Tentative Construction Projects Programmed For Calendar Year 2011 Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles Construction Projects $0 to $250,000 2012 Bay CLARE 18034 111359 US-27 NB under Mostetler Road Thrie Beam Retrofit and portions of railing replacement 10/7/2011 0:00 0.687 2011 Bay GENESEE 25609 108806 Silver Lake Road at Argentine Dam Remove parapit railing and install New Jersey barrier wall with guardrail approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction 9/2/2011 0:00 0.1 2011 Bay GENESEE 25609 107993 Bray Road from Lake Rd to Willard Rd Widen and pave full width shoulders and install shoulder rumble strips. 9/2/2011 0:00 0 2011 Bay GENESEE 25609 108805 Silver Lake Road from Sage Rd to McCaslin Lake Rd Widen and pave shoulder, install shoulder rumble strips. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104198 Ripley Rd Ripley Road Road reconstruction 9/2/2011 0:00 1.1 2012 Bay HURON 32021 110426 M-142 Over Bad Axe Creek Articulating Concrete Block Floor System, Rip Rap and Ditch Cleanout 10/7/2011 0:00 1.016 2011 Bay ISABELLA 37609 108817 W Pickard Road Pickard Road and Littlefield Road Bridge guardrail upgrades and bridge approach guardrail installation. 9/2/2011 0:00 0 2011 Bay LAPEER 44609 107998 Hadley Road from Stewart Rd to Lippencott Rd Guardrail installation and tree removal. 9/2/2011 0:00 0 2011 Bay MIDLAND 56031 110494 M-30 Saginaw Road to US-10 Low volume ultra-thin HMA overlay with crack pre-treatment. 1/7/2011 0:00 1.224 2012 Bay SAGINAW 73063 110429 M-46 Over Blumfield Creek Articulating Concrete Block Floor System, Rip Rap, Channel Cleanout and Plugging Weep Holes 10/7/2011 0:00 0.998 2011 Bay SAGINAW 73145 108794 Midland Street M-46 to Mahoney Street Midland Street Streetscape 6/3/2011 0:00 0 2011 Bay State Wide 84914 110613 Various Huron, Sanilac, and Tuscola Counties HMA Crack Treatment 1/7/2011 0:00 19.165 2011 Bay State Wide 84914 110567 Various Genesee and Lapeer Counties HMA Crack Treatment 1/7/2011 0:00 16.469 2011 Bay TUSCOLA 79609 108858 Gleason Road Gleason Street HMA crush and shape, curb and gutter, mid-block crossings, add sidewalk and ADA ramps, and permanent signing upgrades. 9/2/2011 0:00 0 2011 Bay TUSCOLA 79609 108001 Kingston Road from Marlette Rd to the Kingston SVL Guardrail, permanent signing, and pavement marking upgrades. 9/2/2011 0:00 0 2011 Grand IONIA 34609 108811 Riverside Drive east of Somers Rd Horizontal curve modification, add paved shoulers and fixed object removal. 9/2/2011 0:00 0 2011 Grand IONIA 34609 107995 Hubbardston Road Hubbardstown Road Horizontal curve modification and slope flattening. 9/2/2011 0:00 0 2012 Grand KENT 41033 90168 M-37 at Peach Ridge Avenue NW Quadrant Crack Sealing the carpool parking lot. 10/7/2011 0:00 0 2012 Grand KENT 41064 102915 M-6 at M-37 and 60th Street NE Quadrant Crack Sealing of the existing carpool lot. 10/7/2011 0:00 0 2012 Grand KENT 41132 102914 US-131 at Post Road NE Quadrant HMA resurface of the existing carpool lot. 10/7/2011 0:00 0 2011 Grand KENT 41401 104918 1st Street Lane to Stocking Rotomill/Resurface 9/2/2011 0:00 0.234 2012 Grand KENT 41033 57828 M-37 At 10 Mile Road Remove through movement on 10 Mile Road to utilize the existing indirect left turns only. 10/7/2011 0:00 0.002 2011 Grand KENT 41401 112076 College Avenue Fulton Street to Fountain Street Resurface 2/4/2011 0:00 0.16 2011 Grand KENT 41401 104923 68th Avenue Fillmore Street to M-45 Resurface & Add 3' Paved Shoulder 9/2/2011 0:00 1.996 2011 Grand MECOSTA 54555 110981 5 Mile Rd 170th to Northland resurface 9/2/2011 0:00 1 2011 Grand MECOSTA 54008 105421 Jefferson Rd 120th-130th Resurface 1/7/2011 0:00 0.991 2011 Grand MECOSTA 54555 105418 Pierce Rd 100th-70th Resurface 1/7/2011 0:00 0.859 2012 Grand MONTCALM 59012 102916 US-131 at M-82 SW Quadrant HMA resurface of the existing with minor widening. 11/4/2011 0:00 0 2011 Grand MONTCALM 59609 108841 County Road 510 Sidney Road Add passing flare on Sidney Road, add turn lane on College Drive. 9/2/2011 0:00 0 2011 Grand NEWAYGO 62421 109101 Stone Avenue 38th to 44th HMA overlay with gravel shoulders 9/2/2011 0:00 1 2011 Grand NEWAYGO 62555 111053 S Stone Rd 32nd to 38th Street resurface 9/2/2011 0:00 0.749 2011 Grand NEWAYGO 62555 111933 Stone Road 32nd - 38th resurface 9/2/2011 0:00 0 2011 Grand NEWAYGO 62123 111054 Centerline St Pickerel Lake - M82 resurface 9/2/2011 0:00 1.763 2011 Grand NEWAYGO 62123 111935 Chain of Lakes Centerline Ct to M82 resurface 9/2/2011 0:00 0 2012 Grand OCEANA 64022 87479 M-20 at US-31 NE Quadrant Crack Sealing of existing carpool lot. 10/7/2011 0:00 0 2011 Grand OCEANA 64015 106297 US-31 NB over US-31 Business Route (Monroe Road) abutment repairs, healer/sealer (floodcoat), zone paint and south approach replacement with relief joints 4/1/2011 0:00 0 2011 Grand OCEANA 64127 106424 OLD-31/State Street North City Limits-South City Limits, Shelby Crack seal and surface coating; slurry seal, mill and resurface. 1/7/2011 0:00 1.661 2011 Grand OTTAWA 70555 90155 144th Ave M45-Lincoln Street Resurface 1/7/2011 0:00 2.01 2011 Grand OTTAWA 70555 90153 68th Ave Fillmore Street-M45 Resurface 1/7/2011 0:00 1.996 2011 Grand State Wide 84913 102951 Regionwide Kent & Ottawa Counties Signing Upgrade to existing carpool parking lots. This project will be coordinated and let with Traffic & Safety Signing Project JN 105732. 3/4/2011 0:00 0 1

Upload: others

Post on 24-Mar-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles Construction Projects $0 to $250,000

2012 Bay CLARE 18034 111359 US-27 NB under Mostetler Road Thrie Beam Retrofit and portions of railing replacement 10/7/2011 0:00 0.687

2011 Bay GENESEE 25609 108806 Silver Lake Road at Argentine DamRemove parapit railing and install New Jersey barrier wall with guardrail

approach terminals. 9/2/2011 0:00 02011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction 9/2/2011 0:00 0.12011 Bay GENESEE 25609 107993 Bray Road from Lake Rd to Willard Rd Widen and pave full width shoulders and install shoulder rumble strips. 9/2/2011 0:00 02011 Bay GENESEE 25609 108805 Silver Lake Road from Sage Rd to McCaslin Lake Rd Widen and pave shoulder, install shoulder rumble strips. 9/2/2011 0:00 02011 Bay GENESEE 25402 104198 Ripley Rd Ripley Road Road reconstruction 9/2/2011 0:00 1.12012 Bay HURON 32021 110426 M-142 Over Bad Axe Creek Articulating Concrete Block Floor System, Rip Rap and Ditch Cleanout 10/7/2011 0:00 1.0162011 Bay ISABELLA 37609 108817 W Pickard Road Pickard Road and Littlefield Road Bridge guardrail upgrades and bridge approach guardrail installation. 9/2/2011 0:00 02011 Bay LAPEER 44609 107998 Hadley Road from Stewart Rd to Lippencott Rd Guardrail installation and tree removal. 9/2/2011 0:00 02011 Bay MIDLAND 56031 110494 M-30 Saginaw Road to US-10 Low volume ultra-thin HMA overlay with crack pre-treatment. 1/7/2011 0:00 1.224

2012 Bay SAGINAW 73063 110429 M-46 Over Blumfield CreekArticulating Concrete Block Floor System, Rip Rap, Channel Cleanout and

Plugging Weep Holes 10/7/2011 0:00 0.9982011 Bay SAGINAW 73145 108794 Midland Street M-46 to Mahoney Street Midland Street Streetscape 6/3/2011 0:00 02011 Bay State Wide 84914 110613 Various Huron, Sanilac, and Tuscola Counties HMA Crack Treatment 1/7/2011 0:00 19.1652011 Bay State Wide 84914 110567 Various Genesee and Lapeer Counties HMA Crack Treatment 1/7/2011 0:00 16.469

2011 Bay TUSCOLA 79609 108858 Gleason Road Gleason StreetHMA crush and shape, curb and gutter, mid-block crossings, add sidewalk

and ADA ramps, and permanent signing upgrades. 9/2/2011 0:00 02011 Bay TUSCOLA 79609 108001 Kingston Road from Marlette Rd to the Kingston SVL Guardrail, permanent signing, and pavement marking upgrades. 9/2/2011 0:00 0

2011 Grand IONIA 34609 108811 Riverside Drive east of Somers Rd Horizontal curve modification, add paved shoulers and fixed object removal. 9/2/2011 0:00 02011 Grand IONIA 34609 107995 Hubbardston Road Hubbardstown Road Horizontal curve modification and slope flattening. 9/2/2011 0:00 02012 Grand KENT 41033 90168 M-37 at Peach Ridge Avenue NW Quadrant Crack Sealing the carpool parking lot. 10/7/2011 0:00 02012 Grand KENT 41064 102915 M-6 at M-37 and 60th Street NE Quadrant Crack Sealing of the existing carpool lot. 10/7/2011 0:00 02012 Grand KENT 41132 102914 US-131 at Post Road NE Quadrant HMA resurface of the existing carpool lot. 10/7/2011 0:00 02011 Grand KENT 41401 104918 1st Street Lane to Stocking Rotomill/Resurface 9/2/2011 0:00 0.234

2012 Grand KENT 41033 57828 M-37 At 10 Mile RoadRemove through movement on 10 Mile Road to utilize the existing indirect left

turns only. 10/7/2011 0:00 0.0022011 Grand KENT 41401 112076 College Avenue Fulton Street to Fountain Street Resurface 2/4/2011 0:00 0.162011 Grand KENT 41401 104923 68th Avenue Fillmore Street to M-45 Resurface & Add 3' Paved Shoulder 9/2/2011 0:00 1.9962011 Grand MECOSTA 54555 110981 5 Mile Rd 170th to Northland resurface 9/2/2011 0:00 12011 Grand MECOSTA 54008 105421 Jefferson Rd 120th-130th Resurface 1/7/2011 0:00 0.9912011 Grand MECOSTA 54555 105418 Pierce Rd 100th-70th Resurface 1/7/2011 0:00 0.8592012 Grand MONTCALM 59012 102916 US-131 at M-82 SW Quadrant HMA resurface of the existing with minor widening. 11/4/2011 0:00 02011 Grand MONTCALM 59609 108841 County Road 510 Sidney Road Add passing flare on Sidney Road, add turn lane on College Drive. 9/2/2011 0:00 02011 Grand NEWAYGO 62421 109101 Stone Avenue 38th to 44th HMA overlay with gravel shoulders 9/2/2011 0:00 12011 Grand NEWAYGO 62555 111053 S Stone Rd 32nd to 38th Street resurface 9/2/2011 0:00 0.7492011 Grand NEWAYGO 62555 111933 Stone Road 32nd - 38th resurface 9/2/2011 0:00 02011 Grand NEWAYGO 62123 111054 Centerline St Pickerel Lake - M82 resurface 9/2/2011 0:00 1.7632011 Grand NEWAYGO 62123 111935 Chain of Lakes Centerline Ct to M82 resurface 9/2/2011 0:00 02012 Grand OCEANA 64022 87479 M-20 at US-31 NE Quadrant Crack Sealing of existing carpool lot. 10/7/2011 0:00 0

2011 Grand OCEANA 64015 106297 US-31 NB over US-31 Business Route (Monroe Road)abutment repairs, healer/sealer (floodcoat), zone paint and south approach

replacement with relief joints 4/1/2011 0:00 02011 Grand OCEANA 64127 106424 OLD-31/State Street North City Limits-South City Limits, Shelby Crack seal and surface coating; slurry seal, mill and resurface. 1/7/2011 0:00 1.6612011 Grand OTTAWA 70555 90155 144th Ave M45-Lincoln Street Resurface 1/7/2011 0:00 2.012011 Grand OTTAWA 70555 90153 68th Ave Fillmore Street-M45 Resurface 1/7/2011 0:00 1.996

2011 Grand State Wide 84913 102951 Regionwide Kent & Ottawa Counties

Signing Upgrade to existing carpool parking lots. This project will be coordinated and let with Traffic & Safety Signing Project JN 105732.�

3/4/2011 0:00 0

1

Page 2: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2011 Metro MACOMB 50990 111651Macomb Orchard

Trailhead Clinton St. and 32 Mile Road, Village of Romeo

The project will include the construction of a parking lot, demolition of an out-building, landscaping, and the addition of a vaulted outhouse at the trailhead. The trailhead will provide pedestrians and bicyclists of the Macomb Orchard

Trail with a star 6/3/2011 0:00 02011 Metro OAKLAND 63609 108845 Main Street Main Street Install dynamic speed limit signs. 9/2/2011 0:00 02011 Metro OAKLAND 63051 110764 M-1 Jewel Avenue to Winchester Avenue HMA Crack Treatment 1/7/2011 0:00 0.5532011 Metro OAKLAND 63041 110759 M-59 Airport Rd to Elizabeth Lake Rd. HMA Crack Treatment 1/7/2011 0:00 3.2712011 Metro OAKLAND 63609 108847 Paddock Paddock Traffic signal upgrades. 9/2/2011 0:00 02011 Metro OAKLAND 63091 110765 I-75 BL Woodward Loop to Opdyke Road HMA Crack Treatment 1/7/2011 0:00 3.6122011 Metro OAKLAND 63459 104707 Lafayette Wayne Street to Perry Street Resurface 9/2/2011 0:00 0.1552012 Metro OAKLAND 63191 100473 I-96 WB over 9 Mile Road Epoxy Overlay and Substructure Repair. 10/7/2011 0:00 0.7442011 Metro OAKLAND 63609 108842 12 Mile Road at Greenfield Rd Traffic signal upgrades and box span installation. 9/2/2011 0:00 02011 Metro OAKLAND 63609 108843 Opdyke Road at University Drive Traffic signal upgrades and box span installation. 9/2/2011 0:00 0

2011 Metro OAKLAND 63609 108844 14 Mile Road at Rochester RdInstall traffic signal center left turn phase, countdown pedestrian signals, box

span configuration, and ADA ramps. 9/2/2011 0:00 02011 Metro OAKLAND 63172 110756 I-75 Giddings Road to M-15 HMA Crack Treatment 1/7/2011 0:00 9.1412012 Metro ST. CLAIR 77871 103339 M-154 at North Channel Drive in Harsens Island Resurface lot, signs, striping, border maintenance 10/7/2011 0:00 0.0012012 Metro ST. CLAIR 77023 103342 I-69 at Wahdams Road Resurface lot, signs, striping, border maintenance 10/7/2011 0:00 02012 Metro ST. CLAIR 77111 103341 I-94 at Range Road Resurface Lot, signs, striping, border maintenance 10/7/2011 0:00 02012 Metro ST. CLAIR 77024 103343 I-69 at M-19 Resurface lot, signs, striping, border maintenance 10/7/2011 0:00 0

2011 Metro ST. CLAIR 77475 112349 Kilgore Road Lapeer Rd to Bryce Rd

1.98 mi of hot mix asphalt ultra thin overlay, aggregate shoulders and pavement markings on Kilgore Road, from Lapeer Road northerly to 0.25

miles north of Bryce Road in St. Clair County. 4/1/2011 0:00 02011 Metro ST. CLAIR 77412 111829 10th Street Military to Lapeer Resealing joints and pavement markings. 1/7/2011 0:00 1.39

2011 Metro ST. CLAIR 77475 112351 North Road Beard Rd to Norman Rd

3.49 mi of hot mix asphalt ultra thin overlay, aggregate shoulders and pavement markings on North Road, from 0.11 miles north of Beard Rd.

northerly to 0.07 miles north of Norman Rd, in St. Clair County. 4/1/2011 0:00 0

2011 Metro ST. CLAIR 77475 112431 County Line Road Meisner Rd to Gratiot Rd

2.91 mi of hot mix asphalt ultra thin overlay, aggregate shoulders and pavement markings on County Line Rd, from 0.35 mi north of Meisner Rd.

northerly to Gratiot Rd, in St. Clair County. 4/1/2011 0:00 2.91

2011 Metro WAYNE 82163 112253Lezotte Park Multi Use

Path Between Old Fort Street and Swallow DriveLezotte Park multi-use path rest areas. SAFETEA-LU Earmark MI186, HPP

1910 1/7/2011 0:00 02011 Metro WAYNE 82022 110726 I-94 E. of I-275 to Wayne Road Concrete Joint Resealing 2/4/2011 0:00 0.942

2011 Metro WAYNE 82609 108863 Kercheval Avenue at McMillan RdTraffic signal upgrades, mast arm and countdown pedestrian signal installation, clear vision improvements, and ADA ramp upgrades. 9/2/2011 0:00 0

2011 Metro WAYNE 82194 111913Delray Community

Center I-75 and Dearborn Street, City of Detroit

The project will include the installation of a screening wall near the bridge as well as trees, shrubs and perennials to improve aesthetics. The project will

also include the construction of a non-motorized trail adjacent to the screening wall which will 3/4/2011 0:00 0

2011 Metro WAYNE 82609 108866 West Chicago Road 3 locations

Install countdown pedestrian signals at West Chicago and Middlebelt Road and Merriman Road, and traffic signal modernization and box span installation

at Haggerty Road at 6 Mile Road. 9/2/2011 0:00 02011 North ALPENA 04609 108787 Area wide City wide Permanent signing upgrades and sign post delineator installation. 9/2/2011 0:00 0

2011 North ALPENA 04609 108786 Long Rapids Road at Gaffney Creek Culvert reconstruction and extension, guardrail removal and slope flattening. 9/2/2011 0:00 0

2011 North CRAWFORD 20014 110738 I-75 NB at Grayling Rest Area, Beaver Creek TwspRemove and replace existing PITWS�

6/3/2011 0:00 02011 North CRAWFORD 20015 107867 I-75 at the Hartwick Pines Rest Area Rest Area Landscaping 2/4/2011 0:00 0.4812011 North EMMET 24609 108804 W Conway Road West Conway Road Guardrail upgrades. 9/2/2011 0:00 02011 North EMMET 24555 89483 Powers Rd Moore Rd-US31 Resurface 1/7/2011 0:00 0.633

2011 North GRAND TRAVERSE 28013 109989 US-31 South of Kay Ray Road on US-31Construct new paved parking lot with drainage and landscaping

improvements. 9/2/2011 0:00 0

2

Page 3: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2011 North IOSCO 35609 108816 Bridge Street at River Street / Washington Street Intersection realignment and clearing for sight distance improvements. 9/2/2011 0:00 02012 North IOSCO 35022 88904 M-55 M-55 in Iosco County Non-Freeway Signing Upgrade in Iosco County 10/7/2011 0:00 18.733

2011 North IOSCO 35609 108814 River Road from Rea Rd to Knute RdHMA overlay, install centerline and shoulder rumble strips, and permanent

pavement markings. 9/2/2011 0:00 0

2011 North IOSCO 35069 111179 National City Road Keystone Road to Turtle Road1.00 mi of hot mix asphalt resurfacing, base crushing and shaping, aggregate

base, aggregate shoulders, and slope restoration 2/4/2011 0:00 0.9742011 North MANISTEE 51555 109684 9 Mile Rd Village Limit-Village Limit, Kaleva Reconstruct 1/7/2011 0:00 1.0082011 North MASON 53555 105589 N Stiles Rd At Sugar Grove Rd 0.1 Mi S of Intrsctn Culvert replacement, debris removal 9/2/2011 0:00 0.0972011 North MASON 53555 105588 W Fountain Rd Dennis Rd to E of Culvert Culvert Replacement, debris removal 9/2/2011 0:00 0.126

2011 North MASON 53105 110317 N Jebavy Dr Angling Road to Shagway RoadPlace A HmA leveling course as needed then a HMA surface course at 165

PSY over entire roadway 9/2/2011 0:00 2.704

2011 North MISSAUKEE 57555 102961 Rosted & Seeley Roads LaChance Rd to Co Line Resurface 1/7/2011 0:00 3.042011 North MISSAUKEE 57555 109674 S 13 Mile Rd Falmouth Road to Kelly Road Bituminous Overlay 1/7/2011 0:00 3.988

2012 North OGEMAW 65033 110708 I-75 BL on I-75 BL at I-75 and Cook Road interchangeHMA resurfacing, curb and gutter, access management (eliminate 1 of 2

driveways) for car pool lot 465001 12/2/2011 0:00 02011 North ROSCOMMON 72555 89821 CR106 (Steele Rd) CR100-W Federal Highway Resurface 1/7/2011 0:00 1.2022011 North State Wide 84912 110667 Alpena TSC Wide Various Crack Treatment 3/4/2011 0:00 11.32012 Southwest ALLEGAN 03024 112213 M-89 M-89 @ SHERWOOD AVENUE Signal modernization in conjunction with road reconstruct JN 90028 12/2/2011 0:00 02012 Southwest BERRIEN 11016 103294 I-94 at Nickerson Road, M-40 at M-43 and I-94 at M-40 Resurface carpool lots 12/2/2011 0:00 0.0112012 Southwest BERRIEN 11400 112085 Niles Buchanan Rd 12/2/2011 0:00 2.5142012 Southwest BERRIEN 11400 112086 Ontario Rd Ontario Road from M-51 to County line Hot Patching and single seal coat 12/2/2011 0:00 3

2011 Southwest BERRIEN 11494 109194 Friday Road Ryno Road to Mountain RoadRESURF/RESTOR/REHAB�

9/2/2011 0:00 0.5062011 Southwest BERRIEN 11400 100085 E Britain Ave City of Benton harbor to Crystal Resurface 1/7/2011 0:00 0.909

2011 Southwest BERRIEN 11555 103385 S Elm St US12 South, Three Oaks0.24 miles of machine grading, sewer, hot mix asphalt removal, hot mix

asphalt paving, curb and gutter, sidewalk ADA, traffic control 1/7/2011 0:00 0.5072012 Southwest BERRIEN 11400 112084 W Bertrand Rd Mayflower Road to Red Bud Trail Resurface 12/2/2011 0:00 1.4452011 Southwest BERRIEN 11400 100087 Highland Ave City of Benton Harbor to Crystal Resurface 1/7/2011 0:00 0.8682011 Southwest BERRIEN 11111 109087 I-196 under Red Arrow Highway Beam repairs 1/7/2011 0:00 0.032011 Southwest BERRIEN 11400 100082 Riverview Dr Main to Empire Mill & resurface, minor drainage 1/7/2011 0:00 0.852011 Southwest BERRIEN 11494 109193 South Church Street St Joseph to Ryno Road Reconstruct with curb and gutter. Add storm sewer to improve drainage 9/2/2011 0:00 0.232011 Southwest BRANCH 12075 76802 S Fremont Rd Over Tallahassee Creek Bridge Replacement 9/2/2011 0:00 0.7522011 Southwest BRANCH 12007 102381 West Garfield Road At Coldwater River, Branch County Bridge Rehabilitation, BHT 1/7/2011 0:00 02011 Southwest BRANCH 12555 102701 Division Rd Dunks Rd-Sherwood W VL Reconstruct 1/7/2011 0:00 0.5152011 Southwest BRANCH 12555 89438 Division Rd Main-WCL, Sherwood Reconstruct 1/7/2011 0:00 0.502

2011 Southwest BRANCH 12900 102702County Wide Pavement

Marking County Wide Pavement Marking 1/7/2011 0:00 0.79

2011 Southwest CALHOUN 13411 101247 20th St. Michigan to Columbia, 20th to Angellhot mix asphalt cold milling and resurfacing, intermittent concete curb and

gutter, concrete sidewalk, and ADA ramps 3/4/2011 0:00 0.99

2012 Southwest CALHOUN 13411 110529 Jackson- Stringham Rd Bedford Rd to Michigan Ave. Resurface 10/7/2011 0:00 0.9292011 Southwest CASS 14442 109075 W High St Spruce to Tuthill Mill and Overlay with HMA, joint, base, curb/gutter repairs and patching 9/2/2011 0:00 0.12011 Southwest CASS 14442 109076 Park Place Depot Street to East High Street Resurface with join, base, curb/gutter, and patching 9/2/2011 0:00 0.13

2011 Southwest CASS 14442 109098 Marcellus Hwy Colby Street to City LimitsSelective joint repairs, patching, seal coat (chip or cape seal); add aggregate

shoulders 9/2/2011 0:00 0.57

2011 Southwest CASS 14442 109099East Prairie Ronde

Street North Front to Rail Road StreetSelective joint repairs, patching, curb/gutter repairs and seal coat (chip or cape

seal) 9/2/2011 0:00 0.462011 Southwest CASS 14442 109074 North Lowe Street Main Street to West Telegraph Street Mill and overlay HMA, joint, base, curb/gutter repairs and patching 9/2/2011 0:00 0.142012 Southwest CASS 14121 110758 M-60 at US-12 Interchange Install Permanent Intermittent Truck Weigh Station (PITWS). 11/4/2011 0:00 02011 Southwest CASS 14400 100027 Ironwood Dr Stateline to Redfield Resurface 1/7/2011 0:00 0.5452011 Southwest CASS 14442 109073 Middle Crossing Road Yaw Street to 750 ft N of Sarabyn Resurface with HMA and aggregate shoulders 9/2/2011 0:00 0.69

3

Page 4: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2012 Southwest CASS 14400 112092 Redfield Rd M-62 to Ridgewood Drive Restore and rehabilitate 12/2/2011 0:00 0.522012 Southwest CASS 14400 112093 Redfield Rd Stateline Road to Oak Street Resurface with structural overlay 12/2/2011 0:00 0.512011 Southwest CASS 14442 109072 Mathews Street Dailey Road to Cherry Grove Road Crush and Shape HMA and aggregate shoulders 9/2/2011 0:00 0.52012 Southwest KALAMAZOO 39014 90201 US-131 at D Avenue in Kalamazoo County Resurface existing lot and pavement markings 10/7/2011 0:00 0

2011 Southwest ST. JOSEPH 78900 102707Co Wide Pavement

Marking County Wide Pavement Marking 9/2/2011 0:00 0.8432011 Southwest ST. JOSEPH 78434 109203 Lafayette Road Big Hill Road to Lakeview Resurface 9/2/2011 0:00 1.022011 Southwest VAN BUREN 80012 89982 S George St RR-Prairie Ronde, Decatur Resurface 1/7/2011 0:00 0.205

2011 Superior BARAGA 07100 106033County Wide Pavement

Marking County Wide Pavement Marking 9/2/2011 0:00 1092011 Superior BARAGA 07609 108739 Froberg Road at East Sturgeon Slough Bridge approach guardrail upgrades. 1/7/2011 0:00 0

2011 Superior BARAGA 07609 109301 Townline Road Over Silver River, Baraga CountyPreventative Maintenance, including hot mix asphalt wearing surface and

approaches, railing replacement, and riprap placement. 1/7/2011 0:00 02011 Superior BARAGA 07555 103601 Mead Rd US41 West Resurface 9/2/2011 0:00 0.299

2011 Superior BARAGA 07609 109292 Pelkie Road Over West Branch Sturgeon River, Baraga CountyPreventative Maintenance including joint replacement, new hot mix asphalt

wearing surface and approaches, new railing and riprap placement. 1/7/2011 0:00 02011 Superior CHIPPEWA 17032 107601 I-75 BL NW quadrant of I-75 and 3 Mile Rd Install Carpool lot lighting 9/2/2011 0:00 0.01

2011 Superior CHIPPEWA 17063 110631 M-28 west of I-75 at Dafter TSTConstruct new PITWS with curb island and active traffic lane. Reconstruct

existing pavement from 3 inch to 5 inch. 5/6/2011 0:00 0.1

2011 Superior CHIPPEWA 17467 109177 Water Tower Drive M-80 to Woodside DriveCold mill, minor surface drainage correctio, resurface, pave shoulders and

pavement markings 9/2/2011 0:00 0.5722011 Superior DELTA 21024 109984 US-2 over the Sturgeon River, Nahma Junction Complete Painting and Traffic Control 2/4/2011 0:00 2.749

2011 Superior HOUGHTON 31437 109103 Bridge Street Montezuma Avenue south .34 milesMill 2'' and repave. Sidewalk replacement and repair. Storm sewer manhole

repair 9/2/2011 0:00 0.34

2011 Superior HOUGHTON 31437 109105 Main Street Copper Ridge to Green Acretotal reconstruction including earth excavation, subbase, aggregate base,

storm sewer, concrete cub and gutter and HMA pavement 9/2/2011 0:00 0.162011 Superior HOUGHTON 31437 109114 Campus Drive US 41 then North Westerly .50 Mi Resurface 9/2/2011 0:00 0.52011 Superior IRON 36555 86937 County Road 424 Alpha Bypass Reconstruct 9/2/2011 0:00 0.52011 Superior IRON 36555 106117 County Road 424 Alpha Bypass Reconstruct 9/2/2011 0:00 0.4792011 Superior IRON 36555 106119 County Road 424 Alpha Bypass Reconstruct 1/7/2011 0:00 0.4792011 Superior IRON 36555 73564 CR424 M189-Gaastra CL, Caspian Resurface 9/2/2011 0:00 0.62011 Superior IRON 36039 106118 W Franklin St/Lay St US2-River St, Iron River Reconstruct 9/2/2011 0:00 0.4592011 Superior LUCE 48042 110737 M-28 0.1 mile west of CR 399 intersection Construct new carpool parking lot. 3/4/2011 0:00 02011 Superior MACKINAC 49555 89952 Charles Moran Rd East of M123 Resurface 1/7/2011 0:00 2.7

2011 Superior MENOMINEE 55555 89954G-18 (County Road

374) US41-VL, Village of Carney Resurface 1/7/2011 0:00 0.3012011 Superior MENOMINEE 55555 105934 County Road 338 K-3 Lane to CR346 Reconstruct 1/7/2011 0:00 1.7162011 Superior ONTONAGON 66555 89634 Airport Rd Parker Rd-Paul Bunyan Rd, Ontonagon Resurface 9/2/2011 0:00 0.7532011 Superior SCHOOLCRAFT 75038 102937 County Road 436 Bear Creek N Resurface 1/7/2011 0:00 0.9412011 Superior SCHOOLCRAFT 75088 102942 Fox River Rd 3.5 miles N of M28 northerly .05 MI Resurface 1/7/2011 0:00 0.52011 Superior SCHOOLCRAFT 75555 111252 County Rd 437 Iron Creek nthly 5.5 mi to end of pavement resurface 9/2/2011 0:00 0.4372011 Superior SCHOOLCRAFT 75555 111253 County Road 434 US 2 to CR 432 resurface 9/2/2011 0:00 3.8422011 Superior SCHOOLCRAFT 75555 111254 County Road 433 US 2 to CR 438 resurface 9/2/2011 0:00 6.1182011 University CLINTON 19400 112051 East Clark Road Watson to Webster 0.75 miles of cold milling hot mix asphalt surface, and hot mix asphalt. 2/4/2011 0:00 0.756

2011 University CLINTON 19609 107992 North County Line Road east of Ely Rd Vertical curve modification. 9/2/2011 0:00 02011 University EATON 23063 110619 I-69 NB at Potterville Rest Area New concrete pad and construct PITWS 4/1/2011 0:00 0

2011 University HILLSDALE 30555 106433 East Saint Joe Street Wade Rd-Adams Rd, Litchfield0.9 miles shoulders, cold milling, hot mix asphalt, paving, pavement marking,

traffic control, and slope restoration. 3/4/2011 0:00 1.2492011 University JACKSON 38103 103377 I-94 I-94 at Sargent Road New carpool lot 3/4/2011 0:00 0

4

Page 5: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2011 University JACKSON 38075 110134 West Street Ezra Eby Elem. and Napoleon Mid. School, Napoleon

Bike and pedestrian safety improvements including improving sidewalk construction, pedestrian fencing and enhanced crosswalk markings. SRTS

2009-0012 & 2009-0013 2/4/2011 0:00 02011 University JACKSON 38609 108818 Springport Road at Rives Junction Rd Intersection realignment. 9/2/2011 0:00 02011 University WASHTENAW 81072 110172 I-94BL/Huron St. I-94BL/Huron St. between Thayers and Ingalls Install pedestrian refuge island at mid-block location 4/1/2011 0:00 0.0642011 University WASHTENAW 81063 100373 I-94 and Huron/US-12/Whittaker in the SE Quadrant Resurface lot 1/7/2011 0:00 02011 University WASHTENAW 81609 108862 Areawide 4 various locations Permanent signing upgrades. 9/2/2011 0:00 0

Construction Projects $250,001 to $500,0002011 Bay ARENAC 06555 89720 Briggs Rd Maple Ridge Rd-County Line Reconstruct 1/7/2011 0:00 1.398

2012 Bay CLARE 18033 106307 US-27 NB under Mannsiding Road18033-S09: Full Depth Patching, Deck Patching, Joints, Substructure Repair,

Seal Deck and HPR reference lines 10/7/2011 0:00 0.252011 Bay GENESEE 25609 108807 Pasadena Avenue 7 locations Traffic signal upgrade and box span installation. 9/2/2011 0:00 02011 Bay GENESEE 25402 103998 W 2nd St West Second Street Road Resurface 9/2/2011 0:00 0.32011 Bay GENESEE 25402 103999 W 2nd St West Second Street Road Resurface 9/2/2011 0:00 0.42011 Bay GENESEE 25402 104219 Lansing Street Lansing/Ray Road Road Resurface 9/2/2011 0:00 0.4912011 Bay GENESEE 25402 104213 Seymour Road Lahring to Smith Road resurface 9/2/2011 0:00 1.0082011 Bay GENESEE 25402 104214 Seymour Road Rolston to Lahring Road resurface 9/2/2011 0:00 1.0062011 Bay GENESEE 25204 104211 Perry Rd Perry Road Road resurface (30,250 5307 Flex) 9/2/2011 0:00 1.0272011 Bay GENESEE 25402 104001 W Stewart Ave West Stewart Avenue Road Resurface 9/2/2011 0:00 12011 Bay GENESEE 25031 111662 US-23 NB US-23, Livingston/Genesee COL to Thompson Rd Slab stabilization with polyurethane foam 9/2/2011 0:00 5.392011 Bay GENESEE 25402 103967 E Bristol Rd Bristol Road Road Resurface 9/2/2011 0:00 12011 Bay GENESEE 25402 103969 Glenwood Ave Glenwood Avenue Road Resurface 9/2/2011 0:00 0.52011 Bay GENESEE 25091 47323 M-15 M-15 at Green Road Add Center Left Turn Lane 3/4/2011 0:00 0.2742011 Bay GLADWIN 26555 89710 Howard Rd M30-Dundas Rd Reconstruct with Minor Widening 7/8/2011 0:00 0.995

2011 Bay GRATIOT 29609 108808 Luce Road at Lincoln Rd0.24 miles of hot mix asphalt reconstruction, storm sewer, concrete curb and

gutter, water main, and tree removal. 2/4/2011 0:00 02011 Bay GRATIOT 29555 109519 W Washington Rd Lumberjack Rd to Warner Rd Resurface 1/7/2011 0:00 2.9792011 Bay HURON 32032 110294 M-53 M-142 to Railroad Crossing, Bad Axe Mill and Hot Mix Asphalt Overlay 1/7/2011 0:00 0.4962011 Bay HURON 32555 83440 Main St M53-Crockard, Kinde Reconstruct 1/7/2011 0:00 0.9842011 Bay HURON 32555 89596 Filion Rd M25-Caseville Rd Reconstruct 1/7/2011 0:00 2.1232012 Bay LAPEER 44012 108876 North Court Street over Farmer's Creek, City of Lapeer Bridge Rehabilitation - BHT 10/7/2011 0:00 0

2011 Bay LAPEER 44031 111272 M-53 at Hough RoadAdd Center Left Turn Lane CMAQ Grant # 10109; A Phase is CMAQ GRant

# 11022 9/2/2011 0:00 0.5682011 Bay MIDLAND 56111 112415 Saginaw Road Center Street to Oak Street Saginaw Road Streetscape, ENH10-058 6/3/2011 0:00 0.2312011 Bay MIDLAND 56415 109185 Saginaw Road Meridian to West River Road Reconstruct 9/2/2011 0:00 0.7

2011 Bay SAGINAW 73609 108852 Ithaca Road from Raucholz Rd to Dempsey RdSuper-elevation modification, clearing, guardrail, and permanent signing

upgrades. 9/2/2011 0:00 0.537

2011 Bay SAGINAW 73609 108853Fashion Square

Boulevard at Schust Rd Add center left turn lanes and upgrade traffic and pedestrian signals. 9/2/2011 0:00 0

2011 Bay SAGINAW 73609 108654 W Genesee Avenue at N. Michigan AvenueAdd right turn lanes on south and west legs of intersection, upgrade traffic

signal and install box span configuration and countdown pedestrian signals. 9/2/2011 0:00 02011 Bay TUSCOLA 79041 110293 M-46 Tressla Road to Vassar Road Multiple Course Microsurface 1/7/2011 0:00 4.4862011 Bay TUSCOLA 79555 54622 Huron St M15-Sherman, Vassar Resurface 1/7/2011 0:00 1.942011 Grand IONIA 34609 108812 Johnson Road from Wheeler Rd to Kiddville Rd Vertical curve modification and add paved shoulders. 9/2/2011 0:00 02011 Grand IONIA 34609 108813 Kelsey Highway from Grand River Ave to David Highway Shoulder widening, culvert extensions, clearing, and guardrail installation. 9/2/2011 0:00 02011 Grand KENT 41025 109762 I-96 WB Cascade Rd/I-96 WB On-Ramp Ramp reconstruction. 3/4/2011 0:00 0

2011 Grand KENT 41062 111226 M-11 M11 (28TH ST) @ BURLINGAME and M-45 @ Kinney Signal Modernizations 9/2/2011 0:00 0

2011 Grand KENT 41609 108824 Lincoln Lake Ave SE 4 various locationsTraffic signal moderization, install pedestrian countdown signals, box span

installation. 9/2/2011 0:00 0

5

Page 6: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2011 Grand KENT 41401 104931 12th Avenue Port Sheldon Street to Baldwin Street Resurface & 3' paved shoulders 9/2/2011 0:00 1.282011 Grand KENT 41401 104899 Clyde Park Avenue 76th Street to 68th Street Resurface 9/2/2011 0:00 1.0092011 Grand KENT 41131 106272 US-131 NB and SB under 100th Street Deck patching, substructure repairs and slope paving repairs 3/4/2011 0:00 02011 Grand KENT 41081 108834 S Main St NW Spring Street to M-46, Village of Kent City Streetscape, pedestrian safety improvements 5/6/2011 0:00 02012 Grand MECOSTA 54012 109749 US 131 OLD US-131 Old over the Paris Creek Full paint, substructure repairs, beam repairs, slope protection repairs 10/7/2011 0:00 0

2011 Grand MECOSTA 54022 107671 M-20 over the Muskegon RiverModular joint replacements, epoxy overlay, deck patching and scour

countermeasures 3/4/2011 0:00 02011 Grand MONTCALM 59609 107999 Peck Road at Fitzner Rd Vertical curve modification 9/2/2011 0:00 0

2011 Grand MONTCALM 59117 111527Fred Meijer Heartland

Trail Hillcrest to Meijer Drive along Greenville West +1.00 miles of concrete bike path, grading, aggregate base course, concrete

curb and gutter, hot-mix asphalt approach work, and tree relocation. 2/4/2011 0:00 0.927

2011 Grand MONTCALM 59555 111007 CR 522 (E Stanton Rd) E Co Line to Crystal resurface 9/2/2011 0:00 2.9762011 Grand MONTCALM 59051 109046 M-66 Quarterline Road north to M-46 Single Course Chip Seal 3/4/2011 0:00 7.5822011 Grand MONTCALM 59555 111008 North County Line Rd Sheridan to Wyman resurface 9/2/2011 0:00 2.2052011 Grand MONTCALM 59555 105428 N Wyman Rd Stanton Rd-Cannonsville Rd Resurface 1/7/2011 0:00 2.9872011 Grand MONTCALM 59023 107973 M-57 Carson City Full depth concrete joint repairs and diamond grinding 3/4/2011 0:00 0.998

2011 Grand MUSKEGON 61121 112053Trail through North

Muskegon Shoreline to Berry Junction, City of N. MuskegonNon-motorized facilities to connect Muskegon Shoreline Trail to the future

Fred Meijer Berry Junction Trail, ENH10-032. 3/4/2011 0:00 12011 Grand MUSKEGON 61407 104275 Getty Street Keating Avenue to Laketon Street Reconstruct 9/2/2011 0:00 0.2722011 Grand MUSKEGON 61407 104276 Gerry Street Sherman Street to Broadway Street Reconstruct and Resurface 9/2/2011 0:00 0.1942011 Grand MUSKEGON 61407 104272 Giles Road M-120 to Whitehall Road Resurface 9/2/2011 0:00 0.8232011 Grand MUSKEGON 61073 87158 US-31BR over Abandoned Railroad, Whitehall Superstructure replacement, abutment repair, and approaches. 2/4/2011 0:00 02011 Grand OCEANA 64031 90145 S Michigan Ave Wilkie St-McKinley St, Rothbury Reconstruct 1/7/2011 0:00 0.9952011 Grand OCEANA 64555 90146 W Shelby Rd 40th Avenue to 28th Avenue Resurface 1/7/2011 0:00 1.5132011 Grand OTTAWA 70823 111224 M-121 M-121 (CHICAGO DR) @ 48TH AVE New Traffic Signal 3/4/2011 0:00 02011 Grand OTTAWA 70034 90154 Taylor St 72nd Avenue-96th Avenue Resurface 1/7/2011 0:00 3.0472011 Grand OTTAWA 70555 76806 W Randall St 64th-68th, Coopersville Resurface 9/2/2011 0:00 0.4942012 Grand State Wide 84913 105732 Grand Region Grand Rapids TSC Non-Freeway Signing Upgrade 11/4/2011 0:00 20.9332011 Metro MACOMB 50031 102348 M-97 Macomb County Non-Freeway Signing Upgrade 3/4/2011 0:00 22.812011 Metro MACOMB 50458 104603 19 Mile Rd North Point Bouleverd Pavement patching 9/2/2011 0:00 1

2011 Metro MACOMB 50609 108828 Ryan Road 4 locationsAdd center left turn phase, install box span configuration, countdown

pedestrian signals, and ADA ramps. 9/2/2011 0:00 0

2011 Metro OAKLAND 63459 107206 Walton Road From 950' west of Livernois to Livernois Road

0.18 miles of concrete pavement cracking and seating, cold milling concrete pavement, concrete pavement repairs, hot mix asphalt resurfacing, drainage structure work, concrete curb and gutter, ADA ramps, and pedestrian signal

upgrades 2/4/2011 0:00 0.2

2011 Metro OAKLAND 63459 107207 Walton Road From Livernois Road to Great Oaks Boulevard

0.29 miles of concrete pavement cracking and seating, cold milling concrete pavement, concrete pavement repairs, hot mix asphalt resurfacing, drainage structure work, concrete curb and gutter, ADA ramps, and pedestrian signal

upgrades 2/4/2011 0:00 0.2532011 Metro OAKLAND 63609 108846 Orchard Lake Road at Berwick Add center left turn lanes and traffic signal optimization. 9/2/2011 0:00 0

2012 Metro ST. CLAIR 77475 112337 Clinton Avenue Sixth to Riverside, City of St. Clair

The City of St. Clair will streetscape Clinton Avenue from Sixth Street to Riverside Drive (M-29). The project will include sidewalk improvements, the

addition of ADA ramps, lighting and landscaping. ENH 09-073 11/4/2011 0:00 02011 Metro ST. CLAIR 77052 110771 M-29 NCL of St. Clair to Laura Street Full Depth Concrete Repairs 2/4/2011 0:00 1.5942011 Metro ST. CLAIR 77475 112324 Keewahdin Road M-136 to M-25 Resurface 4/1/2011 0:00 1.382011 Metro State Wide 84917 109778 Oakland TSC Oakland TSC Non-Freeway Signing Upgrade 1/7/2011 0:00 10.073

2011 Metro WAYNE 82021 86929 I-94 P01, Quirk Road WalkoverP&H replacement, painting, joint replacement, epoxy overlay, substructure

repairs. 2/4/2011 0:00 2.4822011 Metro WAYNE 82081 110753 M-153 Wayne Road to Venoy Road Multiple Course Microsurfacing 3/4/2011 0:00 1.246

6

Page 7: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2011 Metro WAYNE 82062 82728 US-12 from 14th Street to Rosa Park Blvd.

Streetscape amenities: including replacing existing concrete sidewalk with brick pavers, and placement of trash receptacles.�

ENH #2003-00278.�3/4/2011 0:00 0.228

2011 Metro WAYNE 82400 104604 Lafayette Bridge Over Conrail Rehabilitate Bridge 9/2/2011 0:00 02012 Metro WAYNE 82141 106841 M-102 M-102 EB and WB over the Rouge River 2 Epoxy Overlays 10/7/2011 0:00 0.2192011 Metro WAYNE 82609 108867 Farmington Road at 6 Mile Rd and 7 Mile Rd Traffic signal modernization and box span installation. 9/2/2011 0:00 02011 Metro WAYNE 82011 110749 US-12 Rawsonville Rd. to Denton Rd. Concrete Joint Resealing 2/4/2011 0:00 1.6882011 Metro WAYNE 82400 104595 12th Street Bridge Over Conrail Rehabilitate Bridge 9/2/2011 0:00 0

2011 Metro WAYNE 82400 104606 2nd Ave From Grand Blvd and Ferry

Geometric modifications, pavement markings, and signage for 2-way conversion�

9/2/2011 0:00 0.608

2011 Metro WAYNE 82609 108668Inkster Road &

Middlebelt Road at Norfolk Southern railroad structure Install barrier wall, guardrail, and sidewalk improvements. 1/7/2011 0:00 0

2011 Metro WAYNE 82123 105321Edward J Jeffries Fwy

(Local) I-96, Hubbell St. to Fullerton St. Extend Blunt End Sections outside of the clear zones. 6/3/2011 0:00 0.309

2011 Metro WAYNE 82025 110689 I-94 9 Bridges, Harper Woods, Wayne County

Epoxy Overlay, Expansion Joint Replacement, Substructure Patching, Substructure Concrete Surface Coating and Horizontal Surface Sealer, Spot

Painting Beams, and Replace Approach Sidewalk Ramps 3/4/2011 0:00 2.012011 Metro WAYNE 82609 108864 Merriman Road Merriman Road Add right turn lanes in all four quadrants and traffic signal upgrades. 9/2/2011 0:00 02011 Metro WAYNE 82609 108865 Merriman Road at 6 Mile Rd Add right turn lanes in four quadrants and traffic signal upgrades. 9/2/2011 0:00 0

2011 North ALCONA 01001 111981 2nd Street Main Street/F-41 to Traverse Bay/F-41Streetscape Enhancements, Light Fixtures, Signage and Sidewalks, ENH

08065 5/6/2011 0:00 0

2011 North ALCONA 01096 106331 Hubert Road Mt. Maria Road to West Drive0.97 mile of hot mix asphalt resurfacing, base crushing and shaping,

aggregate base, drainage, guardrail, pavement marking, and slope restoration 2/4/2011 0:00 0.9952011 North ALPENA 04055 102805 Long Rapids Rd Woodview-Bolton Reconstruct 1/7/2011 0:00 6.4712011 North BENZIE 10609 108798 Mick Road 4 locations Super-elevation modification, add paved shoulder, and guardrail upgrades. 9/2/2011 0:00 02011 North CHEBOYGAN 16051 105442 M-33 Cheboygan County Non-Freeway Signing Upgrade 3/4/2011 0:00 34.5682011 North EMMET 24011 110607 US-31 US-31 HMA Cold Milling & Overlay 1/7/2011 0:00 0.8812011 North EMMET 24451 109202 Anderson Road Lears Road to Intertown Road Mill and fill with HMA w/ minor widening 9/2/2011 0:00 0.501

2011 North EMMET 24555 89482 Hathaway Road Pleasant View Rd-Mink Rd1.02 mi of hot mix asphalt resurfacing, base crushing and shaping, concrete

curb and gutter, pavement marking, slope restoration 1/7/2011 0:00 0.998

2011 North GRAND TRAVERSE 28420 89610Silver Drive/Franke

Road 11th to Silver Lake Road Reconstruct 9/2/2011 0:00 02011 North GRAND TRAVERSE 28555 76681 Gray Rd Cedar Run-M72 Reconstruct 1/7/2011 0:00 1.116

2011 North IOSCO 35900 111181 Chain Lake Road South Branch Road to Jose Lake Road2.74 mi of trenching, aggregate base, HMA base crushing and shaping, HMA

surfacing, aggregate shoulders and slope restoration. 4/1/2011 0:00 3.069

2011 North IOSCO 35609 107997 Bissonette Road Chain Lakes Road and Bissonette RoadShoulder trenching, HMA surfacing and centerline and shoulder rumble strip

installation. 9/2/2011 0:00 0

2011 North MANISTEE 51012 106638 US-31 US-31/8 Mile Road IntersectionIntersection improvement including center lane for left turns and right turn

lanes 1/7/2011 0:00 0.23

2011 North MASON 53555 110315 N Stiles Rd Sugar Grove Road to S of Hansen RoadMinor drainage improvement, clearing of trees/brush in ROW, HMA widening

and HMA overlay. 9/2/2011 0:00 2.594

2011 North MASON 53432 109179 North Staffon Street Ludington Avenue to Tinkham AvenueReconstruct with new pavement, new curb and gutter, new sidewalk, and

storm water drainage 9/2/2011 0:00 0.48

2011 North OGEMAW 65038 82679County Road 16/State

Rd Sage Lake Rd-Clark Rd Reconstruct 3/4/2011 0:00 1.0712011 North OGEMAW 65022 111763 M-55 Beach Rd to ECL HMA overlay a shoulder gravel 5/6/2011 0:00 3.981

2011 North OSCEOLA 67011 110516 Old US-131 2 Mile Road to 1 Mile Road1.02 mi of hot mix asphalt road reconstruction�

3/4/2011 0:00 1.0092011 North OTSEGO 69555 105402 Mancelona Rd Passenheim Rd-W Otsego Lake Dr Reconstruction 4/1/2011 0:00 0.796

7

Page 8: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2011 North ROSCOMMON 72555 102773 County Road 100 CR300-CR104 Resurface 9/2/2011 0:00 3.7742012 North State Wide 84912 107629 TSC wide Grayling and Alpena TSC's Signal modernization 12/2/2011 0:00 02011 North State Wide 84912 110478 Var Various locations Crack Treatment 3/4/2011 0:00 105.189

2011 North WEXFORD 83013 110736 M-37 from West Street to Carl Street

Streetscape improvements, including decorative lighting, trees, walkways and decorative sidewalk, and miscellaneous streetscape amenities. ENH 2010

00023 7/8/2011 0:00 0.179

2011 North WEXFORD 83609 108023 N 31 Rd 31 RoadRemove horizontal curve, intersection realignment, and sight distance

improvements. 9/2/2011 0:00 0

2011 North WEXFORD 83609 108669 13th Street from Wilson Ave to Third Street

0.50 miles of roadway conversion from 4 lanes to 3 lanes and add turn lanes at Leeson Ave., Sixth Avenue and Fourth Avenue. Work includes earth excavation, aggregate base, hot mix asphalt surfacing, curb and gutter,

drainage improvements, slope restorati 2/4/2011 0:00 0

2011 North WEXFORD 83609 108022 Hodenpyle Dam Road from Wexford WCL to M-115Super-elevation modification, widen paved shoulder, fixed object removal, and

permanent signing improvements. 9/2/2011 0:00 02011 North WEXFORD 83030 102962 Various Locations Various Locations County Wide Pavement Marking 1/7/2011 0:00 0.9792011 North WEXFORD 83061 105674 US-131BR US-131BR (MITCHELL) @ 4 locations 4 signal modernizations with road JN 87041A 2/4/2011 0:00 02011 North WEXFORD 83609 108868 E 13th Street 13th Street Construct roundabout. 9/2/2011 0:00 02011 Southwest ALLEGAN 03414 109062 Hooker Road Easter Avenue to City Limits Reconstruct, curb and gutter, storm drainage, sidewalk. 9/2/2011 0:00 0.42011 Southwest BERRIEN 11555 105943 Cleveland Ave Linco Rd North 0.55 Miles Reconstruct 9/2/2011 0:00 0.576

2012 Southwest BERRIEN 11400 112087 Broadway Pipestone Street to Empire AvenueMill and resurface , minor drainage improvements, ADA sidewalk ramp

replacements 12/2/2011 0:00 0.92011 Southwest BERRIEN 11400 100083 Kingsley Ave South State to Niles Avenue Reconstruct with curb & gutter 1/7/2011 0:00 0.1542011 Southwest BERRIEN 11400 111992 John Beers Road St. Joesph Ave to DeMorrow Rd. Reconstruct 3/4/2011 0:00 1

2011 Southwest BERRIEN 11609 107991 Glendora Road from Madron Lake Rd to Burgoyne RdSuper-elevation modification, HMA surfacing and paved shoulder widening,

fixed object removal, and permanent signing upgrades. 9/2/2011 0:00 0

2012 Southwest BERRIEN 11400 112088 Lake St Elm Street to Broad StreetReconstruct road, replace storm sewer, sanatary sewer, and watermain, install

new sidewalk ramps 12/2/2011 0:00 0.064

2012 Southwest BERRIEN 11015 88086 I-94 under John Beers Road Full paint, Substructure repair, Joint replacement, Crack sealer, Concrete

surface coating 10/7/2011 0:00 0.2472011 Southwest BERRIEN 11000 109065 Deans Hill Road Houchberger Rd thence SWly 2700 Reconstruct 9/2/2011 0:00 0.52

2011 Southwest BRANCH 12555 103653 N Fremont Rd Corless Rd-Dorrance RdCrush and shape existing bit, reconstruct existing embankments, and place

HMA pavement. 9/2/2011 0:00 1.724

2011 Southwest CALHOUN 13411 109772 Helmer Rd S Beckley to Gethingshot mix asphalt cold milling and resurfacing, intermittent concrete curb and

gutter, concrete sidewalk, and ADA ramps 3/4/2011 0:00 1.52012 Southwest CALHOUN 13411 110528 Capital Ave SW Weeks to Cascade Resurface 10/7/2011 0:00 0.89

2011 Southwest CALHOUN 13446 109184 15 Mile Rd Michigan Avenue to Verona RoadHMA resurface, gravel shoulders, permanent pavement markings, minor tree

removal and drainage work 9/2/2011 0:00 0.644

2011 Southwest CALHOUN 13411 109773 North Avenue Capitol to Roosevelthot mix asphalt cold milling and resurfacing, intermittent concrete curb and

gutter, concrete sidewalks, and ADA ramps 3/4/2011 0:00 1.32011 Southwest CALHOUN 13427 109058 Berrien Street Michigan to Pine Reconstruct 9/2/2011 0:00 0.22

2011 Southwest CALHOUN 13411 101249 Capital Ave SW Cascade to Rebecca Sthot mix asphalt cold milling and resurfacing, intermittent concrete curb and

gutter, concrete sidewalks, and ADA ramps 3/4/2011 0:00 1.7

2011 Southwest CASS 14011 109705 M-51 Pokagon Street to W. Railroad StreetCold milling at 1.5 inch depth and HMA overlay at 1.5 inch depth. Sidewalk

ramp upgrade to the current standard. 3/4/2011 0:00 1.575

2011 Southwest KALAMAZOO 39609 108821 S. Sprinkle Road S. Sprinkle RoadAdd center left turn lane, horizontal curve modification, and sight distance

improvements. 9/2/2011 0:00 02011 Southwest KALAMAZOO 39609 108822 E VW Ave W. VW Avenue Shoulder widening and HMA surfacing. 9/2/2011 0:00 02012 Southwest KALAMAZOO 39405 110418 Drake Road Grand Prairie to Ravine Road Resurface 10/7/2011 0:00 0.963

2012 Southwest KALAMAZOO 39405 110286 Millcork St Cork to Miller Mill & Resurface, bring ADA ramps to standard; new curb & gutter as needed 10/7/2011 0:00 0.53

2011 Southwest State Wide 84915 109708 Multiple US-12 and M-62Crack Treatment on US-12 from Three Oaks to 2.0 miles east of Galien.

Overband Crack Fill at all other locations 3/4/2011 0:00 26.884

8

Page 9: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2011 Southwest VAN BUREN 80609 108859 68th Street at CR 388 (Phoenix Avenue)Add center left turn lane on 68th Street, permanent signing and pavement

marking upgrades. 9/2/2011 0:00 0

2011 Southwest VAN BUREN 80609 108021 County Road 681 CR 681 Add turn lanes, clearing for sight distance, and install centerline rumble strips. 9/2/2011 0:00 02011 Southwest VAN BUREN 80449 111819 N. Bailey Avenue Wells St/Bailey Ave to Kalamazoo St/Huron St Construct new NM trail and on street 'sharrow' ENH10031 5/6/2011 0:00 0

2011 Southwest VAN BUREN 80609 107989CR 388 (Phoenix

Avenue) at 62nd Street Add turn lanes, install stop rumble strips and permanent signing upgrades. 1/7/2011 0:00 0

2011 Superior ALGER 02555 89729 Deerton Rd Deerton/Onota-M281.44 miles of hot mix asphalt base crushing and shaping, trenching, drainage

improvements, hot mix asphalt paving. 2/4/2011 0:00 1.4712011 Superior ALGER 02041 111984 M-28 West of Portage Street to Onota Street Full Depth Concrete Pavement Repair. 3/4/2011 0:00 1.781

2011 Superior BARAGA 07609 108791Pequaming (Bay Shore)

Road Pequaming RoadSuper-elevation and vertical curve modification, culvert extension, guardrail

upgrades, slope flattening, permanent signing and pavement markings. 9/2/2011 0:00 0

2011 Superior BARAGA 07609 108789 Aura Road from .35 m e of Second Sand Beach to NE for .75 miSuper-elevation and vertical curve modification, culvert extension, slope

flattening, permanent signing and pavement markings. 9/2/2011 0:00 02011 Superior BARAGA 07084 83442 Aura Rd Second Sand Beach Rd-Townline Rd Pulverize, reshape, drainage, resurfacing 4/1/2011 0:00 22011 Superior BARAGA 07023 83498 Froberg Rd Tahtinen Rd W Pulverize, reshape, resurface. 4/1/2011 0:00 2.0272011 Superior CHIPPEWA 17063 108013 M-28 over the Waiska River Complete Painting, Joint Replacement, and Minor Deck Patching 3/4/2011 0:00 0.998

2011 Superior DICKINSON 22426 48976Lk Antoine Rd/Grd Blvd

Circle SPRING ST-LK ANTOINE PARKCONSTRUCT PATH-ENH#98143 North and South Lake Antoine Bike path

(Phase I & II) 4/1/2011 0:00 1.62011 Superior DICKINSON 22031 103709 US-141 US-141 at Breitung Cutoff Road New signal and construction of center left turn lanes. 4/1/2011 0:00 0.38

2011 Superior GOGEBIC 27430 109175 Hemlock Street Norrie Street to Arch StreetReconstruct to all season standard. Pavement removed, subbase, aggregate,

curb & gutter, HMA and pavement marking 9/2/2011 0:00 0.372011 Superior HOUGHTON 31076 103186 Rice Lake Rd Bootjack Rd-Sawmill Rd Crush, shape, HMA resurfacing 1/7/2011 0:00 1.5012011 Superior IRON 36039 90367 Lay Ave School St-US2, Iron River Resurface 9/2/2011 0:00 0.125

2011 Superior IRON 36555 89626CR643/Bates Amasa

Rd Pond-Austin Resurface 1/7/2011 0:00 1.268

2011 Superior IRON 36555 89619CR643/Bates Amasa

Rd Shady Lane-Pond Resurface 9/2/2011 0:00 2.02

2011 Superior IRON 36555 76718CR643/Bates Amasa

Rd Austin-Snuff Country Resurface 1/7/2011 0:00 1.4942011 Superior IRON 36071 110392 Lay Avenue Kofmehl Rd to Evergreen St, City of Iron River Streetscape Enhancement, ENH10-007 5/6/2011 0:00 02011 Superior IRON 36000 109064 Cedar Lake Road Kings Corner to Thayer Street Reconstruct 9/2/2011 0:00 1.72011 Superior KEWEENAW 42555 51842 Eagle Harbor Rd NE of US41-Eagle Harbor Resurface 1/7/2011 0:00 1.9982011 Superior LUCE 48555 76805 County Road 381 M28-Toonerville Reconstruct 1/7/2011 0:00 2.1862011 Superior MACKINAC 49022 110383 US-2 US-2 Boucha Rd west 1.14 miles HMA cold milling and single course HMA resurfacing 1/7/2011 0:00 1.1432011 Superior MACKINAC 49022 110387 US-2 1.902 mi W of Black River e'ly 1.26 mi Cold milling HMA surface and single course HMA resurfacing 1/7/2011 0:00 1.2592011 Superior MACKINAC 49609 108632 N Gould City Road 0.3 mi south of Camp A Rd to 1.3 n of Camp A Aggregate lift, shoulder widening, and clearing. 9/2/2011 0:00 0

2011 Superior MARQUETTE 52423 109176 South Pine Street Division Street to Salisbury Street

1.04 miles of hot mixed asphalt road resurfacing, including, drainage improvements, crush and shaping, concrete sidewalk, concrete curb and gutter, guardrail replacement, hot mixed asphalt paving and pavement

markings. 1/7/2011 0:00 1.12011 Superior MENOMINEE 55555 105935 County Road 338 K-3 Lane to CR346 Paving 1/7/2011 0:00 1.7162011 Superior ONTONAGON 66555 103202 Lake Shore Dr Village Limit-Bear Creek Reconstruct 9/2/2011 0:00 2.6912011 Superior ONTONAGON 66555 103211 Mud Creek Rd Rousseau Rd-Fox Rd Reconstruct 1/7/2011 0:00 2.4592011 Superior ONTONAGON 66555 39386 Sleepy Hollow Rd US45-Choate Rd Resurface 1/7/2011 0:00 3.222

2011 Superior ONTONAGON 66091 103212Federal Forest Highway

16 M38-County Line Resurface 1/7/2011 0:00 6.2442011 Superior SCHOOLCRAFT 75555 87618 County Road 433 US2-CR432 Resurface 1/7/2011 0:00 2.4332011 University CLINTON 19609 108801 Clark Road at Wood Rd Install traffic signal, add turn lanes, and permanent pavement markings. 9/2/2011 0:00 0

2011 University CLINTON 19609 108802 N Wright Road Wright RoadCulvert reconstruction and extension, shoulder widening, clearing, and slope

flattening. 9/2/2011 0:00 0

9

Page 10: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2012 University CLINTON 19400 112064 Clintonia Rd Price to Centerline resurface 12/2/2011 0:00 0.9792011 University EATON 23400 100188 Degroff St M-43 to Edwards Reconstruction and add non-motorized lanes 1/7/2011 0:00 0.249

2011 University EATON 23439 109071 Main Street Dunbar to Hartel and east to Dawn CtReconstruct with new curb, sidewalk improvmeents, drainage and utility

improvements 9/2/2011 0:00 0.52011 University HILLSDALE 30555 90372 S Main St Main St @ Center St, Waldron Reconstruct 1/7/2011 0:00 0.2572011 University HILLSDALE 30059 90373 Waldron Rd US12 to South 1.1 Miles Reconstruct 1/7/2011 0:00 1.1142012 University INGHAM 33403 112114 N Clippert St Saginaw to Grand River resurface 12/2/2011 0:00 0.0772011 University INGHAM 33061 108051 M-43 I69BL,M43 (SAGINAW) @ WAVERLY RD Signal MODERNIZATION to be let with road JN 106903 2/4/2011 0:00 0.001

2011 University JACKSON 38609 108819 Hawkins Road 4 various locationsBridge railing and bridge approach guardrail upgrade, concrete deck patching

and waterproofing. 9/2/2011 0:00 02011 University LENAWEE 46101 112479 US-12 US-12 at M-50 Renovation of the Hewitt House at the Walker Tavern State Historic Site 1/7/2011 0:00 0.041

2011 University LENAWEE 46417 109053 Bent Oak Avenue Riverside Avenue to North City LimitsNew road base, additional drainage and upgrades, curb gutter, road surface,

intersection reconstruction 9/2/2011 0:00 0.44

2011 University LENAWEE 46082 110743 M-50 from Main St to Norfolk Southern RR

Streetscape improvements include trees, benches, trash receptacles, decorative pedestrian lighting, decorative concrete sidewalk, stamped

bituminous crosswalks, storm water infiltration planters, and other streetscape amenities. ENH2010 00018 9/2/2011 0:00 0.123

2011 University LIVINGSTON 47065 101619 I-96 at Latson Road Removal of Rest Area for construction of New Interchange 9/2/2011 0:00 02011 University LIVINGSTON 47609 108826 W Grand River Road Grand River Avenue Add center left turn lane. 9/2/2011 0:00 02011 University MONROE 58171 104636 N Dixie North Dixie Rehhabilitate roadway 9/2/2011 0:00 0.62011 University MONROE 58609 108838 W Hurd Road Hurd Road Add center left turn lane. 6/3/2011 0:00 02011 University MONROE 58171 104612 E. Elm Street East Elm Street Rehabilitate Roadway 9/2/2011 0:00 0.82011 University SHIAWASSEE 76421 109187 W Oliver St M-52 to Washington and Chipman to Cedar Resurface with curb 4/1/2011 0:00 0.5642011 University State Wide 84916 110604 TSC wide TSC wide HMA crack treatment 3/4/2011 0:00 0.0012011 University State Wide 84916 110554 LANSING TSC AREA LANSING TSC WIDE Overband Crack Fill 3/4/2011 0:00 3.1082011 University State Wide 84916 110592 Regionwide TSC Wide Crack Treatment 3/4/2011 0:00 8.7672011 University WASHTENAW 81012 78850 M-52 over the River Raisin, Village of Manchester, Wash Deck replacement, full paint, abutment wall patching. 5/6/2011 0:00 02011 University WASHTENAW 81161 86157 Rawsonville Rd Milan-Oakville to Willow Rawsonville 9/2/2011 0:00 2.0172011 University WASHTENAW 81075 104548 Golfside Dr From Packard to Clark Rehabilitate Roadway 9/2/2011 0:00 0.9972011 University WASHTENAW 81075 112162 Cross St From River to Prospect Reconstruct Roadway 3/4/2011 0:00 0.45

Construction Projects $500,001 to $750,000

2011 Bay ARENAC 06002 102357 Arenac State Road At Rifle River, Arenac CountyBridge deck replacement, steel repairs, full painting along with related

approach work including hot mix asphalt paving and guardrail placement. 1/7/2011 0:00 02011 Bay BAY 09555 102731 W Pinconning Rd 9 Mile Rd-11 Mile Rd Reconstruct 9/2/2011 0:00 1.991

2011 Bay GENESEE 25003 102517 E Atherton Road At Thread River, City of BurtonBridge rehabilitation including a superstructure replacement, scour

countermeasures, approach paving and guardrail placement. 1/7/2011 0:00 02011 Bay GENESEE 25402 104212 North Saginaw Street Saginaw (N) Road Road resurface 9/2/2011 0:00 0.52011 Bay GENESEE 25402 104197 Coutant St Coutant Street Resurface 9/2/2011 0:00 1.42011 Bay GENESEE 25402 111964 East Flint St State Road to East City limit Resurface 9/2/2011 0:00 2.282011 Bay GENESEE 25402 104205 Davison Rd Davison Road Road resurface 9/2/2011 0:00 1.52011 Bay GENESEE 25402 104216 Silver Lake Road Lobdell to Linden City Limits Road resurfacing 9/2/2011 0:00 1.5532011 Bay GENESEE 25402 103968 E Bristol Rd Lapeer Road Road Resurface 9/2/2011 0:00 1

2012 Bay GENESEE 25019 108873S Grand Traverse

Street Over Thread Creek, City of Flint Bridge Rehabilitation, BHT 10/7/2011 0:00 0.056

2011 Bay GENESEE 25042 86978 I-69 under M-13

Expansion Joint Replacment, Deck Patching, Surface healer / sealer, concrete curb and gutter, Substructure repairs, Slab fascia/overhand repairs, slope

sealing, approaches, guardrail and concrete surface sealer on S01 of 25042. 1/7/2011 0:00 0.0492011 Bay GENESEE 25091 108628 M-15 Heritage Route, Genesee County M-15 Recreational Heritage Roue Trail Pathway Project 2/4/2011 0:00 0.442

10

Page 11: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2011 Bay LAPEER 44446 109178 Lake Nepessing Road Davison Road to John Conley Drive

Pulverize existing pavement, widen to 3 lane section, install drainage facilities, install curb and gutter, pave with HMA, perform pavement markings and

restoration 9/2/2011 0:00 0.599

2011 Bay MIDLAND 56416 111934 N. Custer Road Shoulders from Pinnacle Blvd to Monroe City Limit

Phase 1 of Monroe County Greenway - Reconstruction of paved, non-motorized bikeway along shoulders of road with single course mill and surface.

SAFETEA-LU Earmark MI306, HPP 3643 1/7/2011 0:00 1.112011 Bay State Wide 84914 111131 Region Wide Bay Region Permanent Pavement Markings - Special Markings 4/1/2011 0:00 02011 Bay TUSCOLA 79007 39287 N Bray Rd Willard-Barnes Resurface 1/7/2011 0:00 3.053

2011 Grand IONIA 34609 107994 Keefer Highway from. .5 mile s of Knox Rd to .5 mile n of Know Rd Widen and add paved shoulders, slope flattening, and fixed object removal. 9/2/2011 0:00 02011 Grand KENT 41401 104926 24th Avenue Byron Road to Ottogan Street Resurface 9/2/2011 0:00 3.0052012 Grand KENT 41010 108885 68th Street SE Over Plaster Creek, Kent County Bridge Rehabilitation - BHT 10/7/2011 0:00 02011 Grand KENT 41401 104933 8th Avenue Port Sheldon Street to 44th Street Reconstruct to 3 lanes 9/2/2011 0:00 0.542011 Grand KENT 41401 112368 Forest Hill Street Hall Street to Cascade Street Reconstruct and widen 3/4/2011 0:00 0.52011 Grand KENT 41401 104901 76th Street Eastern Street to Kalamazoo Street Reconstruct & Widen from 2 to 3 lanes 9/2/2011 0:00 1.005

2012 Grand MONTCALM 59012 106291 US-131 SB over Tamarack CreekDeep overlay, concrete approach replacement, beam end repairs,

substructure patching and repairing and painting pier columns 11/4/2011 0:00 02012 Grand MONTCALM 59010 108886 Fenwick Road Over Dickerson Creek, Montcalm County Bridge Rehabilitation, BHT 10/7/2011 0:00 0

2012 Grand MONTCALM 59012 106278 US-131 NB and SB over Kendaville RoadDeck patching, full paint, joint replacements, pin and hanger replacements,

beam repairs (heat straightening) and bearing replacements 11/4/2011 0:00 02011 Grand MUSKEGON 61407 104269 Airline Road I-96 to US-31 Structural HMA overlay 9/2/2011 0:00 0.5322011 Grand MUSKEGON 61407 104274 Laketon Avenue Henry Stree to Park Street Reconstruct 9/2/2011 0:00 0.4282011 Grand MUSKEGON 61555 90140 Maple Island Rd Sweeter Road to Ryerson Road Reconstruct 1/7/2011 0:00 2.9072011 Grand NEWAYGO 62555 105435 120th St Grant City Limits-Wisner Ave Reconstruct 1/7/2011 0:00 2.434

2011 Grand OCEANA 64555 90143 Peach Street Johnson St-W Main St, HartHot mix asphalt road reconstruction, machine grading, aggregate base,

concrete curb and gutter, storm sewer 1/7/2011 0:00 0.287

2012 Grand OTTAWA 70023 90100 I-196 BL At 92nd AveWork includes the construction of indirect left turn lanes and the closing of the

92nd Avenue through movement. 11/4/2011 0:00 0.3142012 Grand State Wide 84913 111569 TSC wide Muskegon TSC Safety upgrade traffic signals 12/2/2011 0:00 0.0012011 Metro MACOMB 50052 110768 M-3 Gratiot to I-94 Surfcace Milling with 1-1/2" Non-structural HMA Overlay 3/4/2011 0:00 0.623

2011 Metro MACOMB 50400 109653 23 Mile Road Areawide along 23 mile roadTraffic signal upgrades, wireless interconnect, vehicle/pedestrain detection,

and viideo surveillance. 2/4/2011 0:00 0

2011 Metro OAKLAND 63459 111831 12 Mile Road Coolidge Hwy to Woodward0.55 miles of hot mix asphalt cold milling and resurfacing, pavement repairs,

concrete curb and gutter, concrete sidewalk, and ADA ramps 2/4/2011 0:00 0.552011 Metro OAKLAND 63459 104713 S Adams Rd South Blvd to Auburn Resurface 9/2/2011 0:00 0.899

2011 Metro ST. CLAIR 77475 110793 Gladys to Water Gladys Street to Bridge Street, Marine City

Marine City will construct approximately 0.4 miles of non-motorized facilities. The proposed section will start at the Bridge to Bay Trail, cross the Belle River

and connect through Marine City and ending at the ferry dock on Bridge Street. ENH 09-071 4/1/2011 0:00 0.469

2011 Metro ST. CLAIR 77475 104691 Gratiot West of Airport Dr-Airport Dr Rehabilitate Roadway 9/2/2011 0:00 1.1692011 Metro ST. CLAIR 77111 106551 I-94/I-69 I-94/I-69 New Wetland Area 2/4/2011 0:00 02012 Metro State Wide 84917 105437 TSC wide Port Huron TSC Non-Freeway Signing Upgrade 11/4/2011 0:00 41.0242011 Metro WAYNE 82022 110747 I-94 Pelham Rd. to E. of M-39 Concrete Pavement 9/2/2011 0:00 1.192011 Metro WAYNE 82195 110721 I-75 US-12 to M-3 Concrete Pavement Restoration 3/4/2011 0:00 2.0562011 Metro WAYNE 82051 88833 US-24 over Smith Creek Culvert Replacement 4/1/2011 0:00 0.094

2011 Metro WAYNE 82071 106971 M-85 MLK, West Grand, Fort, & Trumbull, City of Detroit

The City of Detroit, in partnership with the Southwest Detroit Business Association and Greater Corktown Development Corporation, will construct

approximately 18.34 miles of bicycle path connecting the Corktown and Mexicantown neighborhoods in the southwe 4/1/2011 0:00 1.29

11

Page 12: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2011 Metro WAYNE 82457 112341Huroc Park to

Oakwoods Huroc to Oakwoods, City of Flat Rock

The City of Flat Rock in partnership with the Huron-Clinton Metropolitan Authority will construct a non-motorized path from Huron Park in Flat Rock to the Oakwoods Metropark. This project will be the final link on the Downriver

Linked Greenways Intiative 9/2/2011 0:00 02011 Metro WAYNE 82021 111891 I-94 2 structures, I-94 at Hannan Road Epoxy overlay, jt replacement 2/4/2011 0:00 0.1572011 North ANTRIM 05555 54170 CR620/Alba Hwy US131-M66 Reconstruction 1/7/2011 0:00 4.352011 North GRAND TRAVERSE 28420 109205 Park Dr Cass Road to South Airport Road Pavement widening and inclusion of paved shoulders 9/2/2011 0:00 0.1062011 North IOSCO 35465 109118 Houghton View Dr M-55 to M-55 HMA paving, shoulders, trenching, drainage, aggregate shoulders 9/2/2011 0:00 3.472011 North KALKASKA 40555 105602 Ingersoll Rd SW Puffer Rd-M66 Reconstruct 1/7/2011 0:00 1.832011 North LAKE 43555 103065 E Old M 63 Hawkins Road to Frank Smith Road Reconstruct 1/7/2011 0:00 2.479

2011 North OGEMAW 65555 89741 Valley Street E Houghton St-Griffin St, West Branch

0.49 mi of hot mix asphalt road reconstruction, machine grading, aggregate base, concrete curb and gutter, storm sewer, storm water treatment system,

water main 2/4/2011 0:00 0.4762011 North OSCEOLA 67555 106409 Mackinaw Trl W VL-16 Mile Road, LeRoy Reconstruct 1/7/2011 0:00 1.0312011 North OSCEOLA 67016 111237 US-131 South County Line to north of US-10 Guardrail installation and upgrading 9/2/2011 0:00 5.3492012 North OSCEOLA 67001 108902 200th Avenue Over Rose Lake Outlet, Osceola County Bridge Replacement, BRT 10/7/2011 0:00 02012 North OSCEOLA 67013 108901 190th Avenue Over Hersey River, Osceola County Bridge Replacement, BRO 10/7/2011 0:00 0

2011 North OTSEGO 69486 109102West Otsego Lake

Drive Cottage to Mancelona & Lake Manuka to St. JohnCrush and shape, land widening and shoulder pavement, minor clearing, HMA

resurface, approach improvements, slope restoration 3/4/2011 0:00 1.752011 North State Wide 84912 111125 TSC Wide Alpena TSC Permanent Pavement Markings 4/1/2011 0:00 02011 North State Wide 84912 104493 TSC Wide Osceola & Missaukee Counties Non-Freeway Signing Upgrade 8/5/2011 0:00 51.9392011 North State Wide 84912 111137 TSC Wide Cadillac TSC Permanent Pavement Markings 3/4/2011 0:00 02011 North State Wide 84912 109859 Traverse City TSC Traverse City TSC Non-Freeway Signing Upgrade 2/4/2011 0:00 57.037

2011 North WEXFORD 83061 87218 US-131 BR over Clam River, CadillacDeck Replacement, Complete Paint, Steel Beam End Repairs, Concrete

Patching, Approach Slabs 2/4/2011 0:00 0.2922012 Southwest ALLEGAN 03041 111645 M-222 M-89 north to Grand Ravine Drive in Allegan Cold Mill and HMA Overlay with Sidewalk Ramp ADA Upgrades 12/2/2011 0:00 1.004

2011 Southwest ALLEGAN 03014 102274 58th Street At Kalamazoo River, Allegan County

Bridge Rehabilitation 58th St over Kalamazoo River�Deck overlay, deck patching, joint replacement, bridge rail replacement,

approach work and maintenance of traffic�2/4/2011 0:00 0

2011 Southwest ALLEGAN 03111 108606 US-131 under 106 th AvenueSubstructure repair, deck fascia patching, concrete deep overlay, and railing

replacement. 6/3/2011 0:00 0.4362012 Southwest ALLEGAN 03034 109738 I-196 Southwest Region Freeway Signing Upgrade 12/2/2011 0:00 12.1162011 Southwest BERRIEN 11071 89972 N Coloma Rd Little Paw Paw Lake Rd-Hagar Shore Rd Reconstruct 1/7/2011 0:00 0.9952011 Southwest BERRIEN 11400 100086 Lincoln Ave John Beers to Maiden Resurface 1/7/2011 0:00 2.52011 Southwest BERRIEN 11400 100026 W Bertrand Rd Red Bud Trail to Weaver Resurface 1/7/2011 0:00 3.8412011 Southwest BERRIEN 11071 109706 M-140 M-62 to Napier Road Multiple Course Micro-Surface with overband crack fill pretreatment. 1/7/2011 0:00 7.462011 Southwest BERRIEN 11555 89971 Cleveland Ave Linco Rd-Lemon Creek Reconstruct 1/7/2011 0:00 1.942

2011 Southwest BRANCH 12555 89436 N Main St RR-VL, Quincy

0.50 miles of aggregate base, project cleanup, drainage structures, hot mix asphalt,sidewalk, pavement markings, traffic control, sanitary sewer and water

main. 1/7/2011 0:00 0.292011 Southwest BRANCH 12034 108711 I-69 under Jonesville Road Abutment repair, Full paint, End joint replacement 7/8/2011 0:00 0.372012 Southwest KALAMAZOO 39405 110405 Romence Rd Constitution to Westnedge Reconstruction with 4" overlay, spot curb & gutter repair 10/7/2011 0:00 0.7052011 Southwest KALAMAZOO 39400 112095 12th Street at Texas Drive/Milmam Ave Construct a modern roundabout CMAQ Grant #11012 3/4/2011 0:00 0

2011 Southwest ST. JOSEPH 78443 109204South Constantine

Street Broadway to MillardPavement rehab, curb and gutter, storm sewer, sidewalk ramp, sanitary sewer

replacement, and water main installation 9/2/2011 0:00 0.512011 Southwest State Wide 84915 111142 TSC Wide Marshall TSC Permanent Pavement Markings 2/4/2011 0:00 02011 Southwest State Wide 84915 111126 TSC Wide Coloma TSC Permanent Pavement Markings 3/4/2011 0:00 02011 Southwest VAN BUREN 80555 89977 County Road 652 CR354-CR358 Resurface 1/7/2011 0:00 1.793

2011 Southwest VAN BUREN 80449 109206 Wells Street 300 ft east of Bailey Ave to Blue Star

0.19 miles of road reconstruction, including excavation, storm sewer, sanitary sewer, watermain, guardrail, retaining wall, hot mix asphalt surfacing, concrete

curb and gutter, bicycle path, and ADA ramps 2/4/2011 0:00 0.19

12

Page 13: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2011 Superior BARAGA 07019 106034 Plains Rd S Randolph Rd-Menge Creek Rd Reconstruct 9/2/2011 0:00 2.8072011 Superior CHIPPEWA 17034 107231 I-75 Easterday Avenue over I-75, Sault Ste. Marie Deep Overlay 1/7/2011 0:00 0.2542011 Superior CHIPPEWA 17555 89915 S Mackinac Trl M28-12 Mile Rd Reconstruct 1/7/2011 0:00 3.532011 Superior DICKINSON 22609 108803 Lincoln Street at US-141 Intersection realignment. 9/2/2011 0:00 02011 Superior HOUGHTON 31013 110196 M-26 over Gooseneck Creek, two branches Replacement of two existing culverts 3/4/2011 0:00 0.911

2011 Superior MACKINAC 49021 110311 US-2 US-2 and M-117Cold Milling HMA surface with single course HMA resurfacing, aggregate

shoulder, pavement marking, maintaining traffic. 1/7/2011 0:00 2.167

2012 Superior MARQUETTE 52003 109303 County Road Ch Over Middle Branch Escanaba River, Marquette CoBridge Replacement,�

BRO, Off-system 10/7/2011 0:00 0

2011 Superior MARQUETTE 52004 105348 County Road 565 At Bear Creek, Marquette CountyBridge removal and replacement along with related approach work including

hot mix asphalt paving and guardrail placement. 3/4/2011 0:00 02011 Superior ONTONAGON 66555 78912 Bond Falls Rd Ontonagon River-Calderwood Resurface 9/2/2011 0:00 5.6682011 Superior ONTONAGON 66079 72710 Pori Rd Rousseau-Co Line Reconstruct 9/2/2011 0:00 2.4772012 Superior State Wide 84911 105747 Escanaba TSC Escanaba TSC Non-Freeway Signing Upgrade 12/2/2011 0:00 62.222011 University EATON 23071 110041 Main Street Nelson St. to Hartel Rd. (M-100), Potterville Streetscape Improvements, ENH 09037 2/4/2011 0:00 0

2011 University INGHAM 33400 111427 E Jolly Road Aurelius to Dunckel0.54 miles of hot mix asphalt cold milling, hot mix asphalt resurfacing with

pavement markings and concrete sidewalk improvements. 2/4/2011 0:00 0.5112012 University INGHAM 33400 112111 S Washington Rd Holt to Willoughby resurface 12/2/2011 0:00 1.0352012 University INGHAM 33400 112109 Cedar St Dallas to Aurelius resurface 12/2/2011 0:00 0.8492012 University JACKSON 38409 90128 E High St Cooper to Losey Mill and Overlay, curb repairs 11/4/2011 0:00 0.622011 University LENAWEE 46555 100214 E Weston Rd Pence Rd-Neuroth Rd Resurface 1/7/2011 0:00 1.036

2011 University LIVINGSTON 47014 90273 US-23 SB over Hyne RoadDeep concrete overlay, railing and fascia replacement and approach slab

replacement. 3/4/2011 0:00 3.236

2011 University LIVINGSTON 47014 90275 US-23 NB over Hyne RoadDeep concrete overlay, replacement of bridge railing and fascias, and

approach slab replacement. 3/4/2011 0:00 3.234

2011 University LIVINGSTON 47555 112148 Old US 23 Hwy From Hogan Road to White Lake Road

1.39 miles of HMA cold milling, HMA crushing and shaping, HMA resurfacing, machine grading, and aggregate shoulders�

1/7/2011 0:00 1.39

2011 University LIVINGSTON 47014 90266 US-23 under Spencer Road

Concrete deck patching, railing and fascia replacement, structural steel repairs, partial painting of structural steel, concrete approaches, and concrete

substructure patching. 2/4/2011 0:00 0.613

2011 University MONROE 58052 103333 US-24 (Telegraph) US-24 (Telegraph) at Hurd Rd. Construct offset right turn lane for NB right turn at US-24/Hurd intersection 6/3/2011 0:00 0.13

2011 University SHIAWASSEE 76007 89715 West Hibbard Road At Bear Creek, Shiawassee CountyBridge replacement with a 21 inch Prestressed concrete box beams, placing

rip-rap, approach work and maintaining traffic. 2/4/2011 0:00 0

2011 University SHIAWASSEE 76012 89718 Shaftsburg Road At Bear Creek, Shiawassee CountyBridge replacement with a 21 inch Prestressed concrete box beams, placing

rip-rap, approach work and maintaining traffic. 2/4/2011 0:00 0

2012 University SHIAWASSEE 76014 109317 Lennon Road Over Rush Bed Creek, Shiawassee CountyBridge replacement�

BRO, Off-system, SN. 12974 10/7/2011 0:00 0.632

2011 University SHIAWASSEE 76041 87176 M-71 M-71 over Holly Drain, Shiawassee CountyDeck replacement & widening for shoulders, steel repairs, full paint,

substructure repairs, and approaches 2/4/2011 0:00 02011 University State Wide 84916 111128 TSC Wide Jackson TSC Permanent Pavement Markings 3/4/2011 0:00 0

2011 University WASHTENAW 81609 108861 Waters Road from S. Wagoner Rd to Honeysuckle DrVertical curve modification, removal of fixed objects from clear zone, slope

flattening, and drainage improvements. 9/2/2011 0:00 02011 University WASHTENAW 81132 103352 US-12 US-12BR from Wiard to Holmes Fill in sidewalk gaps and install new pedestrian signal(HAWK) 3/4/2011 0:00 0.7172011 University WASHTENAW 81103 105659 M-14 Washtenaw County Freeway Signing Upgrade 9/2/2011 0:00 8.684

2011 University WASHTENAW 81012 101692 M-52 Duncan to Chi-Bro Pk; Main St. from Elton to M-52Streetscape elements include brick pavers, decorative level lighting, trees,

trash recepticles, benches and other street amenities. ENH 2007 036 3/4/2011 0:00 0.188

Construction Projects $750,001 to $1 Million2011 Bay GENESEE 25101 110117 M-57 WCL of Montrose to Brent Run Ck Mill, HMA Overlay, Joint Repairs, ADA Ramps 3/4/2011 0:00 2.577

13

Page 14: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2011 Bay GENESEE 25402 103971 Lippincott Blvd Lippincott Bouleverd Road Resurface 9/2/2011 0:00 1.12011 Bay GENESEE 25402 104204 W Coldwater Rd Coldwater Road Road resurface 9/2/2011 0:00 12011 Bay GENESEE 25402 104217 Van Slyke Road Maple to Bristol Road resurfacing 9/2/2011 0:00 1.0042011 Bay GENESEE 25402 104209 Perry Rd Perry Road Road resurface 9/2/2011 0:00 1.2032011 Bay GENESEE 25072 109865 M-54 Atherton Rd to Lippincott Rd Add sidewalks 9/2/2011 0:00 1.0072011 Bay GENESEE 25402 104215 Silver Lake Road McCaslin Lake to Lobdell Road resurface (200,965 5307Flex) 9/2/2011 0:00 2.092011 Bay GENESEE 25402 104208 Pasadena Ave Pasadena Avenue Road resurface 9/2/2011 0:00 1.12012 Bay GENESEE 25011 108874 Richfield Road over Kearsley Creek, Genesee County Bridge Rehab - BHT 10/7/2011 0:00 0

2012 Bay GRATIOT 29433 109063 Superior Street Luce to Charles0.49 miles of hot mix ashpalt reconstruction, concrete curb and gutter,

concrete sidewalk, ADA ramps, storm sewer, and water main. 12/2/2011 0:00 0.6

2011 Bay GRATIOT 29013 105293 Bridge Avenue At Pine River, City of AlmaBridge superstructure replacement and pier removal along with related

approach work including hot mix asphalt paving and guardrail placement. 2/4/2011 0:00 02011 Bay HURON 32021 90241 M-142 M-142 over Nettle Run Culvert replacement 8/5/2011 0:00 0

2011 Bay ISABELLA 37555 89713 Winn Road Wing Rd to Saratoga Springs Rd0.95 mi of hot mix asphalt resurfacing, base crushing and shaping, aggregate

shoulders, peat excavation, swamp backfill, drainage, slope restoration 4/1/2011 0:00 1.176

2012 Bay ISABELLA 37006 108878 East Beal City Road over S. B. Salt River, Isabella CountyBridge Replacement - BRO�

10/7/2011 0:00 02012 Bay LAPEER 44012 102796 M-24 over Plum Creek Bridge Replacement 12/2/2011 0:00 1.0442011 Bay SAGINAW 73073 110393 M-47 Shattuckville Road to Church Street Concrete pavement repairs, spall repairs, joint/crack sealing 1/7/2011 0:00 6.0922011 Bay SAGINAW 73062 109601 Thomas Twp Trail Saginaw Valley Trail to Shields Drive Construct non-motorized path. ENH 2009 096 6/3/2011 0:00 02012 Bay SAGINAW 73009 108881 South Merrill Road Over South Branch Bad River, Saginaw Co Bridge Replacement - BRT 10/7/2011 0:00 02011 Bay SAGINAW 73404 103899 Carrollton Rd Carrollton Road Mill and pave 9/2/2011 0:00 2.252011 Grand KENT 41401 112075 Breton Avenue 28th Street to Burton Street Resurface 2/4/2011 0:00 12011 Grand KENT 41081 108112 Foreman Street Foreman Rd to Vergennes Rd, City of Lowell Non-motorized Trail, ENH09085 2/4/2011 0:00 1.035

2011 Grand KENT 41024 106669 I-96 under Whitneyville RoadDeep overlay, full paint, substructure repairs, bearing replacements, approach

replacement 3/4/2011 0:00 0

2011 Grand KENT 41401 104928 Lafayette Avenue Wealthy Street to State Street

0.3 miles of hot mixed asphalt road reconstruction, including, concrete curb and gutter,drainage structues, sanitary sewer, watermain, storm sewer, street

lightiing, pavement markings and landscaping. 2/4/2011 0:00 0.33

2011 Grand KENT 41025 109666 I-96 WB at Cascade Road(CMAQ GRANT NO. 10081) Extend the I-96 Westbound on Ramp to east of

M-21. 3/4/2011 0:00 0.651

2011 Grand MONTCALM 59117 102229Fred Meijer Heartland

Trail Pedestrian trail outside Greenville City limits 5.2 miles of non-motorized hot-mix asphalt pathway. 6/3/2011 0:00 02012 Grand MUSKEGON 61007 108887 Pontaluna Road Over Norris Creek, Muskegon County Bridge Replacement, BRO 10/7/2011 0:00 02011 Grand OCEANA 64012 106096 US-31 BR 50' East of Wythe Street Replace culvert using lightweight fill and reconstruct affected roadway. 6/3/2011 0:00 0

2012 Grand OTTAWA 70023 109753 M-121 M-121 over the Rush Creek Deep overlay, beam repairs, fascia paint, substructure repairs, approaches 12/2/2011 0:00 0

2011 Metro MACOMB 50400 109654 10 Mile Road Areawide along 10 Mile RoadTraffic signal upgrade, wireless interconnect, vehicle/pedestrain detection, and

video surveillance. 1/7/2011 0:00 0

2011 Metro MACOMB 50003 102598 26 Mile Road At Deer Creek, Macomb CountyBridge removal and replacement along with related approach work including

hot mix asphalt paving and guardrail placement. 3/4/2011 0:00 02011 Metro OAKLAND 63459 104715 Crooks Rd Equity to Big Beaver Resurface 9/2/2011 0:00 1.235

2011 Metro OAKLAND 63459 107202 Walton Boulevard From east of Meadowbrook Dr to east of Avonwood St

0.76 miles of concrete pavement cracking and seating, cold milling concrete pavement, concrete pavement repairs, hot mix asphalt resurfacing, drainage

structure work, concrete curb and gutter, ADA ramps, and signal work 2/4/2011 0:00 0.7262011 Metro ST. CLAIR 77023 108625 I-69 Port Huron TSC Area Freeway Signing Upgrade 3/4/2011 0:00 18.748

2011 Metro ST. CLAIR 77013 102654 Kilburn Road At Plum Creek, St. Clair CountyBridge removal and replacement along with related approach work including

hot mix asphalt paving and guardrail placement. 1/7/2011 0:00 0

2011 Metro ST. CLAIR 77023 110774 I-69 BL 24th St. to JCT I-94BLSuface milling with 1-1/2" HMA Non-structural Overlay (24th St. to 10th St.)

and Multiple course microsurfacing (10th St. to JCT I-94BL) 5/6/2011 0:00 1.404

14

Page 15: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2012 Metro ST. CLAIR 77012 108898 Lakeshore Road Over Carrigan Drain, St Clair County Bridge Replacement, BRT 10/7/2011 0:00 02011 Metro ST. CLAIR 77023 110772 I-69 BL 32nd Street to 24th Street Concrete Pavement Restoration 4/1/2011 0:00 2.4952011 Metro State Wide 84917 111136 Region Wide Metro Region Permanent Pavement Markings - Special Markings 2/4/2011 0:00 02011 Metro State Wide 84917 107608 Regionwide Various Locations in the Metro Region ITS System Modernizations 9/2/2011 0:00 02011 Metro WAYNE 82457 112328 Vernor Hwy Ferney to Riverside Resurface and Overlay 4/1/2011 0:00 0.32

2011 Metro WAYNE 82211 84020 M-85 NB and SB over Sexton Kilfoil DrainB03-1: Bridge replacement�B03-2: Bridge replacement 7/8/2011 0:00 0

2011 Metro WAYNE 82371 110723 CONN 024 Carter Road to I-75 Surface Milling with 1-1/2" Non-structural HMA Overlay 4/1/2011 0:00 1.6112011 Metro WAYNE 82457 104681 Wyoming From Eagle Pass to Michigan Resurface and Reconstruct (under bridge) 9/2/2011 0:00 1.6

2011 North BENZIE 10032 110018 US-31 Goose Road to Covey RoadCold Mill and resurface traveled lanes, detail 8 joint repairs with misc.

pavement and shoulder repairs. 2/4/2011 0:00 3.2982011 North CRAWFORD 20014 110603 I-75 NB I-75 NB HMA Cold Milling & Overlay 3/4/2011 0:00 3.9332011 North GRAND TRAVERSE 28555 76683 N Garfield Rd Potter-Birmley Reconstruct 1/7/2011 0:00 1.708

2011 North LEELANAU 45031 108626 M-109 Sleeping Bear Dunes National ParkLeelanau Scenic Heritage Route Trailway Project�

3/4/2011 0:00 3.2032012 North OGEMAW 65041 106313 I-75 SB over Br of Laporte Creek Culvert Replacement 10/7/2011 0:00 0.12011 North OGEMAW 65041 106152 I-75 NB over Br of Laporte Creek Complete replacement 6/3/2011 0:00 1.2042011 North OSCEOLA 67555 108848 Mackinaw Trl from 14 Mile Rd to 15 Mile Rd Roadway reconstruction. 9/2/2011 0:00 1.336

2011 North OTSEGO 69014 110484 I-75 2 Bridges on I-75, Vanderbilt

Bridge in Vanderbilt contains joint replacement with deck patching. Bridge north of Vanderbilt are joint replacement and railing replacement with some

minor pier patching. 3/4/2011 0:00 3.0722012 North PRESQUE ISLE 71001 108903 W 638 Highway Over Black River, Presque Isle County Bridge Replacement, BRO 10/7/2011 0:00 02011 North State Wide 84912 111127 TSC Wide Traverse City TSC Permanent Pavement Markings 2/4/2011 0:00 02011 North State Wide 84912 111132 TSC Wide Grayling TSC Permanent Pavement Markings 3/4/2011 0:00 02012 North State Wide 84912 105441 TSC wide Alpena TSC area Non-Freeway Signing Upgrade 10/7/2011 0:00 79.062012 Southwest ALLEGAN 03034 111428 I-196 I-196 NB over Kalamazoo River P&N replacement, Zone paint, Resetting tipped rockers, Abutment repair. 12/2/2011 0:00 0.6812012 Southwest ALLEGAN 03019 109278 30th Street Over Little Rabbit River, Allegan County Bridge rehabilitation, BRT, On-system 10/7/2011 0:00 02011 Southwest BERRIEN 11111 109716 I-196 I-196 NB & SB over CSX RR Concrete deep overlay, Railing replacement. 1/7/2011 0:00 0.3942012 Southwest BERRIEN 11057 108921 US-31 Southwest Region Freeway Signing Upgrade 10/7/2011 0:00 21.166

2011 Southwest BRANCH 12555 89435 Copeland Rd Fremont Road to Ray-Quincy RoadWiden 1 foot each side, crush and shape, place 2 courses HMA, aggregate

shoulders, related drive approach work. 9/2/2011 0:00 2.5112012 Southwest CALHOUN 13411 110527 B Dr N 8 1/2 Mi Rd to 11 Mi Rd Resurface 10/7/2011 0:00 2.772011 Southwest CALHOUN 13555 89448 22 Mile Rd M60-T Drive S Resurface 9/2/2011 0:00 2.0092012 Southwest KALAMAZOO 39405 89652 9th St KL Avenue to M-43 Mill & resurface; turn lanes lengthened and tapers adjusted 10/7/2011 0:00 1.062012 Southwest KALAMAZOO 39405 110406 Romence Pkwy Lovers Lane to Sprinkle Road Reconstruction with 4" overlay; spot curb & gutter repair 10/7/2011 0:00 1.7512011 Southwest State Wide 84915 111139 TSC Wide Kalamazoo TSC Permanent Pavement Markings 4/1/2011 0:00 0

2011 Southwest VAN BUREN 80493 89604West Red Arrow

Highway 39th to west Village limits Resurface 9/2/2011 0:00 02011 Superior BARAGA 07011 110599 US-141 US-141, US-41, M-28 Baraga and Houghton Counties Micro-Surfacing 3/4/2011 0:00 15.183

2012 Superior CHIPPEWA 17011 109302 Riverside Drive Over Mission Creek, Sault Ste MarieBridge Replacement�

BRT, On-system, SN. 1676 10/7/2011 0:00 02011 Superior HOUGHTON 31052 110601 US-41 US-41, Houghton County HMA Mill and Overlay 3/4/2011 0:00 2.025

2012 Superior MACKINAC 49025 109986 I-75 Charles Moran and Bay Road OverpassesS05 and S06: Complete Painting, Joint Replacement, and Maintaining Traffic.

S11 and S12: Complete Painting and Maintaining Traffic. 10/7/2011 0:00 4.967

2011 Superior MENOMINEE 55002 105347 F4 Lane At Big Cedar River, Menominee CountyBridge removal and replacement along with related approach work including

hot mix asphalt paving and guardrail placement. 3/4/2011 0:00 02011 Superior SCHOOLCRAFT 75011 110303 M-149 US-2 to State Park Entrance Double Chip Seal 1/7/2011 0:00 10.62011 Superior State Wide 84911 110425 Various Eastern Half of the Superior Region HMA Crack Seal 5/6/2011 0:00 0.0012011 Superior State Wide 84911 110692 Various Western UP HMA Crack Treatment 5/6/2011 0:00 0.0012011 Superior State Wide 84911 105742 Newberry TSC Newberry TSC area Non-freeway Signing Upgrade 3/4/2011 0:00 88.7262011 University CLINTON 19003 109316 S Dewitt Road Over Stony Creek, Clinton County Bridge ReplacementBRT, On-system, SN. 1931 1/7/2011 0:00 02012 University EATON 23007 109319 E Kalamo Highway Over Battle Creek River, Eaton County Bridge Replacement, BRO, Off-system, SN. 2393 10/7/2011 0:00 0.147

15

Page 16: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2011 University EATON 23400 100189 E Saint Joe Hwy Canal to Broadbent Reconstruct and add dedicated turn lanes at intersection 1/7/2011 0:00 0.9962011 University EATON 23111 110395 M-188 M-99 TO VFW HOME HMA Cold mill and resurface 3/4/2011 0:00 4.55

2011 University HILLSDALE 30012 105361 Camden Road At Laird Creek, Hillsdale County

Removal of existing structure, bridge replacement with precast 3-sided culvert, foundation excavation, slope protection, approach work and maintaining

traffic. 3/4/2011 0:00 0

2011 University LENAWEE 46062 104546 US-223 S. Monroe St to Elm St in the Village of Blissfied

Streetscape enhancement work including sidewalk, decorative street lighting, decorative paving, trees, benches, and trash receptacles.�

ENH 2008-00010 2/4/2011 0:00 0.4972011 University LENAWEE 46062 87182 US-223 over Gall County Drain, Lenawee County Culvert replacement, approach work, scour countermeasures 2/4/2011 0:00 0

2011 University LIVINGSTON 47013 90259 US-23 2 bridge locations along US-23

Deep concrete overlay, structural steel repairs, approach pavement replacement, full painting of structural steel, and substructure concrete

patching. 2/4/2011 0:00 2.702

2011 University MONROE 58004 102625 Dennison Road At N Drain Middle Branch Macon River, Monroe Co

Bridge Replacement, BRT�Bridge removal and replacement with 27 inch prestressed concrete box

beams, structure backfill, slope protection, approach work and maintaining traffic. 1/7/2011 0:00 0

2011 University MONROE 58171 104651 W 14 Mile Rd 14 Mile Road Resurface 9/2/2011 0:00 0.9

2011 University SHIAWASSEE 76011 109991 M-52 over Vermillion CreekCulvert replacement and associated approach work.�

7/8/2011 0:00 1.496

2011 University SHIAWASSEE 76023 90264 I-69 under State Road, Shiawassee County

Deep overlay, full paint, pin and hanger replacement, high load hit repairs, substructure repairs, thrie beam retrofit, new approaches, concrete surface

coating and maintaining traffic. 2/4/2011 0:00 3.4932011 University State Wide 84916 108052 Region-wide Up to 5 locations in Univ. region requiring ROW Safety upgrade of traffic signals 9/2/2011 0:00 02011 University State Wide 84916 105753 Jackson TSC Jackson TSC Non-Freeway Signing Upgrade 6/3/2011 0:00 76.6342012 University WASHTENAW 81002 109322 Willis Road Over W Branch Paint Creek, Washtenaw County Bridge Replacement, BRT, On-system, SN 10967 10/7/2011 0:00 0.2932011 University WASHTENAW 81406 104566 Whittaker At Merritt Intersection Improvement 9/2/2011 0:00 0

Construction Projects $1 Million to $2.5 Million2011 Bay ARENAC 06073 110396 US-23 M-65 to Santiago Road Mill & HMA Overlay 1/7/2011 0:00 5.01

2012 Bay ARENAC 06111 89615 I-75 2 locations along I-75, Arenac County

S07: Deep Overlay, Full Depth Patching, PCI Repair and Thrie Beam Retrofit, Approaches�

S13: Deep Overlay, Full Depth Patching, P&H Replc, Partial Pt, Thrie Bm Retro, Approaches 11/4/2011 0:00 0.72

2011 Bay BAY 09035 108781 I-75 Two Bridges in Bay County

09035-B04: Deep Overlay, Widening, Railing Replacement, Pier Patching, Steel Repairs, Paint and Approach Work�

09035-B10: Deep Overlay, Widening, Railing Replacement, Pier Patching, Steel Repairs, Paint and Approach Work 3/4/2011 0:00 0.824

2012 Bay BAY 09033 84909 M-13 over Johnson Creek Structure Replacment 11/4/2011 0:00 02011 Bay BAY 09408 102255 East Midland Road 2 Mile Rd to 3 Mile Rd Reconstruct and add center turn lane 9/2/2011 0:00 0

2012 Bay CLARE 18034 107498 US-27 US-127 over US-127 BR

18034-S05-1: Deep Overlay, Full Depth Patching, Full Paint, Substructure and Barrier Patching, Concrete Surface Sealer�

18034-S05-2: Deep Overlay, Full Depth Patching, Full Paint, Substructure and Barrier Patching, Concrete Surface Sealer 10/7/2011 0:00 0.47

2011 Bay GENESEE 25402 104218 Washburn Road Sister Lake Road to Otter Lake Village Limits Road Reconstruction 9/2/2011 0:00 1.5082011 Bay GENESEE 25402 103966 N Belsay Rd Belsay Road Road Resurface 9/2/2011 0:00 0.82011 Bay GENESEE 25003 102516 Maple Avenue At Thread River, City of Burton Bridge Replacement, on-system, BRT 3/4/2011 0:00 02011 Bay GENESEE 25402 103711 Kearsley St. Crapo St. to Robert T. Longway Blvd Streetscape improvements, ENH 07046 5/6/2011 0:00 02011 Bay GENESEE 25402 104199 S Ballenger Hwy Ballenger Highway Road reconstruction (5307 Flex) 9/2/2011 0:00 1.22011 Bay GENESEE 25402 103965 E Atherton Rd Atherton Road Road Resurface 9/2/2011 0:00 12011 Bay GENESEE 25081 46973 M-21 I-75 to Miller Road Mill and HMA Overlay, Joint Repairs and ADA Ramp Upgrades 3/4/2011 0:00 2.3812011 Bay GENESEE 25402 104206 Fenton Rd Fenton Road Road resurface 9/2/2011 0:00 2

16

Page 17: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2012 Bay GRATIOT 29006 108875 East Washington Road over Bad River, Gratiot County Bridge Replacement - BRT 10/7/2011 0:00 02011 Bay HURON 32021 100745 M-142 M-142 over Pigeon River Bridge Replacement 8/5/2011 0:00 02012 Bay ISABELLA 37005 108877 West River Road over N. B. of Chippewa River, Isabella Co Bridge Replacement - BRT 10/7/2011 0:00 0

2011 Bay ISABELLA 37012 112073 US-127 BR High Street northerly to North Mission StreetCold milling, HMA overlay, joint repairs, ADA sidewalk ramp upgrades, and

other miscellaneous work. 3/4/2011 0:00 1.482

2011 Bay LAPEER 44004 105296 Castle Road At North Branch Flint River, Lapeer CountyBridge removal and replacement, approach work including hot mix asphalt

paving and guardrail placement. 4/1/2011 0:00 02012 Bay LAPEER 44012 90239 M-24 over Abandoned CR Railroad Remove structure and replace with a culvert 12/2/2011 0:00 0.602

2011 Bay LAPEER 44044 108919 I-69 4 Bridges in Lapeer County

44044-S16: Bowman Road over I-69 - Full Paint, Expansion Joints, Concrete Approaches, Curb and Gutter, Guardrail and Concrete Surface Sealer �

44044-S17: Bristol Road over I-69 - Full Paint, Expansion Joints, Concrete Approaches, Curb and Gutter, Guardrai 3/4/2011 0:00 2.551

2012 Bay SAGINAW 73001 105295 Bishop Road At Miller Drain, Saginaw County Bridge Replacement 10/7/2011 0:00 02012 Bay SAGINAW 73025 108879 Frost Road Over Swan Creek, Saginaw Co Bridge Replacement - BRT 10/7/2011 0:00 0

2012 Bay SAGINAW 73111 88245 I-75 under Janes Road and Wadsworth Road Deck replacement, full paint, substructure repairs, slope paving, approaches 11/4/2011 0:00 0.3972011 Bay SAGINAW 73900 105391 Countywide Saginaw Countywide Safety upgrade of traffic signals 4/1/2011 0:00 0.1092011 Bay State Wide 84914 110292 Various 4 Locations in Sanilac and Huron Counties Double Chip Seal 1/7/2011 0:00 25.432011 Bay State Wide 84914 111129 Region Wide Bay Region Permanent Pavement Markings - Long Lines 3/4/2011 0:00 0

2012 Bay TUSCOLA 79042 100622 M-46 M-46 over Sucker Cr and M-25 over Harbor Beach Cr

B01-79042 Bridge replaced with three sided culvert�B01-39092 Bridge replaced with CFRP composite arch tubes type culvert

construction (bridge in a backpack) 11/4/2011 0:00 0

2011 Grand IONIA 34043 87157 I-96 Saranac Rest Area east to M-66Full depth concrete transverse, longitudinal joint repairs and spall repairs on I-

96. Surface milling with non-structural HMA overlay on ramps. 2/4/2011 0:00 5.0822011 Grand KENT 41131 87397 US-131 I-196 North to Ann Street Replace Freeway Lighting 3/4/2011 0:00 1.4422011 Grand KENT 41062 109765 M-11 At Ivanrest & Byron Center Avenues Intersection reconstruction 9/2/2011 0:00 0.1432011 Grand KENT 41029 108907 I-196 M-11 east to The Grand River Surface Milling with Non-Structural HMA Overlay 1/7/2011 0:00 3.9842011 Grand KENT 41401 104907 4 Mile Road Baumhoff to East of Bristol Widen, Reconstruct 9/2/2011 0:00 0.5122011 Grand KENT 41401 112428 Chicago Drive SW From Division to Ottawa Streetscape Improvements, ENH10019 8/5/2011 0:00 02011 Grand KENT 41401 104898 10 Mile Road 2700' W of Wolven to Childsdale Reconstruct & Widen from 2 to 4 lanes 9/2/2011 0:00 1.1542011 Grand KENT 41062 105473 M-11 Church St. east to US-131 Surface Milling with Non-Structural HMA Overlay 3/4/2011 0:00 4.192

2011 Grand KENT 41051 105475 M-37 Lake Eastbrook Blvd. north to I-96Full Depth Concrete Transverse and Longitudinal Joint Repairs and Diamond

Grinding. 1/7/2011 0:00 3.64

2012 Grand MONTCALM 59012 90209 US-131 NB over Tamarack Creek

Deck replacement (including widening 5.25' for std shoulders), PCI-beam repairs, painting of the steel columns, bridge approach work and

miscellaneous slope protection repairs 11/4/2011 0:00 0.6872011 Grand MUSKEGON 61407 104278 Lake/Center Whitehall Street to Mills Street Add 2 to 3 continuous center lane to Lake Avenue. Mill and resurface 9/2/2011 0:00 0.739

2011 Grand MUSKEGON 61072 105716 US-31 Hile Rd north to M-46Full depth concrete pavement repairs, diamond grinding, cold milling and

resurfacing shoulders. 3/4/2011 0:00 5.352011 Grand OTTAWA 70114 110318 M-231 Over North Cedar Drive New Structure on New Route 7/8/2011 0:00 0

2012 Grand OTTAWA 70013 108888 West Spring Lake Road Over Cornelius Bayou, Ottawa Co Bridge Rehabiltation, BHT 10/7/2011 0:00 02012 Grand State Wide 84913 110797 Region-Wide Grand Region Safety upgrade of electronic traffic control devices 12/2/2011 0:00 02012 Metro MACOMB 50062 110769 I-696 SD M-97 to I-94 Surface Milling with 1-1/2" Non-structural HMA Overlay 11/4/2011 0:00 2.2872011 Metro MACOMB 50458 104588 Frazho Rd Frazho Resurface roadway 9/2/2011 0:00 1.252011 Metro MACOMB 50400 109648 Countywide Countywide Video surveillance and wireless interconnect. 1/7/2011 0:00 0

2011 Metro MACOMB 50458 110327 Little Mack Avenue 10 Mile to 12 Mile

2.02 miles of cold milling concrete pavement, concrete overlay, concrete pavement repairs, trenching, concrete sidewalk, ADA ramps, and irrigation

system restoration. 1/7/2011 0:00 2.84

17

Page 18: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2012 Metro OAKLAND 63132 109966 M-150 from Second Street to the Paint Creek

The streetscaping enhancements include upgrading existing decorative street lighting with LED fixtures and fiberglass poles, installing pedestrian benches,

installing trash receptacles, reconstructing tree planter curbs and planting areas with salvaged br 10/7/2011 0:00 0.266

2011 Metro OAKLAND 63459 112343 Airline Trail Arrowhead to Haggerty, Twp of West Bloomfield

The Road Commission for Oakland County, in partnership with West Bloomfield Township, will construct a non-motorized trail from Arrowhead

Road to Haggerty Road. The trail will be an extension of the West Bloomfield Trail which connects on the east to the 8/5/2011 0:00 0

2011 Metro OAKLAND 63459 107203 Walton Road From east of Avonwood to west of Livernois

1.00 miles of concrete pavement cracking and seating, cold milling concrete pavement, concrete pavement repairs, hot mix asphalt resurfacing, drainage

structure work, concrete curb and gutter, ADA ramps, and signal work 2/4/2011 0:00 1.92011 Metro OAKLAND 63459 111954 8 Mile Road Dixboro to Pontiac Trail Resurface 2/4/2011 0:00 0.862012 Metro OAKLAND 63020 108894 Beech Road Over Rouge River, City of Southfield Bridge Replacement, BRT 10/7/2011 0:00 02011 Metro OAKLAND 63041 110761 M-59 Bogie Lake Rd. to Williams Lake Rd. Surface Milling with True Pave and 1-1/2" Non-structural HMA Overlay 6/3/2011 0:00 4.4132011 Metro ST. CLAIR 77023 108622 I-69 4 Bridges on I-69, St Clair County Scour Protection 3/4/2011 0:00 1.7152011 Metro State Wide 84917 107609 Regionwide Various locations in Metro Region ITS System Modifications 9/2/2011 0:00 12011 Metro State Wide 84917 111135 Region Wide Metro Region Permanent Pavement Markings - Long Lines 4/1/2011 0:00 0

2011 Metro WAYNE 82022 111633 I-94 2 Bridges in I-94/M39 Interchange, Wayne CountyEpoxy Overlays, Deck Patches, Joints, Approaches, Barriers, Painting,

Concrete Surface Coating 9/2/2011 0:00 02011 Metro WAYNE 82457 111968 Elizabeth Street Annapolis to Michigan Concrete pavement reconstruct 2/4/2011 0:00 0.612011 Metro WAYNE 82102 107516 M-14 M-14 from Wayne Co. to I-96 Install Median Cable Rail. 9/2/2011 0:00 6.9582011 Metro WAYNE 82292 110725 I-275 Hannan Rd. to South of Ecorse Rd. Surface Milling with 1-1/2" Non-structural HMA Overlay 2/4/2011 0:00 1.3652011 Metro WAYNE 82062 108185 US-12 US-12 and US-24 in Western Wayne County Areawide sidewalk ramps design 9/2/2011 0:00 2.169

2011 Metro WAYNE 82023 111686 I-94 2 Ped Bridges over I-94, Detroit, Wayne Co.Superstructure Replacement, Deck Patching, Beam End Repair, Partial Paint,

Pier Repair, Slope Protection, Concrete Surface Coating 9/2/2011 0:00 0.5662012 Metro WAYNE 82023 80477 I-94 under West Grand Boulevard U-turn S13-7-82023: Bridge Replacement 10/7/2011 0:00 0.001

2012 Metro WAYNE 82293 106629 I-275 NB and SB over East Hines Drive

Deep Overlay & rail replacement, zone paint beam ends, substructure repairs,�

approach pav't work. 10/7/2011 0:00 0.0072011 Metro WAYNE 82457 112326 Ecorse Road Pelham Rd to Norwood Ave Resurface and Overlay 4/1/2011 0:00 0.72011 Metro WAYNE 82081 110755 M-153 Napier Rd. to Marlowe Street Surface Milling with 1-1/2" Non-structural HMA Overlay 3/4/2011 0:00 3.057

2011 Metro WAYNE 82291 100344 I-275 I-94 EB over I-275 SB to I-94 EB rampDeck replacement, widen (minor), superstructure longitudinal re-position,

substructure repair 2/4/2011 0:00 0.001

2011 Metro WAYNE 82400 104599 I-96 EB Service Drive Over Rouge River

Bridge rehabilitation including deck replacement, pin and hanger replacment, cleaning and coating of the steel beams along with related approach work

including concrete approach slabs and guardrail replacement. 1/7/2011 0:00 0

2011 Metro WAYNE 82025 110763 I-94 15 Bridges, Detroit, Wayne County

Penetrating Floodcoat on Bridge Deck, Penetrating Water Repellent Treatment on Bridge Sidewalks, Spot Painting, Substructure Patching, Substructure Concrete Surface Coating, Horizontal Surface Sealer, and

Replace Approach Sidewalk Ramps 3/4/2011 0:00 2.273

2011 Metro WAYNE 82400 104601 I-96 WB Service Drive Over Rouge River

Bridge rehabilitation including deck replacement and painting along with related approach work including hot mix asphalt paving and guardrail

replacment. 1/7/2011 0:00 02011 Metro WAYNE 82457 104619 Cherry Hill Rd From Canton Center to Haggerty Widen from 2 to 5 lanes 9/2/2011 0:00 1.9932011 Metro WAYNE 82293 111903 I-275 at I-96/I-275 south Interchange Construction of MITS Tower - Node 11 9/2/2011 0:00 0.252011 Metro WAYNE 82022 111904 I-94 at the I-94 / M-39 Interchange Construction of MITS Tower - Node 9 9/2/2011 0:00 0.25

2011 Metro WAYNE 82131 101528 M-1 I-94 to Euclid Street

Streetscape - installation of new decorative pavers, trees with decorative grates, historic lighting, and street furniture including trash receptacles,

benches and bike racks. ENH 2007 040 8/5/2011 0:00 1.0252011 Metro WAYNE 82121 104462 M-5 (Grand River) M-5 (Grand River) in Detroit signal modernization and interconnect 1/7/2011 0:00 3.895

18

Page 19: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2012 Metro WAYNE 82121 104463 M-5 (Grand River) M-5 (Grand River) in Detroit Signal modernization and interconnect 10/7/2011 0:00 4.788

2011 Metro WAYNE 82022 111471 M-39 2 Bridges at the I-94/M-39 Interchange

Deck Patch, Crack Seal/Healer Sealer, Joint Repair, Joint Gland Replacement, Beam Repair, Railings, Conc Surf Coat, Painting, P&H Repl,

Abut Rpr, Appr Pavt, Slope Protect Rpr 9/2/2011 0:00 0.001

2012 Metro WAYNE 82023 79788 I-94 3 Bridges under CSX, Conrail, and GTW Railroads

X01-82023: beam end rpr., pier & abut. rpr.�X02-82023: beam end rpr., pier & abut. rpr.�X02-82023-8: beam end rpr., pier & abut. rpr 10/7/2011 0:00 0

2011 North ALPENA 04021 74900 M-32 INTERSECTION AT RIPLEY STREET IN ALPENA

INTERSECTION RECONSTRUCTION, INCLUDING PAVING THE INTERSECTION IN CONCRETE, PLACING CURB AND GUTTER, HMA

PAVING BEYOND THE INTERSECTION, WIDENING FOR 3 LANES ON M-32, STORM SEWER RECONSTRUCTION, AND SLOPE RESTORATION 2/4/2011 0:00 0.456

2011 North BENZIE 10555 83394 County Road 606 Forrester Rd-M22 Reconstruct 1/7/2011 0:00 2.6242011 North EMMET 24011 79065 US-31 US-31 from west of Division to Manvel and M-119 Geometric modifications for safety 1/7/2011 0:00 1.217

2011 North GRAND TRAVERSE 28012 110019 US-31 14th Street North to Grandview Parkway2" Mill and Fill with High Stress Mix, Detail 8 Joint Repairs, upgrade sidewalk

Ramps. Also add $10,000 for a B-Phase for Grading Permits. 3/4/2011 0:00 1.1372012 North LAKE 43022 87084 US-10 Depot Street to West of Saddler Road Crush and shape, HMA resurfacing, access management improvements 11/4/2011 0:00 1.764

2012 North OGEMAW 65032 109229 M-55/I-75 BL I-75 BL from Husted to Gray RoadWiden to north side of I-75 BL/M-55 and add center left turn lane. This job will

be combine with a future programmed CPM concrete patch job. 12/2/2011 0:00 1.0952011 North PRESQUE ISLE 71555 83212 Grand Lake Rd US23-Stoneport Rd Reconstruct 1/7/2011 0:00 3.9

2012 North ROSCOMMON 72061 110557 I-75 NB & SB under County Road 100 P&H replacement, Complete Paint, Joint Replacement, and Deck Patching 10/7/2011 0:00 2.5082011 North State Wide 84912 105741 Regionwide North Region, various locations Install Environmental Sensors 8/5/2011 0:00 02012 North State Wide 84912 109861 Traverse City TSC Traverse City TSC Non-Freeway Signing Upgrade 10/7/2011 0:00 166.558

2011 North WEXFORD 83013 109264 M-37 4 Road to North Wexford County LineCrush and Shape and HMA Resurfacing, Curb & gutter and drainage/safety

improvements in Village of Buckley 7/8/2011 0:00 1.966

2012 Southwest ALLEGAN 03032 111983 US-31 US-31 NB over Kuipper Drian

Removal and replacing the culvert.��

12/2/2011 0:00 0.5282012 Southwest ALLEGAN 03023 100217 M-89 over Kalamazoo River Mill Race, Plainwell Bridge Replacement 12/2/2011 0:00 0.196

2011 Southwest ALLEGAN 03034 112152 I-196 130th North to US-31Advance construction of maintenance of traffic cross overs and shoulder

paving in preparation for JN 103152 reconstruction. 8/5/2011 0:00 8.5542012 Southwest ALLEGAN 03015 105341 2nd Street At Gun River, Allegan County B03 Bridge replacement 10/7/2011 0:00 02012 Southwest ALLEGAN 03015 105339 2nd Street At Gun River, Allegan County B01 Bridge Replacement 10/7/2011 0:00 0

2012 Southwest ALLEGAN 03111 89306 US-131 under M-89, PlainwellConcrete deep overlay, Railing replacement, Substructure repair, Full paint,

Longitudinal joint real. 12/2/2011 0:00 0.392011 Southwest ALLEGAN 03041 107575 M-222 West of Eastern Avenue Slope Stabilization 5/6/2011 0:00 0.3982011 Southwest BARRY 08031 109503 M-37 Various locations in Calhoun and Barry counties Double chip seal warranty 2/4/2011 0:00 15.036

2011 Southwest BARRY 08052 111066 M-66 Coats Grove Road to M-50Mill 3/4 inch (to remove crack treatment) and HMA overlay 2 inches (2 inch

CPM approved by Kevin Kennedy 7/1/10 and FHWA 7/6/10) 1/7/2011 0:00 5.4212011 Southwest BARRY 08555 82838 Lawrence Rd M37-Bird Rd Reconstruct 9/2/2011 0:00 1.948

2012 Southwest BARRY 08012 100132 M-43 over Thornapple River in HastingsConcrete deep overlay, Beam ends repair, P&H replacement, Full paint,

Substructure repair. 10/7/2011 0:00 0.167

2011 Southwest BERRIEN 11111 106108 I-196 NB & SB over Coloma RoadConcrete deep overlay, Beam repair, Zone paint, Substructure repair, Railing

replacement, and Approaches. 1/7/2011 0:00 0.281

2011 Southwest BERRIEN 11091 108186 M-51 Along Dowagiac River South of Pucker St.

M-51 slope stabilizatoin by installation of sheet piling. Work includes shoulder reconstruction, bank underdrain, guardrail replacement and placement of rip

rap at base of slope. 9/2/2011 0:00 0.241

2011 Southwest BERRIEN 11012 109704 I-94 BL Glenlord Road to Pearl StreetMilling at 2 inch depth and HMA resurface at 2 inch depth. Sidewalk ramp

upgrade to the current standard. 3/4/2011 0:00 4.7682012 Southwest BERRIEN 11052 86785 M-139 over Dowagiac River Structure replacement, scour countermeasures and approach work. 10/7/2011 0:00 02011 Southwest BRANCH 12041 103912 M-86 over Batavia #1 & #7 Drain Culvert replacement. 8/5/2011 0:00 0.987

19

Page 20: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2011 Southwest CALHOUN 13131 109498 M-96 Armstrong Road to M-37 (Helmer Road) Cold milling and one course HMA overlay with ADA ramp upgrades 3/4/2011 0:00 3.485

2011 Southwest CALHOUN 13083 100581 I-94 under M-199 (26 Mile Road) and 22 1/2 Mile RoadConcrete shallow overlay, Railing tube removal, Superstructure and

Substructure repair, Full paint of all bearings 2/4/2011 0:00 0.3092011 Southwest CALHOUN 13083 103239 I-94 21? Mile Road to 29 Mile Road Cable Median Barrier 2/4/2011 0:00 7.4962012 Southwest CALHOUN 13032 89916 M-66 over Wanondaga Creek Bridge replacement 10/7/2011 0:00 0.785

2011 Southwest CALHOUN 13411 111572Calhoun Cty Trailway,

Ph1/Seg1 Verona/Raymond Rds to the Historic Bridge Park Multi-use Trailway/Linear Park, ENH08092 4/1/2011 0:00 0

2011 Southwest CALHOUN 13033 106888 I-194 I-194 over GTW RailroadConcrete deep overlay, Beam end repair, Full paint, Pin & Hanger

replacement. 8/5/2011 0:00 0.112012 Southwest CASS 14009 109283 Redfield Road Over Christiana Creek, Cass County Bridge Replacement. BRT, On-system, SN.13476 10/7/2011 0:00 02011 Southwest KALAMAZOO 39555 103658 N 12th St C Avenue-N Co Line Reconstruct 9/2/2011 0:00 2.0642012 Southwest KALAMAZOO 39405 110281 S Burdick St Kilgore to Cork Restore and Rehabilitate 10/7/2011 0:00 12011 Southwest KALAMAZOO 39405 108259 Sprinkle Rd S Ave to Zylman Ave Resurface 2/4/2011 0:00 2.08

2012 Southwest KALAMAZOO 39052 106677 M-331 M-331 (Park Street) over Axtell CreekBridge/Culvert replacement, Approaches, Road and sidewalk improvements,

Sewer relocation, Tree removal. 10/7/2011 0:00 0.0022011 Southwest KALAMAZOO 39022 110571 I-94 EB Eastbound ML Avenue east to 40th Street Cold Mill and HMA Resurfacing 1/7/2011 0:00 7.5272012 Southwest ST. JOSEPH 78005 109286 Kime Road Over Fawn River, St. Joseph County Bridge Replacement, BRO, Off-system, SN.10335 10/7/2011 0:00 0

2012 Southwest ST. JOSEPH 78012 111642 US-131 north of US-12 through Constantine Cold Milling and HMA Overlay with necessary sidewalk ramp ADA upgrades. 12/2/2011 0:00 3.4942012 Southwest State Wide 84915 109858 Coloma TSC Coloma TSC Non-Freeway Signing Upgrade 12/2/2011 0:00 85.032011 Southwest State Wide 84915 105632 Southwest Region Barry & Calhoun Counties Non-Freeway Signing Upgrade 7/8/2011 0:00 119.539

2012 Southwest State Wide 84915 110727Various in Kalamazoo

TSC Various in Kalamazoo TSC Safety upgrade to electronic traffic control devices 12/2/2011 0:00 0.0032011 Southwest VAN BUREN 80012 109739 I-196 Southwest Region Freeway Signing Upgrade 9/2/2011 0:00 17.634

2011 Superior DICKINSON 22031 103248 US-141 US-141 from state line to US-2 in Dickinson County

Reconstruct existing composite pavement, crush/shape/resurface existing flexible pavement, construct center left-turn lane at Breitung Cutoff

Road/Lincoln Avenue intersection, construct indirect left turn crossovers and new signal at US-141/US-2 junction 4/1/2011 0:00 0.9

2011 Superior GOGEBIC 27041 110308 M-28 Wakefield to Tula Cold Milling, Joint Repairs, and HMA Resurfacing 1/7/2011 0:00 7.695

2011 Superior IRON 36051 106897 US-2 US-2 from Co. Rd. 424 to State LineHMA cold milling and HMA resurfacing of traveled lanes. Double chip seal

shoulders. 2/4/2011 0:00 7.272011 Superior LUCE 48555 84620 County Road 135 CL-CR98 Reconstruct 1/7/2011 0:00 2.202

2011 Superior MACKINAC 49023 85619 US-2 On the Cut River Bridge (B01)

Historic Preservation of the sandstone facia, stabilization and restoration of bank washout; including permanent stormwater runoff mitigation measures.�

ENH 2003-00420�3/4/2011 0:00 0

2011 Superior MACKINAC 49025 59314 I-75 OVER HOBAN CREEKREPLACE CMP CULVERT�

3/4/2011 0:00 02011 Superior MARQUETTE 52418 111574 Iron Heritage Trail Iron Ore Heritage Trail, Negaunee to Marquette Non-motorized trail construction, ENH10036 6/3/2011 0:00 0

2012 Superior MARQUETTE 52042 106661 US-41 US-41, Marquette CountyReconstruct US-41by gradelift with a modern rural cross section. Eliminate

curbs adjacent to the travel lane, add paved shoulders and standard ditches. 11/4/2011 0:00 1.82011 Superior MARQUETTE 52031 110309 M-35 M-35, Marquette County Crush & Shape & Resuface with Ditching 3/4/2011 0:00 2.8492011 Superior State Wide 84911 106879 Regionwide Crystal Falls and Ishpeming TSC's Safety upgrade of traffic signals 9/2/2011 0:00 0.4152011 Superior State Wide 84911 111134 Region Wide Superior Region Permanent Pavement Markings 4/1/2011 0:00 0

2011 University EATON 23051 110552 M-50 I-69 to HallawoodPaver Placed Surface Seal including some locations of cold mill and

resurface. 2/4/2011 0:00 8.452011 University EATON 23400 100176 Michigan Avenue Canal to Creyts Construct roadway extension 1/7/2011 0:00 1

20

Page 21: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2011 University HILLSDALE 30032 110579 M-99 Arch Street to US-12

1) Concrete Pavement Restoration, Cold Milling and Single Course HMA Overlay.�

2-3) Cold Mill and Single Course HMA Overlay including sidewalk ramp upgrades at stop controlled or signalized intersections.�

3/4/2011 0:00 5.473

2012 University INGHAM 33045 105918 I-496 Clemens Street over I-496 & CSX RR

Deep overlay, partial deck replacement of span 2 south, approach road work, sidewalk repair, approach rail replacement, crack sealing and maintaining

traffic. 11/4/2011 0:00 0.5582011 University INGHAM 33403 100192 S Washington Ave CN Railroad to Main Street Reconstruct and install storm drainage facilities 1/7/2011 0:00 0.432

2012 University INGHAM 33083 105884 I-96 EB & WB over Cedar Street, LansingJoint replacement, structural steel repairs, railing & fascia repairs, substructure

repairs, deck crack sealing, and maintaining traffic. 10/7/2011 0:00 1.376

2011 University INGHAM 33001 109321 Willoughby Road Over Sycamore Creek, Ingham County

Bridge Replacement, BRO, Off-system, SN. 3890�Bridge removal and replacement with 27" Prestressed Concrete Beam,

placing riprap, approach work and maintaining traffic. 2/4/2011 0:00 02012 University INGHAM 33403 112128 S Washington Ave Main To Barnes Resurface 12/2/2011 0:00 0.736

2012 University INGHAM 33083 102843 I-96 2 bridge locations along I-96Deck replacement, structural steel repairs, substructure repairs, slope paving

repairs, approach pavement reconstruction, and maintaining traffic. 10/7/2011 0:00 0.152012 University JACKSON 38011 90296 M-99 over the South Branch of Rice Creek Culvert replacement and associated approach work. 10/7/2011 0:00 2.1442011 University JACKSON 38555 90389 County Farm Rd Sandstone Rd-Gardner Rd Resurface, mill & ditching 2/4/2011 0:00 1.7612012 University JACKSON 38409 110462 E Michigan Ave Ballard to Vista Resurface 10/7/2011 0:00 1.094

2011 University JACKSON 38061 109144 M-60 M-60 over I-94 BL, Jackson County

Deep concrete overlay, partial deck replacement, full painting of structural steel, minor substructure concrete patching, bridge rail patching, approach

work and maintenance of traffic. 6/3/2011 0:00 0.09

2011 University LENAWEE 46062 110544 US-223 High St. to A&B Railroad1) Full depth concrete pavement repairs�

2) Microsurfacing for rutfilling; Paver Placed Surface Seal 2/4/2011 0:00 3.0212012 University LENAWEE 46006 109314 Benner Highway Over South Branch of River Raisin, Lenawee County Bridge Replacement, BRT, On-system, SN. 5583 10/7/2011 0:00 0

2011 University LIVINGSTON 47555 111947 Old US 23 Hwy From Hogan to White Lake Road

1.00 miles of hot mix asphalt cold milling, hot mix asphalt crushing and shaping, machine grading, hot mix asphalt resurfacing, and aggregate

shoulders 1/7/2011 0:00 1.4

2011 University LIVINGSTON 47093 111798 Lakelands Trail Hamburg to Unadilla, Putnam TownshipPaving the Lakelands Trail in Putnam Township and Village of Pinckney,

ENH200900057 3/4/2011 0:00 0

2011 University LIVINGSTON 47066 109174 I-96 6 bridges on I-96 at Ingham/Livingston County Line

Deep overlay, substructure epoxy crack injection, minor substructure and barrier repairs, scour countermeasures, approach work, maintaining traffic and

aesthetics. 5/6/2011 0:00 3.831

2011 University LIVINGSTON 47013 102694 US-23 NB and SB under Grand River Avenue

Deck patching, expansion joint replacement, full painting of structural steel, structural steel repairs, substructure repairs, railing and deck fascia repairs,

approach pavement reconstruction, and maintaining traffic. 3/4/2011 0:00 0.1042011 University MONROE 58032 110591 M-50 M-50 Wilcox to Lewis Double microsurface 2/4/2011 0:00 6.7342011 University MONROE 58052 59564 US-24 over Little Sandy Creek Culvert replacement 6/3/2011 0:00 02011 University MONROE 58171 104644 Sumpter Rd Oakville/Waltz to Colf Rd Pavement Patching 9/2/2011 0:00 1.0062011 University State Wide 84916 111133 TSC Wide Lansing TSC Permanent Pavement Markings 3/4/2011 0:00 02011 University State Wide 84916 111141 TSC Wide Brighton TSC Permanent Pavement Markings 2/4/2011 0:00 02012 University State Wide 84916 109742 University Region University Region Freeway Signing Upgrade 10/7/2011 0:00 21.1762012 University State Wide 84916 109748 University Region University Region Freeway Signing Upgrade 10/7/2011 0:00 21.412011 University WASHTENAW 81075 104535 7 Mile Road From Sunflower to Main Construct new 2 lane road 9/2/2011 0:00 0.5

2011 University WASHTENAW 81406 112277E. Stadium Blvd.

Bridges South Industrial Highway to Kipke Drive, Ann Arbor Non-motorized facilities on E. Stadium Blvd., ENH201000021 3/4/2011 0:00 0.42011 University WASHTENAW 81001 112335 E Stadium Boulevard Over State Street, City of Ann Arbor Bridge Replacement 2/4/2011 0:00 02012 University WASHTENAW 81104 106791 I-94 I-94 median from county line to Parker Install cable barrier system in the median 11/4/2011 0:00 12.14

Construction Projects $2.5 Million to $5 Million

21

Page 22: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2011 Bay CLARE 18041 106844 US-127 BR/M-61 County Farm Road Southeasterly to M-61 East

Two course HMA overlay with Asphalt Stabilized Crack Relief Layer (ASCRL), HMA cold milling, intersection improvements, drainage, and guardrail

upgrading. 2/4/2011 0:00 2.72

2011 Bay GENESEE 25085 89236 I-69 Four bridges over I-69, City of FlintPaint, Pin and Hanger, Steel Repairs, Deck Patch, Substructure Repairs,

Joints, Epoxy Overlay 2/4/2011 0:00 0.386

2012 Bay GENESEE 25132 107124 I-475 Four Bridges in Genesee County

I-475 under Third Street (25132-S17) - Deck Patching, Crack Sealing, Expansion Joint Replacement, Resealing End Joints, Pin and Hanger

Replacement, Diaphragm Replacement, Paint, Substructure Patching and Concrete Surface Coating�I-475 under Kearsley Stre 10/7/2011 0:00 0.339

2012 Bay SAGINAW 73112 87659 I-75 At Zilwaukee Bridge Upgrade median, tower and shoulder freeway lighting 11/4/2011 0:00 2.059

2011 Bay SAGINAW 73101 84986 I-675 at Warren AvenueConstruct new interchange per Break in Access Justification Study for I-675.

Work includes bridge removal, bridge widening, ramp improvements 3/4/2011 0:00 0.552012 Grand IONIA 34044 90210 I-96 EB and WB over abandoned CSX Railroad Replacement of EB & WB structures with a box culvert or 3 sided arch 11/4/2011 0:00 0.028

2011 Grand IONIA 34043 101616 I-96 EB at the Saranac Rest Area #532Building replacement, utilities, grading, parking expansion, and associated site

work. 8/5/2011 0:00 0.542011 Grand KENT 41025 105308 Burton Street SW At Conrail Railroad, City of Grand Rapids Bridge Rehab 3/4/2011 0:00 02011 Grand KENT 41401 112367 Forest Hill Street Burton Street to Hall Street Reconstruct and add turn lanes 3/4/2011 0:00 1.4

2011 Grand KENT 41131 87156 US-131 under 36th Street

Total replacement of the existing structure. The approach slabs will also be replaced.�

2/4/2011 0:00 02012 Grand MECOSTA 54012 88885 US-131 OLD 19 Mile to Mecosta/Osceola County Line Coldmill and HMA resurface. 10/7/2011 0:00 5.04

2011 Grand MONTCALM 59012 90040 US-131 Pierson Road north to Cutler RoadConstruction of temporary HMA cross-overs for maintenance of traffic during

2012 R&R jobs. 1/7/2011 0:00 9.7332011 Grand OTTAWA 70114 110391 M-231 over Little Robinson Creek New Structure 7/8/2011 0:00 02011 Grand State Wide 84913 111138 Region Wide Grand Region Permanent Pavement Markings 2/4/2011 0:00 02011 Metro OAKLAND 63041 110767 M-59 Tipisco Lake Rd. to Bogie Lake Rd. Surface Milling with 1-1/2" Non-structural HMA Overlay 6/3/2011 0:00 8.2942012 Metro OAKLAND 63132 45725 M-150 2nd Street to University Drive Reconstruct. 10/7/2011 0:00 0.2652011 Metro OAKLAND 63043 106133 M-59 at Dequindre Road and M-150 interchanges. Construction of two Soundwalls 3/4/2011 0:00 02012 Metro ST. CLAIR 77009 108895 Bridge Street Over Belle River, City of Marine City Bridge Replacement, BRT 10/7/2011 0:00 02011 Metro ST. CLAIR 77111 106466 I-94/I-69 at Water Street Bridge Replacement 2/4/2011 0:00 02011 Metro WAYNE 82021 86927 I-94 2 bridges on I-94, Van Buren Twp Joint replc, Deck patch, Epoxy overlay, P&H replc, paint 2/4/2011 0:00 0.6552012 Metro WAYNE 82191 106674 I-75 I-75 under I-75 NB / Dix Toledo Connector Bridge Replacement 10/7/2011 0:00 0.1492011 Metro WAYNE 82024 103334 I-94 St. Aubin to French Rd. Replace Freeway Lighting 2/4/2011 0:00 3.5342012 Metro WAYNE 82191 108039 I-75 I-75 under I-75 SB / Dix Toledo Connector Bridge Replacement 10/7/2011 0:00 0.1492012 Metro WAYNE 82022 109744 I-94 Metro Region Freeway Signing Upgrade 11/4/2011 0:00 11.533

2011 Metro WAYNE 82900 103727 Area Wide Wayne County: Multiple locations along M-10&US-24

Replace the existing mixed flow pump motors and control equipment with appropriate style pumps and update the electronic controls to current

technology standards. 5/6/2011 0:00 0.3742011 Metro WAYNE 82457 104618 Cherry Hill Rd From Canton Center to Morton Taylor Widen from 2 to 5 lanes 9/2/2011 0:00 1.0762011 Metro WAYNE 82025 110722 I-94 JCT M-3 to N. County Line CPM 1 1/2" HMA mill and rusurface 3/4/2011 0:00 6.685

2012 Metro WAYNE 82400 111641 Detroit Riverfront Walk Along the Det River btwn Chene and Joseph CampauRiverfront walk way, sea walls, lighting, site furnishings, landscaping,

pedestrian bridge, etc 11/4/2011 0:00 0.001

2011 North CHARLEVOIX 15051 103023 M-32 M-32 from East Jordan southerly to Rogers Road

Mill and fill with joint repairs on the east-west section of M-32,begining with a crush and shape with paved shoulders from the intersection of State Street

and M-32 southerly to Rogers Road with a grade lift south of Rogers Road to the POE. 2/4/2011 0:00 1.89

2011 North CHEBOYGAN 16081 79651 US-23 from Cheboygan east county line to CordwoodBit Base Crushing & Shaping, HMA resurfacing, Culvert Repair, and Guardrail

Upgrading 9/2/2011 0:00 6.8372011 North EMMET 24012 103443 US-31 Paradise Tr to I-75 HMA Base crushing and shaping with minor safety improvements 4/1/2011 0:00 5.117

2011 North MANISTEE 51012 87083 US-31 South of Coates Highway to Maidens RoadCrush and shape, HMA resurfacing, miscellaneous safety and drainage

improvements 1/7/2011 0:00 6.475

22

Page 23: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2011 North ROSCOMMON 72021 106683 M-55 Roscommon Co WCL to US-127 Crush and shape, geometric changes 2/4/2011 0:00 2.2132011 North WEXFORD 83011 87217 M-37 over Pine River Deck Replacement, Railing, Complete Paint, and approach Slabs 1/7/2011 0:00 1.204

2011 North WEXFORD 83061 87041 US-131BR River Street to North of 13th StreetPavement removal, curb & gutter replacement, grading and drainage, and

HMA pavement 2/4/2011 0:00 0.799

2011 Southwest ALLEGAN 03112 109433 US-131 Six structures on US-131, Allegan CountyConcrete deep overlay, Beam and substructure repair, Full paint, Approchs,

Concrete surface coating. 8/5/2011 0:00 3.327

2011 Southwest ALLEGAN 03032 100577 US-31 BR US-31 BR and US-31 BR Ramp ov N Br Macatawa River Bridge Replacement and associated road work. 6/3/2011 0:00 0.102

2012 Southwest BARRY 08006 109279 N Michigan Avenue Over Thornapple River, City of HastingsBridge Replacement, BRT, On-system�

SN 576 10/7/2011 0:00 02011 Southwest CALHOUN 13033 104046 I-194 I-194 over I-94 BL (Dickman), and Fountain Concrete deep overlay, Beam end repair, Full paint, P&H replacement. 8/5/2011 0:00 0.1212011 Southwest KALAMAZOO 39014 111271 US-131 Milham Road north to M-43 Cold Mill and HMA Overlay, One Course 3/4/2011 0:00 5.6172012 Southwest KALAMAZOO 39005 109284 River Street Overver Kalamazoo River, Kalamazoo Co Bridge Replacement, BRT, On-System, SN 4640 10/7/2011 0:00 0

2011 Superior MARQUETTE 52418 109688 McClellan Avenue From Fair Avenue to Wright Street, Marquette

Construct road to continue McClellan Avenue fro Fair Avenue to Wright Street. ISTEA MI028 $554,811, $138,703 local match, $1,121,297 local participating,

$915,000 local non-participating 3/4/2011 0:00 0.442012 Superior MARQUETTE 52042 80147 US-41/M-28 Bayout St to the Carp River Grade lift with the addition of shoulders and roadway ditches. 11/4/2011 0:00 2.29

2011 Superior MENOMINEE 55012 87551 US-41 COUNTY ROAD G-12 TO BAGLEY

HMA Base Crushing and Shaping in the Flexiable sections and Coldmilling in the Composite sections, Culvert Extensions, Curb and Gutter Replacement

and Resurfacing. 3/4/2011 0:00 7.959

2011 University INGHAM 33171 110595 US-127 NB I-496 TO M-43

Construct auxiliary weave lane on NB US-127connecting the I-496 Entrance Ramp to the M-43 (Grand River Ave/Saginaw St) Exit Ramp. No additional through travel lanes are being added to US_127. CMAQ Grant #10096 for

C/D phase. 9/2/2011 0:00 0.418

2011 University INGHAM 33032 110546 I-96 BL EDGEWOOD TO GRAND RIVER AVEHMA cold mill and resuface, including updating sidewalk ramps to meet ADA

Guidelines, and full depth concrete repairs. 3/4/2011 0:00 6.321

2011 University INGHAM 33082 103318 M-43 ECL Williamston to east Jct of M-52cold-milling, joint repairs, 2-course HMA resurfacing, drainage and intersection

improvements 3/4/2011 0:00 3.711

2011 University INGHAM 33035 101617 US-127 NB at the Lansing Rest Area #810Building replacement, utilities, grading, parking expansion, and associated site

work. 6/3/2011 0:00 0.5192011 University JACKSON 38111 83396 US-127 under M-50, Jackson County Bridge Replacement and associated approach work. 3/4/2011 0:00 0.22012 University LENAWEE 46062 102851 US-223 over River Raisin Complete bridge replacement and all associated approach work. 10/7/2011 0:00 0.238

2011 University LENAWEE 46082 87514 M-50 Ridge Hwy to the EVL of Britton, Lenawee County Pavement Rehabilitation (3R) HMA Mill and Resurface, shoulder upgrade and

drainage improvements. 9/2/2011 0:00 2.1552011 University LIVINGSTON 47014 103322 US-23 US-23 median from M-36 to Genesee County Line Install cable barrier system in median 3/4/2011 0:00 22.1142011 University SHIAWASSEE 76023 87169 I-69 M-71 over I-69, Shiawassee County Bridge replacement and associated approach work. 2/4/2011 0:00 02011 University State Wide 84916 108889 Various I-94 Freeway Signing Upgrade, I-94 in Washtenaw County 9/2/2011 0:00 35.783

2011 University WASHTENAW 81075 104554 Holmes Road From Spencer to Michigan Ave

0.93 miles of road reconstruction including earthwork, underground storm drainage, sanitary sewer and watermain, subbase and aggregate base

construction, placing hot mix asphalt pavement and concrete curb and gutter, placing signs and pavement markings an 1/7/2011 0:00 0.944

2011 University WASHTENAW 81081 109088 M-17 US-23/M-17 interchange

Interchange operational improvements(dual right turn lane SB exit ramp; extend left turn lane storage EB M-17 at Carpenter; right turn lane on WB M-17 at Carpenter; extend ramp storage NB US-23 entrance ramp, traffic signal

upgrades). Construct non-motor 9/2/2011 0:00 0.843

2011 University WASHTENAW 81011 87525 M-52 M-52 from I-94 to Old US-12Mill & resurface, overlay ramps, guardrail, intermittent curb & gutter

replacement. 6/3/2011 0:00 0.8882011 University WASHTENAW 81406 104513 East Stadium Blvd From Seventh Street to South Main Street Reconstruct Roadway 9/2/2011 0:00 0.6

Construction Projects $5 Million to $10 Million

23

Page 24: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2011 Bay BAY 09035 108681 I-75 Nine Bridges in Bay County along I-75

09035-S12: I-75 Under Coggins Road in Bay County - Bridge Replacement�09035-S13: I-75 Under Pinconning Road in Bay County - Deep Overlay, Full Depth Patching, Abutment Addition, Railing Replacement, Approach Work,

Full Paint and Concrete Surface Sealing 3/4/2011 0:00 6.132

2011 Bay SAGINAW 73006 105294 Dixie Highway At Cass River, Saginaw CountyBridge removal and replacement along with related approach work including

hot mix asphalt paving and guardrail placement. 2/4/2011 0:00 0

2011 Grand KENT 41131 87155 US-131 under Franklin, Burton and Hall Streets

Franklin Street (R03 of 41131) - Replacement of deck on spans 1, 2, 3, 4, 5, 7, 8 and 9 and western approach replacement. �

Burton Street (S10 of 41131) - Replacement of the deck and approaches. �Hall Street (S11 of 41131) - Replacement of the deck. 5/6/2011 0:00 0

2012 Grand MONTCALM 59012 90035 US-131 NB N of Cannonsville Rd to S of M-46Concrete Inlay, guardrail replacement, drainage improvements, and ramp

rehabilitation/reconstruction. 11/4/2011 0:00 5.4482011 Metro MACOMB 50458 104587 Van Dyke Ave Van Dyke Widen from 2 to 5 lanes 9/2/2011 0:00 1

2011 Metro OAKLAND 63459 111071 Martin Luther King Blvd Elm to M-59

1.06 miles of road widening, including concrete pavement, concrete curb and gutter, storm drainage, concrete sidewalk, street lighting, and traffic signal

modernization 2/4/2011 0:00 2.882011 Metro OAKLAND 63152 106972 US-BR-24 Woodward Loop to Montcalm Reconstruct, Replace Storm Sewer, ADA Ramps 9/2/2011 0:00 1.059

2011 Metro ST. CLAIR 77024 106535 I-69 10 Bridges on I-69, St Clair CountyDeck Patching, Steel Beam Painting, Concrete Surface Coating, Substructure

Patching and Joint Replacements 3/4/2011 0:00 5.8632012 Metro WAYNE 82025 100497 I-94 Gratiot Avenue to 8 Mile Rd. Replace Freeway Lighting 10/7/2011 0:00 6.36

2012 Metro WAYNE 82291 79694 I-275 5 Bridges on I-275

S01-82292: Deck patch, partial paint, P&H, substr. rpr.�S01-82293: Shallow Ovly, Pt, P&H, Realign Brgs, Substr Rpr�

S06-82293: Dk Repl, Pt, P&H, Substr Patch�B02-82293: Deep conc. overlay, substr. rpr., beam end rpr., P&H, railing rpl.�

B03-82293: D 10/7/2011 0:00 1.1332012 Metro WAYNE 82191 106969 I-75 Ramps Dix Toledo Interchange Reconstruct Ramps 10/7/2011 0:00 0.628

2011 Metro WAYNE 82023 111751 I-94 6 Bridges on I-94, Detroit, Wayne CountyBeam End Repairs, Substructure Repairs, Abutment Repairs, Zone Painting,

Surface Coating 9/2/2011 0:00 0.6172012 Metro WAYNE 82292 83690 I-275 10 bridges on I-275, Wayne County 8 deep concrete overlays, 2 CPM and rail replacements 10/7/2011 0:00 2.858

2011 Metro WAYNE 82291 102074 I-275 3 Bridges, I-94 / I-275 Interchange

Deck replacement, Backwall replc, widening, P&H replc, Rocker bearing re-align, �

Pier 2 Cap replc, Substr repairs, Rdwy Shoulder widen, and Approach work. 2/4/2011 0:00 0.458

2012 Metro WAYNE 82101 55664 Old M-14 Market St to Farmington Road

Mill and Resurface, intermittent curb and gutter, sidewalk, driveway and drainage structure replacement, ADA sidewalk compliance, joint and crack repairs (transverse and longitudinal), full depth concrete pavement repairs. 10/7/2011 0:00 1.682

2011 Metro WAYNE 82457 104615 Allen Road Under CN Railroad Grade Separation 9/2/2011 0:00 02012 Metro WAYNE 82292 83141 I-275 14 Bridges on I-275, Wayne County 14 Epoxy overlays 10/7/2011 0:00 7.514

2012 North OGEMAW 65033 103442 I-75 BL I-75 to Woodland DrComposite pavement removal, HMA inlay, HMA reconstruction and widening,

safety and drainage improvements. 12/2/2011 0:00 2.08

2012 Southwest BERRIEN 11017 106483 I-94 EB Park Road to Hennesey

Two course HMA overlay with roadway lowering for Friday Road Bridge over I-94 and barrier replacement. �

12/2/2011 0:00 2.138

2011 Southwest BERRIEN 11072 87321 M-140 Dan Smith Road to Watervliet North City Limits

Pavement reconstruction, curb and gutter replacement, and full drainage upgrade. Watermain upgrade to be performed as determined by the

conclusions of the future MDOT study and future participation agreement with the city of Watervliet. Intersectio 2/4/2011 0:00 2.3

24

Page 25: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles

2011 Southwest KALAMAZOO 39042 48550 M-96 Michigan Avenue to 35th Street Widen for left turns, storm sewer with curb and gutter on the southside only.

Coldmill existing pavement and resurface. 3/4/2011 0:00 3.868

2011 Superior MACKINAC 49022 87543 US-2 M-117 TO NAUBINWAY

Aggregate grade lift with 3 course HMA surface, side slope construction, wetland mitigation, drainage replacement and upgrades, permanent pavt

marking. 1/7/2011 0:00 5.092

2011 University EATON 23042 106903 M-43 EAST OF CANAL TO WEST OF ROSEMARY

Cold Milling, 2 course HMA resurfacing, concrete patches, intermittent curb & gutter replacement, ADA sidewalk ramp upgrade, drainage improvements,

and access management. 2/4/2011 0:00 3.545

2012 University INGHAM 33045 109201 I-496 33 bridges on I-496

Miscellaneous CPM & CSM work including: epoxy overlay, concrete surface coat, joint replacement, seal joints, substructure patching, concrete deck & sidewalk patches, brush block & fascia patches, approach work, replace

pedestrian fencing, and maintaining 10/7/2011 0:00 1.9832012 University INGHAM 33061 105905 M-43 M-43 EB (Saginaw Street) over the Grand River Bridge Replacement 12/2/2011 0:00 0.131

2011 University JACKSON 38072 79005 M-50 / US-127 BR M-50/US-127 BUSINESS ROUTE over Norfolk Southern Bridge replacement and associated roadway approach reconstruction. 9/2/2011 0:00 0

2011 University LENAWEE 46062 84028 US-223 East of Silberhorn Hwy to west of Rodesiler RoadCold mill and multi-course HMA overlay, add CLTL between A/B Railroad and

Silberhorn Hwy 2/4/2011 0:00 3.447

2012 University LENAWEE 46161 87522 M-52 US-223 NORTH TO SOUTH OF M-34Reconstruction (4R fix) replacing with HMA Pavement, curb and gutter and

drainage improvements 10/7/2011 0:00 0.7792011 University LIVINGSTON 47065 101622 I-96 at Latson Road Construct New Bridge 9/2/2011 0:00 0.0012011 University LIVINGSTON 47065 101621 I-96 at Latson Road Construct New Ramps for New Latson Road Interchange 9/2/2011 0:00 1

2011 University MONROE 58052 87546 US-24 US-24 from Stewart Rd to LaSalle Rd

Mill & two course overlay, minor widening (approx 4,600 ft), guardrail, curb & gutter. The road varies from 2 to 3 to 5 lanes, culvert replacement/extensions.

The minor widening is to improve traffic operations & safety. 3/4/2011 0:00 1.3422011 University WASHTENAW 81012 77662 M-52 AUSTIN TO DUTCH Reconstruct, Drainage improvements. Water main replacement 5/6/2011 0:00 1.68

Construction Projects $10 Million to $15 Million

2011 Bay SAGINAW 73101 107496 I-675 at Warren Avenue

Construct new interchange per Break in Access Justification Study for I-675. �

Work includes 2 bridge removals, 6 bridge replacement & widening, �ramp removal, ramp construction, road rehab, safety improvements. 3/4/2011 0:00 0.241

2012 Grand MONTCALM 59012 87108 US-131 SB North of Cannonsville Road to South of M-46Concrete inlay, guardrail replacement, drainage improvements, and ramp

rehabilitation. 11/4/2011 0:00 5.39

2011 Metro ST. CLAIR 77475 107205Michigan,Griswold,Rang

e At 3 CN Railroad crossings south or Griswold Road

Premiminary engineering (PE), right of way (ROW), and construction (Const) of grade separation to allow CN Railroad cars to continue to move at 10 miles an hour for security check. Port Huron NAFTA Congestion Mitigation Project.

SAFETEA-LU Earmark MI310 5/6/2011 0:00 0

2011 Metro WAYNE 82022 111636 I-94 9 Bridges at the I-94/M-39 InterchangeDk Patch, Epoxy Ovly, Crack Seal/Healer Sealer, Jnt Repl, Railing, P&H, Abut

Rpr, Pier Rpr, Beam Rpr, Appr Pavt, Surface Coating 9/2/2011 0:00 0.021

2012 Metro WAYNE 82141 85479 M-102 M-5 to Rouge River

Mill and Resurface. Joint and crack repairs (lonitudinal and transverse). Full depth concrete pavement repairs. Reconstruct sinking pavement sections due

to agg base failures. Increase storage and taper lengths for median cross overs. Traffic signal modif 10/7/2011 0:00 2.193

2012 Metro WAYNE 82023 79784 I-94 5 Bridges on I-94, Detroit

S13-82023: Bridge Replacement�S13-82023-8: Bridge Replacement�S14-82023: Bridge Replacement�

S21-82023: Shallow overlay, beam end repr, P & H repl ,substr rpr�S25-82023: Shallow overlay, partial paint, subst repr, approaches 10/7/2011 0:00 0

2011 Metro WAYNE 82400 111639 Detroit Riverfront Walk Along the Det River btwn Cobo Hall and Belle IsleRiverfront walk way, sea walls, lighting, site furnishings, landscaping, pavilion,

etc 9/2/2011 0:00 0.3772012 Metro WAYNE 82025 108061 I-94 M-3 over I-94, Wayne County Bridge Replacement 10/7/2011 0:00 0.001

25

Page 26: Fiscal Year Region County CS Num. Job Num. Route Location ......approach terminals. 9/2/2011 0:00 0 2011 Bay GENESEE 25402 104221 East Main Street Lansing/Ray Road Road Reconstruction

Tentative Construction Projects Programmed For Calendar Year 2011

Fiscal Year Region County CS Num. Job Num. Route Location Work Description Estimated Let Date Miles 2012 Southwest ALLEGAN 03023 90028 M-89 West of US-131 east to Florence St. in Plainwell Reconstruct Existing, No widen 12/2/2011 0:00 1.7212012 Southwest ALLEGAN 03034 103152 NB I-196 Northbound only, 130th Ave. north to US-31 split Roadway Rehabilitation 12/2/2011 0:00 8.481

2011 Southwest CALHOUN 13083 86970 I-94 WB 21 1/2 Mile Road to 29 Mile Road

Multiple Course HMA overlay, concrete pavement repairs and diamond grinding under bridges, ramp paving and improvements, guardrail upgrades,

and ROW fence. 2/4/2011 0:00 7.4422011 University LIVINGSTON 47065 101623 I-96 At Latson Road Construct local road improvements for new interchange 9/2/2011 0:00 1

Construction Projects $15 Million to $30 Million

2011 Grand OCEANA 64015 90073 US-31 Polk Rd to N Branch of Pntwtr RvrMainline and ramp reconstruction, ramp acceleration and deceleration lane

extensions, drainage and safety upgrades. 4/1/2011 0:00 5.8892011 Grand OTTAWA 70114 88887 M-231 Over the Grand River (River Span) New sub and super structure for the river unit of B05 of 70114. 7/8/2011 0:00 0

2011 Metro ST. CLAIR 77111 86951 I-94 approach to Black River BridgeApproach work and reconstruction of exisitng ramps and design for the bridge

replacment 2/4/2011 0:00 0.4142011 Metro WAYNE 82131 76903 M-1 Chandler to Sibley Reconstruct 8/5/2011 0:00 2.87

2011 University JACKSON 38103 100001 I-94 I-94 at Sargent Road, Jackson Co.

Complete Interchange Reconstruction including removal and replacement of S01-38103, removal of S12-38101, removal of ramp Z (eastbound exit ramp),

construction of new ramp F(eastbound exit ramp) and ramp B (eastbound entrance ramp), tie in both westbound 3/4/2011 0:00 3.178

2011 University LIVINGSTON 47013 79897 US-23 Silver Lake Road to CSX Railroad

Two course HMA overlay, replace superstructure and widen pier on B01-1 & B01-2 (12 foot to the outside) to lengthen southbound off ramp & northbound on ramp at Silver Lake Road and deep overlay and paint on S03-2 of 47013 &

X03 of 47013 3/4/2011 0:00 0.353

2012 University WASHTENAW 81103 100246 M-14 M-14 from east of Earhart Road to Washtenaw County

2" milling HMA pavement and 2 " HMA overlay from Earhart Rd to M-153, repairing & patching concrete pavement and two course 4" overlay from M-

153 to Washtenaw/Wayne county line. Widen outside shoulders to 12 ft(POB to M-153), superelevation corrections, 11/4/2011 0:00 7.819

Construction Projects $30 Million and Up2011 Bay BAY 09035 106856 I-75 Linwood Rd to Pinconning Rd Concrete overlay, drainage and safety improvements. 3/4/2011 0:00 7.838

2012 Bay SAGINAW 73111 87509 I-75 Janes to I-675 North Junction

Reconstruction, concrete barrier wall, drainage and safety improvements, ramp improvements. Concrete pavement repairs, spall repairs, joint sealing and HMA shoulders on Zilwaukee Bridge Ramps. LCCA required for final

pavement design. 11/4/2011 0:00 4.515

2011 Grand OTTAWA 70114 88888 M-231 Over the Grand River (Approach Spans)New sub structure and super structure for the approach spans of B05 of

70114. 7/8/2011 0:00 02012 Metro MACOMB 50031 45735 M-97 Hayes to 14 Mile Road Reconstruct 10/7/2011 0:00 3.4332011 Metro ST. CLAIR 77111 110808 I-94 I-94/I-69 over the Black River Bridge Replacement 2/4/2011 0:00 02011 Metro ST. CLAIR 77111 87024 I-94 / I-69 Freeway Port Huron, St. Clair County Freeway Reconstruciton and widening 2/4/2011 0:00 2.9362011 Metro WAYNE 82051 46277 US-24 Vreeland to West Road Widen and Reconstruct 4/1/2011 0:00 2.212011 Metro WAYNE 82211 72409 M-85 Sibley to Goddard Reconstruct 7/8/2011 0:00 3.87