flexible tubing kerui.doc
TRANSCRIPT
-
7/23/2019 Flexible tubing KERUI.doc
1/51
More Efficient in Oil & Gas Extraction
FLEXIBLE TUBING
-
7/23/2019 Flexible tubing KERUI.doc
2/51
Flexible tubing KERUI
Coiled Line Pipe is an evolutionarydevelopment in our
industry as itutilizes the use of the trusted steel pipegrades and ombines it!ith thefast spoolaledeploy!ent"
Coiled Line Pipe allo!s for safer" faster and c#eaper pro$ectco!pletionbyutting the pipeline installation time"
#$% &'( less man hours")$% ( less e*uipment hours"+$% redued ris,s related to safety and *uality"-$% smaller Right of .ay and minimal environmental impat"
-
7/23/2019 Flexible tubing KERUI.doc
3/51
Flexible tubing KERUIFlexible Pipeline is a ontinuously milled length of steel tubing"
/he pipe is externally oated at the end of the milling proess before spooling
and 0nal testing" It is ideally suited for !ell tie1ins2 long 3o!lines and pipelines"
Flexible Pipeline allo!s for a pro4et to be ompleted !ithout 0eld !elding"
.56 U7E FLE8I9LE PIPELI:E
; #PI 'LCP
monogram ?Liense @
-
7/23/2019 Flexible tubing KERUI.doc
4/51
%i# 'uality
5igh =uality Aaster Coils of steel are slit to the!idth
re*uired for the diameter of tube to be milled
Chemistry veri0ed Aehanial properties veri0ed .idth veri0ed /hi,ness veri0ed
Full traeability of eah strip2 master oil andheat of
ra! materials (ipeline )o!pliance *it# +(I ,L)(
-
7/23/2019 Flexible tubing KERUI.doc
5/51
'uality )o!pliance *it# +(I '- and I.O /00-
-
7/23/2019 Flexible tubing KERUI.doc
6/51
)usto! Manufacturin (rocess
-
7/23/2019 Flexible tubing KERUI.doc
7/51
.tate Of T#e +rt )oiled Line (ipe
Mills
-
7/23/2019 Flexible tubing KERUI.doc
8/51
Every Coil is hydro tested for +< minutesbefore leaving
for the 0eld
-
7/23/2019 Flexible tubing KERUI.doc
9/51
1escription" se2uence and si!ultaneousness $o
Loistic preparation on $o site3
Kerui team !ill he, all the materials delivered at the4ob site2
he,ing the pa,ing list"
#"
)"
+"
-"
'"
>ll this he,ing !ill be advise to the lient"
Aoving the e*uipment 3exible pipes reels to the 0eld"
Che,ing the ranes erti0ations
Po!er eletriity supply for the !elding mahine
Preparing the safety signals on site"
-
7/23/2019 Flexible tubing KERUI.doc
10/51
1escription" se2uence and si!ultaneousness $o
4econition of t#e *or5 area3
Kerui team !ill visit 0rst the loation and the stages ?!ell pads$
#"
)"
+"
In order to ,no! the restritions that !e an have for the 4ob"
Aa,e a plan for the solution aording !ith the restritions"
.eather situation !ill be part of the 4ob2 Kerui an not .eld !ith rain"
-
7/23/2019 Flexible tubing KERUI.doc
11/51
1escription" se2uence and si!ultaneousness $o
7tarting 4ob"
#" Aeeting box2 all days during the pro4ets
)" Explaining !or, proedure
+" B7>2 preparing and signing all the permition"-" as analysis by detetor2 no !elding 4ob lose to the!ellpad
'" 7etting the reels on tru,s and pulling aording !iththe stages"
&" Inspetion 4ob on the !elding pipe zone"
D" Aehanial test aording by lient re*uested
" Fixing and overing the !elded area on the pipes
" Gaily reports for the 4ob done"
-
7/23/2019 Flexible tubing KERUI.doc
12/51
1escription" se2uence and si!ultaneousness $o
Bob done report"
#" Kerui !ill provide a Gossier =uality report for the 4obperformane"
)" /he Gossier =uality the follo!ing doumentsH Aanufaturing pipe reports
.elding erti0ations
Calibration !elding mahine"
/esting report
Inspetion report provide by the inspetor Company"
-
7/23/2019 Flexible tubing KERUI.doc
13/51
Flexible Pipes
Charateristis
-
7/23/2019 Flexible tubing KERUI.doc
14/51
Flexible Pipes
Charateristis
-
7/23/2019 Flexible tubing KERUI.doc
15/51
Flexible Pipes
Charateristis
-
7/23/2019 Flexible tubing KERUI.doc
16/51
Flexible Pipes 'J
-
7/23/2019 Flexible tubing KERUI.doc
17/51
Flexible Pipes
Charateristis
-
7/23/2019 Flexible tubing KERUI.doc
18/51
Flexible Pipes Charateristis Coatings H + LayerPolyole0n
-
7/23/2019 Flexible tubing KERUI.doc
19/51
.elding e*uipmentCharateristis
Ailler Gynasty )
-
7/23/2019 Flexible tubing KERUI.doc
20/51
.elding ,its
-
7/23/2019 Flexible tubing KERUI.doc
21/51
.elding ,its
-
7/23/2019 Flexible tubing KERUI.doc
22/51
)oiled Line (ipe Installation
E2uip!ent needed for unloadin reels67Typically .upplied y )lient8
50 Ton Crane3- 20 Foot Blue Endless Slings ( 21,220 lbs.Vertical, 17,000 lbs. Choker, 42,400 lbs.
Basket)
-
7/23/2019 Flexible tubing KERUI.doc
23/51
)oiled Line (ipe Installation
1eploy!ent Tools 79ill e provided y :erui8 Two Way Radios communication 3-2 Yellow Straps 6 foot in length 4-3/4 Shackles
2- Shackles 5- Pull heads 2- 12 Inches Crescent Wrenches 1-36 Pipe Wrench 1- 5 foot digging bar
1-Set of open end wrenches (/4 thr! " 1- #ri$e %atchet with a 3 /& Socket
-
7/23/2019 Flexible tubing KERUI.doc
24/51
)oiled Line (ipe Installation
.#rin5 .leeve Installation 7'uoted y
:erui8
2 Shrink Sleeves per each coil length2 FB Epoxy Kits per each coil length1- Scrapper per 5 reels
1- Tigger Torch and Spare bottles
1- Inferred Temperature Gun1- Roller per 5 reels
-
7/23/2019 Flexible tubing KERUI.doc
25/51
)oiled Line (ipe Installation
)onsu!ales 7(rovided y )lient8 Gaily Field /i,ets
B7> 9oo,s
ear ilBerry Can
Premium Fuel 9ox of Rags
9ottles of >lohol for 7hrin, 7leeveinstallations rease
9rea, Cleaner
-
7/23/2019 Flexible tubing KERUI.doc
26/51
Inspetion suggested by
Kerui/he onsite inspetions !ould be based on the re*uirements ofthe end1user2but here are some of the typial onesH
Eletrial Current /esting for Coating Integrity ?eep$" Pipe1to1pipe 81ray >s per the end user re*uirements
?idential to existingsteel pipeline re*uirements$
Coating Repair Inspetion visual and volumetri inspetionas per the
manufaturerMs re*uirements" ?see the attahed Proedure$
5ydrotest of pipeline >s re*uired by the end user" /his
e*uipment2 !ater
-
7/23/2019 Flexible tubing KERUI.doc
27/51
?air$2 drying pigs and all other materials !ill need to beproured by theloal ontrator"
>s1Installed Nisual inspetion based on EndUserMs O>s 9uiltJre*uirements"
-
7/23/2019 Flexible tubing KERUI.doc
28/51
Fixing pipe !elded
-
7/23/2019 Flexible tubing KERUI.doc
29/51
Fixing pipe !elded
Aaterials and E*uipment
7urfae Preparation
Installation Proedure delivered at the 4ob time
=uality Indiators performane for the 4ob
/esting of the applied oating
-
7/23/2019 Flexible tubing KERUI.doc
30/51
Existin )T( 1eploy!ent E2uip!ent
-
7/23/2019 Flexible tubing KERUI.doc
31/51
/railer 7ystem for
installation"
-
7/23/2019 Flexible tubing KERUI.doc
32/51
Installation Example
-
7/23/2019 Flexible tubing KERUI.doc
33/51
-
7/23/2019 Flexible tubing KERUI.doc
34/51
Common 7trutural
Composition)arcass 7Flexody;8
Prevents ollapse under external hydrostati
pressure
Internal (ressure .#eat# 7Flexarrier;8>ts as the boundary for
onveyed 3uid
Interloc5ed (ressure +r!our 7Flexlo5;8
Resists internal external pressure in the hoop
diretion
Inner Layer & Outer Layer of Tensile+r!our 7Flextensile;8
Provides both hoop and axial
strength
Insulatin Layer 7Flexinsul;8
Protets against heat
-
7/23/2019 Flexible tubing KERUI.doc
35/51
loss
Outer .#eat# 7Flexs#ield;8
Protets against sea!ater ingress and other
mehanial damage
http://var/www/apps/conversion/tmp/AppData/Users/AppRunner/AppData/Local/Temp/pdftmp/soporte/1.-%20Wellstream_Spanish_Full.wmvhttp://var/www/apps/conversion/tmp/AppData/Users/AppRunner/AppData/Local/Temp/pdftmp/soporte/1.-%20Wellstream_Spanish_Full.wmv -
7/23/2019 Flexible tubing KERUI.doc
36/51
Common materials present
on /FCarass +#&L 77 ))
-
7/23/2019 Flexible tubing KERUI.doc
37/51
5GPE P>##TP>#)mm x +mm 7tati >ppliationsmm x -mm Gynami >ppliations
#)mm x &mm I Gynami>ppliation
7tati appliations 5GPE ?6ello!$ 7yntati Foam P/#
-
7/23/2019 Flexible tubing KERUI.doc
38/51
-
7/23/2019 Flexible tubing KERUI.doc
39/51
End Fitting /ehnology
End 0ttings are ritialomponents of any 3exible pipesystem Custom designed for eah 3exible pipe struture
Eah layer of the pipe individually terminated
Gesigned toH >ssure a lea, tight transition bet!een subsea and surfae failities .ithstand severe environmental loads and thermal yling
7tronger than pipe in burst and failure tension
>llo! for the venting of permeated gases
/erminations an be any design 1>PIT>:7I 3anges2 hubs2 !elded2 or
other Aost ommon strutural material
is >I7I -#+< lo! alloy steel
-
7/23/2019 Flexible tubing KERUI.doc
40/51
>nillary E*uipment
/ehnology> ,ey omponent of any 3exible riser and 3o!linesystem is thedesign and analysis of all re*uired anillary e*uipment
9end 7tiQeners Restritors
Installation >ids
7eabed 7tabilisation
9uoyany
End Fittin
+sse!ly
.usea Bend
.tiffener +sse!ly
Bracelet
+nodes
Flexile
(ipe
Grayloc Interface+sse!ly 7%u" )la!p"
Gas5et" Test %ead8
1istri
uted
Buoyancy
Modules
Topsides Bend
.tiffener +sse!ly
-
7/23/2019 Flexible tubing KERUI.doc
41/51
I
-
7/23/2019 Flexible tubing KERUI.doc
42/51
7ubmarine installation onshallo!
!aters
Rigid riser mustbe previouslyinstalled on theplatform inorder to speedthe installation
-
7/23/2019 Flexible tubing KERUI.doc
43/51
Flexible pipe standards >:7I T I7 #+&) T >PI #DB 1 7pei0ation for Unbonded Flexible Pipe 1
Petroleumnatural gas industries 1 Grilling and prodution e*uipment 1 Gesign andoperationof subsea system1 Part )H Flexible pipe systems for subsea andmarine appliations"
Petrobras :I1)- 1 Flexible Pipe 7pei0ation 1 )
-
7/23/2019 Flexible tubing KERUI.doc
44/51
operations" >PI#D> ontains >PI #D9 and #DB
G7 :7IT>7AE 9+#"" " /he >:7IT>7AE9+#"- speifythat in the ase of the use of 3exible pipe2 the >PI #D9 must be used"
FLEXIBLE (I(E I. 1IFFE4ENT F4OM T%E 4IGI1 (I(E3 E+)% T>(E %+. IT. O9N. .(E)
-
7/23/2019 Flexible tubing KERUI.doc
45/51
Reel
Loadout ptions
Used in the prodution failities /he most 3exible form of shipping unit Reels may be shipped diretly by installation vessel or by speialist heavy lift
argo vessels Reels an be on0gured for multiple lines or speial pa,ing arrangements Reels an be loaded diretly into lay system drives 7imple onshore drive systems for spooling
Carousel enerally more suitable for ables and umbilials >llo!s longer lengths from onshore arousels in :e!astle Re*uires purpose built installation or transport vessels !ith suitable arousel
systems Extensive pa,ing usually re*uired for multiple lengths
9espo,e Pa,aging Coiled and banded 1 for short 4umper lengths .ooden reels disposable 7teel frames 1 disposable
-
7/23/2019 Flexible tubing KERUI.doc
46/51
Installation systemsinludeH
Installation
5orizontal Lay 7ystem ?5L7$ Installation
Nertial Lay 7ystem ?NL7$ Installation
Installation proess imposes additional loads inludingH /ensioner pad s*ueeze /ension loads !hih vary !ith !ater depth
9ending loads over hutes
Compression loads during deployment
Impat loads and bending during touhdo!n on
seabed
Post installation lea, testing on0rms integrity of all installedlines follo!ing installation /ypially at #"# x design pressure for a period of - to )- hours
depending upon type and length
-
7/23/2019 Flexible tubing KERUI.doc
47/51
-
7/23/2019 Flexible tubing KERUI.doc
48/51
-
7/23/2019 Flexible tubing KERUI.doc
49/51
E8>APLE
-
7/23/2019 Flexible tubing KERUI.doc
50/51
E8>APLE
-
7/23/2019 Flexible tubing KERUI.doc
51/51
Kerui Petroleum E*uipment and Engineering 7ervie 7>C"
>ddressH Centro Empresarial Bose Pardo2 Calle Aartir Bose laya :o #) FFICE #D