Casestudy
Cordova,Alaska
EnergyStorageofRenewablePowerinIslandedMicrogrids
Heike Merkel, Data and Project Manager, Alaska Center for Energy and Power Dec 3th, 2016
![Page 2: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/2.jpg)
LocationofMap
Cordova
HumpbackCreekHydroPlant
PowerCreekHydroPlant
CraterLake
OrcaPowerPlant
CECSubstation
![Page 3: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/3.jpg)
OrcaPowerPlant:5Units:2x1125kW1x2450kW1x2500kW1x3800kWTOTAL:10.8MWProduced10GWh(2011)
![Page 4: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/4.jpg)
PowerCreekHydroPlant
2x3MWturbinesTotal:6MW
Produced15.7GWh(2011)
Potential~21GWhSpilled~5.3GWh
![Page 5: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/5.jpg)
HumpbackCreekHydroPlant3Units:2x500kWFrancis1x250kWTurgoTotal:1.25MWProduced1.6GWh(2011)Nospillage,plantrunsatfullcapacity
![Page 6: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/6.jpg)
PowerCreekGenerationandLoads
![Page 7: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/7.jpg)
AnimationbyMarcMueller-Stoffels(ACEP)
![Page 8: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/8.jpg)
ObjectiveandApproach
• EnergyStorageanalysisandoptimizationmodelingto:– Recoverspilledpower– Reducediesel
consumption– ReducedieselO&M– Supportgridstability
• Deliverables– Technicalspecificationfor
RFPbyCEC– Projectblueprintfor
otherAKutilities
CordovaEnergyMixin2011• 18GWhHydropower• 10GWhDiesel• 781,000GalDiesel@$3.55/gal
• $2.77MFuelbill• Costofgeneration:
• Hydro:~$0.06/kWh• Diesel:~$0.35/kWh
• Estimate:~5.3GWhspilledhydro
Cansomeofthespilledhydroberecoveredtodisplacedieselfuel?
![Page 9: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/9.jpg)
ESSPotentialin2011
Diminishingreturnsofreductionofdieselfuel.LowpowerESS(<1MW)oflimitedvalue.
Rangeincludedinthesimulation
TorecoverALLspilledhydropowerwould
requirea10MW/2.5GWh
battery!
Red
uctio
n in
die
sel c
onsu
mpt
ion
![Page 10: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/10.jpg)
DieselchargingESS:YES DieselchargingESS:NO
ReductioninDieselConsumption
![Page 11: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/11.jpg)
ReductioninDieselRunTime
DieselchargingESS:YES DieselchargingESS:NO
![Page 12: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/12.jpg)
DieselCapacityFactor
DieselchargingESS:YES DieselchargingESS:NO
![Page 13: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/13.jpg)
DieselSwitching
DieselchargingESS:YES DieselchargingESS:NO
![Page 14: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/14.jpg)
ESSCycles/CycleAmplitude
DieselchargingESS:YES DieselchargingESS:NO
![Page 15: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/15.jpg)
ESSasSRCSupport
DieselchargingESS:YES DieselchargingESS:NO
![Page 16: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/16.jpg)
PreliminaryResultsandNextSteps
• Replacementof1GWhofdieselwithhydroresultsinapotentialsavingsindieselfuelof~$300k
• EstimatedieselO&Mcost• Mergeourdatawithdynamic
systemmodelbySandiaNationalLabtodeterminetheoptimalESSlocation
• DeveloptechnicalspecificationfortheESS
• CEC:IssueRFPwithoptiontoown/operateorbidirectionalPPA.
![Page 17: Flinders Island Isolated Power System (IPS) Connect 2016 H MERKEL ACEP](https://reader031.vdocument.in/reader031/viewer/2022030305/58740efa1a28ab6f1d8b812d/html5/thumbnails/17.jpg)
Thankyou!
ACEPProjectteam:Dr.MarcMueller-Stoffels(PI),Dr.HendrikSchaede,JeremyVandermeer,LuisMiranda,HeikeMerkel
http://acep.uaf.edu