flexible tubing kerui.doc

Upload: ingchemical

Post on 14-Feb-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/23/2019 Flexible tubing KERUI.doc

    1/51

    More Efficient in Oil & Gas Extraction

    FLEXIBLE TUBING

  • 7/23/2019 Flexible tubing KERUI.doc

    2/51

    Flexible tubing KERUI

    Coiled Line Pipe is an evolutionarydevelopment in our

    industry as itutilizes the use of the trusted steel pipegrades and ombines it!ith thefast spoolaledeploy!ent"

    Coiled Line Pipe allo!s for safer" faster and c#eaper pro$ectco!pletionbyutting the pipeline installation time"

    #$% &'( less man hours")$% ( less e*uipment hours"+$% redued ris,s related to safety and *uality"-$% smaller Right of .ay and minimal environmental impat"

  • 7/23/2019 Flexible tubing KERUI.doc

    3/51

    Flexible tubing KERUIFlexible Pipeline is a ontinuously milled length of steel tubing"

    /he pipe is externally oated at the end of the milling proess before spooling

    and 0nal testing" It is ideally suited for !ell tie1ins2 long 3o!lines and pipelines"

    Flexible Pipeline allo!s for a pro4et to be ompleted !ithout 0eld !elding"

    .56 U7E FLE8I9LE PIPELI:E

    ; #PI 'LCP

    monogram ?Liense @

  • 7/23/2019 Flexible tubing KERUI.doc

    4/51

    %i# 'uality

    5igh =uality Aaster Coils of steel are slit to the!idth

    re*uired for the diameter of tube to be milled

    Chemistry veri0ed Aehanial properties veri0ed .idth veri0ed /hi,ness veri0ed

    Full traeability of eah strip2 master oil andheat of

    ra! materials (ipeline )o!pliance *it# +(I ,L)(

  • 7/23/2019 Flexible tubing KERUI.doc

    5/51

    'uality )o!pliance *it# +(I '- and I.O /00-

  • 7/23/2019 Flexible tubing KERUI.doc

    6/51

    )usto! Manufacturin (rocess

  • 7/23/2019 Flexible tubing KERUI.doc

    7/51

    .tate Of T#e +rt )oiled Line (ipe

    Mills

  • 7/23/2019 Flexible tubing KERUI.doc

    8/51

    Every Coil is hydro tested for +< minutesbefore leaving

    for the 0eld

  • 7/23/2019 Flexible tubing KERUI.doc

    9/51

    1escription" se2uence and si!ultaneousness $o

    Loistic preparation on $o site3

    Kerui team !ill he, all the materials delivered at the4ob site2

    he,ing the pa,ing list"

    #"

    )"

    +"

    -"

    '"

    >ll this he,ing !ill be advise to the lient"

    Aoving the e*uipment 3exible pipes reels to the 0eld"

    Che,ing the ranes erti0ations

    Po!er eletriity supply for the !elding mahine

    Preparing the safety signals on site"

  • 7/23/2019 Flexible tubing KERUI.doc

    10/51

    1escription" se2uence and si!ultaneousness $o

    4econition of t#e *or5 area3

    Kerui team !ill visit 0rst the loation and the stages ?!ell pads$

    #"

    )"

    +"

    In order to ,no! the restritions that !e an have for the 4ob"

    Aa,e a plan for the solution aording !ith the restritions"

    .eather situation !ill be part of the 4ob2 Kerui an not .eld !ith rain"

  • 7/23/2019 Flexible tubing KERUI.doc

    11/51

    1escription" se2uence and si!ultaneousness $o

    7tarting 4ob"

    #" Aeeting box2 all days during the pro4ets

    )" Explaining !or, proedure

    +" B7>2 preparing and signing all the permition"-" as analysis by detetor2 no !elding 4ob lose to the!ellpad

    '" 7etting the reels on tru,s and pulling aording !iththe stages"

    &" Inspetion 4ob on the !elding pipe zone"

    D" Aehanial test aording by lient re*uested

    " Fixing and overing the !elded area on the pipes

    " Gaily reports for the 4ob done"

  • 7/23/2019 Flexible tubing KERUI.doc

    12/51

    1escription" se2uence and si!ultaneousness $o

    Bob done report"

    #" Kerui !ill provide a Gossier =uality report for the 4obperformane"

    )" /he Gossier =uality the follo!ing doumentsH Aanufaturing pipe reports

    .elding erti0ations

    Calibration !elding mahine"

    /esting report

    Inspetion report provide by the inspetor Company"

  • 7/23/2019 Flexible tubing KERUI.doc

    13/51

    Flexible Pipes

    Charateristis

  • 7/23/2019 Flexible tubing KERUI.doc

    14/51

    Flexible Pipes

    Charateristis

  • 7/23/2019 Flexible tubing KERUI.doc

    15/51

    Flexible Pipes

    Charateristis

  • 7/23/2019 Flexible tubing KERUI.doc

    16/51

    Flexible Pipes 'J

  • 7/23/2019 Flexible tubing KERUI.doc

    17/51

    Flexible Pipes

    Charateristis

  • 7/23/2019 Flexible tubing KERUI.doc

    18/51

    Flexible Pipes Charateristis Coatings H + LayerPolyole0n

  • 7/23/2019 Flexible tubing KERUI.doc

    19/51

    .elding e*uipmentCharateristis

    Ailler Gynasty )

  • 7/23/2019 Flexible tubing KERUI.doc

    20/51

    .elding ,its

  • 7/23/2019 Flexible tubing KERUI.doc

    21/51

    .elding ,its

  • 7/23/2019 Flexible tubing KERUI.doc

    22/51

    )oiled Line (ipe Installation

    E2uip!ent needed for unloadin reels67Typically .upplied y )lient8

    50 Ton Crane3- 20 Foot Blue Endless Slings ( 21,220 lbs.Vertical, 17,000 lbs. Choker, 42,400 lbs.

    Basket)

  • 7/23/2019 Flexible tubing KERUI.doc

    23/51

    )oiled Line (ipe Installation

    1eploy!ent Tools 79ill e provided y :erui8 Two Way Radios communication 3-2 Yellow Straps 6 foot in length 4-3/4 Shackles

    2- Shackles 5- Pull heads 2- 12 Inches Crescent Wrenches 1-36 Pipe Wrench 1- 5 foot digging bar

    1-Set of open end wrenches (/4 thr! " 1- #ri$e %atchet with a 3 /& Socket

  • 7/23/2019 Flexible tubing KERUI.doc

    24/51

    )oiled Line (ipe Installation

    .#rin5 .leeve Installation 7'uoted y

    :erui8

    2 Shrink Sleeves per each coil length2 FB Epoxy Kits per each coil length1- Scrapper per 5 reels

    1- Tigger Torch and Spare bottles

    1- Inferred Temperature Gun1- Roller per 5 reels

  • 7/23/2019 Flexible tubing KERUI.doc

    25/51

    )oiled Line (ipe Installation

    )onsu!ales 7(rovided y )lient8 Gaily Field /i,ets

    B7> 9oo,s

    ear ilBerry Can

    Premium Fuel 9ox of Rags

    9ottles of >lohol for 7hrin, 7leeveinstallations rease

    9rea, Cleaner

  • 7/23/2019 Flexible tubing KERUI.doc

    26/51

    Inspetion suggested by

    Kerui/he onsite inspetions !ould be based on the re*uirements ofthe end1user2but here are some of the typial onesH

    Eletrial Current /esting for Coating Integrity ?eep$" Pipe1to1pipe 81ray >s per the end user re*uirements

    ?idential to existingsteel pipeline re*uirements$

    Coating Repair Inspetion visual and volumetri inspetionas per the

    manufaturerMs re*uirements" ?see the attahed Proedure$

    5ydrotest of pipeline >s re*uired by the end user" /his

    e*uipment2 !ater

  • 7/23/2019 Flexible tubing KERUI.doc

    27/51

    ?air$2 drying pigs and all other materials !ill need to beproured by theloal ontrator"

    >s1Installed Nisual inspetion based on EndUserMs O>s 9uiltJre*uirements"

  • 7/23/2019 Flexible tubing KERUI.doc

    28/51

    Fixing pipe !elded

  • 7/23/2019 Flexible tubing KERUI.doc

    29/51

    Fixing pipe !elded

    Aaterials and E*uipment

    7urfae Preparation

    Installation Proedure delivered at the 4ob time

    =uality Indiators performane for the 4ob

    /esting of the applied oating

  • 7/23/2019 Flexible tubing KERUI.doc

    30/51

    Existin )T( 1eploy!ent E2uip!ent

  • 7/23/2019 Flexible tubing KERUI.doc

    31/51

    /railer 7ystem for

    installation"

  • 7/23/2019 Flexible tubing KERUI.doc

    32/51

    Installation Example

  • 7/23/2019 Flexible tubing KERUI.doc

    33/51

  • 7/23/2019 Flexible tubing KERUI.doc

    34/51

    Common 7trutural

    Composition)arcass 7Flexody;8

    Prevents ollapse under external hydrostati

    pressure

    Internal (ressure .#eat# 7Flexarrier;8>ts as the boundary for

    onveyed 3uid

    Interloc5ed (ressure +r!our 7Flexlo5;8

    Resists internal external pressure in the hoop

    diretion

    Inner Layer & Outer Layer of Tensile+r!our 7Flextensile;8

    Provides both hoop and axial

    strength

    Insulatin Layer 7Flexinsul;8

    Protets against heat

  • 7/23/2019 Flexible tubing KERUI.doc

    35/51

    loss

    Outer .#eat# 7Flexs#ield;8

    Protets against sea!ater ingress and other

    mehanial damage

    http://var/www/apps/conversion/tmp/AppData/Users/AppRunner/AppData/Local/Temp/pdftmp/soporte/1.-%20Wellstream_Spanish_Full.wmvhttp://var/www/apps/conversion/tmp/AppData/Users/AppRunner/AppData/Local/Temp/pdftmp/soporte/1.-%20Wellstream_Spanish_Full.wmv
  • 7/23/2019 Flexible tubing KERUI.doc

    36/51

    Common materials present

    on /FCarass +#&L 77 ))

  • 7/23/2019 Flexible tubing KERUI.doc

    37/51

    5GPE P>##TP>#)mm x +mm 7tati >ppliationsmm x -mm Gynami >ppliations

    #)mm x &mm I Gynami>ppliation

    7tati appliations 5GPE ?6ello!$ 7yntati Foam P/#

  • 7/23/2019 Flexible tubing KERUI.doc

    38/51

  • 7/23/2019 Flexible tubing KERUI.doc

    39/51

    End Fitting /ehnology

    End 0ttings are ritialomponents of any 3exible pipesystem Custom designed for eah 3exible pipe struture

    Eah layer of the pipe individually terminated

    Gesigned toH >ssure a lea, tight transition bet!een subsea and surfae failities .ithstand severe environmental loads and thermal yling

    7tronger than pipe in burst and failure tension

    >llo! for the venting of permeated gases

    /erminations an be any design 1>PIT>:7I 3anges2 hubs2 !elded2 or

    other Aost ommon strutural material

    is >I7I -#+< lo! alloy steel

  • 7/23/2019 Flexible tubing KERUI.doc

    40/51

    >nillary E*uipment

    /ehnology> ,ey omponent of any 3exible riser and 3o!linesystem is thedesign and analysis of all re*uired anillary e*uipment

    9end 7tiQeners Restritors

    Installation >ids

    7eabed 7tabilisation

    9uoyany

    End Fittin

    +sse!ly

    .usea Bend

    .tiffener +sse!ly

    Bracelet

    +nodes

    Flexile

    (ipe

    Grayloc Interface+sse!ly 7%u" )la!p"

    Gas5et" Test %ead8

    1istri

    uted

    Buoyancy

    Modules

    Topsides Bend

    .tiffener +sse!ly

  • 7/23/2019 Flexible tubing KERUI.doc

    41/51

    I

  • 7/23/2019 Flexible tubing KERUI.doc

    42/51

    7ubmarine installation onshallo!

    !aters

    Rigid riser mustbe previouslyinstalled on theplatform inorder to speedthe installation

  • 7/23/2019 Flexible tubing KERUI.doc

    43/51

    Flexible pipe standards >:7I T I7 #+&) T >PI #DB 1 7pei0ation for Unbonded Flexible Pipe 1

    Petroleumnatural gas industries 1 Grilling and prodution e*uipment 1 Gesign andoperationof subsea system1 Part )H Flexible pipe systems for subsea andmarine appliations"

    Petrobras :I1)- 1 Flexible Pipe 7pei0ation 1 )

  • 7/23/2019 Flexible tubing KERUI.doc

    44/51

    operations" >PI#D> ontains >PI #D9 and #DB

    G7 :7IT>7AE 9+#"" " /he >:7IT>7AE9+#"- speifythat in the ase of the use of 3exible pipe2 the >PI #D9 must be used"

    FLEXIBLE (I(E I. 1IFFE4ENT F4OM T%E 4IGI1 (I(E3 E+)% T>(E %+. IT. O9N. .(E)

  • 7/23/2019 Flexible tubing KERUI.doc

    45/51

    Reel

    Loadout ptions

    Used in the prodution failities /he most 3exible form of shipping unit Reels may be shipped diretly by installation vessel or by speialist heavy lift

    argo vessels Reels an be on0gured for multiple lines or speial pa,ing arrangements Reels an be loaded diretly into lay system drives 7imple onshore drive systems for spooling

    Carousel enerally more suitable for ables and umbilials >llo!s longer lengths from onshore arousels in :e!astle Re*uires purpose built installation or transport vessels !ith suitable arousel

    systems Extensive pa,ing usually re*uired for multiple lengths

    9espo,e Pa,aging Coiled and banded 1 for short 4umper lengths .ooden reels disposable 7teel frames 1 disposable

  • 7/23/2019 Flexible tubing KERUI.doc

    46/51

    Installation systemsinludeH

    Installation

    5orizontal Lay 7ystem ?5L7$ Installation

    Nertial Lay 7ystem ?NL7$ Installation

    Installation proess imposes additional loads inludingH /ensioner pad s*ueeze /ension loads !hih vary !ith !ater depth

    9ending loads over hutes

    Compression loads during deployment

    Impat loads and bending during touhdo!n on

    seabed

    Post installation lea, testing on0rms integrity of all installedlines follo!ing installation /ypially at #"# x design pressure for a period of - to )- hours

    depending upon type and length

  • 7/23/2019 Flexible tubing KERUI.doc

    47/51

  • 7/23/2019 Flexible tubing KERUI.doc

    48/51

  • 7/23/2019 Flexible tubing KERUI.doc

    49/51

    E8>APLE

  • 7/23/2019 Flexible tubing KERUI.doc

    50/51

    E8>APLE

  • 7/23/2019 Flexible tubing KERUI.doc

    51/51

    Kerui Petroleum E*uipment and Engineering 7ervie 7>C"

    >ddressH Centro Empresarial Bose Pardo2 Calle Aartir Bose laya :o #) FFICE #D