    School & Mass Education Department, Government of OdishaState Project Management Unit (MDM)

    Request for ProposalSoftware Development, Implementation, Training & IT Project ManagementUnit for SMS Based Monitoring System through Web Application Software forsmooth & timely monitoring of Mid Day Meal (MDM) Scheme in Odisha.

  • 7/29/2019 Final Mdm Rfp

    2/47

    2

    NOTICE INVITING TENDER

    School & Mass Education Department, Government of Odisha

    State Project Management Unit (MDM)SRC Building, 1st Floor, Unit-V, Bhubaneswar, 751001

    RFP Tender Notice No. 01 / 2013 Dated: 19 / 01 / 2013

    Sealed Tenders are invited for selection of implementing agency for Software

    Development, Implementation, Training & IT Project Management Unit initially for

    period of one year for SMS Based Monitoring System through Web Application

    Software for smooth & timely monitoring of Mid Day Meal (MDM) Scheme in Odisha.

    Sl# Items Date & Time

    1Availability of Bid Document in Websitewww.opepa.in/www.odisha.gov.in

    From - 21 / 01 / 2013To 05 / 02 / 2013 up to

    03.00 PM

    2Last date of receipt of Bids(Through Speed Post /Registered post/Courier only. No dropbox facility available)

    05 / 02 / 2013 up to 03.00 PM

    3 Opening of General Bid 11 / 02 / 2013 at 11.00 AM

    4 Opening of Technical Bid 11 / 02 / 2013 at 11.00 AM

    4 Opening of Commercial Bid 14 / 02 / 2013 at 03.00 PM

    The tender document can be availed from the Authority by paying Rs. 10,000/- in

    shape of Bank Draft drawn in favour of State Nodal Officer, MDM, Odisha, payable

    at Bhubaneswar before the due date as mentioned above. However, the tenderdocument is also downloadable from the websitewww.opepa.in/www.odisha.gov.in.

    However, the cost of tender document is required to be deposited in the shape of

    Bank Draft (only) along with the bid, failing which the bid shall not be accepted.

    No consortium bidding is allowed.

    http://www.opepa.in/http://www.opepa.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.opepa.in/http://www.opepa.in/http://www.opepa.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.opepa.in/http://www.odisha.gov.in/http://www.opepa.in/
  • 7/29/2019 Final Mdm Rfp

    3/47

    3

    DISCLAIMER

    All information contained in this Request for Proposal (RFP) is in good interest and faith.

    This is not an agreement and is not an offer or invitation to enter into an agreement of any

    kind with any party.

    Adequate care has been taken in the preparation of this RFP document, the interested firms

    shall satisfy itself that the document is complete in all respects. The information is not

    intended to be exhaustive. Interested Bidders are required to make their own enquiries and

    assumptions wherever required. Intimation of discrepancy, if any, should be given to the

    specified office immediately. If no intimation is received by this office by the date mentioned

    in the document, it shall be deemed that the RFP document is complete in all respects and

    firms submitting their bids are satisfied that the RFP Document is complete in all respects.

    Government of Odisha reserves the right to reject any or all of the applications submitted in

    response to this RFP document at any stage without assigning any reason whatsoever.

    Government of Odisha also reserves the right to withhold or withdraw the process at any

    stage with intimation to all who submitted the RFP application.

    Government of Odisha reserves the right to change / modify / amend any or all of the

    provisions of this RFP document. Such changes would be posted on the websitewww.opepa.in/www.odisha.gov.in.

    Neither Government of Odisha nor their employees and associates will have any

    liability to any prospective respondent interested to apply or any other person under the law

    of contract, to, the principles of restitution or unjust enrichment or otherwise for any loss,

    expense or damage which may arise from or be incurred or suffered in connection with

    anything contained in this RFP document, any matter deemed to form part of this RFP

    document, the award of the assignment, the information and any other information supplied

    by or on behalf of Government of Odisha or their employees and bidder or otherwise arising

    in any way from the selection process for the assignment.

    Information provided in this document or imparted to any respondent as part of the RFP

    process is confidential to Government of Odisha and shall not be used by the respondent for

    any other purpose, distributed to, or shared with any other person or organization.

    http://www.opepa.in/http://www.opepa.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.opepa.in/
  • 7/29/2019 Final Mdm Rfp

    4/47

    4

    TABLE OF CONTENTS

    1 INTRODUCTION ............................................................................................................. 71.1 ABOUT MDM ................................................................................................................. 71.2 OVERVIEW ..................................................................................................................... 81.3 OBJECTIVE .................................................................................................................... 92 INVITATION TO PROPOSAL ....................................................................................... 102.1 DUE DILIGENCE ........................................................................................................... 102.2 COST OF BIDDING ........................................................................................................ 102.3 AMENDMENT OF TENDER DOCUMENT ............................................................................ 102.4 COST OF THE RFPDOCUMENT ..................................................................................... 102.5 SITE VISIT (S) ............................................................................................................... 103 INSTRUCTIONS TO BIDDERS ..................................................................................... 113.1 INTRODUCTION............................................................................................................. 113.2 SCOPE OF PROPOSAL .................................................................................................. 113.3 FORMAT &SIGNING...................................................................................................... 113.4 SUBMISSION OF RFP-PACKING,SEALING AND MARKING .............................................. 113.5 NUMBER OF PROPOSALS.............................................................................................. 123.6 LANGUAGE OF BID ....................................................................................................... 123.7 CONFLICT OF INTEREST ................................................................................................ 123.8 VALIDITY OF PROPOSALS ............................................................................................. 123.9 RIGHT TO ACCEPT PROPOSAL....................................................................................... 123.10 PROPOSAL DUE DATE ................................................................................................ 123.11 LATE SUBMISSION...................................................................................................... 123.12 MODIFICATIONS /WITHDRAWAL .................................................................................. 133.13 BID OPENING ............................................................................................................. 133.14 FRAUD &CORRUPTION............................................................................................... 133.15 AMENDMENTS ............................................................................................................ 133.16 CLARIFICATIONS ........................................................................................................ 143.17 REJECTION OF BID ..................................................................................................... 143.18 AUTHENTICATION OF BID ............................................................................................ 143.19 CONTACT DETAILS ..................................................................................................... 143.20 ACKNOWLEDGEMENT BY THE BIDDER ......................................................................... 143.21 EARNEST MONEY DEPOSIT (EMD) .............................................................................. 153.22 FORFEITURE OF EMD ................................................................................................. 153.23 EXTENSION OF PERIOD OF VALIDITY............................................................................ 153.24 VALIDATION OF INTERLINEATIONS IN BID ..................................................................... 163.25 ANNOUNCEMENT OF BIDS ........................................................................................... 163.26 CLARIFICATION OF BIDS ............................................................................................. 163.27 COMPLETENESS OF BIDS............................................................................................ 163.28 RECTIFICATION OF ERRORS ........................................................................................ 163.29 NOTIFICATION TO BIDDER ........................................................................................... 163.30 SIGNING OF CONTRACT .............................................................................................. 173.31 EXPENSES FOR THE CONTRACT .................................................................................. 173.32 FAILURE TO ABIDE BY THE CONTRACT......................................................................... 173.33 PERIOD FOR FURNISHING PERFORMANCE GUARANTEE ................................................ 17

  • 7/29/2019 Final Mdm Rfp

    5/47

    5

    3.34 ANNULMENT OF AWARD ............................................................................................. 173.35 DISQUALIFICATIONS ................................................................................................... 184 BIDDING PROCEDURE & EVALUATION .................................................................... 184.1 PRELIMINARY SCRUTINY............................................................................................... 185 SCOPE OF WORK ........................................................................................................ 195.1 PROPOSED SOLUTIONS ................................................................................................ 195.2 SOLUTION ARCHITECTURE............................................................................................ 205.3 IMPLEMENTATION APPROACH &METHODOLOGY............................................................ 215.4 ONLINE MONITORING APPLICATION............................................................................... 215.5 MISREPORTS.............................................................................................................. 225.6 IMPLEMENTATION &TRAINING ...................................................................................... 235.7 TRANSPARENCY PORTAL ............................................................................................. 245.8 INTEGRATION ............................................................................................................... 245.9 CALL CENTER.............................................................................................................. 245.10 ITPROJECT MANAGEMENT UNIT................................................................................. 245.11 INFRASTRUCTURE CONSULTANCY ............................................................................... 276 GENERAL BID .............................................................................................................. 287 TECHNICAL BID........................................................................................................... 308 COMMERCIAL BID ....................................................................................................... 319 BIDDING PROCEDURE & EVALUATION .................................................................... 329.1 PRELIMINARY SCRUTINY............................................................................................... 329.2 TECHNICAL EVALUATION (TOTAL MARKS100) ........................................................... 3210 GENERAL TERMS & CONDITIONS ........................................................................... 3310.1 RELATIONSHIP BETWEEN THE PARTIES........................................................................ 3310.2 STANDARDS OF PERFORMANCE .................................................................................. 3310.3 DELIVERY AND DOCUMENTS ....................................................................................... 3310.4 INTELLECTUAL PROPERTY RIGHTS .............................................................................. 3310.5 ASSIGNMENT ............................................................................................................. 3410.6 SUSPENSION.............................................................................................................. 3410.7 TERMINATION............................................................................................................. 3410.8 TAXES AND DUTIES .................................................................................................... 3410.9 LEGAL JURISDICTION ................................................................................................. 3410.10 NOTICE.................................................................................................................... 3410.11 LIMITATIONS OF LIABILITIES...................................................................................... 3510.12 PROGRESS OF THE ASSIGNMENTS............................................................................. 3510.13 MISCELLANEOUS...................................................................................................... 3511 PROFORMA & ANNEXURE ....................................................................................... 36

  • 7/29/2019 Final Mdm Rfp

    6/47

    6

    11.1 ANNEXURE-G1(GENERAL BID LETTER) ...................................................................... 3611.2 ANNEXURE-G2(BIDDER COMPANY PROFILE) .............................................................. 3811.3 ANNEXURE-G3(STATE OF DEVIATIONTERMS &CONDITIONS) ................................... 3912 PERFORMA & ANNEXURE ....................................................................................... 4012.1 ANNEXURE-T1(TECHNICAL BID LETTER) .................................................................... 4012.2 ANNEXURE-T2(BIDDER COMPANY PROFILE) ............................................................... 4212.3 ANNEXURE-T3(BIDDER PROJECT PROFILE) ................................................................ 4312.4 ANNEXURE-T4(STATE OF DEVIATIONSCOPE OF WORK) ........................................... 4412.5 ANNEXURE-C1(BIDDER COMPANY PROFILE) .............................................................. 4512.6 ANNEXURE-C2(COMMERCIAL DEVIATION) .................................................................. 4612.7 ANNEXURE-C3(PRICE SCHEDULE) ............................................................................. 47

  • 7/29/2019 Final Mdm Rfp

    7/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Introduction 7

    1 Introduction

    1.1 About MDMSchool & Mass Education Department was established as a separate Department in

    January 1993, to look into the issues pertaining to Elementary Education, Secondary

    Education, Teachers Training, and Mass Education in the State. The provision of

    funds for the development of these sectors is being made every year keeping in view

    to the availability of State resources for Education sector and other assistance.

    The State Government is committed to the Universalisation of Elementary Education

    in the State with the aim of fulfilling the constitutional obligation with the assistance of

    Central Government. Keeping in view the need for Universalisation of Elementary

    Education, there has been expansion of Schools at Primary and Upper Primary stageof education, in the Government sector, especially in rural areas as well as backward

    areas.

    Mid Day Meal Scheme in Odisha, formerly implemented by the Department of

    Women & Child Development was transferred to the Department of School & Mass

    Education (S&ME) in August, 2011. However, the central assistance is still released

    to S&ME through Department of Women and Child Development because the

    Demand for Grants 2011-12 were passed in favor of DWCD. The Demands for

    Grants for 2012-13 would be presented by Department of School & Mass Education

    and the central assistance would be released directly to S&ME. As per the existing

    arrangements, State Finance Department releases funds to Director, Elementary

    Education who in turn releases them to the District Inspector of School (DIS). State

    Project & Monitoring Unit (SPMU) headed by State Nodal Officer is set-up for

    monitoring the implementation of this scheme from the State level. Odisha has 30

    districts and the scheme is implemented and monitored in each district by the HQ

    DIS. There are 75 education districts in the State; each headed by District Inspectorof Schools (DIS). Out of these 75 DISs, 30 DISs at each HQ are declared as Drawing

    & Disbursing Officers (DDOs) for the scheme. They are vested with the powers to

    release the MDM funds to Block Development Officers on the basis of number of

    schools/children in each block. The remaining 45 DIS are responsible for the

    implementation of the scheme in the school under their respective education districts

    and report the physical and financial progress of the scheme to the HQ DISs.

    There are 314 Blocks in the State and each block Development Officers look after

    the implementation of the scheme in the schools at block level. They are assisted by

    District Inspectors of Schools for assessing the fund requirement of each school and

  • 7/29/2019 Final Mdm Rfp

    8/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Introduction 8

    releasing it to the schools. As observed by the Central Review Mission, due to lack of

    proper organizational structure for monitoring at Directorate, District, Sub-district and

    school level, Mid Day Meal Scheme is not so effectively implemented till date. The

    Review Mission observed that there is a comprehensive and rigorous monitoring

    mechanism being followed in the State for monitoring of the all education Schemes

    through Samikshya under which 80 parameters of a school are monitored under

    SSA. The State Govt. has added 7 parameters for monitoring of Mid day meal

    scheme as follows.

    Regularity in serving meals and adherence of weekly menu.

    Availability of food grains.

    Availability of cooking cost.

    Proper storage of food grains and

    Payment of honorarium to cook-cum-helpers for the last month.

    Availability of kitchen shed.

    Availability of kitchen devices.

    The State Government is monitoring around 57,000 schools through Samikshya

    every month. The Review Mission recommends that one more parameter i.e.

    coverage of children may be included as it is an important indicator under Mid Day

    Meal Scheme.

    The Review Mission also observed that Online Management Information System

    (MIS) is not yet established in Odisha for capturing real time data on Mid Day Meal

    scheme. The data is compiled manually at district level and sub district level. Since

    Management Information System (with the intervention of IT) is an important

    management tool for monitoring the implementation of the scheme, the State should

    take necessary steps immediately for putting in place an effective MIS. If considered

    appropriate, the State may adopt MIS integrating with IVRS being developed by

    MHRD. The funds for this purpose may be utilized from MME funds allocated to the

    State.

    1.2 OverviewMid-Day-Meal Scheme was introduced in Odisha in 1995 for the children studying in

    Government, Government-aided and local body schools. The objective of this

    scheme is

    To improve the nutritional and health standard of the growing children.

    To reduce drop-out rate and to increase attendance and to attract poorer children to come

    to the school.

    To create supplementary employment opportunities at the village level

  • 7/29/2019 Final Mdm Rfp

    9/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Introduction 9

    To achieve social and national integration.

    To supplement state efforts towards removal of poverty

    Government provides rice to the schools on the basis of student strength reported by

    the School. The MDM in-charge teacher keeps the following records;

    Cash Book on fund released and expenditure

    Stock Register on available Rice and other items

    Daily consumption on no. of students provided mid day meal every day.

    Expenditure register fund spent per child.

    The Dal, Egg, Vegetable and Cooking items are purchased by MDM in-charge

    teacher in school from MDM fund and the transit register of expenses is maintainedon daily basis. In this register the MDM in-charge maintains the Name of school, No

    of student in class, No of student taking food in monthly basis, Balance, Received

    amount total amount, Expenditure and Balance and remarks. The Cooks description

    is also maintained by MDM in charge teacher. In this register the school name, No of

    Cook, initial amount, fund received, Total amount, Expenditure and balance is

    maintained. The monthly consolidated Report called Utilization certificate is sent to

    HQ DIs. The Quality of food provided to students under MDM scheme is strictly

    checked by the Head Master/Mistress (HM) and MDM in-charge teacher and the

    menu is pre-decided at the state level.

    1.3 ObjectiveThe existing process for data collection are manual and it is error prone as there are

    so much human intervention & inter dependencies. It is difficult to monitor &

    evaluation of its impact without an up-to-date reporting on daily basis like;

    Total beneficiaries for a day (attendance)vs- the consumption happened

    Attendancevs- enrollment

    Availability ofMDM materials for next day

    Fund receipt and utilization

    Payments to the Cook & Helper etc.

    Statutory compliance report

    Decision Support MIS as and when it required

    Also the delay in receiving reports from each and every school affects the

    consolidation time at sub-district/District/State level resulting for delay reporting and

    affects to prompt action towards deficiencies in the system.An IT integrated On-line monitoring system may solve the purpose better than the

    existing manual system to make the scheme effective in the state.

  • 7/29/2019 Final Mdm Rfp

    10/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Invitation to Proposal 10

    2 Invitation to Proposal

    2.1 Due Diligence

    The Bidder is expected to and shall be deemed to have examined all instructions,forms, terms and specifications and other information in this Tender Document. The

    bid should be precise, complete and in the prescribed format as per the requirement

    of the Tender Document. Failure to furnish all information required by the Tender

    Document or submission of a bid not responsive to the Tender Document in every

    respect will be at the Bidders risk and may result in rejection of the bid. The Authority

    shall at its sole discretion be entitled to determine the adequacy / sufficiency of

    the information provided by the Bidder

    2.2 Cost of BiddingThe Bidder will bear all costs associated with the preparation and submission of its

    bid and the Authority will in no event or circumstance be held responsible or liable for

    these costs, regardless of the conduct or outcome of the bidding process.

    2.3 Amendment of Tender DocumentAt any time before the deadline for submission of bids, the Authority may, for any

    reason, whether at its own initiative or in response to a clarification requested by a

    prospective Bidder, modify the Tender Document by amending, modifying and/or

    supplementing the same.

    Any amendments/modifications in the tender document would be displayed on the

    website www.opepa.in / www.odisha.gov.in and all such amendments shall be

    binding on the bidders without any further act or deed on the Authority part. In the

    event of any amendment, the Authority reserves the right to extend the deadline for

    the submission of the bids, in order to allow prospective Bidders reasonable time in

    which to take the amendment into account while preparing their bids.

    2.4 Cost of the RFP Document The cost of the tender document is Rs 10,000/-

    The RFP document can be downloaded fromwww.opepa.in/www.odisha.gov.in.

    But the proposal must accompany the RFP cost in shape of demand draft in

    favour ofStateNodal Officer, MDM, Odisha payable at Bhubaneswar

    The proposal without the cost of RFP document will not be considered for

    evaluation.

    2.5 Site Visit (s)The bidder may wish to visit and examine the site (s) of the project and obtain for

    itself, at its own responsibility and risk, all information that may be necessary for

    http://www.opepa.in/http://www.opepa.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.opepa.in/http://www.opepa.in/http://www.opepa.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.odisha.gov.in/http://www.opepa.in/http://www.odisha.gov.in/http://www.opepa.in/
  • 7/29/2019 Final Mdm Rfp

    11/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Instructions to Bidders 11

    preparing the bid and entering into the contract. The cost of visiting the site (s) shall

    be borne by the bidder.

    No site visit (s) shall be scheduled after the prescribed date for submission of bids.

    3 Instructions to Bidders

    3.1 IntroductionThe section aims to provide guidelines/Instructions for Bidders, to be used while

    submitting the Proposals. These are generic in nature, but bidders are required to

    abide by them during the currency of the Project.

    3.2 Scope of ProposalDetailed description of the objectives, scope of services and other requirements

    relating to the job/assignment are as specified in this RFP. The Proposal is required

    to be submitted in the form and manner as specified in this document.

    3.3 Format & SigningThe RFP shall be submitted in three parts

    Part A General Bid

    Part B Technical Bid

    Part C Commercial Bid

    The RFP shall be typed or written in indelible ink and shall be signed by the applicantor a person or persons duly authorized. Any interlineations, erasures or overwriting

    shall be valid only if the person or persons signing the RFP prior to opening of the

    same initial them.

    3.4 Submission of RFP - Packing, Sealing and MarkingThe bidder shall prepare one original of each part of the RFP i.e. General Bid (Part-

    A), Technical Bid (Part-B) & Commercial Bid (Part-C). The General Bid, Technical

    Bid & Commercial Bid shall be sealed separately clearly marking General Bid,

    Technical Bid & Commercial Bid respectively on the envelope along with the

    Purpose, RFP Number, Date & Tendering Authority Address. The General Bid,

    Technical Bid & Commercial Bid of the RFP must be inserted in separate sealed

    envelopes, along with bidders name and address on the envelope and super scribed

    as Proposal for Software Development & IT PMU for SMS Based Monitoring

    System through Web Application Software.

    If the envelopes are not sealed and marked as mentioned above, then the tendering

    authority will assume no responsibility for the Proposals misplacement or premature

    opening.

  • 7/29/2019 Final Mdm Rfp

    12/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Instructions to Bidders 12

    3.5 Number of ProposalsA bidder can submit one proposal at a time. Bidder submitting more than one

    proposal shall be rejected.

    3.6 Language of BidAll Proposals and various documents related to these Proposals should be in English

    Language. All correspondence between the Authority and the Bidders would also be

    in English Language. Supporting Documents and Printed Literature furnished by the

    Bidders may be in another Language provided they are accompanied by an accurate

    translation in English Language.

    3.7 Conflict of InterestThe Authority requires that bidder must provide professional, objective and impartial

    advice and at all times hold the Authority interests paramount, strictly avoid conflicts

    with other assignments/jobs or their own corporate interests and act without any

    consideration for future work. In case the Bidders have any subsisting interest, either

    by themselves or through their partners, that is likely to conflict the work specified in

    the Scope of Work, they shall declare such interests as part of their proposal.

    3.8 Validity of Proposals

    The Bids shall remain valid for at least 180 days after the date of bid opening.

    A bid valid for a shorter period shall be rejected by the Authority as being non-

    responsive.

    During the period of validity of Bids, the rates quoted shall not change.

    3.9 Right to accept ProposalThe Authority reserves the right to accept or reject any Proposal, and to annul the

    Proposal process and reject all Proposals at any time prior to award of contract,

    without thereby incurring any liability to the affected bidder or any obligation to inform

    the affected bidder of the grounds for such decision.

    3.10 Proposal Due DateRFP filled in all respect must reach the Authority at the address, time and date

    specified in the cover page of the RFP through Speed Post / Registered Post /

    Courier. If the specified date for the submission of RFPs is declared as a holiday for

    the Authority, the RFPs will be received up to the appointed time on the next working

    day.

    3.11 Late SubmissionRFPs submitted after the deadline for submission prescribed by the Authority will

    not be considered.

  • 7/29/2019 Final Mdm Rfp

    13/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Instructions to Bidders 13

    3.12 Modifications / WithdrawalNo modifications / withdrawal to the Proposals shall be allowed; once it is received by

    the tendering authority.

    3.13 Bid OpeningThe Authority will open all Proposals, in the presence of bidders or their authorized

    representatives who choose to attend, at the date and time mentioned in the RFP.

    The bidders representatives who are present shall sign a register evidencing their

    attendance. In the event of the specified date being declared a holiday, the RFPs

    shall be opened at the appointed time and location on the next working day.

    3.14 Fraud & CorruptionThe Authority requires that the bidder must observe the highest standards of ethics

    during the performance and execution of such contract. In pursuit (pursuance) of this

    policy,

    Corrupt practice means the offering, giving, receiving or soliciting of anything of

    value to influence the action of the Authority official by any personnel of bidder in

    procurement process or in contract execution.

    Fraudulent practice means a misrepresentation of facts, in order to

    influence a procurement process or the execution of a contract, to the detriment of

    the Authority, and includes collusive practices among the bidders (prior to or after

    Proposal submission) designed to establish bids at artificially high or non-

    competitive levels and to deprive the Authority of the benefits of free and open

    competition;

    Unfair trade practices means supply of services different from what is ordered

    on, or change in the Scope of Work which was given by the Authority.

    Coercive practices means harming or threatening to harm, directly or indirectly,

    persons or their property to influence their participation in the execution of

    contract.

    The Authority will reject a proposal for award, if it determines that the bidder

    recommended for award has engaged in corrupt, fraudulent, unfair trade practices

    or coercive practices.

    The Authority will declare a firm ineligible, either indefinitely or for a stated period

    of time, for awarding the contract, if it at any time determines that the firm has

    engaged in corrupt, fraudulent, unfair trade and coercive practices in competing

    for, or in executing, the contract.

    3.15 AmendmentsAt any time prior to deadline for submission of proposal, the Authority may for any

    reason, modify the RFP. The prospective bidders having received the RFP shall be

  • 7/29/2019 Final Mdm Rfp

    14/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Instructions to Bidders 14

    notified of the amendments through e-mail/website and such amendments shall be

    binding on them.

    3.16 Clarifications

    During evaluation of the Proposals, the Authority may, at its discretion, ask the bidder

    for clarifications on their proposal.

    3.17 Rejection of BidThe Authority reserves the right to reject any or all proposals, in whole or in part, to

    waive any or all informalities, and to disregard all non-confirming, non-responsive or

    conditional proposals.

    In the event any or all proposals are rejected, in whole or in part, thereafter the

    Authority, in its sole discretion may initiate a new RFP process including all or part of

    the components of this Request for Proposals.

    3.18 Authentication of BidThe original and all copies of the bid document shall be type written in indelible ink

    and shall be signed by a person or persons duly authorized to bind the bidder to the

    contract. A duly stamped Power-of-Attorney accompanying the bid document shall

    support the letter of authorization. The person or persons signing the bid document

    shall initial all pages of the Bid document, including pages where entries or

    amendments have been made. All the pages of the proposal should be serially

    numbered. All parts of the bid shall be properly spiral binded together. There shall be

    no loose sheets. Documents submitted in clip file shall be rejected.

    3.19 Contact Details

    Name

    Designation

    Contact Details

    3.20 Acknowledgement by the BidderIt shall be deemed that by submitting the Proposal, the bidder has:

    Made a complete and careful examination of the RFP

    Received all relevant information requested from the Authority

    Acknowledged and accepted the risk of inadequacy, error or mistake in the

    information provided in the RFP or furnished by or on behalf of the Authority or

    relating to any of the matters Stated in the RFP Document

    Acknowledged that it does not have a conflict of Interest; and

  • 7/29/2019 Final Mdm Rfp

    15/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Instructions to Bidders 15

    Agreed to be bound by the undertaking provided by it under and in terms hereof.

    The Authority shall not be liable for any omission, mistake or error on the part of the

    Applicant in respect of any of the above or on account of any matter or thing arising

    out of or concerning or relating to RFP or the Selection Process, including any error

    or mistake therein or in any information or data given by the Authority.

    3.21 Earnest Money Deposit (EMD)The EMD is required to protect the Authority against the risk of Bidders conduct,

    which would warrant the securitys forfeiture.

    Unsuccessful Bidders EMD will be discharged / returned as promptly as possible,

    but not later than 30 days after the expiration of the period of bid validity.

    The successful Bidders EMD will be returned after furnishing the performance

    guarantee or adjusted against the performance guarantee upon the bidder signing

    the contract.

    3.22 Forfeiture of EMDEMD submitted by the bidder may be forfeited under the following conditions.

    If the bidder withdraws the tender before the expiry of the validity period

    If the bidder violates any of the provisions of the terms and conditions of the

    tender

    If the successful bidder fails to (a) accept award of work, (b) sign the contract

    agreement with the Authority, after acceptance of communication on placement of

    award, (c) furnish performance security, or the bidder violates any of such

    important conditions of this tender document or indulges in any such activities as

    would jeopardize the interest of the Authority in timely finalization of this tender

    The decision of the Authority regarding forfeiture of bid security shall be final and

    shall not be called upon to question under any circumstances. A default in such a

    case may involve black-listing of the bidder by the Authority.

    3.23 Extension of Period of ValidityIn exceptional circumstances, the Authority may solicit the bidders consent to an

    extension of the period of validity. The request and the response thereto shall be

    made in writing. Extension of validity period by the Bidder shall be unconditional. The

    EMD provided shall also be suitably extended. A Bidder may refuse the request

    without forfeiting the EMD. A Bidder granting the request will not be permitted to

    modify its bid.

  • 7/29/2019 Final Mdm Rfp

    16/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Instructions to Bidders 16

    3.24 Validation of Interlineations in BidAny interlineations, erasures, alterations, additions or overwriting shall be valid only if

    the person or persons signing the bid have authenticated the same with signature.

    3.25 Announcement of BidsThe name of Bidder, bid prices, total amount of each Bid, EMD, discount, etc. shall

    be announced at the Commercial Bid opening.

    3.26 Clarification of BidsTo assist in the evaluation, comparison and examination of bids, the Authority may,

    at its sole discretion, ask the Bidder for a clarification of its bid including breakdown

    of unit rates. The request for clarification and the response shall be in writing. If the

    response to the clarification is not received before the expiration of deadline

    prescribed in the request, the Authority reserves the right to make its own reasonableassumptions at the total risk and cost of the Bidder

    3.27 Completeness of BidsThe Authority will examine the bids to determine whether they are complete, whether

    they meet all the conditions of the Tender Document and Technical Specifications,

    whether any computational errors have been made, whether required sureties have

    been furnished, whether the documents have been properly signed, and whether the

    Bid Documents are substantially responsive to the requirements of the RFP.

    3.28 Rectification of ErrorsArithmetical errors will be rectified on the following basis: -

    If there is a discrepancy between the unit price and the total price that is obtained

    by multiplying the unit price and quantity, the unit price shall prevail and the total

    price shall be corrected.

    If there is a discrepancy between the rates in words and figures, the rate in words

    will govern.

    If the bidder does not accept the correction of errors, his bid will be rejected andEMD may be forfeited.

    3.29 Notification to BidderThe Bidder whose Bid has been accepted shall be notified of the award prior to the

    expiration of the period of validity of the proposal, by registered letter or by fax. This

    letter (hereinafter the Letter ofAcceptance) shall state the sum that the Authority

    shall pay the Bidder in consideration of the execution, completion and maintenance

    of the work as prescribed by the Contract (hereinafter the Contract Cost) in

    accordance with Payment Terms. The Bidder shall acknowledge in writing, the

    receipt of the Letter of Acceptance and shall send his acceptance to enter into the

    Contract within five (5) days from the receipt of the Letter of Acceptance.

  • 7/29/2019 Final Mdm Rfp

    17/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Instructions to Bidders 17

    3.30 Signing of ContractPursuant to the Bidder acknowledging the Letter of Acceptance, the Bidder and the

    Authority shall promptly and in no event later than 7 working days from the date of

    acknowledgement of the Letter of Acceptance, sign the Contract. This shall be

    subject to the furnishing of the Performance Guarantee. The Authority shall have the

    right and authority to negotiate certain terms with the successful Bidder before

    signing of the Contract. The signing of the Contract shall amount to award of the

    Contract and the Bidder shall initiate the execution of the work as specified in the

    Contract.

    3.31 Expenses for the ContractAll incidental expenses for the execution of the Contract shall be borne solely by the

    successful Bidder and such amount shall not be refunded to the successful Bidder by

    the Authority.

    3.32 Failure to abide by the ContractThe conditions stipulated in the Contract shall be strictly adhered to and violation of

    any of these conditions shall entail immediate termination of the Contract without

    prejudice to the rights of the Authority with such penalties as specified in the Bid

    Document and the Contract.

    3.33 Period for Furnishing Performance GuaranteeWithin five (5) working days of the receipt of the acknowledgment of the Letter of

    Acceptance from the Authority, the successful Bidder shall furnish a Performance

    Guarantee for an amount equivalent to 10% of the Contract Cost in accordance with

    the conditions of the Contract, in the form of a Bank Guarantee / Bank Draft / Pay

    Order from a scheduled bank (except cooperative bank) drawn in favour of State

    Nodal Officer, MDM, Odisha, payable at Bhubaneswar. If such Performance

    Guarantee is in the form of a Bank Guarantee, then such Bank Guarantee shall be in

    a form acceptable to the Authority. The EMD submitted earlier by the successful

    Bidder may be adjusted against the Performance Guarantee and such Performance

    Guarantee shall be retained by the Authority till the end of the Term as defined in the

    Contract.

    3.34 Annulment of AwardFailure of the successful Bidder to submit the performance security or sign the

    contract shall constitute sufficient grounds for the annulment of the award ofContract

    and forfeiture of the EMD, in this event, the Authority mayaward the contract to thenext lowest evaluated Bidder or call for new bids.

  • 7/29/2019 Final Mdm Rfp

    18/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Bidding Procedure & Evaluation 18

    3.35 DisqualificationsThe Authority may at its sole discretion and at any time during the evaluation of

    Proposal, disqualify any bidder, if the bidder has:

    Submitted the Proposal documents after the response deadline Made misleading or false representations in the forms, statements and

    attachments submitted in proof of the eligibility requirements Submitted a proposal that is not accompanied by required documentation or is

    non-responsive Failed to provide clarifications related thereto, when sought for Submitted more than one Proposal (comprising of same Prime Applicant

    individually or in case of a consortium Prime Applicant and ImplementationPartner)

    Been declared ineligible by the Government of India for corrupt and fraudulentpractices or blacklisted

    Submitted a proposal with price adjustment/variation provision.

    4 Bidding Procedure & EvaluationAll evaluation will be carried out by the Authority. The Authority may constitute an

    evaluation committee to evaluate the bids. Evaluation conducted by the committee

    shall be final and binding on all the bidders.

    The evaluation committee may choose to conduct technical negotiations or

    discussions with any or all the bidders. The decision of the evaluation committee in

    the evaluation of the General, Technical & Commercial bids shall be final and binding

    on all the parties. No correspondence will be entertained outside the process of

    negotiation / discussion with the evaluation committee.

    Information relating to the examination, clarification, evaluation and comparison of

    the bid document and recommendations (if any) shall not be disclosed by the

    evaluation committee to the bidders or any other persons (other than officers /

    advisors of the Authority or as required by applicable law) not officially concerned

    with such process until the award to the successful bidder has been announced. Any

    effort by a bidder to influence the tender evaluation committees processing ofbids or

    award decisions may result in the rejection of the bid.

    4.1 Preliminary ScrutinyThe Authority will prepare a list of firms based on the compliance to all the terms and

    conditions of the tender. The tenders who do not confirm to the tender conditions

    shall be straight away rejected. All eligible tenders will be considered for further

    evaluation. The decision of the Authority will be final in this regard.

    The Commercial Bids of those bidders will be opened, who successfullyqualify in the technical bids.

  • 7/29/2019 Final Mdm Rfp

    19/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Scope of Work 19

    5 Scope of Work

    5.1 Proposed SolutionsIt is not feasible to make the Online Reporting using Computer and Internet from

    school point due to poor/no internet connectivity in the rural areas and due to non-

    availability of Computers at schools. There is a need of an efficient system that

    facilitates field staff (School HM / MDM In-Charge Teacher) to update the details

    through their mobile from the place of occurrence (school) on daily basis through an

    SMS Based Monitoring System. The system will push the information to central

    server and consolidate the data of all location to generate required MIS for different

    user (State/District/Block) level. The system shall be integrated into the existing

    systems of the S&ME to fetch the master data.

    The objective here is to develop a software application for data updation by sending

    SMS in standard formats through the simple Mobile Applications. This application

    will be hosted centrally with a single database with existing Odisha State SMS

    Gateway. The user will also have option to download the Mobile apps for updating

    Mid-Day-Meal information through his mobile.

    The HM/ Mid day meal in-charge Teacher can send the information at school level on

    daily basis through SMS to a fixed number in a predefined format by using mobile

    apps. The data sent through SMS received through Odisha State SMS Gateway /

    Mobile modem and the information is updated in the centralized database. The SMS

    gateway will fire alerts to the concerned officials for sending data in wrong format.

    Similarly information provided in the mobile Apps gets updated and auto consolidated

    in centralized database.

    Some of the inherent advantages of this solution are:

    Rich user experience

    Ease of use and maintainability

    Scalable

    Fast and effective gathering of information.

    Quick & easy updation of information in centralized database.

    Easy modification of erroneous data.

    Auto consolidation

    Alerts for non-reporting/delay reporting

    Monitoring becomes easy & transparent

  • 7/29/2019 Final Mdm Rfp

    20/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Scope of Work 20

    5.2 Solution Architecture

    5.2.1 Process Flow

    5.2.2 Requirement Analysis

    Sl# Requirements Analysis1 Volume of SMS 70,000 (Incoming) | 7,000 (Outgoing)2 Nature of SMS Unique/BULK3 Nature of Activity Real Time4 Frequency of Activity Daily basis5 Priority Very High

    5.2.3 Server Architecture

    Re l on SMS or wron format sendin

    Teachers/

    Head Master

    SMS Server-I

    SMS Server-II

    Database Server

    SMS Gateway

    Application Server

    Mobile Tower

  • 7/29/2019 Final Mdm Rfp

    21/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Scope of Work 21

    5.3 Implementation Approach & Methodology

    5.3.1 System Configuration (User creation and Access Control) Administrator: Administrator will set/authenticate the master data, creates users,

    assign roles and responsibilities to the users.

    Users: All the users can access the application as per the role and rights

    assigned. Different level of authorities will be assigned to different level of access

    as per the requirements.

    5.3.2 Master Database CreationThe existing updated data bases of Schools / Children from e-Shishu & DISE shall be

    integrated into the system, so that there will be no duplicity & redundancy in the

    system.

    The demographic details of Schools, latitude and longitude from GIS system, details

    of each HM & MDM In-charge teachers with Mobile nos. etc. will be mapped to the

    system created.

    Master database will be prepared on District

    Block /Urban Local Bodies

    Gram Panchayat /ward

    Village

    Primary/Upper Primary/Secondary Schools

    Officials (Head Master/Mistress, Mid-day meal in-charge) details with Mobile Nos.

    Monitoring Officers details with Mobile Nos. etc.

    An Online MDM reporting form to be designed, hosted to the central server &

    available through web for access by concerned officials to register the mobile number

    of the school HMs through which SMS will be accepted by the system at central

    server. If any change in mobile number, then the concern school will send the

    request to the Administrator through HQ District Inspector of Schools, who will

    approve the new mobile number into the system database.

    5.4 Online Monitoring ApplicationEach Mid Day Meal in-charge teacher of school will be identified through a

    Registered Mobile number. Every time the message will be sent to a fixed number

    that should come from the specific registered mobile number. Each message sent by

    the teacher is received at the SMS server. The message gets validated with the

    master data for source mobile number and with their demographic details such as

    village name, gram panchayat/ ward name, block/urban local bodies name, district

    name, School name & date format.

  • 7/29/2019 Final Mdm Rfp

    22/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Scope of Work 22

    Once the data is received and validated, then the central database gets updated with

    the MDM data on that particular date.

    Mobile based application may be used for data updation. User has to login with their

    mobile number as user id and password. Through the application concerned teacher

    of the School will update the details of Mid Day Meal. Schools having Computers and

    Internet facility for CAL & ICT programme can use this application for uploading daily

    information on Mid day meal activities. The teacher can install the application his/her

    android mobile and send information as desired.

    User can also update the data through the web base system also wherever internet

    facility is available in a computer using his/her user id & password.

    5.5 MIS ReportsDifferent MIS reports as mentioned below can be generated from the system.

    5.5.1 General MIS SMS History Report

    Invalid SMS Report

    Valid SMS Report

    SMS Success Rate

    School Participation Report

    Month wise Transaction Report (Periodical, within the given range)

    Deleted SMS Report

    Till Date SMS Report

    Daily Status Report

    SMS Transaction Report

    School Type Wise Transaction Report

    Transaction Participation Report

    School Management Type Wise Report

    School with gender wise Capacity wise Report

    FY wise Transaction Comparison Report

    School wise children consumed MDM

    Village Wise Data consolidated Report

    Date Wise Transaction Report

    Schools Having Children less than 50% for MDM

    Schools Having Children more than 50% for MDM

    Schools having more than One SMS per Day

    Day Wise Status Report

  • 7/29/2019 Final Mdm Rfp

    23/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Scope of Work 23

    School Update Status Report

    District Wise Transaction Report

    Block Wise Transaction Report

    5.5.2 Exceptional Reports Duplicate Mobile Number Report

    School having no valid SMS

    School Not Involved in Transaction

    District Wise Transaction Report

    Block Wise Transaction Report

    GP Wise Transaction Report

    Village Wise Transaction Report

    District Wise Duplicate School Code Report

    Schools Having No Mobile Number

    School having Invalid Mobile Registration

    School having MDM allotment more than strength of school

    5.5.3 Graphical Reports Graphical Analysis of District Wise School Participation

    Graphical Analysis of Block Wise School Participation

    Graphical Analysis of GP Wise School Participation

    Graphical Analysis of Village Wise School Participation

    Pie Chart representing percentage of school participated

    Pie Chart representing percentage of school Not participated

    Pie Chart for Month wise Transaction Comparison Report

    5.6 Implementation & TrainingSuccess of the project lies upon proper Implementation, Handhold & Training to the

    users. In order to enhance the usability of the software application, proper

    Implementation, Handhold & Training to be ensured by the implementing agency.

    Training need to be imparted to all the school HM & MDM In-charge Teachersthrough train-to-the trainer concept. Master trainers to be identified at District and

    Sub-District level to get trained and impart training to schools and also to handhold

    the system.

    Training shall be given upto the block level user (around 400 people) by the

    implementing agency. A proper training manual need to be prepared and distributed

    to the schools. The same shall be uploaded in the website for ready reference.

    Similarly a Computer Based Tutorial may be prepared in local / regional languagesfor best use of the application software and to make it a success.

  • 7/29/2019 Final Mdm Rfp

    24/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Scope of Work 24

    5.7 Transparency PortalAn exclusive website on Mid Day Meal Scheme in Odisha is to be developed on the

    Online Monitoring System, where all the reports & information relating to MDM

    Scheme in Odisha shall be hosted. Different stake holders such as Government of

    India, Odisha Government, Directorates, Schools & Common Citizens can access

    the information.

    5.8 IntegrationThe proposed application need to be integrated with

    State SMS Gateway managed by I.T. Department, Government of Odisha, DISE database of OPEPA to fetch the master & annual data of schools & Child Tracking System (e-Shishu) database of OPEPA to authenticate the

    student wise beneficiary in the schools.

    Existing GIS System

    OPEPA being the implementing society of RTE-SSA in the State has its own Server

    Room with required HW & Software for carrying the application and its web hosting.

    The DISE and CTS database can be integrated to MDM application if the monitoring

    software will be hosted from same server.

    The existing man-power under MIS, OPEPA from State to Block level may be utilized

    along with the Programmers placed with DIS for MDM as Master Trainers for training,

    implementation and handholding of the application at school level.

    5.9 Call CenterApproximately 70,000 users (which included Schools, DEO, DI, DPC, BRCC, CRCC,

    etc) will use the software to update the database on daily basis though the SMS /

    Mobile Apps. Hence, for effective implementation of the software a separate call

    center may be set up or the existing call center service of OPEPA (School Student

    Helpline) or of OCAC (Sanjog Helpline) may be taken to address the issues relating

    to the functional & usability issue of the software. The implementing agency will

    provide necessary training to the call center executives and manage the call center

    for smooth implementation & effective query handling of this application software.

    5.10 IT Project Management Unit

    The main objectives is to provide project management and coordination support to

    the Authority and others involved in the management of projects and in planning,

    disbursement and other project matters. It is required that a team of experienced

    technical and management personnel may be placed for proper implementation and

    monitoring of the system and reaching out to the all the sections of f ield functionaries

    for improving the quality, accessibility and effectiveness of the services offered

    through proper IT intervention. The aim is to meet the objectives of subprojects,

  • 7/29/2019 Final Mdm Rfp

    25/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Scope of Work 25

    implement the components under the subprojects in a timely and efficient manner,

    and to help build project management capacity of the Authority.

    5.10.1 Responsibility of PMU

    Handling planning, technical, and financial management, disbursement, and

    auditing issues arising from implementation of the project activities.

    Ensuring that effective communication and consultations continue with all

    stakeholders

    Monitoring and facilitating full compliance of all components with the

    implementation and technical requirements of projects

    Undertaking the monitoring and evaluation of performance indicators and

    outcomes against the targets

    Use of ICT as a part of the business process in shifting the focus on technology

    based business process instead of task.

    Define processes to ensure consistency and quality of output including using

    standardized tools for discussions, reporting and monitoring etc.

    PMU would function as a permanent advisory body to the Directorate by

    integrating people, processes, data, technology & strategy.

    Prepare standard frameworks for Technology Standards, change management

    and maintenance.

    Assist the Directorate to implement processes for effective management

    Prepare the framework and templates so that the evolution of the program is

    objective and consultative.

    The exact nature of support provided by the PMU would vary over the period of

    time. However, initially it would be to assist the Directorate in providing direction,

    prioritization and programme management role.

    Carries out surveys, studies and site investigations.

    Generates primary data and updates the findings of the feasibility study

    Prepares master plans.

    The implementing agency will set-up the PMU with development of application for

    SMS based Monitoring System and the PMU would be in existence for one year on

    turnkey basis at the initial stage till the department own these responsibilities. After

    one year, the PMU services may be extended on the basis of the requirement &

    performance of the PMU as well with same terms & conditions without any price hike.

    The implementing agency will provide the necessary computer desktop / laptop,

    internet, software licenses to operate the PMU. Department will provide work station

    & electricity for this purpose. Accordingly the bidder has to quote in the financial bid.

  • 7/29/2019 Final Mdm Rfp

    26/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Scope of Work 26

    5.10.2 Constituents of IT PMUAs the next step, IT Project Monitoring Unit (IT PMU) will be set up by implementing

    agency as per the technical resource proposed below;

    Sl# Member Qty Qualification & Experience

    01ProjectManagementConsultant

    1

    Must be a B. Tech. or equivalent with MBA frompremier Institution. Must have 5+ years of workexperience out of which 2 years in the IT projects and3 years in the management consulting domain.

    02TechnicalConsultant

    1Must be a B.Tech / M. Tech / M.Sc. in ECE / IT / CSEfrom a premier Institution. Must have 5+ years ofrelevant work experience in the IT projects.

    03CapacityBuildingConsultant

    1Must be a Graduate with MBA from a premierInstitution. Must have 5+ years of relevant experiencein IT training and capacity building area.

    5.10.3 Responsibilities of IT PMU Members

    Project Management Consultant

    Prepare the detailed project report and process for obtaining approval

    Lead, coordinate, manage and contribute across the full life cycle of programmewith the objective of achieving the timely completion and quality of theprogramme

    Identify tools for project monitoring and evaluation.

    Develop/design templates for monitoring the status of project implementation asperS&MEs requirement.

    Provide inputs for project monitoring and implement tools for it

    Coordinate with S&ME / Government agencies / other stake holders to enhanceand speed up the project implementation.

    Monitor weekly / monthly progress of the project, issue resolution andescalation and submit weekly / monthly project status reports to S&ME.

    Support in convene meetings and workshops

    Support S&ME in formal acceptance of deliverables prepared by serviceproviders.

    Undertake regular visits to the field to support implementation

    Technical Consultant

    Understanding of Function Point Analysis, Entity Relationship Diagrams, ObjectOriented Design Pattern, Software Development and Testing Tools

    Provide inputs on various technology, standards and their evaluation

    Assess IT Infrastructure needs, usage and utilization

    Advise and monitor network, hardware and software installation andconfiguration including DRC and DC

    Draft Technology SLAs and monitoring compliance of the same

    Audit the application processes and their compliance

    Management of Vulnerability Assessment, Penetration Testing and Applicationsecurity

    Appraise project reports w.r.t technology components

  • 7/29/2019 Final Mdm Rfp

    27/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Scope of Work 27

    Capacity Building Consultant

    Impact Assessment: Study of As-Is and definition of To-Be roles andresponsibilities

    Change Readiness Assessment: To understand preparedness for change from

    structure, processes and staff perspective (Training Needs Analysis) Develop CB & Change Management Plan (CM)

    Manage and Assist in conducting CB & CM Workshops and facilitate all the IECactivities of the Programme

    Oversee the compliance and implementation of CM & CB plan as per plan

    Monitoring of effectiveness of training delivered to the associated Stake Holders

    Prepare and submit progress reports including identification of problems,causes of potential bottlenecks in Programme implementation w.r.t. capacitybuilding, change management and knowledge management

    Undertake regular visits to the field to support implementation

    Appraise project reports w.r.t CB & CM components

    5.11 Infrastructure ConsultancyImplementing agency has to study the GAP IT Infrastructure available in the OPEPA

    Data Center, where the application will be initially hosted, that are most suitable for

    running the SMS Base Monitoring System through Web Application Software

    provided to MDM, Odisha. Bidder will be responsible for properly drawing up all

    hardware and networking specifications to ensure that the installation and

    deployment of the software is smooth. Specifications shall be independent of any

    proprietary technology of any hardware / networking. Specific activities that need to

    be done in this task are:

    Draw up detailed Hardware and Networking Specifications pertaining to the

    proposed Software being implemented

    Assist S&ME Department in the procurement of the specified Hardware and

    Network Equipments and suggest whether any additional electrical requirements

    would arise in setting up the Data Center.

    Help & ensure the smooth shifting of computer hardware from OPEPA Data

    Center to already established State Data Center in OCAC.

    Assist S&ME Department in carrying out a quality check of the procured Hardware

    and Network Equipments.

    Be a part of the Team set up to achieve an effective installation of the Hardware

    and Network Equipments

    Fine-tune and optimize the hardware and networking facility during implementation

    period.

  • 7/29/2019 Final Mdm Rfp

    28/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | General Bid 28

    6 General Bid

    The RFP is open to eligible bidders only as per the pre qualification criteria. The

    following documents shall be submitted in Original in a sealed envelope.

    6.1. Non-refundable Tender Paper cost of Rs.10,000/- in shape of Bank Draft from any

    scheduled bank drawn in favour of StateNodal Officer, MDM, Odisha, payable at

    Bhubaneswar.

    6.2. Interest free Earnest Money Deposit (EMD) of Rs. 2,00,000/- in shape of Bank Draft

    from any scheduled bank drawn in favour of State Nodal Officer, MDM, Odisha,

    payable at Bhubaneswar.

    The EMD of successful bidder is liable to be forfeited if the bidder revokes any terms

    of the tender. EMDs given by unsuccessful bidders will be refunded after placing of

    work order to the successful bidder.

    6.3. The bidder firm registered under the Company Registered under the Indian

    Companies Act, 1956, copy of such certificate should be enclosed as a proof.

    6.4. The bidder must be registered with Service Tax Authority. Copy of such certificate

    should be enclosed as a proof. Firm has also to submit the copy of Service Tax

    Return at least up to 31st March 2012.

    6.5. The bidder must be registered under Employees Provident Fund (EPF) Authority.Copy of such certificate should be enclosed as a proof along with the latest PF

    Return document such as PF Register & Deposit Challan.

    6.6. The bidder must be having valid VAT registration. Copy of such certificate should be

    enclosed as a proof. The firm has also to submit the copy of VAT Clearance

    Certificate up to 31st March 2012.

    6.7. The proof of operating in IT Service in India i.e. the office location must be given.

    6.8. The bidder should have an average annual turnover of at least Rs. 5,00,00,000/- in IT/ ITES sector during last three Financial Years ending on 31-Mar-2012 and must

    submit Income Tax Return as a proof of average annual turnover stated above. Turn

    over only from Supply & Installation of Computer Hardware will not be considered.

    6.9. The bidder should have successfully Completed / Continuing at least two IT Project

    Management Units (minimum contract duration of 6 months or more) with minimum

    project cost of Rs. 25,00,000/- (repeat orders will be considered as one) during last

    three calendar years ending on 31-Oct-2012 for any State / India Government. Copy

    of work order from the Government Authority along with completion / continuation

    certificate from the user Department / Project Authority stating the above criteria

    should be submitted as a proof.

  • 7/29/2019 Final Mdm Rfp

    29/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | General Bid 29

    6.10. The bidder should have successfully completed at least two software development

    projects with minimum project cost of Rs. 30, 00,000/- during last three Financial

    Years for any State / India Government. Copy of work order for any Government

    Department along with completion certificate should be submitted as a proof.

    6.11. The bidder should have minimum strength of 50 IT professionals with the company.

    Copy of the EPF register of previous month along with the deposit challan must be

    enclosed as a proof.

    6.12. Applicants should not be under a declaration of ineligibility for corrupt and fraudulent

    practices issued by Government of India / State Governments. A self-declaration

    certificate on the company letter head should be enclosed.

    6.13. Representative authorization letter in the company letter that he/she is chosen to sign

    the entire document relating to this RFP and will be present during evaluation &

    negotiation during the RFP period.

    6.14. Duly filled in & signed annexures as follows, in the company letter head with seal.

    6.14.1. Annexure-G1 (General Bid Letter)6.14.2. Annexure-G2 (Bidder Company Profile)6.14.3. Annexure-G3 (State of Deviation Terms & Conditions)

    Important Points

    (a) In absence of any one of the above, the offer will be treated as non-responsive and summarily rejected.

    (b) Relevant documents in support of the above criteria must be enclosedalong with the General Bid documents, failing which the bid will liable tobe rejected.

    (c) The Technical Bids of the bidders, nonresponsive in General Bid shall notbe considered for evaluation.

    (d) No supporting document or printed literature shall be submitted with the

    General Bid proposal unless specifically asked for.

    (e) The successful bidder have no claim, if the software designed for SMSenabled Mid Day Meal monitoring is integrated to IVRS or any othersoftware in future.

  • 7/29/2019 Final Mdm Rfp

    30/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Technical Bid 30

    7 Technical Bid

    The Technical Bids of those bidders will be opened, who are assessed be qualified in

    General (Pre Qualification) Bid. The following documents shall be submitted in

    original in a sealed envelope.

    7.1. Technical bid letter in the company letter head as per Annexure-T1

    7.2. Bidder Company Profile as per Annexure-T2

    7.3. Bidder Project Profile of the prominent Government Customer in India as per

    Annexure-T3

    7.4. Proposed Methodology, Time Line, Implementation Plan, etc

    7.5. Statement Deviation (if any) for Scope of Work as per Annexure-T4

    7.6. Documents supports to the technical evaluation given at point no. 9.2 of this RFP.

    No supporting document or printed literature shall be submitted with theTechnical Bid unless specifically asked for.

  • 7/29/2019 Final Mdm Rfp

    31/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Commercial Bid 31

    8 Commercial BidThe Commercial Bids will be opened, in the presence of the Bidders or their

    representatives, who wish to attend the Commercial Bid opening on the date and

    time to be communicated to all the technically qualified Bidders.

    The Commercial Bids of those bidders will be opened, who are assessed be qualified

    in Technical Bid. The following documents shall be submitted in Original in a sealed

    envelope.

    8.1. Bidder Company Profile as per Annexure-C1.

    8.2. Statement of Commercial Deviation (if any) as per Annexure-C2.

    8.3. Price Schedule as per Annexure-C3.

    8.4. Before taking a call on selection of successful bidder and award of contract, the

    tendering authority is at liberty to go for further negotiation to reduce the price if it is

    felt unreasonable price.

    No supporting document or printed literature shall be submitted with theCommercial Bid unless specifically asked for.

  • 7/29/2019 Final Mdm Rfp

    32/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Bidding Procedure & Evaluation 32

    9 Bidding Procedure & EvaluationAll evaluation will be carried out by School & Mass Education Department,Government of Odisha through its evaluation committee. Evaluation conducted bythe committee shall be final and binding on all the bidders.

    The evaluation committee may choose to conduct technical negotiations ordiscussions with any or all the bidders. The decision of the evaluation committee inthe evaluation of the General, Technical & Commercial bids shall be final and bindingon all the parties. No correspondence will be entertained outside the process ofnegotiation / discussion with the evaluation committee.

    Information relating to the examination, clarification, evaluation and comparison ofthe bid document and recommendations (if any) shall not be disclosed by theevaluation committee to the bidders or any other persons (other than officers /advisors of School & Mass Education Department, Government of Odisha or asrequired by applicable law) not officially concerned with such process until the awardto the successful bidder has been announced. Any effort by a bidder to influence thetender evaluation committees processing of bids or award decisions may result in

    the rejection of the bid.

    9.1 Preliminary ScrutinySchool & Mass Education Department, Government of Odisha will prepare a list offirms based on the compliance to all the terms and conditions of the tender. Thetenders who do not conform to the tender conditions shall be straight away rejected.All eligible tenders will be considered for further evaluation. The decision of School &Mass Education Department, Government of Odisha will be final in this regard.

    9.2 Technical Evaluation (Total Marks 100)# Items Criteria Points

    (a) Quality Certification (Proof must be submitted)CMMi Level

    ISO

    05

    03(b)

    Local Presence in Odisha State for last 3 years.(Proof must be submitted)

    05

    (c)

    Bidder should have successfully implemented (in last3 financial years ending on 31/03/2012) onlinetransaction based project in time-bound manner forany Government Department in India costing;(Project completion certificate stating the above criteria must besubmitted for consideration)

    150 Lakhs 100 Lakhs 050 Lakhs 030 Lakhs

    40302010

    (d)

    The bidders experience in Mobile Apps or SMS BaseMonitoring System during last three years for anyGovernment Department in India. (Proof must besubmitted)

    2 Nos.1 No.

    1005

    (e)

    Technical Presentation on SMS Based Monitoring System of theMid Day Meal, Hardware Component, Software Solution, Timefactor & Training factor as per the scope defined in this RFP for 30Minutes.NB: The prospective bidder may contact the tendering authority to have an ideaabout the proposed project before submission of tender papers.

    40

    Project completion certificate should have the project completion date, value of theproject, type of project & project duration fulfilling the criteria as under 9.2(c) andcontact telephone numbers of the project authority / certificate issuing officer.

    Minimum qualifying mark for opening of commercial bid is 70% (70 out of 100).Commercial bid of those bidders will be opened, only which are technically qualifiedin the technical evaluation. All other commercial bids will be ignored. The biddingprocess will continue in case of single bidder. In such cases, the committee maynegotiate with the commercial bid and will take final decision. The job will be awardedto the L1 (Lowest Quoted Price) bidder among those who have qualified in theTechnical Bid evaluation.

  • 7/29/2019 Final Mdm Rfp

    33/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | General Terms & Conditions 33

    10 General Terms & Conditions

    10.1 Relationship between the PartiesNothing mentioned herein shall be constructed as relationship of master and servant

    or of principal and agent as between the The Authority and the Bidder. The bidder

    subject to this contract has complete charge of personnel, performing the services

    under this project from time to time. The bidder shall be fully (jointly and severally)

    responsible for the services performed by them or on their behalf hereunder.

    10.2 Standards of PerformanceThe bidder shall perform the services and carry out their obligations under the

    contract with due diligence, efficiency and economy in accordance with generally

    accepted professional standards and practices. The bidder shall always act in

    respect of any matter relating to this contract as faithful advisor to the Authority.

    The bidder shall always support and safeguard the legitimate interests of the

    Authority, in any dealings with the third party. The bidder shall abide by all the

    provisions / acts / rules etc. of Information Technology prevalent in the country. The

    bidder shall conform to the standards laid down in RFP in totality.

    10.3 Delivery and Documents

    The bidder shall submit all the deliverables on due date as per the delivery schedule.The bidder shall not without the Authoritys prior written consent disclose the

    contract, drawings, specifications, plan, pattern, samples to any person for project

    management unit set up other than an entity employed by the Authority for the

    performance of the contract. In case of termination of the contract, the entire

    document used by bidder in the execution of project shall become property of the

    Authority.

    10.4 Intellectual Property RightsNo services covered under the contract shall be sold or disposed of by the bidder in

    violation of any right whatsoever of third party, and in particular, but without prejudice

    to the generality of the foregoing, of any patent right, trademark or similar right, or

    any charge mortgage or lien. The bidder shall indemnify the Authority from all

    actions, costs, claims, demands, expenses and liabilities, whatsoever, resulting from

    any actual or alleged infringement as aforesaid and at the expenses of the bidder,

    the Authority shall be defended in the defense of any proceedings which may be

    brought in that connection. The data ownership on MDM under no circumstances be

    infringed upon by the bidder or any third party.

  • 7/29/2019 Final Mdm Rfp

    34/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | General Terms & Conditions 34

    10.5 AssignmentThe bidder shall not assign the project to any other agency, in whole or in part, to

    perform its obligation under the Contract, without the Authority prior written consent.

    10.6 SuspensionThe Authority may, by written notice to bidder, suspend all payments to the bidder

    hereunder if the bidder fails to perform any of its obligations under this contract

    including the carrying out of the services, provided that such notice of suspension

    Shall specify the nature of failure.

    Shall request the bidder to remedy such failure within a period not exceeding thirty

    (30) days after receipt by the bidder of such notice of failure.

    10.7 TerminationUnder this contract, the Authority may, by written notice terminate the bidder in the

    following.

    For failing to perform obligations under the contract or if the quality is not up to the

    specification or in the event of non adherence to time schedule.

    Termination for Convenience in whole or in part thereof, at any time. The Authority

    reserves the right to elect:

    To have any portion completed at the work order and /or the Work Order terms

    and prices; and /or

    To cancel the remainder and pay to the agency an agreed amount for partially

    completed Services.

    Termination for Insolvency if the bidder becomes bankrupt or otherwise insolvent.

    10.8 Taxes and DutiesThe commercial proposal shall be inclusive of all taxes, duties and OPEs.

    10.9 Legal JurisdictionAll legal disputes between the parties shall be subject to the jurisdiction of the

    Bhubaneswar. In case of any dispute or difference arising out of or in relation to this

    agreement, same will be referred to arbitration of an Arbitrator (other than the

    employee of the Authority) to be appointed by the Authority and whose decision shall

    be final and binding upon the bidder. The arbitration will be governed by Arbitration &

    Conciliation Act 1996.

    10.10 NoticeAny notice, request or consent required or permitted to be given or made pursuant to

    this contract shall be in writing. Any such notice, request or consent shall be deemed

    to have been given or made when delivered in person to an authorized

    representative of the party to whom the communication is addressed, or when sent to

    such party at the address mentioned in the Contract Agreement.

  • 7/29/2019 Final Mdm Rfp

    35/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | General Terms & Conditions 35

    10.11 Limitations of Liabilities

    Either party will accept liability without limit. For death or personal injury caused to

    the order party by its negligence or the negligence of its employees acting in the

    course of their employment;

    Any other liability which by law either party cannot exclude.This does not in any way confer greater rights than what either party wouldotherwise have at law

    The contract does not contemplate any consequential, indirect, loss profit, claim

    for tort or similar damages of any form to be paid by the bidder to the Authority or

    any other organizations

    Notwithstanding anything to the contrary contained in this contract, in no event willthe bidder be liable to the Authority, whether a claim be in tort, contract or

    otherwise; for any amount in excess of 100% of the total professional fees

    payable for the respective project provided that this limitation shall not apply

    to any obligation of bidder to indemnify to the Authority with respect to intellectual

    property right infringement.

    No action regardless of form, arising out of this Contract may be brought be either

    party more than one year after the cause of action has accrued

    10.12 Progress of the AssignmentsThe bidder would be required to intimate the progress of the assignments and

    submitted required documents to the Authority in a frequency and manner prescribed

    by the Authority in consultation with the bidder after the award of contract.

    10.13 Miscellaneous

    The end product of the work assignment carried out by the bidder, in any form, will

    be the sole property of the Authority.

    In the event the bidders company or the concerned Division of the company is

    taken over / bought over by another company, all the obligations under the

    agreement with the Authority, shall be passed on the compliance by the new

    company new division in the negotiation for their transfer.

  • 7/29/2019 Final Mdm Rfp

    36/47

    Request for ProposalSoftware Development & IT PMU for SMS Based Monitoring System through Web Application Software

    S&ME, GoO | SPMU (MDM) | Proforma & Annexure 36

    11 Proforma & Annexure

    11.1 Annexure-G1 (General Bid Letter)

    To Dated: ___/___/_____The State Nodal Officer (SNO)State Project Management Unit (MDM)School & Mass Education Department, Government of OdishaSRC Building, 1st Floor, Unit-V, Bhubaneswar, 751001

    Sub: Request for Proposal (RFP) for selection of implem