Page 1: Flow Cac 2g Swap Bts & Mw

STEP I STEP II

SWAP BTS ATP BTSSWAP MW ATP MW

SAAF NEW

SAAF APP

Page 2: Flow Cac 2g Swap Bts & Mw

STEP II

CHECK COLO AND LB

CHECK SAAF, COLO, AND LB

Page 3: Flow Cac 2g Swap Bts & Mw

STEP II

MATCH

UNMATCH

SAAF AND COLO MATCH, LB UNMATCH

SAAF AND LB MATCH, COLO UNMATCH

COLO AND LB MATCH, SAAF UNMATCH

Page 4: Flow Cac 2g Swap Bts & Mw

STEP II

SUBMIT SAAF BY SB

REVISE COLO OR LB

DIFF HEIGHT ANTENNADIFF DIAMETER ANTENNA

DIFF MODEL ANTENNA

DIFF HEIGHT ANTENNADIFF NUMBER OF LINKDIFF MODEL ANTENNA

DIFF DIAMETER ANTENNA

DIFF HEIGHT ANTENNADIFF DIAMETER ANTENNA

DIFF NUMBER OF LINK

Page 5: Flow Cac 2g Swap Bts & Mw

STEP II STEP III

BOQ BTSBOQ MW

REVISE LBREVISE LBREVISE LB

REVISE LB AND SAAFRE-COLO OR RE-SAAF

RE-COLORE-COLO

RE-SAAFRE-SAAFRE-SAAF

Page 6: Flow Cac 2g Swap Bts & Mw

STEP IV STEP V

SIGN MS 1 CACSIGN MS 2

Page 7: Flow Cac 2g Swap Bts & Mw

Additional CAC checklist Detail (2G swap & 3G) V1.21 Additional Check List Detail1 MSFI

2 TSSR

3 IP

4 SAAF

5 Installasi BTS

Page 8: Flow Cac 2g Swap Bts & Mw

6

7 Foot Note

8 Photo

9 ATP BTS

10 BOQ BTS

Check Table Equipment

Page 9: Flow Cac 2g Swap Bts & Mw

11 Installasi MW

12 ATP MW

13 BOQ MW

14 Factory Test BTS

15 Factory Test MW

Page 10: Flow Cac 2g Swap Bts & Mw

16 DN BTS & MW

Page 11: Flow Cac 2g Swap Bts & Mw

Additional CAC checklist Detail (2G swap & 3G) V1.2Additional Check List Detail

WPO NumberReferenceSite NumberSite NameCheck List Options

Cocokan TSSR dengan Site Name dan Site Informasi

Check SAAF Jika Site Protelindo dan XL berarti site Sharing

BOQ (AS PLAN) di dalam SAAF

Check Site IDCheck Configuration

IP (Installation Permit) (Protelindo + XL, Tower Company, Operator Company), Maka PASTIKAN ADA COLO DAN IP, jika site HCPT maka tidak ada keduanya

CARI dengan Team Installasi sebelum install mereka pasti mempunyai IP

Check Bila site Sharing (Protelindo + XL, Tower Company, Operator Company) harus ADA COLLO

Check SJP Check Jumlah MW Type dari Link ID, Radio Model dan Diameter dan sesuaikan dengan Link Budget

Konfigurasi di As Plan BOQ adalah Kongfigurasi As Plan di ATP BTSLihat Point 1.3 --> swap : Huawei 2G dan Huawei 3G Collocation atau 2G Only

Jika 2G/3G collocation maka Claim Battere dan PSU dilakukan di 3G sehingga Jumlah Battere and PSU di installasi BTS didalam BOQ BTS harus dihapus

Jika 2G Only Maka Claim battere dan PSU dilakukan di 2G (Jumlah Battere dan PSU diinstall di isi kedalam BOQ)

Page 12: Flow Cac 2g Swap Bts & Mw

Check BTS Type

Check Site ID di FOOT NOTE

Check site ID

Check Type BTS

AS PLAN HARUS SAMA DENGAN SAAF

Check Capture (configurasi)Check Capture (GRFU dalam keadaaan normal)Check Punch ListCheck GRFU Photo

Check Referensi NumberCheck Site IDCheck Nomor WPOCheck BTS TypeCheck Jumlah PSU dan Battere

1. Jika di BOQ as plan 2G/3G collocation maka check list harus di pilih " Collocated 2G/3G"

2 Jika di BOQ as plan HANYA 2G maka check list harus di pilih " SINGLE 2G"

1. Untuk Jumlah Battere dan PSU, jika Collocation site 2G/3G, maka Jumlah Battere dan PSU dihapus

2. Untuk Jumlah Battere dan PSU, jika BUKAN Collocation site 2G/3G (Hanya 2G site), maka Jumlah Battere dan PSU DI ISI

Check Ulang Photo CABINET pada kondisi Pintu Terbuka dan Pintu tertutupCheck Photo cable Jumper, Dll

Check Site Address dan HARUS SAMA alamat nya dengan SAAF

Check Table Confirmasi Hal 8 (As Plan dan Actual Configuration)

ACTUAL HARUS SAMA DENGAN CAPTURE BTS DAN YANG ADA DI CONFIG DI BTS BOQ

Page 13: Flow Cac 2g Swap Bts & Mw

Check Photo Antenna config (1+0) atau (1+1)

Check SignCheck Visual CheckSerial Number IDU dan ODU

Check DDF matrixCheck Link Budget

Check Punch List (PL)

Check Referensi NoCheck Site IDCheck WPO NumberCheck type MWCheck Jumlah Antenna, Serial Number, Bear ID

Check site ID di Foot Note

Check Sheet Number dan samakan dengan DN BTS

1. Untuk Jumlah Battere dan PSU, jika Collocation site 2G/3G, maka Jumlah Battere dan PSU dihapus

2. Untuk Jumlah Battere dan PSU, jika BUKAN Collocation site 2G/3G (Hanya 2G site), maka Jumlah Battere dan PSU DI ISI

Battere Type harus diisi sesuai dengan type Battere apakah 50 aH atau 92 aH, LIHAT DN BTS/SERIAL NUMBER

Serial Number Hybrid Antenna apakah (1+0) atau (1+1) dengan photo antenna

Link Budget Harus Sama dengan SJP, Link ID, Radio Model, Diameter, dan Jumlahnya

Jumlah Antenna juga harus disesuaikan dengan LINK BUDGET

Check factory test sesuaikan dengan Type BTS untuk BTS Type 3900 atau BTS 3900A

Page 14: Flow Cac 2g Swap Bts & Mw

Check factory test sesuaikan dengan IDU (605 atau 620)

Check Sheet Number dan samakan dengan DN MW

Check Site IDCheck WPO NumberCheck BTS Type + Config + Sheet NumberCheck MW Type

Check Configurasi

DN BTS dan MW harus hasil hasil Scan, tidak boleh langsung convert exel to PDF

On Air Date:Submit Date:

Page 15: Flow Cac 2g Swap Bts & Mw

Additional CAC checklist Detail (2G swap & 3G) V1.2Huawei Subcont

□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK□OK □NOK □OK □NOK

Page 16: Flow Cac 2g Swap Bts & Mw

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK

□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK

Page 17: Flow Cac 2g Swap Bts & Mw

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

Page 18: Flow Cac 2g Swap Bts & Mw

*Signature by partner Signature by Huawei

*PM do sampling check

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

□OK □NOK □OK □NOK

Page 19: Flow Cac 2g Swap Bts & Mw

Additional CAC checklist Detail (2G swap & 3G) V1.2Remark

Page 20: Flow Cac 2g Swap Bts & Mw
Page 21: Flow Cac 2g Swap Bts & Mw
Page 22: Flow Cac 2g Swap Bts & Mw