first cms results with lhc beam

13
First CMS Results with LHC Beam Toyoko Orimoto, Caltech 1 First CMS Results First CMS Results with LHC Beam with LHC Beam Toyoko Orimoto Toyoko Orimoto California Institute of California Institute of Technology Technology On behalf of the CMS On behalf of the CMS Collaboration Collaboration Lake Louise Winter Institute Lake Louise Winter Institute 16-21 February 2009 16-21 February 2009

Upload: viho

Post on 14-Jan-2016

36 views

Category:

Documents


3 download

DESCRIPTION

First CMS Results with LHC Beam. Toyoko Orimoto California Institute of Technology On behalf of the CMS Collaboration Lake Louise Winter Institute 16-21 February 2009. Tracker 66M Si pixels & 10M Si strips. EM calorimeter: ECAL PbWO 4 crystal calorimeter High resolution - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 1

First CMS Results First CMS Results with LHC Beamwith LHC Beam

Toyoko OrimotoToyoko OrimotoCalifornia Institute of TechnologyCalifornia Institute of Technology

On behalf of the CMS CollaborationOn behalf of the CMS Collaboration

Lake Louise Winter InstituteLake Louise Winter Institute16-21 February 200916-21 February 2009

Page 2: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 2

The CMS Detector

PixelsTrackerECALHCALSolenoidMuons

Compact, ModularWeight: 12500 tDiameter: 15mLength: 21.6 m

EM calorimeter: ECALPbWO4 crystal calorimeterHigh resolutionHigh granularity, >70k crystalsBarrel (EB) & Endcap (EE)Hadronic calorimeter: HCALBrass & scintillatorBarrel (HB), Endcap (HE), Outer (HO)

Tracker66M Si pixels & 10M Si strips

Superconducting SolenoidVery large, 6m x 13m3.8T, 1.6 GJ stored energyMuon SystemBarrel: Drift Tubes (DT) Endcap: Cathode Strip Chambers (CSC)Barrel & Endcap interleaved with Resistive Plate Chambers (RPC)

Page 3: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 3

Timeline: First LHC Beams

• 7-9 September

• Single shots of beam 1 onto closed collimator 150m upstream of CMS (“beam splash” events)

• 10 September (Media Day!)

• Beam 1 circulated in the morning, 3 turns within 1 hour!

• Beam 2 circulated by 3:00pm, 300 turns by evening

• 11 September

• RF system captures beam at evening (millions of orbits)

• During all these activities, CMS triggered and recorded data

• ~40 hours of beam to CMS

Beam 2, E=450 GeV

Beam 1, E=450 GeV

CMS

The Large Hadron ColliderThe Large Hadron Collider

BEAM

Collimators

146m

CMSCMSDebris

Beam Splash Schematic

BEAM

Page 4: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 4

Beam Splash Event Display

HCAL energyHCAL energy ECAL energyECAL energy

DT muon DT muon chamber chamber

hitshits

LHC Tunnel profile visible

LHC Tunnel profile visible

Longitudinal views

Transverse views

Single beam shots of 2*109 protons onto closed collimatorsHundreds of thousands of muons pass through CMS per event

BEAMDebris

Page 5: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 5

Beam Splash: ECAL Energy

Enormous amount of energy deposited in calorimeters!

~200 TeV energy deposited in EB+EE

> 99% of ECAL channels fired

Beam (clockwise) came from plus side.

ECAL Endcaps

crystal index ix

cry

sta

l in

dex

iy

crystal index ix

cry

sta

l in

dex

iy

En

erg

y (G

eV

)

TOP BOTTOM

ECAL BarrelECAL Barrel

cry

sta

l in

dex

i

crystal index i

En

erg

y (G

eV

)

Correlation Between Energies Correlation Between Energies

in Barrel HCAL and ECALin Barrel HCAL and ECAL

~150 TeV in ECAL & ~1000 TeV in HCAL

per splash event

Page 6: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 6

Beam Halo Muons

Beam Halo:Beam Halo: Muons outside of beam-pipe, arising from decays of pions created when off-axis protons scrape collimators or other beamline elements

Muon Endcap Layer -1

LHC Tunnel Profile

Endcap Muon Cathode Strip Chamber Hits from Beam Halo EventsEndcap Muon Cathode Strip Chamber Hits from Beam Halo EventsMuon Endcap Layer -2 Muon Endcap Layer -3 Muon Endcap Layer -4

BEAM

Page 7: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 7

Beam Halo Muons

Endcap muon chambers

3 muons

1 muon

Barrel muon drift tubes

Endcap muon chambers

Reconstructed Tracks

Page 8: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 8

Halo and Cosmic Muon Angles

• Beam halo muons to make a small angle

• Cosmic Ray muons pass through the CSCs at a more oblique angle

• Beam-on distribution consists of two pieces, one resembling cosmic rays and the other matching the beam halo simulation.

Angle of Muon Tracks wrt Beam LineAngle of Muon Tracks wrt Beam Line

beam ON data =beam halo MC

+ cosmic ray data

Page 9: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 9

Beam Halo Before and After RF Capture

Beam Halo Rates in Muon Endcaps

• Muon Endcap (CSC) halo trigger rate in the minus endcap vs time.

• First successful capture lasted for 10 min and ended with beam abort

HCAL Endcap Energy

• Before, high rate of energy deposition near beamline.

• After, beam is cleaner, depositing less energy in HCAL endcap.

BeforeBefore AfterAfter

First RF capture of beam

time h:m

X (cm)X (cm)

Y (

cm)

Y (

cm)

HCAL Endcap Peak Energy Location & Amp

Page 10: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 10

CMS Performance with Cosmics

collision loss

brem radiation

ECAL dE/dx:Experimental data vs Expected stopping power for PbWO4

MomentumData vs MC

p (GeV/c)

CRAFT: Cosmic Run at Full Tesla

• ~300 M cosmic events collected

• Field at 3.8T operated for ~1 month

• Participation from all subsystems

• Detector performance studies as well as detailed cosmics studies ongoing

Page 11: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 11

CMS Performance with Cosmics/ndof After Tracker Alignment

/ndof

Strip Inner BarrelRMS26m

Pixel Barrel

RMS 47m

Pixel & Strip Tracker Alignment: Mean of Residuals

S/N = ~30

Excellent eff > 99%

Si Strip Tracker: Signal to Noise

S/N

Page 12: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 12

CMS Detector Status• Since beginning of September 2008

• All installed CMS sub-detectors in global readout routinely

• All triggers operational

• Stability of running with all CMS components proven

• LHC clock and orbit signals tested

• Synchronization to few ns or better

• Have continued global data-taking with cosmics

• CRAFT: Cosmic Run at Full Tesla

• Detector opening started Nov 17th

• Interventions/repairs for problematic channels

• Installation of Preshower detector

Page 13: First CMS Results  with LHC Beam

First CMS Results with LHC Beam Toyoko Orimoto, Caltech 13

Conclusions

• After many years of design & construction, CMS is commissioned and has collected first data with LHC

• Detector performance proven with beam splash, beam halo, as well as cosmics with and without B field.

Expect more results, not just with single beam or cosmics, but with collisions!