findings and conclusions
DESCRIPTION
Findings and Conclusions. ST. LOUIS DOWNTOWN ACCESS, CIRCULATION & TRAFFIC STUDY. Study Area Map. Goals & Objectives. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/1.jpg)
Findings and Conclusions
ST. LOUIS DOWNTOWN ACCESS, CIRCULATION &
TRAFFIC STUDY
![Page 2: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/2.jpg)
Study Area Map
![Page 3: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/3.jpg)
Goals & Objectives
Identify measures to improve motorist’s access and vehicular movement throughout the CBD, while enhancing the safety and attractiveness of Downtown to pedestrians and making street-level retail more attractive and safe for customers.
Emphasis on addressing changes proposed by the Downtown CBD Streetscape Plan and to respond to specific issues raised for this evaluation.
![Page 4: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/4.jpg)
Study Guidelines
St. Louis Downtown CBD Streetscape Plan “Street Hierarchy” vs. Functional
Classifications Proposed Conversion of Several Streets
Downtown Development Plan
Stakeholder Survey Results and Identification of Primary Issues
![Page 5: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/5.jpg)
Stakeholder Survey
Primary sources of frustration are signal operations, unnecessary delays and obstructions;
Strong desire for peak period parking restrictions, more aggressive enforcement and consistent street patterns;
Competing emphases between access to/from the CBD (a concern of the existing office uses) and mobility within the CBD (a concern of the up and coming residential & commercial developments);
Priorities for improving circulation and/or decreasing delay include simplified signal operations and more liberal regulations.
![Page 6: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/6.jpg)
Vehicular Access To & From CBD Improved Traffic Operations Improved Circulation: 1-Way Vs. 2-Way Pedestrian Accommodations On-Street Parking Treatments, Loading
Zones & Cab Stand Observations Evaluation of Key Landmarks
Study Elements
![Page 7: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/7.jpg)
Vehicular Access To/From CBD
To/FromHighway 40
(I-64)West
![Page 8: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/8.jpg)
To/FromI-55/70/64
East(Illinois)
Vehicular Access To/From CBD
![Page 9: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/9.jpg)
To/FromI-70 West
Vehicular Access To/From CBD
![Page 10: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/10.jpg)
To/FromI-55 South
& I-44 West
Vehicular Access To/From CBD
![Page 11: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/11.jpg)
To/From North City, Midtown / CWE and
South City
Vehicular Access To/From CBD
![Page 12: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/12.jpg)
Anticipated Changes in Vehicular Access
To/From the CBD
Due to the New
Mississippi River
Bridge
Vehicular Access To/From CBD
![Page 13: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/13.jpg)
Signal Coordination & Simplified Phasing: Advanced Traffic Management System (2006) Upgraded signal equipment & fiber optic
communications. Optimized signal timing for priority corridors. Fewer stops, less delay, improved traffic flow. Simpler – two phase – operations for motorists and
pedestrians. Increased flexibility in the use of the system
(special events, sporting event, different flashing modes, etc.)
Improved Traffic Operations
![Page 14: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/14.jpg)
Improved Traffic Operations
Improved Traffic Signal
Operations
![Page 15: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/15.jpg)
Operational & Regulatory Enhancements: Modification of “Flashing” operations
─ Inner core signals flash ~7:00 p.m.─ Arterial signals flash ~10:00 p.m.
Allow LTOR at One-Way Streets─ Maneuver is already common-place.─ Not currently allowed in Missouri;
legislative action is required.─ Would require aggressive public
education.
Improved Traffic Operations
![Page 16: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/16.jpg)
Operational & Regulatory Enhancements: Standardization of RTOR
─ Perceived lack of consistency in application & enforcement.
─ Contributes to delay and disrupts circulation.─ Some RTOR restrictions will be warranted.─ Restrictions could increase pedestrian
conflicts.─ Promote countermeasures to reduce
pedestrian conflicts (small radii, curb bulbs, signage).
Improved Traffic Operations
![Page 17: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/17.jpg)
Modification of Traffic Control: Spruce & 11th – Potential signalization and
lane modifications. Walnut & 11th – Potential signalization. Walnut & 9th – Potential signalization. Walnut & Tucker – Potential signalization. 4th & Locust – Pedestrian signal
enhancements. Broadway & Locust – Pedestrian signal
enhancements and turning restrictions.
Improved Traffic Operations
![Page 18: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/18.jpg)
Miscellaneous “Spot” Improvements: Pavement markings to reinforce lane
utilization and provide improved guidance.
Addition or clarification of dual left-turn lanes and dual right-turn lanes at selected locations.
Modifications of Memorial Drive at Pine, Chestnut, Market and Walnut to reduce conflicts, improve compliance, improve efficiency and reduce confusion.
Improved Traffic Operations
![Page 19: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/19.jpg)
Improved Traffic Operations
Recommended
Modifications Along
Memorial Drive
![Page 20: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/20.jpg)
Proposed Streetscape Modifications
Tucker Boulevard Reconfiguration: Eliminates “extra” lanes (two southbound, one
northbound). Provides obvious streetscape and “calming”
benefits. Will require extensive signal, striping and signage
modifications and restrictions of peak period parking.
Could facilitate two-stage pedestrian crossings (with refuge) and improved signal timing along Tucker.
Reconfiguration can be accommodated.
![Page 21: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/21.jpg)
Proposed Streetscape Modifications
Tucker Boulevard Streetscape Treatment
![Page 22: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/22.jpg)
Vision for CBD:
Two-way streets to address concerns
about access, mobility and vitality.
Improved access, circulation and
convenience for street-level retail.
Proposed Streetscape Modifications
![Page 23: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/23.jpg)
Existing Street
Patterns
Proposed Streetscape Modifications
![Page 24: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/24.jpg)
Recommended Street
Conversions:Downtown
Streetscape Plan
Circulation: 1-Way vs. 2-Way
![Page 25: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/25.jpg)
Existing Circulatory Patterns: Odd number of north-south streets creates
an imbalance. Street grid is interrupted in several locations. Temporary closures exacerbate conditions. Consecutive southbound streets (Broadway
& 6th) results in poor circulation. Lack of complement to eastbound Walnut. Some landmarks are located on blocks with
non-complimentary orientations (Laclede Gas Bldg).
Circulation: 1-Way vs. 2-Way
![Page 26: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/26.jpg)
One-way flow improves capacity, reduces delay and allows more efficient signal operations.
One-way flow affects retail operations, creates more adverse travel, increases turning movements and can be confusing to visitors.
Two-way flow provides improved mobility and access, reduces confusion and provides calming benefits.
Circulation: 1-Way vs. 2-Way
![Page 27: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/27.jpg)
Conversion of existing one-way streets
will… Increase visibility & convenience for street-
level retail and reduce confusion for visitors. Will adversely affect signal operations,
reduce capacity and cause more congestion. May cause loading, parking maneuvers and
turning movements to disrupt flow and may adversely affect access to some parking facilities.
Circulation: 1-Way vs. 2-Way
![Page 28: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/28.jpg)
Evaluation of Streetscape Plan:Conversion of 8th Street “Natural” two-way spine for Downtown. Enhanced circulation in vicinity of Laclede Gas,
U.S. Bank Plaza and improved access to new Highway 40 ramps at Gratiot.
Consistent with Ballpark Village modifications. Cross-section will pose capacity constraints. Potentially significant transit impacts.
APPROPRIATE
Circulation: 1-Way vs. 2-Way
![Page 29: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/29.jpg)
Evaluation of Streetscape Plan:Conversion of 9th and 10th Street Enhanced circulation in vicinity of Old Post Office
and Renaissance/Mayfair. Conflicts with access at Highway 40 and disrupts
access to I-70. Conflicts with SBC garage ramps. Adverse impact on Metro Bus operations Requires 8 signal modifications.
INAPPROPRIATE
Circulation: 1-Way vs. 2-Way
![Page 30: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/30.jpg)
Evaluation of Streetscape Plan:Conversion of 11th Street Enhanced access to loft district and retail. Relatively lightly traveled. Safety/alignment concerns at Spruce/Highway 40
off-ramp and offset intersection with Market Requires up to 8 signal modifications. Can be accommodated north of Market.
APPROPRIATE (with limitations)
Circulation: 1-Way vs. 2-Way
![Page 31: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/31.jpg)
Evaluation of Streetscape Plan:Conversion of Walnut Street Enhanced access to Ballpark Village and Pavilion. Relatively lightly traveled. Limitations at Memorial. Requires up to three new signal installations and
modifications of four others. Requires enforcement of double parking and
elimination of some parking near Tucker.
APPROPRIATE
Circulation: 1-Way vs. 2-Way
![Page 32: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/32.jpg)
Evaluation of Streetscape Plan:Conversion of Locust Street Enhanced access to Old Post Office and retail. Relatively lightly traveled. Potentially significant impact on Metro Bus operations. Limitations at Broadway and Tucker and it isolates
Olive as a one-way street. Narrow width near 6th and 7th would require elimination
of parking/stopping and potentially some widening.
INAPPROPRIATE (but viable)
Circulation: 1-Way vs. 2-Way
![Page 33: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/33.jpg)
Consideration of Additional Alternatives:Evaluation of Pine Street as Two-Way Westbound leg of “couple” with Chestnut. Important freeway access route. Concentration of parking facilities results in
heavy commuter flows. Intersections with Memorial, 4th & Broadway
aren’t conducive to two-way, and blockages at garages and loading docks would be too disruptive.
INAPPROPRIATE
Circulation: 1-Way vs. 2-Way
![Page 34: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/34.jpg)
Consideration of Additional Alternatives:Conversion of Olive Street Enhanced access to Old Post Office. Complements potential conversion of Locust. Closure of Locust at Broadway creates increased
demand for a westbound street. Potentially significant impact on Metro Bus
operations. Significant constraints (lane restrictions) from 9th
through 6th would require elimination of parking/stopping/loading and potentially widening.
INAPPROPRIATE (but viable)
Circulation: 1-Way vs. 2-Way
![Page 35: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/35.jpg)
Consideration of Additional Alternatives:Conversion of 6th / 7th Street Enhances access to Metropolitan Sq., Laclede Gas and
U.S. Bank (corrects existing problem with consecutive SB streets) and improves circulation west of Broadway.
Relatively lightly traveled corridors. Potentially significant impact on Metro Bus operations. Significant constraints (lane restrictions) from
Washington through Pine would require elimination of parking/stopping and potentially some widening.
INAPPROPRIATE (but viable)
Circulation: 1-Way vs. 2-Way
![Page 36: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/36.jpg)
Circulation: 1-Way vs. 2-Way
Alternative Circulatory
Plan
![Page 37: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/37.jpg)
Pedestrian Accommodations
Evaluate maintenance needs of existing pedestrian equipment.
Standardize & update pedestrian signal heads with pedestrian friendly equipment.
Provide pedestrian signals at all signalized intersections.
Simplify pedestrian operations at signalized intersections.
Provide supplemental signage to reinforce the requirement for motorists to yield to pedestrians.
![Page 38: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/38.jpg)
Pedestrian Accommodations
Provide ADA compliant accessibility ramps at each intersection.
Install audible pedestrian heads for the visually impaired where specific needs have been identified.
![Page 39: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/39.jpg)
Pedestrian Accommodations
Treatment of Pedestrian Barriers: Narrowing of crossings of Tucker Boulevard
and provision of a pedestrian refuge. Enhancing the signalized crossings of Market
Street. Elimination of pedestrian/vehicle conflicts at
Memorial Drive. Elimination of pedestrian/vehicle conflicts on
Broadway at I-64 westbound.
![Page 40: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/40.jpg)
Treatment of On-Street Parking & Loading Zones
Establish more consistent regulations.
Provide more aggressive & consistent enforcement of regulations.
Consider additional angled parking on 11th Street.
Provide short-term parking in the vicinity of street-level retail or convenience oriented uses.
Remove peak period parking restrictions on Market Street.
![Page 41: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/41.jpg)
Treatment of On-Street Parking & Loading Zones
Additional on-street parking
recommended at specific locations.
Discourage parking on Washington
Avenue during peak traffic periods.
Consider alternative methods of parking
control (e.g., Pay & Display systems).
![Page 42: Findings and Conclusions](https://reader036.vdocument.in/reader036/viewer/2022062309/56814c56550346895db97113/html5/thumbnails/42.jpg)
Treatment of On-Street Parking & Loading Zones
Provide more aggressive enforcement of loading zones regulations.
Restrict parking and provide commercial loading zones adjacent to Metropolitan Square.
Prohibit on-street loading during peak periods along 8th Street.
Enhance Poplar Street to accommodate potential closure of Spruce Street east of Broadway.
Establish cab stands at designated locations.