final enquiry for soil resitivity of substation

4

Click here to load reader

Upload: anonymous-ufmagxcskm

Post on 21-Jul-2016

217 views

Category:

Documents


3 download

DESCRIPTION

Soil

TRANSCRIPT

Page 1: Final Enquiry for Soil Resitivity of Substation

IRCON INTERNATIONAL LIMITEDCivil, Mechanical, Electrical, Communications and Turnkey Contractors

(A Government of India Undertaking)

Project Office House No.772, P.O.Box-1681, Code 1250, Bole Sub-city, Kebele-01, (Near Zimbawe’s Ambassador Residence),

Addis Ababa, Tel : 00251-11-6188457, Fax: 00251-11-6180406, E-mail : [email protected]

No.IRCON/9033/Elect/EEPC0/Lot2/Camp Addis/23 Date 1st December 2008

M/s……………………………………..……………………………………………………………………………………………….

Sub : Supply of Substation Equipment, EAEP 10/99 -lot 2 : Enquiry for Soil Resitvity Measurement at Existing EEPCO Substations.

Dear Sir

1.0 Ircon International Limited (IRCON), A Government of India Undertaking hereby invites tender quotations for carrying soil resitivity measurement of substations as per following scope of works and terms and condition.

2.0 SCOPE OF WORK

2.1 The scope covers all the work required for measurement of electrical resistivity of soil and submission of report for 8 nos. of substation which are detailed below.

2.2 The scope includes mobilization of soil resitivity measuring instrument to the respective site and associated equipment, providing necessary engineering supervision and technical personnel skilled and unskilled labour etc. as required to carry out complete measurement of soil resitivity at respective locations.

2.3 The agency required to quote unit rate for each substation for carrying out above scope of work.

2.4 The agency should have a valid calibration certificate of the instrument proposed to be used for measurement of electrical resitivity of soil.

2.5 IRCON reserves the right to carry out the soil resitivity measurement at all locations or any number location/locations without assigning any reason thereof.

Regd. Office: C-4, District Center, Saket, New Delhi-110017 Ph+91-11-29565666 Fax +91-11-26522000, E-Mail: [email protected]

3.0 LOCATION OF SUBSTATION

Sl. No. Location of Substation Distance from Addis Ababa

1. Assela 132/33/15 kV Substation 177

Page 2: Final Enquiry for Soil Resitivity of Substation

2. Adamitulu 132/33/15 kV Substation

170

3. Shashamane 132/33/15 kV Substation

250

4. Wolayta sodo 132/33/15 kV Substation

380

5. Hosaina 132/33/15 kV Substation 215

6. Hormat 132/33 kV Substation 138

7. Melka wakena 132/33/15 kV Substation

277

8. Gedo 132/33/15 kV Substation 195

4.0 ELECTRICAL RESISTIVITY TEST

4.1 This test shall be conducted to determine the Electrical resistivity of soil required for designing safety-grounding system for the entire bay extension area.

4.2 The specifications for the equipments and other accessories required for performing electrical resistivity test, the test procedure, and reporting of field observations shall confirm latest standards and shall be conducted using Wagner's four electrodes method. Unless otherwise specified at each test location, the test shall be conducted along two perpendicular lines parallel to the coordinate axis on each line a minimum of 5 to 8 readings shall be taken by changing the spacing of the electrodes from an intial small value of 1.0m upto a distance of 20.0m.

5.0 Terms and Conditions

5.1 The validity of offer shall be 30 days from the date of opening of offer.

5.2 The price quoted shall include carrying out the above scope of work and also includes accommodation, food and other expenses to it personnel required for executing the scope of work.

5.3 The quoted rates shall be inclusive of all taxes and duties as applicable.

5.4 No Advance payment will be paid, 100 % payment shall be done against the invoice through cheque payment.

5.5 IRCON will provide the transportation facility from Addis to the substation location to the personal required for carrying out soil resitivity test.

6.0 QUOTATIONS

6.1 You are requested to quote your most competitive rates as per the following

Page 3: Final Enquiry for Soil Resitivity of Substation

Sl. No.

Description Unit

Quantity

Unit Rate in

Ethiopian Birr

Total Amount

1. Cost of carrying out measurement of electrical resistivity of soil and submission of report for each substations including mobilization of soil resitivity measuring instrument to the respective site and providing necessary skilled and unskilled labour etc as per scope and terms and conditions mentioned above.

LS 8 Location

s

Sub TotalVATGrand Total

Yours faithfullyFor and on behalf of IRCON International Limited

(Sanjay Nayak)DGM/Electrical