Consultancy for study on Trespassing over Railway
Track in Mumbai Suburban area & remedial measures
thereon.
FINAL REPORT
“Central Railway: Thane”
Vol. XI
July 2012
MRVC SIR JJCOA
CONSULTANCY CELL
FINAL REPORT
CONTENT
1. INTRODUCTION
1.1 BRIEF DESCRIPTION.
1.2 PRIMARY SURVEY.
1.3 REASONS OF TRESPASSING AT THANE
2. IDENTIFICATION OF TROUBLE SPOTS
2.1 IDENTIFIED TROUBLE SPOTS.
2.2 DRAWING INDICATING TROUBLE SPOTS
3. SOLUTIONS
3.1 INTRODUCTION
3.2 SOLUTIONS TO DISCOURAGE TRESPASSING AT THANE
3.3 DRAWING INDICATING SOLUTIONS
3.4 3D SKETCHES INDICATING SOLUTIONS
4. GENERAL ARRANGEMENT DRAWING
4.1 GENERAL ARRANGEMENT DRAWINGS
5. ESTIMATED COST
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 1 - Sir JJCOA Consultancy Cell
CHAPTER 1
INTRODUCTION
1.1 BRIEF DESCRIPTION
THIS IS A STATION IN THE CENTRAL SUBURBAN RAILWAY LINE. THIS STATION IS PREDOMINENTLY CHOSEN TO STUDY AND PREVENT
TRESPASSING THAT OCCURS LARGELY AT THE SOUTHERN END OF THE
PLATFORMS.
THIS STATION HAS IN ALL TEN PLATFORMS.
THANE EAST AS WELL AS WEST IS LARGELY POPULATED .
THERE ARE 3 FOBS. ONE AT SOUTHERN END WHICH CONNECT THANE EAST TO
THANE WEST AND OTHER AT MIDDLE OF PLATFORM LENGTH AND THIRD ONE
AT NORTHERN END.
THERE ARE TWO TICKET WINDOWS.
THE MAGNITUDE OF TRESPASSING PROBLEM AND THE REASONS OF TRESPASSING
AT THANE STATION HAVE BEEN STUDIED AT INCEPTION REPORT STAGE WHICH HAVE
BEEN PRESENTED TO MRVC AND ALSO SUBMITTED AS INCEPTION REPORT.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 2 - Sir JJCOA Consultancy Cell
1.2 PRIMARY SURVEY
THE FOLLOWING PHOTOS INDICATE THE OBSERVED TRESPASSING LOCATION.
THE CROWD ON THE TRACKS AS COMPARED
TO THE PLATFORM AND THE FOB IS MORE.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 3 - Sir JJCOA Consultancy Cell
EVEN DURING NIGHT TIME THE AMOUNT OF TRESPASSING IS HUGE.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 4 - Sir JJCOA Consultancy Cell
1.3 REASONS OF TRESPASSING AT THANE
TO SAVE TIME AS THE WIDTH OF THE PLATFORMS ARE INSUFFICIENT TO CATER
TO THE OVERCROWDING ON THE PLATFORM ITSELF WHICH RESULTS INTO LOT
OF TIME BEING WASTED, IN REACHING THE PROVIDED FOB.
THE HEIGHT OF THE FOB IS VERY HIGH AND HENCE IS UNCOMFORTABLE EVEN
FOR NORMAL HEALTHY PERSON TO USE IT.
NUMBERS OF FOBS ARE INSUFFICIENT TO CATER TO THE PEAK HOUR NEEDS OF
PASSENGER TRAFFIC LEADING TO LOT OF OVERCROWDING ON THE FOB ITSELF.
LACK OF FACILITIES FOR PHYSICALLY HANDICAPPED PEOPLE & SENIOR
CITIZENS; LIKE ESCALATOR, RAMP, ETC.
SMALL RAMP AT BOTH THE ENDS OF THE PLATFORM ALSO ENCOURAGES
TRESPASSING.
LAST MINUTE ANNOUNCEMENT OF CHANGE IN THE PLATFORM SCHEDULE FOR
ARRIVAL / DEPARTURE OF THE TRAIN.
HUMAN SETTLEMENT ALONG THE TRACK ALSO LEADS TO REGULAR
TRESPASSING BY THE INHABITANTS.
EXCEPTIONAL CIRCUMSTANCES LIKE MEDICAL EMERGENCY, PERSON WITH
HEAVY LUGGAGE, ETC. LEADS TO COMPULSORY TRESPASSING.
RAG PICKERS ARE REGULAR TRESPASSERS.
INADEQUATE HEIGHT OF FENCING BETWEEN TRACKS ENCOURAGES PEOPLE TO
JUMP FROM PLATFORM ON TO THE TRACK & CLIMB THE FENCING TO REACH THE
OTHER PLATFORM, THUS LEADING TO SERIOUS TRESPASSING.
PEOPLE TRAVELLING WITHOUT PROPER TICKET TRESPASS IN ORDER TO AVOID
T.C.
PEOPLE ARE ACCUSTOMED TO TRESPASSING AND IT HAS BECOME A DEFAULT
BEHAVIORAL TENDENCY.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 5 - Sir JJCOA Consultancy Cell
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 6 - Sir JJCOA Consultancy Cell
CHAPTER 2
IDENTIFICATION OF TROUBLE SPOTS
A DETAILED STUDY FOR IDENTIFICATION OF TROUBLE SPOTS WAS CARRIED OUT
BY OUR TEAM WITH RESPECT TO AFORE MENTIONED REASONS FOR TRESPASSING.
THE TROUBLE SPOTS IDENTIFIED FOR THANE ARE AS UNDER:
a. SOUTH END OF PLATFORM 1.
b. SOUTH END OF PLATFORM 1 TO 7.
c. NORTH END OF PLATFORMS 8-9 & 10.
d. NORTH END OF PLATFORMS 2, 3, 4, 5, 6&7.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 7 - Sir JJCOA Consultancy Cell
2.2 DRAWING INDICATING TROUBLE SPOT IDENTIFIED TROUBLE SPOTS BASED ON ABOVE STUDY HAVE BEEN INDICATED IN THE
DRAWING NO:-
JJC/MRVC/TS/TNA_1
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 8 - Sir JJCOA Consultancy Cell
CHAPTER 3
SOLUTIONS
3.1 INTRODUCTION :
IN PRIVIOUS CHAPTER TROUBLE SPOT HAVE BEEN INDENTIFIED WITH RESPECT TO
THANE STATION. HENCE SOLUTION TO DISCOURAGE TRESSPASSING HAVE BEEN
WORKED OUT KEEPING IN MIND THE FOLLOWING 5 MAIN POINTS.
FOB
RAILING
R.C.C. WALL
GREEN PATCH
RE-ORGANIZATION OF SPACES
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 9 - Sir JJCOA Consultancy Cell
3.2 SOLUTIONS TO DISCOURAGE TRESPASSING AT THANE :
1. PROVIDE RAILING BETWEEN PLATFORMS 2, 3/4, 5/6, 7/8 & 9/10.
TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.
2. PROVIDE GREEN PATCH IN TRIANGULAR PORTION AT NORTHERN END OF
PLATFORM 7/8.
TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.
3. PROVIDE R.C.C. COMPOUND WALL BEYOND PLATFORM NO.1 AT NORTHERN END
ON EAST SIDE TILL VITAWA.
TO PREVENT TRESPASSSSING FROM THANE EAST TO PLATFORMS 7/8 AND 9/10
4. WIDEN 2ND FOB AT NORTHERN END TOWARDS KALYAN SIDE TO PROVIDE
ADDITIONAL CONNECTION TO ALL PLATFORMS LANDING ON THE NORTHERN
SIDE.
TO DIVERT THE PUBLIC FLOW ON BOTH SIDES OF THE FOB AND PREVENT
CROWDING ON THE FOB.
5. TICKET OFFICE ON WEST SHOULD BE DEMOLISHED AND PROVIDE FOB ABOVE IT,
WHICH WILL HAVE EXIT THROUGH STAIRS ON PLATOFRM NO.2,3/4,5/6,9/10 & ON
PLATFORM NO. 7/8 THROUGH ESCALATORS/LIFTS.
TO DIVERT THE PUBLIC FLOW, AND PREVENT OVERCROWDING ON THE EXISTING
FOBs AND PREVENT TRESPASSING BETWEEN THE PLATFORMS.
6. PROVIDE GREEN PATCH WITH BARRICADES AT NORTHERN END OF PLATFORM
NO. 3/4.
TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.
7. PROVIDE R.C.C. BOUNDARY WALL ON THE NORTHERN END PARALLEL TO
PLATFORM NO.2 TILL CREEK.
TO PREVENT TRESPASSSSING FROM THANE WEST TO PLATFORMS 3/4 AND 5/6.
8. PROVIDE EAST-WEST FOB AT SOUTHERN END OF THANE STATION CONNECTING
PLATFORMS 1 & 7/8 BY RAMPS TO FACILITATE EASY FLOW OF HEAVY LUGGAGE TO SOUTHERN END OF PLATFORM 7/8
9. WIDEN EXISTING SOUTHERN FOB BY 6M.
10. WIDEN NORTH END PUBLIC FOB BY 2.4M AND PROVIDE LANDING TO PLATFORMS
3/4 & 5/6 AND CONNECT THE SAME TO 2ND
FOB FROM NORTH BY A SKYWALK.
TO PROVIDE DIRECT ACCESS FROM THANE WEST NORTH END BUS STOP TO ALL PLATFROMS AND
HENCE PREVENT TRESPASSING.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 10 - Sir JJCOA Consultancy Cell
3.3 DRAWING INDICATING SOLUTIONS PROPOSED SOLUTIONS BASED ON ABOVE STUDY HAVE BEEN INDICATED IN THE
DRAWINGS AS SHOWN IN DRAWING NO:-
JJC/MRVC/S/TNA_1.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 11 - Sir JJCOA Consultancy Cell
3.4 3D SKETCHES INDICATING SOLUTIONS FOR BETTER APPRECIATION OF THE 2D DRAWINGS, 3D SKETCHES HAVE BEEN
PREPARED INDICATING THE PROPOSED SOLUTION.
WIDEN SECOND FOB AT NORTHERN END TOWARDS KALYAN SIDE TO PROVIDE ADDITIONAL
CONNECTION TO ALL PLATFORMS.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 12 - Sir JJCOA Consultancy Cell
PROVIDE EAST-WEST FOB AT SOUTHERN END OF THANE STATION CONNECTING PLATFORMS A &
7/8
PROVIDE GREEN PATCH WITH BARRICADES AT NORTHERN END OF PLATFORM NO. 3/4
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 13 - Sir JJCOA Consultancy Cell
CHAPTER 4
GENERAL ARRANGEMENT DRAWING
WITH RESPECT TO THE MAJOR SOLUTIONS AS STATED EARLIER GENERAL
ARRANGEMENT DRAWINGS (G.A.D.) HAVE BEEN PREPARED FOR ACTUAL EXECUTION
KEEPING IN MIND SCHEDULE OF DIMENSIONS (S.O.D.) RESTRICTION.
ENCLOSED HERE ARE THE DETAILED DRAWINGS OF
FOB
ESCALATORS
ELEVATORS
RE-ORGANIZATION OF BUILT SPACES
STAIRCASES
SOLUTIONS PERTAINING TO GREEN PATCHES, RAILING, R.C.C. WALLS HAVE BEEN
PROVIDED AS GENERAL STANDARD DRAWINGS WHICH ARE A PART OF EXECUTIVE
SUMMARY.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 14 - Sir JJCOA Consultancy Cell
4.1 GENERAL ARRANGEMENT DRAWINGS DETAILS OF THE PROPOSED SOLUTIONS HAVE BEEN INDICATED IN DRAWING NO:-
JJC/MRVC/GAD/TNA_1.
JJC/MRVC/GAD/TNA_2.
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 15 - Sir JJCOA Consultancy Cell
CHAPTER 5
ESTIMATED COST QUANTITES HAVE BEEN DERIVED BASED ON GENERAL ARRANGEMENT DRAWINGS
COST ESTIMATE HAS BEEN WORKED OUT AS PER THE RATES SPECIFIED BY M.R.V.C.
THANE
LOCATION OF RAILING LENGTH OF RAILING WEIGHT/M COST/KG COST
BETWEEN PLATFORM NO. 2 AND 3 250M 24 KG RS. 75 450000
BETWEEN PLATFORM NO. 4 AND 5 370 M 24 KG RS. 75 666000
BETWEEN PLATFORM NO. 6 AND 7 620 M 24 KG RS. 75 1116000
BETWEEN PLATFORM NO. 8 AND 9 490 M 24 KG RS. 75 882000
TOTAL 3114000
LOCATION OF GREEN PATCH AREA OF GREEN
PATCH PERIMETER OF
FENCING COST/M2 COST
SOUTH END OF PLATFORM NO. 2 948 SQ.M. 361 M RS. 400 379200
SOUTH END OF PLATFORM NO. 3/4 202 SQ.M. 80 M RS. 400 80800
NORTH END OF PLATFORM NO. 3/4 135 SQ.M. 65 M RS. 400 54000
NORTH END OF PLATFORM NO. 7/8 400 SQ.M. 170 M RS. 400 160000
NORTH END OF PLATFORM NO. 9/10 180 SQ.M. 62 M RS. 400 72000
TOTAL 746000
LOCATION OF R.C.C. WALL LENGTH OF R.C.C. WALL
CROSS-SECTIONAL AERA COST/M3 COST
NORTHERN END OF THANE WEST 320 M 0.95M2 RS. 12000 3648000
NORTHERN END OF THANE EAST 295 M 0.95M2 RS. 12000 3363000
SOUTHERN END OF THANE WEST 260 M 0.95M2 RS. 12000 2964000
SOUTHERN END OF THANE EAST 340 M 0.95M2 RS. 12000 3876000
TOTAL 13851000
LOCATION OF FOB WIDTH AREA COST/M2 COST
SOUTHERN END OF THANE STATION 6.5 M 754M2 RS. 40000 30160000
EXISTING SOUTHERN FOB 1M 67M2 RS. 40000 2680000
CENTRAL FOB (ALREADY SANCTIONED) 6.5 M 715M2 RS. 40000 28600000
WIDENING OF EXISTING NORTHERN FOB 2 M 220M2 RS. 40000 8800000
WIDENING OF EXISTING NORTHERN END B.M.C. FOB AND PROVIDE LANDING 2.4 M 420M2 RS. 40000 16800000
TOTAL 87040000
LOCATION OF ESCALATOR __ NO. OF
ESCALATOR COST/ESCALATOR COST
CENTRAL FOB TO PLATFORM NO 7/8 2 RS. 7500000 15000000
TOTAL 15000000
TOTAL COST OF PROPOSED SOLUTION AT THANE STATION 119751000
SAY Rs. 12.0Cr
Final draft Report on Trespassing over Railway Track in Mumbai Suburban area
& remedial measures thereon.
MRVC - 16 - Sir JJCOA Consultancy Cell
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
A
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
1. PROVIDE RAILING BETWEEN PLATFORMS 2, 3/4, 5/6, 7/8 & 9/10.TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.
2. PROVIDE GREEN PATCH IN TRIANGULAR PORTION AT NORTHERN END OFPLATFORM 7/8.TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.
3. PROVIDE R.C.C. COMPOUND WALL BEYOND PLATFORM NO.10 ATNORTHERN END ON EAST SIDE TILL VITAWA.TO PREVENT TRESPASSSSING FROM THANE EAST TO PLATFORMS 7/8 AND9/10
4. WIDEN 2ND FOB AT NORTHERN END TOWARDS KALYAN SIDE TO PROVIDEADDITIONAL CONNECTION TO ALL PLATFORMS LANDING ON THENORTHERN SIDE.TO DIVERT THE PUBLIC FLOW ON BOTH SIDES OF THE FOB AND PREVENTCROWDING ON THE FOB.
5. TICKET OFFICE ON WEST SHOULD BE DEMOLISHED AND PROVIDE FOBABOVE IT, WHICH WILL HAVE EXIT THROUGH STAIRS ON PLATOFRMNO.2,3/4,5/6,9/10 & ON PLATFORM NO. 7/8 THROUGH ESCALATORS/LIFTS.(ALREADY UNDER CONSTRUCTION)TO DIVERT THE PUBLIC FLOW, AND PREVENT OVERCROWDING ON THEEXISTING FOBs AND PREVENT TRESPASSING BETWEEN THE PLATFORMS.
6. PROVIDE GREEN PATCH WITH BARRICADES AT NORTHERN END OFPLATFORM NO. 3/4.TO PREVENT TRESPASSING BETWEEN THE PLATFORMS.
7. PROVIDE R.C.C. BOUNDARY WALL ON THE NORTHERN END PARALLEL TOPLATFORM NO.2 TILL CREEK.TO PREVENT TRESPASSSSING FROM THANE WEST TO PLATFORMS 3/4 AND5/6.
8. PROVIDE EAST-WEST FOB AT SOUTHERN END OF THANE STATIONCONNECTING PLATFORMS 1 & 7/8 BY RAMPS
TO FACILITATE EASY FLOW OF HEAVY LUGGAGE TO SOUTHERN END OF PLATFORM 7/8
9. WIDEN EXISTING SOUTHERN FOB BY 6M.
10. WIDEN NORTH END PUBLIC FOB BY 2.4M AND PROVIDE LANDING TOPLATFORMS 3/4 & 5/6 AND CONNECT THE SAME TO 2ND FOB FROM NORTHBY A SKYWALK.TO PROVIDE DIRECT ACCESS FROM THANE WEST NORTH END BUS STOP TO ALLPLATFROMS AND HENCE PREVENT TRESPASSING.
LEGEND
TWO EXISTING FOBS AT SOUTHERN
END ARE RUNNING PARALLEL IN
EXISTING WHICH ARE PROPOSED TO
MERGE AT SAME LEVEL AND WIDEN
IT FOR FASTER AND EASY
MOVEMENT OF PASSANGERS.
PROPOSED FOB AT SOUTHERN
END WHICH CONNECTS PLATFORM
NO1. & 7&8 WHERE OUTSTATION
TRAINS STOPS AND IT CONTINUOS
TILL WEST
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT