Florida Governmental Utility Authority SYSTEM “ATLAS” October 2017 FGUA REGION CENTRAL ENTERPRISE SYSTEM NAME UNIFIED AQUA SYSTEM NAME FLORIDA CENTRAL COMMERCE PARK WATER/WASTEWATER WASTEWATER ONLY COUNTY SEMINOLE PRESENTED BOARD MEETING DATE FEBRUARY 2017

Upload: others

Post on 17-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Florida Governmental Utility Authority SYSTEM “ATLAS” · CSR first attended the Board of Commissioner’s meeting on August 27, 2013 and made an introduction, explaining the role

Florida Governmental Utility Authority SYSTEM “ATLAS”  

October 2017

FGUA REGION CENTRAL

ENTERPRISE SYSTEM NAME UNIFIED AQUA

SYSTEM NAME FLORIDA CENTRAL COMMERCE PARK

WATER/WASTEWATER WASTEWATER ONLY

COUNTY SEMINOLE

PRESENTED BOARD MEETING DATE

FEBRUARY 2017

Page 2: Florida Governmental Utility Authority SYSTEM “ATLAS” · CSR first attended the Board of Commissioner’s meeting on August 27, 2013 and made an introduction, explaining the role

FGUA SYSTEM PROFILE Seminole County – Florida Central Commerce Park (FCCP)

FLORIDA CENTRAL COMMERCE PARK (FCCP) SYSTEM

In Seminole County, (FGUA Unif ied Aqua System) FCCP is a wastewater-only system. The system is located south of SR 434 on Flor ida Central Parkway. The system is interconnected to the City of Longwood since September 2016. FGUA serves approximately 78 wastewater customers. During the acquisit ion of the Aqua systems, the City of Longwood stated its interest to purchase the FCCP WW plant site. Accordingly on October 15, 2015 an agreement for a wholesale wastewater service, interconnect, and land purchase was signed between FGUA & City of Longwood. As per the agreement the wastewater interconnect was designed and the wastewater f lows were connected to the City’s col lect ion system. The WWTP was disconnected, disinfected and abandoned. The reclaimed water system serving irr igat ion to several propert ies was transferred to the City. Al l useful equipment has been relocated for FGUA ownership and use at other faci l i t ies. The City of Longwood now owns the WWTP plant site. The remaining plant infrastructure at the site wi l l removed by the City of Longwood as per the agreement.

 

 

Florida Central Commerce Park 

Page 3: Florida Governmental Utility Authority SYSTEM “ATLAS” · CSR first attended the Board of Commissioner’s meeting on August 27, 2013 and made an introduction, explaining the role

170201 Page 2 of 4  

Florida Central Commerce Park Service Area

Wastewater System Summary Wastewater System Components

Collection system has approximately o 7,365 LF of 8 inch Gravity Mains o 940 LF of Force Main pipe o 22 Manholes o One Master Lift station

New FM interconnect components o Approx. 1,800 LF of 6 inch HDPE pipe (Conveyed to the city and now) o Flow meter (6 inch) with accessories at master FCCP Lift Station o New Chain Link fence at master lift station to surround the new flow meter. o Flow meter (4 inch) with accessories near Bennett Commerce Park (BCP) Lift Station

Page 4: Florida Governmental Utility Authority SYSTEM “ATLAS” · CSR first attended the Board of Commissioner’s meeting on August 27, 2013 and made an introduction, explaining the role

170201 Page 3 of 4  

FM Interconnect details

FCCP Master LS Fence Construction of the FM Interconnect at Master LS

New Fence enclosing the flow meter at Master LS Master LS New Ultrasonic flow meter

6 inch HDPE FM being installed New Ultrasonic flow meter for BCP Flows

Page 5: Florida Governmental Utility Authority SYSTEM “ATLAS” · CSR first attended the Board of Commissioner’s meeting on August 27, 2013 and made an introduction, explaining the role

170201 Page 4 of 4  

Florida Central Commerce Park

Community Service Representative: Michelle Harris

Local Government – Seminole County Board of Commissioners

Board of County Commissioners Meetings are conducted on the 2nd and 4th Tuesday of every month at 9:30 a.m.

and 1:30 p.m. in the Seminole County Services Building, 1101 East First Street, Sanford, Florida.

The Community Service Representative (CSR) for the area reviews the monthly agenda in advance of the meeting for

any utility items or issues of concern that may be discussed.

Commissioner Carlton D. Henley serves the Florida Central Commerce Park community with a term expiring in

November 2018.

CSR first attended the Board of Commissioner’s meeting on August 27, 2013 and made an introduction, explaining

the role of a FGUA Community Service Representatives. CSR followed up with an email to all Commissioners

thanking them for the opportunity to speak during the meeting and provided contact information for any future

requests.

Customer Information

Staff was involved in notifications to customers in July and August of 2016. These notices informed customers that

the FGUA entered into an agreement with the City of Longwood to decommission the existing Wastewater Treatment

Facility that serves the Florida Central Commerce Park. Reuse water provided by FGUA will no longer be available for

irrigation effective the end of August 2016.

Local Information - Websites

http://www.seminolecountyfl.gov

http://www.longwoodfl.org

http://www.seminolebusiness.org

http://www.wftv.com

http://www.mynews13.com/content/news/cfnews13/news/seminole.html

http://www.orlandosentinel.com/news/lake