New Meadows Lake Tidal Restoration Feasibility Study
November 15, 2005 Steering Committee Meeting
Sponsored by: Sponsored by: Sponsored by: Sponsored by: With funding provided by:With funding provided by:With funding provided by:With funding provided by:
![Page 2: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/2.jpg)
Study Goal & ObjectivesStudy Goal & ObjectivesTo develop and evaluate the feasibility of technical To develop and evaluate the feasibility of technical alternatives for improving water quality and enhancing alternatives for improving water quality and enhancing ecological resources in New Meadows Lake through ecological resources in New Meadows Lake through increased tidal exchange. increased tidal exchange.
Public InvolvementPublic Involvement • A key component of the study process and any ultimate A key component of the study process and any ultimate
decision-making process.decision-making process.• There will be three public forums during the study.There will be three public forums during the study.
![Page 3: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/3.jpg)
Study ProgressStudy ProgressStudy ProgressStudy Progress
1.1. Temperature and Stage DataTemperature and Stage Data2.2. Bathymetry DataBathymetry Data
1.1. BathymetryBathymetry2.2. Stage-Volume RelationStage-Volume Relation
3.3. Preliminary Model DevelopmentPreliminary Model Development1.1. CalibrationCalibration2.2. Conceptual AlternativesConceptual Alternatives
4.4. Discussion of Conceptual AlternativesDiscussion of Conceptual Alternatives
![Page 4: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/4.jpg)
Temperature and Stage DataTemperature and Stage DataTemperature and Stage DataTemperature and Stage Data– Temperature/Pressure Transducers Installed
July 29, 2005– Temperature/Pressure Transducers Retrieved
October 14, 2005
![Page 5: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/5.jpg)
Stage DataStage DataStage DataStage Data– Water Surface Elevations (Stage): New Meadows
River (blue) and New Meadows Lake (red)
![Page 6: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/6.jpg)
Bathymetry DataBathymetry Data
• Complete Bathymetry Mapping of Upper and Lower Lake
• Data Corrected for Changes in Tidal Stage
• Data in Maine West 1983 Coordinate Plane
![Page 7: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/7.jpg)
Stage-Volume RelationStage-Volume Relation
![Page 8: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/8.jpg)
Preliminary Model DevelopmentPreliminary Model Development
• HEC-RAS Model Development – Geometry Data From Bathymetry and Existing Information– Tidal Stage Data for Input
2400 1200 2400 1200 2400 1200 2400 1200 2400 1200 2400 1200 240003Oct2005 04Oct2005 05Oct2005 06Oct2005 07Oct2005 08Oct2005
96.0
96.2
96.4
96.6
96.8
97.0
Time
STA
GE
(fe
et)
STA
GE
(F
EE
T)
![Page 9: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/9.jpg)
Alternative 1: Deeper CulvertAlternative 1: Deeper Culvert
• Existing Culvert Alignment and Width with Invert Set 2.4-ft Below Current Invert
• Lower Typical Lake Level• Tidal Stage Variation Does
Note Change
![Page 10: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/10.jpg)
Alternative 2: Deeper/Wider CulvertAlternative 2: Deeper/Wider Culvert
• Existing Culvert Alignment and Double-Width (24-ft) and Invert Set 4.4-ft Below Current Invert
• Lower Typical Lake Level• Tidal Stage Variation Does
Note Change
![Page 11: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/11.jpg)
Alternative 4: Bridge Replacing Alternative 4: Bridge Replacing CulvertCulvert
• Bridge Through Embankment• Width of 50-ft• Invert Set Below MLW
![Page 12: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/12.jpg)
Alternative 4: Bridge Replacing Alternative 4: Bridge Replacing CulvertCulvert
• Substantial Tidal Stage Variation
2400 1200 2400 1200 2400 1200 2400 1200 2400 1200 2400 1200 240003Oct2005 04Oct2005 05Oct2005 06Oct2005 07Oct2005 08Oct2005
88
90
92
94
96
98
100
Time
STA
GE
(F
EE
T)
![Page 13: Final Nmrwp Scm Meeting 11 15 05 Mrc](https://reader035.vdocument.in/reader035/viewer/2022062710/55b869d3bb61ebc21d8b45b9/html5/thumbnails/13.jpg)
Thank youThank you
Questions? Comments?Questions? Comments?