  • INSTALLATION AND OPERATION INSTRUCTION

    1F95600 04/2013FlowCon International assumes no responsibility for mistakes, if any, in any printed material.

    Commissioning meter

    Denmark Dubai USA Brasil Singapore www.flowcon.com

    FlowCon FAC6HP

    - 1 -

    FlowCon FAC6HP

    Figure 1

    Isolatingvalves

    Commissioningmeter

    Equalizingvalve

    P/tneedles

    P/tplugs

    Tube

    Connect the FlowCon FAC6HP commissioningmetertoavalvebythefollowingsteps:

    1. Ensurethattheisolatingvalveoneachtubeis closed and that the equalizing valve on the sideofthecommissioningmeterisfullyopen.2. Connect each tube (recommended opposite endoftheisolatingvalves,thoughitdoesnot matterwhichend)withap/tneedle.3. Removemetalprotectioncapsonp/tneedles.4. Put the p/t needles into the p/t plugs on the valvethatistobemeasured.(Theredtubeis tobeconnectedtothe inletsideof thevalve andthebluetubewiththeoutletside)5. Remove black plastic protection caps on commissioningmeter.6. Attachthetubestothecommissioningmeter. (Matchingthecolors)7. Opentheisolatingvalvesonthetubes.(This willcausewatertoflowthroughthetubesand commissioning meter and thus for a short whilebypassingthevalve)8. Closetheisolatingvalves.9. Pressanybuttontoturnonthecommissioning meter and then press the ZERO button on thecommissioningmeter.10.Opentheisolatingvalvesagain.11.Closetheequalizingvalveonthesideof the commissioningmeter.

    Ifthecommissioningmeterissubjectedtoextremetemperaturechangese.g.iftransferredfromahottoacoldsystem(oropposite)orifthecommissioningmeterhasbeenstoredinacoldenvironmentandisusedinawarmsystem(oropposite),itmightbenecessaryforthecommissioningmetertostabilizeatthenewtemperaturebeforezeroing(point9inthe above list). The time necessary to stabilize,dependonthetemperaturedifference.

    To disconnect the commissioning meter followthesesteps:1. Open the equalizing valve. (this will cause water toflowthroughthetubesandcommis- sioningmeter and thus for a short while by- passingthevalve)2. Closetheisolatingvalves.3. Ifneededdisconnectthetubesfromthecom- missioningmeter.4. Removethep/tneedlesfromthep/tplugson thevalve.5. Ifneededdisconnectthep/tneedlesfromthe tubes.6. Whenfinishedreplaceprotectioncapsonboth p/tneedlesandcommissioningmeter.

  • Denmark Dubai USA Brasil Singapore www.flowcon.com1F95600 04/2013

    FlowCon International assumes no responsibility for mistakes, if any, in any printed material.

    Commissioning meterFlowCon FAC6HP

    - 2 -

    Figure 2

    MENUS MAIN DISPLAy UNITS ADvANCED DAMPING

    SubMEnuS SELECTVALVE FLOW/PRESSuRE PRESSuRE FLOWALERTS uP-DATETIMEE

    VALVEPOSITIOn MuLTIDISPALy FLOW bLACk-LIghTTIMER SAMPLETIME

    DESIgnFLOW PRESSuRE AuTO-OFFTIMER

    TARgETFLOW AbOuT VIEWSIZEAS?

    PIPESIZE

    uSERkVS

    ChAngESg

    FLOWCOn

    green

    green.0

    15-25mmFigure 3 Figure 4

    Flowcon Green.0

    352 l/h

    124.20 kPa

    FLOW

    OK 352.0 l/h

    2.0 16.00

    108.20

    Min.dPCurrentdP CurrentFlowConvalve

    Setting

    Currentflow Verifiedflow nominalflow

    Setting up. Press any button to turn on the commis- sioningmeter. Press the MEnu button once to enter the menuortwicetochoosealanguage(English, French, Italian, norwegian, Spanish, and Swedishareavailable). navigatebetweenthemenuswithand andthesubmenuswithand.Tochoose asubmenuuse.generally,isforente- ringsubmenus,acceptingvaluesorchoices, while is for annulling andexitingmenus. Forafulllistofmenus,pleaseseefigure2.

    Priortouse,pleasechecktheunITSmenu(and tomovebetweenmenusand to con-firm)toensurethattheunitsonthecommission-ingmetermatchtheunitsonthesystemorotherrequirements. ChoosethevalvebyfindingtheMAInmenu ( and ) and the sub menu SELECT VALVE(and),thenpresstoconfirm. Anewmenuopens,pleaseseefigure3.

    Thelinesinfigure3are:1.line:themanufacturer2.line:valveseries3.line:valvename4.line:valvesize

    Tomovebetweenthelinesuseand.In each lineandcanbeused to change thesetting.Toacceptthevalve,press. Tochangethemax.flowsettingofthevalve (thedefaultsettingisthehighestsetting),go to the MAIn menu and enter the VALVE POSITIOnsubmenu.Enterthesettingdigit bydigit(0-9and.).Toleavethemenupress. nowthecurrentdifferentialpressureandflow canbeseeninthedisplay(asshowninfig.4).

  • 1F95600 04/2013FlowCon International assumes no responsibility for mistakes, if any, in any printed material.

    Commissioning meter

    Denmark Dubai USA Brasil Singapore www.flowcon.com

    FlowCon FAC6HP

    - 3 -

    Setting

    Alert Icon/text ExplanationZeroing ZERODP Zeroingisneeded.

    Pleasefollowthelistofhowtoconnectthecommissioningmetertoavalve,orrepeatsteps1and5-11.

    Lowbattery batterylevelislow.

    Changebattery

    ChAngEbATTERy(wholescreen)

    batteryleveliscriticallylow.Pleasechangethebattery.

    Specificgravity

    Sg Specificgravityisnotsetto1.0sg.Thecommissioningmeterdoesnotsupportcalculationswithotherspecificgravitiesthan1.0sgforFlowConvalves.

    Temperaturewarning

    hIghTEMP

    Theinternaltempera-tureofthecommis-sioningmeterishigh(45Corabove).Thisresultsinpooreraccuracy.Ifpossibletrytocoolitdown.

    Toturnoffthecommissioningmeter,pleasepressfirst(untilpromptedforshut-off),then.Thecommissioningmeterwillbydefaultshutoffau-tomatically after a period of inactivity specifiedin the ADVAnCEDmenuunder thesubmenuAuTO-OFFTIMER.

    Memory. bydefaultthememoryinthecommissioningmeterholds10groupseachwith10valvesspaces. To access the memory, press. When the memoryisaccessed,thecolorsonthescreen willbeinverted(textisbrightandbackground isdark). navigatebetweenthegroupsbypressing and , and the valves within the current groupsbypressingand. Tosavedata,chooseavalveandvalveset- tingthenormalwayandhavethecommission- ingmeterconnectedtothevalve,thenaccess the memory, press MEnu and then to savethedata. Ifrepeatingthesamemeasurementslater,the stepof choosingeachvalveprior toaccess- ingthememorycanbeskippedbyaccessing thememory,andpressingMEnu,thento load the previously saved valve (including valvesetting)forthatlocation.Tosavethenew data,accessthememoryandpressMEnu, thentosavethenewdata. Alldatacanbeclearedfromavalvebypress- ingMEnu,then.

    Alerts. Alertsareshownwhiteonblackintheupperleftcor-nerofthedisplay.Ifseveralalertsareactive,theywill beshownside-by-side if possible,butother- wiseonlyasinglealertwillbevisibleatatime.

  • Denmark Dubai USA Brasil Singapore www.flowcon.com1F95600 04/2013

    FlowCon International assumes no responsibility for mistakes, if any, in any printed material.

    Commissioning meterFlowCon FAC6HP

    - 4 -

    Changing battery. To change thebattery, first turnoff the com- missioningmeter. Thenremovethelidfromthelowerpartofthe back of the commissioning meter by un- screwingthetwoscrews(thescrewdriverfrom thecarrycasematchesthescrews)andlifting thelidoff. Detachthetwoconnectorsfromtheoldbattery andconnectthemtothenewbattery. Putthelidbackonandfastenthetwoscrews. The normal operating time for a standard alkaline9V6LR61batteryis20hours.

    Optional software. For largesystemsorsystemsincludingFlowConwafers,theoptionalsoftwareforthecommissioningmeterisrecommended.The software offers a possibility of setting upvalvesconsistingofmultiplevalvecartridges liketheFlowConWafers.Awafer includesanumberofStainlessSteelcartridgesanditsflowdependssolelyonthecharacteristicofthesecartridges.Furthermore the software provides an option oforganizing thegroupsandvalves in thememoryincludingcustomnamingandupto2000memorylocationsintotal.

    General.It is recommended flushing the system beforeinstalling the insert in the valve body. Suitableflushing caps are available. Water must alwaysbesuitabletreated,cleanandfreeofdebris.It isrecommendedthatastrainerbeinstalledpriortothe valve body to prevent damage or blockageduetodebris.Ensurethat thevalve isnot inthefully closedpositionwhen filling the systemwithwater.

    Warranty obligation.Failure to abide by all recommendations as perthisinstallationandoperationinstructionwillvoidwarranty.