final schematic design package - ncha · final schematic design package . plan overview cafe /...
TRANSCRIPT
Alleghany Memorial Hospital Renovation & MOBFINAL Schematic Design Package
Plan Overview
Cafe / Vending
Emergency Department
Chapel
Materials Management
Hospital Renovation
Lower Level MOB PlanPrimary Care & Specialty Services
SPRINKLER RISER
CLINICAL SUPPLY O2 STOR.
EQUIPMENT
MEDICATION STOR.
CLEAN UTILITYSOILED UTILITY
EQUI
PMEN
T
DME STORAGE
NURSEWORK
REGISTRATIONCENTRAL CHECK-IN
MENS RR
WOMENS RR
WAITING
PROCEDURE/CAST
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
PROCEDURE
EXAM
VITALS
EXAM
ELECTRICAL IT CLOSET
EXAM EXAM
JANITORLAB
DRUG SCREENING
BLOOD DRAW
SUBWAIT
CONSULT
PRACTICE MANAGER
STOR.
NURSEWORK
N STATION
N STATION
PROVIDERWORK RM
PROVIDERWORK RM
EXAM EXAM EXAM
EXAM
VITALS
6'PROVIDERWORK RM
10'
11'-2
5 8"
006007008009
001
002
003
004
AAABBBCCCDDD
001
002
003
004
A.100SPACE PLANFIRST FLOOR
MAY 22, 2019
2019.0501
ML
ML
ALLE
GHAN
Y M
EMOR
IAL
233
DOCT
ORS
STRE
ET
SPAR
TA, N
ORTH
CAR
OLIN
A 28
675
SCHEMATIC DRAWINGNOT FOR
CONSTRUCTION
SUMMIT HEALTHCARE GROUP
project no:
sheet title:
ML
ML
Copyright 2019
date:
drawn by:
designer:
RevisionsDescription Date
PLANNORTH
p. 336.971.2251 I www.summithg.com4244 GOODYEAR DRIVE | WINSTON-SALEM, NC
No:
01 FIRST FLOOR PLAN scale: 1/8" = 1'-0"
01 OWNER REQUESTED REV. 06.08.1902 OWNER REQUESTED REV. 06.12.19
Upper Level MOB PlanPhysical & Respiratory Therapy, Administration &
Health Information Services
PARALLEL BARS-folding
TREADMILL
UPPER BODYERGOMETER
NUSTEP
TREADMILL
TREATMENT TABLE
THERAPIST
LOCKERSLINEN STORAGE
WORKSTATIONCONSULT RM
STRESS TESTING
STOR.
CHANGING
STAFF WORK RM
CLASSROOM / MEETING ROOM
RESPIRATORY & PHYSCIAL THERAPY
ADMINISTRATION
CEO OFFICE
RECEPTION
OFFICE
BREAK RM
ELECTRICAL IT CLOSET MECHANICALJANITOR
WORK ROOM
HEALTH INFO SERVICES
SHELL SPACE 1,038 SF
TWO-STORYATRIUM
TREATMENT RM
TREATMENT TABLE
OFFICE
OFFICE
TREATMENT TABLE TREATMENT TABLE
TREATMENT RM TREATMENT RM
TREADMILL
EXAM RM
3'
7'-738"3'
3'7'
32'-738"
10'
9'-1"
A.101SPACE PLAN
SECOND FLOOR
MAY 22, 2019
2019.0501
ML
ML
ALLE
GHAN
Y M
EMOR
IAL
233
DOCT
ORS
STRE
ET
SPAR
TA, N
ORTH
CAR
OLIN
A 28
675
SCHEMATIC DRAWINGNOT FOR
CONSTRUCTION
SUMMIT HEALTHCARE GROUP
project no:
sheet title:
ML
ML
Copyright 2019
date:
drawn by:
designer:
RevisionsDescription Date
PLANNORTH
p. 336.971.2251 I www.summithg.com4244 GOODYEAR DRIVE | WINSTON-SALEM, NC
No:
01 SECOND FLOOR PLAN scale: 1/8" = 1'-0"
01 OWNER REQUESTED REV. 06.08.1902 OWNER REQUESTED REV. 06.12.19
ALTERNATE Upper Level MOB Plan
BREAK RM
ELECTRICAL IT CLOSET MECHANICALJANITOR
TWO-STORYATRIUM
SHELL SPACE
A.101SPACE PLAN
SECOND FLOOR
MAY 22, 2019
2019.0501
ML
ML
ALLE
GHAN
Y M
EMOR
IAL
233
DOCT
ORS
STRE
ET
SPAR
TA, N
ORTH
CAR
OLIN
A 28
675
SCHEMATIC DRAWINGNOT FOR
CONSTRUCTION
SUMMIT HEALTHCARE GROUP
project no:
sheet title:
ML
ML
Copyright 2019
date:
drawn by:
designer:
RevisionsDescription Date
PLANNORTH
p. 336.971.2251 I www.summithg.com4244 GOODYEAR DRIVE | WINSTON-SALEM, NC
No:
01 SECOND FLOOR PLAN - SHELL SPACE scale: 1/8" = 1'-0"
01 OWNER REQUESTED REV. 06.08.1902 OWNER REQUESTED REV. 06.12.1903 OWNER REQUESTED REV. 06.19.19
• Contractor to provide deduct pricing to not up-fit Break Room and Restrooms. Pricing to include plumbing rough ins for both Break Room and Restrooms
Hospital Vending/Cafe Plan
202 SF
Women'sToilet Room
165 SF
Men's ToiletRoom
1568 SF
Cafe/ Dining
NourishmentStation
88 SF
X-RayRoom262 SF
Corridor857 SF
MaterialManagement
914 SF
Wait1182 SF
413 SF
Corridor
Corridor695 SF
Department Legend
Dining & VendingMaterial Management
86 SF
MaterialManagement
Office
Hospital Emergency Dept. Plan
Toilet
Toilet
213 SF
PatientRoom 2
212 SF
PatientRoom 3
260 SF
Staff BreakRoom
84 SF
HouseKeeping
68 SF
On-callToilet
85 SF
On-call
113 SF
Cardiac
51 SF
PatientToilet
113 SF
CartStorage
124 SF
DecontaminationRoom
229 SF
Trauma
118 SF
Triage
408 SF
Reception &Waiting
146 SF
Observation/ Behavioral
Health
253 SFObservation
184 SF
Observation
Toilet
64 SFStaff Toilet
Storage
BoneDensitometry
120 SF
Ultrasound162 SF
GurneyStorage
X-RayStorage andDevelopment
48 SF
Toilet Room
Toilet Room
Corridor
Corridor
240 SF
PatientRoom 1
Elec Closet
H.T. 244 SF
PhysicalLounge
192 SF
Call Room 265 SF
SecurityOffice111 SF
46 SF
Work
MenRestroom
167 SF
WomenRestroom
150 SF
Corridor521 SF
157 SF
ED SurgeWaiting
Department Legend
Building ServicesEmergencyImagingMammography
128 SF
ImagingStorage
Nou
rishm
ent
Medicine
83 SF
MammoWaiting
169 SF
Mammo
96 SF
FoodService
323 SF
CleanSupply/LinenEquipment
Storage32 SF
Dress
Overhead rolling protective curtain
197 SF
Trauma
51 SF
PatientToilet
102 SFCardiac
97 SF
IT Office
Chapel & ED Waiting Floor Plan
S
252 SF
Chapel
97 SF
IT Office
229 SF
ED SurgeWaiting
Materials Management Floor Plan
X-Ray
367 SF
Locker/BreakRoom
52 SF
CT Room
331 SF
Imaging Office
82 SF
86 SF
MaterialManagement
Office413 SF
Corridor
914 SF
MaterialManagement
Storage
Mechanical
140 SF
Electrical
137 SF
Morgue
105 SF
Department Legend
Dining & VendingMaterial ManagementStaff Services
Exterior Pricing
Contractor to price shortening width of canopy by 1/3
Contractor to price alternate handrail options instead of glass.