![Page 1: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/1.jpg)
Florida Gas Transmission10-Inch Hydrostatic Test
10-Inch Saint Petersburg Lateral PipelineFrom I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton Road (Valve 24-103B)
Pinellas County
![Page 2: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/2.jpg)
Who is Florida Gas Transmission (FGT)?
Why is FGT testing?What is the test exactly?When will the test occur?Where will the test take place?How will the test be conducted?How will the test affect me?
Today’s Outline
2
![Page 3: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/3.jpg)
Natural gas transmission company operating a 5,000 mile pipeline system along the Gulf
Provide majority of the natural gas for power generation in Pinellas County
10-inch diameter pipeline serving Tampa area
Customers include: Electric utility companies Local distributors Industrial clients
Florida Gas Transmission Company
3
![Page 4: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/4.jpg)
The U.S. Department of Transportation regulates all interstate pipelines
Testing is federally mandatedBest practice to confirm the safety
and reliability of the pipeline Safety is our #1 priority Ensure continued superb client service
Need for the Test
4
![Page 5: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/5.jpg)
Hydrostatic Test Remove the natural gas from the line• Controlled release vents harmlessly into
atmosphere
• Service is maintained on another system
Test the integrity of the pipeline by filling the line with water• Put the water under pressure for a fixed
period of time
Nature of the Test
5
![Page 6: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/6.jpg)
Hydrotesting the 10-inch lateral systemStandard, common pipeline test
procedureRecent, successful pipeline tests were
completed in:
Pinellas testing has been set for September 2015
Background
Hillsborough Miami-Dade Broward
Palm Beach St. Lucie Martin
6
![Page 7: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/7.jpg)
Public Awareness Campaign
Project Process
Begin Project
Obtain Permits
Prepare System for
Testing
Conduct Hydrotest
End Project
7
![Page 8: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/8.jpg)
TASK DATE
Community Awareness July – October
Permit Applications June – July
System Preparation July – August
Test Preparation August – September
Conduct Hydrotest 28 September 2015
Test window is set: Monday, 28 September 2015 Early morning, midnight – 4:00 a.m.
Project Schedule
8
![Page 9: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/9.jpg)
Total Project Length = 6.1 miles Begin: I-275 at SR 694/Gandy Blvd End: US-19 north of SR 688/Ulmerton Rd
Generally follows 3 roadway alignments: SR 694/Gandy Blvd 78th Ave N US-19 Northbound Frontage Road
Within St. Petersburg, Pinellas Park, Largo, and Unincorporated Pinellas County
Project Location
9
![Page 10: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/10.jpg)
Project Location (con’t)
10
![Page 11: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/11.jpg)
Remove natural gas from the pipeline Completed the week before the hydrotest
Fill the line with waterPressurize the system
Normal operating pressure is 712 PSI Test pressure is up to 1,500 PSI• Relatively short duration (approx. 30 minutes)
Reduce to intermediate pressure at 1,350 PSI•Maintain for 8 hours
How the Test is Performed
11
![Page 12: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/12.jpg)
De-pressurize the lineDrain the water from the systemIf any integrity issues are found:
They are corrected as soon as possible The hydrotest is performed again• Any re-testing will be performed as soon as
possible, during the same hours
Resume normal natural gas service
How the Test is Performed (con’t)
12
![Page 13: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/13.jpg)
Safety is our #1 priorityPerformed extensive test
preparations, including an inspection of the entire system
Any pipe anomalies will be repaired in advance of conducting the hydrotest
For the duration of the high pressure test, as a safety consideration, we plan to isolate sections of the pipeline route from people and traffic
Safety During the Test
13
![Page 14: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/14.jpg)
Advance Preparations Make all key stakeholders aware• Adjacent property owners
• Emergency service providers
•General driving public
Announcements• Flyers, newspaper, website, etc.
Dynamic message signs• 2 weeks in advance
Conducting the Test
14
![Page 15: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/15.jpg)
Night of the Test Begin at midnight Close roads/lanes with barricades Law enforcement support Confirm all-clear along the 6.1-mile
corridor Conduct hydrotest Reopen roadways at approximately 4:00
AM
Conducting the Test (Con’t)
15
![Page 16: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/16.jpg)
General Utility Permit from the Florida Department of Transportation is in process
Officers will be stationed at road and lane closures
Emergency responders will be able to cross as needed
Detours will include signs and officer support
Traffic Control During the Test
16
![Page 17: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/17.jpg)
Detours During the Test - 1
Northbound US-19 at CR 611/49th St N
Exiting from US-19 northbound: 52nd St N 110th Ave N
Entering onto US-19 northbound: CR 611/49th St N SR 688/Ulmerton Rd 58th St N 142nd Ave N
17
![Page 18: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/18.jpg)
Detours During the Test - 2
Northbound US-19 at 110th Ave N
Entering onto US-19 northbound: CR 611/49th St N SR 688/Ulmerton Rd 58th St N 142nd Ave N
18
![Page 19: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/19.jpg)
Detours During the Test - 3
Northbound US-19 at 118th Ave N
Eastbound 118th Ave N: CR 611/49th St N SR 688/Ulmerton Rd 58th St N 142nd Ave N
Westbound 118th Ave N: CR 296/Bryan Dairy Rd SR 693/66th St N
19
![Page 20: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/20.jpg)
Detours During the Test - 4
Northbound US-19 at 126th Ave N
Eastbound 126th Ave N: CR 296/Bryan Dairy Rd SR 693/66th St N
Westbound 126th Ave N: 60th St N SR 688/Ulmerton Rd 62nd St N 142nd Ave N
20
![Page 21: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/21.jpg)
Detours During the Test - 5
Northbound US-19 at SR 688/Ulmerton Rd
Eastbound SR 688/Ulmerton Rd: 58th St N (or SR 693/66th St N) 142nd Ave N
Westbound SR 688/Ulmerton Rd: 58th St N (or 62nd St N) 142nd Ave N
21
![Page 22: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/22.jpg)
Project Location – District 3 / 6
22
![Page 23: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/23.jpg)
Project Location – District 1 / 5
23
![Page 24: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/24.jpg)
Please visit our website:www.fgthydrotest.com
Or contact FGT:Mr. Terry Coleman
2405 Lucien Way, Suite 200Maitland, FL 32751
Toll Free – 844-FGT-INFO (844-348-4636)
Office – 407.838.7054Fax – 407.838.7052
Email – [email protected]
For More Information
24
![Page 25: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/25.jpg)
FGT 10-Inch Hydrotest Summary
Federal mandate Testing with water Test will be Monday,
28 September 2015 Midnight – 4:00 AM 5 detours for US-19
northbound (frontage road) intersections
With law enforcement Emergency vehicles
can always cross
25
![Page 26: Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve 24-102B) to US-19 North of SR 688/Ulmerton](https://reader036.vdocument.in/reader036/viewer/2022081420/56649f325503460f94c4e09c/html5/thumbnails/26.jpg)
Thank You