finishing works detail of residence building
TRANSCRIPT
ARC O5005512ARC 05005521ARC 05005532ARC 05005533ARC 05005515ARC 05005517ARC 04805449ARC 04305278ARC 04305283
CONSTRUCTION WORKSHOP
FINISHING WORKS OF BUILDING CONSTRUCTION
West raja bazar,house -48Road-1
WALL-
A WALL IS A STRUCTURE THAT DEFINES AN AREA, CARRIES A LOAD, OR PROVIDES SHELTER OR SECURITY
WALL FINISHING
WALL FINISHING STEPS OF WALL FINISHING
CURING TIME OF BRICK- BEFORE BONDING-24 HOUR
MORTARS WIDTH BETWEEN TWO
BRICKS OF MASONRY WALL ½” ,
CURING TIME OF MASONRY BRICK MASONRY WALL 7-14 DAYS BEFORE PLASTER AFTER PLASTERING 7-14 DAYS
WALL FINISHING STEPS OF WALL FINISHING
RATIO OF MORTER
RATIO OF MORTER FOR 5” WALL BONDING 1:4 (CEMENT:SAND)
RATIO OF MORTAR FOR 10” WALL BONDING 1:5 (CEMENT:SAND)
REQUIRED TOOLS FOR MASONRY WALL TROWELL,BRICK HAMMER ,SPIRIT LEVEL,PLUMB BOB.METRE RULE,LINE AND PINS
WALL FINISHINGSTEPS OF PLASTERING
CURING THE WALL THREE TIMES OF THE DAY (7 DAYS)BRUSHING AND SCRAPING THE WALL RAKED JOINTS WASHED THE WALL WITH WATER AND KEPT WET BEFORE PLASTERING RATIO OF MORTER FOR PLASTER 1:4PLASTER THICKNESS 1/2” -1”CURING TIME OF WALL AFTER PLASTERING 10 DAYS
WALL FINISHING STEPS OF PAINTING
PREPARATION OF SURFACE:
FIRST RUBBED THE PLASTER BY WALL PLASTER STONE(60 NO. ,80 NO. , 120 NO.)THEN RUBBED THE WALL WITH BRUSHES FOR FREE FROM MORTAR DROPPINGS AND OTHER FOREIGN-MATTER
WALL FINISHING STEPS OF PAINTING
3 STEPS OF PAINT-
PARIMARY COATING (WHITE WASHING)
SECONDARY COATING (COLOUR WASHING)
TERTIARY COATING (DISTEMPER)
TIME DURATION COATING- MINIMUM 1 DAY
WALL FINISHING STEPS OF TILES
FIRST WASHED THE WALL WITH WATER AND KEPT WET BEFORE TILES SETTINGSECOND PASTE THE MORTER OVER THE WALLMORTER RATIO FOR TILES 1:3 OR 1:4THICKNESS OF MORTER FOR TILES ¾” BEFORE SETTING TILES HAVE TO CURING 1- 1.5 HOURRATIO OF TILES FOOTING 1:1 (WHITE CEMENT:WATER)
CERAMIC TILES GLASS TILE
CERAMIC TILES DIGITAL/3D TILE
CERAMIC TILES
Gilded Ceramic Tile
STONE TILES
NATURAL STONE
CLADDING TILES
BATHROOM WALL TILES
KITCHEN WALL TILES
WALL FINISHING
TYPES OF WALL
BRICK WALLWOODEN WALLCONCRETE WALLFERROCEMENT WALLSTONE WALLBAMBOO WALL
BRICK WALL
BRICKWORK IS MASONRY PRODUCED BY A BRICKLAYER, USING BRICKS AND MORTAR IN A VARIETY OF PATTERNS WITH A VARIETY OF MORTAR JOINTS. TYPICALLY, ROWS OF BRICKS – CALLED COURSES – ARE LAID ON TOP OF ONE ANOTHER TO BUILD UP A STRUCTURE SUCH AS A BRICK WALL.
WOODEN WALL
CONCRETE WALL
FERROCEMENT WALL
STONE WALL
BAMBOO WALL
A FLOOR IS THE WALKING SURFACE OF A ROOM OR VEHICLE. FLOORS MAY BE STONE, WOOD, BAMBOO, METAL, OR ANY OTHER MATERIAL THAT CAN SUPPORT THE EXPECTED LOAD.
FLOOR FINISHING
STEPS OF FLOOR FINISHING
CHIPING THE FLOOR BY ROUGHING TOOL (LOCALLY-বা�সু�লা�), CLEAN THE TOTAL FLOOR BY WATER LEVEL THE FLOOR BY LEVELING TOOLS COVER THE FLOOR BY MORTER MIXING (RATIO OF MORTER -1:3THICKNESS OF MORTAR – ½” COVER THE MORTER BY GRAVING CEMENT.MIXING RATIO OF GRAVING CEMENT (1:1) (CEMENT:WATER)6TH SET THE TILES OVER THE MORTAR-CURING THE CERAMICS TILES 1- ½ HOUR BEFORE SETTING ON THE FLOOR.TILES--A TILE IS A MANUFACTURED PIECE OF HARD-WEARING MATERIAL SUCH AS CERAMIC, STONE, METAL, OR EVEN GLASS , walls.
FLOOR FINISHING
FLOOR FINISHING
•WET FLOORING•MUD FLOOR•BRICK FLOOR•CONCRETE FLOOR•TILES FLOOR•MARBLE & GRANITE•NET CEMENT
•DRY FLOORING
•WOODEN FLOOR•BAMBOO FLOOR•GLASS FLOOR•METAL FLOOR•VINYL SHEET•RUBBER FLOORING
TYPES OF FLOORWET FLOORINGDRY FLOORING
WET FLOORING
MUD FLOORING
WET FLOORING
BRICK FLOORING
WET FLOORING
CONCRETE FLOORING
WET FLOORING
TILES FLOORING
WET FLOORING
MARBEL FLOORING
WET FLOORING
TERAZZO FLOORING
DRY FLOORING
WOODEN FLOORING
DRY FLOORING
BAMBOO FLOORING
DRY FLOORING
GLASS FLOORING
GLASS
DRY FLOORING
METAL FLOORING
DRY FLOORING
STONE FLOORING
DRY FLOORING
VENYL SHEET FLOORING
CEILING FINISHING
CEILING ---- A CEILING IS AN OVERHEAD INTERIOR SURFACE THAT COVERS THE UPPER LIMIT OF A ROOM. IT IS NOT GENERALLY CONSIDERED A STRUCTURAL ELEMENT, BUT A FINISHED SURFACE CONCEALING THE UNDERSIDE OF THE FLOOR OR ROOF STRUCTURE ABOVE.
CEILING FINISHING
DROPPED CEILING ---- A DROPPED CEILING IS A SECONDARY CEILING, HUNG BELOW THE MAIN (STRUCTURAL) CEILING. IT MAY ALSO BE REFERRED TO AS A DROP CEILING, T-BAR CEILING, FALSE CEILING, SUSPENDED CEILING, GRID CEILING, DROP IN CEILING, OR DROP OUT CEILING.
CEILING FINISHING
STEPS OF CEILING FINISHING
CHIPING THE CEILING. WASH THE CEILING BY WATER. COVER THE TOTAL CEILING BY GRABING CEMENT.THAN COVER THE GRABING CEMENT BY MORTAR THICKNESS OF CEILING PLASTER ½”
DOOR SETTING
DOOR ---- A DOOR IS A MOVING STRUCTURE USED TO BLOCK OFF, AND ALLOW ACCESS TO, AN ENTRANCE TO OR WITHIN AN ENCLOSED SPACE, SUCH AS A BUILDING OR VEHICLE. SIMILAR EXTERIOR STRUCTURES ARE CALLED GATES. WHEN OPEN, DOORS ADMIT PEOPLE, ANIMALS, VENTILATION, AND LIGHT.
DOOR SETTING
DOOR TYPES :
SWINGING DOORBYPASS SLIDING DOORSURFACE SLIDING DOORPOCKET SLIDING DOORFOLDING DOOR
SWINGING DOOR
DOOR SETTING
DOOR SETTING TIME :
DOOR FRAME- DURING BRICK WORKS AND BEFORE WALL PLASTERINGDOOR PANEL- AFTER WALL AND FLOOR TILES SETTING
DOOR SETTING
DOOR ELEMENTS :
DOOR PANELDOOR FRAMEHINGESDOOR LOCKSETS
DOOR LOCK
DOOR PANEL
HINGES
DOOR FRAME
DOOR MODULE
WINDOW SETTING
•A WINDOW IS AN OPENING IN A WALL THAT ALLOWS THE PASSAGE OF LIGHT AND AIR IF NOT CLOSED OR SEALED.
•MODERN WINDOWS ARE USUALLY GLAZED OR COVERED IN SOME OTHER TRANSPARENT OR TRANSLUCENT MATERIAL.
WINDOW SETTING
WINDOW TYPES: FIXED WINDOWCASEMENT WINDOWAWNING & HOPPER WINDOWSLIDING WINDOWDOUBLE – HUNG WINDOWPIVOTING WINDOWHIGH WINDOW
WINDOW SETTING
WINDOW SETTING TIME: WINDOW GRILL- DURING BRICK WORKS AND BEFORE WALL PLASTERINGWINDOW FRAME- AFTER WALL PLASTERINGWINDOW SLIDING PANEL-AFTER PLASTERING AND TILES SETTING
WINDOW SETTING
WINDOW ELEMENTS: WINDOW FRAMECASING TRIMROUGH OPENING SASH AND GLAZING
FRAME
CASING TRIM
SASH AND GLAZING
ROUGH OPENING
GRILL SETTING TIME:
WINDOW GRILL SETTING
DURING BRICK WORK AND BEFORE WALL PLASTER
RAILING SETTING TIME:
RALING SETTING
DURING BRICK WORK AND BEFORE WALL PLASTER.
STAIR RAILING
STAIR RAILING SETTING TIME- AFTER OPEN SHUTTERING OF STAIR .
PLUMBING
PLUMBING IS THE SYSTEM OF PIPES, DRAINS FITTINGS, VALVES, AND DEVICES INSTALLED IN A BUILDING FOR THE DISTRIBUTION OF WATER FOR DRINKING, HEATING AND WASHING, AND THE REMOVAL OF WATERBORNE WASTES.
PLUMBING AND FIXTURE
PLUMBING COMPONENT SETTINGS TIME: AFTER BRICK WORKS AND BEFORE WALL PLASTER AND TILES SETTING.
PLUMBING AND FIXTURE
PIPE OR TUBINGVALVESELBOWSTEES AND UNIONS
PLUMBING COMPONENTS:
PLUMBING COMPONENTS:
PIPE OR TUBING
PLUMBING COMPONENTS:
VALVES
PLUMBING COMPONENTS:
ELBOWS
PLUMBING COMPONENTS:
TEES
PLUMBING COMPONENTS:
UNIONS
A KITCHEN IS A ROOM OR PART OF A ROOM USED FOR COOKING AND FOOD PREPARATION.
KITCHEN
KITCHEN FIXTURES:SINKRANGEKITCHEN HOOD
KITCHEN FIXTURES SETTINGS TIME: SINK-BEFORE TILES SETTING.RANGE AND KITCHEN HOOD AFTER PLASTERING OR TILES SETTING
KITCHEN
SINK
KITCHEN FIXTURES
KITCHEN RANGE
KITCHEN FIXTURES
KITCHEN HOOD
KITCHEN FIXTURES
KITCHEN CABINETS
KITCHEN FIXTURES
A TOILET IS A SANITATION FIXTURE USED PRIMARILY FOR THE DISPOSAL OF HUMAN URINE AND FECES. THEY ARE OFTEN FOUND IN A SMALL ROOM REFERRED TO AS A TOILET/BATHROOM/LABORATORY
TOILET
BASINSHOWERSURINALSWATER CLOSETS (WC)LOW PAN
TOILET FIXTURES SETTING TIME: W.C , LOW PAN AND BASIN- BEFORE TILES SETTING
TOILET FIXTURES
BASIN
TOILET FIXTURES
SHOWERS
TOILET FIXTURES
C 6’-6”
C 3’-6”
URINALS
TOILET FIXTURES
WATER CLOSET
TOILET FIXTURES
LOW PAN
TOILET FIXTURES
ELECTRICAL SYSTEMS IS THE ELECTRICAL WIRING AND ASSOCIATED DEVICES SUCH AS SWITCHES, METERS AND LIGHT FITTINGS USED IN BUILDINGS OR OTHER STRUCTURES.
ELECTRICAL SYSTEMS
ELECTRICAL SYSTEMS COMPONENT:ELECTRIC POWERELECTRIC SERVICEELECTRIC CIRCUITSELECTRIC WIRINGELECTRICAL OUTLETS
ELECTRICAL SYSTEMS
ELECTRIC POWER
ELECTRICAL SYSTEMS COMPONENT
ELECTRIC SERVICE
ELECTRICAL SYSTEMS COMPONENT
ELECTRICAL SYSTEMS COMPONENT
ELECTRIC CIRCUITS
ELECTRIC WIRING
ELECTRICAL SYSTEMS COMPONENT
ELECTRIC OUTLETS
ELECTRICAL SYSTEMS COMPONENT
ELECTRICAL SYSTEMS SETTING TIME
FIRST ELECTRICAL SERVICES (PIPE) – BEFORE CASTING OF ROOF AND AFTER BRICK WORKSELECTRICAL CIRCUITS-BEFORE WALL PALSTERINGELECTRIC WIRING- AFTER ELECTRICAL CIRCUIT SETTINGELECTRICAL OUTLETS - AFTER WALL PLASTERING AND WALL PAINT OR TILES FITTINGS
ELECTRICAL SYSTEMS
AN ELEVATOR (LIFT IN BRITISH ENGLISH) IS A TYPE OF VERTICAL TRANSPORT EQUIPMENT THAT EFFICIENTLY MOVES PEOPLE OR GOODS BETWEEN FLOORS (LEVELS, DECKS) OF A BUILDING, OR OTHER STRUCTURE.
LIFTT
LIFT
LIFT