STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
)
Rev. 04
21.0-336
Figure 9.1-1 – Fuel Pool Cooling and Cleanup System P&ID (Sheet 2 of 3
![Page 2: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/2.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
)
Rev. 04
21.0-337
Figure 9.1-2 – Fuel Pool Cooling and Cleanup System PFD (Sheet 1 of 2
![Page 3: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/3.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
)
Rev. 04
21.0-338
Figure 9.1-2 – Fuel Pool Cooling and Cleanup System PFD (Sheet 2 of 2
![Page 4: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/4.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
REPLACESEPARATOR
NOTE 1
BOLTSEPARATOR& REMOVE
STEAM LINEPLUGS
NOTES 1,3
REPLACEFUEL POOLGATE AND
SLOT PLUGSNOTE 1
CONTAINMENTINERT
D SERVICING SEQUENCE
(TURBINE/OPERATION
GENERATOR
FULL POWER
ON LINE)
Rev. 04
21.0-339
Figure 9.1-12 – Plant Refueling And Servicing Sequence
& WASHERS
TRANSPORT
NOTE 6
HEAD NUTS
REMOVE &
FILL &COOL DOWN
REACTOR
VENT NOTE 1HEAD
DRYWELLREMOVE
VENT DUCTS
DISCONNECT
NOTE 1
PIPING ANDRPV HEAD
AND HEAD
NOTE 1PIPING
REMOVE
INSULATIONRPV REMOVE
RPVHEAD
NOTE 1NOTE 2STUDS
PROTECTORSAND REMOVE
INSTALLFLOOD
REACTORWELL AND
DRYER/SEPARATOR
POOL
REMOVEDRYER
NOTE 1
REMOVEFUEL POOL
SLOT PLUGSNOTE 1
CLOSEREFUELINGBULKHEAD
COVERS
REMOVEFUEL POOL
GATENOTE 1
PURGEDRYWELL
ANDWETWELL
CHAMBERS
TESTFMCRD'S
REPLACEFUEL POOL
GATENOTE 1
INSTALLNEW FUEL
NOTE 3
SERVICEINTERNAL
RECIRCPUMPSNOTE 3
REPLACEINCORE
DETECTORSNOTES 3,4
REPLACECONTROLBLADES
NOTES 3,5
SHUFFLEFUEL
NOTE 3
REMOVESPENT FUEL
NOTE 3
SIPFUEL
NOTE 2
REMOVESEPARATOR
NOTE 1
INSTALLSEPARATOR
STRONGBACKNOTE 1
UNBOLTSEPARATOR
INSERTSTEAM
LINEPLUGS
MAINTAINMAIN STEAM
SRV'S
INSTALLRPV HEAD
NOTE 1
REMOVESEAL
SURFACESUPPORTASSEMBLY
NOTE 1
OPENREFUELINGBULKHEAD
COVERS
WET & DECON
WALLSPOOL
SEPARATOR& DRYER/
REAC WELLINSTALLDRYER
NOTES 1,3
DRAINREACTORWELL &DRYER/
SEPARATORPOOL
REPLACEHEAD NUTS& WASHERS
NOTE 1
HEAD
NOTE 1AND PIPINGINSULATION
INSTALL RPV
HYDRO TESTFULL RPV
INSTALLDRYWELL
HEADNOTE 1
INSTALLREACTOR
WELLSHIELDPLUGSNOTE 1
STARTUPPOWERTESTS
POWERSTEPS
NOTE 1PLUGS
REACTORWELL SHIELD
REMOVE
REPLACEDRYER/
SEPARATOR
SHIELD PLUGSPOOL
NOTE 1
NOTES
1. REACTOR BUILDING CRANE REQUIRED.
2. ADDITIONAL NON ROUTINE OPERATIONTO BE PERFORMED AS REQUIRED.
3. PLATFORM REQUIRED OVER REACTOR.
WITH MOVING FUEL BUT NOT SIMULTANEOUSLY.4. WORK MAY BE PERFORMED INTERMITTENTLY
5. TECHNICAL SPECIFICATIONS RESTRICTIONS APPLY.
6. NUTS AND WASHERS STORED ON RPV CAROUSEL.
FIGURE 9 1 12 PLANT REFUELING AN
OFF LINE)GENERATOR
SHUTDOWN(TURBINE/
PLUGSNOTE 1
SLOTSEPARATOR
DRYER/REMOVE
NOTE 1ASSEMBLYSUPPORT
HEAD SEALSURFACE
INSTALL RPV
VERIFYCORE
NOTE 3
RECONNECTRPV HEAD
PIPING ANDVENT DUCTS
NOTE 1
SERVICE CRDGUIDE TUBE
AND FUELSUPPORT
NOTES 2,4
![Page 5: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/5.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
9)
Rev. 04
21.0-340
Figure 9.2-1 – Reactor Building Cooling Water System P&ID (Sheet 5 of
![Page 6: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/6.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
9)
Rev. 04
21.0-341
Figure 9.2-1 – Reactor Building Cooling Water System P&ID (Sheet 8 of
![Page 7: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/7.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
Rev. 04
21.0-342
Figure 9.2-2 – Hvac Normal Cooling Water System P&ID
![Page 8: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/8.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
Rev. 04
21.0-343
Figure 9.2-4 – Makeup Water System (Condensate) P&ID (Sheet 1 of 1)
![Page 9: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/9.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
Rev. 04
21.0-344
Figure 9.2-5 – Makeup Water System (Purified) P&ID (Sheet 2 of 3)
![Page 10: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/10.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
Rev. 04
21.0-345
Figure 9.2-7 – Reactor Service Water System P&ID (Sheet 1 of 3)
![Page 11: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/11.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
Rev. 04
21.0-346
Figure 9.2-7 – Reactor Service Water System P&ID (Sheet 2 of 3)
![Page 12: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/12.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
Rev. 04
21.0-347
Figure 9.2-7 – Reactor Service Water System P&ID (Sheet 3 of 3)
![Page 13: Final Safety Analysis Report · final safety analysis report large-scale drawings 21.0-339 figure 9.1-12 – plant refueling and servicing sequence & washers transport note 6 head](https://reader033.vdocument.in/reader033/viewer/2022042306/5ed2a8bcb9f87260d87dbea3/html5/thumbnails/13.jpg)
STP 3 & 4
Final Safety Analysis R
eport
Large-Scale Draw
ings
Rev. 04
21.0-348
Figure 9.2-9b – Potable and Sanitary Water System P&ID (Sheet 2 of 2)