  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    1/49

    An Analysis of Increase in Volumeof Payroll Queries and Streamlining

    the Payroll ProcessINTERNSHIP REPORT

    Compiled by: Dennis Joseph Koshy (50)

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    2/49

    1

    ACKNOWLEDGEMENT

    First and foremost we offer our sincere gratitude to our project manager, Suresh SR,

    (Associate Vice President & Lead HR Operations (Global Payroll)) who gave us the

    opportunity to work with his team on this project. He supported us throughout our

    project with his patience and knowledge whilst giving us the liberty to work in our own

    way.

    We are grateful to Saraswathy MS (Senior Manager - Global Payroll and International

    Transfers), for her constant encouragement, guidance and support throughout our

    project. We would also like to acknowledge the valuable inputs that she provided which

    helped us to develop a better understanding of the entire payroll process.

    We wish to express our deep sense of gratitude to Fanny Florence (Senior Officer - HR

    Global Payroll), for her timely guidance and useful suggestions, which helped us in

    carrying out the project work.

    Sincere thanks to Shalom Thomas (HR Business PartnerCorporate Support) and

    Julie John (Assistant Manager-PMO) for their timely guidance and valuable assistance

    in the conduct of our project work.

    I would like to thank Prof. J. Philip, President, XIME for instituting the Summer

    Internship Programme (SIP) which has helped us prepare better for corporate life. I also

    thank Prof. Reji Mathew, Dean, XIME for his support. I extend my warm gratitude to

    Prof. Binu Modoor, Associate Dean, XIME and my Project guide for his time,

    encouragement and able guidance.

    Finally, yet importantly, we would like to express our heartfelt thanks to our beloved

    parents, friends and the entire payroll team for their help and wishes for the successful

    completion of this project.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    3/49

    2

    Contents

    List of Tables.3

    List of Figures..4

    Abbreviations5

    Executive Summary6

    Introduction to the Industry....7

    Introduction to the Company....10

    Introduction to Payroll & Project........................................14

    Research Methodology...19

    Findings & Analysis.25

    Limitations of the Study.38

    Recommendations..39

    Conclusion43

    Bibliography.45

    Annexure............................................................................46

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    4/49

    3

    List of Tables

    Table 1.1 Category of Queries 27

    Table 2.1 Types of SalaryQueries

    32

    Table 3.1Volume of queries

    from each businesstower

    35

    Table 4.1 Volume of queriesfrom each level

    36

    Table 5.1 Volume of queriesfrom each location 38

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    5/49

    4

    List of Figures

    Figure 1.1 IPM StakeholdersInputs

    17

    Figure 2.1 Data Flow in PayrollSystem

    18

    Figure 3.1 L1 & L2 Queries v/sMonth

    25

    Figure 4.1 Types of Queries v/sMonth

    26

    Figure 5.1 Clarifications v/sMonth

    29

    Figure 6.1 Updates v/s Month 30

    Figure 7.1 Errors v/s Month 31

    Figure 8.1 Salary Issues fordifferent months

    32

    Figure 9.1 Category v/s Month 33

    Figure 10.1 Business Tower v/sMonth

    35

    Figure 11.1 Level v/s Month 36

    Figure 12.1 Location v/s Month 37

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    6/49

    5

    Abbreviations

    AWOI Absent Without Information

    C & B Compensation & Benefits

    ESI Employee State Insurance ETW- Employee tagged Wrongly

    FFS - Full & Final Settlement

    FLM Front line Manager

    HRA House Rent Advance

    HRHD Human Resource Help Desk

    HRMS Human Resource Management System

    IPM Integrated Pay Master LAAS Leave and Attendance Automation System

    LOP Loss of Pay

    MDS Master Data System

    MTP Medically terminated pregnancy

    ML Maternity Leave

    MSI Merit Salary Increment

    OMS Offer Management System PIP - Performance Incentive Plan

    PS PeopleSoft

    RMG Resource Management Group

    R & R Rewards & Recognition

    SABL Sabbatical Leave

    SAL Shift Allowance

    TAT Turn Around Time

    VPF Voluntary Provident Fund

    VP/VD Variable pay/ Variable deduction

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    7/49

    6

    Executive Summary

    The HR-Payroll and HR-Helpdesk teams handle any kind of salary discrepancies or

    queries that are brought forward by the employees regarding their payroll variables and

    components. This project attempts to identify the reasons for the large number of payroll

    queries and aims at finding ways and means to reduce them.

    In order to conduct the study we extracted the data i.e. the payroll queries from

    November, 2011 to April, 2012 from PeopleSoft (PS) which constituted the primary

    data. Apart from analyzing queries I also spoke to a few members of the payroll team

    and the HR Helpdesk.

    The study gave fresh insights about the functioning of HR-Payroll and HR-Helpdesk inanswering payroll queries. I observed that the steps taken to raise a query on

    PeopleSoft were a cumbersome process and some of the queries raised did not require

    the need for a team member to address it. I became aware of the facts that some

    managers overlooked uploading important details on IPM, employees failed to

    regularize their attendance, and the level of employees awareness on critical issues

    like company policies, how to navigate through PeopleSoft, etc.

    To overcome these problems we came up with a few suggestions. Some of the majorones were:

    Customized tabs on PeopleSoft to raise queries effectively and efficiently.

    Auto triggered emails for certain queries to route queries to concerned teams.

    Constant communication regarding company polices to all employees.

    Action against managers who fail to upload essential details on IPM.

    Reminders to employees to ensure that they regularize their attendance.

    Mandatory training hours on PeopleSoft (PS).

    My main intention was to assist HRHD and the payroll team to function effectively and

    efficiently, keeping in mind the need for payroll team to concentrate on core payroll

    issues and HRHDs long term goal of going off calls in the future.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    8/49

    7

    Introduction to the Industry

    The Information Technology industry in India has gained a brand identity as a

    knowledge economy due to its IT and ITES sector. The ITITES industry has two major

    components: IT Services and Business Process Outsourcing (BPO). The growth in the

    service sectorin India has been led by the ITITES sector, contributing substantially to

    increase in GDP, employment, and exports. The sector has increased its contribution to

    India's GDP from 1.2% in FY1998 to 7.1% in FY2011.

    According to NASSCOM, the ITBPO sector in India aggregated revenues of US$88.1

    billion in FY2011, where export and domestic revenue stood at US$59 billion and

    US$29 billion respectively. The major cities that account for about nearly 90% of thissectors exports are Bangalore, Delhi, Mumbai, Chennai, Hyderabad, Pune, Kolkata and

    Coimbatore. Export dominate the ITITES industry, and constitute about 77% of the

    total industry revenue. Though the ITITES sector is export driven, the domestic market

    is also significant with a robust revenue growth. The industrys share of total Indian

    exports (merchandise plus services) increased from less than 4% in FY1998 to about

    25% in FY2012. According to Gartner, the "Top Five Indian IT Services Providers" are

    Tata Consultancy Services, Infosys, Cognizant, Wipro and HCL Technologies

    This sector has also led to employment generation. Direct employment in the IT

    services and BPO/ITES segment was 2.3 million in 2009-10 indirect employment of

    over 8.3 million job opportunities is also expected to be generated due to the growth of

    this sector in 2010-11. Generally considered a dominant player in the global outsourcing

    sector, however, the sector continues to face challenges of competitiveness in the

    globalized world, particularly from countries like China and Philippines.

    India's growing stature in the Information Age enabled it to form close ties with both the

    United States of America and the European Union. However, the recent global financial

    crisis has deeply impacted the Indian IT companies as well as global companies. As a

    result, hiring has dropped sharply, and employees are looking at different sectors like

    the financial service, telecommunications, and manufacturing industries, which have

    http://en.wikipedia.org/wiki/Information_technologyhttp://en.wikipedia.org/wiki/Indiahttp://en.wikipedia.org/wiki/Indiahttp://en.wikipedia.org/wiki/Brand_identityhttp://en.wikipedia.org/wiki/Knowledge_economyhttp://en.wikipedia.org/wiki/IT_Serviceshttp://en.wikipedia.org/wiki/Business_process_outsourcinghttp://en.wikipedia.org/wiki/Service_sectorhttp://en.wikipedia.org/wiki/GDPhttp://en.wikipedia.org/wiki/NASSCOMhttp://en.wikipedia.org/wiki/Bangalorehttp://en.wikipedia.org/wiki/Delhihttp://en.wikipedia.org/wiki/Mumbaihttp://en.wikipedia.org/wiki/Chennaihttp://en.wikipedia.org/wiki/Hyderabad,_Indiahttp://en.wikipedia.org/wiki/Punehttp://en.wikipedia.org/wiki/Kolkatahttp://en.wikipedia.org/wiki/Coimbatorehttp://en.wikipedia.org/wiki/Gartnerhttp://en.wikipedia.org/wiki/Tata_Consultancy_Serviceshttp://en.wikipedia.org/wiki/Infosyshttp://en.wikipedia.org/wiki/Cognizanthttp://en.wikipedia.org/wiki/Wiprohttp://en.wikipedia.org/wiki/HCL_Technologieshttp://en.wikipedia.org/wiki/Outsourcinghttp://en.wikipedia.org/wiki/Chinahttp://en.wikipedia.org/wiki/Philippineshttp://en.wikipedia.org/wiki/Information_Agehttp://en.wikipedia.org/wiki/United_States_of_Americahttp://en.wikipedia.org/wiki/European_Unionhttp://en.wikipedia.org/wiki/Financial_crisis_of_2007%E2%80%932010http://en.wikipedia.org/wiki/Financial_crisis_of_2007%E2%80%932010http://en.wikipedia.org/wiki/Financial_crisis_of_2007%E2%80%932010http://en.wikipedia.org/wiki/Financial_crisis_of_2007%E2%80%932010http://en.wikipedia.org/wiki/European_Unionhttp://en.wikipedia.org/wiki/United_States_of_Americahttp://en.wikipedia.org/wiki/Information_Agehttp://en.wikipedia.org/wiki/Philippineshttp://en.wikipedia.org/wiki/Chinahttp://en.wikipedia.org/wiki/Outsourcinghttp://en.wikipedia.org/wiki/HCL_Technologieshttp://en.wikipedia.org/wiki/Wiprohttp://en.wikipedia.org/wiki/Cognizanthttp://en.wikipedia.org/wiki/Infosyshttp://en.wikipedia.org/wiki/Tata_Consultancy_Serviceshttp://en.wikipedia.org/wiki/Gartnerhttp://en.wikipedia.org/wiki/Coimbatorehttp://en.wikipedia.org/wiki/Kolkatahttp://en.wikipedia.org/wiki/Punehttp://en.wikipedia.org/wiki/Hyderabad,_Indiahttp://en.wikipedia.org/wiki/Chennaihttp://en.wikipedia.org/wiki/Mumbaihttp://en.wikipedia.org/wiki/Delhihttp://en.wikipedia.org/wiki/Bangalorehttp://en.wikipedia.org/wiki/NASSCOMhttp://en.wikipedia.org/wiki/GDPhttp://en.wikipedia.org/wiki/Service_sectorhttp://en.wikipedia.org/wiki/Business_process_outsourcinghttp://en.wikipedia.org/wiki/IT_Serviceshttp://en.wikipedia.org/wiki/Knowledge_economyhttp://en.wikipedia.org/wiki/Brand_identityhttp://en.wikipedia.org/wiki/Indiahttp://en.wikipedia.org/wiki/Information_technology
  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    9/49

    8

    been growing phenomenally over the last few years. India's IT Services industry was

    born in Mumbai in 1967 with the establishment of Tata Group in partnership with

    Burroughs. The first software export zone SEEPZ was set up in Mumbai way back in

    1973, the old avatar of the modern day IT Park. More than 80 percent of the country's

    software exports happened out ofSEEPZ, Mumbai in the 80s.

    The economic effect of the technologically inclined services sector in Indiaaccounting

    for 40% of the country's GDP and 30% of export earnings as of 2006, while employing

    only 25% of its workforce

    Today, Bangalore is known as the Silicon Valley of India and contributes 33% of Indian

    IT Exports. Two of Indias largest IT companies, Infosys and Wipro are head-quartered

    in Bangalore, as are many of the global SEI-CMM Level 5 Companies.

    Mumbai too has its share of IT companies that are India's first and largest, like TCS and

    well established companies like Reliance, Patni, LnT Infotech, i-Flex, WNS, Shine,

    Naukri, Jobspert etc. And these IT and dot com companies are ruling the roost of

    Mumbai's relatively high octane industry ofInformation Technology.

    Such is the growth in Information Technology; it was revealed that Cap Gemini will soon

    have more staff in India than it does in its home market of France with 21,000

    personnel+ in India.

    A joint EU-India group of scholars was formed on 23 November 2001 to further

    promote joint research and development. On 25 June 2002 India and the European

    Union agreed to bilateral cooperation in the field of science and technology. India holds

    observer status at CERN while a joint India-EU Software Education and Development

    Center is due at Bangalore.

    http://en.wikipedia.org/wiki/Mumbaihttp://en.wikipedia.org/wiki/SEEPZhttp://en.wikipedia.org/wiki/SEEPZhttp://en.wikipedia.org/wiki/Mumbaihttp://en.wikipedia.org/wiki/Silicon_Valley_of_Indiahttp://en.wikipedia.org/wiki/Mumbaihttp://en.wikipedia.org/wiki/Tata_Consultancy_Serviceshttp://en.wikipedia.org/wiki/Reliancehttp://en.wikipedia.org/wiki/Patni_Computer_Systemshttp://en.wikipedia.org/wiki/Larsen_%26_Toubro_Infotechhttp://en.wikipedia.org/wiki/Oracle_Financial_Services_Softwarehttp://en.wikipedia.org/wiki/WNS_Global_Serviceshttp://en.wikipedia.org/wiki/Information_Technologyhttp://en.wikipedia.org/wiki/European_Unionhttp://en.wikipedia.org/wiki/European_Unionhttp://en.wikipedia.org/wiki/CERNhttp://en.wikipedia.org/wiki/Bangalorehttp://en.wikipedia.org/wiki/Bangalorehttp://en.wikipedia.org/wiki/CERNhttp://en.wikipedia.org/wiki/European_Unionhttp://en.wikipedia.org/wiki/European_Unionhttp://en.wikipedia.org/wiki/Information_Technologyhttp://en.wikipedia.org/wiki/WNS_Global_Serviceshttp://en.wikipedia.org/wiki/Oracle_Financial_Services_Softwarehttp://en.wikipedia.org/wiki/Larsen_%26_Toubro_Infotechhttp://en.wikipedia.org/wiki/Patni_Computer_Systemshttp://en.wikipedia.org/wiki/Reliancehttp://en.wikipedia.org/wiki/Tata_Consultancy_Serviceshttp://en.wikipedia.org/wiki/Mumbaihttp://en.wikipedia.org/wiki/Silicon_Valley_of_Indiahttp://en.wikipedia.org/wiki/Mumbaihttp://en.wikipedia.org/wiki/SEEPZhttp://en.wikipedia.org/wiki/SEEPZhttp://en.wikipedia.org/wiki/Mumbai
  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    10/49

    9

    India's IT industry (in USD bn)

    Particulars

    FY

    2004

    FY

    2005

    FY

    2006

    FY

    2007

    FY

    2008

    IT Services 10.4 13.5 17.8 23.5 31.0

    - Exports 7.3 10.0 13.13 18.0 23.1

    - Domestic 3.1 3.5 4.5 5.5 7.9

    ITES-BPO 3.4 5.2 7.2 9.5 12.5

    - Exports 3.1 4.6 6.3 8.4 10.9

    - Domestic 0.3 0.6 0.9 1.1 1.6

    Engineering services, R&D and Software

    products2.9 3.9 5.3 6.5 8.6

    - Exports 2.5 3.1 4.0 4.9 6.4

    - Domestic 0.4 0.7 1.3 1.6 2.4

    Hardware 5.0 5.9 7.0 8.5 12.0

    - Exports 0.5 0.5 0.6 0.5 0.5

    - Domestic 4.4 5.1 6.5 8.0 11.5

    Total IT industry (including hardware) 21.6 28.4 37.4 48.0 64.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    11/49

    10

    Introduction to the Company

    MphasiS a unit of Hewlett-Packard Co., is an Information Technology services

    company based in Bangalore, India. MphasiS is certified with ISO 9001:2008, ISO/IEC

    27001:2005 and is assessed at CMMI v 1.2 Level 5. MphasiS is ranked #7 in India IT

    companies and overall #165 by Fortune India 500 in 2011 with more than 38,000

    employees as of 2011. The company has 29 offices in 14 countries with delivery centers

    in India, Sri Lanka, China, North America and Europe.

    History

    MphasiS (then, MphasiS BFL Limited) was formed in June 2000 after the merger of the

    US-based IT consulting company MphasiS Corporation (founded in 1998) and the

    Indian IT services company BFL Software Limited (founded in 1992). MphasiS

    Corporation was founded in 1998 in Santa Monica, California by Jerry Rao and Jeroen

    Tas.

    In June 2006 Electronic Data Systems (EDS) purchased a controlling stake in the

    company (52%) for $380 million and operated as an independent EDS unit. On May 13,

    2008, Hewlett-Packard confirmed that it had reached a deal with Electronic Data

    Systems to acquire the company for $13.9 billion. The deal was completed on August

    26, 2008.

    In September 2009 MphasiS changed its brand identity by dropping EDS association to

    become "MphasiS, an HP Company" after HP retired EDS Brand to become "HP

    Enterprise Services". MphasiS operates as an independent HP subsidiary with its own

    board and continues to be listed on Indian markets as "MphasiS Limited". Currently HP

    owns close to 62% in MphasiS.

    MphasiS marked $1 billion in revenues and registered a consolidated revenue of Rs

    5,037 crore ($1,099.3 million) for the year ended October 31, 2010 becoming the sixth

    Indian IT company to do that. MphasiS headquarters at Bagmane Tech Park,

    Bangalore.

    http://en.wikipedia.org/wiki/Hewlett-Packard_Co.http://en.wikipedia.org/wiki/Bangalorehttp://en.wikipedia.org/wiki/Indiahttp://en.wikipedia.org/wiki/Fortune_India_500http://en.wikipedia.org/wiki/Santa_Monicahttp://en.wikipedia.org/wiki/Californiahttp://en.wikipedia.org/wiki/Jerry_Raohttp://en.wikipedia.org/wiki/Electronic_Data_Systemshttp://en.wikipedia.org/wiki/Hewlett-Packardhttp://en.wikipedia.org/wiki/HP_Enterprise_Serviceshttp://en.wikipedia.org/wiki/HP_Enterprise_Serviceshttp://en.wikipedia.org/wiki/Bagmane_Tech_Parkhttp://en.wikipedia.org/wiki/Bangalorehttp://en.wikipedia.org/wiki/Bangalorehttp://en.wikipedia.org/wiki/Bagmane_Tech_Parkhttp://en.wikipedia.org/wiki/HP_Enterprise_Serviceshttp://en.wikipedia.org/wiki/HP_Enterprise_Serviceshttp://en.wikipedia.org/wiki/Hewlett-Packardhttp://en.wikipedia.org/wiki/Electronic_Data_Systemshttp://en.wikipedia.org/wiki/Jerry_Raohttp://en.wikipedia.org/wiki/Californiahttp://en.wikipedia.org/wiki/Santa_Monicahttp://en.wikipedia.org/wiki/Fortune_India_500http://en.wikipedia.org/wiki/Indiahttp://en.wikipedia.org/wiki/Bangalorehttp://en.wikipedia.org/wiki/Hewlett-Packard_Co.
  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    12/49

    11

    Services

    MphasiS is engaged in providing information technology services to its customers

    around the world. MphasiS provides integrated solutions that include business process

    outsourcing, infrastructure technology, and application services. The application

    services offered by the company include application development as well as

    applications maintenance and support services. The markets served by the company

    are financial services & insurance, healthcare, manufacturing, government,

    transportation, communications, and consumer & retail industries.

    MphasiS- BPO

    Fortune 500 companies globally are served through voice and contact center by the

    MphasiS BPO. Personalizing near shore, offshore and onshore solutions are part of the

    field of expertise of the company. Value added and efficient customer service care is

    provided by the business process outsourcing unit. The various processes include

    finance and accounting, tax and compliance, research and content management and

    customer relationship management

    The company has BPO operating in Mangalore, Pune, Noida, Mumbai, Bangalore,

    Pondicherry and Ahmadabad. All these centers offers English language customer care

    services. The Latin American clients are routed normally to the Tijuana and Mexico

    units.

    The support service in various sectors as provided by MphasiS business process

    outsourcing includes comprehensible solutions. For instance in research and content

    management processes the customer service helps you to clean, and manage through

    integrated and aggregative mediums. This enhances access to information and data.

    Similarly in financial processes effective management and awareness is provided byconforming to company rules and policies. Customer relationship management helps in

    enhancing interactivity with customers. This includes leveraging in a seamless way

    through phone, web and effective communicating devices. Human resource outsourcing

    includes effective utilization of Human Resource policies and practices.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    13/49

    12

    The MphasiS BPO operates through an efficient management system. This

    management is dedicated to allotting processes and structuring them. A team of

    management information systems, quality assurance and business analysts handles the

    operations of each individual processes. Customer service improvement is handled by

    the Six Sigma team. The business process outsourcing unit works on a three step

    process principle: Transition, stabilization and finally optimization.

    Offices

    With more than 38,000 employees, MphasiS has presence across India with centers in

    Bangalore, Raipur, Chennai, Pune, Mumbai, Noida-NCR, Indore, Pondicherry,

    Ahmedabad, Bhubaneswarand Mangalore.

    http://en.wikipedia.org/wiki/Indiahttp://en.wikipedia.org/wiki/Bangalorehttp://en.wikipedia.org/wiki/Raipurhttp://en.wikipedia.org/wiki/Chennaihttp://en.wikipedia.org/wiki/Punehttp://en.wikipedia.org/wiki/Ahmedabadhttp://en.wikipedia.org/wiki/Bhubaneswarhttp://en.wikipedia.org/wiki/Bhubaneswarhttp://en.wikipedia.org/wiki/Bhubaneswarhttp://en.wikipedia.org/wiki/Ahmedabadhttp://en.wikipedia.org/wiki/Punehttp://en.wikipedia.org/wiki/Chennaihttp://en.wikipedia.org/wiki/Raipurhttp://en.wikipedia.org/wiki/Bangalorehttp://en.wikipedia.org/wiki/India
  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    14/49

    13

    HR Organization Chart

    Chief Human

    Resource Officer

    SVP & Head -

    Global HR

    Operations

    SVP & Business HR

    Head BPO

    Domestic

    SVP & Head -

    Global Staffing &

    Learning

    SVP & Head -

    Technical Learning

    SVP & Head -

    Global

    Compensation &

    Benefits

    SVP & Apps Bus HR

    Head-Matured

    Mkts Benefits.

    SVP and Business

    HR Head ITO

    core &Talent

    Management

    SVP and Head HR

    BPO International,

    Service desk &

    Corporate Support

    Executive Assistant

    to CHRO

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    15/49

    14

    Introduction to Payroll and the Project

    In a company, payroll is the sum of all financial records of salaries, wages, bonuses,

    allowances, incentives and deductionsfor an employee. In accounting, payroll refers to

    the amount paid to employees for services they provided during a certain period of time.In the case of most Indian companies that being on a monthly basis. Payroll plays a

    major role in a company for several reasons. From an accounting perspective, payroll is

    crucial because payroll and payroll taxes considerably affect the net income of most

    companies and they are subject to laws and regulations. From an ethics in business

    viewpoint payroll is a critical department as employees are responsive to payroll errors

    and irregularities: good employee morale requires payroll to be paid timely and

    accurately. The primary mission of the payroll department is to ensure that all

    employees are paid accurately and timely with the correct withholdings and deductions,

    and to ensure the withholdings and deductions are remitted in a timely manner. This

    includes salary payments, tax withholdings, and deductions from a paycheck.

    It consists of details regarding the employee ID, employee name, date of joining, daily

    attendance record, basic salary, allowances, overtime pay, different types of bonuses,

    commissions, incentives, pay for holidays, vacations and sickness, and accommodation

    etc. Various deductions such as PF, taxes, loan installments or salary advances taken

    by employee are deducted before releasing the salary to the employee.

    Calculation of gross salaries and deductible amounts is a tedious task which involves

    risk. Some of the organizations use the traditional manual method of payroll processing

    and some go for the advanced payroll processing software.

    In todays computerized environment, payroll system has developed into automated

    software that performs every action needed by the payroll process. It helps in

    calculating the payable amounts and deductions very easily. It also helps in generating

    the pay slips in lesser time. MphasiS however, belongs to the first category, and still use

    the traditional manual method.

    http://en.wikipedia.org/wiki/Companyhttp://en.wikipedia.org/wiki/Financialhttp://en.wikipedia.org/wiki/Salaryhttp://en.wikipedia.org/wiki/Wagehttp://en.wikipedia.org/wiki/Tax_deductionhttp://en.wikipedia.org/wiki/Tax_deductionhttp://en.wikipedia.org/wiki/Paycheckhttp://en.wikipedia.org/wiki/Paycheckhttp://en.wikipedia.org/wiki/Paycheckhttp://en.wikipedia.org/wiki/Tax_deductionhttp://en.wikipedia.org/wiki/Wagehttp://en.wikipedia.org/wiki/Salaryhttp://en.wikipedia.org/wiki/Financialhttp://en.wikipedia.org/wiki/Company
  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    16/49

    15

    Automated calculations minimize errors. Data is validated automatically by the software.

    It needs professionals to make use of the software for its efficient working.

    IPM InputsIntegrated Pay Master (IPM) is an internal tool developed with the help of Chief

    Information Office (CIO) team for collating all the payroll inputs. The various payroll

    inputs for all India & Overseas employees or their respective managers are provided

    through IPM. All the inputs given by the stakeholders on this tool are considered as

    approved. All the inputs have to be provided before 15th of every month after which the

    data uploaded on IPM, will be processed by the payroll team.

    Features of IPM

    Ensures data security and confidentiality

    Removes person & email dependency (multiple handovers)

    Audit Trail

    Reduction in effort & time taken by the payroll team

    IPM Stakeholders

    IPM gets the inputs from various stakeholders for the Payroll Processing. The majorstakeholders are:

    Recruitment

    Offer Management System (OMS)

    Delivery

    Compensation & Benefits (C & B)

    Finance

    Human Resource (HR)- Talent Management Group

    Resource Management Group (RMG)

    Admin

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    17/49

    16

    Figure 1: IPM Stakeholders Inputs

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    18/49

    17

    Validation of Payroll System

    Payroll system proves to be an integral part of any companys efficient and successful

    running. At MphasiS, the payroll system comprises of 4 elements:

    IPM

    PS

    MDS

    Delphi

    IPM Integrated Pay Master is an internal tool developed with the help of CIO team for

    collating all the payroll inputs

    PS - PeopleSoft is being used by MphasiS as the Human Resource Management

    System (HRMS).

    MDS - Master Data System is where all these details get accumulated and is sent to

    other downstream applications. It is currently used only for VP/VD inputs.

    Delphi It is the system used by the Finance team to integrate the payout details of

    each employee.

    Figure 2: Data Flow in Payroll System

    IPM PS MDS DELPHI

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    19/49

    18

    Validation Process

    In order to reduce the number of payroll related queries coming to the payroll team, a

    study was conducted to identify the major issues or errors in the existing process.

    Sample: A sample of 7989 payroll queries was pulled out from PeopleSoft, for doing the

    study. The dump was from 1st November 2011 to 30th April 2012.

    Validation: Each query was manually looked up on PeopleSoft and then categorized.

    Validation was done in Excel with the help of vlookup formula to extract essential

    details.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    20/49

    19

    Research Methodology

    Research in common parlance refers to a search for knowledge. Once can also define research

    as a scientific and systematic search for pertinent information on a specific topic. The Advanced

    Learners Dictionary of Current English lays down the meaning of research as a careful

    investigation or inquiry especially through search for new facts in any branch of knowledge.

    According to Clifford Woody research comprises defining and redefining problems,

    formulating hypothesis or suggested solutions; collecting, organizing and evaluating

    data; making deductions and reaching conclusions; and at last carefully testing the

    conclusions to determine whether they fit the formulating hypothesis. Research is, thus,

    an original contribution to the existing stock of knowledge making for its advancement. It

    is the pursuit of truth with the help of study, observation, comparison and experiment. In

    short, the search for knowledge through objective and systematic method of finding

    solution to a problem is research.

    The purpose of research is to discover answers to questions through the application of

    scientific procedures. The main aim of research is to find out the truth which is hidden

    and which has not been discovered as yet. Though each research study has its own

    specific purpose, we may think of research objectives as falling into a number of

    following broad groupings:

    To gain familiarity with a phenomenon or to achieve new insights into it (studies

    with this object in view are termed as exploratoryorformulate research studies)

    To portray accurately the characteristics of a particular individual, situation or a

    group (studies with this object in view are known as descriptive research

    studies); To determine the frequency with which something occurs or with which it is

    associated with something else (studies with this object in view are known as

    diagnosticresearch studies);

    To test a hypothesis of a causal relationship between variables (such studies are

    known as hypothesis-testingresearch studies).

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    21/49

    20

    Statement of the Problem: The large amount of payroll queries that was coming to the

    payroll team was considered more than what it should be getting each month. Some of

    the issues caused by this were;

    Increasing number of payroll queries lead to: low employee satisfaction and

    increased man-hours.

    Apart from that, this caused the payroll team to divert their focus from hard core

    payroll issues.

    Increasing the workload of the HR Helpdesk

    Assumptions: Few assumptions regarding the study were that;

    Since BPO employees were not used to the corporate setup, the initial

    assumption was that maximum queries would come from the BPO Tower.

    The main location from where the queries were coming in was considered to be

    Bangalore and Pune, since they had the highest number of employees.

    The assumption was that the new employees would be asking more queries than

    the older employees.

    Hypothesis: Since the study conducted was descriptive in nature, I did not have a

    hypothesis for the same.

    Sample: A sample of 7989 payroll queries was pulled out from PeopleSoft, for doing the

    study. The dump was from 1st November 2011 to 30th April 2012.

    Universe: All queries that were coming to the HR Helpdesk, from 1st November 2011 to

    30th April 2012 would be the universe for the study.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    22/49

    21

    Limitations of the Study: This study had its share of limitations. Some of the major

    ones were:

    Data was not accurate that was pulled out from PS - The L1 queries that were

    pulled out for the November, December and January were all Salary queries,

    unlike for the other months, which was purely data from payroll category.

    Difficult to categorize since they were very similar- Some of the queries were

    so similar in nature that it was difficult to put it into a category sometimes. The

    categorization was done on the basis of our understanding of the query or

    solution provided.

    No proper Summary - Some of the L1 queries did not have a proper summary.

    Because of this, there was no clarity on the issue. Therefore we were not able

    categorize them.

    Time Limitation Since the report has to be submitted before the results of the

    implemented recommendations are still unknown, estimations cant be based it.

    Due to the time limit, this study cant be compared to any other organizations that

    have implemented similar recommendations.

    The target population for the purpose of our analysis were all the permanent, contractbasis, pre-separated and separated employees of MphasiS Ltd, both onsite and

    offshore employees, who have raised payroll related queries on PeopleSoft via calls

    and e-mails, from November, 2011 to April; 2012.The duration of study was from May

    7th June 29th, 2012.

    The data was collected by, extracting reports from PeopleSoft by using the following

    steps:

    Main MenuReporting Tools Helpdesk Reporting Tools 9.1 Helpdesk Query

    Manager 9.1

    The command for each category being:

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    23/49

    22

    RC_CASE_SUMMARY L1 Queries

    RC_CASE_SUMMARY_1_PAYROLL L2 Queries

    The entire payroll dump was analyzed by using their respective case IDs on PeopleSoft

    (PS). Based on our observation we were able to classify them on the following basis:

    updates, clarification and errors.

    Those queries which were grouped underclarifications were raised because:

    The employees were seeking general information

    Employees needed clarity on certain issues

    Those queries marked as updates were done for the following reasons:

    Employees faced difficulties in updating their bank account and PAN card details

    so they required the assistance of the payroll team for the same.

    Employees made requests with respect to application of leaves, salary advance

    and VPF requests.

    The Errors were classified taking into consideration the following:

    Technical errors

    Human errors

    After going through the queries, on the basis of our understanding we were able to

    classify them into the following categories:

    Advances:Queries were based on employees requests to apply for salary advances

    for medical reasons, house rent etc. as they required the payroll team to apply for it ontheir behalf and forward the same to the finance team.

    Allowances: Queries based on shift/on-call special, deputation, onsite, leave travel

    allowances.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    24/49

    23

    Bank Accounts & Pan Card Issues: Requests to update the bank account numbers or

    deletion of the previous accounts and updating the employee PAN details on People

    Soft.

    Bonus Issues: Issues relating to joining, longevity, referral, skill and retention bonus

    were placed under this category.

    Deductions: This consisted of issues involving deductions with respect to taxes

    (Professional & Income), transport and insurance premium deductions.

    Employee tagged wrongly: These were queries regarding incorrect Band, Level,

    Designation and location of employees on their pay slips or on PS.

    Gratuity and Superannuation: Employees want to know the status and breakup of the

    gratuity amount for the tenure of the employees. The status of the gratuity cheque sent

    is also clarified at times.

    Incentives: Employees raise their concerns of the amounts due to them with respect torewards and recognition (R&R) amounts, PIP, and training incentives.

    Leave Related:Requests relating to employees extending their LOP for the following

    months, LOP reversal issues, leave balance and leave encashment for the year.

    PF issues: Employees raise the cases for reasons of discontinuing the VPF or

    information regarding PF transfer, withdrawal, contribution, balance enquiry etc.

    Reimbursements: Joining /discontinuing transport and Car and fuel reimbursements

    policies.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    25/49

    24

    Salary Issues: Discrepancies in the Salary credited for the month and clarifications as

    to why the salary hasnt been released. These queries were sub categories on the

    solutions provided to the queries stated below:

    HRMS Stoppay

    LAAS Stoppay

    Bank Stoppay

    Released Through Cheque

    Interim Payout

    Raise case on PS

    Salary deductions

    Others

    Miscellaneous Issues: Employees raised cases requesting for information purposes

    on various issues like car enrollment policy, Change of LAN ID, payment of summit

    award etc.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    26/49

    25

    Findings & Analysis

    The total amount of queries analyzed over a period of 6 months from November, 2011

    to April, 2012 was 7989. Out of which 4502 (56.4%) were L1 Queries and 3487 (43.6%)

    were L2 queries, handled by the HR- Helpdesk and HR- Payroll team respectively.

    Figure 3.1

    As shown in figure 3.1 the month of November 2011 had a sum total of 1536 queries.

    This was because for the month of November, December and January the data

    received was not purely Payroll data, but queries were extracted from the salary

    category as well.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    27/49

    26

    Figure 4.1

    7989 queries were then classified into 6393 Clarifications (80%), 1283 (16.1%) request

    for system updates and 313 (3.9%) technical or human errors.

    As shown in figure 4.1 the queries that have hit payroll every month have been relativelyof the same type over the last six months. The clarifications seem to have reduced over

    the months, but the updates have seen an upward trend till the month of March. The

    errors have been relatively low on a month on month basis.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    28/49

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    29/49

    28

    Gratuity and superannuation constituted around 2.3% of total queries where

    employees inquired about their gratuity status.

    PF issues were 2.2% of the total queries where employees raised queries about

    their PF calculations, statement, and information on transfer or withdrawal of PF.

    Queries were also raised with respect to alterations in VPF contribution.

    Issues relating to incorrect information shown in PS or on Pay-slip of employees

    with regard to Band, Designation, Level and Location represented 2% of total

    queries.

    Advances and Miscellaneous issues were 1.3% of total queries.

    Reimbursements amounted to 0.9% of total queries.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    30/49

    29

    Figure 5.1

    As seen in figure 5.1 Clarifications were primarily because of salary issues 57%,

    deductions 8%, leave related 7% and bank account and pan card issues 4.5% of total

    clarifications. The rise in allowances and deductions were mainly because of the

    change in shift allowance policy and transport policy for the month of April and March

    respectively.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    31/49

    30

    Figure 6.1

    As seen in the above figure 6.1, Updates were largely because of requests for bank

    account and pan card updates (61.6%) and leave related issues (21.2%) as a

    percentage of total updates.

    The reason for the increasing trend in bank account updates from the month of

    February was because the data received for the month of November- January wasnt

    purely Payroll data, majority of the queries were extracted from the salary category.

    The leave related issues were considerably high for November and December because

    of LOP reversals as employees would have gone on leave and on resuming work they

    would have been on LOP.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    32/49

    31

    Figure 7.1

    As depicted in figure 7.1, Errors were mainly because of salary issues (30%).

    Employees raised queries on salary deductions as they would have been on LOP after

    resuming from December vacations.

    Allowances were 28% of total errors, due to managers carelessness as they failed to

    upload the shift allowance and incentive inputs on IPM. 15% were leave related LOP

    reversal cases, which has been stopped as of June, 2012.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    33/49

    32

    Figure 8.1

    As seen in the above figure 8.1, Majority of the queries raised were because of salary

    issues, 47.4 % of total queries. The number of queries raised for the months of

    November to January is relatively higher because the data received for those months

    wasnt purely Payroll data, majority of the queries were extracted from the salary

    category.

    Salary Issues cases raised were largely due to LAAS Stoppay that constituted 26% of

    total salary issues and 12% of the total queries. Whereas for the months of February till

    April the queries related to salary issues have been relatively stable.

    Table 2.1

    1005

    638710

    465 508 457

    Nov Dec Jan Feb March April

    Salary Issues

    Salary Issues

    Queries Cases Grand

    Total

    Percentage

    HRMS Stoppay 159 7989 2.0

    Bank Stoppay 314 7989 3.9LAAS Stoppay 993 7989 12.4

    Interim Payout 411 7989 5.1

    Raise Case 143 7989 1.8

    LOP 222 7989 2.8

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    34/49

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    35/49

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    36/49

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    37/49

    36

    Figure 11.1

    As seen in figure 11.1, a majority of the queries were raised by levels 4, 3 and 2.

    But when compared as a proportion of the total number of employees active in the

    system as on May 2012, vast majority of the queries were raised by employees fromlevels 4 (30.5%), 5 (29.6%) and 6 (25.9%).

    Table 4.1

    Levels No. of Cases No. of Employees Percentage

    1 1343 6731 20.0

    2 1418 9116 15.6

    3 1477 7412 19.9

    4 1534 5024 30.5

    5 1086 3673 29.6

    6 628 2422 25.9

    7 288 1361 21.2

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    38/49

    37

    Figure 12.1

    As observed in figure 12.1 a vast majority of the queries were raised by employees from

    locations like Bangalore, Pune and Indore in descending order.

    But when compared as a proportion of the total number of employees active in the

    system as on May 2012, the location which had the most queries in proportion to the

    number of employees was Indore (39.8%), Mumbai (26.1%) and Vadodara (25.9%).

    Table 5.1

    Location No. of Cases No. of Employees Percentage

    Bangalore 2236 10872 20.6

    Chennai 1008 5082 19.8

    Indore 1378 3458 39.8Mangalore 295 1510 19.5

    Mumbai 372 1428 26.1

    Pune 1664 8435 19.7

    Vadodara 417 1612 25.9

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    39/49

    38

    Limitations of the Study

    This study had its share of limitations. Some of the major ones were:

    Data was not accurate that was pulled out from PS - The L1 queries that were

    pulled out for the November, December and January were all Salary queries,

    unlike for the other months, which was purely data from payroll category.

    Difficult to categorize since they were very similar- Some of the queries were

    so similar in nature that it was difficult to put it into a category sometimes. The

    categorization was done on the basis of our understanding of the query or

    solution provided.

    No proper Summary - Some of the L1 queries did not have a proper summary.

    Because of this, there was no clarity on the issue. Therefore we were not able

    categorize them.

    Time Limitation Since the report has to be submitted before the results of the

    implemented recommendations are still unknown, estimations cant be based it.

    Due to the time limit, this study cant be compared to any other organizations that

    have implemented similar recommendations.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    40/49

    39

    Recommendations

    Sr.

    No

    Problem Impact Solution

    1. Responses to queries

    are wavered and lack

    clarity at times.

    Employees are notcommunicatedefficiently.

    Increased no. ofre-opened cases.

    Standardization of

    responses to certain

    issues.

    2. Employees are not

    regularizing their

    attendance in time.

    Increased LAASstoppay cases

    Alerts of LAAS systems

    and Computer Systems

    (wallpapers).

    3. Lack of awareness -

    Bank Account and Pan

    card details.

    Increased Bankand Pan cardRelated Queries.

    On-boarding SPOCs

    must ensure that

    employees are well

    informed.

    4. Employees are

    unaware of how to

    navigate through PS.

    Increased Updates for

    Payroll.

    Refresher /training

    courses on PS.

    5. Managers fail to:

    Upload the

    details on IPM.

    Regularize

    attendance

    Inform policychanges

    Employees are :

    Unable to claim

    their allowances

    and incentives.

    LAAS Stoppay

    More cases raised

    Managers should

    without fail

    Upload details

    Regularize

    attendance

    Inform policychanges

    (Action taken if found

    lacking)

    6. L2 Queries specific to

    payroll are not being

    routed to payroll.

    Increased TAT HD has to make sure

    that they clearly assign

    queries to the respective

    departments.

    7. Employees have too

    many options in

    categories.

    Wrong category chosen

    thus increasing workload.

    One category for payroll.

    8.. Employees do not read

    email alerts for policy

    change.

    Unaware of the change in

    policy.

    Change in structure of

    email alerts conveying

    policy changes.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    41/49

    40

    9. Employees are

    unaware how to check

    their salary status.

    Increase in salary status

    queries.

    Running scrolls on E-

    payroll requesting

    employees to check their

    status

    10. Employees sending tax

    related queries to

    payroll, instead of

    raising a ticket on e-

    payroll.

    Unwanted increased

    number of L1 payroll

    queries.

    Auto triggered mails to

    ensure employees raise

    a ticket on e-payroll.

    11. Employees are

    confused about when

    they will receive their

    bonus amounts.

    Increase in L2 payroll

    queries with reference to

    bonus.

    Clearly state the exact

    date the employee can

    expect to receive their

    bonus amounts.

    Recommendations in detail:

    1. Reminders for regularization of attendance

    Reminders should be sent in the form ofwallpapers on monitor screens

    for those employees who have access to computers just before payroll

    dates.

    For those who do not have accessibility to computer systems, reminders

    will be showcased on the LAAS system in the form of running scrolls.

    2. Handbooks

    On-boarding Handbook- A handbook containing details like: Bank/ PAN Card Updates on PS

    Medi-claim ( w.r.t. now or never )

    Allowances

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    42/49

    41

    Exit Handout at the start of the notice period - A handout containing

    information on :

    PF withdrawal/ PF Transfer(especially sharing of personal E-mail

    ID)

    Gratuity/ Superannuation

    Pre-separation process

    Full & Final settlement procedure

    3. There should be only Single Category for employees to raise their queries

    regarding payroll. ( Check Annexure II for further categories)

    4. Auto-triggered mails for:

    Queries specific to Transport,

    Tax ( e-payroll)

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    43/49

    42

    Suggestions that have been initiated:

    1. Running Scrolls on e-Payroll

    Though the salary is being processed for the current month, please do login to

    Self Service Po rtal (SSP)to know exactly what is yourSalary payout status

    for the current month. Use this link, which navigates you to SSP:

    URL:

    https://appgate.mphasis.com/uniquesig6b474584fc2fa80679cd75f32eedf6b6253

    cb4311c336d04850c4093eec403e1/uniquesig1/pfcab/aspx/PayStatusDetails.as

    px?ParentId=1&Id=58&Type=1

    Expectations

    Strengthen HDs processes in order to go off calls in the near future.

    Help employees who are unable to elucidate their queries.

    Increase the speed and efficiency of the HRHD Team

    Clearly stated problems, avoids confusion among HD team members.

    Number of re-opened cases will reduce as HD team will have a clearer

    understanding of Employees queries.

    This will help streamline all queries to the correct stakeholders and there will be

    less room for error.

    https://appgate.mphasis.com/uniquesig6b474584fc2fa80679cd75f32eedf6b6253cb4311c336d04850c4093eec403e1/uniquesig1/pfcab/aspx/PayStatusDetails.aspx?ParentId=1&Id=58&Type=1https://appgate.mphasis.com/uniquesig6b474584fc2fa80679cd75f32eedf6b6253cb4311c336d04850c4093eec403e1/uniquesig1/pfcab/aspx/PayStatusDetails.aspx?ParentId=1&Id=58&Type=1https://appgate.mphasis.com/uniquesig6b474584fc2fa80679cd75f32eedf6b6253cb4311c336d04850c4093eec403e1/uniquesig1/pfcab/aspx/PayStatusDetails.aspx?ParentId=1&Id=58&Type=1https://appgate.mphasis.com/uniquesig6b474584fc2fa80679cd75f32eedf6b6253cb4311c336d04850c4093eec403e1/uniquesig1/pfcab/aspx/PayStatusDetails.aspx?ParentId=1&Id=58&Type=1https://appgate.mphasis.com/uniquesig6b474584fc2fa80679cd75f32eedf6b6253cb4311c336d04850c4093eec403e1/uniquesig1/pfcab/aspx/PayStatusDetails.aspx?ParentId=1&Id=58&Type=1https://appgate.mphasis.com/uniquesig6b474584fc2fa80679cd75f32eedf6b6253cb4311c336d04850c4093eec403e1/uniquesig1/pfcab/aspx/PayStatusDetails.aspx?ParentId=1&Id=58&Type=1https://appgate.mphasis.com/uniquesig6b474584fc2fa80679cd75f32eedf6b6253cb4311c336d04850c4093eec403e1/uniquesig1/pfcab/aspx/PayStatusDetails.aspx?ParentId=1&Id=58&Type=1
  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    44/49

    43

    Conclusion

    Every month the HRHD is hit by more than 10,000 queries, of which approximately

    1,500 are payroll related queries. The project was conducted in order to reduce such

    queries by finding means to streamline processes and create awareness thereby

    utilizing companys resources in the best possible way.

    Primarily, the trend analysis conducted lead to the following conclusions:

    Majority of the queries were raised by the CS business tower and not APPS and

    BPO which was the supposition.

    Locations which had the most queries in proportion to the number of employees

    were Indore, Mumbai and Vadodara. A good number of the queries were raised by employees from levels 4, 5 and 6.

    Queries raised by employees who joined in 2005, 2006 and 2008 were the

    highest in proportion to the total number of employees who joined that year.

    Essentially, our recommendations for streamlining the entire process and thereby

    reducing the number of queries were to:

    Clear identification of L1 and L2 queries

    Simplify the PS CRM navigations/ drop down list to help employee to select the

    right option to raise the issue

    Assign queries to the right stakeholder at the first place

    Structure of responses can be more clear and understandable to employee

    Conclusive closure to queries at first place rather than partial response or

    incomplete responses

    Identify area of concerns which are of repetitive nature and highlight back to the

    stakeholders

    Commitments made to employees should be tracked in system itself( PS-CRM)

    While the overall communication can be improved by:

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    45/49

    44

    Make it effective to the end customer (employees)

    Any policy or process changes which are impacting the employees , should

    have multiple mode communication (email, FLM connects , running scrolls,

    wallpapers, etc)

    Reviewing Manager tool kit and updating it on regular basis

    Strengthening the on-boarding effectiveness in terms of mandatory dos &

    don'ts

    Mandatory training for employees/Front Line Managers (FLMs) on PS system

    Our main intention was to assist HRHD and the payroll team to function effectively andefficiently, keeping in mind the need for payroll team to concentrate on core payroll

    issues and HRHDs long term goal of going off calls in the future.

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    46/49

    45

    Bibliography

    Websites

    www.mphasis.com

    www.mymphasis.com

    www.humanresource.net.in

    www.hrdc.in

    www.humancapitalonline.com

    www.shrmindia.org

    www.wikipedia.org

    http://www.mphasis.com/http://www.humanresource.net.in/http://www.hrdc.in/http://www.humancapitalonline.com/http://www.shrmindia.org/http://www.shrmindia.org/http://www.humancapitalonline.com/http://www.hrdc.in/http://www.humanresource.net.in/http://www.mphasis.com/
  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    47/49

    46

    Annexure

    This will have further categories that an employee can select from:o Leave

    o Allowances

    o Advances

    o Bonus

    o Salary

    o Payslip

    o Bank account details

    o Pan Card details

    o Incentives

    o Gratuity and

    Superannuation

    o Reimbursements

    o Deductions

    o PF

    o Data upload in PS

    o Others

    Each Category thereafter will have a Specific Summary.

    o Leave

    LOP

    LAAS

    SABL / ML/MTP

    Leave balance

    Others

    o Allowances

    Dispute in Shift/On- Call allowance

    Dispute in OT allowance

    Dispute in Deputation allowance

    Dispute in Leave travel allowance Special Allowance

    Others

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    48/49

    47

    o Deductions

    Professional Tax

    Income Tax

    Transport

    ESI

    Medi-claim

    Others

    o Payslip

    Attestation

    Changes in Details on Payslip

    Designation

    Others

    o Bonus Issues

    Joining

    Referral

    Retention

    Longevity

    Skill

    Others

    o Gratuity and Superannuation

    Gratuity

    Superannuation

    o Incentives

    Training

    PIP

    R&R

    MSI

    Others

    o Advances Salary Advance

    HRA / HDA

    Medical Advance

    Others

  • 7/28/2019 Final PrAn Analysis of Increase in Volume of Payroll Queries and Streamlining the Payroll Processoject Doc

    49/49

    o Salary

    Salary Not credited

    Discrepancies in Salary Amount

    Salary Status

    Salary Deductions

    Cheque not received

    Wrong cheque

    Others