FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012
Driving Progress
The Fives FCBsustainable
cement plant
![Page 2: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/2.jpg)
FICEM APCAC – 05/09/2012 2
The Fives FCB sustainable plant in figures
Less than 500 mg/Nm3 of NOx (equivalent NO2 dry @ 10%O2) at stack
Up to 70% of AFR substitution at precalciner (on thermal load)
Thanks to the combination of the Fives FCB precalciner & Fives Pillard burner
Less than 80 kWh/t of cement
High clinker substitution factor
Thanks to the Fives FCB Horomill & Fives FCB TSVTM
Zero water consumption
Thanks to the combination of the Fives FCB Horomill & common filter
![Page 3: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/3.jpg)
A combination of advanced proven technologies
Low emissions
Low power consumption
High alternative fuels substitution
Zero water consumption
High clinker substitution
![Page 4: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/4.jpg)
4
The Fives FCB Zero-NOx Precalciner: an advanced technology
The Concept: a real COMBUSTION CHAMBER
Downward High-Performance Burner:• Creating a Hot Spot• For successful ignition & efficient
combustion• Staged Combustion in reducing conditions• Zero-NOx
Air and Meal injection:• Through a ring without cycloning• Creating a meal curtain• Protection of lining• Progressive and efficient mixing
Designed to burn difficult solid fuels and a high rate of alternative solid fuels with Zero-NOx emission
Low-NOx burner with central channel for ASF
Meal feed
Direct flow
Ring-shaped injection
Distribution chamber
FICEM APCAC – 05/09/2012
![Page 5: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/5.jpg)
5
The Fives FCB Zero-NOx Precalciner: an advanced technology
Hot spot for complete burn-out
Centered flame
Protected lining
FICEM APCAC – 05/09/2012
![Page 6: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/6.jpg)
6
Combined with the Fives Pillard Precalciner burner
A low-NOx high performance burner
(in Hoang Mai/Vietnam cement plant)
FICEM APCAC – 05/09/2012
![Page 7: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/7.jpg)
7
The Fives FCB Zero-NOx Precalciner: a proven technology
Hoang Mai (Vietnam)
• 100% low volatile anthracite coal (< 8%)
• Ø 5.6 m – capacity 4,000 t/d
• Residence time: 4.5 seconds
Umm Bab (Qatar)
• Natural gas
• Ø 5.2 m – capacity 5,000 t/d
• Residence time: 3 seconds
Holcim-Apasco (Mexico)
• 100% petcoke & ASF
• Ø 5.6 m – capacity 3,500 t/d
• Residence time: 5 seconds
FICEM APCAC – 05/09/2012
![Page 8: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/8.jpg)
8
The Fives FCB Horomill: an advanced technology
FICEM APCAC – 05/09/2012
![Page 9: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/9.jpg)
9
The Fives FCB Horomill: an advanced technology
FICEM APCAC – 05/09/2012
Grinding layer centrifugation
Control of grinding actions
Control of material advance
Simple concept
Continuous adaptations
![Page 10: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/10.jpg)
3
2+4
1+2
2+2
2
2
2
2
3
2
Twin cement grinding
Cement grinding
Raw grinding
Plants with both rawand cement grinding
Slag or mineral grinding
Twin slag grinding
Not erected
56 HOROMILLS
Horomill®: a worldwide proven technology
10
More than 1.5 millions hours of operation
FICEM APCAC – 05/09/2012
![Page 11: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/11.jpg)
A combination of advanced proven technologies
Low emissions
Low power consumption
High alternative fuels substitution
Zero water consumption
High clinker substitution
![Page 12: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/12.jpg)
12
The Fives FCB sustainable plantLow emissions
Cartago (Holcim Costa Rica) NOx Emissions hourly average in mg/Nm3 @ 10%O2 dry
Less than500 mg/Nm3
NOx atpreheaterexhaust
No need ofSNCR systemin most cases
HOURLY NOx EMISSIONS AT CHIMNEY STACK
100
150
200
250
300
350
400
450
500
550
00:00 08:00 16:00 00:00 08:00 16:00 00:00 08:00 16:00 00:00 08:00 16:00 00:00 08:00 16:00 00:00
TOTAL NOx (mg/Nm³ @ 10%O2, dry fumes) on 15th to 19th October 2007
… and less than 100 ppm CO with 100% petcoke
mg/Nm³
FICEM APCAC – 05/09/2012
![Page 13: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/13.jpg)
A combination of advanced proven technologies
Low emissions
Low power consumption
High alternative fuels substitution
Zero water consumption
High clinker substitution
![Page 14: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/14.jpg)
14
The Fives FCB sustainable plantHigh alternative fuels substitution
Cartago (Holcim Costa Rica) : up to 70% coarse ASF (thermal load) can be fed directly in the precalciner burner (ASF made of rubber, plastics and papers)
ppm kg/h
FICEM APCAC – 05/09/2012
![Page 15: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/15.jpg)
15
The Fives FCB sustainable plantHigh alternative fuels substitution
Alternative Fuels
Hermosillo (Holcim Apasco)
A quick and efficient ignition
A good burn-out & low CO
50% of shredded tyres (thermal load)
FICEM APCAC – 05/09/2012
![Page 16: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/16.jpg)
A combination of advanced proven technologies
Low emissions
Low power consumption
High alternative fuels substitution
Zero water consumption
High clinker substitution
![Page 17: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/17.jpg)
17
The Fives FCB sustainable plantLow power consumption
Horomill® 3800 CEM II/B-PSlag /
CEM III/A/BCEM I /
CEM II/A-LCEM I
Blaine 3 600 4 000 3000 / 3500 4 000Capacity t/h 130 67 115 72Horomill® kW 2 047 1 880 1 900 1 880
Horomill® kWh/t 15,7 28,1 16,5 26,1
TSV™ kWh/t 0,5 1,5 0,5 1,5Elevator kWh/t 0,8 1,3 0,9 1,3Fan kWh/t 4,2 8,5 3,7 6,7Total kWh/t 21,3 39,4 21,6 35,5
Ball Mill CEM II/B-PSlag /
CEM III/A/BCEM I /
CEM II/A-LCEM I
Blaine 3 800 4 000 3200 / 3700 4 200Capacity t/h 121 53 115 78Ball mill kW 3 600 3 600 3 600 3 600Ball mill kWh/t 29,8 67,9 31,3 46,2
TSV™ kWh/t 0,3 0,6 0,2 0,6Elevator kWh/t 0,4 0,8 0,4 0,6Fan kWh/t 3,3 6,3 2,6 4,1Total kWh/t 33,7 75,7 34,5 51,4
Savings kWh/t 12,4 36,3 13,0 15,937% 48% 38% 31%
Large energy savings compared to the ball mill …
FICEM APCAC – 05/09/2012
![Page 18: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/18.jpg)
18
Horomill® : the lowest energy consumption
… but also substantial energy savings compared with the vertical mill
Absorbed Power Vertical mill Horomill® Vertical mill Horomill®
Mill 1 820 1 820 1 850 1 850
Separator 60 30 135 55
Elevator 30 160 30 105
Fan 1 880 770 930 450
Auxiliaries 60 50 60 50
Total abs. Power kW 3 850 2 830 3 005 2 510
Specific energy kWh/t 16.7 12.3 26.1 21.8
Savings (%) -26.5% -16.5%
Raw meal grinding Cement grinding
230 t/h - 12% R90µ 115 t/h CEM II A/P - 3900 Blaine
FICEM APCAC – 05/09/2012
which can represent more than 1 MUSD in annual operation cost
![Page 19: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/19.jpg)
19
The Fives FCB sustainable plantLow power consumption
Cement plant consumption: 80 kWh/ton of cement
Example of cement plants fully equipped with Fives FCB Horomill
Tepetzingo (Mexico): 2 lines with 1 Horomill®
for raw grinding and 1 Horomill® for cement
Cerritos (Mexico): 2 lines with 1 Horomill®
for raw grinding and 2 Horomill® for cement
Apazapan (Mexico):1 line with 1 Horomill®
for raw grinding and 2 Horomill® for cement
Typical cement produced: CEM I / CEM II-A/P @ 4200 Blaine
FICEM APCAC – 05/09/2012
![Page 20: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/20.jpg)
A combination of advanced proven technologies
Low emissions
Low power consumption
High alternative fuels substitution
Zero water consumption
High clinker substitution
![Page 21: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/21.jpg)
21
The Fives FCB sustainable plantHigh clinker substitution: stability & flexibility
the Horomill® installed at Lafarge Karsdorf (Germany) produces up to 7 different recipes
FICEM APCAC – 05/09/2012
Trino 2SMA 1Cimentas 1Darica 3Karsdorf 7Tepetzingo 3 & 4 2Cizkovice 2Tepetzingo 1 & 2 1RCC 1Denizli 3 & 4 3Maxit 1Confidential 1 1Confidential 2 1Konya 1
7 2 4 2 2 1 1 1 1 1 1 2 1
![Page 22: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/22.jpg)
A combination of advanced proven technologies
Low emissions
Low power consumption
High alternative fuels substitution
Zero water consumption
High clinker substitution
![Page 23: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/23.jpg)
23
The Fives FCB sustainable plantZero water consumption: the Fives FCB common filter
FICEM APCAC – 05/09/2012
Example of zero water burning line equipped with Fives FCB common filter: Holcim Hermosillo
Air/Air Heat exchanger
Mixing chamberwith dilution
Common stack
Common filterwith PTFE bagsHE cyclones
Booster fan
Preheater downcomerwithout water injection
![Page 24: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/24.jpg)
24
The Fives FCB sustainable plantZero water consumption: the Fives FCB Horomill
FICEM APCAC – 05/09/2012
Example of zero water cement grinding equipped with Fives FCB Horomill: Holcim Hermosillo
No need of water for grinding
Centrifugation of the layer
procuring grinding stability
No need of water thermal balance
External recirculation
with cooling in the classifier loop
![Page 25: Fives FICEM APCAC – XXIX Congreso Técnico – Costa Rica - San José – 05/09/2012 Driving Progress The Fives FCB sustainable cement plant](https://reader038.vdocument.in/reader038/viewer/2022110210/56649eb55503460f94bbea5e/html5/thumbnails/25.jpg)
FICEM APCAC – 05/09/2012 25
The Fives FCB sustainable plant in figures
Less than 500 mg/Nm3 of NOx (equivalent NO2 dry @ 10%O2) at stack
Up to 70% of AFR substitution at precalciner (on thermal load)
Thanks to the combination of the Fives FCB precalciner & Fives Pillard burner
Less than 80 kWh/t of cement
High clinker substitution factor
Thanks to the Fives FCB Horomill & Fives FCB TSVTM
Zero water consumption
Thanks to the combination of the Fives FCB Horomill & common filter