Of Khathikhathi Road, 0-2km 700,000 2.00 2009/05/01 2009/10/31 3
Constr. Of Basiyeni Road, 0-1.7km 650,000 1.70 2009/05/01 2009/10/31 3
Constr. Of Bhidla Road Phase 2, A1792, 0-1.2km 450,000 1.20 2009/05/01 2009/10/31 2
Constr. Of Tholinhlanhla Road, 0-1.8km 620,000 1.80 2009/05/01 2009/10/31 3
Constr. Of Magagasi Road, 0-1.8 620,000 1.80 2009/05/01 2009/10/31 3
Constr. Of Nkomba Road, 0-1.6km 700,000 1.60 2009/05/01 2009/10/31 3
Constr. Of Nene Road, 0-1km 350,000 1.00 2009/05/01 2009/10/31 2
Constr. Of Mpushini Road 300,000 0.50 2009/05/01 2009/10/31 2
Constr. Of Mtolo Road, 0-1.8km 750,000 1.80 2009/05/01 2009/10/31 3
Constr. Of Dlozi Road, 0-1.2km 500,000 1.20 2009/07/01 2009/11/30 2
Constr. Of Susu Road, 0-1km 450,000 1.00 2009/07/01 2009/11/30 2
Constr. Of Masheleni Road, 0-1.5km 600,000 1.50 2009/07/01 2009/11/30 2
Constr. Of Jatini Road, 0-1.7km 700,000 1.70 2009/07/01 2009/11/30 3
Constr. Of Mzwabantu Road, 0-0.8km 425,000 0.80 2009/07/01 2009/11/30 2
232
Construction Of Mconjwana Road, 0-1.1km 465,000 1.10 2009/07/01 2009/11/30 2
Constr. Of Tetelegu Road 300,000 0.55 2009/07/01 2009/11/30 2
Constr. Of Ezakhiweni Road 420,000 1.00 2009/07/01 2009/11/30 2
Constr. Of Bhidla Road Causeway, A1792 800,000 1.00 2009/05/01 2009/10/31 3
9,800,000.00 9,800,000.00 23.25
Other equipment 1,700,000 2009/04/01 2010/02/28 Open
Civil material 500,000 2009/04/01 2010/02/28 Open
Fuel and Oil Routine Maintenance 1,400,000 2009/04/01 2010/02/28 Open
Fuel and Oil - Blading 1,100,000 2009/04/01 2010/02/28 Departmental
Routine Maintenance - Blading 1,200,000 2009/04/01 2010/02/28 Open
Routine maintenance-Blading of local roads-1 330,000 2009/06/01 2009/10/31 2
Routine maintenance-Blading of local roads-2 330,000 2009/10/01 2009/12/31 2
Routine maintenance-Blading of local roads-3 330,000 2009/12/01 2010/02/28 2
Routine Maintenance - Impendle-specialised 200,000 2009/05/01 2010/02/01 1
Routine Maintenance - Impendle-Pipe desilting 1 170,000 2009/05/01 2010/02/01 1
Routine Maintenance - Impendle-labour based-1 170,000 2009/05/01 2010/02/01 1
Routine Maintenance - Howick-specialised 200,000 2009/05/01 2010/02/01 1
Routine Maintenance - Howick-Pipe desilting 1 170,000 2009/05/01 2010/02/01 1
Routine Maintenance - Howick-labour based-1 170,000 2009/05/01 2010/02/01 1
Routine Maintenance - Mooi river-specialised 200,000 2009/05/01 2010/02/01 1
Routine Maintenance - Mooi River-Pipe desilting 1 170,000 2009/05/01 2010/02/01 1
Routine Maintenance - Mooi river-labour based-1 170,000 2009/05/01 2010/02/01 1
Routine Maintenance - Taylors Halt-specialised 200,000 2009/05/01 2010/02/01 1
Routine Maintenance - Taylors halt-Pipe desilting 1 170,000 2009/05/01 2010/02/01 1
Routine Maintenance - Taylors halt-labour based-1 170,000 2009/05/01 2010/02/01 1
Routine Maintenance - Grass Cutting-Taylors halt - 1 150,000 2009/11/01 2010/02/28 1
Routine Maintenance - Grass Cutting-Mooi River - 1 150,000 2009/11/01 2010/02/28 1
Routine Maintenance - Grass Cutting-Nottingham road - 1 150,000 2009/11/01 2010/02/28 1
Routine Maintenance - Grass Cutting-Howick -1 150,000 2009/11/01 2010/02/28 1
Routine Maintenance - Noxious Weeds 395,000 2009/11/01 2010/02/28 Open
Routine Maintenance - Fence & Km Posts 145,000 2009/04/01 2010/02/28 Open
Routine Maintenance - Patch Gravelling 650,000 2009/07/01 2009/09/30 2
Routine Maintenance - Patch Gravelling 650,000 2009/07/01 2009/09/30 2
Routine Maintenace - Crack Sealing 100,000 2009/04/01 2010/02/28 Open
Routine Maintenance - Signs : Purchase 300,000 2009/04/01 2010/02/28 Open
Routine Maintenance - Signs & km Markers : Installation 200,000 2009/05/01 2010/02/01 1
233
Routine Maintenance - Signs & km markers: Installation 200,000 2008/11/01 2009/02/28 1
12,292,345.00 12,290,000.00
Zibambele - Materials 144,000 Open
Zibambele - Contractors 5,265,780 Zibamb.
5,409,780.00 5,409,780.00
Regravelling of D735, 0-3.73km 700,000 3.73 2009/06/01 2009/10/31 3
Regravelling of D293, 0-5.5km 1,000,000 5.50 2009/07/01 2009/11/30 3
Regravelling of P169, 22-31.52km 1,800,000 9.52 2009/05/01 2009/10/31 DOT
Regravelling of P175, 27-40.88km 2,500,000 13.88 2009/05/01 2009/10/31 DOT
Regravelling of P129, 9.31-15.81km 1,200,000 6.50 2009/07/01 2009/11/30 4
Regravelling of D1227, 0-4.44km 800,000 4.44 2009/05/01 2009/10/31 DOT
Regravelling of P140, 0-4.52km 945,000 4.95 2009/07/01 2009/11/30 3
Regravelling of P390, 0-4.95km 900,000 4.52 2009/07/01 2009/11/30 3
Regravelling of P132 1,700,000 10.00 2009/06/01 2009/10/31 4
Regravelling of P27-2 1,850,000 10.00 2009/06/01 2009/10/31 4
Regravelling of P165 1,600,000 10.00 2009/06/01 2009/10/31 4
Regravelling of P167 1,700,000 11.00 2009/05/01 2009/10/31 DOT
16,696,216.00 16,695,000.00 94.04
50,394,225.00 50,394,780.00
234
KZN DEPARTMENT OF TRANSPORT
Vulindlela KZ 222-225 - 20010/11
Contract Description Budget Km/m/m2/no Start End Stage
Safety Maintenance - Guardrails : Purchase 200,000 2010/05/01 2010/10/31 Open
Safety Maintenance - Guardrails : Installation-Taylors Halt 200,000 2010/05/01 2010/10/31 1
Safety Maintenance - Guardrails : Installation-Nottingham road 200,000 2010/05/01 2010/10/31 1
Safety Maintenance - Roadmarking : Painting 2,000,000 2010/05/01 2010/10/31 Open & 2
Safety Maintenance - Roadmarking : Installation of Studs No 1 200,000 2010/05/01 2010/10/31 1
Safety Maintenance - Roadmarking : Installation of Studs No 2 200,000 2010/05/01 2010/10/31 1
Safety Maintenance - Roadmarking : Studs 400,000 2010/05/01 2010/10/31 Open
Safety Maintenance - Blacktop Patching : Materials 955,000 2010/04/01 2011/02/28 Open
Safety Maintenance - Blacktop Patching : Contract 1 200,000 2010/05/01 2010/10/31 1
Safety Maintenance - Blacktop Patching : Contract 2 200,000 2010/05/01 2010/10/31 1
Safety Maintenance - Blacktop Patching : Contract 3 200,000 2010/11/01 2011/01/31 1
Safety Maintenance - Blacktop Patching : Contract 4 200,000 2010/11/01 2011/01/31 1
Safety Maintenance - Blacktop Patching : Contract: Materials/Plant 950,000 2010/11/01 2011/01/31 Open
Safety Maintenance - Signs : Installation 200,000 2010/05/01 2011/01/31 1
Safety Maintenance - Signs : Purchase 200,000 2010/04/01 2011/02/28 Open
6,505,678.00 6,505,000.00
Vulisaka Pholani Road 875,000 2.50 2010/05/01 2010/10/31 3
Nzakane Road 1,050,000 3.00 2010/05/01 2010/10/31 3
Mfiselwa Road (phases 1&2) 231,000 0.66 2010/05/01 2010/10/31 2
Nene Road 210,000 0.60 2010/05/01 2010/10/31 2
Shobalensimbi Road 210,000 0.60 2010/05/01 2010/10/31 2
Mashiyane Road 231,000 0.66 2010/05/01 2010/10/31 2
Mlandu Road 455,000 1.30 2010/05/01 2010/10/31 2
Nxamalala Road 280,000 0.80 2010/05/01 2010/10/31 2
Bongi Road 490,000 1.40 2010/05/01 2010/10/31 3
Dladla Road 3,325,000 9.50 2010/05/01 2010/10/31 4
Thulisa Road 1,225,000 3.50 2010/05/01 2010/10/31 3
Imbali Yezwe Road 1,400,000 4.00 2010/05/01 2010/10/31 3
Amblose Road 1,575,000 4.50 2010/05/01 2010/10/31 3
Regravelling of Various Local Roads 800,000 2010/05/01 2010/10/31 3
235
12,334,350.00 12,357,000.00 33.02
Other equipment 1,750,000 2010/04/01 2011/02/28 Open
Civil material 500,000 2010/04/01 2011/02/28 Open
Fuel and Oil Blading Routine Maintenance 1,500,000 2010/04/01 2011/02/28 Open
Fuel and Oil - Blading 1,250,000 2010/04/01 2011/03/31 Departmental
Routine Maintenance - Blading 1,200,000 2010/10/01 2011/02/28 Open
Routine maintenance-Blading of local roads-1 330,000 2010/08/01 2011/10/31 2
Routine maintenance-Blading of local roads-2 330,000 2010/10/01 2011/12/31 2
Routine maintenance-Blading of local roads-3 330,000 2010/12/01 2011/02/28 2
Routine Maintenance - Impendle-specialised 200,000 2010/05/01 2011/02/28 1
Routine Maintenance - Impendle-Pipe desilting 1 170,000 2010/06/01 2011/12/31 1
Routine Maintenance - Impendle-labour based-1 170,000 2010/04/01 2011/12/31 1
Routine Maintenance - Howick-specialised 200,000 2010/05/01 2011/02/28 1
Routine Maintenance - Howick-Pipe desilting 1 170,000 2010/06/01 2011/12/31 1
Routine Maintenance - Howick-labour based-1 170,000 2010/04/01 2011/12/31 1
Routine Maintenance - Mooi river-specialised 200,000 2010/05/01 2011/02/28 1
Routine Maintenance - Mooi River-Pipe desilting 1 170,000 2010/06/01 2011/12/31 1
Routine Maintenance - Mooi river-labour based-1 170,000 2010/04/01 2011/12/31 1
Routine Maintenance - Taylors Halt-specialised 200,000 2010/05/01 2011/02/28 1
Routine Maintenance - Taylors halt-Pipe desilting 1 170,000 2010/06/01 2011/12/31 1
Routine Maintenance - Taylors halt-labour based-1 170,000 2010/04/01 2011/12/31 1
Routine Maintenance - Grass Cutting-Taylors halt - 1 175,000 2010/11/01 2011/02/28 1
Routine Maintenance - Grass Cutting-Mooi River - 1 175,000 2010/11/01 2011/02/28 1
Routine Maintenance - Grass Cutting-Nottingham road - 1 175,000 2010/11/01 2011/02/28 1
Routine Maintenance - Grass Cutting-Howick -1 175,000 2010/11/01 2011/02/28 1
Routine Maintenance - Noxious Weeds 450,000 2010/09/01 2011/02/28 Open
Routine Maintenance - Fence & Km Posts 200,000 2010/04/01 2011/02/28 Open
Routine Maintenance - Patch Gravelling 700,000 2010/07/01 2011/10/30 2
Routine Maintenance - Patch Gravelling 700,000 2010/07/01 2011/10/30 2
Routine Maintenace - Crack Sealing 100,000 2010/04/01 2011/02/28 Open
Routine Maintenance - Signs : Purchase 300,000 2010/04/01 2011/02/28 Open
Routine Maintenance - Signs & km Markers : Installation 200,000 2010/04/01 2011/02/28 1
Routine Maintenance - Signs & km markers: Installation 200,000 2010/04/01 2011/02/28 1
12,906,963.00 12,900,000.00
Zibambele - Materials 144,000 2010/04/01 2011/02/28 Open
Zibambele - Contractors 5,265,780 2010/04/01 2011/02/28 Zibamb.
236
5,409,780.00 5,409,780.00
Re - Gravelling P526 (0-7.4km) 1,850,000 7.40 2010/07/01 2010/10/31 DOT
Re - Gravelling P28-1 (59 - 64km ) 1,250,000 5.00 2010/07/01 2010/10/31 3
Re - Gravelling D 750 (0-2.3km) 600,000 2.30 2010/05/01 2010/10/31 2
Re- Gravelling P28-2 (0-8.2km) 2,100,000 8.20 2010/05/01 2010/10/31 DOT
Re - Gravelling P131 (0-5.6km) 1,400,000 5.60 2010/07/01 2010/10/31 DOT
Re - Gravelling D14 (0-6.4km) 1,600,000 6.40 2010/05/01 2010/10/31 4
Re - Gravelling D1357 (5-8.5km) 900,000 3.50 2010/06/01 2010/09/30 3
Re - Gravelling P402 (0-12.5km) 3,150,000 12.50 2010/06/01 2010/09/30 4
Re - Gravelling D1133 (0 -3km) 800,000 3.00 2010/06/01 2010/09/30 DOT
Re - Gravelling P411 (0-3.6km) 900,000 3.60 2010/06/01 2010/09/30 DOT
Re - Gravelling P412 (0-6.8km) 1,700,000 6.80 2010/06/01 2010/09/30 4
Re - Gravellleing P167 (5km) 1,258,000 5.00 2010/05/01 2010/10/31 DOT
17,531,027.00 17,508,000.00 69.30
54,687,798.00 54,679,780.00
237
NEW GRAVEL ROADS: 2010-11: RRTF VULINDLELA
Kz Area Location Name Length (km) Estimation
kz225 Nadi Vulisaka Pholani Road 2.5 R 800,000.00
kz225 Nadi Nzakane Road 3 R 960,000.00
kz225 Mpumuza Mfiselwa Road (phases 1&2) 0.66 R 211,200.00
kz225 Mpumuza Nene Road 0.6 R 192,000.00
kz225 Ximba Shobalensimbi Road 0.6 R 192,000.00
kz225 Mafunze Mashiyane Road 0.66 R 211,200.00
kz225 Mafunze Mlandu Road 1.3 R 416,000.00
kz225 Nxamalala Nxamalala Road 0.8 R 256,000.00
kz225 Nxamalala Bongi Road 1.4 R 448,000.00
kz223 Mpofana/Middelrus Dladla Road 9.5 R 3,040,000.00
kz223 Mpofana/Middelrus Thulisa Road 3.5 R 1,120,000.00
kz224 Impendle Imbali Yezwe Road 4 R 1,280,000.00
kz224 Impendle Amblose Road 4.5 R 1,440,000.00
Total R 10,566,400.00
238
REGRAVELLING: 2010 - 2011
Kz Area Road No. From To Estimate
kz222 P526 0 7.316 R 1,316,880.00
kz223 P28-1 59 64 R 900,000.00
kz223 D750 0 2.3 R 414,000.00
kz222 P28-2 0 8.2 R 1,476,000.00
kz224 P131 0 5.6 R 1,008,000.00
kz224 D14 0 6.4 R 1,152,000.00
kz224 D1357 5 8.5 R 630,000.00
kz225 P402 0 12.5 R 2,250,000.00
kz225 D1133 0 3 R 540,000.00
kz225 P411 0 3.6 R 648,000.00
kz225 P412 0 6.8 R 1,224,000.00
TOTAL R 11,558,880.00
239
U m g u n g u n d l o v u D i s t r i c t M u n i c i p a l i t y
D i s t r i c t C o u n c i l 2 2
A p p r o x im a t e c o s ts f o r r o a d w o r k s :
R e - g r a v e l l in g o f P a n d D R o a d s R 3 0 0 0 0 0 .0 0C o n s t r u c t io n o f L o c a l R o a d s ( 5 m ) R 3 2 5 0 0 0 .0 0U p g r a d e G r a v e l R o a d t o S u r f a c e d R d R 3 0 0 0 0 0 0 . 0 0R o a d M a r k in g o f R o a d s ( p e r k m ) R 1 0 0 0 0 . 0 0R o a d s t u d s ( p e r k m ) R 6 0 0 0 . 0 0L ig h t R e h a b o f R o a d s ( p e r k m ) R 1 0 0 0 0 0 0 . 0 0H e a v y / D e e p m i l l in g R e h a b ( p e r k m R 2 0 0 0 0 0 0 . 0 0R e s e a l in g o f r o a d s R 3 2 5 0 0 0 .0 0
Umgungundlovu District MunicipalityDistrict Council 22
Budget Allocation Baskets and Basket Descriptions:
Safety M aintenance: Road Marking, B lacktop patching, Guard rails and safety signs.
Construction of Local Roads: Upgrade and construction of local gravel roads.
Routine M aintenances: Pipe cleaning, verge m aintenance, km m arkers, Blading of roads, noxious weeds and directional s igns.
Zibam bele Contractors: Poverty elevation program me for road m aintenance on certain roads.
Re – Gravelling: Re – gravelling and betterm ent of P and D roads.
U m g u n g u n d l o v u D i s t r i c t M u n i c i p a l i t y
D i s t r i c t C o u n c i l 2 2
R e h a b i l i t a t i o n a n d U p g r a d e P r o j e c t s 2 0 0 8 / 9 :
M R 9 O t t o ’ s B l u f f – 3 k m - U p g r a d e R 6 0 0 0 0 0 0 . 0 0
M R 6 M a t t i s o n s – L i g h t R e h a b 4 k m R 4 0 0 0 0 0 0 . 0 0
M R 1 5 4 – R e s e a l 8 k m R 2 5 6 0 0 0 0 . 0 0
M R 1 5 9 – R e s e a l 9 k m R 2 6 0 0 0 0 0 . 0 0
M R 2 9 2 – R e s e a l 6 k m R 1 9 3 5 0 0 0 . 0 0
T O T A L R 1 7 0 9 5 0 0 0 . 0 0
240
DEPT OF ARTS, CULTURE & TOURISM
88
Arts a nd Culture P rog ra mmesArts a nd Culture P rog ra mmesPLANNED ACTIVITIES TIME FRAME BUDGET
Providing support to Arts & Culture Forum:
April - May 08 R20 000
Social Cohesion Programme(Support to/ facilitation of multicultural
projects)•Wildsfees
•Intercultural Food Tasting Event
•ATKV Music Project
•Cultural Day
2 August 2008
17 May 2008
13 September 2008
24 September 2008
R200 000
R100 000
R60 000
R20 000
R20 000
Partnership initiatives with municipalities,
other spheres of government and relevant
stake holders.
(Programme focus on women, youth and the
physically challenged)
Moral Regeneration •HIV Aids Awareness Project.
•Collaboration project with Health Dept. and other stake
holders.
•Amagosa/ Izinduna Workshop
•Workshop and training – Children’s Act.
•Projects focussing on youth/ aged.
Visual Arts & Craft Promotion(-Painting and etching-Beadwork; leatherwork, fabric painting)
•Publicity
•Auditions/ Identification
•Mentorship
•District selection
•Platform for exhibition
Performing Arts Promotion(Kwaito, Hip-hop; Jazz)
1 December 08
April – Nov 08
23-24 July 08
25 May - 1 June 08
May – Jul 08
3-16 May 08
19 May – 6 June
14 – 18 July 08
18 – 22 August
Dec 2008
2-27 June 08
22-24 August
R80 000R15 000
R25 000
R10 000
R10 000
R20 000
R180 000
R100 000
CULTURAL AF F AIRS CULTURAL AF F AIRS
CONTCONT’’DDPLANNED ACTIVITIES TIME FRAME BUDGET
PERFORMING ARTS/ VISUAL ARTS AND CRAFT DEVELOPMENT(ACCREDITED)
1 July – 31 October R130 000
These programmes are guided by the
following provincial imperatives:
•Towards 2010: Support of SPEDS -
Corridor Dev. Initiative (Tourism Focus
points) – Umsunduzi/Midlands Meander
•Facilitation of marketing and
promotion of artists
Music, Song and Dance Project •Auditions/ Identification
•Mentorship
•District selection
Theatre Project•Auditions/ Identification
•Mentorship
•District selection
•Participation in KZN Arts Festival
Providing a platform to showcase talent of performing artists.
5-27 July
4-15 August
22 Aug -21 Sept
Dec 2008
31 May – 29 June
14 – 31 July 08
8-10 August
Dec 2008
Apr – Feb 09
R100 000
R60 000
R40 000
R910 000
241
Cultura l Affa irs Cultura l Affa irs
�� Arts a nd Culture Arts a nd Culture
E nsure cultura l divers ity a nd the a dva ncement of cultura l E nsure cultura l divers ity a nd the a dva ncement of cultura l disciplines into via ble indus tries disciplines into via ble indus tries
-- E s ta blish s tructures a nd provide ins titutiona l E s ta blish s tructures a nd provide ins titutiona l
supportsupport
-- P rovide a nd ma inta in fa cilities P rovide a nd ma inta in fa cilities
-- F a cilita te a ccess to fa cilities a nd F a cilita te a ccess to fa cilities a nd progra mmesprogra mmes
-- P rovide ca pa city building P rovide ca pa city building progra mmesprogra mmes
-- F a cilita te a nd support excellence enha ncing F a cilita te a nd support excellence enha ncing progra mmesprogra mmes
Cultura l Affa irs cont. Cultura l Affa irs cont.
�� La ng ua g eLa ng ua g e
P romote multiling ua lism, redress pa s t P romote multiling ua lism, redress pa s t
ling uis tic imba la nces a nd develop the ling uis tic imba la nces a nd develop the
previous ly ma rg ina lized lang ua g esprevious ly ma rg ina lized lang ua g es
-- E s ta blish a nd support s tructuresE s ta blish a nd support s tructures
-- P rovide la ng ua ge services P rovide la ng ua ge services
242
La ng ua g e La ng ua g e P rog ra mmesP rog ra mmes
�� P rovide a dminis tra tive support to P rovide a dminis tra tive support to KZNP GNC KZNP GNC –– form Dis trict committeesform Dis trict committees
�� Tra ns la tion of documents Tra ns la tion of documents
�� Interpreting services Interpreting services
�� S imulta neous Interpreting equipment S imulta neous Interpreting equipment
�� Litera ture writing Litera ture writing
Libra ries a nd Archives Libra ries a nd Archives �� Libra ries Libra ries
P rovide libra ry a nd informa tion services which a re free, P rovide libra ry a nd informa tion services which a re free, equita ble, a ccess ible, provide for the information, equita ble, a ccess ible, provide for the information, rea ding a nd lea rning needs of peoplerea ding a nd lea rning needs of people…….. ..
-- P rovide libra ry ma teria l, books a nd other forma ts to P rovide libra ry ma teria l, books a nd other forma ts to public libra ry.public libra ry.
-- P romote the use of libra ries a nd culture of readingP romote the use of libra ries a nd culture of reading
-- Monitor a nd support public libra ries with fresh ma teria l.Monitor a nd support public libra ries with fresh ma teria l.
243
LIBRARY S E RVICE SLIBRARY S E RVICE S
MUNICIPALITY SERVICE
Richmond S et up of the Internet Ca fé – 6 computers with internet a ccess , printers Cyber ca det – appointment of one CB to provide tra ining and a ss is ta nce to thepublic to use internet. Tota l va lue R 220 000
uMng eni Hilton Library – E xtra S tudy S pa ce is being providedMpophomeni - S et up of the Internet Ca fé – 6 computers with internet a ccess , printers Cyber ca det – a ppointment of one CB to provide tra ining a nd a ss is ta nce to the public to use internet. Tota l va lue R 220 000
Impendle Built new libra ry – R 4mS et up of the Internet Ca fé – 6 computers with internet a ccess , printers Cyber ca det – a ppointment of one CB to provide tra ining a nd a ss is ta nce to the public to use internet. Tota l va lue R 220 000
Msunduzi Opened E a stwood Libra ry – R4.5mS et up of the Internet Ca fé – 6 computers with internet a ccess , printers Cyber ca det – appointment of one CB to provide tra ining and a ss is ta nce to thepublic to use internet. Tota l va lue R 220 000Built Umsunduzi libra ry ( Bess ie Hea d) - R13m
Mkha mba thini Ca mperdown Libra ryS et up of the Internet Ca fé – 6 computers with internet a ccess , printers Cyber ca det – appointment of one CB to provide tra ining and a ss is ta nce to thepublic to use internet. Tota l va lue R 220 000
Libra ries a nd Archives cont.Libra ries a nd Archives cont.
�� ArchivesArchives
Acquire, preserve a nd ma na g e public a nd nonAcquire, preserve a nd ma na g e public a nd non--public records in public records in order to ensure public a cces s to the na tionorder to ensure public a cces s to the na tion’’s a rchiva l herita g es a rchiva l herita g e
-- E nsure proper ma na g ement a nd ca re of a ll public records in E nsure proper ma na g ement a nd ca re of a ll public records in g overnmenta l bodies .. g overnmenta l bodies ..
-- Ma na g e Archives Repos itories Ma na g e Archives Repos itories
-- F a cilita te a cces s to recordsF a cilita te a cces s to records
-- Render records ma na g ement service to g overnmenta l bodies .Render records ma na g ement service to g overnmenta l bodies .
-- P romote a wa reness a nd us e of a rchivesP romote a wa reness a nd us e of a rchives
244
TOURIS M P ROGRAMME STOURIS M P ROGRAMME S
�� P rovincia l Tourism P olicy P rovincia l Tourism P olicy �� Tourism Awareness Tourism Awareness P rogrammesP rogrammes�� Tourism Mentorship Tourism Mentorship P rogrammeP rogramme�� S kills Development S kills Development -- B&B and Tour B&B and Tour
Opera tors Tra iningOpera tors Tra ining�� S kills AuditS kills Audit�� Tour Guide Tra iningTour Guide Tra ining�� Grading and reg istra tion of establishmentsGrading and reg istra tion of establishments�� Tourism Career S upport Tourism Career S upport P rogrammeP rogramme ––
bursaries ; bursaries ; lea rnershipslearnerships ; career exhibition; ; ca reer exhibition;
245
DEPT OF AGRICULTURE & ENVIRONMENTAL AFFAIRS
DEPARTMENT OF AGRICULTURE AND ENVIRONMENTAL AFFAIRS
� 3 SUB DIRECTORATES� AGRICULTURE� ENVIRONMENTAL AFFAIRS
• REGULATORY• ENFORCEMENT• EIA’S• AWARENESS CAMPAIGNS• Transferred R260 000 to the district for a review of integrated
waste mngplan• R300 000 for greening• Emf for Umsunduzi –1st for Province (R1,7m)
� VET• RABIES • DIP TANKS
DEPARTMENT’S COMMITMENT
� 4 PROGRAMS
� CORRIDOR MASSIFICATION
� MUSHROOMS
� LIVESTOCK
� FOOD SECURITY
246
CORRIDOR MASSIFICATION
� LINKED TO THE PSEDS OF CORRIDORS
� VAST TRACKS OF HIGH POTENTIAL AGRIC. LAND THAT IS UNDERUTILISED
� ASSIST TO BRING THESE LANDS INTO PRODUCTION BY PLANTING AND TRAINING
MUSHROOMS
� PARTNER WITH CHINESE GOVT TO
PROMOTE THE MUSHROOM INDUSTRY
� 3 MUSHROOM BASE STATIONS WILL BE ESTABLISHED
� FORMATION OF COOPERATIVES
� PRODUCE SUBSTRATES
� PRODUCE MATERIAL FOR SUBSTRATES
� PRODUCE MUSHROOMS
� MARKET MUSHROOMS
247
LIVESTOCK
� COMMUNAL HERD IN KZN IS 62% OF KZN HERD
� OFF TAKE ONLY 2%
� DEPT STRATEGY:
� STRENGTHENING LIVESTOCK ASSOCIATIONS
� INCREASING TRAINING AND AWARENESS PROGRAMS
� REHAB OF DIPTANKS
� IMPROVE MARKETING AND VALUE ADDING
FOOD SECURITY
� ASSISTS SMALL SCALE COMMUNITIES
� FOOD SECURITY PROJECTS
� TRAINING OF SMALL SCALE FARMERS
� MIGRATION FROM EMERGING TO COMMERCIAL FARMERS.
248
ADDITIONAL PROGRAMS
� INVASIVE ALIEN WEED ERADICATION PROGRAM
� LAND CARE PROGRAM
� PUBLIC PRIVATE PARTNERSHIPS
� ESTABLISHMENT OF YARD AND WARD COMMITTEES
� PPC COMMITMENT
� INTERACTION WITH DEPARTMENT OF LAND AFFAIRS
� RESEARCH – VITICULTURE
2008/9 INTERVENTIONS
� FORMATION OF WARD ASSOCIATIONS
� FORMATION OF COMMODITY ASSOCIATIONS
� WARD AND DISTRICT AGRIC PLAN
� SUPPORT TO SECTOR DEPARTMENTS
� PARTNERSHIP WITH DTP
249
2008/9 INTERVENTIONS CONT.
� SUPPORT TO LAND REFORM PROJECTS
� IDENTIFICATION AND IMPLEMENTATION OF CORRIDOR PROJECTS
� RETRAINING OF EXTENSION OFFICERS
�DISTRICT AGRICULTURAL SHOW
ACCESSING OF FUNDING
� IS THE COMMUNITY COMMITTED TO THE PROJECT
� SOCIAL DYNAMICS
� IS THE SITE SUITABLE
�WILL THE PROJECT BE SUSTAINABLE
� FUNDS FOR INITIAL INPUTS AND INFRASTRUCTURE
250
ACCESSING OF FUNDING
� PROVINCIAL� CONTACT ASST MANAGER OR TECH
� INITIAL PROJ ASSESSMENT IN TERMS OF TECH SUITABILITY. BP TO BE COMPLETED
� PPC WILL VISIT PROJ FOR DETAILED STUDY
� SUBMISSION OF PROJECT TO D.T.T
� PROJECT RECOMMENDED AND RETAINED FOR BUDGET AVAILABILITY
� BUDGET WILL BE AVAILABLE ALONG DEPT PRIORITIES
ACCESSING OF FUNDING
� DEPT IDENTIFY POSSIBLE PROJECT AREAS
� AGRICULTURAL ASSESMENT COMPLETED
� SOCIAL ASSESSMENT
� INSTITUTIONAL ARRANGEMENTS
� BUSINESS PLAN COMPLETED
� SUBMITTED FOR FUNDING
251
ACCESSING OF FUNDING
� LAND CARE
� FUNDING FROM CASP
� MUST HAVE A LAND CARE ELEMENT
� BUSINESS PLAN TO BE COMPLETED
� FUNDING IS NORMALLY FOR A PERIOD OF 3 YEARS
� FUNDING INCLUDES WAGES
CHALLENGES
� PTO’S
� EIA’S
� OPPORTUNISTIC FARMERS
� LAND PREPERATION SERVICES
� EMERGING CONTRACTORS – INSUFFICIENT BUSINESS SKILLS AND LACK OF ACCESS TO FINANCE DELAY IMPLEMENTATION OF PROJECTS
� LOSS OF SKILLED DEPARTMENTAL AGRICULTURAL STAFF
252
WHAT CAN MUNICIPALITIES DO?
� NEED TO JOINTLY IDENTIFY PRIORITISED AREAS/COMMUNITIES
� BE MEMBER OF DTT MEETINGS
� ASSIST WITH FORMATION OF WARD COMMITTEES
� CO FUND PROJECTS
� OFFICE ACCOMMODATION
253
DEPARTMENT OF HEALTH
UmshwatiUmshwati
8 days8 days48,5%48,5%2484248411District District
HospitalHospital
2496249668168122Mobile Mobile
ClinicsClinics
1958195832132122Fixed Fixed
Clinics x Clinics x
8hrs a 8hrs a
day, 5 day, 5
days a days a
weekweek
433843381024102433Fixed Fixed
Clinics Clinics
24hrs on 24hrs on
callcall
Average Average
length of length of
StayStay
Bed Bed
UtilisationUtilisationOPD OPD
Attendees Attendees
per monthper month
HeadHead
count count
over 5over 5
HeadHead
count under 5count under 5
NumberNumberType of Type of
Services Services
UmngeniUmngeni
89089023123111Fixed Fixed
Clinics Clinics
24hrs on 24hrs on
callcall
67%67%11Specialised Specialised
HospitalHospital
1 6691 66972572544Mobile Mobile
ClinicsClinics
4 5344 53456656611Fixed Fixed
Clinics x Clinics x
8hrs a day, 8hrs a day,
5 days a 5 days a
weekweek
4 9784 9781 2111 21111Fixed Fixed
Clinics Clinics
24hrs 24hrs
Average Average
length of length of
StayStay
Bed Bed
UtilisationUtilisationOPD OPD
headcount headcount
per monthper month
HeadHead
count count
over 5over 5
HeadHead
count under 5count under 5
NumberNumberType of Type of
Services Services
254
ImpendleImpendle
5 4685 4681 1021 10211Fixed Fixed
Clinics Clinics
24hrs 24hrs
62062015515511Mobile Mobile
ClinicsClinics
79079036036011Fixed Fixed
Clinics Clinics
24hrs on 24hrs on
callcall
Average Average
length of length of
StayStay
Bed Bed
UtilisationUtilisationOPD OPD
headcount headcount
per monthper month
HeadHead
count count
over 5over 5
HeadHead
count under 5count under 5
NumberNumberType of Type of
Services Services
uMsunduziuMsunduzi
33Fixed Clinics Fixed Clinics
24hrs on 24hrs on
callcall58 19858 19813 49213 492
22Fixed Clinics Fixed Clinics
24hrs24hrs
44 62044 6204 0014 00122CHCCHC
909062%62%11TB HospitalTB Hospital
13213258%58%22SpecialisedSpecialised
12 days12 days76%76%16 67616 67611TertiaryTertiary
5.5 days5.5 days78%78%20 40420 40411RegionalRegional
5.2 days5.2 days75%75%16 97416 97411District District
HospitalHospital
1 6161 61666766744Mobile Mobile
ClinicsClinics
2222Fixed Clinics Fixed Clinics
x 8hrs a x 8hrs a
day, 5 days day, 5 days
a weeka week
11Fixed ClinicsFixed Clinics
12 hrs a day12 hrs a day
Average Average
length of length of
StayStay
Bed Bed
UtilisationUtilisationOPD OPD
headcount headcount
per monthper month
Headcount Headcount
>5>5
PHCPHC
Headcount Headcount
<5<5
PHCPHC
NumberNumberType of Type of
Services Services
255
MkhambatiniMkhambatini
306430641670167011CHCCHC
1770177066566522Mobile Mobile
ClinicsClinics
4702470289089033Fixed Fixed
Clinics Clinics
24hrs on 24hrs on
callcall
Average Average
length of length of
StayStay
Bed Bed
UtilisationUtilisationOPD OPD
headcount headcount
per monthper month
HeadHead
count count
over 5over 5
HeadHead
count under 5count under 5
NumberNumberType of Type of
Services Services
RichmondRichmond
172 days172 days64%64%11TB TB
HospitalHospital
99399326426411Mobile Mobile
ClinicsClinics
595595898911Fixed Fixed
Clinics x Clinics x
8hrs a 8hrs a
day, 5 day, 5
days a days a
weekweek
784778471784178433Fixed Fixed
Clinics Clinics
24hrs on 24hrs on
callcall
Average Average
length of length of
StayStay
Bed Bed
UtilisationUtilisationOPD OPD
headcount headcount
per monthper month
HeadHead
count count
over 5over 5
HeadHead
count under 5count under 5
NumberNumberType of Type of
Services Services
256
Health PostsHealth Posts
EsimozomeniEsimozomeni
MpululeMpulule
KwaKwa--ShangeShange
KwaKwa ThuinziThuinzi
TendelaTendela
MashingeniMashingeni
MthombeniMthombeni
ProposedProposed
NameName
R 6 497 101 R 6 497 101 77TotalTotal
R 990 443R 990 443InfrastructureInfrastructure??RichmondRichmond
R 990 443R 990 443InfrastructureInfrastructure??MkhambatinMkhambatin
ii
R 990 443R 990 443InfrastructureInfrastructure??MsunduziMsunduzi
R 990 443R 990 443InfrastructureInfrastructure??ImpendleImpendle
R 554 443 R 554 443 InfrastructureInfrastructure??MpofanaMpofana
R 990 443R 990 443InfrastructureInfrastructure??UmgeniUmgeni
R 990 443R 990 443InfrastructureInfrastructure??UmshwatiUmshwati
Budget RequiredBudget Required
ProvincialProvincial
RequiredRequiredSiteSiteMunicipalityMunicipality
Service Expansion as per Service Transformation Service Expansion as per Service Transformation Service Expansion as per Service Transformation Service Expansion as per Service Transformation Service Expansion as per Service Transformation Service Expansion as per Service Transformation Service Expansion as per Service Transformation Service Expansion as per Service Transformation
Plan Plan Plan Plan Plan Plan Plan Plan
NewNewPhateniPhateni
NewNewHopewell ClinicHopewell Clinic
Upgrade to Upgrade to
CHCCHCRichmond ClinicRichmond Clinic
RichmondRichmond
NewNewEzimwiniEzimwiniMkhambatiniMkhambatini
NewNewKwaKwa MpandeMpande
NewNewMahlutshiniMahlutshini
09/1009/10 10/1110/11
NewNewBhamshelaBhamshela ClinicClinic
Upgrade to Upgrade to
CHCCHCGomaneGomane
ImpendleImpendle
New CHCNew CHCTaylorsTaylors HaltHalt
MsunduziMsunduzi
Upgrade to Upgrade to
CHCCHCMpophomeniMpophomeniUmgeniUmgeni
Upgrade to Upgrade to
CHCCHCGcumisaGcumisa
NewNewDalton ClinicDalton Clinic
NewNewEfayeEfaye ClinicClinic
New New EmambedwiniEmambedwini
ClinicClinic
UmshwatiUmshwati
11/1211/1208/0908/09StatusStatusProjectProjectMunicipalityMunicipality
257
Service Expansion as per Service Service Expansion as per Service Service Expansion as per Service Service Expansion as per Service Service Expansion as per Service Service Expansion as per Service Service Expansion as per Service Service Expansion as per Service
Transformation PlanTransformation PlanTransformation PlanTransformation PlanTransformation PlanTransformation PlanTransformation PlanTransformation Plan09/1009/10 10/1110/11
New UnitNew UnitDoris Doris
GoodwinGoodwin
MDR UnitMDR Unit
RevitalisationRevitalisationEdendale Edendale
HospitalHospital
HospitalsHospitals
11/1211/1208/0908/09StatusStatusProjectProjectMunicipalityMunicipality
CHALLENGESCHALLENGESINFRASTRUCTRE DEVELOPMENTINFRASTRUCTRE DEVELOPMENT�� As per the previous slide we are dogged by delays in the processAs per the previous slide we are dogged by delays in the process of of
implementing and completing new infrastructure proposals. Projecimplementing and completing new infrastructure proposals. Projects ts have been delayed from the previous MTEF Period now to be have been delayed from the previous MTEF Period now to be completed in the next MTEF Period and in some cases beyond that.completed in the next MTEF Period and in some cases beyond that.
�� Contractor capacity, Financial constraints and skill shortages pContractor capacity, Financial constraints and skill shortages play a lay a major role in delaying these projects.major role in delaying these projects.
�� NxamalalaNxamalala and and MhlahlutshiniMhlahlutshini has not progressed at all in 2007 due has not progressed at all in 2007 due the above problems.the above problems.
COMMUNICATIONSCOMMUNICATIONS�� NxamalalaNxamalala Clinic in Impendle and Clinic in Impendle and NdaleniNdaleni Clinic are affected Clinic are affected
adversely by the theft of copper wire which renders their telephadversely by the theft of copper wire which renders their telephones ones and faxes useless.and faxes useless.
�� The road linking Bruntville township to Bruntville CHC in MpofanThe road linking Bruntville township to Bruntville CHC in Mpofana a has a unhas a un--tarred gap which renders this road impassable during tarred gap which renders this road impassable during adverse weather conditions.adverse weather conditions.
258
CHALLENGES CHALLENGES WATER QUALITY AND SUPPLYWATER QUALITY AND SUPPLY
�� The uMgungundlovu District has the highest incidence of incidencThe uMgungundlovu District has the highest incidence of incidence of e of DiaohhrealDiaohhrealdiseases in the Country (06/07 DHB)diseases in the Country (06/07 DHB)
�� The pollution levels in the The pollution levels in the uMsunduzi RiveruMsunduzi River are a cause for concern as many are a cause for concern as many informal communities along the banks of the river use this as a informal communities along the banks of the river use this as a water source and water source and a large number of these can only access health care at PHC clinia large number of these can only access health care at PHC clinics which supply cs which supply this datathis data
�� The supply of water at Appelsbosch Hospital and to the surroundiThe supply of water at Appelsbosch Hospital and to the surrounding community ng community is a cause for concern as there are frequent reports of “purifieis a cause for concern as there are frequent reports of “purified” water running d” water running out at the dam due to the lack of chemicals available to make thout at the dam due to the lack of chemicals available to make the water potablee water potable
SANITATIONSANITATION
�� The building of sanitation units in households is ongoing but coThe building of sanitation units in households is ongoing but completion has been mpletion has been affected by lack of sufficient funds.affected by lack of sufficient funds.
�� Staff shortages. Resignations and deaths have affected essentialStaff shortages. Resignations and deaths have affected essential coverage and coverage and inspection of these units and household adherence to correct utiinspection of these units and household adherence to correct utilisation of these lisation of these units.units.
HIV and TB PREVALENCEHIV and TB PREVALENCE
�� 44% 44% -- second highest in the country behind second highest in the country behind AmajubaAmajuba District.District.
�� VCT Testing of Catchment Population is low at 2%.VCT Testing of Catchment Population is low at 2%.
�� TB Crisis District which requires input from all sectors to ensuTB Crisis District which requires input from all sectors to ensure that population is re that population is well aware of the prevention and treatment of TB conditions.well aware of the prevention and treatment of TB conditions.
259
SECTION F.
IMPLEMENTATION PLAN
260
MIG - 3 Year Capital Plan 2008/2009 - 2010/2011
2008/2009 2009/2010 2010/2011
Agent Project Title Annual Value Annual Value Annual Value
DC22 - Umgungundlovu DC Solid Waste MP Implementation 2,753,563.93 0.00
Total Total 2,753,563.93 0.00 0.00
2008/2009 Financial Year MIG
FINANCIAL YEAR 2008/2009 2009/2010 2010/2011
Agent Project Title Annual Value Annual Value Annual Value
DC22 - Umgungundlovu DC Richmond: Hopewell Storm water Rehabilation 185,277.00
DC22 - Umgungundlovu DC Swayimane wards 6 & 9 0.00 4,832,751.19
DC22 - Umgungundlovu DC Swayimane wards 10 0.00 4,438,522.19
DC22 - Umgungundlovu DC Swayimane ward 11 0.00 3,648,994.94
DC22 - Umgungundlovu DC Stoffelton ward 1 0.00 1,702,539.69
DC22 - Umgungundlovu DC Emakholweni ward 5 250,000.00 3,846,388.44
DC22 - Umgungundlovu DC Ndaleni ward 3 & 6 250,000.00 5,407,761.59
DC22 - Umgungundlovu DC Magoda ward 2 250,000.00 3,857,824.19
DC22 - Umgungundlovu DC Mvoti Slopes Sanitation 274,998.19 1,580,636.26
DC22 - Umgungundlovu DC Greater Eston Water Supply 21,084,581.51 45,605,579.49
Embuthweni 1 (bulk pipeline & reserviours) 8,000,000.00
Embuthweni 2 (reticulation) 7,300,000.00
Inhlazuka 1 (bulk pipeline & reserviours) 7,650,000.00
Inhlazuka 2 (Reticulation) 9,964,723.00
Bulk Design 0.00
DC22 - Umgungundlovu DC Rehabilitation of D1017 0.00 6,281,032.64
DC22 - Umgungundlovu DC Rehabilitation of D1130 0.00 5,264,385.42
DC22 - Umgungundlovu DC Mooiriver Village Roads 0.00 3,793,325.32
DC22 - Umgungundlovu DC Enguga,Entshayabantu & Macksam Water Supply
Enguga- Phase 1 - (Reservoir, treatment works, rising main & Ret) 6,800,000.00
261
Enshayabantu- Phase 2 (Bulk pipeline, reservoir, ret) 9,925,000.00
Macksam- Phase 2 (Bulk pipeline, reservoir, ret) 8,292,316.02
DC22 - Umgungundlovu DC KwaNovuka Water Supply 3,794,464.50
Kwa Gqugquma Water 1,220,640.58
Ntanzi Water 923,128.55
DC22 - Umgungundlovu DC Inhlazuka Sanitation 4,990,136.52
TOTAL 70,070,684.36 50,400,000.00 60,944,322.87
TOTAL FOR THE YEAR 72,824,248.29 50,400,000.00 60,944,322.87
262
SECTION G.
PROJECTS
263
MIG / INTERNALLY FUNDED
WATER PROJECT NAME FUNDING
SOURCE REQUIRED BUDGET (2008/09)
ALLOCATED BUDGET (2008/09)
Embuthweni 1( bulk pipeline & resevouir) MIG 8 000 000.00 8 000 000.00
Embuthweni 2 ( rerticulation) MIG 7 300 000.00 7 300 000.00
iNhlazuka 1( bulk pipeline) MIG 7 650 000.00 7 650 000.00
iNhlazuka 2 (rerticulation) MIG 9 964 000.00 9 964 000.00
Enguga Phase 1( reservoir, treatment works, rising main & rerticulation)
MIG 6 800 000.00 6 800 000.00
ENtshayabantu Phase 2 ( bulk pipeline, reservoir, ret) MIG 9 925 000.00 9 925 000.00
Macksam phase 2 ( bulk pipeline, reservoir, ret) MIG 8 292 316.00 8 292 316.00
KwaNovuka Water Supply
MIG
3 794 465.00
3 794 465.00
Kwa Gqugquma Water MIG 1 220 641.00 1 220 641.00 Ntanzi Water Supply
MIG
1 502 464.00 1 502 464.00
264
SANITATION
PROJECT NAME FUNDING
SOURCE REQUIRED BUDGET (2008/09)
ALLOCATED BUDGET (2008/09)
Emakholweni 5 MIG 829 333.00 829 333.00
Ndaleni 3 & 6
MIG 829 333.00
829 333.00
Magoda
MIG 829 333.00
829 333.00
Mvotislopes
MIG 854 331.00
854 331.00
Inhlazuka
MIG 4,990,136.52
4,990,136.52
SPORTS AND RECREATION
PROJECT NAME FUNDING SOURCE REQUIRED
BUDGET (2008/09)
ALLOCATED BUDGET (2008/09)
Empolweni Sportsfields Dept Sports and Recreation
1 800 000.00 1 800 000.00
265
PROJECT NAME FUNDING SOURCE REQUIRED BUDGET (2008/09)
ALLOCATED BUDGET (2008/09)
Dales Athletic Track Dept Sports and Recreation
2 000 000.00 2 000 000.00
PROJECT NAME FUNDING SOURCE
REQUIRED BUDGET (2008/09)
ALLOCATED BUDGET (2008/09)
Backlog In Clinics Water And Sanitation DWAF 2 524 000.00 2 542 000.00
ELECTRIFICATION PROJECT NAME FUNDING
SOURCE REQUIRED BUDGET (2008/09)
ALLOCATED BUDGET (2008/09)
Schools Electrification Programme 800 000.00 800 000.00
CEMETERIES AND CREMATORIA PROJECT NAME FUNDING
SOURCE REQUIRED BUDGET (2008/09)
ALLOCATED BUDGET (2008/09)
Mpofana Cemetery Fencing
MIG 400 000.00 400 000.00
SOLID WASTE PROJECT NAME FUNDING
SOURCE REQUIRED BUDGET (2008/09)
ALLOCATED BUDGET (2008/09)
UMDM Solid Waste Master Plan MIG 2 753 564.00 2 753 564.00
266
PARTIALLY FUNDED PROJECTS
HIV/AIDS No. Project Name Funding Source Required Budget Allocated Budget Project Start Date
1. DAC – Establishment, Development and Launch.
INT
ER
NA
L
FU
ND
ING
R 300 000.00
R275 0
00
July 2008
2. LAC’s – Establishment, Development and Launch.
R 200 000.00 August 2008
3. HIV/AIDS District Wide Strategic Plan.
R 800 000.00 July 2008
4. Launch of an HIV/AIDS Strategic Plan.
R 250 000.00 1st December 2008
5. District HIV/AIDS Summit. R 500 000.00 1st June 2009
YOUTH DEVELOPMENT
No. Project Name Funding Source Required Budget Allocated Budget Project Start Date
1. Establishment of Youth Forum
INT
ER
NA
L
FU
ND
ING
R50 000
R350 0
00
2. Facilitate Youth Entrepreneurship development Input into the Supply Chain Management Policy Review
R 50 000
3. Youth summit in tourism
R45000 000
267
TOURISM
PROJECT NAME
FUNDING SOURCE REQUIRED BUDGET
(2008/09)
ALLOCATED BUDGET (2008/09)
START DATE
Manage/monitor the development of the website
INT
ER
NA
L F
UN
DIN
G
400 000
R750 0
00
Statistics of tourists visiting our region, list of graded and registered products within the district and statistics.
500 000
Feasibility study 150 000
Meet with relevant stakeholders 0.00
Investigate product development 800 000
Cooperation with local municipalities and other stakeholders 0.00
Investigate the type of events the district could be involved in 500 000
268
SPECIAL PROGRAMMES
No. Project Name Funding Source Required Budget Allocated Budget
1. INTERFAITH &TRADITIONAL AFFAIRS
INT
ER
NA
L F
UN
DIN
G 300 000.00 271 013.00
2. INTER-GOVERNMENTAL RELATIONS
500 000.00 325 000.00
3. COMMUNICIATION 5 000 000.00 225 000.00 4. POVERTY ALLEVIATION 750 000.00 5. SPORTS & CULTURE
PROMOTION 700 000.00
6. SPORTS AND RECREATION PROMOTION
200 000.00 700 000.00
269
UNFUNDED PROJECTS
TECHNICAL DEPARTMENT
PROJECT NAME REQUIRED BUDGET (2008/09)
Trust Feed Cemetery construction - retention payment
74 637.08
Construct new Cemetery for Mpofana Municipality ( budget allocated for fencing of the current cemetery)
886 522.73
Co fund construction of Cemetery Extension at Mpophomeni Cemeteries
500 000.00
Roads upgrade - Umsunduzi Municipality Cemetery 1 743 265.00
Fencing at Impendle Municipality 92 950.00
Bulk - Embo Thumini
1 300 000.00
Review of ESDP 340 000.00
270
PROJECT NAME REQUIRED BUDGET (2008/09)
Increase in cost of Loteni electrical 260 000.00
Construction of D1017
3,771,052.00
Construction of D1130
5,332,441.00
Mooi River Village roads 0.00
Mooi River Taxi Rank 7,179,465.00
Upgrading roads in Nxamalala 3,811,410.00
Upgrading roads in Basotho 0.00
Upgrading Embo Thumini roads 0.00
Hopewell roads and stormwater 820,604.00
Construct Perimeter Road -New England Road Landfill Site
950,000.00
271
PROJECT NAME REQUIRED BUDGET (2008/09)
Landfill Operators Training and Mentoring Project
100,000.00
External Audits of Landfill Sites 400,000.00
Improving Equipment on Landfill Sites 1,800,000.00
Develop uMshwathi Landfill Site
Close Hilton Landfill Site 1,500,000.00
Leachate Study - New England Road 11,400.00
Airspace Study - New England Road Landfill Site 20,000.00
Refuse Collection Projects 0.00
IWMP Review 800,000.00
Airspace and State of Leachate at the uMngeni Landfill Site 30,000.00
272
PROJECT NAME REQUIRED BUDGET (2008/09)
Development of a District Landfill Site 600,000.00
Installation of Weighbridges and Software on Landfill Sites 550,000.00
Construction of Offices on Currys Post Landfill Site 350,000.00
Feasibility into the development of Hazardous Cell on the New District Landfill Site
200,000.00
Closure of Mpofana Landfill Site and Construction of Waste Transfer Station
800,000.00
Transfer of Waste Disposal Function to the UMDM from LM's. 300,000.00
273
TOWN AND REGIONAL PLANNING
PROJECT NAME REQUIRED BUDGET (2008/09)
Ensuring all developments or activities are inline with the District SDF.
None
District Intergrated Environmental Management Plan. Create awareness programes fro protection of the environment.
450.000.00
Facilitation and coordination of housing development throughout the District Municipality.
450.000.00
Land reform R 100 000
District Wide land and infrastructure audit None
Systems Rollout
R 100 000
Data Management
None
Systems Support & Improvements
R 100 000
GIS Products Support
R 25 000
Database Management
R 75 000
Project Management & Costing
None
274
SOCIAL SERVICES
PROJECT NAME REQUIRED
BUDGET (2008/09)
Transfer of environmental health staff and service from the KZN Province and the Local Municipalities
R10 000 000
FIRE FIGHTING
PROJECT NAME REQUIRED
BUDGET (2008/09)
Training of all fire fighters R 600 000
Build Impendle Fire Station 1.5 million
Fire Safety Awareness Campaign R 200 000
Staff recruitment 6 million
Enhance response time Nil
275
LOCAL ECONOMIC DEVELOPMENT
PROJECT/ PROGRAMME NAME REQUIRED
BUDGET (2008/09)
Completion and Adoption of the Comprehensive District-Wide LED Strategic Plan and read for implementation
N/A
By July 2008, have begun implementation of some of the projects as contained in the LED Strategy with appropriate partners.
N/A
Resource Mobilization activities
N/A
Completion and adoption of a total of seven District-aligned local municipalities LED Strategic Plans
N/A
Develop a roster of all government owned land, buildings and other assets for each LM by mid 2009. This includes comments on state of repair as well as potential uses and broad cost of rehabilitation where necessary
N/A
In partnership with relevant partners Review road, rail, water, energy and telecommunications infrastructure in the light of each target sector requirements and needs.
N/A
Compilation of the UMDM SMME Database
300, 000
Establish and Operate the UMDM SMME Stakeholder Forum
100, 000
276
PROJECT/ PROGRAMME NAME REQUIRED
BUDGET (2008/09)
Conduct Seven SMME Entrepreneurship Workshops/Campaigns within UMDM
400, 000
Hold a District-Wide SMME Fair
400, 000
Sponsor at Least Four SMMEs/Cooperatives to participate in Exhibitions and Shows
200, 000
Undertake SMME Opportunities Study offered by N3 Highway
100, 000
Facilitate Access to Finance by SMMEs in partnership with Ithala and other financial institutions.
Facilitation
Develop a package for SMMEs in each target sector
Facilitation
With the CSIR in partnership assess the feasibility of setting up internet and digital communication centres combined with SMME service centres in a one stop shop by mid 2009
Facilitation
Facilitate access to various business development services in partnership with various roleplayers including KZNDED, FET Colleges, SEDA, LMs, etc…on an ongoing basis.
Facilitation
Facilitate the Development and implementation of SEDA One-Stop-Shop Centre
Facilitation
Feasibility Study of Mkhambathini Business Hub with Cubic Stalls
100, 000
277
PROJECT/ PROGRAMME NAME REQUIRED
BUDGET (2008/09)
Establish Business Information Centres in two Local Municipalities
200, 000
Develop and Maintain a District-Wide Informal Economy Database
100, 000
Facilitate access to Business Management and related Skills Training for the targeted informal Economy players (at least within two of the LMs)
200, 000
Provision of Business Incubation
Development of Informal Economy By-Laws (Impendle, Mpofana, uMshwathi & Mkhambathini)
150, 000
Development of a manufacturing Sector Plan
150, 000
Development of an Agriculture and Agro-processing Sector Plan 150, 000
Develop a Property Development Sector Plan (These plans should include employment and revenue targets as well as exact incentive packages and a cost benefit and break even analysis of incentive versus expected gains..)
150, 000
Review annually achievements against targets. N/A
278
PROJECT/ PROGRAMME NAME REQUIRED
BUDGET (2008/09)
Development of a Services Sector Plan
Facilitate the establishment of the UMDM Investment Unit 154, 000
Facilitate Investment promotion and Marketing in partnership with sector players
260, 400
Conduct Market research and Business Opportunity Development 600, 000
Create a series of inward fact finding missions for target sectors by end 2008. By mid 2008 have identified sites and correct incentive packages for target sectors
N/A
Annual business survey by target sector and LM to identify business needs
N/A
Action research in focus groups in partnership with UKZN each sector annually. Begin immediately
N/A
Establish the District-Wide LED Multi-Stakeholder Forum / Structure
100, 000
Develop a clear LED Communication Strategy / Guiding Document linked to the municipal master communication Plan
N/A
279
PROJECT/ PROGRAMME NAME REQUIRED
BUDGET (2008/09)
Set up task teams of action oriented decision makers for each of the target sector
N/A
FINANCE: INCOME
PROJECT/ PROGRAMME NAME REQUIRED
BUDGET (2008/09)
Implement a new billing system 250 000
Calculating new tariff for new services
N/A
Engage in discussions with LM perfuming district function
N/A
280
OFFICE OF THE MUNICIPAL MANAGER: PERFORMANCE MANAGEMENT
PROJECT/ PROGRAMME NAME REQUIRED
BUDGET (2008/09)
Performance Management Divided into the following activities
1010,000
Review Policy Framework
Develop and submit Organisational scorecards (SDBIPs)
Coordinate the submission of performance reports, including: Monthly , Quarterly and Annual reports
Review and submit Performance Agreements for Section 57 employees
Review Individual Performance Plans of all Managers
Provide advice and support during the appraisal of Managers
Develop Organisational Performance Management Systems
Develop Individual Performance Management Systems
281
PROJECT/ PROGRAMME NAME REQUIRED
BUDGET (2008/09)
Provide advice and support on PM related matters
Conduct research
Develop Policy Document
Develop Process Plan setting out assessment criteria and process to be followed
Administer the assessment and judging process
Facilitate the development of trophies
Arrange a prestigious awards ceremony
282
OFFICE OF THE MUNICIPAL MANAGER: INTERNAL AUDIT
PROJECT/ PROGRAMME NAME REQUIRED
BUDGET (2008/09)
Audit assignments as per approved Internal Audit Plan NIL
Development of Risk Management policy
NIL
Advertise the fraud hotline number.
Development of Fraud Policy
NIL
Awareness Campaigns
NIL
Quarterly audit of PMS NIL
283
OFFICE OF THE MUNICIPAL MANAGER: SPECIAL PROGRAMMES No. Project Name Funding Source Required Budget Allocated Budget Project Start Date
1. ELDERLY PERSONS
R300 000.00 - 2. PUBLIC PARTICIPATION R500 000.00 - 3. GENDER EQUITY R300,000.00
-
OFFICE ON THE RIGHT OF A CHILD (ORC)
No. Project/Programme Name
Funding Source
Required Budget Allocated Budget Project Start Date
1. Programme: ORC Mainstreaming Workshops
uMDM R 100 000.00 NIL 2008/09 Financial Year.
2. Project: Children’s Rights Advisory Council
uMDM R 300 000.00 NIL September 2008
3. Project: Launch of a Children’s Rights Advisory Council.
uMDM R 150 000.00 NIL November 2008
4. Programme: ORC Key National Events
uMDM R 100 000.00 NIL 2008/09 Financial Year.
284
SECTION H.
FINANCIAL PLAN & SDBIPS
DOCUMENT AVAILABLE SEPARATE AS ANNEXURE A
285
SECTION I.
ORGANISATIONAL PERFORMANCE MANAGEMENT
DOCUMENT AVAILABLE SEPARATE AS ANNEXURE B
286
SECTION J.
LIST OF ANNEXURES ANNEXURE A: FINANCIAL PLAN AND SDBIPS
ANNEXURE B: ORGANISATIONAL PERFORMANCE MANAGEMENT
ANNEXURE C: SPATIAL DEVELOPMENT FRAMEWORK
ANNEXURE D: DISASTER MANAGEMENT PLAN
287
SECTION K.
APPENDICES
288
Status of Sector Plans Document Title
Status
Cemeteries and Crematoria Plan Adopted Integrated Waste Management Plan Adopted Integrated Electrification Plan Adopted Public Transport Plan Adopted Northdale/Edendale Public Transport Corridor Study Work in progress Integrated Environmental Management Plan Adopted
Water Services Development Plan Adopted ( in the process of being reviewed)
uMgungundlovu Spatial Development Framework (Reviewed)
Adopted
uMgungundlovu District Land Use Management Framework: Adopted
National Dept of Land Affairs SDF Checklist (See also the Project Brief which incorporates these guidelines)
Guideline Document
Land Affairs Area Based Plan To be completed in 2008 uMgungundlovu District-Wide LED Strategy Adopted
uMgungundlovu Tourism Strategy Adopted