final submission 62 hove street, toronto on a000 emma...

15
Scale Instructor Drawn by Date Class FINAL SUBMISSION Adv. Residential Design 62 Hove Street, Toronto ON EMMA WATERFIELD April/14 Emma Waterfield Micheal Muller A000

Upload: others

Post on 17-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

ScaleInstructor

Drawn by

Date

Class

FINAL SUBMISSIONAdv. Residential Design

62 Hove Street, Toronto ON

EMMA WATERFIELDApril/14

Emma Waterfield

Micheal Muller

A000

Page 2: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

HOVE STREET

CO

DSE

LL A

VE

ADJO

ININ

G S

ITE

EXIS

TIN

G B

UIL

DIN

G

ADJOINING SITE

EXISTING BUILDING706

4000

825

4000

12 N

OO

N

1 :

1 00

Sit e

Pla

n1

All existing structures and foliage to beremoved from site.Exterior walls are to be of straw bale, loadbearing construction.Windows on the ground floor on the southside will be angled to 90 degrees to thewinter sun, allowing for the growth of foodinside all year round.There will be a planting bed all along thesouth wall on the ground floor, this will bedeep enough to allow the growth of largefruit or vegetable bearing plants.Doors will have high R values and beproperly sealed to prevent heat loss.Windows will be shaded during summer toprevent excessive cooling loads.Deciduous trees will be planted on thesouth side of the building to provide shadeduring the summer months, coniferoustrees will be planted on the north side, aswell as the east and west to provideprotection of blowing rain, wind and snow.Site will be graded to allow water drainageto the streets.Green roof will be provided to add to thesustainability and insulation requirements.All interior floors will be heated via radiantheating, flooring material will be QuarryTile, this will also function as a thermalmass during the winter months, and willhelpcool the building in the summer months.

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

1 : 100

SITE PLAN

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A101

Page 3: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

UP

1

A106

A104 2

A105

1

A1041

A105

2

MAIN ENTRANCE

LIVING

KITCHEN

DINING

OFFICE

POWDERROOM

PORCH

PORCH

INDOOR FOOD PRODUCTION

1

A109

2

A109

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

1 : 50

FIRST FLOOR

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A102 1 : 50

First Floor1

Page 4: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

DN

1

A106

A104 2

A105

1

A1041

A105

2

MASTERBEDROOM

LAUNDRY

GUEST ROOM

W/R

UTILITY

HALL

WALK INCLOSET

MASTERENSUITE

GREEN ROOF BELOW

BALCONY

1

A110

2

A110

3

A110

3

A109

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

1 : 50

SECOND FLOOR

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A103 1 : 50

Second Floor1

Page 5: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

First Floor

0

Second Floor

3000

T/O Footing

-1500

B/O Roof

6065

First Floor Ceiling

2772

Second Floor Ceiling

5765

T/O Roof

7457

First Floor

0

Second Floor

3000

T/O Footing

-1500

B/O Roof

6065

First Floor Ceiling

2772

Second Floor Ceiling

5765

T/O Roof

7457

1 : 100

EAST ELEVATION1

1 : 100

WEST ELEVATION2

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

1 : 100

E & W ELEVATIONS

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A104

Page 6: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

First Floor

0

Second Floor

3000

T/O Footing

-1500

B/O Roof

6065

First Floor Ceiling

2772

Second Floor Ceiling

5765

T/O Roof

7457

First Floor

0

Second Floor

3000

T/O Footing

-1500

B/O Roof

6065

First Floor Ceiling

2772

Second Floor Ceiling

5765

T/O Roof

7457

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

1 : 100

N & S ELEVATIONS

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A105

1 : 100

SOUTH ELEVATION1

1 : 100

NORTH ELEVATION2

Page 7: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

First Floor

0

Second Floor

3000

T/O Footing

-1500

B/O Roof

6065

First Floor Ceiling

2772

Second Floor Ceiling

5765

LIVING

MASTER BEDROOM WALK INCLOSET

EXTERIORON GRADEPORCH

BALCONY

MAIN ENTRANCEEXTERIORON GRADEPORCH

GREEN ROOF

GREEN ROOF

2000mmOVERHANG

2A109

T/O Roof

7457

2A110

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

1 : 50

BUILDING SECTION

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A106

1 : 50

Section 11

Dec 21stWinter Solstice

March 20thEquinox

June 21stSummer Solstice

Dec 21stWinter Solstice

March 20thEquinox

June 21stSummer Solstice

23.0

45.0

69.0

0°23

.00°45

.00°

69.0

INDOOR FOODPRODUCTION

400mm OVERHANG

100mmOVERHANG

Page 8: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

Winter Solstice

5PM 8AM

12 NOON

Summer Solstice

Spring Equinox

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

1 : 200

SUNPATH

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A107

1 : 200

Sunpath1

Page 9: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

HEATING COST

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A108

AREA CHART

SUNPATHHEATING COST ESTIMATE

Page 10: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

First Floor

0

T/O Footing

-1500

Metal Flashing

Removable Planting Container

Drain Formed into Concrete SlabMetal Flashing to Extend Through

Bottom of Planter

R20 POURED CONCRETEFOUNDATION WALL

6mil Vapour Barrier100mm Rigid Insulation

337mm Conc. Foundation Wall100mm Rigid Insulation

6mil Polyethelene Air Barrier13mm Plywood Protection

6mil Vapour Barrier100mm Poured Concrete Slab on Grade

100mm Rigid Insulation6mil Polyethelene Air Barrier

100mm Rigid Structural Insulation

70degree Sloped Triple Pane Glazing

140x140mm Heavy Timber Column

INTERIOR

EXTERIOR

First Floor

0

INTERIOR

EXTERIOR

Column Base Plate

140x140mm Timber Column

Rebar Embedded in FoundationWall and Extending 800mm min

into Straw Bales

T/O Foundation Wall to beCompleately Waterproofed

Rebar is tied together aftereach bale is added and

continues to top of bale wall

R20 RADIENT HEATED FLOOR6mil Polyethelene Sheet100mm Rigid Insulation100mm Poured Concrete Slab onGrade with radient heating systemembedded6mil Vapour Barrier13mm Quarry Tile Flooring

R40 STRAW BALE WALL50mm Lime PlasterWire Mesh450mm MechanicallyCompacted 3-String StrawBalesWire Mesh50mm Lime Plaster

R20 CONCRETEFOUNDATION WALL

6mil Vapour Barrier350mm Poured Concrete

Foundation Wall100mm R20 Rigid

Insulation6mil Polyethelene Air

Barrier13mm Plywood Protection

R20 RADIENT HEATED FLOOR6mil Polyethelene Sheet100mm Rigid Insulation100mm Poured Concrete Slab onGrade with radient heating systemembedded6mil Vapour Barrier13mm Quarry Tile Flooring

Second Floor

3000First Floor Ceiling

2772INTERIOR FLOOR

13mm Quarry Tile Floor Finish13mm Plywood Subfloor

38x140mm Wood Joists @400 o/c13mm Gypsum Wall Board

R40 STRAW BALE WALL50mm Lime Plaster

Wire Mesh450mm Mechanically Compacted 3-String Straw Bales

140x140mm Heavy Timber ColumnWire Mesh

50mm Lime Plaster

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

1 : 20

DETAILS

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A109

1 : 20

Foundation Wall at Planter1 1 : 20

Foundation Wall at FirstFloor2

1 : 20

Bale Wall at Second FLoor3

Page 11: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

Second Floor

3000

First Floor Ceiling

2772

B/O Roof

6065

Second Floor Ceiling

5765

87 1000

Metal Flashing

Wood Fascia

Metal Flashing Built in Gutter

Vented Roof Soffit

38x140mm Wood Rafters @ 400o/c

19mm Structural Sheeting

6mil Polyethelene Waterproof Membrane

50mm Rigid Insulation

Root Barrier

Protective Fabric

DrainageLayer

Filter Layer

150mm Groawing Media

Vegetation

100mm Rigid Insulation13mm Plywood Sheething13mm Gypsum Wall Board

140x140mm Heavy Timber ColumnTypical Bale Wall

Wood Top Plate fastenedto Column and Rafters

13mm Gypsum Wall Board

13mm Plywood Sheething

100mm Rigid Insulation

Wood Top Plate fastenedto Column and Rafters

Vegetation

150mm Groawing Media

Filter Layer

DrainageLayer

ProtectiveFabric

Root Barrier

50mm Rigid Insulation

6mil Polyethelene Waterproof Membrane

19mm Structural Sheeting

Soil Retainerwith drainage

holes

38x140mm Wood Rafters @ 400o/c

Vented Roof Soffit

Metal Flashing

Typical Bale Wall

140x140mm Heavy Timber Column

140x140mm TimberBeam

140x140mm TimberBeam

T/O Roof

745787

1000

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

As indicated

DETAILS

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A110

1 : 10

Second Floor at Balcony1

Metal Flashing to compleatelyenclose cantileavered balcony

6mil Polyethelene Sheet50mm Rigid Insulation

38x140mm Wood Joist140mm Batt Insulation

13mm Plywood Subfloor13mm Quarry Tile Floor

Gutter/Drain to prevent water pooling at base of second floorbales

Metal Window Flashing to be folded into adjoining metal balconyflashing

Hollow Steel Curtain Wall Sill, filled with insulation

Triple Glazed Curtain Wall Panel

140x140mm Heavy Timber Beam

38x140mm Wood Top Plate

Custom Wood Cant Strip

Metal Flashing

140x140mm HeavyTimber Beam

1100mm High Guard50x50mm Wood Guard Rails with 75mm max spacing

140x140mm HeavyTimber Beam

140x140mm HeavyTimber Column

Metal Flashing

38x140mm WoodHeader

Straw Bale WallBeyond

INTERIOR

EXTERIOR BALCONY

1 : 20

Bale Wall at B/O Roof2 1 : 20

Bale Wall at T/O Roof3

Page 12: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

INTERIOR VIEWS

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A111KITCHEN

1

Page 13: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

INTERIOR VIEWS

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A112Stair1

Page 14: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

INTERIOR VIEWS

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A113

Living Room1

Page 15: FINAL SUBMISSION 62 Hove Street, Toronto ON A000 EMMA ...trantor.sheridanc.on.ca/student/waterfem/images/Portfolio/Revit/FIN… · FINAL SUBMISSION Adv. Residential Design 62 Hove

Scale

Instructor

Drawn by

Date

Advanced Residential Construction

Con. North True North

INTERIOR VIEWS

62 Hove Street, Toronto ON

April/14

Emma Waterfield

Micheal Muller

A114

Interior Planter1