final submission 62 hove street, toronto on a000 emma...
TRANSCRIPT
ScaleInstructor
Drawn by
Date
Class
FINAL SUBMISSIONAdv. Residential Design
62 Hove Street, Toronto ON
EMMA WATERFIELDApril/14
Emma Waterfield
Micheal Muller
A000
HOVE STREET
CO
DSE
LL A
VE
ADJO
ININ
G S
ITE
EXIS
TIN
G B
UIL
DIN
G
ADJOINING SITE
EXISTING BUILDING706
4000
825
4000
12 N
OO
N
1 :
1 00
Sit e
Pla
n1
All existing structures and foliage to beremoved from site.Exterior walls are to be of straw bale, loadbearing construction.Windows on the ground floor on the southside will be angled to 90 degrees to thewinter sun, allowing for the growth of foodinside all year round.There will be a planting bed all along thesouth wall on the ground floor, this will bedeep enough to allow the growth of largefruit or vegetable bearing plants.Doors will have high R values and beproperly sealed to prevent heat loss.Windows will be shaded during summer toprevent excessive cooling loads.Deciduous trees will be planted on thesouth side of the building to provide shadeduring the summer months, coniferoustrees will be planted on the north side, aswell as the east and west to provideprotection of blowing rain, wind and snow.Site will be graded to allow water drainageto the streets.Green roof will be provided to add to thesustainability and insulation requirements.All interior floors will be heated via radiantheating, flooring material will be QuarryTile, this will also function as a thermalmass during the winter months, and willhelpcool the building in the summer months.
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
1 : 100
SITE PLAN
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A101
UP
1
A106
A104 2
A105
1
A1041
A105
2
MAIN ENTRANCE
LIVING
KITCHEN
DINING
OFFICE
POWDERROOM
PORCH
PORCH
INDOOR FOOD PRODUCTION
1
A109
2
A109
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
1 : 50
FIRST FLOOR
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A102 1 : 50
First Floor1
DN
1
A106
A104 2
A105
1
A1041
A105
2
MASTERBEDROOM
LAUNDRY
GUEST ROOM
W/R
UTILITY
HALL
WALK INCLOSET
MASTERENSUITE
GREEN ROOF BELOW
BALCONY
1
A110
2
A110
3
A110
3
A109
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
1 : 50
SECOND FLOOR
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A103 1 : 50
Second Floor1
First Floor
0
Second Floor
3000
T/O Footing
-1500
B/O Roof
6065
First Floor Ceiling
2772
Second Floor Ceiling
5765
T/O Roof
7457
First Floor
0
Second Floor
3000
T/O Footing
-1500
B/O Roof
6065
First Floor Ceiling
2772
Second Floor Ceiling
5765
T/O Roof
7457
1 : 100
EAST ELEVATION1
1 : 100
WEST ELEVATION2
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
1 : 100
E & W ELEVATIONS
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A104
First Floor
0
Second Floor
3000
T/O Footing
-1500
B/O Roof
6065
First Floor Ceiling
2772
Second Floor Ceiling
5765
T/O Roof
7457
First Floor
0
Second Floor
3000
T/O Footing
-1500
B/O Roof
6065
First Floor Ceiling
2772
Second Floor Ceiling
5765
T/O Roof
7457
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
1 : 100
N & S ELEVATIONS
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A105
1 : 100
SOUTH ELEVATION1
1 : 100
NORTH ELEVATION2
First Floor
0
Second Floor
3000
T/O Footing
-1500
B/O Roof
6065
First Floor Ceiling
2772
Second Floor Ceiling
5765
LIVING
MASTER BEDROOM WALK INCLOSET
EXTERIORON GRADEPORCH
BALCONY
MAIN ENTRANCEEXTERIORON GRADEPORCH
GREEN ROOF
GREEN ROOF
2000mmOVERHANG
2A109
T/O Roof
7457
2A110
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
1 : 50
BUILDING SECTION
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A106
1 : 50
Section 11
Dec 21stWinter Solstice
March 20thEquinox
June 21stSummer Solstice
Dec 21stWinter Solstice
March 20thEquinox
June 21stSummer Solstice
23.0
0°
45.0
0°
69.0
0°23
.00°45
.00°
69.0
0°
INDOOR FOODPRODUCTION
400mm OVERHANG
100mmOVERHANG
Winter Solstice
5PM 8AM
12 NOON
Summer Solstice
Spring Equinox
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
1 : 200
SUNPATH
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A107
1 : 200
Sunpath1
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
HEATING COST
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A108
AREA CHART
SUNPATHHEATING COST ESTIMATE
First Floor
0
T/O Footing
-1500
Metal Flashing
Removable Planting Container
Drain Formed into Concrete SlabMetal Flashing to Extend Through
Bottom of Planter
R20 POURED CONCRETEFOUNDATION WALL
6mil Vapour Barrier100mm Rigid Insulation
337mm Conc. Foundation Wall100mm Rigid Insulation
6mil Polyethelene Air Barrier13mm Plywood Protection
6mil Vapour Barrier100mm Poured Concrete Slab on Grade
100mm Rigid Insulation6mil Polyethelene Air Barrier
100mm Rigid Structural Insulation
70degree Sloped Triple Pane Glazing
140x140mm Heavy Timber Column
INTERIOR
EXTERIOR
First Floor
0
INTERIOR
EXTERIOR
Column Base Plate
140x140mm Timber Column
Rebar Embedded in FoundationWall and Extending 800mm min
into Straw Bales
T/O Foundation Wall to beCompleately Waterproofed
Rebar is tied together aftereach bale is added and
continues to top of bale wall
R20 RADIENT HEATED FLOOR6mil Polyethelene Sheet100mm Rigid Insulation100mm Poured Concrete Slab onGrade with radient heating systemembedded6mil Vapour Barrier13mm Quarry Tile Flooring
R40 STRAW BALE WALL50mm Lime PlasterWire Mesh450mm MechanicallyCompacted 3-String StrawBalesWire Mesh50mm Lime Plaster
R20 CONCRETEFOUNDATION WALL
6mil Vapour Barrier350mm Poured Concrete
Foundation Wall100mm R20 Rigid
Insulation6mil Polyethelene Air
Barrier13mm Plywood Protection
R20 RADIENT HEATED FLOOR6mil Polyethelene Sheet100mm Rigid Insulation100mm Poured Concrete Slab onGrade with radient heating systemembedded6mil Vapour Barrier13mm Quarry Tile Flooring
Second Floor
3000First Floor Ceiling
2772INTERIOR FLOOR
13mm Quarry Tile Floor Finish13mm Plywood Subfloor
38x140mm Wood Joists @400 o/c13mm Gypsum Wall Board
R40 STRAW BALE WALL50mm Lime Plaster
Wire Mesh450mm Mechanically Compacted 3-String Straw Bales
140x140mm Heavy Timber ColumnWire Mesh
50mm Lime Plaster
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
1 : 20
DETAILS
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A109
1 : 20
Foundation Wall at Planter1 1 : 20
Foundation Wall at FirstFloor2
1 : 20
Bale Wall at Second FLoor3
Second Floor
3000
First Floor Ceiling
2772
B/O Roof
6065
Second Floor Ceiling
5765
87 1000
Metal Flashing
Wood Fascia
Metal Flashing Built in Gutter
Vented Roof Soffit
38x140mm Wood Rafters @ 400o/c
19mm Structural Sheeting
6mil Polyethelene Waterproof Membrane
50mm Rigid Insulation
Root Barrier
Protective Fabric
DrainageLayer
Filter Layer
150mm Groawing Media
Vegetation
100mm Rigid Insulation13mm Plywood Sheething13mm Gypsum Wall Board
140x140mm Heavy Timber ColumnTypical Bale Wall
Wood Top Plate fastenedto Column and Rafters
13mm Gypsum Wall Board
13mm Plywood Sheething
100mm Rigid Insulation
Wood Top Plate fastenedto Column and Rafters
Vegetation
150mm Groawing Media
Filter Layer
DrainageLayer
ProtectiveFabric
Root Barrier
50mm Rigid Insulation
6mil Polyethelene Waterproof Membrane
19mm Structural Sheeting
Soil Retainerwith drainage
holes
38x140mm Wood Rafters @ 400o/c
Vented Roof Soffit
Metal Flashing
Typical Bale Wall
140x140mm Heavy Timber Column
140x140mm TimberBeam
140x140mm TimberBeam
T/O Roof
745787
1000
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
As indicated
DETAILS
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A110
1 : 10
Second Floor at Balcony1
Metal Flashing to compleatelyenclose cantileavered balcony
6mil Polyethelene Sheet50mm Rigid Insulation
38x140mm Wood Joist140mm Batt Insulation
13mm Plywood Subfloor13mm Quarry Tile Floor
Gutter/Drain to prevent water pooling at base of second floorbales
Metal Window Flashing to be folded into adjoining metal balconyflashing
Hollow Steel Curtain Wall Sill, filled with insulation
Triple Glazed Curtain Wall Panel
140x140mm Heavy Timber Beam
38x140mm Wood Top Plate
Custom Wood Cant Strip
Metal Flashing
140x140mm HeavyTimber Beam
1100mm High Guard50x50mm Wood Guard Rails with 75mm max spacing
140x140mm HeavyTimber Beam
140x140mm HeavyTimber Column
Metal Flashing
38x140mm WoodHeader
Straw Bale WallBeyond
INTERIOR
EXTERIOR BALCONY
1 : 20
Bale Wall at B/O Roof2 1 : 20
Bale Wall at T/O Roof3
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
INTERIOR VIEWS
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A111KITCHEN
1
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
INTERIOR VIEWS
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A112Stair1
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
INTERIOR VIEWS
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A113
Living Room1
Scale
Instructor
Drawn by
Date
Advanced Residential Construction
Con. North True North
INTERIOR VIEWS
62 Hove Street, Toronto ON
April/14
Emma Waterfield
Micheal Muller
A114
Interior Planter1