first meeting 10 sept 2011 @ 2 - wordpress.com · 10 sept 2011 @ 2.00pm. first and foremost, the...

19
First Meeting 10 Sept 2011 @ 2.00pm

Upload: others

Post on 14-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

First Meeting 10 Sept 2011 @ 2.00pm

Page 2: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

First and foremost, the committee wishes to thank

Dr Mohamed Rafick Khan bin Abdul Rahman President

PERSATUAN PEMILIK BANGUNAN TERBENGKALAI MALAYSIA (VICTIMS)

for his ability, dedication and sincerity in helping us connect fruitfully with Prokhas Sdn. Bhd.

Page 3: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

To confirm & update Record of Purchasers To conduct a survey on the Keep/Sell decision of purchasers Briefing on the status of the project◦ By protem committee◦ By invited professionals viz., legal, Dr Rafick

Formalisation of the Owners’ Action Committee◦ Appointment of committee members◦ Establishment of scope of work◦ Determination & collection of funding requirements

Discussion & formulation of action plans◦ What are our options?◦ Sell our land to I&P Group?◦ Continue development as originally planned?◦ Redeem our individual land and walk away?◦ Work together with developer(s) to redevelop the land?◦ Others?

Other matters

Page 4: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

Name: __________________________________ Tel. (Hse): __________________

Lot No.: _________________ Tel. (HP): __________________

Address: _______________________________________________________________________

Email: _______________________________________________________________________

Next of kin information:

Name: ___________________________________ _________________

Address: _______________________________________________________________________

Tel. (HP) ___________________________________ Tel. (Hse): __________________________

Email: _______________________________________________________________________

Loan Taken From (Banker): _____________________________________________________(This information needed by Prokhas Sdn. Bhd.)

I would like to [tick below] my land:

KEEP SELL

REMARKS

_________________________________________________________________________________

_________________________________________________________________________________

__________________________ __________________Signature Date

SURVEY FORM(TO ASCERTAIN THE NUMBER OF OWNERS OF BROGAVILLE HORTICULTURAL VILLAGE

BUNGALOW LOTS WHO WISHES TO KEEP OR TO SELL THEIR LAND)

Relationship:

Would appreciate if you fill up this Survey Form before the end of this meeting.

Page 5: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN
Page 6: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

1) History – Timeline◦ Feb 1998 – Project abandoned ◦ Mar 2000 - KPMG (Liquidator) wrote to all purchasers informing

that Rumpun Jadi Sdn Bhd has gone into liquidation◦ Jan 2004 – Petaling Garden Bhd’s subsidiary company viz.,

Corporate Premier Sdn. Bhd. bought over the unsold lots totaling 102.45 acres.

◦ July 2005 – Jayaratnam & Partners, solicitor for KPMG wrote to purchasers informing that individual titles ready to be transferred

◦ June 2009 - That’s when Bernard Ho & Tham See Ho decided to help themselves (and others) by forming the BHVOAG. June 2009 – 3 people (2.5%) Oct 2009 – 16 people (13.6%) Sept 2011 – 85 people (72.0%) Methods – website, emails, banners, meetings with liquidator &

Prokhas esp. to obtain list of purchasers, telephone calls to purchasers, house to house visit, mouth to mouth contact etc.

Page 7: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

2) What have we bought?

BROGAVILLE HORTICULTURAL VILLAGE PROJECT @ SEMENYIH

SUMMARY Total Phase 1 Phase 2 Phase 3Total (Sq Ft) 5,188,033 1,487,473 1,796,529 1,904,031 Sold 1,640,367 1,096,424 416,648 127,295 % 31.6% 73.7% 23.2% 6.7%Value Sold (RM) 32,850,484 19,162,524 9,247,122 4,440,838 RM Per Sq Ft 20.03 17.48 22.19 34.89Total number bungalow lots 365 104 106 155No of Lots Sold 122 79 32 11% Sold 33% 76% 30% 7%No of Lots Unsold 243 25 74 144OVERALL ANALYSIS Acres %Total land area per our S&P (acres) 209.00 100% Total raw land sizeBought by Petaling Garden Bhd 102.45 49.0%Sold to purchasers (Victims) 37.65 18.0%Land used for infrastructure etc. 68.90 33.0%

Remarks

excluding infrastructure etc.excluding infrastructure etc.

Page 8: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

2) What have we bought? – Lots Layout

Page 9: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

3) Site Location

Page 10: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

4) Negotiation results with Prokhas Sdn Bhd (verbally communicated)

Redemption Sum: 10% on balance purchase price

E.g. Purchase Price RM200,000 (with infrastructure)Land size 10,000 sq feetPrice per sq feet RM20 psfAmount paid to developer RM120,000 (60%)Balance purchase price RM80,000Redemption Sum (10%) RM8,000Total costs RM128,000 (without infrastructure)Final cost per sq feet RM12.80 psf

Exemption on stamp duty – Prokhas is trying to accommodate Arrears on Quit Rent & Assessment – Purchasers will have to settle Time period for settlement of Redemption Sum – 60 days (from date of letter of demand) Those who doesn’t settle within the 60 days period will render their land being foreclosed Meaning those purchasers can’t be contacted will also stand to have their land foreclosed Foreclosure means all subsequent proceeds from the sale of the foreclosed land will go back to Prokhas and nothing for

the affected purchaser Legal fees for the execution of MOT – Prokhas can only help to arrange for a solicitor to give

bulk discount No advertisement in newspapers as a last ditch to contact purchasers

Page 11: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

Fresh from the oven!!!

Page 12: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

5) The Letter of Demand From Prokhas/Liquidator

◦ Firstly, Prokhas has to send a demand letter to the Liquidator to ask for redemption and if there is no response (definitely so because Rumpun Jadi is now insolvent) within 30 days, Prokhas will then issue out the Letter of Demand to the individual buyers; probably by mid to end Oct 2011

◦ Will give 60 days for purchaser to redeem – meaning by December 2011◦ Things to note: The amount paid to developer – please check your records The land size – please check your S&P to ensure that the land size indicated is correct Name of owner – please check to make sure that there is no mistake Dual names - if one of partners is gone, get legal help

6) Individual Land Titles

◦ Will be transferred into purchaser(s) name (s) but delivered to our end financier◦ Purchasers advised to settle their outstanding loans

Page 13: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

7) Information required by Prokhas via BHVOAC

◦ Name of end financier of each purchaser◦ Latest address – as the Letter of Demand will be sent to it

8) List of Contacted Purchasers

◦ A list of contacted purchasers together with their:Name, Lot No., Address, Telephone No., Email

To be made available to all especially I&P Group?

Page 14: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

Formalization of BrogavilleHorticultural Village Owners’ Action Committee

Page 15: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

Why do we need to do that? (Scope of Work)

◦ To act as an official conduit between Prokhas and Purchasers◦ To negotiate with the state governmental authorities to waive/reduce the

arrears of quit rent and annual assessment etc.◦ To negotiate with I&P Group Sdn. Bhd. and/or other parties to deal with the

land after obtaining individual titles◦ To continue the search for those purchasers who have not been contacted yet;

so that with more members we can strengthened our nego with I&P Group◦ To conduct research on the valuations of our land etc. in preparation for

negotiation with I&P Group and/or other developers◦ To explore ways and means to deal with our land for the benefit of the

owners

Appointment of members – proposed 11 members Contributions to finance the above objectives plus to reimburse those

who has spent money during the protem stage ◦ Proposed – RM50 each ◦ Those who wish to contribute more to the cause is most welcomed!

Page 16: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

Discussion Points and Questions & Answers

Page 17: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

◦ What are our options?◦ Sell our land to the I&P Group?◦ Continue development as originally planned?◦ Redeem our individual land and walk away?◦ Work together with developer(s) to redevelop the

land?◦ Others?

Page 18: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN

Wholly owned subsidiary of PermodalanNasional Bhd (PNB).

Formed in May 2009 after the merger of:◦ Island & Peninsula Sdn. Bhd.◦ Petaling Garden Sdn. Bhd.◦ Pelangi Sdn. Bhd.

The unsold lots (102.45 acres) were purchased by Corporate Premier Sdn. Bhd. which is now a 100% subsidiary of Petaling Garden Sdn. Bhd.

Page 19: First Meeting 10 Sept 2011 @ 2 - WordPress.com · 10 Sept 2011 @ 2.00pm. First and foremost, the committee wishes to thank . Dr Mohamed Rafick Khan bin Abdul Rahman President. PERSATUAN