INDUSTRIAL INTERNSHIP FINAL REPORT

1

Page 2: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

2

EXECUTIVE SUMMARY

The Student Industrial Internship Program is conducted for 32 weeks and

compulsory for all student of UTP in order to graduate with Bachelor's Degree. The

students will undergo their industrial internship at a host company relevant to their

courses. The purpose of the industrial internship is to expose UTP students to the real

working environment and also develop skills which are necessary in the working life in

future.

The author was attached to Foxboro (M) Sdn Bhd, which is one of the Control

and Instrumentation company in Malaysia. Under supervision of Mr. Zulkefli Zakba,

Mr. Muharram and Mr. Aimee, the author has successfully completed a project relates

to the Distributed Control System (DCS) design. The author also able to get some

insight and practical application of theories learnt in UTP based on industrial practice.

This Industrial Internship Final Report summarizes all the relevant tasks and

projects that the author was involved during eight-month internship period at the host

company. The report consists of five main sections, the first section being the

Introduction which includes an introduction to the host company, the objectives of

internship program and the scope of the author's work during the internship period. The

second section covers the projects and activities done for the internship program. The

author's learning experiences will be well explained in the third section of the report. In

the fourth section, discussions and recommendations towards the Host Company and

UTP will be put across. The final section is a wrap up of the whole report consisting of

Conclusion, References and Appendices.

Page 3: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

3

ACKNOWLEDGEMENT

First and foremost, I would like to convey my deepest appreciation and gratitude

to all supervisors and engineers at Foxboro which are Mr. Zulkefli, Mr. Aimee, Mr.

Muharram and Mr. Hafiz for their guidance, advice and discussions for the completion

and success of this internship. Without their support and encouragement, I would not be

able to have as much knowledge and input as I already gain from this internship.

Next, I want to thank all Foxboro staffs, apprentices and other interns for their

remarkable assist and sharing while I was there. With their help and support, I am able

to adopt with the new working environment and to cope with all the given task.

Other than that, I would also like to thank my UTP supervisor, Ms. Salina

Mohmad for travelling far away to attend industrial visit at my host company, for taking

the time to evaluate this report, and for her advices and suggestions regarding this

Industrial Internship Program.

Last but not least, I like to take this opportunity to express my appreciation to

my family, especially to my parent for giving me full support to complete this industrial

training. May ALLAH SWT bless them all and thank you so much for their support.

Page 4: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

4

TABLE OF CONTENTS

VERIFICATION STATEMENT .................................................................................. 1

EXECUTIVE SUMMARY ........................................................................................... 2

ACKNOWLEDGEMENT .................................................................................... 3

TABLE OF CONTENT ....................................................................................... 4

LIST OF FIGURES AND TABLE ........................................................................ 5

CHAPTER I : INTRODUCTION

1.1 Description of Host Company .............................................................. 7

1.2 Objectives of Industrial Internship Program ........................................... 9

1.3 Scope of Works, Tasks and Project Undertaken ..................................... 10

CHAPTER II : PROJECTS AND ACTIVITIES

2.1 System Fundamental

2.1.1 Objectives ............................................................................. 11

2.1.2 Intelligent Automation (I/A) Series .......................................... 11

2.1.3 Process Control ...................................................................... 14

2.2 Software Induction

2.2.1 Introduction ........................................................................ 18

2.2.2 FoxView ............................................................................. 18

2.2.3 FoxDraw ............................................................................. 20

2.2.4 Integrated Control Configurator (ICC) .................................... 27

2.3 HIMA Upgrade Project

2.3.1 Introduction ..................................................................... 31

2.3.2 The Task .......................................................................... 31

2.3.3 Factory Acceptance Test (FAT) .......................................... 35

Page 5: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

5

CHAPTER III : LESSON LEARNED AND EXPERIENCE GAINED

3.1 Technical Lessons

3.1.1 Foxboro I/A Series ............................................................... 41

3.2 Non-Technical Lessons

3.2.1 Communication Skills ........................................................... 41

3.2.2 Leadership and Management Skills ......................................... 42

3.2.3 Safety Training and Awareness ............................................... 42

3.3 Problems Faced ................................................................................... 43

CHAPTER IV : DISCUSSION AND RECOMMENDATIONS

4.1 Host Company .................................................................................... 44

4.2 UTP ................................................................................................... 45

CHAPTER V

CONCLUSION ....................................................................................... 46

REFERENCES ........................................................................................ 47

APPENDICES .......................................................................................... 48

Page 6: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

6

LIST OF FIGURES AND TABLE

FIGURES

Figure 1.1 : Chart of Foxboro

Figure 2.1 : Components of control system

Figure 2.2 : Engineering diagram for Control Systems

Figure 2.3 : FoxView

Figure 2.4 : FoxDraw

Figure 2.5 : Sample FoxDraw Supplied Palettes

Figure 2.6 : I/A Series Symbol Palette Examples

Figure 2.7 : Configure Objects Dialog Box

Figure 2.8 : ECB16 Diagram

Figure 2.9 (a) : Mapping Table

Figure 2.9 (b) : Complete Database

Figure 2.10 : Loading Database to ICC

Figure 2.11 (a) : Configure Graphic

Figure 2.11 (b) : Edit Layout of Graphic

TABLE

Table 2.1 : ECBPG Parameters

Page 7: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

7

CHAPTER I

INTRODUCTION

1.1: Description of Host Company

Foxboro Malaysia Sdn. Bhd. or Foxboro (M) Sdn. Bhd. is the result of a venture

between Invensys and a local associated company of Permodalan Usahawan Nasional

Berhad (PUNB) which is Progressive Impact Technology (PIT).

Foxboro (M) Sdn. Bhd. leading products and services fall into several inter-

related categories: Intelligent Automation (I/A) Series System for Distributed Control

System (DCS), SCADA and Remote Terminal Unit, Terminal Automation System and

Field Measurement and Instrumentation.

Foxboro (M) Sdn. Bhd., with its employees support Foxboro's entire range of

process control products including Design, Engineering, Fabrication, Integration,

Commissioning, Training and Maintenance. Foxboro (M) Sdn. Bhd. thrives in the areas

of engineering and customer service. Foxboro (M) Sdn. Bhd. operation has extensive

experience in handling design, engineering, procurement, site services and supports

associated with grass root projects, re-instrumentation, revamps and modernization

projects - all performed locally. All products and services are developed, delivered and

serviced under ISO 9001:2000 certified guidelines.

Page 8: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

8

Foxboro (M) Sdn. Bhd. was established in Malaysia since 1977. Malaysia equity

participation since 1992:

Figure 1.1 : Chart of Foxboro

• Office Locations:

o Head Office: Bukit Jelutong, Shah Alam, Peninsular Malaysia.

o Branch Office 1: Bintulu, Sarawak, East Malaysia.

o Branch Office 2: Paka, Terengganu, Peninsular Malaysia.

• Local Agents (Field Instruments):

Peninsular & East Malaysia.

• Major Registration Status:

TNB License (PIT), MOF (PIT) and Petronas License.

Foxboro Malaysia is an ISO 9001 : 2000 Certified Organization

Page 9: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

9

1.2: Objectives of Industrial Internship Program

The primary objective of the industrial internship is to expose UTP students to

the real working environment so that the student can relate theoretical knowledge

gained at the university with application in industry. Besides, the student will also be

able to develop work ethics and communication skills which can only be achieved

through actual working experience. At the end of the industrial internship program,

student will be able to:

i. To give opportunity to student to work with industrial practitioners

- Student will work and communicate with the practitioners from

different position such as managers, engineers, technicians, vendor and

etc.

ii. To expose students to potential employers

- Students will have an opportunity to create good acquaintances with the

individuals and organizations involved in the industry, which hopefully

will be useful for future purposes.

iii. To acquaint the UTP students with industry and its programs

- Students will aware on various industries related to their field of

studies. In the same time, it also enhances the student’s work ethics thru

the ethics practiced by industrial practitioners.

iv. To integrate theory with practice.

- Theory learned must be practice in a real life application. Thru

industrial internship program, student will have the opportunity to

correlate theory learned at university with the practical application in the

industry.

Page 10: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

10

1.3: Scope of Work, Tasks and Projects Undertaken

1.3.1 System fundamental

• Attend briefing about Foxboro (M) system presented by En. Abdul Halim

i. Intelligent Automation (I/A) Series

ii. Introduction to Process Control

1.3.2 Software induction

• Study training manual provided about Intelligent Automation (I/A) series.

i. FoxView

ii. FoxDraw

• Attend training about I/A series conducted by engineering manager, Mr. Fuad.

i. Integrated Control Configurator (ICC)

1.3.3 Main Project

• Hima Upgrade Project

i. Creating the comparison table

ii. Do the mapping table

iii. Upload the database to the Application Workstation (AW)

iv. Configuring the graphic

v. Factory Acceptance Test (FAT)

Page 11: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

11

CHAPTER II

PROJECTS AND ACTIVITIES

2.1: System Fundamental

2.1.1 Objectives

For the first 6 weeks of industrial training program, trainee had to undergo an

induction program which is a systematic training program for new engineers and staff

that acquire them to understand better the system used by Foxboro (M). Below are

training induction program objective:

• To provide basic technical knowledge necessary to enable engineers to

understand and apply on the features and benefit of Foxboro Automation

products, services and related offerings.

• Understand conceptual overview of the products

• Further enhance the depth of product knowledge necessary to build

yourself as a competent I/A System Engineer.

2.1.2 Intelligent Automation (I/A) Series

• Current offering by Foxboro (M)

i. Foxboro I/A Series System

ii. Foxboro A² Automation System

• Technology terms

i. Fault Tolerant

o 2 running module e.g. CP60

Page 12: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

12

o Both modules running and process information at the same time with

identical image, once CP60 failed, the other will take over without

any delay

ii. Redundant

o 2 running modules e.g. LAN interface

o One module running and the other is on standby, once the running

module failed, the standby will take over with some delay over

transfer of image file

iii. Single

o 1 running module

o If module failed, no information from that module available to

DCS

• Hardware Component

i. Networks

o Nodebus – 10 Mbps

o Carrier Band LAN (interconnecting nodebus) – 5 Mbps

o Mixed – Nodebus & Ethernet

o Mesh networks – Ethernet

o Fieldbus

ii. Workstation

o Application workstation (AW) – AW functions as file/image

server for diskless station like Control Processor (CP) and

Gateway (GW). It also function as server for application like

integrated control configurator (ICC) and AIMHistorian package

Page 13: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

13

(program file and data storage). AW can also be used as operator

workstation

o Model – AW50 series, AW51 series, P92, P93, P95, P79, P80,

P81 series

o Workstation processor (WP) – WP function as operator

workstation to monitor/control plant process/alarm thru custom

graphic display and alarm displays. Operator are able to change

setpoint of controller, acknowledge alarm and etc

o AW with control software – functions as operator workstation,

file server and also as control station to directly communicate

with FBMs, PLC etc depending on the control station software

loaded to it. Available in NT system and Solaris operating system

(Version prior to V8.0)

iii. Gateway (GW)

o GW functions as DCS interface to 3rd party subsystem e.g.

PLC. It processes the input/output signals from 3rd party

system via serial link communication. Normal protocol is

MODBUS RTU using RS232 (15 mtr), RS485 (~ 1.2 km)

o Current offering – GW30B, FBM23X (FDSI with

serial/Ethernet comm)

o Fault tolerant and simplex configuration

iv. Control Processor (CP)

o CP functions is to process the input/output signals from

Fieldbus Modules (FBM) and further process these signal

with required function such as PID controller, sequences

control, logic control, alarm, etc.

Page 14: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

14

o Hardware series – CP10, CP30, CP40, CP60, FCP270,

ZCP270

v. Fieldbus Modules (FBM)

o Functions as an interface to input/output signals from the field

and send the information to CP for further processing such

analogue indication, analogue alarming, digital alarm indication

etc.

o Hardware series – FBM100 series, FBM200 series

vi. Others

o Communication Processor (COMM10) – functions as DCS

interface to printers

o Dual Nodebus Interface (DNBT) – functions as interface for

AW/WP to nodebus

o CBLAN Interface (CBLI)v – functions as interface for nodebus

to communicate to another nodebus

o Ethernet switches (100Mbps) with 1G uplinks

2.1.3 Process Control

A process control system is used to monitor data and control equipment on the

plant. Very small installations may use hydraulic or pneumatic control systems, but

larger plants with up to 30.000 signals to and from the process require a dedicated

distributed control system. The purpose of this system is to read values from a large

number of sensors, run programs to monitor the process and control valves switches etc.

to control the process. At the same time values, alarms, reports and other information

are presented to the operator and command inputs accepted.

Page 15: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

15

Process control systems consists of following components:

Figure 2.1 : Components of control system

- Field instrumentation: sensors and switches that sense process conditions such as

temperature, pressure or flow. These are connected over single and multiple pair

electrical cables (hardwired) or communication bus systems called fieldbus.

- Control devices, such as Actuators for valves, electrical switchgear and drives or

indicators are also hardwired or connected over fieldbus.

- Controllers execute the control algorithms so that desired actions are taken. The

controllers will also generate events and alarms based on changes of state and alarm

conditions and prepare data for operators and information systems.

Page 16: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

16

- A number of servers perform the data processing required for data presentation,

historical archiving, alarm processing and engineering changes.

- Clients such as operator stations and engineering stations are provided for human

interfaces.

- The communication can be laid out in many different configurations, often including

connections to remote facilities, remote operations support and similar.

Figure 2.2 : Engineering diagram for Control Systems

The main function of the control system is to make sure the production,

processing and utility systems operate efficiently within design constraints and alarm

limits. The control is typically specified in programs s a combination of logic and

control function blocks such as AND, ADD, PID. For a particular system, a library of

standard solutions such as Level Control Loop, Motor Control is defined. This means

that the system can be specified with combinations of typical loops, consisting of one or

more input devices, function blocks and output devices, rather than formal

programming.

Page 17: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

17

The system is operated from the Central Control Room (CCR) with a

combination of graphical process displays, alarm lists, reports and historical data

curves. Desk screens are often used in combination with large wall screens as shown on

the right. With modern system the same information is available to remote locations

such as an onshore corporate operations support centre.

Field devices in most process areas must be protected not to act as ignition

sources for potential hydrocarbon leaks. Equipment is explosive hazard classified e.g. as

safe by pressurization (Ex.p), safe by explosive proof encapsulation (Ex.d) or

intrinsically safe (Ex.i). All areas are mapped into explosive hazard zones from Zone 0

(Inside vessels and pipes), Zone 1 (Risk of hydrocarbons), Zone 2 (Low risk of

hydrocarbons) and Safe Area.

Beyond the basic functionality the control system can be used for more

advanced control and optimization functions. Some examples are:

• Well control may include automatic startup and shutdown of a well and/or a set

of wells. Applications can include optimization and stabilization of artificial lift

such as Pump off control and Gas lift Optimization.

• Flow assurance serves to make sure that the flow from wells, in pipelines and

risers are stable and maximized under varying pressure, flow and temperatures.

Unstable flow can result in slug formation, hydrates etc.

• Optimization of various processes to increase capacity or reduce energy costs.

• Pipeline Management modeling, leak detection and pig tracking

• Support for Remote Operations, where facility data is available to company

specialists located at a central support center.

• Support for remote operation where the entire facility is unmanned or without

local operators full or part time, and is operated from a remote location.

Page 18: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

18

2.2: Software Induction

2.2.1 Introduction

The I/A Series software is a sophisticated set of software that provides optimum

process control and management capability for a wide range of applications. It is easily

tailored to meet specific requirements and plant management needs and allows for the

distribution of functionality and computing power to a wide geographic area.

2.2.2 FoxView

FoxView is a window into the I/A Series system software, providing a user-

friendly interface to the total process. On either a 70 Series or 50 Series workstation,

user can interact with any or all of the real-time plant, field, and process data available

in the system. FoxView provides:

• Direct access to dynamic process displays

• Entry into user-configurable operating environments specific to each user - the

process engineer, process operator, and software engineer

• Execution of embedded real-time and historical trending

• Service and display of process alarms via the Alarm Manager

• An overview of the compounds and blocks in the control database and access to

block default detail displays via FoxSelect

• Access to other applications, such as:

- FoxDraw software for building and configuring dynamic user graphics

- System Management Displays for monitoring system equipment health

- Integrated Control Configurator for configuring the control database

Page 19: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

19

- Historian for configuring the historization of data and system messages

- Access to FoxAlert Alarm Manager

- Access to the four most recently used displays.

Additionally, with FoxView user have:

• Flexibility in customizing environments to conform to the site requirements

• Rapid access to FoxView from other applications

• Screen print utility

• Window sizing options.

The multi-window capability of Solaris and Windows NT operating systems

allows user to monitor the information on a process control display as well as access

other applications without closing any window.

Figure 2.3 : FoxView

Page 20: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

20

2.2.3 FoxDraw

FoxDraw is a display builder and configurator that allows user to create and

maintain dynamically updating process displays. Displays can represent the plant, a

process area or a detailed portion of the process.

User can draw basic objects using FoxDraw's toolbars, menu items and shortcut

keys. User assign graphic attributes such as color and line style to the objects, and then

configure them to reflect process variable changes or operator actions.

FoxDraw includes numerous palettes of objects such as operator buttons, pumps,

tanks, pipes, motors, valves and ISA symbols. User can also create own palettes for

storing complex objects and company-standard symbols. The Palette Browser helps

user navigate standard FoxDraw palettes as well as an extended library of I/A Series

Symbols palettes. Displays can include faceplates, trends and bitmapped images. User

can easily edit the displays to reflect changes in the process control scheme or to

maximize operating efficiency and security.

Using FoxDraw's built-in conversion utility, user can convert 50 Series displays

and markers and AutoCAD files to FoxDraw format.

Configuration information such as variable names and process limits (high/low

scale, for example) is retrieved through the FoxAPI server.

FoxDraw runs on Solaris and Windows NT platforms. It is also compatible with

Windows 95/98, so user can run it on a PC without I/A Series software. This means user

can build and maintain process displays on- or off-site, with optimum convenience and

flexibility.

Page 21: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

21

Figure 2.4 : FoxDraw

2.2.3.1 Symbol Palettes

FoxDraw includes numerous palettes of pre-built objects such as pumps, tanks,

pipes, motors, valves, and ISA symbols. Standard libraries include vast selections of

simple and complex objects with which to build displays. User can copy an object from

a "copy" palette to a display and modify the object's primitive objects.

Page 22: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

22

i. Standard Palettes

Palettes (see Figure 2.5) are collections of objects that user can select for use in

displays. Numerous useful display elements are available in FoxDraw supplied palettes,

and user can create your own palettes of frequently used objects. Foxboro supplied

palette objects include:

• ISA-recommended symbols

• Three-dimensional drawings of tanks, valves, pipes and utility equipment

• Buttons and switches

• Arrows

• Flow chart symbols

• Electronic symbols

• Workstations, consoles, and enclosures.

Page 23: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

23

Figure 2.5 : Sample FoxDraw Supplied Palettes

ii. I/A Series Symbols Palettes

I/A Series Symbols provides over 1,200 configurable FoxDraw graphical objects

to help users build displays with greater flexibility and ease. It is an extended directory

of palettes designed to accompany I/A Series FoxDraw's existing palettes. Sample

displays built using the Symbols palette libraries are included with the CD-ROM.

Advantages of the Symbols FoxDraw palette library include:

• Every part of a graphic object can have its graphical attributes changed,

including fill color, pattern and level; edge color, style and thickness; and text

front, style and color.

• With the Palette Browser, user can install whatever palettes user want on the

hard drive.

Page 24: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

24

• Every part of a graphic object can be configured for passive or operator

dynamics.

• Each graphic object is well labeled, for quick navigation, which allows the user

to easily find the piece or section of an object to be configured.

• Every graphical object has been optimized for best call up time during run-time.

• Engineering time is reduced to build new graphic objects.

Figure 2.6 : I/A Series Symbol Palette Examples

Page 25: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

25

2.2.3.2 Configuration

There are two ways of configuring a display object. User can:

i. Choose the Dynamic Update tab to connect one of the object's attributes, such as

visibility or fill level, to a process variable or a file. With this type of

configuration, changes in an attribute are triggered dynamically by changes in

the process variable. No operator intervention is necessary.

ii. Choose the Operator Action tab to connect the entire object to an action, such as

opening a display, executing a command, or setting a value. An operator triggers

the action by selecting the object.

An individual object can have both types of connections, although it can have

only one operator action. Each object type (for example, rectangle, circle, text) has its

own set of dynamic attributes such as visibility, fill level and text color.

As shown in Figure 2.7, all configuration options are available from a single

dialog box that displays all selected objects. There is no need to reopen the dialog box

for each configuration task. A built-in filter provides a convenient way of selecting

desired object types.

Page 26: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

26

Figure 2.7 : Configure Objects Dialog Box

User can assign unique names to the objects that has been created and configure

in FoxDraw. While the names are optional, they are useful for distinguishing among

several objects of the same type in a single display. User configure an object's dynamic

attributes to the value of a variable (process variable or shared variable) which then

controls the object's behavior.

User can specify an object's static presentation (as specified by its graphic

attributes). Typically, these attributes determine an object's fill and edge. A text object's

specifications include font style, color, and direction. A display object can reflect the

current value of a process variable. The appearance of a display object can be animated,

based on the value of one or more process variables. User configure animation by

specifying an object's dynamic attribute, choosing a conversion method, and creating a

table of expected inputs and desired outputs.

FoxDraw allows user to assign an operator action to a display object, creating an

interactive connection between the display object and the operator. This capability

permits an operator to trigger an event by performing an action or record data.

Page 27: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

27

2.2.4 Integrated Control Configurator (ICC)

2.2.4.1 Integrator Database Configuration

When configuring the Integrator, it is recommended that user verify proper

communication with the PLCs prior to configuring the compounds or blocks, as

follows:

i. Configure the ECBP and ECB16’s.

ii. Verify proper operation of ECBP (goes on-line, or white, automatically after an

Integrator reload providing all initialization checks are successful).

iii. Verify proper operation of ECB16’s (MOD PC). These must be initially turned

on-line by selecting GO ON-LINE from the Equipment Change Display

(Peripheral Change Option).

Once all ECBs are on-line and communication has been established, compound and

block configuration can begin.

Please observe the following rules:

i. Only one MDSCAN is allowed per compound.

ii. The MDSCAN block must be the first block entered in a compound, to ensure

processing of current data.

iii. Control and I/O blocks operating on PLC data retrieved by a MDSCAN block

must be resident in the same compound as that MDSCAN block.

iv. All I/O blocks in a compound must be configured to execute in a BPC in which

the associated MDSCAN executes. Failure to comply causes the I/O block to

process data values of 0.

Page 28: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

28

v. All blocks that perform I/O must be in the same compound as the MDSCAN

block, must be the same phase as the MDSCAN block and cannot run at a faster

frequency than the MDSCAN block.

vi. Within a compound, block periods can be equal to, or a multiple of, the

MDSCAN block PERIOD. I/O blocks should not be configured to execute at a

faster frequency than the associated MDSCAN block.

vii. A MDSCAN block may request up to 256 bytes of data (2000 register for coil or

contact values; 125 registers for analog values).

viii. Multiple compounds may be configured to run in a single phase, but the I/O load

should be kept under 75% as shown by the Station Block display. This equates

to reading approximately 900 bytes per second at 9600 baud or 1800 bytes per

second at 19,200 baud. Additionally, the number of block equivalents executing

per second should not exceed 300. If either limit is exceeded, BPC overruns may

occur.

Figure 2.8 : ECB16 Diagram

Page 29: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

29

2.2.4.2 Compound Configuration

An Integrator compound can contain one and only one MDSCAN block, and

this block must be the first block (top of the list) in the list of blocks in a compound.

When configuring the compound, the recommended settings for period and phase are 1

and 0, respectively.

Compounds in the Integrator may exist without a MDSCAN block; however,

any block which performs I/O to the PC must be in a compound which contains an

associated MDSCAN block (which addresses the PC memory location of the I/O block)

2.2.4.3 ECBPG Block Configurations

Basic ECBPG Parameters:

Table 2.1 : ECBPG Parameters

NRBUS This parameter defines the number of active ports: 1 = 1 port 2 = 2 ports.

Set NRBUS=1 for non fault tolerant gateway.

BUSTYP The value configured for BUSTYP is the number of retries to make in case of communications failures, before failing a device.

The default value of R for this parameter prevents the premature initialization of the integrator's hardware interface to the communications channel(s) to the field devices. When the ECBP or ECBPG parameters have been configured to their desired values, and the R is changed to any other value, the communications interface is initialized in accordance with the other configured parameters.

Page 30: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

30

PIOWDT PIO Watch Dog Timer is a nonconnectable, nonsettable integer input that determines the value, in seconds, of each FBMs communications watch dog timer.

Each FBM’s BSDLAY parameter is based on the value of PIOWDT. PIOWDT can be only be changed by the FBM Configure function of the Integrated Control Configurator.

BAUD RS-232-C serial communications baud rate selection: 3 = 19200 4 = 9600 5 = 4800 6 = 2400 7 = 1200 8 = 600 9 = 300 3 is not available for the gateway integrator.

DATBIT RS-232-C serial communications number of data bits: 7 or 8.

PARITY RS-232 serial communications parity selection: 0 = no parity 1 = odd parity 2 = even parity

STPBIT RS-232-C serial communications number of stop bits: 1 or 2.

The communication settings above should matched to the PLC devices for

communication to be establish properly.

Page 31: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

31

2.3: HIMA Upgrade Project

2.3.1 Introduction

HIMA is the first port of call for many companies throughout the world when it

comes to safety-related automation solutions. The secret of success is that HIMA focus

uncompromisingly on the field of safety. That is because focus leads to absolute

expertise and increases experience - and that in turn means better solutions for process,

machine and building safety. It is one of the leading PLC company in safety and

shutdown system.

HIMA Upgrade Project is one of the project owns by Malaysia Liquefied

Natural Gas (MLNG) as the client. The purpose of doing this upgrade is because

HIMA, as the third party PLC for shutdown and safety system, has upgraded their

system by dividing the I/O into two gateway and some new point has been added to

their system. So, Foxboro as the Distributed Control System (DCS) side, have to follow

the new system from HIMA and also have to upgrade the system accordingly. This is

because the graphic for the system and process of the plant is showed at DCS side.

2.3.2 The Task

2.3.2.1 Build The Database For The System

For this project, the upgrade consists total of 19 gateways to be upgraded

including Fire Fighting and Gas Detection System. So, there are 19 different database to

be build or edit depends on the I/O list and mapping table. Mapping table shows the

analogue and digital point that DCS connected to HIMA PLC side. Usually use excel to

build. It is the important document for F.A.T.

Page 32: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

32

Figure 2.9 (a) : Mapping Table

Next task after completing the mapping table is starting to build the real

database. From the mapping table, we know where to locate the block in the database. If

the block does not exist in the database, new block is created.

Figure 2.9 (b) : Complete Database

Page 33: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

33

2.3.2.2 Load The Database To Application Workstation (AW)

For this purpose, the database in CSV file been converted into ICC file before

uploading it to the AW. Check the database in ICC and make sure all the blocks have

been uploaded. Configure the parameters of the block using ICC so that the block is

function. For this project, the changes of the database mostly on the naming of the

compounds, but the blocks name remain same as existing name.

Figure 2.10 : Loading Database to ICC

2.3.2.3 Configure and Edit The Graphic

For this upgrade, the graphic needs to be reconfigured because of the change of

the compound name in the database. Use Display Configurator to change the

configuration of the graphic. Display Builder can be used to edit the graphic.

Page 34: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

34

Figure 2.11 (a) : Configure Graphic

Figure 2.11 (b) : Edit Layout of Graphic

Page 35: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

35

2.3.3 Factory Acceptance Test (FAT)

2.3.3.1 Introduction

The intent of FAT is to provide an integration testing procedure for the I/A

Series DCS System with HIMA PLC System. It describes Integration Test management

aspects, participation, problem classifications and resolutions, acceptance and

overviews of the tests.

This FAT shall govern the scope and test methods to be performed during the

whole duration of the Integration Test. Deviations from the said documented procedures

shall not be allowed unless otherwise agreed between Foxboro, HIMA and MLNG. The

objectives of the Integration Test are:

• To demonstrate that the Foxboro DCS system communicates correctly with the

HIMA, that the software configuration of the communication modules has been

completed correctly and that total system performance meets MLNG functional

specification and technical directions which have been agreed upon throughout

the project execution phase, as documented in relevant referenced

correspondence and approved drawings.

The objective of testing of interfaces to the I/A Series verify and establish that:

i. I/A and the HIMA can communicate and exchange read/write data.

ii. Address mapping between I/A and the HIMA is consistent.

iii. Control database functions configured within the I/A System are correct.

iv. Data from HIMA are properly displayed on I/A displays.

v. There are fall back and recovery schemes in place that lead to acceptable

situations in the event of partial or total loss of communication.

Page 36: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

36

In order to achieve above objectives:

i. HIMA PLC will be tested for communication compatibility with I/A DCS

system.

ii. Complete I/O testing for the HIMA interface shall be checked for address

mapping by reference to HIMA and Foxboro supplied documents.

iii. I/A resident control/display functions shall be checked for the gateway blocks.

iv. Special communication failure schemes shall be checked.

v. Error messages generated by HIMA (if any) that are part of the interfaces shall

be checked.

Actual interface devices shall be integrated to I/A system, forced to simulate conditions

of data change from PLCs. Verification of data transfer and configuration in DCS

involves viewing the data status in detail blocks as well as user graphic displays,

checking alarm reports and checking safety an functions. In order to assist in having the

integration test run in an organized, systematic manner, the following information is

included:

a) Test procedures

b) Log forms (System activity log, problem log, etc.)

c) Inventory and test forms

d) Acceptance/waiver forms

Page 37: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

37

2.3.3.2 Integration Test Methodology

2.3.3.2.1 Integration Test Management

The Foxboro DCS Lead Engineer shall be responsible ensuring personnel and

facilities are adequate for the performance of the integrated test. All test activities shall

be managed by the DCS Lead Engineer/Project Engineer responsible taking the system

to the jobsite.

2.3.3.2.2 Participation

The proposed integration test program is a joint effort between Foxboro and

HIMA, which is witnessed by MLNG. Separate physical test teams are normally

assigned for each test section to prevent confusion due to system complexity. The

general anatomy of a test team is as follows:

a) MLNG Representative.

b) HIMA PLC Representative.

c) Foxboro implementation engineer.

For the testing, MLNG representative witnesses the test to be performed with the

Foxboro DCS implementation engineer being responsible for demonstration of system

function. Foxboro/MLNG representative shall be responsible for logging problems in

the problem log.

2.3.2.2.3 Software Control

Software modifications shall only be performed by equipment owners. For DCS

software, modification to control and I/O configuration may only be made by Foxboro

Engineer who shall take equipment to the jobsite. DCS software version numbers shall

be updated in the DCS system log when they are revised.

Page 38: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

38

2.3.3.2.4 System Activity

Foxboro I/A Series system activity shall be monitored and recorded once the

system is powered up until acceptance. All kind of abnormal activities shall be recorded

in this System Activity Log. This is to check the hardware failures during testing. Please

refer Appendix D.

2.3.3.2.5 Problem Resolution

When product deficiencies (non-conformance to specifications) are identified

during the course of the tests, they will be recorded and Foxboro will initiate corrective

action. However, the test will continue, even though the deficiency may not have been

corrected (in accordance with the problem classifications, see section below). It is

desirable to initially run the demonstration from beginning to end (when possible), and

thereby, define all deficiencies that require additional work. All deficiencies will then

be corrected and appropriate tests re-run to demonstrate that the deficiencies have been

corrected. Where possible, Foxboro shall endeavor to rectify deficiencies on a daily

basis and demonstrate corrections the next day to prevent an accumulation of

unresolved issues.

Five major classes of problems are identifiable which may occur during the test period:

CLASS 1 Testing cannot continue until the problem is resolved (e.g., processor

failure and system is not functional for further testing without repair).

CLASS 2 Continued testing is not obstructed, but the system cannot be accepted

for shipment until the problem is resolved (e.g., software bug disabling a

process critical function i.e. system implementation configuration errors.

CLASS 3 Shipment need not be delayed, but the modifications/revisions must be

implemented prior to customer field acceptance.

Page 39: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

39

CLASS 4 Foxboro, HIMA and MLNG agreed scope extensions that extend the

scope of the system from that defined by Foxboro, HIMA and MLNG.

Agreed scope extensions will require review for schedule impact and

cost prior to formal implementation schedule.

CLASS 5 Software bugs which require non standard techniques (or work around)

to utilize a needed function. All system faults (e.g. software bugs, etc)

shall be corrected prior to shipment.

When a problem occurs, Foxboro, HIMA and MLNG will prepare a description

of the problem on a PROBLEM LOG form. This form will be directed to the Foxboro

Service Manager or his designated representative for this particular area of the test.

Foxboro will then respond with a classification of the problem that is mutually

agreeable to both parties. Next, Foxboro will then submit to HIMA a schedule for

resolution of the problem. Finally, Foxboro will proceed with the resolution in

accordance with the submitted schedule and the problem classification, as follows:

CLASS 1 Foxboro project personnel will work to correct the problem. The test

section that was being executed at the time the problem occurred will be

repeated as appropriate, depending upon the fault.

CLASS 2 The problem will be recorded on a PROBLEM LOG form, with a

schedule for resolution. At the time the problem is corrected by Foxboro

project personnel, the test section that was being executed at the time the

problem occurred will be repeated from the beginning.

CLASS 3 The modification/revisions will be recorded on a PROBLEM LOG form,

with a schedule for resolution.

CLASS 4 Foxboro will promptly prepare a schedule proposal and cost estimate for

the desired application

Page 40: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

40

CLASS 5 Software bugs which require non-standard techniques [or work-around]

to utilize a needed function shall be corrected before shipment. At the

time the problem is corrected, a suitable test for it will be developed.

The test will be reviewed and agreed by Foxboro, HIMA and MLNG.

2.3.3.2.6 Reporting Test Result

Foxboro shall be responsible for maintaining records of the test result entered on

forms specifically designed for the test. The SIT test results along shall form the basis

for signing the Inspection Release Certificate required before the system can be

accepted. When test results are negative, the problem reporting procedures shall be

followed.

Page 41: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

41

CHAPTER III

LESSON LEARNED AND EXPERIENCE GAINED

After going through 32 weeks of training in Services Department at Foxboro

(M), I have gained a lot of experiences and learned so many things related to employee

disciplines as well as an engineer. Apart from applying theoretical knowledge to the

industry based practice, the author also gained various experiences related to DCS

engineer working life. Moreover, the nature of Foxboro in treating the trainee like the

real engineer allows the author to grab as much knowledge as possible from the project

masters, engineers, apprentices, trainees and other interns. Lastly, the author was able to

improve his soft skills through observation and experience with other fellow workers.

3.1: Technical Lessons

3.1.1 Foxboro I/A Series

Throughout the internship program, the author was exposed to the software that

Foxboro use to design the DCS system for the plant called I/A Series. Using this

software, the author can design the graphic layout for certain plant and configure the

graphic as well. FoxView and FoxDraw are the common utilities that have been used by

the author during his internship period.

3.2: Non-Technical Lessons

3.2.1 Communication Skills

The past eight months internship was the author's first experience of the working

life. He had to make full use of his soft skills in order to successfully complete the given

tasks. Good communication skills are a necessity as most of the tasks assigned to the

author could not be done by the author alone. Discussions and consultations with other

engineers are required to understand the related topic to the task. So, it is vital to the

Page 42: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

42

author to communicate effectively or to convey the messages and questions correctly,

so that problem faced can be solved easily. Besides, the author was also required to

present the project output to the supervisor for grading purpose which in the same time

helping to improve the author's communication and presentation skill.

3.2.2 Leadership And Management Skills

Leadership and management are most important skills that must have in an

employee to become successful person in his/her career. During 32 weeks of training at

Foxboro (M) the author have gain many experience that build his leadership and

management skill. On the second week of the training, the author was asked to make a

planning schedule to complete the task given to him. This schedule develop his skill on

manage time to complete the task on time without any delay.

Working with a leader Mr. Zulkefli, as his supervisor, was a great experience

where the author can observe how a leader work and manage the department jobs. The

way he works little bit influences how the author performs in his work. His skill on lead

a group encourage the author to work hard and become a good leader in the future.

3.2.3 Safety Training And Awareness

At Foxboro (M), the author have undergone safety briefing about the importance

of safety environmental in order to give awareness towards the danger exposed in the

plant and know the procedures for handling portable extinguisher beside acknowledge

about the acts available related to health and safety. The content of the course include:

• Occupational Safety and Health Act (OSHA)

• Emergency fire extinguishers such as fire fighting hose and fire fighting hose.

• Personal Protective Equipment (PPE)

• Emergency help due to exposure.

Page 43: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

43

3.3: Problems Faced

Every work has its own challenges and problems. As a trainee, the first

challenge that the author faced is to adapt with the working environment practiced at the

host company. However, after several weeks working, the author was able to work at

ease at both site office and staging room as the workers are very friendly and extremely

helpful in resolving any problems occurred during the training period.

In the process of finishing the projects given by the supervisor, sometimes the

author have to find information from different persons. The author have takes this as

challenges in dealing with people from different level. Sometimes it is very difficult to

find answers to solve the tasks given because of the lost of data and lack of information

on the tasks. When this happened, the author have to search for the answers from the

engineers. Dealing with experienced people from different levels was a challenge where

the communication skill is very important.

Doing work that different from what the author learned at UTP also another

problem faced by him during his internship training at Foxboro (M). Task that given

need him to learn new things to finish it up. The author have to learn I/A series software

that used by Foxboro (M) by himself. Although there are many problems and challenges

faced during internship, the author have successfully encountered them with the help

from family, friends and supervisors.

Page 44: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

44

CHAPTER IV

DISCUSSION AND RECOMMENDATIONS

The industrial internship programmed offered by UTP, which is prior to the

completion of our studies in UTP carries fourteen credit hours and lasts for thirty-two

weeks. This internship turns out to be an excellent experience indeed where the

undergraduate student of UTP managed to undergo practical work in the industry and

not only learn the theoretical knowledge from class. The Industrial Internship Program

(IIP) guidelines book provided to both students and plant supervisors is really help in

ensuring the success of the program. Nevertheless there are some rooms for the program

improvement that need to be discussed here.

4.1: Host Company (Foxboro)

4.1.1 Group

A trainee should be assign to a group of engineers or work in a group with other

engineers. This is important so that trainee can learn from the other engineers and also

can become reference for the trainee when they face a problem. In the process of

learning it is proved that learning in a group is better than learning alone. So, I strictly

recommend Foxboro(M) to put trainee in a group of engineers for their learning process

as well as doing their work as a trainee at Foxboro (M).

4.1.2 Schedule of training

Foxboro (M) should prepared schedule of training for trainees before they arrive

to the host company. The schedule should include what project will be involved and

training will be attended by the trainees during their 32 weeks of training. This is to

make sure all trainees that come to Foxboro (M) doing what suppose they do and not

just wasting time surfing internet or walking around the company. Good schedule of

training will give benefit to both sides. Company will get extra man power while trainee

get new knowledge and experience that cannot be achieve at university.

Page 45: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

45

4.2: UTP

4.2.1 Reduce weekly report

The Industrial Internship Committee (ITC) should review on the significant

number of report and written works that have to be produce by the student during the

Industrial Internship Program (IIP). At the current situation, students have to write a

report on the highlights of their activities on weekly basis instead of the final report at

the end of the training. Most of the supervisors and the students found that, the

requirement is so burdening. Students have to carry out their routine works at the office,

complete the assignments given by the supervisor and the same time they prepare the

weekly report for the IIC. As consequences, UTP trainees are tends to spend most of

their time sit in front the computer or looks for the relevant material in the library to

deal with their report. It will bring no good for the efficiency of the IIP. It also

burdening the supervisors to read and give mark to the report since they are already

busy with their routine work as an engineer.

4.2.2 Marking scheme standardization

The weekly evaluation carried a big portion which about 30 percent of the total

marks of the IIP. For the time being there is no proper marking scheme standardization

on that based on their experience and own justification. Oral presentation marking

should be done by UTP supervisor only except the content. It will be fair for all trainees

as for experienced engineers who are the IIP supervisor, they will more flexible in

evaluating the students compared to the new engineers who set for a higher

requirements and expectation. A proper marking scheme has to be established and a

better supervision by the IIC should be carried out. IIC should looks in depth on this

matter.

Page 46: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

46

CHAPTER V

CONCLUSION

After 32 weeks undergoing Industrial Internship Program at Foxboro (M), a lot

of interesting things can be concluded by the end of my industrial training. Being

exposed to the real working environment, especially in electrical engineering field has

given me many useful knowledge and practical to learn. Involved in project and done

tasks those given to me really challenge me to become a real engineer although I am

still a student. Being trusted by supervisor and engineers in Foxboro (M) to handle and

involved with their projects give me a feel that big responsibilities lay on me. In

conclusion, this industrial training had achieved it objective to expose Universiti

Teknologi Petronas (UTP) students to the real working environment so that they can

relate theoretical knowledge with application in industry. At Foxboro (M), even though

not all tasks that given to me completely practiced my knowledge as electrical and

electronic engineering student at UTP, there still have relation that I can relate and used.

This industrial internship also develop my skills in safety practices, work ethics,

communication, management, and many more as state on the objective of industrial

training program.

Page 47: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

47

REFERENCES

• www.foxboro.com.ny

• www.hima.com

• Training module of Introduction To Configuration – I/A Series software

(Module 2)

• Training module of Introduction To Configuration – FoxDraw (Module 4)

• Manual of I/A Series V8.11

• FoxDoc 8.3

Page 48: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

48

APPENDICES

Page 49: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

49

Page 50: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

50

Page 51: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

51

Page 52: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

52

Page 53: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

53

Page 54: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

54

Page 55: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

55

Page 56: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

56

Page 57: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

57

Page 58: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

58

Page 59: Final Report-9794

INDUSTRIAL INTERNSHIP FINAL REPORT

59