FINGER LAKES LANDFILL SUMMITApril 24 2013April 24, 2013
Hobart and William Smith Colleges
Presentation by:John E. Garvey
Ontario County Administrator
Innovative Energy Systems ‐ Electricity Production
Started Electrical Generation in 2003
Original Plant housed 4 engines
Expanded to hold a total of 8 (CAT 3516 engines)
New building built in 2012. Houses 3 larger engines. Came online January 2013
Single Stream Recycling
• Opened Dec 2005
• $11 million investment
• Single Stream ‐52,000 square Ft
• Glass Beneficiation – 17,000 Square Ft
• 30 Employees
Glass Beneficiation• Opened Feb 2007 Final ProductsOpened Feb, 2007
•2 shifts of 4 employees
R l Gl hi h
Final ProductsFlint #1 30% of l• Recycle Glass which was
traditionally landfilledvolume3/8” or larger
bGramber #2 20 % of volume3/8” or larger
Unders #3 15%Fines 25%1/4 “ or smaller
Product In the DoorRecovery 2%
Waste 8%
PresentPresent
Local Efforts Currently Occurring:Local Efforts Currently Occurring:• Guardian Glass• Zotos• TOMRA• RCR&R E‐Waste• Hobart and William Smith CollegesHobart and William Smith Colleges
FutureFuture
Three Key Factors in Planning for the Future:Three Key Factors in Planning for the Future:• Supply and Demand
C l i• DEC Regulations• Technology