flp - ecoled.ecopowerinc.com - installation instructions.pdf · r = t - = va | _;|_;u va - =ou t;7]...
TRANSCRIPT
Risk of fire or electric shock. The electrical rating of these products are 120-277 VAC standard, the installer must determine whether they have 120-277VAC at the luminaire before installation. Knowledge of luminaires electrical systems required. If not qualified, do not attempt installation. Contact a qualified elec-trician. To prevent wiring damage or abrasion, do not expose wiring to edges of sheet metal or other sharp objects. Disconnect power before installing the product or servicing it. Wait until fixture has cooled down before installing or servicing the fixture.
[email protected] www.ecopowerled.com1.800.564.8086
A Canadian Manufacturer
FLP - FLATLINE LED PANEL WITH INTEGRATED DRIVER
2
RECESSED INSTALLATION
FLS SERIESFLS SERIES INSTALLATION
Please read this entire manual to fully understand and safely use this product.
Specifications are subject to change without notice.
Please visit our website the most recent user guide versions.
NOTE
Unpack and carefully examine the product.
Report any damage and save all packing materials if any part(s) were damaged during shipping.
Do not attempt to use this apparatus if it is damaged.
UNPACKING1
2
3
Designed for use in 100V~277V,50-60Hz protected circuit. Apply class 2 power supply.
READ ALL INSTRUCTIONS BEFORE INSTALLATION
1
2
3
4
5
6
7
8
Consult a qualified electrician to ensure correct branch circuit conductor.
The product should be installed and operated by a qualified electrician or technician in
with relevant local codes.
accordance
Risk of electric shock. Ensure that main power source is off when wiring or soldering the of the product.
sections
Before installing this fixture or doing any maintenance, make sure to turn off the power the circuit breaker or fuse box.
supply at
Check to make sure that all fixture connections have been properly made and the fixture grounded to avoid potential electrical shocks.
is
Do in water.
not handle energized fixture when hands are wet, when standing on wet or damp surfaces, or
This
conditions to ensure safety to human body.
panel lights are normally set to work at extra low voltage below DC42V and constant current
OPTIONAL
FS22-DL-XXX, FS22-DM-XXX, FS24-DM-XXX, FS24-DH-XXX,VS14-DM**
Suitable for Damp location. Access above ceiling required. Suitable for suspended ceilings
IMPORTANT SAFETYINFORMATION
CAUTION: Risk of Electric Shock!
Accessory:
LED Luminaire
Installation instruction
Surface mounted kit (for surface mounted)
J-box ( for recessed )
page 2page 1
RECESSED INSTALLATION
Step3: Turn off power,remove the ceiling panel. Then place the panel in to the T-bar,ensure he panel is attached to the ceiling.(Figure3)
Step4:connect conduit to J-box with proper connector(s).
Remove appropriate round knock-out(s) and
Step5:tightly.the line connect to the connector with the blackmark, the natural connect to another,the ground connectto the green wire.(Figure4)
Put a connector to the end of AC input wire and
Step1: Remove the surface mounted kit from the luminaire.
Step2:
Same to 4 hang buckles.(Figure 2)
Bend hang buckle by 90° making it vertical tothe rear cover of panel light.
Step7:Push all wires back into the junction box,Close J-BOX for cap (Figure 5).
please use switch to dim and don’t need to connect the dimming
wire. Dimming step: Fristly, Turn on to 100% brightness
Secondly,It takes about 0.5~2 seconds from turn off the light to
next trun on and lamp is in 50% brightness, At last ,It takes
about 0.5~2 seconds from turn off the light to next trun on and
lamp 10% brightness. (Figure 7)
Note: For cycle of step dimming, wait until the lamp is in brightness.
For failure of step dimming, turn off the lamp and turn on after 3 second.
For Step Dimming
,
For 0-10V Dimming
The driver PUR (D+) to the dimmer+(PUR),and the
driver GRY(D-)to the dimmer-(GRY)
Connect the wires with terminal cap as shown in wiring
diagram (Figure 6).
Incoming insulated dimming conductors shall have
voltage rated at least equal to the branch voltage.
Compatible with 0-10V dimmer
Figure1
Figure2 Figure3
Figure4
Figure5
WIRING DIAGRAM
0-10VDimmer
D +D -
PURPLE
GREY
L
N
G
PURPLE
GREY
RED BLACK
BLACK
WHITE
GROUND
LED PANEL
Dim
min
gD
river
Figure6
Step Dimming
One Cycle
Note: After 3s turn on lamp to 100% brightness.
Turn Off Lamp
Turn Off Lamp
Turn OffLamp
Turn On Lamp
10% brightness
Turn On Lamp
50% brightness
Turn On Lamp
100% brightness
After 0.5S At 0.5-2s
At 0.5-2sAfter 0.5S
Afte
r 0.5
S
Figure7
1
2
3
4
Risk of fire or electric shock. The electrical rating of these products are 120-277 VAC standard, the installer must determine whether they have 120-277VAC at the luminaire before installation. Knowledge of luminaires electrical systems required. If not qualified, do not attempt installation. Contact a qualified elec-trician. To prevent wiring damage or abrasion, do not expose wiring to edges of sheet metal or other sharp objects. Disconnect power before installing the product or servicing it. Wait until fixture has cooled down before installing or servicing the fixture.
[email protected] www.ecopowerled.com1.800.564.8086
A Canadian Manufacturer
FLP - FLATLINE LED PANEL WITH INTEGRATED DRIVERFLS SERIESSurface Mounted Kit Installation
FLS SERIESSurface Mounted Kit Installation
Step2: Turn off power. Insert the L,N wiresof the J-box into the male connector.
2
Step6:Plug the female connector of the luminaire into the male connector of the AC input wire.The Ground connects to Green wire.Dimming wires connect according to the same wire color.
6
Step4:Alight the 2 longer hooks on the metal plate with the longer hole on the luminaire(Look at the metal palte and the luminaire with the 'STEP 1' mark). Slightly move the luminaire forward and make sure the hooks is in right position.
4
Step1: Remove the surface mounted kit from the luminaire.
1
Step5: Fix the metal string on the hook.(Fig.2)
5
Step3:Align the holes on the surface mounted kit withthe hole on the J-box Tighten 2#8-32 screws, rotatethe plate to your right position and lots of KA3.5*20mmscrews into the ceiling and make the kit flush withthe ceiling.
3
Step8:Push the luminaire on the ceiling. Makesure the 4 hooks are inside the luminaire and push forward the luminaire until you hear a clicking sound.
8-1
Step7:Put the wire into the J-box.
7-1
8-2
page 4page 3
To right position It is the right position which is the longer hooks of the first groove.
7-2
Right position
Risk of fire or electric shock. The electrical rating of these products are 120-277 VAC standard, the installer must determine whether they have 120-277VAC at the luminaire before installation. Knowledge of luminaires electrical systems required. If not qualified, do not attempt installation. Contact a qualified elec-trician. To prevent wiring damage or abrasion, do not expose wiring to edges of sheet metal or other sharp objects. Disconnect power before installing the product or servicing it. Wait until fixture has cooled down before installing or servicing the fixture.
[email protected] www.ecopowerled.com1.800.564.8086
A Canadian Manufacturer
FLP - FLATLINE LED PANEL WITH INTEGRATED DRIVERFLS SERIESSurface Mounted Kit Installation
FLS SERIESSurface Mounted Kit Installation
Step2: Turn off power. Insert the L,N wiresof the J-box into the male connector.
2
Step6:Plug the female connector of the luminaire into the male connector of the AC input wire.The Ground connects to Green wire.Dimming wires connect according to the same wire color.
6
Step4:Alight the 2 longer hooks on the metal plate with the longer hole on the luminaire(Look at the metal palte and the luminaire with the 'STEP 1' mark). Slightly move the luminaire forward and make sure the hooks is in right position.
4
Step1: Remove the surface mounted kit from the luminaire.
1
Step5: Fix the metal string on the hook.(Fig.2)
5
Step3:Align the holes on the surface mounted kit withthe hole on the J-box Tighten 2#8-32 screws, rotatethe plate to your right position and lots of KA3.5*20mmscrews into the ceiling and make the kit flush withthe ceiling.
3
Step8:Push the luminaire on the ceiling. Makesure the 4 hooks are inside the luminaire and push forward the luminaire until you hear a clicking sound.
8-1
Step7:Put the wire into the J-box.
7-1
8-2
page 4page 3
To right position It is the right position which is the longer hooks of the first groove.
7-2
Right position